Calculation of Self Performed Work.docx
DOCX document 19 KB Posted
- Solicitation number
- 36C24922B0033
About this file
This document outlines requirements for a federal construction contract opportunity for roof replacement work at a Veterans Affairs medical center in Nashville, Tennessee. The solicitation seeks a contractor to furnish all labor, materials, equipment, and supervision necessary to replace Building 1's roof at the Tennessee Valley Healthcare System campus. Key details include a project magnitude between $500,000 to $1,000,000, a 61-day period of performance to complete the work, and a 100% set-aside for Service-Disabled Veteran Owned Small Businesses. The solicitation also specifies licensing, insurance, safety, and experience requirements for interested contractors and provides relevant contract clauses pertaining to wage determinations, E-Verify registration, and subcontracting limitations. Bids are due no later than December 14, 2022.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Pre-bid site visit 11-22-2022 sign-in sheet.pdf | ||
| 36C24922B0033 0001.docx | DOCX document | |
| Contractor EMR Certification Form.docx | DOCX document | |
| Specs 626-21-501.pdf | ||
| WD TN TN20220178 Dated 09-02-2022.pdf | ||
| 36C24922B0033_1.docx | DOCX document | |
| RFI Form - Nashville Roof Replacement.pdf | ||
| Drawings Roof Replacement 626-21-501.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CALCULATION OF SELF-PERFORMED/SUBCONTRACTED WORK (626-21-501)
Offerors for General Construction (NAICS code 236220) must provide at least 15 percent (25% for specialty trade NAICS codes with 237 and 238 prefix) of the cost of the contract performance incurred for personnel must be performed by the Service Disabled Veteran Owned Small Business (SDVOSB) awardee or those of a verified SDVOSB subcontractor. Provide a breakdown of material and personnel costs, by specification division listed for the project. Home Office overhead, profit/fee and bond costs shall be added after a subtotal of personnel and material/Equipment costs has been calculated. Clearly identify the personnel costs you will be performing, and the personnel costs of other eligible service disabled veteran-owned small business concerns. Below is a suggested format.
| Specification Division |
| SDVOB Vendor (Y or N) |
| Personnel Cost |
| Material/Equipment Costs |
Division 01
| $ |
| $ |
Division 02
| $ |
| $ |
Division 03
| $ |
| $ |
(Add additional lines as necessary for each Division applicable to this project)
| $ |
| $ |
| $ |
| $ |
Sub Total (Personnel Costs, Material/Equipment Costs)
| Profit |
| $ |
| Home Office Overhead |
| $ |
| Bond |
| $ |
| Grand Total |
| $ |
Calculation of self-performed personnel costs:
1. Total personnel costs * both prime and all subcontractors: $
2. Subtract all subcontractor personnel costs* that are not SDVOSB companies that will perform work on this contract: $
3. Remainder is ‘Total amount of work to be self-performed under the
| Contract’: | $ | |
| 4. Self-performed work = Line 3/Line 1 x 100 = | % |
*personnel costs include labors, mechanics, other tradesmen, and office personnel directly charged to the project (includes project manager, job superintendent, administrative, estimators, etc.)