This document contains a solicitation for roof replacement services at the Tennessee Valley Healthcare System VA Medical Center in Nashville, Tennessee. The contractor shall furnish all labor, materials, equipment, supervision, and other items necessary to completely prepare sites and replace roofs on Building 1 to the satisfaction of the VA. Key requirements include a sixty-one calendar day period of performance, licensing and safety compliance, coordination with medical center operations, and a twenty-year warranty on all work and materials. The solicitation is a 100% set-aside for service-disabled veteran-owned small businesses. The project magnitude is estimated between $500,000 to $1 million.

View the file

Other files

File Type Posted
Pre-bid site visit 11-22-2022 sign-in sheet.pdf PDF
Contractor EMR Certification Form.docx DOCX document
Specs 626-21-501.pdf PDF
WD TN TN20220178 Dated 09-02-2022.pdf PDF
36C24922B0033_1.docx DOCX document
RFI Form - Nashville Roof Replacement.pdf PDF
Calculation of Self Performed Work.docx DOCX document
Drawings Roof Replacement 626-21-501.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 626-21-501 Department of Veterans Affairs Network Contracting Office 9 (90C)

NCO 9

1639 Medical Center Parkway, Suite 400 Murfreesboro

TN

37129 90C Network Contracting Office 9 Department of Veterans Affairs Network Contracting Office (90C) 1639 Medical Center Parkway Suite 400 Murfreesboro

TN

37129 To all Offerors/Bidders

36C24922B0033 11-10-2022

X X X

The purpose of this amendment is to incorporate the answers to all Requests for Information (RFIs).

This amendment also incorporates the completed Site Visit Sign-In Sheet. See the attached file titled Pre-bid site visit 11-22-2022 sign-in sheet.

Diana K. Grube Contracting Officer RFI Answers Nashville Roof Replacement, Project 626-21-501 Solicitation 36C24922B0033

1. Question: Drawing A-001: Are access scaffolds required at all buildings that do not have a roof access door or a ladder?

Answer: Scaffolding is recommended for safety; however, the contractor can use a ladder or scaffolding. All OSHA elements are required for either option. Both options need to be properly secured to the building, no exceptions.

2. Question: Drawing A-002: With reference to the Non-Installed Fall Protection. Will the COR require the contractor to remove the remaining fall protection after installation. Will the government provide and place fall protection material onto roofs if quantities aren’t enough to complete installation?

Answer: All unused fall protection should be removed from the building. If there is not enough existing fall protection to complete the installation, a contract modification will need to be requested from the general contractor.

3. Question: Drawing G-001: Will the staging area have an electrical source for an onsite office trailer?

Answer: There is no power located in the staging area. The area noted on sheet G-001 is only representative of the general staging location, in the past the contractors have been given 6 parking spaces located in the far Northwest location of the parking lot for staging. The area must be fenced in with a 7’ tall fence (covered with fabric to limit visibility into the staging area).

4. Question: Drawing A-001 Sheet Note #C: It states that lightning system is to meet UL Master Label Certificate. Master Label means 100% of the entire building. Is that what you want, or do you want just the specific roof areas in the scope of work to have a “Letter of Findings” which refers to the individual roofs on the scope of work.

Answer: It is the intent to have the system inspected to the standards of the UL Master Label Certification, but the scope of the certification is limited to the individual roofs being replaced and attachment points into the existing lighting protection system. Aluminum materials are not permitted in the lightning protection system, copper and bronze components are specified.

5. Question: Drawing A-101: Does the specified new ladder supplied and installed on section #1. require a fall protection cage?

Answer: Yes, please include a fall protection cage.

6. Question: Form 1442 #11: 61 Calendar days is not enough time to complete the scope of work. I request 180-day timeframe to do the complete job.

Answer: The period of performance will remain the same and if there is a delay in material after award it will be addressed at that time.

7. Question: Drawing A-104: Roof Legend on each sheet shows a pointing line that states "Indicates Roof Slope". Are all roofs structurally sloped by the deck or does the contractor need to figure using tapered insulation to achieve roof slopes?

Answer: The roof deck is not sloped; tapered insulation will be required.

8. Question: Drawing A-104: Key Notes, "Remove all components of complete roofing system down to existing structural deck. Including, but not limited to: Roof insulation, cover board, roof membrane, and roof edge & coping”. Can the contractor assume there is only 1 roof system needs to be removed? I.E., there's not an Asphalt Built Up Roof System underneath the existing EPDM single ply membrane roof system?

Answer: There may be another layer under the EPDM, but in past projects there have been only one roofing layer system.

9. Question: Specification Section 07 01 50.19 Part 1 General and Part 3 Execution: The following are available for contractor reference: 1.7B.1b.Field Conditions, Test cores analysis and 3.1 A. Examination, Infrared Roof Moisture Survey. Can you please send these to me?

Answer: This spec should have been excluded, the VA does not have a moisture survey or test cores analysis.

10. Question: Specification Section 14 91 82 Gravity Trash Chutes. Are trash chutes required for this project? I did not see any on the plans.

Answer: Trash chutes are not required, but it is an option. A trash chute for this project may not be the most effective solution. In the past, contractors have used a crane to remove debris from roof projects.

See attached document: Pre-bid site visit 11-22-2022 sign-in sheet.