Drawings-Replace A-wing roof-583-21-203.pdf

PDF 7 MB Posted

Attached to
Z1DA--Replace A-Wing Roof 583-21-203 Federal contract opportunity
Solicitation number
36C25021B0054
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10

About this file

This notice announces an upcoming Invitation for Bid for roof replacement services at a VA medical center. The Richard L. Roudebush VA Medical Center in Indianapolis will solicit bids to replace the roof on its A-Wing under solicitation number 36C25021B0054. The project is set aside 100% for SDVOSBs and has a value between $500,000 to $1 million. Interested SDVOSBs must be registered in the Vendor Information Pages and SAM databases. The solicitation and drawings will be posted on July 1st with bids due approximately 30 days later. The selected contractor must complete the project within 120 days of receiving the notice to proceed and obtain payment and performance bonds. A pre-bid site visit will be scheduled for interested vendors.

View the file

Other files for this federal contract opportunity

Other files attached to Z1DA--Replace A-Wing Roof 583-21-203, newest first.
File Type Posted
Attachment - Site Visit Sign-In Sheet (8 Jul 21).pdf PDF
36C25021B0054 0002.docx DOCX document
Attachment 7__Staging Area.pdf PDF
Attachment 6__Roof Data.pdf PDF
Attachment 5__7G Drawings-A-Wg Roof Replacement Rev 1.pdf PDF
Attachment 2__Site Walk Q_As.pdf PDF
Attachment 3__6F Specifications Rev 1.pdf PDF
Attachment 4__8H SOW-Replace A-Wing Roofs Revision 1.pdf PDF
Attachment 1_Summary of changes.pdf PDF
36C25021B0054 0001.docx DOCX document
Specifications.pdf PDF
Contractor Certification Regarding Safety and Environmental.docx DOCX document
36C25021B0054.docx DOCX document
RFI Form.docx DOCX document
IN Wage Determination June 2021.txt TXT text file
36C25021B0054 published solicitation.pdf PDF
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PORTO ALEGRE STREET

E2 E2

E2

U

WEST TENTH STREET

Richard L. Roudebush VA Medical Center 1481 W. 10th St.

Indianapolis, Indiana 46202

REPLACE A WING ROOFS

583-21-203

COVER

FY21

1 6

NBES05/11/2021

COVER SHEET

NB

CHIEF OF ENGINEERING: PATRICK HERBER

ASSISTANT CHIEF OF ENGINEERING: N/A.NREPLACE A-WING ROOFS PROJECT

583-21-203

CONSTRUCTION DOCUMENTS

RICHARD L. ROUDEBUSH VAMC

1481. W. 10TH STREET

INDIANAPOLIS, INDIANA

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text

LIFT

AutoCAD SHX Text

STATN.

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text

VA HOSPITAL

AutoCAD SHX Text

STOP

AutoCAD SHX Text

STOP

AutoCAD SHX Text

STOP

AutoCAD SHX Text

STOP

AutoCAD SHX Text

UP

AutoCAD SHX Text

UP

AutoCAD SHX Text

RAMP UP

AutoCAD SHX Text

UP

AutoCAD SHX Text

UP

AutoCAD SHX Text

RAMP UP

AutoCAD SHX Text

PLUMB.

AutoCAD SHX Text

CLOSET

AutoCAD SHX Text

T-COM.

AutoCAD SHX Text

STOP

AutoCAD SHX Text

STOP

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

ESKENAZI HEALTH

AutoCAD SHX Text Dwg. of

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text Drawing Title

AutoCAD SHX Text Approved: Project Director

AutoCAD SHX Text Project Title

AutoCAD SHX Text Date

AutoCAD SHX Text Location

AutoCAD SHX Text Checked

AutoCAD SHX Text Building Number

AutoCAD SHX Text Project Number

AutoCAD SHX Text Drawing Number

AutoCAD SHX Text Drawn

AutoCAD SHX Text Revisions:

AutoCAD SHX Text Date

AutoCAD SHX Text

ADDRESS:

AutoCAD SHX Text

PROJECT ENGINEERS:

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one quarter inch = one foot

AutoCAD SHX Text

RLR VAMC FORM 09-JD0227

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text C

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

NORTH REFERENCE

AutoCAD SHX Text

PLOT DATE:

AutoCAD SHX Text

DRAWN BY:

AutoCAD SHX Text

CAD DRAWING FILE LOCATION:

AutoCAD SHX Text

PLOT DATE:

AutoCAD SHX Text Engineering and Facilities Management Services

AutoCAD SHX Text E

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text N

AutoCAD SHX Text U

AutoCAD SHX Text D

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text I

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text N

AutoCAD SHX Text V

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text S

AutoCAD SHX Text A

AutoCAD SHX Text M

AutoCAD SHX Text O

AutoCAD SHX Text S

AutoCAD SHX Text F

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text C

AutoCAD SHX Text A

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text S

SK

Y

LI

G

H

TS

11 13

16 17

57 5849

44 52

33 38

71A

AREA OF WORK

N.NExisting Conditions

WEST TENTH STREET

Richard L. Roudebush VA Medical Center 1481 W. 10th St.

Indianapolis, Indiana 46202

REPLACE A WING ROOFS

583-21-203

GI001

1FY21

2 9

NBES5/11/2021

INSTALL DETAILS

N, BOYD

CHIEF OF ENGINEERING: PATRICK HERBER

ASSISTANT CHIEF OF ENGINEERING:N/A

1 ROOF 80 (NORTH)

SCALE: NTS GI001

2 ROOF 80 (SOUTH)

SCALE: NTS

3 ROOF 81

SCALE: NTS

4 ROOF 81 (INTERIOR)

SCALE: NTS

5 ROOF 74, 82 AND 81

SCALE: NTS

6 COPING AND LIGHTING PROTECTION

SCALE: NTS

7 HVAC CURBS (ROOF 80)

SCALE: NTS

8 ROOF 80 (ENTRANCE)

SCALE: NTS

9 ROOF 74

SCALE: NTS

GI001

GI001GI001GI001

GI001

GI001 GI001

AutoCAD SHX Text Dwg. of

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text Drawing Title

AutoCAD SHX Text Approved: Project Director

AutoCAD SHX Text Project Title

AutoCAD SHX Text Date

AutoCAD SHX Text Location

AutoCAD SHX Text Checked

AutoCAD SHX Text Building Number

AutoCAD SHX Text Project Number

AutoCAD SHX Text Drawing Number

AutoCAD SHX Text Drawn

AutoCAD SHX Text Revisions:

AutoCAD SHX Text Date

AutoCAD SHX Text

ADDRESS:

AutoCAD SHX Text

PROJECT ENGINEERS:

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one quarter inch = one foot

AutoCAD SHX Text

RLR VAMC FORM 09-JD0227

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text C

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

NORTH REFERENCE

AutoCAD SHX Text

PLOT DATE:

AutoCAD SHX Text

DRAWN BY:

AutoCAD SHX Text

CAD DRAWING FILE LOCATION:

AutoCAD SHX Text

PLOT DATE:

AutoCAD SHX Text Engineering and Facilities Management Services

AutoCAD SHX Text E

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text N

AutoCAD SHX Text U

AutoCAD SHX Text D

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text I

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text N

AutoCAD SHX Text V

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text S

AutoCAD SHX Text A

AutoCAD SHX Text M

AutoCAD SHX Text O

AutoCAD SHX Text S

AutoCAD SHX Text F

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text C

AutoCAD SHX Text A

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text R

AutoCAD SHX Text A

1. EXECUTE WORK METHODS TO MINIMIZE RAISING DUST FROM CONSTRUCTION OPERATIONS.

2. IMMEDIATELY REPLACE CEILING TILE DISPLACED FOR VISUAL INSPECTION.

3. PROVIDE INSPECTED/DATED FIRE EXTINGUISHER(S) IN THE WORK AREAS.

1. PROVIDE ACTIVE MEANS TO PREVENT AIRBORNE DUST FROM DISPERSING INTO

ATMOSPHERE.

2. WATER MIST WORK SURFACES TO CONTROL DUST WHILE CUTTING.

3. SEAL UNUSED DOORS WITH DUCT TAPE.

4. BLOCK OFF AND SEAL AIR VENTS.

6. PLACE A WALK-OFF MAT AND A STICKY MAT AT ENTRANCE AND EXIT WORK AREAS.

7. REMOVE OR ISOLATE H.V.A.C. SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.

1. REMOVE OR ISOLATE H.V.A.C. SYSTEM IN AREA WHERE WORK IS BEING DONE TO

PREVENT CONTAMINATION OF DUCT SYSTEM.

2. COMPLETE ALL CRITICAL BARRIERS IE. SHEETROCK, PLYWOOD, PLASTIC, TO SEAL

AREA FROM NON-WORK AREA OR IMPLEMENT CONTROL CUBE METHOD (CART WITH

PLASTIC COVERING AND SEALED CONNECTION TO WORK SITE WITH HEPA VACUUM FOR

VACUUMING PRIOR TO EXIT) BEFORE CONSTRUCTION BEGINS.

3. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA EQUIPPED AIR

1. WIPE WORK SURFACES WITH DISINFECTANT.

2. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS.

3. WET MOP AND/OR VACUUM WITH HEPA FILTERED VACUUM BEFORE LEAVING WORK AREA.

4. REMOVE ISOLATION OF H.V.A.C. SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.

FILTRATION UNITS IF INDICATED.

4. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS.

5. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS SOLID LID.

6. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT IS

INSPECTED BY THE OWNER'S SAFETY DEPARTMENT AND INFECTION CONTROL

DEPARTMENT AND THOROUGHLY CLEANED BY THE OWNER'S ENVIRONMENTAL SERVICES

DEPARTMENT.

1. REMOVE BARRIER MATERIALS CAREFULLY TO MINIMIZE SPREADING OF DIRT AND DEBRIS

ASSOCIATED WITH CONSTRUCTION.

2. VACUUM WORK AREA WITH HEPA FILTERED VACUUM.

4. WET MOP AREA WITH DISINFECTANT.

5. REMOVE ISOLATION OF H.V.A.C. SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.

1. ISOLATE H.V.A.C. SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT

CONTAMINATION OF DUCT SYSTEM.

2. COMPLETE ALL CRITICAL BARRIERS IE. SHEETROCK, PLYWOOD, PLASTIC, TO SEAL

AREA FROM NON-WORK AREA OR IMPLEMENT CONTROL CUBE METHOD (CART WITH

PLASTIC COVERING AND SEALED CONNECTION TO WORK SITE WITH HEPA VACUUM FOR

VACUUMING PRIOR TO EXIT) BEFORE CONSTRUCTION BEGINS.

3. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA EQUIPPED AIR

FILTRATION UNITS IF INDICATED.

4. SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES APPROPRIATELY.

5. CONSTRUCT ANTEROOM AND REQUIRE ALL PERSONNEL TO PASS THROUGH THIS ROOM

7. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT IS

INSPECTED BY THE OWNER'S SAFETY DEPARTMENT AND INFECTION CONTROL.

9. ROOM AND/OR SHALL BE THOROUGHLY CLEANED BY THE OWNER'S ENVIRONMENTAL

SERVICES DEPARTMENT.

2. REMOVE BARRIER MATERIALS CAREFULLY TO MINIMIZE SPREADING OF DIRT AND DEBRIS

ASSOCIATED WITH CONSTRUCTION.

5. VACUUM WORK AREA WITH HEPA FILTERED VACUUM.

6. WET MOP AREA WITH DISINFECTANT.

SO THEY CAN BE VACUUMED USING HEPA VACUUM CLEANER BEFORE LEAVING WORK

SITE OR THEY CAN WEAR CLOTH OR PAPER COVERALLS THAT ARE REMOVED EACH

TIME THEY LEAVE THE WORK SITE.

6. ALL PERSONNEL ENTERING WORK SITE ARE REQUIRED TO WEAR SHOE COVERS.

SHOE COVERS MUST BE CHANGED EACH TIME THE WORKER EXITS THE WORK AREA.

SITE OR THEY CAN WEAR CLOTH OR PAPER COVERALLS THAT ARE REMOVED EACH

TIME THEY LEAVE THE WORK SITE.

3. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS.

7. REMOVE ISOLATION OF H.V.A.C. SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.

4. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS SOLID LID.

1. OBTAIN APPROVAL BY MCOT TEAM TO REMOVE BARRIERS.

7. PLACE A WALK-OFF MAT AND A STICKY MAT AT ENTRANCE AND EXIT WORK AREAS.

8. PLACE A WALK-OFF MAT AND A STICKY MAT AT ENTRANCE AND EXIT WORK AREAS.

8. REMOVE AND DISCARD WALK-OFF MAT AND STICKY MAT AT ENTRY AND WORK AREAS.

3. REMOVE AND DISCARD WALK-OFF MAT AND STICKY MAT AT ENTRY AND WORK AREAS.

5. REMOVE AND DISCARD WALK-OFF MAT AND STICKY MAT AT ENTRY AND WORK AREAS.

5. PROVIDE INSPECTED/DATED FIRE EXTINGUISHER(S) IN THE WORK AREAS.

8. PROVIDE INSPECTED/DATED FIRE EXTINGUISHER(S) IN THE WORK AREAS.

9. PROVIDE INSPECTED/DATED FIRE EXTINGUISHER(S) IN THE WORK AREAS.

INSPECTION AND NON-INVASIVE ACTIVITIES

INCLUDES, BUT IS NOT LIMITED TO:

REMOVABLE OF CEILING TILES FOR VISUAL INSPECTION LIMITED TO

1 TILE PER 50 SQUARE FEET.

PAINTING (BUT NOT SANDING).

WALL COVERING, ELECTRICAL TRIM, MINOR PLUMBING, AND

ACTIVITIES WHICH DO NOT GENERATE DUST OR REQUIRE CUTTING

OF WALLS OR ACCESS TO CEILINGS OTHER THAN FOR VISUAL

INSPECTION.

SMALL SCALE, SHORT DURATION ACTIVITIES

INCLUDES, BUT IS NOT LIMITED TO:

INSTALLATION OF TELEPHONE AND COMPUTER CABLING.

ACCESS TO CHASE SPACES.

CUTTING OF WALLS OR CEILING WHERE DUST MIGRATION

CAN BE CONTROLLED.

WHICH CREATES MINIMAL DUST.

WORK THAT GENERATES A MODERATE TO

INCLUDES, BUT IS NOT LIMITED TO:

SANDING OF WALLS FOR PAINTING OR WALL COVERING.

REMOVAL OF FLOOR COVERINGS, CEILING TILES OR CASEWORK.

NEW WALL CONSTRUCTION.

HIGH LEVEL OF DUST OR REQUIRES DEMOLITION

OR REMOVAL OF ANY FIXED BUILDING

COMPONENTS OR ASSEMBLIES

MINOR DUCT WORK OR ELECTRICAL WORK ABOVE CEILINGS.

MAJOR CABLING ACTIVITIES.

ANY ACTIVITY WHICH CANNOT BE COMPLETED WITHIN A SINGLE

WORK SHIFT.

MAJOR DEMOLITION AND CONSTRUCTION

PROJECTS

INCLUDES, BUT IS NOT LIMITED TO:

ACTIVITIES WHICH REQUIRE CONSECUTIVE WORK SHIFTS.

REQUIRES HEAVY DEMOLITION OR OR REMOVAL OF A

COMPLETE CABLING SYSTEM.

NEW CONSTRUCTION.

MATRIX OF PRECAUTIONS FOR

CONSTRUCTION & RENOVATION

NFECTIONI R ACONTROL ISK SSESSMENT (ICRA)

LOW RISK

OFFICE AREAS

PATIENT RISK GROUPS

MEDIUM RISK HIGH RISK HIGHEST RISK

CARDIOLOGY CCU ANY AREA CARING FOR

ECHOCARDIOGRAPHY

ENDOSCOPY

NUCLEAR MEDICINE

PHYSICAL THERAPY

RADIOLOGY/MRI

RESPIRATORY THERAPY

EMERGENCY ROOM

LABOR & DELIVERY

LABORATORY (SPECIMEN)

NEWBORN NURSERY

OUTPATIENT SURGERY

PEDIATRICS

IMMUNOCOMPROMISED PATIENTS

BURN UNIT

CARDIAC CATH LAB

CENTRAL STERILE SUPPLY

INTENSIVE CARE UNITS

MEDICAL UNIT

PHARMACY

POST ANESTHESIA CARE UNIT

SURGICAL UNITS

NEGATIVE PRESSURE ISOLATION ROOMS

ONCOLOGY

OPERATING ROOMS INCLUDING

C-SECTION ROOMS

LOW RISK GROUP

CONSTRUCTION PROJECT TYPE

MEDIUM RISK GROUP

HIGH RISK GROUP

HIGHEST RISK GROUP

RISK RELATED GROUP TYPE A TYPE B TYPE C TYPE D

INFECTION CONTROL APPROVAL WILL BE REQUIRED WHEN THE CONSTRUCTION ACTIVITY AND RISK

NOTE:

LEVEL INDICATE THAT CLASS III OR CLASS IV CONTROL PROCEDURES ARE NECESSARY. .NGENERAL NOTES FOR CONTRACTORS

1. ALL WORK SHALL BE COMPLETED IN ACCORDANCE WITH ALL

PUBLISHED APPLICABLE LOCAL / STATE / FEDERAL / NATIONAL CODES,

ORDINANCES AND REGULATIONS ALONG WITH ALL RELATED VA

DIRECTIVES, DESIGN GUIDES AND MANUALS, SPECIFICATIONS AND

STANDARDS PLUS ALL VA REQUIREMENTS (FEDERAL AND LOCAL) THAT

ARE PROJECT SPECIFIC TO THE DOCUMENTED SCOPE OF WORK ON THIS

SITE.

2. EACH CONTRACTOR SHALL HAVE PUBLIC LIABILITY, PROPERTY

DAMAGE AND WORKMAN'S COMPENSATION INSURANCE AS REQUIRED BY

THE VA IN THE BIDDING DOCUMENTATION. CONTACT THE VA/CO DURING

THE BIDDING PHASE WITH ANY QUESTIONS, VERIFICATIONS, AND

DOCUMENTATION NECESSARY CONCERNING ALL REQUIREMENTS FOR

PROJECT INSURANCE COVERAGE.

3. EACH CONTRACTOR PRIOR TO THE COMMENCEMENT OF WORK SHALL

FULLY COORDINATE AND VERIFY WITH ALL OTHER CONTRACTORS, OTHER

TRADES AND THE VA/COR CONCERNING ALL SPACE REQUIREMENTS FOR

THIS PROJECT. THE GENERAL/PRIME CONTRACTOR SHALL BE

RESPONSIBLE FOR COMMUNICATING, DOCUMENTING AND COORDINATING

ALL SPACE REQUIREMENTS WITH THE VA/COR TO AVOID CONFLICTS AND

MISCOMMUNICATION.

4. BEFORE SUBMITTING A BID, ALL CONTRACTORS WILL CAREFULLY

EXAMINE THE DRAWINGS AND SPECIFICATIONS SO AS TO BE

THOROUGHLY FAMILIAR WITH ALL THE CONTRACT REQUIREMENTS. EACH

BIDDER SHOULD THEN VISIT THE SITE OF THE WORK TO BECOME

ACQUAINTED WITH ALL VISIBLE FIELD CONDITIONS AFFECTING THE

CONTRACT, SUCH AS OBSTACLES WHICH MAY BE ENCOUNTERED AND ALL

OTHER CONDITIONS RELATIVE TO WHAT COULD AFFECT/IMPACT THE

WORK OR BE AFFECTED BY THE PERFORMANCE OF THE WORK.

5. IF AWARDED THE CONTRACT, THE CONTRACTORS SHALL NOT BE

ALLOWED ANY EXTRA COMPENSATION BY REASON OF ANY UNFORESEEN

DIFFICULTIES OR OBSTACLES WHICH THE BIDDER COULD HAVE

REASONABLY ANTICIPATED PRIOR TO BIDDING. SHOULD ANY

DISCREPANCIES, ERRORS, CONFLICT OR ITEMS NEEDING CLARIFICATION

BE DISCOVERED IN THE PLANS AND/OR SPECIFICATIONS, THE

CONTRACTOR SHALL NOTIFY THE VA/CO PRIOR TO SUBMITTING A BID AND

THE VA/COR BEFORE STARTING ANY OF THE WORK.

6. CONTRACTORS SHALL REFERENCE ALL DRAWINGS IN ALL SECTIONS

OF WORK FOR FULLY DEFINING THEIR SCOPE OF WORK RESPONSIBILITIES

AND COORDINATE SAME WITH THE GENERAL/PRIME CONTRACTOR.

SUBCONTRACTORS AND SUPPLIERS FOR EACH TRADE ARE ADVISED THAT

INFORMATION PERTINENT TO THEIR SCOPE OF WORK ALSO OCCURS IN

OTHER SECTIONS OF THE DRAWINGS AND THE COMPLETE SET OF

CONTRACT DOCUMENTS.

7. DO NOT SCALE THE DRAWINGS. DRAWINGS ARE NOT TO SCALE.

8. OBTAIN ALL REQUIRED VA/COR AUTHORIZATIONS BEFORE BEGINNING

ANY DEMOLITION WORK OR NEW CONSTRUCTION, INCLUDING TEMPORARY

BARRICADES AND PROTECTION WORK.

9. EACH CONTRACTOR SHALL MAINTAIN A COMPETENT OSHA-30

FOREMAN OR DIRECT REPRESENTATIVE ON THE JOB AT ALL TIMES. THE

CONTRACTOR SHALL COOPERATE WITH AND COORDINATE WITH THE

SUPERINTENDENT AND FOREMAN OF OTHER TRADES IN ORDER THAT

THERE BE NO DELAYS IN THE EXECUTION AND COMPLETION OF THE

WORK. CONTACT VA COR FOR INSPECTION PRIOR TO CONCEALING NEW

WORK.

10. DURING CONSTRUCTION EACH CONTRACTOR SHALL KEEP ON SITE

ACCURATE FIELD RECORDS OF ALL CONCEALED WORK THAT DIFFERS

FROM THE CONTRACT DRAWINGS. THESE AS-BUILT MARKED-UP RECORD

DRAWINGS WILL BE KEPT UP TO DATE BY THE GENERAL/PRIME

CONTRACTOR AND PROVIDED TO THE VA/COR FOR DISTRIBUTION AT THE

COMPLETION OF THE PROJECT.

11. IT SHALL BE THE RESPONSIBILITY OF EACH CONTRACTOR TO

ADEQUATELY PROTECT EXISTING CONSTRUCTION AND FINISHES TO

REMAIN IN PLACE DURING BOTH DEMOLITION AND CONSTRUCTION

SEQUENCES OF THE WORK. ANY DAMAGE TO SUCH AREAS SHALL BE

RESTORED AND REFINISHED TO A "LIKE-NEW" CONDITION PRIOR TO THE

VA/COR'S ACCEPTANCE OF THAT WORK.

12. THE GENERAL/PRIME CONTRACTOR IS RESPONSIBLE FOR THE PATCH,

REPAIR, REFINISHING AND/OR REPLACEMENT OF ALL CONSTRUCTION,

MATERIALS, ASSEMBLIES, EQUIPMENT, SIGNAGE AND FINISHES DAMAGED

BY THE PROJECT DEMOLITION, TEMPORARY CONSTRUCTION, NEW

CONSTRUCTION OR THE MOVEMENT OF PERSONNEL, TOOLS, EQUIPMENT,

MATERIALS, ETC. BOTH INSIDE AND OUTSIDE OF THE DESIGNATED AREAS

OF WORK.

13. RELOCATIONS OF ANY INFRASTRUCTURE DISTRIBUTION SYSTEMS OR

EQUIPMENT, WHICH MAY ALTER THE ARCHITECTURAL OR STRUCTURAL

CONSTRUCTION, MUST BE APPROVED FIRST BY THE VA/COR PRIOR TO

STARTING ITS RELOCATION.

14. THE GENERAL/PRIME CONTRACTOR IS RESPONSIBLE TO PROVIDE THE

REMOVAL OF ALL CONSTRUCTION DEMOLITION DEBRIS, SPOIL AND

MATERIALS FROM THE PROJECT SITE ON A DAILY BASIS UNLESS

SPECIFICALLY REFERENCED OTHERWISE IN THE PROJECT SPECIFIC

LOGISTICAL SEQUENCING REQUIREMENTS.

15. CONTRACTORS TO ENSURE ALL FIRE RESISTIVE RATINGS ARE

MAINTAINED PER LOCATIONS SHOWN ON THE DRAWINGS. ALL

PENETRATIONS ARE TO BE SEALED BY AN APPROVED UL FIRESTOPPING

SYSTEM. SEAL ALL EXISTING PENETRATIONS EXPOSED DURING

CONSTRUCTION AS PER THE APPROVED UL FIRESTOPPING SYSTEM

INSTALLATION REQUIREMENTS. FOLLOW THE MANUFACTURE'S DESIGN

RECOMMENDATIONS FOR THE PROPER FIRE STOPPING MATERIAL TO BE

USED IN EACH SPECIFIC APPLICATION.

16. ALL FIRESTOPS SHALL MATCH THE FIRE RATING OF THE

CONSTRUCTION BEING PENETRATED, SUCH AS WALLS, FLOORS, CEILINGS,

PARTITIONS ETC. AND SHALL COMPLY WITH ALL CODE REQUIREMENTS.

USE ONLY A SINGLE (FMRC) APPROVED MANUFACTURERS LINE OF

PRODUCTS FOR ALL PROJECT FIRESTOPPING. THE BOD FOR ALL FIRE

STOPPING WILL BE ALL PRODUCTS AS MANUFACTURED BY THE 3M

COMPANY. PROVIDE SUBMITTAL FOR FIRESTOP MATERIALS PRIOR TO

PURCHASING.

17. PROVIDE AN HOURLY RATED FIRESTOP AT ALL PENETRATIONS OF

RATED CONSTRUCTION AND/OR ASSEMBLIES, WHETHER NEW OR

EXISTING, AND/OR AS A DIRECT RESULT OF THE PROJECT DEMOLITION

WORK OR NEW CONSTRUCTION. WHERE COMBUSTIBLE PENETRANTS

OCCUR USE A FIRE RATED INTUMESCENT MATERIAL AND WHERE

NONCOMBUSTIBLE PENETRANTS OCCUR USE A FIRE RATED

ENDOTHERMIC MATERIAL. ALL FIRESTOPPING WORK MUST BE APPROVED

BY THE VA/COR BEFORE CONCEALED BY CONSTRUCTION.

18.ALL CONTRACTOR PERSONNEL MUST OBTAIN BADGING PRIOR TO

BEGINNING ANY WORK. ALL VA PARKING AND CONDUCT RULES MUST BE

OBSERVED BY ALL PERSONNEL AT ALL TIMES.

19.THE CONTRACTOR SHALL COMPLETE ALL PATIENT DISRUPTING WORK

AFTER HOURS.

SPECIAL SAFETY NOTES

1. ALL CONTRACTORS, SUBCONTRACTORS AND THEIR REPRESENTATIVES

WORKING ON THIS PROJECT SHALL AT ALL TIMES PRIOR TO AND DURING

THE COURSE OF THEIR ACTIVITY BE RESPONSIBLE FOR THE SAFETY OF

THEIR EMPLOYEES, ALL OTHERS AND ARE TO BE IN CARE OF THE

PROPERTY.

2. EACH CONTRACTOR OR SUBCONTRACTOR, AS REPRESENTATIVES OF

THEIR EMPLOYEES, SHALL ASCERTAIN THAT THE CONDITIONS UNDER

WHICH THEY WILL BE REQUIRED TO ACCOMPLISH THEIR WORK ARE SAFE

AND MEET ALL APPLICABLE REQUIREMENTS OF THE OCCUPATIONAL

SAFETY AND HAZARD ACT, ALONG WITH ALL OTHER APPLICABLE

GOVERNING REGULATIONS AND VA REQUIREMENTS.

3. THE BEGINNING OF WORK ON SITE BY A CONTRACTOR OR

SUBCONTRACTOR SHALL INDICATE HIS/HER SATISFACTION AND FULL

ACCEPTANCE OF THE CURRENT SITE CONDITIONS REGARDING SAFETY

AND THE NECESSARY COMPLIANCE WITH ALL CONTRACT REQUIREMENTS

REGARDING SAME. THE CONTRACTOR ACCEPTS FULL RESPONSIBILITY

FOR ANY ACCIDENTS, INJURIES, AND/OR DAMAGES INCURRED AS A RESULT

OF ANY VISIBLE OR KNOWN UNSAFE CONDITIONS THAT EXIST.

4. THE CONTRACTOR'S SAFETY PLAN SHALL BE REVIEWED AND APPROVED

PRIOR TO STARTING ANY WORK. ANY REVISIONS TO THE SAFETY PLAN

MUST BE APPROVED BY THE COR.

5. ALL CRANES LIFTS OVER THE FACILITY WILL BE CONSIDERED CRITICAL

AND SHALL BE APPROVED BY THE VA.

6. ALL CRANE LIFTS SHALL BE COMPLETE ON THE WEEKENDS ONLY.

7. FALL PROTECTION WILL BE REQUIRED. THE FALL PROTECTION

TYPE/METHOD SHALL BE APPROVED BY THE VA PRIOR TO STARTING WORK.

8. ANY EQUIPMENT THAT IS USED NEAR THE EDGE OF THE BUILDING SHALL

BE TIED OFF.

9. IF A CRANE OR LARGE HYDRAULIC EQUIPMENT IS USED, THE DRAIN

CLOSEST TO THE EQUIPMENT MUST BE PROTECTED FROM AN ACCIDENTAL

HYDRAULIC LEAK. A SPILL KIT WILL BE REQUIRED TO BE WITHIN 10FT OF

THE EQUIPMENT IN USE.

10. THE CONTRACTOR SHALL BE VIGILANT AND WATCH FOR INCLEMENT

WEATHER. ENSURE THERE IS A SAFETY PLAN IN PLACE IF AN

UNKNOWN\PLANNED WEATHER EVENT OCCURS.

11.THE CONTRACTOR WILL BE REQUIRED TO PROVIDED RAIN PROTECTION

TO ANY UNCOVERED ROOFS THAT ARE NOT PROTECTED.

THE CONTRACTOR SHALL CONDUCT A SITE WALK PRIOR TO THE START OF

WORK AND WEEKLY TO EVALUATE THE PROJECT PROGRESS.

12.THE CONTRACTOR'S EMPLOYEE SHALL ONLY ENTER AND EXIT THE

FACILITY IN APPROVED LOCATIONS. EMPLOYEES WILL BE REQUIRED TO

WEAR A BADGE AND HAVE THEIR TEMPERATURE CHECKED EVERY DAY.

13. THE CONTRACTOR SHALL MAKE EVERY REASONABLE ATTEMPT NOT TO

AFFECT PATIENT CARE IF POSSIBLE. THE CONTRACTOR SHALL AVOID

BLOCKING ROADWAYS, SIDEWALKS, CORRIDORS OR DISRUPTING TRAFFIC.

14.THE CONTRACTOR SHALL FOLLOW ALL SAFETY AND INFECTION

PREVENTION GUIDANCE.

15.FIRE HAZARD PREVENTION AND SAFETY INSPECTIONS: INSPECT ENTIRE

CONSTRUCTION AREAS WEEKLY. COORDINATE WITH, AND REPORT

FINDINGS AND CORRECTIVE ACTIONS WEEKLY CONTRACTING OFFICER

REPRESENTATIVE OR GOVERNMENT DESIGNATED AUTHORITY

16. SMOKING IS PROHIBITED ON VA PROPERTY.

18. FLAMMABLE AND COMBUSTIBLE LIQUIDS: STORE, DISPENSE AND USE

LIQUIDS IN ACCORDANCE WITH 29 CFR 1926, NFPA 241 AND NFPA 30.

19. FIRE EXTINGUISHERS: PROVIDE AND MAINTAIN EXTINGUISHERS IN

CONSTRUCTION AREAS AND TEMPORARY STORAGE AREAS IN

ACCORDANCE WITH 29 CFR 1926, NFPA 241 AND NFPA 10.

FALL PROTECTION

1. THE FALL PROTECTION (FP) THRESHOLD HEIGHT REQUIREMENT IS 6 FT

(1.8 M) FOR ALL WORK, UNLESS SPECIFIED DIFFERENTLY OR THE OSHA 29

CFR 1926 REQUIREMENTS ARE MORE STRINGENT, TO INCLUDE STEEL

ERECTION ACTIVITIES, SYSTEMS-ENGINEERED ACTIVITIES

(PREFABRICATED) METAL BUILDINGS, RESIDENTIAL (WOOD)

CONSTRUCTION AND SCAFFOLDING WORK.

A. THE USE OF A SAFETY MONITORING SYSTEM (SMS) AS A FALL

PROTECTION METHOD IS PROHIBITED.

B. THE USE OF CONTROLLED ACCESS ZONE (CAZ) AS A FALL

PROTECTION METHOD IS PROHIBITED.

C. A WARNING LINE SYSTEM (WLS) MAY ONLY BE USED ON FLOORS OR

FLAT OR LOW-SLOPED ROOFS (BETWEEN 0 - 18.4 DEGREES OR 4:12

SLOPE) AND SHALL BE ERECTED AROUND ALL SIDES OF THE WORK

AREA (SEE 29 CFR 1926.502(F) FOR CONSTRUCTION OF WLS

REQUIREMENTS). WORKING WITHIN THE WLS DOES NOT REQUIRE FP.

NO WORKER SHALL BE ALLOWED IN THE AREA BETWEEN THE ROOF

OR FLOOR EDGE AND THE WLS WITHOUT FP. FP IS REQUIRED WHEN

WORKING OUTSIDE THE WLS.

D. FALL PROTECTION WHILE USING A LADDER WILL BE GOVERNED BY

THE OSHA REQUIREMENTS.

CONSTRUCTION NOTES

NORMAL WORK SHIFT HOURS FOR THE RICHARD L. ROUDEVUSH VA MEDICAL

CENTER IS 7:00 AM UNTIL 4:30 PM DAILY, MONDAY THROUGH FRIDAY

1. CERTAIN WORK ITEMS AND CONSTRUCTION ACTIVITIES THAT CREATE

NOISE, DUST, VIBRATIONS AND THAT WOULD CREATE DISTURBANCES

TO THE MEDICAL CENTER AND/OR ANY OF THE ADJACENT OCCUPIED

AREAS MAY NEED TO BE PERFORMED DURING PERIODS OF AFTER

HOURS/OFF-HOURS WORK, IF APPROVED BY THE COR. ITEMS THAT

WILL REQUIRE AFTER HOURS ACTIVITIES SHALL BE FULLY

COORDINATED WITH VA COR PRIOR TO START OF CONSTRUCTION.

2. AFTERHOURS/OFF-HOURS OF OPERATION SHALL BE SCHEDULED FOR

THE FOLLOWING DAYS AND TIMES AS COORDINATED, SCHEDULED AND

AUTHORIZED BY THE COR:

A. MONDAY THROUGH FRIDAY - 4:30 PM UNTIL 7:00 AM.

B. WEEKENDS (AS ALLOWED)

3. THE FOLLOWING CONSTRUCTION ACTIVITIES SHALL BE CONSIDERED

AFTERHOURS/OFF-HOURS OPERATIONS:

A. ALL CONCRETE OR METAL DECKING CORING, CUTTING OR

DRILLING

B. ANY WORK THAT DISTURBS PATIENT CARE OR MEDICAL FACILITY

OPERATIONS

C. ALL WORK (DEMOLITION OR NEW) THAT WILL CAUSE IMPACT NOISE

AND VIBRATIONS THAT CAN BE HEARD OR FELT IN THE

SURROUNDING ADJACENT OCCUPIED SPACES/AREAS

D. CRANE LIFTS-SHALL BE ONLY COMPLETED ON SATURDAYS OR

SUNDAYS ONLY

4. CONTRACTOR WILL BE PERMITTED TWO (2) VEHICLES TO BE PARKED

IN THE F-LOT. ALL PRIVATE VEHICLES MUST BE PARKED OFF SITE.

CRANE SAFETY

1. ALL CRANE WORK SHALL COMPLY WITH 29 CFR 1926 SUBPART CC.

2. PRIOR TO OPERATING A CRANE, THE OPERATOR MUST BE LICENSED,

QUALIFIED OR CERTIFIED TO OPERATE THE CRANE. THUS, ALL THE

PROVISIONS CONTAINED WITH SUBPART CC ARE EFFECTIVE AND

THERE IS NO “PHASE IN” DATE.

3. A DETAILED LIFT PLAN FOR ALL LIFTS SHALL BE SUBMITTED TO THE

GOVERNMENT DESIGNATED AUTHORITY 14 DAYS PRIOR TO THE

SCHEDULED LIFT COMPLETE WITH ROUTE FOR TRUCK CARRYING

LOAD, CRANE LOAD ANALYSIS, SITING OF CRANE AND PATH OF SWING

AND ALL OTHER ELEMENTS OF A CRITICAL LIFT PLAN WHERE THE LIFT

MEETS THE DEFINITION OF A CRITICAL LIFT. CRITICAL LIFTS REQUIRE A

MORE COMPREHENSIVE LIFT PLAN TO MINIMIZE THE POTENTIAL OF

CRANE FAILURE AND/OR CATASTROPHIC LOSS. THE PLAN MUST BE

REVIEWED AND ACCEPTED BY THE GENERAL CONTRACTOR BEFORE

BEING SUBMITTED TO THE VA FOR REVIEW. THE LIFT WILL NOT BE

ALLOWED TO PROCEED WITHOUT PRIOR ACCEPTANCE OF THIS

DOCUMENT.

4. CRANE OPERATORS SHALL NOT CARRY LOADS

A. OVER THE GENERAL PUBLIC OR VAMC PERSONNEL

B. OVER ANY OCCUPIED BUILDING UNLESS

a. THE TOP TWO FLOORS ARE VACATED

b. OR OVERHEAD PROTECTION WITH A DESIGN LIVE LOAD OF 300

PSF IS PROVIDED

WEST TENTH STREET

Richard L. Roudebush VA Medical Center 1481 W. 10th St.

Indianapolis, Indiana 46202

REPLACE A WING ROOFS

583-21-203

GI002

1FY21

3 9

NBES5/11/2021

INSTALL DETAILS

N, BOYD

CHIEF OF ENGINEERING: PATRICK HERBER

ASSISTANT CHIEF OF ENGINEERING:N/A

AutoCAD SHX Text

CLASS 1

AutoCAD SHX Text

CLASS 1V

AutoCAD SHX Text

%%UPRIOR TO ANY CONSTRUCTION

AutoCAD SHX Text

%%UPOST CONSTRUCTION

AutoCAD SHX Text

%%UPRIOR TO ANY CONSTRUCTION

AutoCAD SHX Text

%%UPOST CONSTRUCTION

AutoCAD SHX Text

CLASS 1I

AutoCAD SHX Text

CLASS 1II

AutoCAD SHX Text

%%UPRIOR TO ANY CONSTRUCTION

AutoCAD SHX Text

%%UPOST CONSTRUCTION

AutoCAD SHX Text

TYPE A

AutoCAD SHX Text

TYPE B

AutoCAD SHX Text

TYPE C

AutoCAD SHX Text

TYPE D

AutoCAD SHX Text I

AutoCAD SHX Text

II

AutoCAD SHX Text

II

AutoCAD SHX Text

III/IV

AutoCAD SHX Text

II

AutoCAD SHX Text

II

AutoCAD SHX Text

III/IV

AutoCAD SHX Text

III/IV

AutoCAD SHX Text

III

AutoCAD SHX Text

III/IV

AutoCAD SHX Text

IV

AutoCAD SHX Text

IV

AutoCAD SHX Text

IV

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text

II

AutoCAD SHX Text Dwg. of

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text Drawing Title

AutoCAD SHX Text Approved: Project Director

AutoCAD SHX Text Project Title

AutoCAD SHX Text Date

AutoCAD SHX Text Location

AutoCAD SHX Text Checked

AutoCAD SHX Text Building Number

AutoCAD SHX Text Project Number

AutoCAD SHX Text Drawing Number

AutoCAD SHX Text Drawn

AutoCAD SHX Text Revisions:

AutoCAD SHX Text Date

AutoCAD SHX Text

ADDRESS:

AutoCAD SHX Text

PROJECT ENGINEERS:

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one quarter inch = one foot

AutoCAD SHX Text

RLR VAMC FORM 09-JD0227

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text C

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

NORTH REFERENCE

AutoCAD SHX Text

PLOT DATE:

AutoCAD SHX Text

DRAWN BY:

AutoCAD SHX Text

CAD DRAWING FILE LOCATION:

AutoCAD SHX Text

PLOT DATE:

AutoCAD SHX Text Engineering and Facilities Management Services

AutoCAD SHX Text E

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text N

AutoCAD SHX Text U

AutoCAD SHX Text D

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text I

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text N

AutoCAD SHX Text V

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text S

AutoCAD SHX Text A

AutoCAD SHX Text M

AutoCAD SHX Text O

AutoCAD SHX Text S

AutoCAD SHX Text F

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text C

AutoCAD SHX Text A

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text R

AutoCAD SHX Text A

ROOF INFORMATION

ROOF #

ESTIMATED

SQ. FT. ROOF TYPE INSULATION DECK

80 22,568.00 EPDM POLYISO CONCRETE

81 1,148.00 EPDM POLYISO METAL

82 315.00 EPDM POLYISO CONCRETE

79 12,470.00 EPDM POLYISO CONCRETE

74 1,070.00 EPDM POLYISO METAL

TOTAL 37,571

SK

Y

LI

G

H

TS

71A

L

SK

Y

LI

G

H

TS

11 13

16 17

57 5849

44 52

33 38

71A

AREA OF WORK

N

ADHERED 90 MIL EPDM

FIBERBOARD

METAL DECKING

MECHANICAL FASTENER

NEW ADHERED EPDM MEMBRANE

NEW FIBERBOARD

EXISTING METAL DECKING

NEW MECHANICAL FASTENER

EXISTING

NEW

ROOFS 74 AND 81

PLAN NOTES

1. REMOVE EPDM MEMBRANE, FIBER BOARD AND

FASTENERS.

2. CAREFULLY REMOVE THE LIGHTING PROTECTION AND

STORE FOR REINSTALLATION. DISCARD LIGHTNING

PROTECTION CLIPS.

3. REMOVE THE 4 DOWNSPOUT STONES AND STORE FOR

LATER PLACEMENT.

4. REMOVE EXISTING GUTTER SYSTEM.

5. REMOVE COPING CAULK FROM AROUND THE ENTIRE

PERIMETER OF THE ROOF. PREPARE THE SURFACE FOR

NEW CAULK.

6. REMOVE GUTTER SYSTEM IF REQUIRED FOR MEMBRANE

INSTALLATION..NTHE AREAS LISTED ABOVE ARE ESTIMATES ONLY. THE EXACT MEASUREMENTS SHALL BE FIELD

VERIFIED BY THE CONTRACTOR DURING THE PRE-BID MEETING.

GENERAL NOTES

1. CONTRACTOR SHALL PROTECT THE ROOFS SYSTEMS WITH

2" RIGID FOAM AND 34 PLYWOOD WHEN WORKING ON

NON-CONTRACT ROOFS.

2. INSTALL EPDM ROOF PER THE MANUFACTURES

RECOMMENDATIONS TO RECEIVE A 25 YEAR WARRANTY.

3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVAL

AND REINSTALLATION OF ALL MEP COMPONENTS THAT

NEED TO BE MOVED FOR THE ROOF SYSTEM TO BE

INSTALLED.

4. THE NEW EPDM MEMBRANE SHALL BE AT LEAST 90 MILS

THICK.

5. ANY OUTAGES OR SHUTDOWNS MUST BE COORDINATED

WITH THE COR AT LEAST TWO WEEKS IN ADVANCE.

6. IF CRANES OR LIFTING EQUIPMENT IS USED COORDINATE

WITH THE COR FOR THE EXACT LOCATION OF THE

EQUIPMENT. A LIFT PLAN MUST BE PROVIDED TO THE COR.

7. IF PRODUCTS WITH HIGH VOC ARE USED, AFTER HOURS

USE MAY BE REQUIRED.

8. THE CONTRACTOR WILL BE RESPONSIBLE FOR

TEMPORARILY COVERING THE EXPOSED AREA OF THE

ROOF IF THE WORK CANNOT BE COMPLETED IN ONE DAY

OR IF WEATHER PERMITS.

9. THE CONTRACTOR MUST SUBMIT A SAFETY PLAN PRIOR TO

STARTING WORK.

10. INSTALL THE NEW ROOFING SYSTEM PER THE DETAILS ON

AI100, UNLESS THE MANUFACTURE RECOMMENDS

DIFFERENT TO ACHIVE A 25 YEAR WARRANTY.

11. INSTALL ROOFING DATA PLATE ON ALL NEW ROOF SYSTEM

INSTALLS, IN THE LOCATION SPECIFIED BY THE COR.

12. NOTIFY THE COR ONCE ALL MATERIALS FROM THE ROOF

HAVE BEEN REMOVED. THE COR WILL INSPECT THE DECK

PRIOR TO THE INSTALLATION OF THE NEW ROOF SYSTEM.

13. NOTIFY THE COR IF ANY DAMAGES ARE FOUND THAT MIGHT

LEAD TO FUTURE LEAKS OR DAMAGES TO GOVERNMENT

PROPERTY.

14. THE CONTRACTOR WILL BE REQUIRED TO REMOVE,

REINSTALL OR RELOCATE ANY EQUIPMENT THAT MAY BE

REQUIRED TO TO REMOVE OR REINSTALL THE NEW ROOF

SYSTEM.

15. THE CONTRACTOR SHALL MAINTAIN THE CURRENT SLOPE

OF THE ROOF.

16. THE CONTRACTOR FOLLOW ALL VA ICRA AND ISLM POLICIES

PUT IN PLACE BY THE INFECTION PREVENTION TEAM AND

VA SAFETY.

17. INSPECT THE PARAPET WALL ONCE THE MEMBRANE IS

REMOVED AND NOTIFY THE COR IF WATER DAMAGE IS

VISIBLE.

WEST TENTH STREET

Richard L. Roudebush VA Medical Center 1481 W. 10th St.

Indianapolis, Indiana 46202

REPLACE A WING ROOFS

583-21-203

AD101

1FY21

6 9

NBES5/11/2021

INSTALL DETAILS

N, BOYD

CHIEF OF ENGINEERING: PATRICK HERBER

ASSISTANT CHIEF OF ENGINEERING:N/A

1 ROOF DETAIL (METAL DECK)

SCALE: NTSAD101

AutoCAD SHX Text Dwg. of

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text Drawing Title

AutoCAD SHX Text Approved: Project Director

AutoCAD SHX Text Project Title

AutoCAD SHX Text Date

AutoCAD SHX Text Location

AutoCAD SHX Text Checked

AutoCAD SHX Text Building Number

AutoCAD SHX Text Project Number

AutoCAD SHX Text Drawing Number

AutoCAD SHX Text Drawn

AutoCAD SHX Text Revisions:

AutoCAD SHX Text Date

AutoCAD SHX Text

ADDRESS:

AutoCAD SHX Text

PROJECT ENGINEERS:

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one quarter inch = one foot

AutoCAD SHX Text

RLR VAMC FORM 09-JD0227

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text C

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

NORTH REFERENCE

AutoCAD SHX Text

PLOT DATE:

AutoCAD SHX Text

DRAWN BY:

AutoCAD SHX Text

CAD DRAWING FILE LOCATION:

AutoCAD SHX Text

PLOT DATE:

AutoCAD SHX Text Engineering and Facilities Management Services

AutoCAD SHX Text E

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text N

AutoCAD SHX Text U

AutoCAD SHX Text D

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text I

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text N

AutoCAD SHX Text V

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text S

AutoCAD SHX Text A

AutoCAD SHX Text M

AutoCAD SHX Text O

AutoCAD SHX Text S

AutoCAD SHX Text F

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text C

AutoCAD SHX Text A

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text R

AutoCAD SHX Text A

ESTIMATED

SQ. FT. ROOF TYPE INSULATION DECK

80 22,568.00 EPDM POLYISO CONCRETE

81 1,148.00 EPDM POLYISO METAL

82 315.00 EPDM POLYISO CONCRETE

79 12,470.00 EPDM POLYISO CONCRETE

74 1,070.00 EPDM POLYISO METAL

TOTAL 37,571

SK

Y

LI

G

H

TS

57 5849

44 52

33 38

71A

L

SK

Y

LI

G

H

TS

11 13

16 17

57 5849

44 52

33 38

71A

AREA OF WORK

N

2" EXISTING

INSULATION

TAPERED

INSULATION

ADHERED

EPDM

MEMBRANE

MECHANICAL FASTNER

EXISTING

2" EXISTING

INSULATION

TAPERED

INSULATION

NEW

ADHERED

EPDM

MEMBRANE

NEW 12"

ADHERED

INSULATION

NEW 5/8"

ADHERED

COVER

BOARD

NEW

ROOFS 79,80, AND 82

PLAN NOTES NOTES APPLY TO ALL HIGHLIGHTED ROOFS

1. REMOVE THE EXISTING EPDM MEMBRANE AND WALK

MATS.

2. INSPECT THE POLYISOCYANURATE INSULATION AND

REPLACE ANY WET OR DAMAGED INSULATION FOUND.

CORE 18 HOLES THROUGH THE INSULATION DOWN TO

THE DECK AT MULTIPLE LOCATIONS. INSPECT FOR WET

OR DAMP INSULATION. COORDINATE A WALKTHROUGH

WITH THE COR PRIOR TO COVERING THE INSULATION.

THE CONTRACTOR SHALL ASSUME FOR BIDDING

PURPOSES THAT 28,000 BOARD FEET OF THE

INSULATION MAY NEED REPLACED.

3. INSPECT THE MECHANICAL FASTENERS AND REPLACE

ANY FASTENERS THAT ARE DAMAGED, LOOSE OR THAT

DO NOT PASS A PULL TEST.

4. CAREFULLY REMOVE THE LIGHTING PROTECTION AND

STORE FOR REINSTALLATION. DISCARD LIGHTNING

PROTECTION CLIPS. PROVIDE NEW CLIPS FOR THE

REINSTALLATION.

5. REMOVE EXISTING EPDM EXPANSION JOINT.

6. REMOVE 18 EXISTING DRAINS. NOT ALL LOCATIONS ARE

SHOWN. THE CONTRACTOR SHALL FIELD VERIFY THE

EXACT LOCATIONS DURING THE PRE-BID MEETING.

7. REMOVE THE 4 DOWNSPOUT STONES AND STORE FOR

LATER PLACEMENT.

8. REMOVE THE ABANDONED LIGHTNING PROTECTION

EQUIPMENT.

9. REMOVE COPING CAULK FROM AROUND THE ENTIRE

PERIMETER OF THE ROOF. PREPARE THE SURFACE FOR

NEW CAULK..NTHE AREAS LISTED ABOVE ARE ESTIMATES ONLY. THE EXACT MEASUREMENTS SHALL BE FIELD

VERIFIED BY THE CONTRACTOR DURING THE PRE-BID MEETING.

GENERAL NOTES

1. CONTRACTOR SHALL PROTECT THE ROOFS SYSTEMS WITH

2" RIGID FOAM AND 34 PLYWOOD WHEN WORKING ON

NON-CONTRACT ROOFS.

2. INSTALL EPDM ROOF PER THE MANUFACTURES

RECOMMENDATIONS TO RECEIVE A 25 YEAR WARRANTY.

3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVAL

AND REINSTALLATION OF ALL MEP COMPONENTS THAT

NEED TO BE MOVED FOR THE ROOF SYSTEM TO BE

INSTALLED.

4. THE NEW EPDM MEMBRANE SHALL BE AT LEAST 90 MILS

THICK.

5. ANY OUTAGES OR SHUTDOWNS MUST BE COORDINATED

WITH THE COR AT LEAST TWO WEEKS IN ADVANCE.

6. IF CRANES OR LIFTING EQUIPMENT IS USED COORDINATE

WITH THE COR FOR THE EXACT LOCATION OF THE

EQUIPMENT. A LIFT PLAN MUST BE PROVIDED TO THE COR.

7. IF PRODUCTS WITH HIGH VOC ARE USED, AFTER HOURS

USE MAY BE REQUIRED.

8. THE CONTRACTOR WILL BE RESPONSIBLE FOR

TEMPORARILY COVERING THE EXPOSED AREA OF THE

ROOF IF THE WORK CANNOT BE COMPLETED IN ONE DAY

OR IF WEATHER PERMITS.

9. THE CONTRACTOR MUST SUBMIT A SAFETY PLAN PRIOR TO

STARTING WORK.

10. INSTALL THE NEW ROOFING SYSTEM PER THE DETAILS ON

AE501, UNLESS THE MANUFACTURE RECOMMENDS

DIFFERENT TO ACHIVE A 25 YEAR WARRANTY.

11. INSTALL ROOFING DATA PLATE ON ALL NEW ROOF SYSTEM

INSTALLS, IN THE LOCATION SPECIFIED BY THE COR.

12. NOTIFY THE COR ONCE ALL MATERIALS FROM THE ROOF

HAVE BEEN REMOVED. THE COR WILL INSPECT THE DECK

PRIOR TO THE INSTALLATION OF THE NEW ROOF SYSTEM.

13. NOTIFY THE COR IF ANY DAMAGES ARE FOUND THAT MIGHT

LEAD TO FUTURE LEAKS OR DAMAGES TO GOVERNMENT

PROPERTY.

14. THE CONTRACTOR WILL BE REQUIRED TO REMOVE,

REINSTALL OR RELOCATE ANY EQUIPMENT THAT MAY BE

REQUIRED TO TO REMOVE OR REINSTALL THE NEW ROOF

SYSTEM.

15. THE CONTRACTOR SHALL MAINTAIN THE CURRENT SLOPE

OF THE ROOF.

16. THE CONTRACTOR FOLLOW ALL VA ICRA AND ISLM POLICIES

PUT IN PLACE BY THE INFECTION PREVENTION TEAM AND

VA SAFETY.

17. INSPECT THE PARAPET WALL ONCE THE MEMBRANE IS

REMOVED AND NOTIFY THE COR IF WATER DAMAGE IS

VISIBLE.

WEST TENTH STREET

Richard L. Roudebush VA Medical Center 1481 W. 10th St.

Indianapolis, Indiana 46202

REPLACE A WING ROOFS

583-21-203

AD102

1FY21

7 9

NBES5/11/2021

INSTALL DETAILS

N, BOYD

CHIEF OF ENGINEERING: PATRICK HERBER

ASSISTANT CHIEF OF ENGINEERING:N/A

1 ROOF DETAIL (CONCRETE DECK)

SCALE: NTSAD102

AutoCAD SHX Text Dwg. of

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text Drawing Title

AutoCAD SHX Text Approved: Project Director

AutoCAD SHX Text Project Title

AutoCAD SHX Text Date

AutoCAD SHX Text Location

AutoCAD SHX Text Checked

AutoCAD SHX Text Building Number

AutoCAD SHX Text Project Number

AutoCAD SHX Text Drawing Number

AutoCAD SHX Text Drawn

AutoCAD SHX Text Revisions:

AutoCAD SHX Text Date

AutoCAD SHX Text

ADDRESS:

AutoCAD SHX Text

PROJECT ENGINEERS:

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one quarter inch = one foot

AutoCAD SHX Text

RLR VAMC FORM 09-JD0227

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text C

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

NORTH REFERENCE

AutoCAD SHX Text

PLOT DATE:

AutoCAD SHX Text

DRAWN BY:

AutoCAD SHX Text

CAD DRAWING FILE LOCATION:

AutoCAD SHX Text

PLOT DATE:

AutoCAD SHX Text Engineering and Facilities Management Services

AutoCAD SHX Text E

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text N

AutoCAD SHX Text U

AutoCAD SHX Text D

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text I

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text N

AutoCAD SHX Text V

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text S

AutoCAD SHX Text A

AutoCAD SHX Text M

AutoCAD SHX Text O

AutoCAD SHX Text S

AutoCAD SHX Text F

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text C

AutoCAD SHX Text A

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text R

AutoCAD SHX Text A

ESTIMATED

SQ. FT. ROOF TYPE INSULATION DECK

80 22,568.00 EPDM POLYISO CONCRETE

81 1,148.00 EPDM POLYISO METAL

82 315.00 EPDM POLYISO CONCRETE

79 12,470.00 EPDM POLYISO CONCRETE

74 1,070.00 EPDM POLYISO METAL

TOTAL 37,571

L

SK

Y

LI

G

H

TS

11 13

16 17

57 5849

44 52

33 38

71A

AREA OF WORK

N

2" EXISTING

INSULATION

TAPERED

INSULATION

ADHERED

EPDM

MEMBRANE

MECHANICAL FASTNER

EXISTING

2" EXISTING

INSULATION

TAPERED

INSULATION

NEW

ADHERED

EPDM

MEMBRANE

NEW 12"

ADHERED

INSULATION

NEW 5/8"

ADHERED

COVER

BOARD

NEW

ROOFS 79,80, AND 82

PLAN NOTES NOTES APPLY TO ALL HIGHLIGHTED ROOFS

1. ADHERE 12" POLYISOCYANURATE INSULATION OVER THE

ENTIRE ROOF DECK AND REPLACE ANY DAMAGED

INSULATION.

2. INSTALL AND ADHERE 58" GYPSUM FIBER RE-ENFORCED

COVER BOARD OVER THE ROOF DECK.

3. INSTALL AND ADHERE A NEW EPDM MEMBRANE OVER

THE ENTIRE ROOF. FOLLOW THE MANUFACTURES

RECOMMENDATIONS FOR A 25 YEAR WARRANTY. USE

DETAILS ON AE101, IF DETAILS ARE NOT PROVIDED BY

THE MANUFACTURE.

4. REINSTALL THE LIGHTING PROTECTION IN THE EXACT

LOCATION THAT IT WAS REMOVED. REPLACE LIGHTNING

PROTECTION CLIPS. IF THE LIGHTNING PROTECTION IS

MODIFIED IN ANY WAY THE CONTRACTOR WILL BE

REQUIRED TO UL CERTIFY THE LIGHTING PROTECTION

SYSTEM AT THE CONTRACTORS EXPENSE.

5. PROVIDE AND INSTALL RUBBER WALKING MATS AS

SHOWN. FOLLOW THE MANUFACTURE INSTALLATION

RECOMMENDATIONS.

6. PROVIDE AND INSTALL NEW EXPANSION JOINT. FOLLOW

THE MANUFACTURES RECOMMENDATIONS.

7. PROVIDE AND INSTALL NEW DRAINS AND OVERFLOWS AT

18 LOCATIONS. NOT ALL LOCATIONS ARE SHOWN ON THE

DRAWINGS. (36TOTAL)

8. INSTALL ID PLACARD IN LOCATIONS DESIGNATED BY THE

COR. SEE AE502

9. REAPPLY COPING CAULK AT ALL JOINTS, SEAMS AND

SCREW HEADS AROUND THE ENTIRE PERIMETER OF THE

HIGHLIGHTED ROOFS.

..GENERAL NOTES

1. CONTRACTOR SHALL PROTECT THE ROOFS SYSTEMS WITH

2" RIGID FOAM AND 34 PLYWOOD WHEN WORKING ON

NON-CONTRACT ROOFS.

2. INSTALL EPDM ROOF PER THE MANUFACTURES

RECOMMENDATIONS TO RECEIVE A 25 YEAR WARRANTY.

3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVAL

AND REINSTALLATION OF ALL MEP COMPONENTS THAT

NEED TO BE MOVED FOR THE ROOF SYSTEM TO BE

INSTALLED.

4. THE NEW EPDM MEMBRANE SHALL BE AT LEAST 90 MILS

THICK.

5. ANY OUTAGES OR SHUTDOWNS MUST BE COORDINATED

WITH THE COR AT LEAST TWO WEEKS IN ADVANCE.

6. IF CRANES OR LIFTING EQUIPMENT IS USED COORDINATE

WITH THE COR FOR THE EXACT LOCATION OF THE

EQUIPMENT. A LIFT PLAN MUST BE PROVIDED TO THE COR.

7. IF PRODUCTS WITH HIGH VOC ARE USED, AFTER HOURS

USE MAY BE REQUIRED.

8. THE CONTRACTOR WILL BE RESPONSIBLE FOR

TEMPORARILY COVERING THE EXPOSED AREA OF THE

ROOF IF THE WORK CANNOT BE COMPLETED IN ONE DAY

OR IF WEATHER PERMITS.

9. THE CONTRACTOR MUST SUBMIT A SAFETY PLAN PRIOR TO

STARTING WORK.

10. INSTALL THE NEW ROOFING SYSTEM PER THE DETAILS ON

AI100, UNLESS THE MANUFACTURE RECOMMENDS

DIFFERENT TO ACHIVE A 25 YEAR WARRANTY.

11. INSTALL ROOFING DATA PLATE ON ALL NEW ROOF SYSTEM

INSTALLS, IN THE LOCATION SPECIFIED BY THE COR.

12. NOTIFY THE COR ONCE ALL MATERIALS FROM THE ROOF

HAVE BEEN REMOVED. THE COR WILL INSPECT THE DECK

PRIOR TO THE INSTALLATION OF THE NEW ROOF SYSTEM.

13. NOTIFY THE COR IF ANY DAMAGES ARE FOUND THAT MIGHT

LEAD TO FUTURE LEAKS OR DAMAGES TO GOVERNMENT

PROPERTY.

14. THE CONTRACTOR WILL BE REQUIRED TO REMOVE,

REINSTALL OR RELOCATE ANY EQUIPMENT THAT MAY BE

REQUIRED TO TO REMOVE OR REINSTALL THE NEW ROOF

SYSTEM.

15. THE CONTRACTOR SHALL MAINTAIN THE CURRENT SLOPE

OF THE ROOF.

16. THE CONTRACTOR FOLLOW ALL VA ICRA AND ISLM POLICIES

PUT IN PLACE BY THE INFECTION PREVENTION TEAM AND

N

THE AREAS LISTED ABOVE ARE ESTIMATES ONLY. THE EXACT MEASUREMENTS SHALL BE FIELD

VERIFIED BY THE CONTRACTOR DURING THE PRE-BID MEETING.

WEST TENTH STREET

Richard L. Roudebush VA Medical Center 1481 W. 10th St.

Indianapolis, Indiana 46202

REPLACE A WING ROOFS

583-21-203

AE101

1FY21

4 9

NBES5/11/2021

INSTALL DETAILS

N, BOYD

CHIEF OF ENGINEERING: PATRICK HERBER

ASSISTANT CHIEF OF ENGINEERING:N/A

1 ROOF DETAIL(CONCRETE DECK)

SCALE: NTSAE101

AutoCAD SHX Text Dwg. of

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text Drawing Title

AutoCAD SHX Text Approved: Project Director

AutoCAD SHX Text Project Title

AutoCAD SHX Text Date

AutoCAD SHX Text Location

AutoCAD SHX Text Checked

AutoCAD SHX Text Building Number

AutoCAD SHX Text Project Number

AutoCAD SHX Text Drawing Number

AutoCAD SHX Text Drawn

AutoCAD SHX Text Revisions:

AutoCAD SHX Text Date

AutoCAD SHX Text

ADDRESS:

AutoCAD SHX Text

PROJECT ENGINEERS:

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one quarter inch = one foot

AutoCAD SHX Text

RLR VAMC FORM 09-JD0227

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text C

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

NORTH REFERENCE

AutoCAD SHX Text

PLOT DATE:

AutoCAD SHX Text

DRAWN BY:

AutoCAD SHX Text

CAD DRAWING FILE LOCATION:

AutoCAD SHX Text

PLOT DATE:

AutoCAD SHX Text Engineering and Facilities Management Services

AutoCAD SHX Text E

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text N

AutoCAD SHX Text U

AutoCAD SHX Text D

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text I

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text N

AutoCAD SHX Text V

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text S

AutoCAD SHX Text A

AutoCAD SHX Text M

AutoCAD SHX Text O

AutoCAD SHX Text S

AutoCAD SHX Text F

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text C

AutoCAD SHX Text A

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text R

AutoCAD SHX Text A

ESTIMATED

SQ. FT. ROOF TYPE INSULATION DECK

80 22,568.00 EPDM POLYISO CONCRETE

81 1,148.00 EPDM POLYISO METAL

82 315.00 EPDM POLYISO CONCRETE

79 12,470.00 EPDM POLYISO CONCRETE

74 1,070.00 EPDM POLYISO METAL

TOTAL 37,571

SK

Y

LI

G

H

TS

57 58

33 38

71A

L

SK

Y

LI

G

H

TS

11 13

16 17

57 5849

44 52

33 38

71A

AREA OF WORK

N

ADHERED 90 MIL EPDM

FIBERBOARD

METAL DECKING

MECHANICAL FASTENER

NEW ADHERED EPDM MEMBRANE

NEW FIBERBOARD

EXISTING METAL DECKING

NEW MECHANICAL FASTENER

EXISTING

NEW

ROOFS 74 AND 81

20'

6'

PLAN NOTES

1. INSTALL NEW 5/8 FIBER BOARD OVER EXISTING METAL

DECK WITH NEW METAL FASTENERS.

2. INSTALL AND ADHERE THE NEW EPDM MEMBRANE OVER

THE ENTIRE ROOF. FOLLOW THE MANUFACTURES

RECOMMENDATIONS FOR A 25 YEAR WARRANTY. USE

DETAILS ON AE101, IF DETAILS ARE NOT PROVIDED BY

THE MANUFACTURE.

3. REINSTALL THE LIGHTING PROTECTION IN THE EXACT

LOCATION THAT IT WAS REMOVED. REPLACE LIGHTNING

PROTECTION CLIPS. IF THE LIGHTNING PROTECTION IS

MODIFIED IN ANY WAY THE CONTRACTOR WILL BE

REQUIRED TO UL CERTIFY THE LIGHTING PROTECTION

SYSTEM AT THE CONTRACTOR EXPENSE.

4. REINSTALL DOWNSPOUT SPLASH BLOCKS.

5. INSTALL ID PLACARD IN LOCATIONS DESIGNATED BY THE

COR.

6. INSTALL A NEW COMPLETE GUTTER SYSTEM WITH

DOWNSPOUTS AND SPLASH BLOCKS.

7. INSTALL A LADDER SYSTEM TO ALLOW ROOF ACCESS.

FROM ROOM 75. THE LADDER MUST HAVE A SAFETY

CAGE, OSHA COMPLAINT AND PERMANENTLY ATTACHED.

8. REAPPLY COPING CAULK AT ALL JOINTS AND SEAMS

AROUND THE ENTIRE PERIMETER OF THE HIGHLIGHTED

ROOFS.

9. COVER THE TWO 6' X 20'INTAKE PITS WITH PLYWOOD AND

PLASTIC TO PREVENT ODORS FROM ENTERING THE

FACILITY. DETAIL 2/AE102 AND.NTHE AREAS LISTED ABOVE…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .