Drawings Renovate Lab 583-18-102.pdf

PDF 23 MB Posted

Attached to
Z1DA--Renovate Lab - Histology, Cytology and Molecular 583-18-102
Solicitation number
36C25021B0020
Issued by

About this file

This document outlines a federal construction contract opportunity for the Veterans Administration. The solicitation is for project #583-18-102 to renovate the histology, cytology, and molecular lab at the Richard L. Roudebush VHA Health Care System. The contractor will provide all labor, materials, and equipment to complete the renovation in accordance with the solicitation documents, specifications, drawings, and applicable laws and codes. This is a 100% set-aside for Service-Disabled Veteran-Owned Small Businesses. The NAICS code is 236220 for commercial and institutional building construction up to $39.5 million. The estimated value of this construction project is between $2,000,000 to $5,000,000. The contracting agency is the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACTOR

STATEMENT OF BID ITEMS

ALTERNATE A - ELIMINATE RESIDENT AND TEACHING MICROSCOPE ROOMS

REMOVE RESIDENT ROOM (A-2099) AND TEACHING MICROSCOPE (A-2100) FROM SCOPE OF WORK. ALL WORK AND FINISHES IN

THESE ROOMS ARE TO BE OMITTED.

ALTERNATE B - ELIMINATE STERILE SOLUTION

REMOVE ALL BUILT-IN CASEWORK IN STERILE SOLUTION (A-2051) FROM THE SCOPE OF WORK.

A

B

BID ITEM #1: BASE BID.

CONTRACTOR HAULING

CONTRACTOR HAULING

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

GUIDON DESIGN INC.

1221 N. PENNSYLVANIA ST. | INDIANAPOLIS, IN. 46202

317.800.6388 | WWW.GUIDONDESIGN.COM

SUSTAINABLE ARCHITECTURE + ENGINEERING

PROJECT LEAD

Architect, Structural Engineer, Civil Engineer

C U s e rs

\d v a lla n d in g h a m \D o c u m e n ts

\1 .1

.0

V A

I n d ia n a p o lis

L a b

R e n o v a ti o n d v a lla n d in g h a m g u id o n d e s ig n .c o m

.r v t

/1

/2

:3

:5

P

M

GI000

COVER SHEET

HEAPY ENGINEERING

3850 PRIORITY WAY SOUTH SUITE 204

INDIANAPOLIS, IN 46240

317.571.8795

WWW.HEAPY.COM

RENOVATE LAB - HISTOLOGY,

CYTOLOGY, AND MOLECULAR

1481 W 10TH ST, INDIANAPOLIS, IN

583-18-102

06/24/2020 JC DV

BID DOCUMENTS

FULLY SPRINKLERED

RICHARD L. ROUDEBUSH VA MEDICAL CENTER

1481 W 10TH ST, INDIANAPOLIS, IN

BID DOCUMENTS

RENOVATE LAB - HISTOLOGY,

CYTOLOGY, AND MOLECULAR

583-18-102

SHEET LIST

SHEET

NUMBER SHEET NAME

GENERAL

GI000 COVER SHEET

GI101 LIFE SAFETY PLAN

GI102 PHASING PLAN - PHASE 1

GI103 PHASING PLAN - PHASE 2

GI104 PHASING PLAN - PHASE 3

GI105 PHASING PLAN - PHASE 4

GI106 PHASING PLAN - PHASE 5

GI107 PHASING PLAN - PHASE 6

GI108 PHASING PLAN - PHASE 7

GI109 PHASING PLAN - PHASE 8

GI110 PHASING PLAN - PHASE 9

GI111 PHASING PLAN - PHASE 10

GI112 PHASING PLAN - PHASE 11

GI113 PHASING PLAN - PHASE 12

GI114 EXISTING SECOND FLOOR EQUIPMENT PLAN

GI115 ICRA CLASS III (IDEAL)

GI116 ICRA CLASS III (ALTERNATIVE)

ARCHITECTURAL

AS001 ARCHITECTURAL SYMBOLS AND ABBREVIATIONS

AS002 ARCHITECTURAL STANDARDS

AD101 SECOND FLOOR DEMOLITION PLAN

AS101 SECOND FLOOR ARCHITECTURAL PLAN

AS111 SECOND FLOOR REFLECTED CEILING PLAN

AS502 CASEWORK SECTIONS

AS503 CASEWORK SECTIONS AND INTERIOR DETAILS

AS601 OPENING SCHEDULES

AF101 SECOND FLOOR FINISH PLAN

AQ101 SECOND FLOOR EQUIPMENT PLAN

AQ401 SECOND FLOOR ENLARGED EQUIPMENT PLANS

AQ402 SECOND FLOOR ENLARGED EQUIPMENT PLANS

AQ801 EQUIPMENT CASEWORK ELEVATIONS

AQ802 EQUIPMENT CASEWORK ELEVATIONS

AQ803 EQUIPMENT CASEWORK ELEVATIONS

FIRE PROTECTION

FP001 LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS

FP102 PARTIAL SECOND FLOOR PLAN - FIRE SUPPRESSION

PLUMBING

P001 LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS

PD102 PARTIAL FLOOR PLANS - REMOVALS

PD103 PARTIAL INTERSTITIAL SPACE PLAN - REMOVAL

PD104 PARTIAL THIRD FLOOR PLAN - REMOVALS

PP101 PARTIAL FIRST FLOOR PLANS - DRAINAGE & FIRE SUPPRESSION

PP102 PARTIAL SECOND FLOOR PLANS - DRAINAGE & DISTRIBUTION

PP103 PARTIAL SECOND FLOOR PLANS - DRAINAGE & DISTRIBUTION

PP104 PARTIAL THIRD FLOOR PLANS - DISTRIBUTION

PP105 PARTIAL THIRD FLOOR PLANS - DRAINAGE

P501 SCHEDULES & DIAGRAMS

P901 SOIL, WASTE AND VENT

MECHANICAL

M001 LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS

MD102 PARTIAL SECOND FLOOR PLAN - REMOVALS

MD103 PARTIAL THIRD FLOOR PLAN - REMOVALS

MH102 PARTIAL SECOND FLOOR PLANS - DUCTWORK

MH103 PARTIAL THIRD FLOOR PLANS - DUCTWORK

MP102 PARTIAL SECOND FLOOR PLAN - PIPING

MP103 PARTIAL THIRD FLOOR PLAN - PIPING

M501 DETAILS

M502 DETAILS

M503 DETAILS

M601 SCHEDULES

M701 CONTROLS AND AUTOMATION

M702 CONTROLS AND AUTOMATION

ELECTRICAL

E001 LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS

ED102 PARTIAL SECOND FLOOR PLAN - REMOVALS

EL102 PARTIAL SECOND FLOOR PLANS - LIGHTING, POWER

EP102 PARTIAL SECOND FLOOR PLANS - POWER

EP401 ENLARGED TEMPORARY PLANS

EY102 PARTIAL SECOND FLOOR PLANS - FIRE ALARM

E501 DETAILS

E601 SCHEDULES & DIAGRAMS

E602 PANEL SCHEDULE

TECHNOLOGY

T001 TECHNOLOGY LEGEND

TD102 PARTIAL SECOND FLOOR PLAN - TECHNOLOGY - REMOVALS

T101 PARTIAL SECOND FLOOR PLAN - TECHNOLOGY - TEMPORARY

T102 PARTIAL SECOND FLOOR PLAN - TECHNOLOGY - NEW WORK

T401 TECH ROOM

T501 TECHNOLOGY DETAILS

T502 SECURITY DETAILS

Contact:Contact:Contact: Contact: Contact:

HEAPY ENGINEERING

Joel Summers

Sr. Electrical Designer

ELECTRICAL

ENGINEER

HEAPY ENGINEERING

Luke Richter

Mechanical Engineer

3850 Priority Way South Suite 204 Indianapolis, IN 46240 p: 317.571.8795 ext. 3515 e: ldrichter@heapy.com

MECHANICAL

ENGINEER

RICHARD L. ROUDEBUSH

VA MEDICAL CENTER

Mary Piwowarski

Project Engineer / COR

Richard L. Roudebush VAMC Indianapolis, IN 46202 p: 317.988.4521 e: mary.piwowarski@va.gov

OWNER

GUIDON DESIGN INC.

David Vallandingham

Architect / Project Manager

1221 N. Pennsylvania St.

Suite 200 Indianapolis, IN 46202 p: 317.800.6388 x 130 e: dvallandingham@guidondesign.com

ARCHITECT

HEAPY ENGINEER

Matthew Graham

Principal, Healthcare Practice

LEAD ENGINEER

3850 Priority Way South Suite 204 Indianapolis, IN 46240 p: 317.571.8795 e: jasummers@heapy.com

1400 West Dorothy Lane Dayton, OH 45409 p: 937.224.0861 e: msgraham@heapy.com

AREA MAP

VICINITY MAP

Contact:

HEAPY ENGINEERING

Russell Gill

Sr. Technology Designer

TECHNOLOGY

ENGINEER

3850 Priority Way South Suite 204 Indianapolis, IN 46240 p: 317.571.8795 e: rsgill@heapy.com

Revisions: Date:

CONTRACTOR HAULING PATH - SECOND FLOOR CONTRACTOR HAULING PATH - BASEMENT

UP

UP

CODE CRITERIA

GENERAL: THIS SUMMARY OF CODE REQUIREMENTS IS BASED PRIMARILY ON NFPA 101 (LSC). DESIGN FEATURES NOT ADDRESSED BY NFPA 101 OR DOCUMENTS REFERENCED THEREIN SHALL COMPLY WITH THE REQUIREMENTS OF THE LATEST EDITION OF THE IBC OR AS OTHERWISE IDENTIFIED. FOR DESIGN FEATURES THAT ARE ADDRESSED BY BOTH THE IBC AS WELL AS NFPA 101 OR A DOCUMENT REFERENCED BY NFPA 101, THE REQUIREMENTS OF NFPA 101 OR THE DOCUMENT REFERENCED BY NFPA 101 SHALL BE USED EXCLUSIVELY (THIS APPLIES EVEN IF THE IBC REQUIREMENTS ARE DIFFERENT).

LOCAL CODES: AS AN AGENCY OF THE FEDERAL GOVERNMENT, VA IS NOT SUBJECT TO LOCAL IMPOSITION OF CODE ENFORCEMENT PROCEDURES (DRAWING REVIEWS, BUILDING PERMITS, INSPECTIONS, FEES, ETC.). VA MUST FUNCTION AS THE AUTHORITY HAVING JURISDICTION (AHJ) AND THUS HAS THE RESPONSIBILITY TO GUARD

PUBLIC HEALTH AND SAFETY THROUGH ENFORCING ITS ADOPTED CODES.

NOTES:

CONFLICTS BETWEEN NATIONALLY RECOGNIZED CODES AND STANDARDS AND VA REQUIREMENTS – SHOULD A CONFLICT EXIST BETWEEN VA REQUIREMENTS AND VA ADOPTED NATIONALLY RECOGNIZED CODES AND STANDARDS, THE CONFLICT SHALL BE BROUGHT TO THE ATTENTION OF VA. THE RESOLUTION OF THE CONFLICT SHALL BE MADE BY THE AUTHORITY HAVING JURISDICTION FOR VA TO ENSURE A CONSISTENCY SYSTEM WIDE.

CODE REVIEW

THE 2018 EDITION OF THE LIFE SAFETY CODE, NFPA 101, HAS BEEN USED TO REVIEW THIS PROJECT FOR COMPLIANCE WITH THE FIRE AND LIFE SAFETY REQUIREMENTS.

FOR FEATURES NOT ADDRESSED BY NFPA 101 AND THE REFERENCED NATIONAL FIRE CODES, THE 2018 EDITION OF THE INTERNATIONAL BUILDING CODE HAS BEEN

USED.

PROJECT SCOPE

THE PROJECT SCOPE INCLUDES RENOVATION OF APPROXIMATELY 6,800 SF OF AN EXISTING 8,730 SF PATHOLOGY AND MICROBIOLOGY LAB SUITE. THE PROJECT INCLUDES DEMOLITION OF MUCH OF THE EXISTING SUITE. THE RENOVATION INCLUDES NEW WALLS, DOORS, CEILINGS AND FINISHES. IT ALSO INCLUDES NEW

MECHANICAL DISTRIBUTION, PLUMBING, AND ELECTRICAL.

CODE ANALYSIS

THE CONSTRUCTION TYPE IS DETERMINED BASED UPON THE ALLOWABLE AREA AND HEIGHT REQUIREMENTS OF CHAPTER 5 OF THE 2018 IBC. CONSTRUCTION TYPE AND MATERIALS SHALL BE PER CHAPTER 6 OF THE IBC FOR TYPE1A (IBC CHAPTER 5) 333 (NFPA 101) CONSTRUCTION AS FOLLOWS:

1. OCCUPANCY TYPE: B USINESS OCCUPANCY ADJACENT TO AN I-2 INSTITUTIONAL, IBC CHAPTER 3/LSC CHAPTER 18 HEALTHCARE

2. CONSTRUCTION TYPE: 1A (IBC CHAPTER 5) 333 (NFPA 101)

3. FIRE RESISTIVE RATINGS TYPE 1A CONSTRUCTION, CHAPTER 6 IBC/NFPA 101:

STRUCTURAL FRAME: NONCOMBUSTIBLE, 3-HOUR FIRE RESISTIVE

BEARING WALLS

EXTERIOR: NONCOMBUSTIBLE,3-HOUR FIRE RESISTIVE

INTERIOR: NONCOMBUSTIBLE, 3-HOUR FIRE RESISTIVE

NON-BEARING WALLS AND PARTITIONS

EXTERIOR: NONCOMBUSTIBLE, 1-HOUR FIRE RESISTIVE

INTERIOR: NONCOMBUSTIBLE, 0-HOUR FIRE-RESISTIVE

FLOOR: NONCOMBUSTIBLE, 2-HOUR FIRE RESISTIVE

ROOF: NONCOMBUSTIBLE, 1 1/2-HOUR FIRE RESISTIVE

SHAFT ENCLOSURES 2-HOUR FIRE RESISTIVE >4 STORIES (IBC 713.4, LSC 12.3.6)

SHAFT ENCLOSURES 1-HOUR FIRE RESISTIVE <4 STORIES (IBC 713.4, LSC 12.3.6)

4. STRUCTURAL DESIGN SHALL COMPLY WITH CHAPTER 16 OF THE IBC.

5. ALLOWABLE HEIGHT:UNLIMITED FT (IBC, TABLE 504.3)

6. ALLOWABLE NUMBER OF STORIES ABOVE GRADE PLAN: UNLIMITED (IBC, TABLE 504.4)

7. ALLOWABLE AREA: BASED UPON B OCCUPANCY, 1A CONSTRUCTION TYPE, AND FULLY SPRINKLED: ALLOWABLE AREA: UNLIMITED (IBC, TABLE 506.2)

8. BUILDING SEPARATION: BASED ON A 30 FEET PLUS FIRE SEPARATION DISTANCE A 0-HOUR FIRE RESISTANCE WALL RATING IS REQUIRED. (IBC, TABLE 602)

9. OCCUPANCY SEPARATION: A 1- HOUR OCCUPANCY SEPARATION IS REQUIRED BETWEEN THE AMBULATORY CLINIC B OCCUPANCY (LCS CHAPTER 18) AND OTHER

OCCUPANCIES. (LSC 20.1.3.2)

SECTIONS OF HEALTH CARE FACILITIES SHALL BE PERMITTED TO BE CLASSIFIED AS OTHER OCCUPANCIES, PROVIDED THAT THEY MEET BOTH OF THE FOLLOWING

CONDITIONS: (LSC 18.1.3.3)

(1) THEY ARE NOT INTENDED TO PROVIDE SERVICES SIMULTANEOUSLY FOR FOUR OR MORE INPATIENTS FOR PURPOSES OF HOUSING, TREATMENT, OR CUSTOMARY

ACCESS BY INPATIENTS INCAPABLE OF SELF-PRESERVATION.

(2) THEY ARE SEPARATED FROM AREAS OF HEALTH CARE OCCUPANCIES BY CONSTRUCTION HAVING A MINIMUM 2-HOUR FIRE RESISTANCE RATING IN ACCORDANCE

WITH CHAPTER 8.18.1.3.4 CONTIGUOUS NON-HEALTH CARE OCCUPANCIES.

10. MEANS OF EGRESS

• CLEAR WIDTH OF CORRIDORS SHALL BE CLEAR 8 FEET.

• AISLES, CORRIDORS, AND RAMPS IN ADJUNCT AREAS NOT INTENDED FOR THE HOUSING, TREATMENT, OR USE OF INPATIENTS SHALL BENT LESS THAN 44 IN.

(1120 MM) IN CLEAR AND UNOBSTRUCTED WIDTH.

• CLEAR WIDTH OF DOORS SHALL BE CLEAR 42 INCHES FROM SLEEPING ROOMS; DIAGNOSTIC AND TREATMENT AREAS, SUCH AS X-RAY, SURGERY, OR PHYSICAL

THERAPY;.

• CLEAR WIDTH OF DOORS SHALL BE CLEAR 32 INCHES

• NOT LESS THAN 2 EXITS SHALL BE PROVIDED PER FLOOR.

• ADDITION OCCUPANCY LOAD: <500 THEREFORE 2 EXITS REQUIRED (LSC 7.4.1)

• MAXIMUM TRAVEL DISTANCE, FULLY SPRINKLED: 200 FEET (LSC 18.2.6.2.1)

• COMMON PATH OF TRAVEL SHALL NOT EXCEED 100 FEET (LSC 18.2.5.3)

• DEAD END CORRIDORS SHALL NOT EXCEED 30 FEET. (LSC 18.2.5.2)

• MEANS OF EGRESS SHALL BE ILLUMINATED PER 7.9. (LSC 18.2.6.2.1)

• EMERGENCY LIGHTING SHALL BE PER 7.9. (LSC 18.2.9)

• EXIT SIGNAGE SHALL BE PROVIDED 7.10. (LSC 18.2.10)

11. WHERE GENERAL ANESTHESIA OR LIFE SUPPORT EQUIPMENT IS USED AND ESSENTIAL ELECTRICAL SYSTEM PER NFPA 99 SHALL BE PROVIDED.

12. HAZARDOUS AREAS. ANY HAZARDOUS AREAS SHALL BE PROTECTED IN ACCORDANCE WITH SECTION 8.7, AND THE AREAS DESCRIBED IN TABLE 18.3.2.1 SHALL BE

PROTECTED AS INDICATED. (LSC 18.3.2.2)

TABLE 18.3.2.1

• HAZARDOUS AREA PROTECTION HAZARDOUS AREA DESCRIPTION PROTECTION/SEPARATION BOILER AND FUEL-FIRED HEATER ROOMS 1 HOUR CENTRAL/BULK

LAUNDRIES LARGER THAN 100 FT2 (9.3 M2)1 HOUR

• LABORATORIES EMPLOYING FLAMMABLE OR COMBUSTIBLE MATERIALS IN QUANTITIES LESS THAN THOSE THAT WOULD BE CONSIDERED A SEVERE HAZARD SEE

18.3.6.3.11.

• LABORATORIES THAT USE HAZARDOUS MATERIALS THAT WOULD BE CLASSIFIED AS A SEVERE HAZARD IN ACCORDANCE WITH NFPA 99, STANDARD FOR HEALTH

CARE FACILITIES 1 HOUR

• PAINT SHOPS EMPLOYING HAZARDOUS SUBSTANCES AND MATERIALS IN QUANTITIES LESS THAN THOSE THAT WOULD BE CLASSIFIED AS A SEVERE HAZARD 1

HOUR

• PHYSICAL PLANT MAINTENANCE SHOPS 1 HOUR

• ROOMS WITH SOILED LINEN IN VOLUME EXCEEDING 64 GAL (242 L)1 HOUR

• STORAGE ROOMS LARGER THAN 50 FT2(4.6 M2) BUT NOT EXCEEDING 100 FT2 (9.3 M2) AND STORING COMBUSTIBLE MATERIAL SEE 18.3.6.3.11.

• STORAGE ROOMS LARGER THAN 100 FT2 (9.3 M2) AND STORING COMBUSTIBLE MATERIAL 1 HOUR

• ROOMS WITH COLLECTED TRASH IN VOLUME EXCEEDING 64 GAL (242 L)1 HOUR† MINIMUM FIRE RESISTANCE RATING.

13. INTERIOR FINISH

• WALLS AND CEILINGS: INTERIOR FINISH FLAME SPREAD SHALL BE LIMITED PER CHAPTER 10.2 OF THE NFPA 101 TO CLASS A MATERIALS. (LSC 18.4.3.6.2)

• · CLASS A: FLAME SPREAD 0-25; SMOKE DEVELOPED 0-450.

• FLOORS: INTERIOR FLOOR FINISH SHALL BE CLASS I.

• FABRIC DRAPERIES, CURTAINS (EXCLUDING SHOWER CURTAINS, BUT INCLUDING CUBICLE CURTAINS), AND OTHER LOOSELY HANGING FABRICS AND FILMS

SERVING AS FURNISHINGS OR DECORATIONS IN HEALTH CARE OCCUPANCIES MUST MEET THE FLAME RESISTANCE REQUIREMENTS OF NFPA 701, STANDARD

METHODS OF FIRE TESTS FOR FLAME-RESISTANT TEXTILES AND FILMS.

• UPHOLSTERED FURNITURE AND MATTRESSES. UPHOLSTERED FURNITURE AND MATTRESSES MUST ALSO MEET SPECIFIED REQUIREMENTS, BASED ON NFPA

260, NFPA 261, NFPA 266, 16 CFR 1632, ASTME E1537, AND ASTME E1590

14. EXTINGUISHMENTS REQUIREMENTS, PORTABLE FIRE EXTINGUISHERS SHALL BE PROVIDED PER NFPA 10.

15. DETECTION, ALARM, AND COMMUNICATIONS SYSTEMS.

• FIRE ALARM SYSTEM SHALL BE PROVIDED LSC, NFPA 70 (NEC) AND NFPA 72. (LSC 9.6.1)

• FIRE ALARM MAY BE BY MANUAL MEANS (LSC 18.3.4.2.1)(LSC 9.6.2)

• OCCUPANT NOTIFICATION SHALL BE THROUGH AUTOMATIC MEANS PER 9.6.3. (LSC 18.3.4.3)

• SMOKE DETECTION SHALL BE PROVIDED PER NFPA 72.

• EMERGENCY RESPONDER NOTIFICATION SHALL BE NOTIFIED BY ALARM AND DETECTION SYSTEM PER 9.6.4. (LSC 18.3.4.3.2)

16. FIRE SUPPRESSION:

SPRINKLER SYSTEM: BUILDING IS REQUIRED TO BE SPRINKLED THROUGHOUT IN ACCORDANCE WITH NFPA 13.

THE SPRINKLER SYSTEM SHALL BE HYDRAULICALLY DESIGNED IN ACCORDANCE WITH 2013 EDITION OF NFPA 13 AND THE SIXTH EDITION OF THE DEPARTMENT OF

VETERANS AFFAIRS FIRE PROTECTION DESIGN MANUAL: MINIMUM DESIGN REQUIREMENTS:

STORAGE MECHANICAL AND ELECTRICAL ROOMS SHALL BE PROTECTED AS:

ORDINARY HAZARD OCCUPANCY, GROUP 1: 0.15 GPM/FT2 OVER 1,500 FT2.

HOSE STREAM ALLOWANCE: 250 GPM

ALL OTHER AREAS SHALL BE PROTECTED AS:

LIGHT HAZARD OCCUPANCY: 0.10 GPM/FT2 OVER 1,500 FT2.

HOSE STREAM ALLOWANCE: 100 GPM

CODE ANALYSIS - NFPA 101, INSTITUTIONAL HEALTHCARE CHAPTER 18

CODE ANALYSIS LEGEND

TOTAL OCCUPANCY

FEC

EXIT

OCCUPANCY LOAD FACTOR

EXITS REQUIRED

SQUARE FOOTAGE

OCCUPANCY TYPE

EGRESS EXIT SIGNAGE

FIRE EXTINGUISHER CABINET

DIAGONAL DISTANCE

EXIT SEPARATION DISTANCE

EGRESS PATH

2 HR - FIRE SEPARATION

1 HR - FIRE SEPARATION

SMOKE RESISTIVE HAZARDOUS AREA

B

1500 SF

VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA NATIONAL CAD

STANDARD APPLICATION GUIDE, AND OTHER GUIDANCE ON THE TECHNICAL

INFORMATION LIBRARY (TIL) (HTTP://WWW.CFM.VA.GOV/TIL/).

VA MENTAL HEALTH FACILITIES DESIGN GUIDE, DECEMBER 2010 (REV. 08/01/2014)

VA BARRIER FREE DESIGN GUIDE PG-18-13, ABAAS

ARCHITECTURAL, AUGUST 1, 2014

ASBESTOS ABATEMENT, JULY 2011

CMP SCHEDULE AND RISK MANAGEMENT, VOL. 1 & 2, DECEMBER 2012

ELECTRICAL, DECEMBER 2015

ENERGY SUSTAINABILITY, MAY 2014

EQUIPMENT, JANUARY 2006

ESTIMATING, MARCH 8, 2011

NFPA INTERIM GUIDANCE FOR PROJECTS, PG-18-17, SEPTEMBER 30, 2010

FIRE PROTECTION, SEVENTH EDITION REVISED DECEMBER 2015

HVAC FOR NEW, REPLACEMENT, ADD. AND REN. OF EXIST. CA FACILITIES, MARCH 2011

INTERIOR DESIGN, MAY 2008

PHYSICAL SECURITY DESIGN MANUAL, JANUARY 2015

PLUMBING, NOVEMBER 2014

STRUCTURAL, FEBRUARY 1, 2014

WAY FINDING AND SIGNAGE, INTERIOR, DECEMBER 2012

SEISMIC DESIGN REQUIREMENTS, H-18-8, AUGUST 2013

ENVIRONMENTAL PLANNING GUIDANCE PG-18-17 NEPA INTERIM GUIDELINES FOR

PROJECTS SEPTEMBER 30, 2010

ELEVATOR DESIGN MANUAL, AUGUST 2016

EPA GUIDELINES CHECKLIST

VA DESIGN MANUALS PG-18-10:

GOVERNING CODES:

REFER TO VA MANUAL PG-18-3 FOR ADDITIONAL CODES, STANDARDS, GUIDELINES AND

REGULATIONS, BELOW LISTING IS NOT COMPREHENSIVE.

ICC, INTERNATIONAL BUILDING CODES, 2018 EDITION (IBC)

ASCE-07-10

ACI 318-11

ACI 530-11

AISC 341-10

AISC 360-10

PCI MNL 120-10, DESIGN HANDBOOK

NFPA 10, STANDARD FOR PORTABLE FIRE EXTINGUISHERS, 2018 EDITION

NFPA 13, STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS, 2019 EDITION

NFPA 14, STANDARD FOR THE INSTALLATION OF STANDPIPE AND HOSE SYSTEM, 2019

EDITION

NFPA 20, STANDARD FOR THE INSTALLATION OF STATIONARY PUMPS FOR FIRE

PROTECTION, 2019 EDITION

NFPA 24, STANDARD FOR THE INSTALLATION OF PRIVATE FIRE SERVICE MAINS AND

THEIR APPURTENANCE, 2019 EDITION.

NFPA 54 NATOINAL FUEL GAS CODE, 2018 EDITION

NFPA 70, NATIONAL ELECTRIC CODE, 2017 EDITION

NFPA 72, NATIONAL FIRE ALARM CODE, 2019 EDITION

NFPA 75, STANDARD FOR THE PROTECTION OF ELECTRICAL COMPUTER/DATA

PROCESSING EQUIPMENT, 2017 EDITION

NFPA 77, RECOMMENDED PRACTICE ON STATIC ELECTRICITY, 2019 EDITION

NFPA 80, STANDARD FOR FIRE DOORS AND FIRE WINDOWS, 2019 EDITION

NFPA 90A, STANDARD FOR THE INSTALLATION OF AIR-CONDITIONING AND VENTILATING

SYSTEMS, 2018 EDITION.

NFPA 92, STANDARD FOR SMOKE CONTROL SYSTEMS, 2018 EDITION

NFPA 99, STANDARD FOR HEALTHCARE FACILITIES, 2018 EDITION

NFPA,99B, STANDARD FOR HYPOBARIC FACILITIES, 2018 EDITION

NFPA 101, LIFE SAFETY CODE, 2018 EDITION

NFPA 110, STANDARD FOR EMERGENCY AND STANDBY POWER SYSTEMS

NFPA 220, STANDARD TYPES OF BUILDING CONSTRUCTION, 2018 EDITION.

NFPA 780, STANDARD FOR INSTALLATION OF LIGHTING PROTECTION SYSTEMS, 2017

EDITION

NFPA 54 TYPE 2 CLOTHES DRYER UL 705 DEDPY, 2015 EDITION

MOST RECENT EDITION OF NFPA NATIONAL FIRE CODES WITH THE EXCEPTION OF NFPA

5000 AND NFPA 900

ANSI A117.1-2017 STANDARD ON ACCESSIBLE & USABLE BUILDINGS AND FACILITIES

2010 ADA STANDARDS FOR ACCESSIBLE DESIGN

OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS

ENERGY POLICY ACT OF 2005 (EPACT)

EXECUTIVE ORDER 13423: STRENGTHENING FEDERAL ENVIRONMENTAL, ENERGY, AND

TRANSPORTATION MANAGEMENT.

SUITE

EXIT

ACCESS

SUITE

EXIT

ACCESS

SUITE

EXIT

ACCESS

A

B

C

D

E

F

F.3

16 15 14 13 12

E G

R E

S S

D

IS

T A

N C

E T

O S

U

IT

E E

X

IT

6"

E X

IS

T

IN

G

E G

R E

S S

D

IS

T A

N C

E T

O S

U

IT

E E

X

IT

8'

0"

G

G.6

11 10 9

EXIT

EXIT

9535 SF

10096

B

FEC

FEC

FEC

E G

R E

S S

D

IS

T A

N C

E T

O E

X

IT

: 7 8'

T O

T A

L E

G R

E S

S D

IS

T

A N

C E

T O

E X

IT

9'

4"

SUITE

EXIT

ACCESS

EGRESS DISTANCE

TO SUITE EXIT: 95' - 6"

PROVIDED EXIT WIDTHS = 148"

REQURIED EXIT WIDTHS = 19.2"

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

GUIDON DESIGN INC.

1221 N. PENNSYLVANIA ST. | INDIANAPOLIS, IN. 46202

317.800.6388 | WWW.GUIDONDESIGN.COM

SUSTAINABLE ARCHITECTURE + ENGINEERING

PROJECT LEAD

Architect, Structural Engineer, Civil Engineer

C U s e rs

\d v a lla n d in g h a m \D o c u m e n ts

\1 .1

.0

V A

I n d ia n a p o lis

L a b

R e n o v a ti o n d v a lla n d in g h a m g u id o n d e s ig n .c o m

.r v t

/1

/2

:3

:5

P

M

GI101

LIFE SAFETY PLAN

HEAPY ENGINEERING

3850 PRIORITY WAY SOUTH SUITE 204

INDIANAPOLIS, IN 46240

317.571.8795

WWW.HEAPY.COM

RENOVATE LAB - HISTOLOGY,

CYTOLOGY, AND MOLECULAR

1481 W 10TH ST, INDIANAPOLIS, IN

583-18-102

06/24/2020 JC DV

BID DOCUMENTS

FULLY SPRINKLERED

SCALE: 3/32" = 1'-0"GI101

1 PARTIAL SECOND FLOOR LIFE SAFETY PLAN

N

SCALE: 1" = 100'-0"

KEY PLAN

N

A

B

C

D

E

F

16 15 14 13 12

DEVELOP.

(F.I.S.H.)

A-2063

EM SCOPE

A-2065

RESIDENTS

A-2099

LAB

INFORMATION

MANAGER

A-2078

PROCEDURE

ROOM

A-2077

MOLECULAR

PATHOLOGY

LABORATORY

A-2043

WALK-IN

LABORATORY

A-2053

STORAGE

A-2054A

TELE. ROOM

A-2056

ELEC. ROOM

A-2057

TANK

A-2055

FINISH

A-2060

FILES

A-2061

H.A.C.

A-2103

LIFT

C-2 REFRIGERATOR

A-2101

TEACHING

MICROSCOPY

A-2100

STAFF

PATHOLOGIST

A2038

STAFF

PATHOLOGIST

A-2039

STAFF

PATHOLOGIST

A-2040

A-2045

SUPERVISOR

A-2046

MYCOBACT.

A-2047

BIOSAFETY

A-2049

PROSTATE

CANCER

RESEARCH

A-2133

A-2132A

SUPERVISOR

A-2058

CONTAIN.

A-2048

CYTOLOGY

A-2067

HISTOLOGY

A-2042

CYTOLOGY

A-2041

CORRIDOR

C2-6

CORRIDOR

C2-5

A-2059

MICROBIOLOGY

A-2044

CORRIDOR

C2-2

CORRIDOR

C2-3

CORRIDOR

A2-8

SPEC. CHEM

A-2132

ATRIUMATRIUM

FLUOR. MS.

A-2054

INAC. SLD. BLK.

A-2066

LIFT

C-1

CORRIDOR

C2-4

CORRIDOR

C2-9

M51A

M51B

M51C

A48

A38

A39

M21

M20

M37

A34

A35

A36A37

M35B

M35A

A40

A20C

A20B

A20D

A19B

A19D

A19C

A19A20M46

M29

M42

M45

M43

M17

M25 M44

M26

M19 M39

M30

A27A

M22

M12

A27BA27C

A28

A40

A7A A24A

A7CA7B

A9A

A9B

A8A12A

A10A

A11AA12BA10B

A11BA11C

A12C A10C

A10D

A12D

A11D

A17BA17AA16

A26A

A60

A61

M53M52

A3

M15 M6M16

M7 M5

M13

M17

M8

M9

M10

M17

M12

MIN.

5' - 0"

CONTRACTOR

1M

IN

5'

". 22

STERILE

SOLUTION

A-2051

STERILIZER

A-2050GIP STORAGE

A-2054A

PHASING NARRATIVE: PHASE 1A

PHASE 1:

DURING THIS PHASE THE STERILE SOLUTIONS ROOM WILL

BE CONSTRUCTED. GIP STORAGE IS MOVED FROM ITS

EXISTING LOCATION TO THE NEW GIP STORAGE ROOM

WHICH IS ALSO CONSTRUCTED IN THIS PHASE.

CONTINUOUS FIRESAFE SEALANT

TOP AND BOTTOM, & BOTH SIDES

3 1/2" SOUND ATTENUATION

BATT.

5/8" TYPE X GYPSUM BOARD, BOTH

SIDES

3 5/8" METAL STUD @ 16" O.C.

WITH RUNNER CHANNELS ALONG

TOP AND BOTTOM

CONSTRUCTION

SIDE

PUBLIC

SIDE

6 MIL. FIRE RETARDANT VISQUEEN

MEMBRANE. CONTINUOUSLY

ADHERE TO THE STRUCTURAL DECK

ABOVE AND TO THE FLOOR BELOW

WITH TAPE.

UNDERSIDE OF STRUCTURAL DECK

UL LISTING:

U465

COORDINATE WITH EXISTING

CEILING

PUBLIC

SIDE

1 HOUR FIRE RATED METAL DOOR ASSEMBLY

AND FRAME WITH SEALS, BLUE CORE (SEE

COR), HARDWARE AND CLOSER

TRIATEK MONITOR

HAND SANITIZER

SEAL ALL EDGES WITH TAPE

SEAL ALL EDGES WITH TAPE

REFER TO TEMPORARY BARRIER TYPE

FOR REQUIRED CONDITION TO

STRUCTURE ABOVE

VA / OSHA TEMPORARY SIGNAGE

IC/PHASING LEGEND

TEMPORARY WALLS. SEE PLAN AND

PLAN NOTES

TEMPORARY CONSTRUCTION ACCESS

DOORS

REFERENCE AREA FOR ABOVE

CEILING WORK ON FLOOR BELOW.

REFER TO ENGINEERING DRAWINGS

FOR FULL SCOPE OF WORK

BEYOND PROJECT BOUNDARY

PROJECT BOUNDARY

INFECTION CONTROL PLAN NOTES #

INFECTION CONTROL PROJECT INFORMATION

CONSTRUCTION ACTIVITY - FIRE RISK: TYPE C

PATIENT RISK GROUP: HIGH

CLASS OF PRECAUTION MATRIX: III

PROVIDE TEMPORARY 1 HR FIRE RATED SMOKE BARRIER WALL

CONSTRUCTION PER NFPA 241. REFER TO DETAIL 2/GI102.

PROVIDE TEMPORARY INFECTION CONTROL CONSTRUCTION DOOR WITH BLUE

CORE. REFER TO ELEVATION 4/GI102.

NOT USED

PROVIDE TEMPORARY INFECTION CONTROL PLASTIC BARRIER WALL

CONSTRUCTION. REFER TO SPECIFICATION FOR ADDITIONAL INFORMATION.

REFER TO LIST OF REQUIRED INFECTION CONTROL PRECAUTIONS OUTLINED

BY CLASS IN SPECIFICATION 010110 AND ADDITIONAL INFORMATION.

REFER TO DRAWINGS, SPECIFICATIONS AND DOOR HARDWARE SCHEDULE

FOR ADDITIONAL INFORMATION.

PROJECT SHALL BE COMPLETED IN 12 PHASES.

COORDINATE FULL SCOPE OF WORK WITH ENGINEERING DRAWINGS AND

FIELD VERIFICATION. CONTRACTOR IS RESPONSIBLE FOR SCOPE OF ABOVE

CEILING WORK REQUIRED ABOVE AND BELOW THE FLOOR PLATE OF THE

PROJECT BOUNDARY.

COORDINATE LOCATION OF TEMPORARY INFECTION CONTROL (IC) BARRIER

WALL CONSTRUCTION AND INFECTION CONTROL (IC) MEASURES WITH COR

AND PATIENT SAFETY/ INFECTION CONTROL REPRESENTATIVE. TEMPORARY

IC BARRIER WALL CONSTRUCTION LOCATIONS IN DRAWINGS ARE

APPROXIMATE. CONTRACTOR SHALL PROVIDE DRAWING TO COR AND

PATIENT SAFETY/ INFECTION CONTROL REPRESENTATIVE ONCE ICRA

PROTOCOLS AND PLAN IS APPROVED.

CONTRACTOR TO VERIFY 1-HOUR WALL CONTINUOUSLY WRAPS SUITE AS

ANNOTATED IN DRAWINGS. CONTRACTOR TO CORRECT EXISTING WALLS

THAT ARE NOT 1-HR RATED TO SURROUND SUITE IN REQUIRED SEPARATION.

SCHEDULE AND TIME OF CONSTRUCTION WORK TO BE APPROVED BY COR

AND NURSING STAFF BEFORE CONSTRUCTION MAY BEGIN. PROVIDE PHASING

INFORMATION FOR ABOVE CEILING WORK IN THE CONTRACTOR PROVIDED

CMP SCHEDULE FOR WORK ALSO REQUIRED ABOVE AND BELOW THE FLOOR

PLATE OF THE PROJECT BOUNDARY.

ABOVE CEILING WORK SHALL TAKE PLACE BETWEEN THE HOURS OF 5:00 PM

AND 5:00 AM. IN AREAS THAT REQUIRE ABOVE CEILING WORK WHERE

CEILINGS ARE TO REMAIN, CEILING TILES SHALL BE REMOVED AND STORED IN

A SAFE MANOR UNTIL CEILING TILES CAN BE REINSTALLED. DAMAGED AND

BROKEN CEILING TILES SHALL BE REPLACED BY CONTRACTOR.

EXIT/ACCESS FOR ADJACENT OPERATIONAL AREAS SHALL BE MAINTAINED

DURING NORMAL BUSINESS HOURS. SEE SPECIFICATION FOR HOURS OF

OPERATION.

WORK REQUIRING VIBRATION OR LOAD NOISE SHALL TAKE PLACE BETWEEN

THE HOURS OF 5:00 PM AND 5:00 AM. EVERY EFFORT SHALL BE MADE TO

KEEP NOISE AND VIBRATION TO A MINIMUM.

PROVIDE THE FOLLOWING INFECTION CONTROL MEASURES, A 24"X36" STICKY

WALK OFF MAT AND HAND SANITIZER AT EACH TEMPORARY DOOR LOCATION.

MAT SHALL BE REPLACED OR CLEANED AS NECESSARY

PROVIDE THE VA AND OSHA REQUIRED TEMPORARY SIGNAGE AT EACH

TEMPORARY DOOR LOCATION.

CONTRACTOR SHALL SUPPLY SPILL KIT. SPILL KIT TO INCLUDE SHOP VAC,

MULTI-PURPOSE SPILL CONTROL SORBENTS TO ABSORB NON AGGRESSIVE

LIQUIDS UP TO 30 GALLONS.

ALL NEW MATERIAL MOVED THROUGH THE FACILITY SHALL BE COVERED WITH

4 MIL. POLY SHEET.

ALL DEMOLITION MATERIAL SHALL BE REMOVED FROM THE PROJECT

BOUNDARY THROUGH THE FACILITY TO DUMPSTER ALONG VA APPROVED

ROUTE IN ENCLOSED DUMPSTER CART DESIGNED FOR SUCH PURPOSED

WITH A LID.

ALL MATERIAL, DEBRIS AND HAZARDOUS MATERIALS SHALL BE PROPERLY

STORED IN DESIGNATED AREAS AND APPROVED CONTAINERS. FLAMMABLE

MATERIALS SHALL NOT BE STORED IN THE FACILITY.

PROVIDE CONTAINMENT CART FOR ABOVE CEILING ACCESS OUTSIDE

PROJECT BOUNDARY.

TEMPORARY PLASTIC CONSTRUCTION BARRIERS WILL BE REQUIRED TO

PROTECT THE LAB SPACE FROM THE CONSTRUCTION DEBRIS CREATED

WHEN CONSTRUCTING TEMPORARY PARTITIONS.

A

B

C

D

E

F

G

H

I

J

K

L

M

N

O

P

Q

R

INFECTION CONTROL GENERAL NOTES

PHASING GENERAL NOTES #

A

B

C

PROJECT AREAS TO BE OCCUPIED BY STAFF AND VETERANS THROUGHOUT

CONSTRUCTION.

CONSTRUCTION WORK BEHIND TEMPORARY CONSTRUCTION PARTITIONS

SHALL BE COMPLETED DURING NIGHT SHIFTS, 5:00 PM TO 5:00 AM.

REFER TO SPECIFICATION 01 00 00 FOR INFORMATION ON WORK DURATION

FOR EACH PHASE AND AREA OF WORK.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

GUIDON DESIGN INC.

1221 N. PENNSYLVANIA ST. | INDIANAPOLIS, IN. 46202

317.800.6388 | WWW.GUIDONDESIGN.COM

SUSTAINABLE ARCHITECTURE + ENGINEERING

PROJECT LEAD

Architect, Structural Engineer, Civil Engineer

C U s e rs

\d v a lla n d in g h a m \D o c u m e n ts

\1 .1

.0

V A

I n d ia n a p o lis

L a b

R e n o v a ti o n d v a lla n d in g h a m g u id o n d e s ig n .c o m

.r v t

/1

/2

:3

:5

P

M

GI102

PHASING PLAN - PHASE 1

HEAPY ENGINEERING

3850 PRIORITY WAY SOUTH SUITE 204

INDIANAPOLIS, IN 46240

317.571.8795

WWW.HEAPY.COM

RENOVATE LAB - HISTOLOGY,

CYTOLOGY, AND MOLECULAR

1481 W 10TH ST, INDIANAPOLIS, IN

583-18-102

06/24/2020

BID DOCUMENTS

FULLY SPRINKLERED

SCALE: 3/16" = 1'-0"GI102

1 SECOND FLOOR PHASING PLAN - PHASE 1A

SCALE: 1 1/2" = 1'-0"GI102

2 TEMP 1 HR FIRE RATED SMOKE BARRIER WALL CONSTRUCTION NFPA 241

SCALE: 1/4" = 1'-0"GI102

4 TEMPORARY WALL CONSTRUCTION ELEVATION

N

SCALE: 1" = 100'-0"

KEY PLAN

C

D

E

F

16 15 14 13 12

DEVELOP.

(F.I.S.H.)

A-2063

EM SCOPE

A-2065

RESIDENTS

A-2099

LAB

INFORMATION

MANAGER

A-2078

PROCEDURE

ROOM

A-2077

MOLECULAR

PATHOLOGY

LABORATORY

A-2043

FINISH

A-2060

FILES

A-2061

H.A.C.

A-2103

LIFT

C-2 REFRIGERATOR

A-2101

TEACHING

MICROSCOPY

A-2100

STAFF

PATHOLOGIST

A2038

STAFF

PATHOLOGIST

A-2039

STAFF

PATHOLOGIST

A-2040

A-2045

SUPERVISOR

A-2046

MYCOBACT.

A-2047

BIOSAFETY

A-2049

PROSTATE

CANCER

RESEARCH

A-2133

A-2132A

SUPERVISOR

A-2058

CONTAIN.

A-2048

CYTOLOGY

A-2067

HISTOLOGY

A-2042

CYTOLOGY

A-2041

CORRIDOR

C2-6

CORRIDOR

C2-5

A-2059

MICROBIOLOGY

A-2044

CORRIDOR

C2-2

CORRIDOR

C2-3

CORRIDOR

A2-8

SPEC. CHEM

A-2132

ATRIUMATRIUM

INAC. SLD. BLK.

A-2066

CORRIDOR

C2-4

CORRIDOR

C2-9

A48

A38

A39 A34

A35

A36A37

M35B

M35A

A40

A20C

A20B

A20D

A19B

A19D

A19C

A19A20

A27AA27BA27C

A28

A40

A7A A24A

A7CA7B

A9A

A9B

A8A12A

A10A

A11AA12BA10B

A11BA11C

A12C A10C

A10D

A12D

A11D

A17BA17AA16

A26A

A60

A61

A3

M15 M6M16

M7 M5

M13

M17

M8

M9

M10

M17

M12

TANK

A-2055

TELE. ROOM

A-2056

ELEC. ROOM

A-2057

STERILE

SOLUTION

A-2051

STERILIZER

A-2050GIP STORAGE

A-2054A

FLUOR. MS.

A-2054

M21

M45

M42

M26 M19

M44

M39

M51B

M51A

M51C

M29

M37

M53

M52

WALK-IN

REFRIGERATOR

M20 shelves for supplies centrifuges, heat blocks, nanodrops clerical desk free work space

CONTRACTOR

ACCESS

PHASING NARRATIVE: PHASE 2

PHASE 2:

DURING THIS PHASE THE EXISTING WALK-IN

REFRIGERATOR AND STORAGE ROOMS ARE DEMOLISHED.

THE NEW WALK-IN REFRIGERATOR IS INSTALLED. THE

REMAINING SPACE IS REMODELED AND USED AS A SWING

SPACE FOR TEMPORARILY LOCATED EQUIPMENT. THE

EQUIPMENT LOCATED HERE IS TO BE INSTALLED AS IF IT

WERE TO BE PERMANENTLY LOCATED AS SOME ITEMS

WILL REMAIN HERE FOR THE ENTIRETY OF THE

CONSTRUCTION SCHEDULE.

IC/PHASING LEGEND

TEMPORARY WALLS. SEE PLAN AND

PLAN NOTES

TEMPORARY CONSTRUCTION ACCESS

DOORS

REFERENCE AREA FOR ABOVE

CEILING WORK ON FLOOR BELOW.

REFER TO ENGINEERING DRAWINGS

FOR FULL SCOPE OF WORK

BEYOND PROJECT BOUNDARY

PROJECT BOUNDARY

INFECTION CONTROL PLAN NOTES #

INFECTION CONTROL PROJECT INFORMATION

CONSTRUCTION ACTIVITY - FIRE RISK: TYPE C

PATIENT RISK GROUP: HIGH

CLASS OF PRECAUTION MATRIX: III

PROVIDE TEMPORARY 1 HR FIRE RATED SMOKE BARRIER WALL

CONSTRUCTION PER NFPA 241. REFER TO DETAIL 2/GI102.

PROVIDE TEMPORARY INFECTION CONTROL CONSTRUCTION DOOR WITH BLUE

CORE. REFER TO ELEVATION 4/GI102.

NOT USED

PROVIDE TEMPORARY INFECTION CONTROL PLASTIC BARRIER WALL

CONSTRUCTION. REFER TO SPECIFICATION FOR ADDITIONAL INFORMATION.

REFER TO LIST OF REQUIRED INFECTION CONTROL PRECAUTIONS OUTLINED

BY CLASS IN SPECIFICATION 010110 AND ADDITIONAL INFORMATION.

REFER TO DRAWINGS, SPECIFICATIONS AND DOOR HARDWARE SCHEDULE

FOR ADDITIONAL INFORMATION.

PROJECT SHALL BE COMPLETED IN 12 PHASES.

COORDINATE FULL SCOPE OF WORK WITH ENGINEERING DRAWINGS AND

FIELD VERIFICATION. CONTRACTOR IS RESPONSIBLE FOR SCOPE OF ABOVE

CEILING WORK REQUIRED ABOVE AND BELOW THE FLOOR PLATE OF THE

PROJECT BOUNDARY.

COORDINATE LOCATION OF TEMPORARY INFECTION CONTROL (IC) BARRIER

WALL CONSTRUCTION AND INFECTION CONTROL (IC) MEASURES WITH COR

AND PATIENT SAFETY/ INFECTION CONTROL REPRESENTATIVE. TEMPORARY

IC BARRIER WALL CONSTRUCTION LOCATIONS IN DRAWINGS ARE

APPROXIMATE. CONTRACTOR SHALL PROVIDE DRAWING TO COR AND

PATIENT SAFETY/ INFECTION CONTROL REPRESENTATIVE ONCE ICRA

PROTOCOLS AND PLAN IS APPROVED.

CONTRACTOR TO VERIFY 1-HOUR WALL CONTINUOUSLY WRAPS SUITE AS

ANNOTATED IN DRAWINGS. CONTRACTOR TO CORRECT EXISTING WALLS

THAT ARE NOT 1-HR RATED TO SURROUND SUITE IN REQUIRED SEPARATION.

SCHEDULE AND TIME OF CONSTRUCTION WORK TO BE APPROVED BY COR

AND NURSING STAFF BEFORE CONSTRUCTION MAY BEGIN. PROVIDE PHASING

INFORMATION FOR ABOVE CEILING WORK IN THE CONTRACTOR PROVIDED

CMP SCHEDULE FOR WORK ALSO REQUIRED ABOVE AND BELOW THE FLOOR

PLATE OF THE PROJECT BOUNDARY.

ABOVE CEILING WORK SHALL TAKE PLACE BETWEEN THE HOURS OF 5:00 PM

AND 5:00 AM. IN AREAS THAT REQUIRE ABOVE CEILING WORK WHERE

CEILINGS ARE TO REMAIN, CEILING TILES SHALL BE REMOVED AND STORED IN

A SAFE MANOR UNTIL CEILING TILES CAN BE REINSTALLED. DAMAGED AND

BROKEN CEILING TILES SHALL BE REPLACED BY CONTRACTOR.

EXIT/ACCESS FOR ADJACENT OPERATIONAL AREAS SHALL BE MAINTAINED

DURING NORMAL BUSINESS HOURS. SEE SPECIFICATION FOR HOURS OF

OPERATION.

WORK REQUIRING VIBRATION OR LOAD NOISE SHALL TAKE PLACE BETWEEN

THE HOURS OF 5:00 PM AND 5:00 AM. EVERY EFFORT SHALL BE MADE TO

KEEP NOISE AND VIBRATION TO A MINIMUM.

PROVIDE THE FOLLOWING INFECTION CONTROL MEASURES, A 24"X36" STICKY

WALK OFF MAT AND HAND SANITIZER AT EACH TEMPORARY DOOR LOCATION.

MAT SHALL BE REPLACED OR CLEANED AS NECESSARY

PROVIDE THE VA AND OSHA REQUIRED TEMPORARY SIGNAGE AT EACH

TEMPORARY DOOR LOCATION.

CONTRACTOR SHALL SUPPLY SPILL KIT. SPILL KIT TO INCLUDE SHOP VAC,

MULTI-PURPOSE SPILL CONTROL SORBENTS TO ABSORB NON AGGRESSIVE

LIQUIDS UP TO 30 GALLONS.

ALL NEW MATERIAL MOVED THROUGH THE FACILITY SHALL BE COVERED WITH

4 MIL. POLY SHEET.

ALL DEMOLITION MATERIAL SHALL BE REMOVED FROM THE PROJECT

BOUNDARY THROUGH THE FACILITY TO DUMPSTER ALONG VA APPROVED

ROUTE IN ENCLOSED DUMPSTER CART DESIGNED FOR SUCH PURPOSED

WITH A LID.

ALL MATERIAL, DEBRIS AND HAZARDOUS MATERIALS SHALL BE PROPERLY

STORED IN DESIGNATED AREAS AND APPROVED CONTAINERS. FLAMMABLE

MATERIALS SHALL NOT BE STORED IN THE FACILITY.

PROVIDE CONTAINMENT CART FOR ABOVE CEILING ACCESS OUTSIDE

PROJECT BOUNDARY.

TEMPORARY PLASTIC CONSTRUCTION BARRIERS WILL BE REQUIRED TO

PROTECT THE LAB SPACE FROM THE CONSTRUCTION DEBRIS CREATED

WHEN CONSTRUCTING TEMPORARY PARTITIONS.

A

B

C

D

E

F

G

H

I

J

K

L

M

N

O

P

Q

R

INFECTION CONTROL GENERAL NOTES

PHASING GENERAL NOTES #

A

B

C

PROJECT AREAS TO BE OCCUPIED BY STAFF AND VETERANS THROUGHOUT

CONSTRUCTION.

CONSTRUCTION WORK BEHIND TEMPORARY CONSTRUCTION PARTITIONS

SHALL BE COMPLETED DURING NIGHT SHIFTS, 5:00 PM TO 5:00 AM.

REFER TO SPECIFICATION 01 00 00 FOR INFORMATION ON WORK DURATION

FOR EACH PHASE AND AREA OF WORK.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

GUIDON DESIGN INC.

1221 N. PENNSYLVANIA ST. | INDIANAPOLIS, IN. 46202

317.800.6388 | WWW.GUIDONDESIGN.COM

SUSTAINABLE ARCHITECTURE + ENGINEERING

PROJECT LEAD

Architect, Structural Engineer, Civil Engineer

C U s e rs

\d v a lla n d in g h a m \D o c u m e n ts

\1 .1

.0

V A

I n d ia n a p o lis

L a b

R e n o v a ti o n d v a lla n d in g h a m g u id o n d e s ig n .c o m

.r v t

/1

/2

:3

:5

P

M

GI103

PHASING PLAN - PHASE 2

HEAPY ENGINEERING

3850 PRIORITY WAY SOUTH SUITE 204

INDIANAPOLIS, IN 46240

317.571.8795

WWW.HEAPY.COM

RENOVATE LAB - HISTOLOGY,

CYTOLOGY, AND MOLECULAR

1481 W 10TH ST, INDIANAPOLIS, IN

583-18-102

06/24/2020

BID DOCUMENTS

FULLY SPRINKLERED

SCALE: 3/16" = 1'-0"GI103

1 SECOND FLOOR PHASING PLAN - PHASE 2

N

SCALE: 1" = 100'-0"

KEY PLAN

C

D

E

F

16 15 14 13 12

DEVELOP.

(F.I.S.H.)

A-2063

EM SCOPE

A-2065

RESIDENTS

A-2099

LAB

INFORMATION

MANAGER

A-2078

PROCEDURE

ROOM

A-2077

MOLECULAR

PATHOLOGY

LABORATORY

A-2043

H.A.C.

A-2103

LIFT

C-2 REFRIGERATOR

A-2101

TEACHING

MICROSCOPY

A-2100

STAFF

PATHOLOGIST

A2038

STAFF

PATHOLOGIST

A-2039

STAFF

PATHOLOGIST

A-2040

A-2045

SUPERVISOR

A-2046

MYCOBACT.

A-2047

BIOSAFETY

A-2049

PROSTATE

CANCER

RESEARCH

A-2133

A-2132A

SUPERVISOR

A-2058

CONTAIN.

A-2048

CYTOLOGY

A-2067

HISTOLOGY

A-2042

CYTOLOGY

A-2041

CORRIDOR

C2-5

MICROBIOLOGY

A-2044

CORRIDOR

C2-2

CORRIDOR

C2-3

CORRIDOR

A2-8

SPEC. CHEM

A-2132

ATRIUMATRIUM

INAC. SLD. BLK.

A-2066

CORRIDOR

C2-4

CORRIDOR

C2-9

A48

A38

A39 A34

A35

A36A37

A40

A20C

A20B

A20D

A19B

A19D

A19C

A19A20

A27AA27BA27C

A28

A40

A24A

A26A

A60

A61

M15 M6M16

M7 M5

M13

M17

M8

M9

M10

M17

M12

MIN.

4' - 0".

M

IN

5'

TANK

A-2055

TELE. ROOM

A-2056

ELEC. ROOM

A-2057

STERILE

SOLUTION

A-2051

STERILIZER

A-2050GIP STORAGE

A-2054A

TISSUE

A-7

CUTTING AREA

A-2

EMBEDDING

A-3

GROSSING

A-4

A10A

A1F

A12A

A11A

A11B

A10CA12C

A11C

A13

A9B

A9A

A7A

A7B

A7C

A1B A1A

A1C

A1D

A24B

A16

A56

A3

A59B

A59A

A62 A50

A63

A8

A15

FLUOR. MS.

A-2054

A17A

A17B

MIN.

5' - 0"

A12B

A10B

S2

A65

M21

M45

M42

M26

M19

M44

M39

M51B

M51A

M51C

M29

M37

M53M52

WALK-IN

REFRIGERATOR

M20

CONTRACTOR

ACCESS

IC/PHASING LEGEND

TEMPORARY WALLS. SEE PLAN AND

PLAN NOTES

TEMPORARY CONSTRUCTION ACCESS

DOORS

REFERENCE AREA FOR ABOVE

CEILING WORK ON FLOOR BELOW.

REFER TO ENGINEERING DRAWINGS

FOR FULL SCOPE OF WORK

BEYOND PROJECT BOUNDARY

PROJECT BOUNDARY

INFECTION CONTROL PLAN NOTES #

INFECTION CONTROL PROJECT INFORMATION

CONSTRUCTION ACTIVITY - FIRE RISK: TYPE C

PATIENT RISK GROUP: HIGH

CLASS OF PRECAUTION MATRIX: III

PROVIDE TEMPORARY 1 HR FIRE RATED SMOKE BARRIER WALL

CONSTRUCTION PER NFPA 241. REFER TO DETAIL 2/GI102.

PROVIDE TEMPORARY INFECTION CONTROL CONSTRUCTION DOOR WITH BLUE

CORE. REFER TO ELEVATION 4/GI102.

NOT USED

PROVIDE TEMPORARY INFECTION CONTROL PLASTIC BARRIER WALL

CONSTRUCTION. REFER TO SPECIFICATION FOR ADDITIONAL INFORMATION.

REFER TO LIST OF REQUIRED INFECTION CONTROL PRECAUTIONS OUTLINED

BY CLASS IN SPECIFICATION 010110 AND ADDITIONAL INFORMATION.

REFER TO DRAWINGS, SPECIFICATIONS AND DOOR HARDWARE SCHEDULE

FOR ADDITIONAL INFORMATION.

PROJECT SHALL BE COMPLETED IN 12 PHASES.

COORDINATE FULL SCOPE OF WORK WITH ENGINEERING DRAWINGS AND

FIELD VERIFICATION. CONTRACTOR IS RESPONSIBLE FOR SCOPE OF ABOVE

CEILING WORK REQUIRED ABOVE AND BELOW THE FLOOR PLATE OF THE

PROJECT BOUNDARY.

COORDINATE LOCATION OF TEMPORARY INFECTION CONTROL (IC) BARRIER

WALL CONSTRUCTION AND INFECTION CONTROL (IC) MEASURES WITH COR

AND PATIENT SAFETY/ INFECTION CONTROL REPRESENTATIVE. TEMPORARY

IC BARRIER WALL CONSTRUCTION LOCATIONS IN DRAWINGS ARE

APPROXIMATE. CONTRACTOR SHALL PROVIDE DRAWING TO COR AND

PATIENT SAFETY/ INFECTION CONTROL REPRESENTATIVE ONCE ICRA

PROTOCOLS AND PLAN IS APPROVED.

CONTRACTOR TO VERIFY 1-HOUR WALL CONTINUOUSLY WRAPS SUITE AS

ANNOTATED IN DRAWINGS. CONTRACTOR TO CORRECT EXISTING WALLS

THAT ARE NOT 1-HR RATED TO SURROUND SUITE IN REQUIRED SEPARATION.

SCHEDULE AND TIME OF CONSTRUCTION WORK TO BE APPROVED BY COR

AND NURSING STAFF BEFORE CONSTRUCTION MAY BEGIN. PROVIDE PHASING

INFORMATION FOR ABOVE CEILING WORK IN THE CONTRACTOR PROVIDED

CMP SCHEDULE FOR WORK ALSO REQUIRED ABOVE AND BELOW THE FLOOR

PLATE OF THE PROJECT BOUNDARY.

ABOVE CEILING WORK SHALL TAKE PLACE BETWEEN THE HOURS OF 5:00 PM

AND 5:00 AM. IN AREAS THAT REQUIRE ABOVE CEILING WORK WHERE

CEILINGS ARE TO REMAIN, CEILING TILES SHALL BE REMOVED AND STORED IN

A SAFE MANOR UNTIL CEILING TILES CAN BE REINSTALLED. DAMAGED AND

BROKEN CEILING TILES SHALL BE REPLACED BY CONTRACTOR.

EXIT/ACCESS FOR ADJACENT OPERATIONAL AREAS SHALL BE MAINTAINED

DURING NORMAL BUSINESS HOURS. SEE SPECIFICATION FOR HOURS OF

OPERATION.

WORK REQUIRING VIBRATION OR LOAD NOISE SHALL TAKE PLACE BETWEEN

THE HOURS OF 5:00 PM AND 5:00 AM. EVERY EFFORT SHALL BE MADE TO

KEEP NOISE AND VIBRATION TO A MINIMUM.

PROVIDE THE FOLLOWING INFECTION CONTROL MEASURES, A 24"X36" STICKY

WALK OFF MAT AND HAND SANITIZER AT EACH TEMPORARY DOOR LOCATION.

MAT SHALL BE REPLACED OR CLEANED AS NECESSARY

PROVIDE THE VA AND OSHA REQUIRED TEMPORARY SIGNAGE AT EACH

TEMPORARY DOOR LOCATION.

CONTRACTOR SHALL SUPPLY SPILL KIT. SPILL KIT TO INCLUDE SHOP VAC,

MULTI-PURPOSE SPILL CONTROL SORBENTS TO ABSORB NON AGGRESSIVE

LIQUIDS UP TO 30 GALLONS.

ALL NEW MATERIAL MOVED THROUGH THE FACILITY SHALL BE COVERED WITH

4 MIL. POLY SHEET.

ALL DEMOLITION MATERIAL SHALL BE REMOVED FROM THE PROJECT

BOUNDARY THROUGH THE FACILITY TO DUMPSTER ALONG VA APPROVED

ROUTE IN ENCLOSED DUMPSTER CART DESIGNED FOR SUCH PURPOSED

WITH A LID.

ALL MATERIAL, DEBRIS AND HAZARDOUS MATERIALS SHALL BE PROPERLY

STORED IN DESIGNATED AREAS AND APPROVED CONTAINERS. FLAMMABLE

MATERIALS SHALL NOT BE STORED IN THE FACILITY.

PROVIDE CONTAINMENT CART FOR ABOVE CEILING ACCESS OUTSIDE

PROJECT BOUNDARY.

TEMPORARY PLASTIC CONSTRUCTION BARRIERS WILL BE REQUIRED TO

PROTECT THE LAB SPACE FROM THE CONSTRUCTION DEBRIS CREATED

WHEN CONSTRUCTING TEMPORARY PARTITIONS.

A

B

C

D

E

F

G

H

I

J

K

L

M

N

O

P

Q

R

INFECTION CONTROL GENERAL NOTES

PHASING GENERAL NOTES #

A

B

C

PROJECT AREAS TO BE OCCUPIED BY STAFF AND VETERANS THROUGHOUT

CONSTRUCTION.

CONSTRUCTION WORK BEHIND TEMPORARY CONSTRUCTION PARTITIONS

SHALL BE COMPLETED DURING NIGHT SHIFTS, 5:00 PM TO 5:00 AM.

REFER TO SPECIFICATION 01 00 00 FOR INFORMATION ON WORK DURATION

FOR EACH PHASE AND AREA OF WORK.

PHASING NARRATIVE: PHASE 3

PHASE 3:

DURING THIS PHASE THE NEW CUTTING, EMBEDDING, AND

GROSSING AREAS ARE CONSTRUCTED. THE STAINER

EQUIPMENT WILL TEMPORARILY BE INSTALLED AT

EASTERN MOST CUTTING STATION TO BE IN THE

PROXIMITY OF THE CUTTING AND EMBEDDING STATIONS.

STAFF ACCESS MUST REMAIN FOR F.I.S.H., EM SCOPE,

AND THE INAC. SLD. BLK. STORAGE SPACE.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

GUIDON DESIGN INC.

1221 N. PENNSYLVANIA ST. | INDIANAPOLIS, IN. 46202

317.800.6388 | WWW.GUIDONDESIGN.COM

SUSTAINABLE ARCHITECTURE + ENGINEERING

PROJECT LEAD

Architect, Structural Engineer, Civil Engineer

C U s e rs

\d v a lla n d in g h a m \D o c u m e n ts

\1 .1

.0

V A

I n d ia n a p o lis

L a b

R e n o v a ti o n d v a lla n d in g h a m g u id o n d e s ig n .c o m

.r v t

/1

/2

:3

:0

P

M

GI104

PHASING PLAN - PHASE 3

HEAPY ENGINEERING

3850 PRIORITY WAY SOUTH SUITE 204

INDIANAPOLIS, IN 46240

317.571.8795

WWW.HEAPY.COM

RENOVATE LAB - HISTOLOGY,

CYTOLOGY, AND MOLECULAR

1481 W 10TH ST, INDIANAPOLIS, IN

583-18-102

06/24/2020

BID DOCUMENTS

FULLY SPRINKLERED

SCALE: 3/16" = 1'-0"GI104

1 SECOND FLOOR PHASING PLAN - PHASE 3

N

SCALE: 1" = 100'-0"

KEY PLAN

TANK

A-2055

TELE. ROOM

A-2056

ELEC. ROOM

A-2057

STERILE

SOLUTION

A-2051

STERILIZER

A-2050GIP STORAGE

A-2054A

TISSUE

A-7

CUTTING AREA

A-2

EMBEDDING

A-3

GROSSING

A-4

A10A

A1F

A12A

A11A

A11B

A10CA12C

A11C

A13

A9B

A9A

A7A

A7B

A7C

A1B A1A

A1C

A1D

A24B

A16

A56

A3

A59B

A59A

A62 A50

A63

A8

A15

FLUOR. MS.

A-2054

A17A

A17B

M21 M45

M42

M26 M19

M44

M39

M51B

M51A

M51C

M29

WALK-IN

REFRIGERATOR

M20M37

INFECTION CONTROL PLAN NOTES #

INFECTION CONTROL PROJECT INFORMATION

CONSTRUCTION ACTIVITY - FIRE RISK: TYPE C

PATIENT RISK GROUP: HIGH

CLASS OF PRECAUTION MATRIX: III

PROVIDE TEMPORARY 1 HR FIRE RATED SMOKE BARRIER WALL

CONSTRUCTION PER NFPA 241. REFER TO DETAIL 2/GI102.

PROVIDE TEMPORARY INFECTION CONTROL CONSTRUCTION DOOR WITH BLUE

CORE. REFER TO ELEVATION 4/GI102.

NOT USED

PROVIDE TEMPORARY INFECTION CONTROL PLASTIC BARRIER WALL

CONSTRUCTION. REFER TO SPECIFICATION FOR ADDITIONAL INFORMATION.

REFER TO LIST OF REQUIRED INFECTION CONTROL PRECAUTIONS OUTLINED

BY CLASS IN SPECIFICATION 010110 AND ADDITIONAL INFORMATION.

REFER TO DRAWINGS, SPECIFICATIONS AND DOOR HARDWARE SCHEDULE

FOR ADDITIONAL INFORMATION.

PROJECT SHALL BE COMPLETED IN 12 PHASES.

COORDINATE FULL SCOPE OF WORK WITH ENGINEERING DRAWINGS AND

FIELD VERIFICATION. CONTRACTOR IS RESPONSIBLE FOR SCOPE OF ABOVE

CEILING WORK REQUIRED ABOVE AND BELOW THE FLOOR PLATE OF THE

PROJECT BOUNDARY.

COORDINATE LOCATION OF TEMPORARY INFECTION CONTROL (IC) BARRIER

WALL CONSTRUCTION AND INFECTION CONTROL (IC) MEASURES WITH COR

AND PATIENT SAFETY/ INFECTION CONTROL REPRESENTATIVE. TEMPORARY

IC BARRIER WALL CONSTRUCTION LOCATIONS IN DRAWINGS ARE

APPROXIMATE. CONTRACTOR SHALL PROVIDE DRAWING TO COR AND

PATIENT SAFETY/ INFECTION CONTROL REPRESENTATIVE ONCE ICRA

PROTOCOLS AND PLAN IS APPROVED.

CONTRACTOR TO VERIFY 1-HOUR WALL CONTINUOUSLY WRAPS SUITE AS

ANNOTATED IN DRAWINGS. CONTRACTOR TO CORRECT EXISTING WALLS

THAT ARE NOT 1-HR RATED TO SURROUND SUITE IN REQUIRED SEPARATION.

SCHEDULE AND TIME OF CONSTRUCTION WORK TO BE APPROVED BY COR

AND NURSING STAFF BEFORE CONSTRUCTION MAY BEGIN. PROVIDE PHASING

INFORMATION FOR ABOVE CEILING WORK IN THE CONTRACTOR PROVIDED

CMP SCHEDULE FOR WORK ALSO REQUIRED ABOVE AND BELOW THE FLOOR

PLATE OF THE PROJECT BOUNDARY.

ABOVE CEILING WORK SHALL TAKE PLACE BETWEEN THE HOURS OF 5:00 PM

AND 5:00 AM. IN AREAS THAT REQUIRE ABOVE CEILING WORK WHERE

CEILINGS ARE TO REMAIN, CEILING TILES SHALL BE REMOVED AND STORED IN

A SAFE MANOR UNTIL CEILING TILES CAN BE REINSTALLED. DAMAGED AND

BROKEN CEILING TILES SHALL BE REPLACED BY CONTRACTOR.

EXIT/ACCESS FOR ADJACENT OPERATIONAL AREAS SHALL BE MAINTAINED

DURING NORMAL BUSINESS HOURS. SEE SPECIFICATION FOR HOURS OF

OPERATION.

WORK REQUIRING VIBRATION OR LOAD NOISE SHALL TAKE PLACE BETWEEN

THE HOURS OF 5:00 PM AND 5:00 AM. EVERY EFFORT SHALL BE MADE TO

KEEP NOISE AND VIBRATION TO A MINIMUM.

PROVIDE THE FOLLOWING INFECTION CONTROL MEASURES, A 24"X36" STICKY

WALK OFF MAT AND HAND SANITIZER AT EACH TEMPORARY DOOR LOCATION.

MAT SHALL BE REPLACED OR CLEANED AS NECESSARY

PROVIDE THE VA AND OSHA REQUIRED TEMPORARY SIGNAGE AT EACH

TEMPORARY DOOR LOCATION.

CONTRACTOR SHALL SUPPLY SPILL KIT. SPILL KIT TO INCLUDE SHOP VAC,

MULTI-PURPOSE SPILL CONTROL SORBENTS TO ABSORB NON AGGRESSIVE

LIQUIDS UP TO 30 GALLONS.

ALL NEW MATERIAL MOVED THROUGH THE FACILITY SHALL BE COVERED WITH

4 MIL. POLY SHEET.

ALL DEMOLITION MATERIAL SHALL BE REMOVED FROM THE PROJECT

BOUNDARY THROUGH THE FACILITY TO DUMPSTER ALONG VA APPROVED

ROUTE IN ENCLOSED DUMPSTER CART DESIGNED FOR SUCH PURPOSED

WITH A LID.

ALL MATERIAL, DEBRIS AND HAZARDOUS MATERIALS SHALL BE PROPERLY

STORED IN DESIGNATED AREAS AND APPROVED CONTAINERS. FLAMMABLE

MATERIALS SHALL NOT BE STORED IN THE FACILITY.

PROVIDE CONTAINMENT CART FOR ABOVE CEILING ACCESS OUTSIDE

PROJECT BOUNDARY.

TEMPORARY PLASTIC CONSTRUCTION BARRIERS WILL BE REQUIRED TO

PROTECT THE LAB SPACE FROM THE CONSTRUCTION DEBRIS CREATED

WHEN CONSTRUCTING TEMPORARY PARTITIONS.

A

B

C

D

E

F

G

H

I

J

K

L

M

N

O

P

Q

R

INFECTION CONTROL GENERAL NOTES

PHASING GENERAL NOTES #

A

B

C

PROJECT AREAS TO BE OCCUPIED BY STAFF AND VETERANS THROUGHOUT

CONSTRUCTION.

CONSTRUCTION WORK BEHIND TEMPORARY CONSTRUCTION PARTITIONS

SHALL BE COMPLETED DURING NIGHT SHIFTS, 5:00 PM TO 5:00 AM.

REFER TO SPECIFICATION 01 00 00 FOR INFORMATION ON WORK DURATION

FOR EACH PHASE AND AREA OF WORK.

IC/PHASING LEGEND

TEMPORARY WALLS. SEE PLAN AND

PLAN NOTES

TEMPORARY CONSTRUCTION ACCESS

DOORS

REFERENCE AREA FOR ABOVE

CEILING WORK ON FLOOR BELOW.

REFER TO ENGINEERING DRAWINGS

FOR FULL SCOPE OF WORK

BEYOND PROJECT BOUNDARY

PROJECT BOUNDARY

PHASING NARRATIVE: PHASE 4

PHASE 4:

DURING THIS PHASE ALL REMAINING EXISTING

EQUIPMENT LOCATED IS HISTOLOGY IS RELOCATED TO

TEMPORARY LOCATIONS. THE FINAL WALLS OF OF THIS

AREA ARE CONSTRUCTED AND THE SPACE WILL SOON

HOUSE TEMPORARILY LOCATED EQUIPMENT.

A

B

C

D

E

F

16 15 14 13 12

DEVELOP.

(F.I.S.H.)

A-2063

EM SCOPE

A-2065

RESIDENTS

A-2099

LAB

INFORMATION

MANAGER

A-2078

PROCEDURE

ROOM

A-2077

MOLECULAR

PATHOLOGY

LABORATORY

A-2043

H.A.C.

A-2103

LIFT

C-2 REFRIGERATOR

A-2101

TEACHING

MICROSCOPY

A-2100

STAFF

PATHOLOGIST

A2038

STAFF

PATHOLOGIST

A-2039

STAFF

PATHOLOGIST

A-2040

A-2045

SUPERVISOR

A-2046

MYCOBACT.

A-2047

BIOSAFETY

A-2049

PROSTATE

CANCER

RESEARCH

A-2133

A-2132A

CONTAIN.

A-2048

CYTOLOGY

A-2067

HISTOLOGY

A-2042

CYTOLOGY

A-2041

CORRIDOR

C2-5

MICROBIOLOGY

A-2044

CORRIDOR

C2-2

CORRIDOR

C2-3

CORRIDOR

A2-8

SPEC. CHEM

A-2132

ATRIUMATRIUM

INAC. SLD. BLK.

A-2066

CORRIDOR

C2-4

CORRIDOR

C2-9 A48

A38

A39 A34

A35

A36A37

M35B

M35A

A40

A20C

A20B

A20D

A19B

A19D

A19C

A19A20

M15 M6M16

M7 M5

M13

M17

M8

M9

M10

M17

M12

CONTRACTOR

ACCESS

AMPLI-PREP

A-2060

2 1

M22 M12

M46

A27A A27B A27C

M25

A26AA60

A61

A24A

FUME

HOOD

GROSS

STATION

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

GUIDON DESIGN INC.

1221 N. PENNSYLVANIA ST. | INDIANAPOLIS, IN. 46202

317.800.6388 | WWW.GUIDONDESIGN.COM

SUSTAINABLE ARCHITECTURE + ENGINEERING

PROJECT LEAD

Architect, Structural Engineer, Civil Engineer

C U s e rs

\d v a lla n d in g h a m \D o c u m e n ts

\1 .1

.0

V A

I n d ia n a p o lis

L a b

R e n o v a ti o n d v a lla n d in g h a m g u id o n d e s ig n .c o m

.r v t

/1

/2

:3

:0

P

M

GI105

PHASING PLAN - PHASE 4

HEAPY ENGINEERING

3850 PRIORITY WAY SOUTH SUITE 204

INDIANAPOLIS, IN 46240

317.571.8795

WWW.HEAPY.COM

RENOVATE LAB - HISTOLOGY,

CYTOLOGY, AND MOLECULAR

1481 W 10TH ST, INDIANAPOLIS, IN

583-18-102

06/24/2020

BID DOCUMENTS

FULLY SPRINKLERED

N

SCALE: 1" = 100'-0"

KEY PLAN

SCALE: 3/16" = 1'-0"GI105

1 SECOND FLOOR PHASING PLAN - PHASE 5

C

D

E

F

16 15 14 13 12

DEVELOP.

(F.I.S.H.)

A-2063

EM SCOPE

A-2065

RESIDENTS

A-2099

LAB

INFORMATION

MANAGER

A-2078

PROCEDURE

ROOM

A-2077

MOLECULAR

PATHOLOGY

LABORATORY

A-2043

H.A.C.

A-2103

LIFT

C-2 REFRIGERATOR

A-2101

TEACHING

MICROSCOPY

A-2100

STAFF

PATHOLOGIST

A2038

STAFF

PATHOLOGIST

A-2039

STAFF

PATHOLOGIST

A-2040

A-2045

SUPERVISOR

A-2046

MYCOBACT.

A-2047

BIOSAFETY

A-2049

PROSTATE

CANCER

RESEARCH

A-2133

A-2132A

CONTAIN.

A-2048

CYTOLOGY

A-2067

HISTOLOGY

A-2042

CYTOLOGY

A-2041

CORRIDOR

C2-5

MICROBIOLOGY

A-2044

CORRIDOR

C2-2

CORRIDOR

C2-3

CORRIDOR

A2-8

SPEC. CHEM

A-2132

ATRIUMATRIUM

INAC. SLD. BLK.

A-2066

CORRIDOR

C2-4

CORRIDOR

C2-9 A48

A38

A39 A34

A35

A36A37

M35B

M35A

A40

A20C

A20B

A20D

A19B

A19D

A19C

A19A20

M15 M6M16

M7 M5

M13

M17

M8

M9

M10

M17

M12

M

IN

3'

MIN.

5' - 0".

CONTRACTOR

ACCESS

BLOCKS AND

SLIDES

A-2066

TANK

A-2055

TELE. ROOM

A-2056

ELEC. ROOM

A-2057

STERILE

SOLUTION

A-2051

STERILIZER

A-2050GIP STORAGE

A-2054A

TISSUE

A-7

CUTTING AREA

A-2

EMBEDDING

A-3

GROSSING

A-4

A10A

A1F

A12A

A11A

A11B

A10CA12C

A11C

A9B

A9A

A7A

A7B

A7C

A1B A1A

A1C

A1D

A24B

A16

M54M54

M56

A57

A56

A3

A59B

A59A

A62 A50

GIP STORAGE

A-8

A63

A8

A15

FLUOR. MS.

A-2054

F.I.S.H.

A-2067

M53 M52

M21 M45

M42

M26 M19

M44

M39

M51B

M51A

M51C

M29

WALK-IN

REFRIGERATOR

M20M37

M22 M12

M46

A27A A27B A27C

M25

A26AA60

A61

A24A

IC/PHASING LEGEND

TEMPORARY WALLS. SEE PLAN AND

PLAN NOTES

TEMPORARY CONSTRUCTION ACCESS

DOORS

REFERENCE AREA FOR ABOVE

CEILING WORK ON FLOOR BELOW.

REFER TO ENGINEERING DRAWINGS

FOR FULL SCOPE OF WORK

BEYOND PROJECT BOUNDARY

PROJECT BOUNDARY

INFECTION CONTROL PLAN NOTES #

INFECTION CONTROL PROJECT INFORMATION

CONSTRUCTION ACTIVITY - FIRE RISK: TYPE C

PATIENT RISK GROUP: HIGH

CLASS OF PRECAUTION MATRIX: III

PROVIDE TEMPORARY 1 HR FIRE RATED SMOKE BARRIER WALL

CONSTRUCTION PER NFPA 241. REFER TO DETAIL 2/GI102.

PROVIDE TEMPORARY INFECTION CONTROL CONSTRUCTION DOOR WITH BLUE

CORE. REFER TO ELEVATION 4/GI102.

NOT USED

PROVIDE TEMPORARY INFECTION CONTROL PLASTIC BARRIER WALL

CONSTRUCTION. REFER TO SPECIFICATION FOR ADDITIONAL INFORMATION.

REFER TO LIST OF REQUIRED INFECTION CONTROL PRECAUTIONS OUTLINED

BY CLASS IN SPECIFICATION 010110 AND ADDITIONAL INFORMATION.

REFER TO DRAWINGS, SPECIFICATIONS AND DOOR HARDWARE SCHEDULE

FOR ADDITIONAL INFORMATION.

PROJECT SHALL BE COMPLETED IN 12 PHASES.

COORDINATE FULL SCOPE OF WORK WITH ENGINEERING DRAWINGS AND

FIELD VERIFICATION. CONTRACTOR IS RESPONSIBLE FOR SCOPE OF ABOVE

CEILING WORK REQUIRED ABOVE AND BELOW THE FLOOR PLATE OF THE

PROJECT BOUNDARY.

COORDINATE LOCATION OF TEMPORARY INFECTION CONTROL (IC) BARRIER

WALL CONSTRUCTION AND INFECTION CONTROL (IC) MEASURES WITH COR

AND PATIENT SAFETY/ INFECTION CONTROL REPRESENTATIVE. TEMPORARY

IC BARRIER WALL CONSTRUCTION LOCATIONS IN DRAWINGS ARE

APPROXIMATE. CONTRACTOR SHALL PROVIDE DRAWING TO COR AND

PATIENT SAFETY/ INFECTION CONTROL REPRESENTATIVE ONCE ICRA

PROTOCOLS AND PLAN IS APPROVED.

CONTRACTOR TO VERIFY 1-HOUR WALL CONTINUOUSLY WRAPS SUITE AS

ANNOTATED IN DRAWINGS. CONTRACTOR TO CORRECT EXISTING WALLS

THAT ARE NOT 1-HR RATED TO SURROUND SUITE IN REQUIRED SEPARATION.

SCHEDULE AND TIME OF CONSTRUCTION WORK TO BE APPROVED BY COR

AND NURSING STAFF BEFORE CONSTRUCTION MAY BEGIN. PROVIDE PHASING

INFORMATION FOR ABOVE CEILING WORK IN THE CONTRACTOR PROVIDED

CMP SCHEDULE FOR WORK ALSO REQUIRED ABOVE AND BELOW THE FLOOR

PLATE OF THE PROJECT BOUNDARY.

ABOVE CEILING WORK SHALL TAKE PLACE BETWEEN THE HOURS OF 5:00 PM

AND 5:00 AM. IN AREAS THAT REQUIRE ABOVE CEILING WORK WHERE

CEILINGS ARE TO REMAIN, CEILING TILES SHALL BE REMOVED AND STORED IN

A SAFE MANOR UNTIL CEILING TILES CAN BE REINSTALLED. DAMAGED AND

BROKEN CEILING TILES SHALL BE REPLACED BY CONTRACTOR.

EXIT/ACCESS FOR ADJACENT OPERATIONAL AREAS SHALL BE MAINTAINED

DURING NORMAL BUSINESS HOURS. SEE SPECIFICATION FOR HOURS OF

OPERATION.

WORK REQUIRING VIBRATION OR LOAD NOISE SHALL TAKE PLACE BETWEEN

THE HOURS OF 5:00 PM AND 5:00 AM. EVERY EFFORT SHALL BE MADE TO

KEEP NOISE AND VIBRATION TO A MINIMUM.

PROVIDE THE FOLLOWING INFECTION CONTROL MEASURES, A 24"X36" STICKY

WALK OFF MAT AND HAND SANITIZER AT EACH TEMPORARY DOOR LOCATION.

MAT SHALL BE REPLACED OR CLEANED AS NECESSARY

PROVIDE THE VA AND OSHA REQUIRED TEMPORARY SIGNAGE AT EACH

TEMPORARY DOOR LOCATION.

CONTRACTOR SHALL SUPPLY SPILL KIT. SPILL KIT TO INCLUDE SHOP VAC,

MULTI-PURPOSE SPILL CONTROL SORBENTS TO ABSORB NON AGGRESSIVE

LIQUIDS UP TO 30 GALLONS.

ALL NEW MATERIAL MOVED THROUGH THE FACILITY SHALL BE COVERED WITH

4 MIL. POLY SHEET.

ALL DEMOLITION MATERIAL SHALL BE REMOVED FROM THE PROJECT

BOUNDARY THROUGH THE FACILITY TO DUMPSTER ALONG VA APPROVED

ROUTE IN ENCLOSED DUMPSTER CART DESIGNED FOR SUCH PURPOSED

WITH A LID.

ALL MATERIAL, DEBRIS AND HAZARDOUS MATERIALS SHALL BE PROPERLY

STORED IN DESIGNATED AREAS AND APPROVED CONTAINERS. FLAMMABLE

MATERIALS SHALL NOT BE STORED IN THE FACILITY.

PROVIDE CONTAINMENT CART FOR ABOVE CEILING ACCESS OUTSIDE

PROJECT BOUNDARY.

TEMPORARY PLASTIC CONSTRUCTION BARRIERS WILL BE…