Drawings - Project 506-21-201.pdf
PDF 4 MB Posted
- Attached to
- Z1DA--Supplement AC in Lab Area 506-21-201
- Solicitation number
- 36C25023B0011
About this file
This solicitation is for a project to supplement the air conditioning in lab areas at a Department of Veterans Affairs medical center. Key details include the solicitation number 36C25023B0011 issued by Veterans Health Administration VISN 10 to provide new variable air volume terminal units, temperature sensors, ductwork, diffusers and related mechanical work. The project number is 506-21-201 and involves areas on the third and fourth floors including labs, offices and other clinical spaces. The work includes replacing existing coils, cleaning and rebalancing existing equipment, and commissioning all systems per the sequence of operation. The bid documents provide schematics, notes and schedules to define the scope of work required to upgrade the HVAC systems in the specified areas.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N
EW
S
VICINITY MAP
NOT TO SCALE
Fuller Rd.
Ann Arbor
Geddes Rd.
Fuller Rd.
Huron Par kway
Glazier Way
Plymouth Rd.
Geddes Ave
N
EW
S
LAKE ERIE
GRAND
RAPIDS
TRAVERSE
CITY
LAKE SUPERIOR
UPPER PENINSULA
MACKINAW
CITY LAKE HURONALPENA
PETOSKEY
GAYLORD
GRAYLING
LA
KE
M
IC
HI
GA
N
SAGINAW
FLINT
LANSING
DETROIT
KALAMAZOO ANN
ARBOR
BATTLE
CREEK
LOCATION MAP
NOT TO SCALE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
NO
T
FO
R
CO
NS
TR
UC
TI
ON
3419 PIERSON PLACE
FLUSHING, MI, 48433
(OFFICE) 810-230-6202
VA STATION
Defining
EXCELLENCE
in the 21st Century
HEALTH
CARE
SIGNATURE DATE
Director
Associated Director
Chief of Staff
Associate Director for Patient Care Services
Chief, FMS
Chief, Engineering Section
Chief, Police Service
Chief, Fire Service
Union Safety Representative
Chief, Environmental Management Section
Infection Control Officer
Patient Safety Manager
GEMS Coordinator
Safety Specialist
Contracting Officer
COR
SIGNATURE BLOCK
POSITION DATESIGNATUREPOSITION
DEPARTMENT OF VETERANS AFFAIRS - VA ANN ARBOR HEALTHCARE SYSTEM
ANN ARBOR, MICHIGAN
VA Ann Arbor Healthcare System
2215 Fuller Road
Ann Arbor, MI 48105
C:
\U se rs\
Ju lia n.A bu rto -co rte z\D oc um en ts\
_M
_ju lia n.a bu rto -co rte z.r vt 7/2
5/2
2 3 :07
:45 P
M
G-001
COVER SHEET SUPPLEMENTAL AC IN
LAB AREA
ANN ARBOR, MI
25JUL2022 JDL Author
100% BID DOCUMENTS20-0247
SUPPLEMENTAL AC IN LAB AREA
506-21-201
25JUL2022
100% BID DOCUMENTS
506-21-201
506-21-201
1E
SHEET LIST
SHEET NO. SHEET NAME
MECHANICAL
G-001 COVER SHEET
MECHANICAL
H-001 MECHANICAL LEGENDS
HD-010 THIRD FLOOR HVAC PLAN - AREA 1 DEMOLITION
HD-015 THIRD FLOOR HVAC PLAN - AREA 2 DEMOLITION
HD-020 FOURTH FLOOR HVAC PLAN - AREA 1 DEMOLITION
HD-025 FOURTH FLOOR HVAC PLAN - AREA 2 DEMOLITION
H-010 THIRD FLOOR HVAC PLAN - AREA 1
H-015 THIRD FLOOR HVAC PLAN - AREA 2
H-020 FOURTH FLOOR HVAC PLAN - AREA 1
H-025 FOURTH FLOOR HVAC PLAN - AREA 2
H-100 HVAC ENLARGED MECHANICAL ROOM PLAN
H-300 HVAC SCHEDULES / DETAILS
H-500 HVAC CONTROL DIAGRAMS
Revisions: Date:
T R
AFF ABOVE FINISHED FLOOR
AHU AIR HANDLING UNIT
BDD BACKDRAFT DAMPER
BHP BRAKE HORSEPOWER
B.O.D. BOTTOM OF DUCT
BTU BRITISH THERMAL UNIT
CFM CUBIC FEET PER MINUTE
CHR CHILLED WATER RETURN
CHS CHILLED WATER SUPPLY
CKT CIRCUIT
Db DRY BULB TEMPERATURE
DN DOWN
EA EXHAUST AIR
EAT ENTERING AIR TEMPERATURE
ECM ELECTRONICALLY COMMUTATED MOTOR
EF EXHAUST FAN
EG EXHAUST GRILLE
EXH EXHAUST
F/SDPR COMBINATION FIRE/SMOKE DAMPER
GPM GALLONS PER MINUTE
HWC HOT WATER COIL
HWR HEATING HOT WATER RETURN
HWS HEATING HOT WATER SUPPLY
HP HORSEPOWER
HRU HEAT RECOVERY UNIT
HVAC HEATING/VENTILATING/AIR CONDITIONING
IN INCH
LAT LEAVING AIR TEMPERATURE
LB POUNDS
LWT LEAVING WATER TEMPERATURE
MAX MAXIMUM
MBH BTU PER HOUR (THOUSAND)
MCC MOTOR CONTROL CENTER
NFPA NATIONAL FIRE PROTECTION ASSOCIATION
OA OUTSIDE AIR
OD OUTSIDE DIAMETER
P PUMP
PSI POUNDS PER SQUARE INCH
P/T PRESSURE/TEMPERATURE
QTY QUANTITY
RA RETURN AIR
RD ROOF DRAIN
RG RETURN GRILLE
RPM ROTATIONS PER MINUTE
SA SUPPLY AIR
SD SUPPLY DIFFUSER
SG SUPPLY GRILLE
SP STATIC PRESSURE
TG TRANSFER GRILLE
TU TERMINAL UNIT
TYP. TYPICAL
V VENT
WB WET BULB TEMPERATURE
X- EXISTING
F/SD
F/SD
NOTE:
ALL ABBREVIATIONS AND SYMBOLS SHOWN ON THIS SHEET MAY NOT
BE USED ON THIS PROJECT.
KEY NOTE - DEMOLITION
KEY NOTE - NEW WORK
CONNECTION POINT, NEW TO
EXISTING
DEMOLITION END POINT
THERMOMETER
PRESSURE GAUGE
PENDANT FIRE PROTECTION
SPRINKLER HEAD
SUPPLY AIR DUCT
RETURN AIR DUCT
EXHAUST AIR DUCT
BALANCE DAMPER
CONICAL TEE
90° TEE WITH 45° APPROACH
TRANSITION CONCENTRIC
TRANSITION ECCENTRIC
RETURN AIR GRILLE WITH INSULATED DUCT BOOT
BELLMOUTH BRANCH TAKE-OFF WITH MANUAL
BALANCING DAMPER
VERTICAL FIRE DAMPER
HORIZONTAL FIRE DAMPER
VERTICAL COMBINATION FIRE SMOKE DAMPER
HORIZONTAL COMBINATION FIRE SMOKE DAMPER
MOTORIZED DAMPER
AIR FLOW DIRECTION
THERMOSTAT
LINE VOLTAGE REVERSE
ACTING THERMOSTAT
TEMPERATURE SENSOR
TIMER OVERRIDE
HUMIDISTAT
COLD WATER
HOT WATER HEATING SUPPLY
DUCT SMOKE DETECTOR. INSTALLED BY
M.T.C. PROVIDED
AND WIRED BY E.T.C.
TEST PORT
1. TRANSMISSION OF RFI's AND SUBMITTALS SHALL BE THROUGH SUBMITTAL EXCHANGE.
THE PRIME CONTRACTOR SHALL HOST SUBMITTAL EXCHANGE THROUGH THE LIFE OF
THE CONTRACT. SEE SPECIFICATION SECTION 013323, 1.6.
2. THE FIRST FIGURE OF DUCT SIZE INDICATES DIMENSION OF FACE SHOWN OR INDICATED.
DUCT SIZES ARE NET INSIDE DIMENSIONS.
3. TOTAL STATIC PRESSURE NOTED IN THE SCHEDULES INCLUDES DUCT SYSTEM,
TERMINAL UNITS, FILTERS, COILS, ETC. LOSS FOR FILTERS SHALL BE FOR FILTERS SHALL
BE FOR FILTERS AT 50% LOADING.
4. WATER PIPE CONNECTIONS TO AIR HEATING AND COOLING COILS SHALL BE MADE TO
PROVIDE COUNTER FLOW BETWEEN WATER AND AIR.
5. ABEL MECHANICAL EQUIPMENT- AIR HANDLING UNITS, EXHAUST FANS, VAV BOXES, ETC.
OUTDOOR LABELING TO BE WEATHER RESISTANT. COORDINATE ALL EQUIPMENT
NUMBERS WITH VA PRIOR TO ORDERING THE LABELING.
6. WHEN EQUIPMENT IS REMOVED FROM SERVICE - TURN OVER VA TAG TO THE COR PRIOR
TO REMOVING THE EQUIPMENT FROM THE SITE. (SO THE VA CAN REMOVE THIS
EQUIPMENT FROM THEIR INVENTORY LIST).
7. CONTRACTORS WORKING AT VA FACILITIES ARE REQUIRED TO PROVIDE A DOCUMENT
STATING THAT ALL WORKERS, PRIME AND SUBS, HAVE HAD THE FLU SHOT FOR THE
CURRENT YEAR OF THE CONTRACT. THIS IS IN COMPLIANCE WITH VA DIRECTIVE 1013,
PREVENTION AND CONTROL OF SEASONAL INFLUENZA WITH VACCINES. ACCORDINGLY,
THE GC SHALL PROVIDE A CERTIFICATION THAT ALL WORKS ON THIS CONTRACT HAVE
BEEN IMMUNIZED IN ACCORDANCE WITH THIS DIRECTIVE.
8. HVAC SYSTEMS SHALL REMAIN OPERATIONAL IN OCCUPIED SPACES AT ALL TIMES
UNLESS A SCHEDULED SHUT DOWN IS APPROVED BY THE COR. PROVIDE TEMPORARY
HVAC SYSTEMS AS NEEDED FOR AREAS THAT WILL HAVE HVAC SYSTEMS "OFF" FOR
MORE THAN FOUR (4) HOURS. AHU-11 AND EF-11 SHUTDOWN SHALL ONLY OCCUR
DECEMBER-MARCH.
9. CONTRACTOR SHALL ADHERE TO VETERAN'S ADMINISTRATION INFECTION CONTROL RISK
ASSESSMENT (ICRA) GUIDELINES WITH CLASS III PRECAUTIONS.
DUCT STATIC PRESSURE SENSORDSP
T
S
SD
T O
M
H
HWS
HWR
CHS
CHR
PUMP
CHECK VALVE
SHUT-OFF VALVE
UNION
STRAINER
PIPE OUT OF BOTTOM
PIPE OUT OF TOP
PIPE TURNED DOWN
PIPE TURNED UP
CHILLED WATER RETURN
CHILLED WATER SUPPLY
HOT WATER HEATING RETURN
CW
SPRINKLER HEAD
UPRIGHT FIRE PROTECTION
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
NO
T
FO
R
CO
NS
TR
UC
TI
ON
3419 PIERSON PLACE
FLUSHING, MI, 48433
(OFFICE) 810-230-6202
VA STATION
Defining
EXCELLENCE
in the 21st Century
HEALTH
CARE
VA Ann Arbor Healthcare System
2215 Fuller Road
Ann Arbor, MI 48105
C:
\U se rs\
Ju lia n.A bu rto -co rte z\D oc um en ts\
_M
_ju lia n.a bu rto -co rte z.r vt 7/2
5/2
2 3 :07
:46 P
M
H-001
MECHANICAL LEGENDS SUPPLEMENTAL AC IN
LAB AREA
ANN ARBOR, MI
25JUL2022 Checker Author
100% BID DOCUMENTS20-0247 506-21-201
1E
1.0
GPM
1.0
GPM
3'-6"
15'-0" x
5'-6"EXHAUST
LOUVER
EXHAUST AIR
PLENUM2'-4"
A.F.F.BUILD AIR TIGHT
TOSERVICE BAY
ROOF
LOUVER
48x22 OPEN
ENDW/MOTORIZED
DAMPER
1-IS-11
1-PF-11
1-AF-11
1-ERC-11
1-HC-11
1-SH-11
1-SF-11
1-AH-11
VERTICAL
AIRTIGHT
SEPARATINGWALL
(TYP)
PLENUM2'-4" A.F.F. X 6'-4"
HIGH
1-SUH-5
1-CC-11
16x10
M
M
OAD
VD
VD
x x x
V D
V D
8x6 8x6 x
V D
8x6 x
8x6 8x6
V D
V D
14x12 x x x
VD
VD
18x6
VD
VD
14x10 x x 14x10 x
VD
VD
x
16x10
18x12 x x
VD
VD
14x8
18x6
V D
VD
14x1212x6 x
12x8 x
24x18 x x
18x10
10x6
12x6
12x6
12x6
14x8 14x8
16x8 x
16x8
18x8 18x81 x
16x8 x x
FD
8x6
18x8
EA
V D V D
V D
V D
8x68x6
8x6 8x6 x x
24x8
24x8
24x8 12x6
20x10 x
14x8
22x20
18x16 x
VD
VD
x
12x12
VD
12x6
V D
VD
T
K L M N P QM.7 N.6 P.9
8.1
8.8
9.7
LAB
E315
OFFICE
E317
OFFICE
E319
BIO SAFETY
AREA
E320
LAB
E315B
COLD ROOM
E315A
STORAGE
E323
STORAGE
E324A STAFF LOUNGE
E324
LAB
E326BLAB
E326A
LAB
E326
BLOOD BANK
E330
LAB
E308
LAB
E310
LAB
E306A
STORAGE
E309B
CART LIFT
(CLEAN)
CL-3
STORAGE
E307A
STORAGE
E307
STORAGE
E309A
STORAGE
E313
LAB
E312
LAB
E318
LAV
E325
LAV
E327
CORRIDOR
C3-14
CORRIDOR
C3-13
CORRIDOR
C3-17
STAIR 07
S-07
MECH
E321
ELEC
E321B
DATA
E321A
BLOOD BANK
E330
LAB
E333
LAB
E308
D1D1
D1D1
D2D2
D1D1
N KEY PLAN
NOT TO SCALE
D E
F1 F2
G1 B
A1 A2
C C
BUILDING
1E
BUILDING
BUILDING
1W
BUILDING
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
NO
T
FO
R
CO
NS
TR
UC
TI
ON
3419 PIERSON PLACE
FLUSHING, MI, 48433
(OFFICE) 810-230-6202
VA STATION
Defining
EXCELLENCE
in the 21st Century
HEALTH
CARE
VA Ann Arbor Healthcare System
2215 Fuller Road
Ann Arbor, MI 48105
C:
\U se rs\
Ju lia n.A bu rto -co rte z\D oc um en ts\
_M
_ju lia n.a bu rto -co rte z.r vt 7/2
5/2
2 3 :08
:03 P
M
HD-010
THIRD FLOOR HVAC PLAN - AREA
1 DEMOLITION
SUPPLEMENTAL AC IN
LAB AREA
ANN ARBOR, MI
25JUL2022 Checker Author
100% BID DOCUMENTS20-0247 506-21-201
1E
MECHANICAL DEMOLITION KEYNOTES
Key Value Keynote Text
D1 REMOVE DUCTWORK, GRILLE/ DIFFUSER AS SHOWN. CAP DUCT AT DEMOLITION TERMINATION POINT.
REMOVE CEILING, PROTECT AND STORE FOR REINSTALLATION.
D2 REMOVE SPACE TEMPERATURE SENSOR AND ASSOCIATED WIRING.
D3 REMOVE THE CONSTANT VOLUME TERMINAL UNIT AND ASSOCIATED DUCTWORK.
D4 REMOVE SUPPLY AIR REGISTER IN WALL AND ASSOCIATED DUCTWORK AND FIRE DAMPER.
D6 PATCH FLOOR OPENING.
1/8" = 1'-0"
THIRD FLOOR HVAC PLAN - AREA 1 DEMOLITION
BENCHTOP
HOOD100 CFM
E/A(FURNISHED BY
OTHERS)
1-CH-3
CFM
E/A
20X12 x x
16x8 x
10x6
VD
VD
VD
x
8x6
14x6 x
10x6 x
VD
VD8
x x x
10x6
V D
14x8
12x612x814x6
12x8 x
8x6
12x6 x
V D
14x8
V D2 x
12x8
8x6
VD
x
14x8
10x6 x x x
8x6
14x8
10x6
10x6
14x12 8x6
VD
VD
FD
FD
FD
14x6
VD
24x8
24x8 x x x x
10" X 6" DUCTDN TO 6"
AFF
8x6
24x8
VD
V D
18x8
18x10
8x6
14x6
VD
V D
V D
12x6
V D
VD
x
10x6
12x6
18x8
8x6 8x6
16x8
VD V
D
10x6 x
16x10
8x6
10x6 x
14x6 8x6
14x10
VD VD
x
10x610x6 FD
1-HD-11
880 CFM
E/A
1-HD-12880 CFM
E/A
12X10
10" x 6" DUCTDN TO 6"
AFF
CFM
HD
K L M N P QM.7 P.9
0.7
1.8
2.1
2.3
2.7
3.4
3.5
R.1RQ.9Q.6Q.1 Q.4 R.2
3.49
OFFICE
C317
OFFICE
C318
OFFICE
C319 OFFICE
C321
STORAGE
C322
EAST SERVICE
ELEVATOR
LOBBY
C3-8
SERVICE
ELEVATOR
SE-1
SERVICE
ELEVATOR
SE-2
OFFICE
C323
OFFICE
C324
CORRIDOR
C3-04
OFFICE
C325
OFFICE
C320A
OFFICE
C320
OFFICE
C316
STORAGE
C37C
OFFICE
C313
OFFICE
C311
OFFICE
C37E
MAIL ROOM
C37D
CHECK-IN
C37B
WAITING ROOM
C37A
CORRIDOR
C3-6
EAST
ELEVATOR
LOBBY
C3-9
ELEVATOR
P-1
ELEVATOR
P-2
FNP ROOM
E336
STAIR 08
S-08
STORAGE
E334A
OFFICE
E335
STORAGE
E334 OFFICE
E330A
BLOOD BANK
E330
LAB
E333
GYN
E338
NON GYN
E337
SPECIAL
STAINS
E339
MICROTOMY
E341
OFFICE
E302
H.A.C.
E304
PROCESSOR
E342
H&E STAINING
E340
LAB
E340
CONFERENCE
E306
LAB
E308
OFFICE
E333A
OFFICE
E333B
WALK-IN
REFRIGERATOR
E308B
CORRIDOR
C3-14
LAB
E305
LAB
E305
OFFICE
E300
READING
ROOM
E301
N KEY PLAN
NOT TO SCALE
D E
F1 F2
G1 B
A1 A2
C C
BUILDING
1E
BUILDING
BUILDING
1W
BUILDING
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
NO
T
FO
R
CO
NS
TR
UC
TI
ON
3419 PIERSON PLACE
FLUSHING, MI, 48433
(OFFICE) 810-230-6202
VA STATION
Defining
EXCELLENCE
in the 21st Century
HEALTH
CARE
VA Ann Arbor Healthcare System
2215 Fuller Road
Ann Arbor, MI 48105
C:
\U se rs\
Ju lia n.A bu rto -co rte z\D oc um en ts\
_M
_ju lia n.a bu rto -co rte z.r vt 7/2
5/2
2 3 :08
:05 P
M
HD-015
THIRD FLOOR HVAC PLAN - AREA
2 DEMOLITION
SUPPLEMENTAL AC IN
LAB AREA
ANN ARBOR, MI
25JUL2022 Checker Author
100% BID DOCUMENTS20-0247 506-21-201
1E
1/8" = 1'-0"
THIRD FLOOR HVAC PLAN - AREA 2 DEMOLITION
Revisions: Date:
MECHANICAL DEMOLITION KEYNOTES
Key Value Keynote Text
D1 REMOVE DUCTWORK, GRILLE/ DIFFUSER AS SHOWN. CAP DUCT AT DEMOLITION TERMINATION POINT.
REMOVE CEILING, PROTECT AND STORE FOR REINSTALLATION.
D2 REMOVE SPACE TEMPERATURE SENSOR AND ASSOCIATED WIRING.
D3 REMOVE THE CONSTANT VOLUME TERMINAL UNIT AND ASSOCIATED DUCTWORK.
D4 REMOVE SUPPLY AIR REGISTER IN WALL AND ASSOCIATED DUCTWORK AND FIRE DAMPER.
D6 PATCH FLOOR OPENING.
�16"
�18" x x x x x
�16"
VD 18x12
V D
14x6
V D
10x8 x x x
VD
x
VD
x
V D
VD
V D
8x6
8x8
VD
"D
IA
x
24x10 x
V D
VD
8x6
10x6
VD
V D x
12x6 x
24x8
16x8
VD
x x
VD
x
6 VD
x
24x8 x x
�22"
28x14
STAINLESS
STEEL
28x14
VD
x
�12" x
1-HF-3
x
�18"
�16"
�18"
20x16 24x20 28x24 30x24 26x22
1-AFCV
-302
1-AFCV
-301
1-AFCV
-305
1-AFCV
-304
1-AFCV
-303
FD
FDFD
FD
FD
FD
20x10 DNTO
1-HD-9
x x
�28"
VD
�26"�24"�20"�12" x
�22"
V D
24x8
FD
x
VD
FD
FD
FD
TU
TU
TU
TU
TU
TU
TU
TU
TU
TU
TU
TU
TU
TU
TU
TU
TU
TU
TU
TU
TU
780 270 1920
59015201530
90590390
1700980
300630
120 1460 120
�12"
14x10
VD
VD
x
�22" x x x
V D
V D x
14x8
V D
16x10
VD
VD
x
FD
8x10 x x x
RUN
OVER
DUCT
x
�20"
�20" x
14x10 14x10
VD
VD
x x
�16" x
14x10 14x10
VD
VD
x x
�8" x x
14x12 x x x x x
�26"
16x15
VD
VD
x
18x8
�24" x
16x10
VD
VD
x x
VD
16x10
16x10 x x
�16"
14x12
VD
x x
VD
VD
x x
�12" x
�20" x x x
18x6
16x10
�16"
20x17
V D
12x6
12x6 x
V D
12x6 12x6 x
12x6 12x6
V D
6"DIA.
VD
x
V D
V D
V D
V
DV
D
FD
FD
FD
FD
x
18x12
DN
x
VDV
D
12x102 x x
16x8
VD
V D
VD
x x
24x8 x
VD
VD
V D x
24X8 x
16x10
OPENEND
DUCT
FD
FD
FD
FD
x x
�24" x x x
FD
TO
EF-11
TO EF-19
AT ROOF
TO EF-20
AT ROOF
TO EF-21
AT ROOFTO EF-18
AT ROOF
TO EF-23
AT ROOF
TO EF-24
AT ROOF
J K L M N P QM.7 N.6 P.9
8.1
8.8
9.7
D6
D3
AFCV
FD
AFCV-E326E1
AFCV-E319E
AFCV-E320E
AFCV-E32527E
AFCV-E317EAFCV-E3152E
AFCV-E312E
AFCV-E3151E
AFCV-E309E1
AFCV-E313E
AFCV-E309E2
AFCV-E307E
AFCV-E308E
AFCV-E308A10E
AFCV-E331E
AFCV-E326E2
AFCV-E324E1
AFCV-E324E2
N KEY PLAN
NOT TO SCALE
D E
F1 F2
G1 B
A1 A2
C C
BUILDING
1E
BUILDING
BUILDING
1W
BUILDING
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
NO
T
FO
R
CO
NS
TR
UC
TI
ON
3419 PIERSON PLACE
FLUSHING, MI, 48433
(OFFICE) 810-230-6202
VA STATION
Defining
EXCELLENCE
in the 21st Century
HEALTH
CARE
VA Ann Arbor Healthcare System
2215 Fuller Road
Ann Arbor, MI 48105
C:
\U se rs\
Ju lia n.A bu rto -co rte z\D oc um en ts\
_M
_ju lia n.a bu rto -co rte z.r vt 7/2
5/2
2 3 :08
:07 P
M
HD-020
FOURTH FLOOR HVAC PLAN -
AREA 1 DEMOLITION
SUPPLEMENTAL AC IN
LAB AREA
ANN ARBOR, MI
25JUL2022 Checker Author
100% BID DOCUMENTS20-0247 506-21-201
1E
MECHANICAL DEMOLITION KEYNOTES
Key Value Keynote Text
D1 REMOVE DUCTWORK, GRILLE/ DIFFUSER AS SHOWN. CAP DUCT AT DEMOLITION TERMINATION POINT.
REMOVE CEILING, PROTECT AND STORE FOR REINSTALLATION.
D2 REMOVE SPACE TEMPERATURE SENSOR AND ASSOCIATED WIRING.
D3 REMOVE THE CONSTANT VOLUME TERMINAL UNIT AND ASSOCIATED DUCTWORK.
D4 REMOVE SUPPLY AIR REGISTER IN WALL AND ASSOCIATED DUCTWORK AND FIRE DAMPER.
D6 PATCH FLOOR OPENING.
1/8" = 1'-0"
FOURTH FLOOR HVAC PLAN - AREA 1 DEMOLITION
x x x x
24x10 x
�22" x x
12x812x6
24"DIA.
x
V D
�28"
VD
�26" x
VD
�24" x
V D 12x6 x
VD
10x6
�20" x
VD
V D x
�12"
�24"
�28" x
V D
18x8
8x6 x
V D
V D
8x6
16x8
VD
x
24x12 x
�24" x
�22"
V D
V D x
8x6 8x6 x
VD
V D
8x6
V D
VD
24x8 x x x x
�22"
12x10
�12" x x x
VD
VD
V D
8x6 x
�18"�18" x
81-AFCV
-306
1-AFCV
-307
FD
FD
FD
FD
FD
VD
TU-12-2
TU-12-4 TU-12-3
TU-10-38
TU
TU
TU
TU
TU
TU
TU
TU
TU
TU
TU
TU
TU
TU
TU
TU
TU
TU
TU
TU
TU
TU
TU
TU
TU-11-54
TU-11-53
TU
TU
TU
TU
TU
TU
TU
TU
TU-11-56
160330
240280140140
1504104904202300
750 140
630 490
330 520 350
2401730
750 130 170300970580 730270750140 300 170
�6" 12x8 x x x
14x12
DROP
10x10 x x x
V D
V D
14x6 12x6 x x
�20" x
12x8 x x x
6VD
�26"
12x8 x x
�24" x x
V D V D
10x6 10x6
�22" x1 x x x
VD
V D
10x6 x
�20" x x
VD
x x x
VDV
D
12x10
�12" x
14x12
�8" x
�20" x
V D
14x8
�18" x x
�14" x x
12x8 12x6
VD
V D x x
�10"
12x10 x
10x6 x x
FDAD
�6"
�24"
V D
V D
V D
V D
VD
x
14x8 V D
VD
12x10
(TYP.)
12x10
(TYP.)
R
IS
E
FD
12"
BOOT
(TYP.)
VD
VD
VD
FD
FD
FD
x
24x8
DN
24x8
DN
x x x x x
V D
VD
24x8
�24"
V D x
V D 24x8 x
VD
�16" x x
10x6 x
FD
FD
FD
16x12
DN
8x6
DN
16x10
OPENEND
DUCTW/WIRE
MESH
SCREEN
FD
x
FD
24x12
22x10
FD
J K L M N P QM.7 P.9
0.7
1.8
2.1
2.3
2.7
3.4
3.5
R.1RQ.9Q.6Q.1 Q.4 R.2
3.49
D4
D4
D4
D3
D3
AFCV-E204E
AFCV-E338E
AFCV-E333EAFCV-E338A
AFCV-E306E
AFCV-2
MD
MD
MD
AFCV-E337E
AFCV-C322E
AFCV-CE8E
AFCV-C37324E
AFCV-C321E
1-AFCV-1
AFCV-C31718
AFCV-C31620E
AFCV-E338EAFCV-E30241E
AFCV-E305E
AFCV-121E
AFCV-106
AFCV-E307E
AFCV-E308E
AFCV-E308A10E
AFCV-E331E
AFCV-E326E2
N KEY PLAN
NOT TO SCALE
D E
F1 F2
G1 B
A1 A2
C C
BUILDING
1E
BUILDING
BUILDING
1W
BUILDING
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
NO
T
FO
R
CO
NS
TR
UC
TI
ON
3419 PIERSON PLACE
FLUSHING, MI, 48433
(OFFICE) 810-230-6202
VA STATION
Defining
EXCELLENCE
in the 21st Century
HEALTH
CARE
VA Ann Arbor Healthcare System
2215 Fuller Road
Ann Arbor, MI 48105
C:
\U se rs\
Ju lia n.A bu rto -co rte z\D oc um en ts\
_M
_ju lia n.a bu rto -co rte z.r vt 7/2
5/2
2 3 :08
:09 P
M
HD-025
FOURTH FLOOR HVAC PLAN -
AREA 2 DEMOLITION
SUPPLEMENTAL AC IN
LAB AREA
ANN ARBOR, MI
25JUL2022 Checker Author
100% BID DOCUMENTS20-0247 506-21-201
1E
1/8" = 1'-0"
FOURTH FLOOR HVAC PLAN - AREA 2 DEMOLITION
MECHANICAL DEMOLITION KEYNOTES
Key Value Keynote Text
D1 REMOVE DUCTWORK, GRILLE/ DIFFUSER AS SHOWN. CAP DUCT AT DEMOLITION TERMINATION POINT.
REMOVE CEILING, PROTECT AND STORE FOR REINSTALLATION.
D2 REMOVE SPACE TEMPERATURE SENSOR AND ASSOCIATED WIRING.
D3 REMOVE THE CONSTANT VOLUME TERMINAL UNIT AND ASSOCIATED DUCTWORK.
D4 REMOVE SUPPLY AIR REGISTER IN WALL AND ASSOCIATED DUCTWORK AND FIRE DAMPER.
D6 PATCH FLOOR OPENING.
1.0
GPM
1.0
GPM
3'-6"
15'-0" x 5'-6"
EXHAUST
LOUVER
15'-0" x 5'-6" INTAKE
LOUVER
OUTDOOR AIR
PLENUM
2'-4" A.F.F. x 6'-4"
HIGH
1-IS-11
1-PF-11
1-AF-11
1-ERC-11
1-HC-11
1-SH-11
1-SF-11
1-AH-11
VERTICAL AIRTIGHT SEPARATING WALL
(TYP)
OUTDOOR AIR
PLENUM
2'-4" A.F.F. X 6'-4"
HIGH
1-SUH-5
1-CC-11
1-HD-7
1120 CFM
E/A
880 CFM
E/A
16x10
M
M
OAD
VD
VD
x x
V D
V D
8x6 8x6 x
V D
8x6 x
8x6 8x6
V D
V D
14x12 x x x
VD
VD
18x6
VD
VD
14x10 x x
14x10 x
VD
VD
x
16x10
18x12 x x
VD
VD
18x6
V D
VD
14x1212x6 x
12x8 x
24x18 x x
18x10
10x6
12x6
12x6
12x6
14x8 14x8
16x8 x
16x8
18x8 18x81 x
16x8 x 6 1 x
FD
8x6
12x6
V D V D
V D
V D
8x68x6
8x6 8x6 x x
24x8
24x8
24x8 12x6
20x10 x
1-HD-8
1-HD-9
1380 CFM
E/A
14x8
22x20
18x16 x
VD
VD
x
12x12
VD
T
K L M N P QM.7 N.6 P.9
8.1
8.8
9.7
LAB
E326
LAB
E326A
LAB
E326B
STAFF LOUNGE
E324
STORAGE
E324A
LAB
E318
LAV
E325
LAV
E327
LAB
E312
LAB
E310
LAB
E306A
LAB
E308
ELEC
E321B
DATA
E321A
MECH
E321
BIO SAFETY
AREA
E320
OFFICE
E319
OFFICE
E317
LAB
E315
LAB
E315B
COLD ROOM
E315A
STORAGE
E313
STORAGE
E309A
STORAGE
E309B
STORAGE
E307
CORRIDOR
C3-17
CORRIDOR
C3-14
CORRIDOR
C3-13
STAIR 07
S-07
CART LIFT
(CLEAN)
CL-3
STORAGE
E307A
STORAGE
E323
320 CFM 320 CFM320 CFM
320 CFM 320 CFM320 CFM 320 CFM
625 CFM
625 CFM
150 CFM
150 CFM
320 CFM
350 CFM
E/A
140 CFM140 CFM
140 CFM
140 CFM 140 CFM
350 CFM
E/A
210 CFM
465 CFM
E/A
210 CFM
400 CFM 400 CFM
880 CFM
E/A
1040 CFM
E/A
940 CFM
E/A
300 CFM
300 CFM
300 CFM300 CFM
300 CFM
300 CFM
250 CFM
E/A
225 CFM
200 CFM
200 CFM
E/A
300 CFM 300 CFM
300 CFM300 CFM
1200 CFM50 CFM
E/A
90 CFM
300 CFM300 CFM
240 CFM
E/A
300 CFM
E/A
380 CFM
E/A
380 CFM300 CFM
1050 CFM
E/A
CFM
CFM
CFM
100 CFM
E/A
490 CFM 490 CFM
500 CFM
400 CFM
400 CFM
400 CFM
400 CFM
580 CFM
580 CFM
120 CFM
120 CFM
140 CFM
E/A
140 CFM
E/A
140 CFM
E/A
490 CFM
490 CFM
140 CFM
130 CFM
E/A
100 CFM
E/A
140 CFM
420 CFM
420 CFM 420 CFM
420 CFM
12"ø
SD-400
400 CFM
12"ø
SD-400
400 CFM
12"ø
SD-400
400 CFM
12"ø
SD-400
400 CFM
1400 CFM 22
22 22
22 33
SD-400
420 CFM
14"x8" SA
1400 CFM 1400 CFM
RG-1420
500 CFM
N KEY PLAN
NOT TO SCALE
D E
F1 F2
G1 B
A1 A2
C C
BUILDING
1E
BUILDING
BUILDING
1W
BUILDING
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
NO
T
FO
R
CO
NS
TR
UC
TI
ON
3419 PIERSON PLACE
FLUSHING, MI, 48433
(OFFICE) 810-230-6202
VA STATION
Defining
EXCELLENCE
in the 21st Century
HEALTH
CARE
VA Ann Arbor Healthcare System
2215 Fuller Road
Ann Arbor, MI 48105
C:
\U se rs\
Ju lia n.A bu rto -co rte z\D oc um en ts\
_M
_ju lia n.a bu rto -co rte z.r vt 7/2
5/2
2 3 :07
:49 P
M
H-010
THIRD FLOOR HVAC PLAN - AREA
SUPPLEMENTAL AC IN
LAB AREA
ANN ARBOR, MI
25JUL2022 Checker Author
100% BID DOCUMENTS20-0247 506-21-201
1E
MECHANICAL KEYNOTES
Key Value Keynote Text
1 RE-BALANCE AND RE-COMMISSION THE EXISTING TERMINAL UNIT. SEE SHEET H-500 FOR
SEQUENCE OF OPERATION.
2 BALANCE THE EXISTING GRILLES AND DIFFUSERS TO THE FLOW RATE INDICATED.
3 NEW TEMPERATURE SENSOR.
4 NEW VARIABLE TERMINAL UNIT. EXTEND HEATING SUPPLY AND RETURN PIPING TO NEW REHEAT
COIL.
5 PROVIDE DUST CONTAINMENT AND EQUIPMENT PROTECTION FOR ALL WORK IN THIS AREA.
RE-INSTALL CEILING UPON COMPLETION OF SHEET METAL WORK.
6 NEW EXHAUST AIR FLOW CONTROL VALVE.
7 NEW CONSTANT VOLUME TERMINAL UNIT. EXTEND HEATING SUPPLY AND RETURN PIPING TO
NEW REHEAT COIL.
8 EXHAUST FAN AND EXHAUST SYSTEM ARE NOT IN THE CONTRACT. DO NOT ADJUST OR MODIFY
AIR FLOW SETTINGS.
9 12"X12" SUPPLY AIR DUCT DROP TO NEW DIFFUSER BOOT.
10 REPLACE THE CHILLED WATER COOLING COIL. SEE THE COIL SCHEDULE H-300.
11 CHECK DAMPERS, ACTUATORS AND LINKAGES FOR PROPER OPERATION. ADJUST AND REPAIR AS
REQUIRED.
12 CLEAN COIL.
13 REMOVE AND REPLACE THE STEAM/CONDENSATE PIPE INSULATION AND JACKET.
14 RE-COMMISSION THE AIR HANDLING UNIT BASED ON THE SEQUENCE OF OPERATION INDICATED
ON SHEET H-500
15 PROVIDE A FIRE DAMPER AT ALL FLOOR PENETRATIONS.
16 EXISTING AIRFLOW CONTROL VALVE WITHOUT AND ACTUATOR. LEAVE IN CURRENT POSITION.
17 REFRAME AND PATCH THE WALL OPENING FOR INSTALLATION OF THE NEW SUPPLY AIR
DIFFUSER.
1/8" = 1'-0"
THIRD FLOOR HVAC PLAN - AREA 1
BENCHTOP
HOOD100 CFM
E/A(FURNISHED BY
OTHERS)
1-CH-31570
CFM
E/A
20X12 x x
16x8 x 6 1 x
10x6
VD
VD
VD
x
8x6
14x6 x
10x6 x
VD
VD8
x x x
10x6
V D
14x8
12x612x814x6
12x8 x
8x6
12x6 x
V D
14x8
V D2 x
12x8
8x6
VD
x
14x8
10x6 x x x
8x6
14x8
10x6
10x6
14x12 8x6
VD
VD
FD
FD
FD
1-HD-10
1130 CFM
E/A
14x6
VD
24x8
24x8 x x x x
10" X 6" DUCTDN TO 6"
AFF
24x8
VD
V D
18x8
18x10
8x6
14x6
V D
V D
12x6
V D
VD
x
10x6
12x6
18x8
8x6 8x6
16x8
VD V
D
10x6 x
16x10
8x6
10x6 x
14x6 8x6
14x10
VD VD
x
10x610x6 FD
1-HD-12880 CFM
E/A
12X10
10" x 6" DUCTDN TO 6"
AFF
T
K L M N P QM.7 P.9
0.7
1.8
2.1
2.3
2.7
3.4
3.5
R.1RQ.9Q.6Q.1 Q.4 R.2
3.49
WAITING ROOM
C37A
OFFICE
C311
OFFICE
C313
CHECK-IN
C37B
OFFICE
C320
OFFICE
C317
OFFICE
C318
OFFICE
C319
OFFICE
C320A
OFFICE
C324
OFFICE
C323
STORAGE
C322
EAST SERVICE
ELEVATOR
LOBBY
C3-8
OFFICE
E335
STORAGE
E334
BLOOD BANK
E330
CONFERENCE
E306
OFFICE
E333A
GYN
E338
H&E STAINING
E340
PROCESSOR
E342
H.A.C.
E304
LAB
E340
NON GYN
E337
SPECIAL
STAINS
E339
MICROTOMY
E341OFFICE
E302
LAB
E333
WALK-IN
REFRIGERATOR
E308B
LAB
E305
OFFICE
E300
CORRIDOR
C3-6
ELEVATOR
P-1
ELEVATOR
P-2
SERVICE
ELEVATOR
SE-2
SERVICE
ELEVATOR
SE-1
OFFICE
E330A
OFFICE
E333B
OFFICE
C321
EAST
ELEVATOR
LOBBY
C3-9
CORRIDOR
C3-04
READING
ROOM
E301
STAIR 08
S-08
OFFICE
C37E
MAIL ROOM
C37D
STORAGE
C37C
OFFICE
C316
OFFICE
C325
STORAGE
E334A
FNP ROOM
E336
465 CFM
E/A
CH 100
CFM
E/A
275 CFM 275 CFM
360 CFM130 CFM
240 CFM
130 CFM
240 CFM
525 CFM
175 CFM 175 CFM
175 CFM
260 CFM
260 CFM
720 CFM
175 CFM 175 CFM
325 CFM
360 CFM
350 CFM
325 CFM 75 CFM (2 EA)
250 CFM
E/A
135 CFM
100 CFM
125 CFM
125 CFM
170 CFM
170 CFM
275 CFM
170 CFM
170 CFM
330 CFM
120 CFM
120 CFM
200 CFM 700 CFM
110 CFM
100 CFM
E/A 110 CFM
500 CFM
300 CFM
100 CFM
130 CFM
E/A
320 CFM
E/A
300 CFM
150 CFM
150 CFM
E/A
320 CFM
E/A
520 CFM
E/A 170 CFM
E/A
170 CFM
E/A
500 CFM
110 CFM
E/A
120 CFM
E/A
200 CFM
400 CFM 400 CFM
880 CFM
E/A
780 CFM
E/A
310 CFM 320 CFM75 CFM
75 CFM
400 CFM
E/A
200 CFM
200 CFM
500 CFM
140 CFM130 CFM
130 CFM
E/A
140 CFM
E/A
370 CFM 380 CFM
470 CFM 470 CFM
470 CFM 470 CFM
22222222
22 22
22 22
22 22 22
HD
600 CFM
650 CFM
135 CFM
N KEY PLAN
NOT TO SCALE
D E
F1 F2
G1 B
A1 A2
C C
BUILDING
1E
BUILDING
BUILDING
1W
BUILDING
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
NO
T
FO
R
CO
NS
TR
UC
TI
ON
3419 PIERSON PLACE
FLUSHING, MI, 48433
(OFFICE) 810-230-6202
VA STATION
Defining
EXCELLENCE
in the 21st Century
HEALTH
CARE
VA Ann Arbor Healthcare System
2215 Fuller Road
Ann Arbor, MI 48105
C:
\U se rs\
Ju lia n.A bu rto -co rte z\D oc um en ts\
_M
_ju lia n.a bu rto -co rte z.r vt 7/2
5/2
2 3 :07
:52 P
M
H-015
THIRD FLOOR HVAC PLAN - AREA
SUPPLEMENTAL AC IN
LAB AREA
ANN ARBOR, MI
25JUL2022 Checker Author
100% BID DOCUMENTS20-0247 506-21-201
1E
1/8" = 1'-0"
THIRD FLOOR HVAC PLAN - AREA 2
MECHANICAL KEYNOTES
Key Value Keynote Text
1 RE-BALANCE AND RE-COMMISSION THE EXISTING TERMINAL UNIT. SEE SHEET H-500 FOR
SEQUENCE OF OPERATION.
2 BALANCE THE EXISTING GRILLES AND DIFFUSERS TO THE FLOW RATE INDICATED.
3 NEW TEMPERATURE SENSOR.
4 NEW VARIABLE TERMINAL UNIT. EXTEND HEATING SUPPLY AND RETURN PIPING TO NEW REHEAT
COIL.
5 PROVIDE DUST CONTAINMENT AND EQUIPMENT PROTECTION FOR ALL WORK IN THIS AREA.
RE-INSTALL CEILING UPON COMPLETION OF SHEET METAL WORK.
6 NEW EXHAUST AIR FLOW CONTROL VALVE.
7 NEW CONSTANT VOLUME TERMINAL UNIT. EXTEND HEATING SUPPLY AND RETURN PIPING TO
NEW REHEAT COIL.
8 EXHAUST FAN AND EXHAUST SYSTEM ARE NOT IN THE CONTRACT. DO NOT ADJUST OR MODIFY
AIR FLOW SETTINGS.
9 12"X12" SUPPLY AIR DUCT DROP TO NEW DIFFUSER BOOT.
10 REPLACE THE CHILLED WATER COOLING COIL. SEE THE COIL SCHEDULE H-300.
11 CHECK DAMPERS, ACTUATORS AND LINKAGES FOR PROPER OPERATION. ADJUST AND REPAIR AS
REQUIRED.
12 CLEAN COIL.
13 REMOVE AND REPLACE THE STEAM/CONDENSATE PIPE INSULATION AND JACKET.
14 RE-COMMISSION THE AIR HANDLING UNIT BASED ON THE SEQUENCE OF OPERATION INDICATED
ON SHEET H-500
15 PROVIDE A FIRE DAMPER AT ALL FLOOR PENETRATIONS.
16 EXISTING AIRFLOW CONTROL VALVE WITHOUT AND ACTUATOR. LEAVE IN CURRENT POSITION.
17 REFRAME AND PATCH THE WALL OPENING FOR INSTALLATION OF THE NEW SUPPLY AIR
DIFFUSER.
�16"
�18" x x x x x
�16"
VD 18x12
V D
14x6
V D
10x8 x x x
VD
x
VD
x
V D
VD
V D
8x6
8x8
VD
"D
IA
x
24x12
24x10 x
V D
VD
8x6
10x6
V D x x
24x8
16x8
VD
x
VD
x
6 VD
x x
VD
24x8 x x
22"
28x14
STAINLESS
STEEL
28x14
VD
x
�12" x
1-HF-3
x
�18"
�16"
�18"
20x16 24x20 28x24 30x24 26x22
1-AFCV
-302
1-AFCV
-301
1-AFCV
-305
1-AFCV
-304
1-AFCV
-303
FD
FD
FD
FDFD
FD
FD
FD
20x10 DNTO
1-HD-9
x x x
�28"
VD
�26"�24"�20"�12" x
�22" x
FD
TU
TU
TU
TU
TU
TU
TU
TU
TU
TU
TU
TU
TU
TU
TU
TU
TU
TU
TU
TU
TU
59015201530
90590390
1700980
300630
120 1460 120 x
VD
VD
x
�20"
�20" x
14x10 14x10
VD
VD
x x
�16" x
14x10 14x10
VD
VD
x x
�8" x x
14x12 x x x x x
�26"
16x15
VD
VD
x
18x8
�24" x
16x10
VD
VD
x x
VD
16x10
16x10 x x
�16"
14x12
VD
x x
VD
VD
x x
�12" x
�20" x x x
18x6
16x10 x
�16"
20x17
V D
12x6
12x6 x
V D
12x6 12x6 x
12x6 12x6
V D
6"
VD
x
V D
V D
V D
V
DV
D
FD
FD
FD
FD
x
18x12
DN
x
VDV
D
12x10
TO EF-18 AT
ROOF
TO EF-19 AT
ROOF
TO EF-21 AT
ROOF
TO EF-20 AT
ROOF
TO EF-11
TO EF-23 AT
ROOF
TO EF-24 AT
ROOF
VD
FD
14"
12x10
K L M N P QM.7 N.6 P.9
8.1
8.8
9.7
MECH
CDE4
STAIR 07
S-07
CART LIFT
(CLEAN)
CL-3
14"x10" SA 18"x12" SA14"x8" SA
14"x8" SA 14"x8" SA
14"x8" SA
18"x12" RA
FD
11 11 11 11
11 11 11
11 11
11 1111 11
11 1111
661515
1515 1515
AFCV-11-21
AFCV-E326E1
AFCV-E319E
AFCV-E320E
AFCV-E32527E
AFCV-E317EAFCV-E3152E
AFCV-E312E
AFCV-E3151E
AFCV-E309E1
AFCV-E313E
AFCV-E309E2
AFCV-E307E
AFCV-E308E
AFCV-E308A10E
AFCV-E331E
AFCV-E326E2
AFCV-E324E1
AFCV-E324E2
N KEY PLAN
NOT TO SCALE
D E
F1 F2
G1 B
A1 A2
C C
BUILDING
1E
BUILDING
BUILDING
1W
BUILDING
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
NO
T
FO
R
CO
NS
TR
UC
TI
ON
3419 PIERSON PLACE
FLUSHING, MI, 48433
(OFFICE) 810-230-6202
VA STATION
Defining
EXCELLENCE
in the 21st Century
HEALTH
CARE
VA Ann Arbor Healthcare System
2215 Fuller Road
Ann Arbor, MI 48105
C:
\U se rs\
Ju lia n.A bu rto -co rte z\D oc um en ts\
_M
_ju lia n.a bu rto -co rte z.r vt 7/2
5/2
2 3 :07
:54 P
M
H-020
FOURTH FLOOR HVAC PLAN -
AREA 1
SUPPLEMENTAL AC IN
LAB AREA
ANN ARBOR, MI
25JUL2022 Checker Author
100% BID DOCUMENTS20-0247 506-21-201
1E
MECHANICAL KEYNOTES
Key Value Keynote Text
1 RE-BALANCE AND RE-COMMISSION THE EXISTING TERMINAL UNIT. SEE SHEET H-500 FOR
SEQUENCE OF OPERATION.
2 BALANCE THE EXISTING GRILLES AND DIFFUSERS TO THE FLOW RATE INDICATED.
3 NEW TEMPERATURE SENSOR.
4 NEW VARIABLE TERMINAL UNIT. EXTEND HEATING SUPPLY AND RETURN PIPING TO NEW REHEAT
COIL.
5 PROVIDE DUST CONTAINMENT AND EQUIPMENT PROTECTION FOR ALL WORK IN THIS AREA.
RE-INSTALL CEILING UPON COMPLETION OF SHEET METAL WORK.
6 NEW EXHAUST AIR FLOW CONTROL VALVE.
7 NEW CONSTANT VOLUME TERMINAL UNIT. EXTEND HEATING SUPPLY AND RETURN PIPING TO
NEW REHEAT COIL.
8 EXHAUST FAN AND EXHAUST SYSTEM ARE NOT IN THE CONTRACT. DO NOT ADJUST OR MODIFY
AIR FLOW SETTINGS.
9 12"X12" SUPPLY AIR DUCT DROP TO NEW DIFFUSER BOOT.
10 REPLACE THE CHILLED WATER COOLING COIL. SEE THE COIL SCHEDULE H-300.
11 CHECK DAMPERS, ACTUATORS AND LINKAGES FOR PROPER OPERATION. ADJUST AND REPAIR AS
REQUIRED.
12 CLEAN COIL.
13 REMOVE AND REPLACE THE STEAM/CONDENSATE PIPE INSULATION AND JACKET.
14 RE-COMMISSION THE AIR HANDLING UNIT BASED ON THE SEQUENCE OF OPERATION INDICATED
ON SHEET H-500
15 PROVIDE A FIRE DAMPER AT ALL FLOOR PENETRATIONS.
16 EXISTING AIRFLOW CONTROL VALVE WITHOUT AND ACTUATOR. LEAVE IN CURRENT POSITION.
17 REFRAME AND PATCH THE WALL OPENING FOR INSTALLATION OF THE NEW SUPPLY AIR
DIFFUSER.
1/8" = 1'-0"
FOURTH FLOOR HVAC PLAN - AREA 1
x x x x x
VD
�22"
" 2 x
12x812x6
24"DIA.
x
V D
�28"
VD
�26"
12x6
VD
�24" x
V D 12x6 x
10x6
�20" x
VD
V D x
�12"
�24"
�28" x
V D
18x8
8x6 x
V D
V D
8x6
16x8
VD
x
24x12 x
14x10
�24" x
�22"
V D
V D x
8x6 8x6 x
VD
V D
8x6
V D
VD
24x8 x x x x
�22"
12x10
�12" x x x
VD
VD
V D
8x6 x
�18"�18" x
81-AFCV
-306
1-AFCV
-307
DROP
FD
FD
FD
FD
FD
x
TU-12-3
TU
TU
TU
TU
TU
TU
TU
TU
TU
TU
TU
TU
TU
TU
TU
TU
TU
TU
TU
TU
TU
TU
TU-11-40
TU
TU-11-54
TU-11-53
TU
TU
TU
TU
TU
TU
TU
TU
TU-11-56
160330
240280140140
1504104904202300
750 140
630 490
330 520 350
2401730
750 130 170300970580 730270750140 300 170 x x x
V D
V D
14x6 12x6 x x
�20" x
12x8 x x x
6VD
�26"
12x8 x x
�24" x x
V D V D
10x6 10x6
�22" x1 x x x
VD
V D
10x6 x
�20" x x
VD
x x x
VDV
D
12x10
�12" x
14x12
�8" x
�20" x
V D
14x8
�18" x x
�14" x x
12x8 12x6
VD
V D x x
�10"
12x10 x
10x6 x x
FDAD
�6"
�24"
V D
V D
V D
V D
VD
x
14x8 V D
VD
R
IS
E
FD
VD
VD
VD
FD
FD
FD
x
24x8
DN
24x8
DN
5 '
V D
V D 24x8
FD
22x10
FD
16"0
CFM
CFM
CFM
18"x18"
CFM
K L M N P QM.7 P.9
0.7
1.8
2.1
2.3
2.7
3.4
3.5
R.1RQ.9Q.6Q.1 Q.4 R.2
3.49
ELEVATOR
P-1
ELEVATOR
P-2
SERVICE
ELEVATOR
SE-2
SERVICE
ELEVATOR
SE-1
STAIR 08
S-08
24"x14" SA
"x1
4" S
A
111111
11 111111111111111111
11 11
11 11
11 11
11 11
1120 CFM
1120 CFM
SD-2500
AFCV-E308A10E
AFCV-121E
AFCV-E305E
AFCV-106
AFCV-E30241E
AFCV-E204E
AFCV-E333E
AFCV-E338E
AFCV-E338A
AFCV-E306E
AFCV-2
MD
MD
MD
AFCV-CE8E
AFCV-C322E
AFCV-C37324E
AFCV-E337E
AFCV-C321E
AFCV-C31718AFCV-C31620E
AFCV-E338E
1-AFCV-1
N KEY PLAN
NOT TO SCALE
D E
F1 F2
G1 B
A1 A2
C C
BUILDING
1E
BUILDING
BUILDING
1W
BUILDING
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
NO
T
FO
R
CO
NS
TR
UC
TI
ON
3419 PIERSON PLACE
FLUSHING, MI, 48433
(OFFICE) 810-230-6202
VA STATION
Defining
EXCELLENCE
in the 21st Century
HEALTH
CARE
VA Ann Arbor Healthcare System
2215 Fuller Road
Ann Arbor, MI 48105
C:
\U se rs\
Ju lia n.A bu rto -co rte z\D oc um en ts\
_M
_ju lia n.a bu rto -co rte z.r vt 7/2
5/2
2 3 :07
:56 P
M
H-025
FOURTH FLOOR HVAC PLAN -
AREA 2
SUPPLEMENTAL AC IN
LAB AREA
ANN ARBOR, MI
25JUL2022 Checker Author
100% BID DOCUMENTS20-0247 506-21-201
1E
1/8" = 1'-0"
FOURTH FLOOR HVAC PLAN - AREA 2
MECHANICAL KEYNOTES
Key Value Keynote Text
1 RE-BALANCE AND RE-COMMISSION THE EXISTING TERMINAL UNIT. SEE SHEET H-500 FOR
SEQUENCE OF OPERATION.
2 BALANCE THE EXISTING GRILLES AND DIFFUSERS TO THE FLOW RATE INDICATED.
3 NEW TEMPERATURE SENSOR.
4 NEW VARIABLE TERMINAL UNIT. EXTEND HEATING SUPPLY AND RETURN PIPING TO NEW REHEAT
COIL.
5 PROVIDE DUST CONTAINMENT AND EQUIPMENT PROTECTION FOR ALL WORK IN THIS AREA.
RE-INSTALL CEILING UPON COMPLETION OF SHEET METAL WORK.
6 NEW EXHAUST AIR FLOW CONTROL VALVE.
7 NEW CONSTANT VOLUME TERMINAL UNIT. EXTEND HEATING SUPPLY AND RETURN PIPING TO
NEW REHEAT COIL.
8 EXHAUST FAN AND EXHAUST SYSTEM ARE NOT IN THE CONTRACT. DO NOT ADJUST OR MODIFY
AIR FLOW SETTINGS.
9 12"X12" SUPPLY AIR DUCT DROP TO NEW DIFFUSER BOOT.
10 REPLACE THE CHILLED WATER COOLING COIL. SEE THE COIL SCHEDULE H-300.
11 CHECK DAMPERS, ACTUATORS AND LINKAGES FOR PROPER OPERATION. ADJUST AND REPAIR AS
REQUIRED.
12 CLEAN COIL.
13 REMOVE AND REPLACE THE STEAM/CONDENSATE PIPE INSULATION AND JACKET.
14 RE-COMMISSION THE AIR HANDLING UNIT BASED ON THE SEQUENCE OF OPERATION INDICATED
ON SHEET H-500
15 PROVIDE A FIRE DAMPER AT ALL FLOOR PENETRATIONS.
16 EXISTING AIRFLOW CONTROL VALVE WITHOUT AND ACTUATOR. LEAVE IN CURRENT POSITION.
17 REFRAME AND PATCH THE WALL OPENING FOR INSTALLATION OF THE NEW SUPPLY AIR
14x8
22x20
18x16
12x12
T
M
M
15'-0" x 5'-6"
EXHAUST LOUVER
EXHAUST AIR PLENUM
2'-4" A.F.F.
BUILD AIR TIGHT TO
SERVICE BAY ROOF
15'-0" x 5'-6"
INTAKE LOUVER
OUTDOOR AIR PLENUM
2'-4" A.F.F. x 6'-4" HIGH
48x22 OPEN END
W/MOTORIZED DAMPER
VERTICAL AIRTIGHT
SEPARATING
WALL (TYP)
OUTDOOR AIR PLENUM
2'-4" A.F.F. X 6'-4" HIGH
3'-6"
1-IS-11
1-PF-11
1-SUH-5
OAD
VD
VD
N P Q
ER-3A
250 CFM
1-AF-11
1-ERC-11
1-HC-11
1-SH-11
1-SF-11
1-AH-11
1-CC-11
x1
A
B
H4.3.6
H4.3.6
14x8
22x20
18x16
TO EF-21
AT ROOF
TO EF-20
AT ROOF
TO EF-19
AT ROOF
TO EF-18
AT ROOF
F
84x50 CONNECTION
TO PLENUM
MATCH
LINESEE H4.4.2 FOR
CONT.
3'-6"
1-AFM-21
1-AFM-20
SD
�7"
�10"
10x8
14x12
OPEN END
W/1/4" x 1/4"
WIRE
MESH
TU-11-57
TU-11-58
M
P QN
HORIZONTAL AIRTIGHT
SEPARATING WALL
AT LEVEL OF
MEZZANINE FLOOR
108x56
60x36
1-SA-11E
60x36
1-EF-11
1-PF-11E
1-ER-11
1-EF-44
EAD
48x36 x6
8x6
10x8
1-ERC-11E
D O W N x1
12x10 x8
24x18
24x18
D O W N
1-SA-11
x1
A H4.3.6
B H4.3.6
N P QM.7 N.6 P.9
8.1
8.8
9.7
1212 1313
1111 1212
8.1
8.8
9.7
N KEY PLAN
NOT TO SCALE
D E
F1 F2
G1 B
A1 A2
C C
BUILDING
1E
BUILDING
BUILDING
1W
BUILDING
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
NO
T
FO
R
CO
NS
TR
UC
TI
ON
3419 PIERSON PLACE
FLUSHING, MI, 48433
(OFFICE) 810-230-6202
VA STATION
Defining
EXCELLENCE
in the 21st Century
HEALTH
CARE
VA Ann Arbor Healthcare System
2215 Fuller Road
Ann Arbor, MI 48105
C:
\U se rs\
Ju lia n.A bu rto -co rte z\D oc um en ts\
_M
_ju lia n.a bu rto -co rte z.r vt 7/2
5/2
2 3 :07
:58 P
M
H-100
HVAC ENLARGED MECHANICAL
ROOM PLAN
SUPPLEMENTAL AC IN
LAB AREA
ANN ARBOR, MI
25JUL2022 Checker Author
100% BID DOCUMENTS20-0247 506-21-201
1E
1/4" = 1'-0"
THIRD FLOOR EAST SERVICE BAY PLAN
1/4" = 1'-0"
FOURTH FLOOR EAST SERVICE BAY PLAN
MECHANICAL KEYNOTES
Key Value Keynote Text
1 RE-BALANCE AND RE-COMMISSION THE EXISTING TERMINAL UNIT. SEE SHEET H-500 FOR
SEQUENCE OF OPERATION.
2 BALANCE THE EXISTING GRILLES AND DIFFUSERS TO THE FLOW RATE INDICATED.
3 NEW TEMPERATURE SENSOR.
4 NEW VARIABLE TERMINAL UNIT. EXTEND HEATING SUPPLY AND RETURN PIPING TO NEW REHEAT
COIL.
5 PROVIDE DUST CONTAINMENT AND EQUIPMENT PROTECTION FOR ALL WORK IN THIS AREA.
RE-INSTALL CEILING UPON COMPLETION OF SHEET METAL WORK.
6 NEW EXHAUST AIR FLOW CONTROL VALVE.
7 NEW CONSTANT VOLUME TERMINAL UNIT. EXTEND HEATING SUPPLY AND RETURN PIPING TO
NEW REHEAT COIL.
8 EXHAUST FAN AND EXHAUST SYSTEM ARE NOT IN THE CONTRACT. DO NOT ADJUST OR MODIFY
AIR FLOW SETTINGS.
9 12"X12" SUPPLY AIR DUCT DROP TO NEW DIFFUSER BOOT.
10 REPLACE THE CHILLED WATER COOLING COIL. SEE THE COIL SCHEDULE H-300.
11 CHECK DAMPERS, ACTUATORS AND LINKAGES FOR PROPER OPERATION. ADJUST AND REPAIR AS
REQUIRED.
12 CLEAN COIL.
13 REMOVE AND REPLACE THE STEAM/CONDENSATE PIPE INSULATION AND JACKET.
14 RE-COMMISSION THE AIR HANDLING UNIT BASED ON THE SEQUENCE OF OPERATION INDICATED
ON SHEET H-500
15 PROVIDE A FIRE DAMPER AT ALL FLOOR PENETRATIONS.
16 EXISTING AIRFLOW CONTROL VALVE WITHOUT AND ACTUATOR. LEAVE IN CURRENT POSITION.
17 REFRAME AND PATCH THE WALL OPENING FOR INSTALLATION OF THE NEW SUPPLY AIR
NOTES:
1. DDC CONTROLLER PROVIDED BY SIEMENS.
2. MAXIMUM NOISE CRITERIA = 35.
3. FIBER FREE LINER.
4. PROVIDE A SOUND ATTENUATOR.
EX. 6" CHR
EX. 6" CHS
EX
. 6
" C
HS
EX
. 6
" C
HR
EX. BALANCING/SHUT-OFF
VALVE (TYP)
EX. 2-WAY CONTROL VALVE
EX. UNION (TYP)
EX. THERMOMETER (TYP)
CHR
CHS
CHR
CHS
CHR
SHUT-OFF VALVE
(TYP)
PETE'S PLUG
(TYP)
HOSE END DRAIN
W/ VALVE (TYP)
AIR VENT (TYP)
EX. 8" CHR
EX. 8" CHR
SHUT-OFF VALVE
(TYP)
UNION (TYP)
REHEAT COIL
BALANCING VALVE
DRAIN VALVE
HR
HS
NOTES:
1. MAX N.C. = 30
2. MAX A.P.D.=0.1"
3. LAY-IN CEILING.
4. WALL MOUNT.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
NO
T
FO
R
CO
NS
TR
UC
TI
ON
3419 PIERSON PLACE
FLUSHING, MI, 48433
(OFFICE) 810-230-6202
VA STATION
Defining
EXCELLENCE
in the 21st Century
HEALTH
CARE
VA Ann Arbor Healthcare System
2215 Fuller Road
Ann Arbor, MI 48105
C:
\U se rs\
Ju lia n.A bu rto -co rte z\D oc um en ts\
_M
_ju lia n.a bu rto -co rte z.r vt 7/2
5/2
2 3 :08
:00 P
M
H-300
HVAC SCHEDULES / DETAILS SUPPLEMENTAL AC IN
LAB AREA
ANN ARBOR, MI
25JUL2022 Checker Author
100% BID DOCUMENTS20-0247 506-21-201
1E
TERMINAL UNIT SCHEDULE
MARK MANUFACTURER MODEL
SERVING
INLET
SIZE
AIRFLOW HYDRONIC RE-HEAT
VOLTAGE (V)
NOTESDESIGN
AIRFLOW (CFM)
MIN AIRFLOW
(CFM)
MAX HEATING
AIRFLOW (CFM)
CAPACITY
(MBH)
EAT
(°F)
LAT
(°F)
FLOW
(GPM)
AFCV-11-21 PHOENIX EXVA-112L-ALEHZ EXHAUST 12" 1420 425 24 V 1,2,3
TU-11-21 PHOENIX MAVA-112L-ALEHZ SUPPLY 12" 2000 480 800 39.6 55 95 2.7 24 V 1,2,3
TU-11-40 TITUS DESV SUPPLY 16" 2500 2500 2500 124 55 100 8.3 24 V 1,2,3,4
WATER COIL SCHEDULE
GENERAL AIRFLOW CHILLED WATER COOLING
NOTESMARK SYSTEM AIR FLOW
(CFM)
MAX.
APD
(IN-WG)
MAX. FACE
VELOCITY
(FPM)
TOTAL CAPACITY
(MBH)
EDB
(°F)
EWB
(°F)
LDB
(°F)
LWB
(°F)
FLOW
(GPM)
MAX. WPD
(FT-HD)
EWT
(°F)
LWT
(°F) FLUID ROWS
1-CC-1 1-AH-11 38250 0.60 500 2736 92 75 54 53.6 456.0 7.50 44 56 WATER 8
NOT TO SCALE1 DUAL CHILLED WATER COIL PIPING DIAGRAM
12" = 1'-0"2 HOW WATER REHEAT COIL PIPING DETAIL - 2 WAY VALVE
Revisions: Date:
DIFFUSER, REGISTER, AND GRILLE SCHEDULE
GENERAL DESCRIPTION FINISH MATERIAL NECK
SIZE NOTESMARK MANUFACTURER MODEL
RG-1420 TITUS 50F 24"X24" EGGCRATE GRILLE WHITE ALUMINUM 24"X24" 1,2,3
SD-400 TITUS OMNI 24"X24" PLAQUE SUPPLY DIFFUSER WHITE ALUMINUM 12" DIA. 1,2,3
SD-2500 TITUS ML-39 14' LONG, 7 SLOT, WALL DIFFUSER WITH PLENUM WHITE ALUMINUM 14'X14" 1,2,4
ZS
P
I
I
P
I
SD
ZS
P
P
P
OUTSIDE
AIR
DAMPER END
SWITCH
OUTSIDE
AIR
PLENUM
N.C.
D-1
EN
ER
GY
RE
CO
VE
RY
CO
IL
FROM DAMPER
SOLENOID
DAMPER END SWITCH/SUPPLY FAN
INTERLOCK
D-2
V-2
MPS
FREEZE STAT/SUPPLY FAN
INTERLOCK
ELECTRICAL
INTERLOCK
V-4 N.C.
V-3
MP
S
HUMIDIFIER
CONTROL VA.
N.C.
TEMP.
SWITCH
INPUT
DCP
OUTPUT
CO
ND
EN
SA
TE
SH
SUPPLY FAN/SMOKE DAMPER
INTERLOCK
SD-1
SUPPLY
AIR
LEGEND
P
G
DIFFERENTIAL PRESSURE
SWITCH
TRANSMITS DIFFERENTIAL PRESSURE
TO DCP TO INDICATE FILTER
CONDITIONS AND STATUS OF FANS.
DCP DISTRIBUTED CONTROL
PANEL
CONTROLS OPERATION OF AIR
HANDLING UNIT IN ACCORDANCE
WITH THE SEQUENCE OF OPERATION.
D-1 OUTSIDE AIR DAMPER 2
POSITION
OPENS WHEN SUPPLY FAN
STARTS AND CLOSES WHEN
SUPPLY FAN STOPS.
D-2
MODULATES AIRFLOW BETWEEN
THE COIL FACE AND THE COIL
BY-PASS IN RESPONSE TO DCP.
F SD
DUCT SMOKE DETECTORS
(FURNISHED AND WIRED TO
FIRE ALARM PANEL BY ELECTRICAL)
PRESSURE GAUGE
(SECTION 15880)
FILTER CONDITION
INDICATOR
H-1 SPACE AIR HUMIDITY
SENSOR
SENSES AND TRANSMITS SPACE
HUMIDITY TO DCP FOR
CONTROL AND INDICATION
H-2 SUPPLY AIR HUMIDITY
SENSOR
SENSES AND TRANSMITS SUPPLY
AIR HUMIDITY TO DCP FOR
CONTROL AND INDICATION
SD-1 SUPPLY AIR SMOKE
DAMPER
CLOSES WHEN UNIT IS SHUT
OFF OR WHENEVER SMOKE
IS DETECTED BY F SD.
T-1 SUPPLY AIR TEMPERATURE
SENSOR
SENSES AND TRANSMITS SUPPLY
AIR DRY BULB TEMPERATURE TO
DCP FOR CONTROL AND INDICATION.
T-2
SENSES AND TRANSMITS OUTSIDE
AIR DRY BULB TEMPERATURE TO
DCP FOR CONTROL AND INDICATION.
SHUTS DOWN FAN SYSTEM AND
ALARMS DCP WHEN TEMP. LEAVING
COIL IS BELOW SETPOINT OF
TEMP. SWITCH.
LEAVING PREHEAT COIL
AIR TEMPERATURE SWITCH
(FREEZE PROTECTION)
T-3
V-1
CHILLED WATER CONTROL VALVE
STRAIGHT THRU MODULATING
TYPE
V-2
PROPORTIONS FLOW OF
CHILLED WATER TO COOLING
COIL IN RESPONSE TO DCP.
V-3 CONTROLS STEAM FLOW
TO HUMIDIFIER
V-4 STEAM CONTROL VALVE
MODULATING TWO WAY
PROPORTIONS FLOW OF
STEAM TO HUMIDIFIER
IN RESPONSE TO DCP.
EXISTING SEQUENCE OF OPERATION
SUPPLY FAN/FACE & BY-PASS DAMPER
INTERLOCK
DAMPER END SWITCH/SUPPLY FAN
INTERLOCK
HUMIDIFIER STEAM SHUT-
OFF VALVE
MS STARTS AND STOPS FAN OR PUMP
IN RESPONSE TO DCP
N.C.
ZS DAMPER END
SWITCH
CLOSES WHEN DAMPER IS OPEN
OPENS WHEN DAMPER BEGINS TO
CLOSE
PR
E-
FI
LT
ER
T-4
LEAVING ENERGY RECOVERY COIL
AIR TEMPERATURE
SENSOR
SENSES AND TRANSMITS ENERGY
RECOVERY COIL DRY BULB
TEMPERATURE TO DCP.
EXHAUST
AIR
NC
NO
V-5
ALARM TO
ECC
DE-ENERGIZES SUPPLY FAN AND
PROVIDES SMOKE ALARM SIGNAL
TO DCP AND FIRE ALARM SYSTEM.
STEAM CONTROL VALVE,
TWO-WAY,
OPEN/CLOSE
STOPS AND STARTS FLOW OF
STEAM TO PREHEAT COIL
IN RESPONSE TO DCP.
V-5
1. GENERAL
1.1 UNIT IS NORMALLY STARTED AND STOPPED BY THE DCP OR REMOTELY AT
THE ECC. H-O-A SWITCH SHALL BE KEPT IN THE "AUTO" POSITION.
"HAND" AND "OFF" SHALL BE USED ONLY FOR MAINTENANCE. WHEN THE
UNIT IS "OFF", D-1 AND SD-1 SHALL BE FULLY CLOSED. WHEN THE
UNIT IS "ON", D1 AND SD-1 SHALL BE FULLY OPEN. SMOKE DAMPER END
SWITCH (ZS) AND OUTSIDE AIR DAMPER END SWITCH (ZS) SHALL PREVENT
FAN OPERATION UNTIL BOTH DAMPERS REACH THEIR FULL OPEN POSITION.
D-2 SHALL MODULATE IN ACCORDANCE WITH THE FOLLOWING SEQUENCE:
2.1 THE SUPPLY AIR TEMPERATURE SENSED BY T-1 SHALL BE MAINTAINED AT
SETPOINT BY THE DCP MODULATING/CONTROLLING THE ENERGY RECOVERY
SYSTEM, THE PRE-HEAT COIL VALVE AND THE FACE AND BY-PASS DAMPERS
AND THE COOLING COIL VALVE AS FOLLOWS:
DURING THE HEATING SEASON WHEN THE OUTSIDE AIR TEMPERATURE IS
PRE-HEAT COIL VALVE V-2. THE DCP SHALL THEN BEGIN MODULATING
THE PRE-HEAT COIL FACE AND BY-PASS DAMPERS TO MAINTAIN THE
DISCHARGE AIR TEMPERATURE. IF THE DISCHARGE AIR TEMPERATURE
BY-PASS DAMPERS ARE IN FULL BY-PASS, THE DCP SHALL CLOSE THE
PRE-HEAT COIL VALVE V-2. WHEN VALVE V-2 IS CLOSED AND THE DCP
SENSES A DISCHARGE AIR TEMPERATURE 2 F ABOVE SETPOINT FOR 15
MINUTES, THE DCP SHALL DE-ENERGIZE THE ENERGY RECOVERY SYSTEM
THE OUTSIDE AIR TEMPERATURE FALLS TO 78 F AND REMAINS THERE FOR
3.1 THE DCP SHALL MONITOR THE UNIT PRE-FILTER/AFTER FILTER AND SHALL
ALARM WHEN THE DIFFERENTIAL PRESSURE SWITCH REACHES ITS SETPOINT
INDICATING THAT THE FILTER IS DIRTY AND SHOULD BE CHANGED.
4. HUMIDITY CONTROL
4.1 WHEN THE DCP IS NOT CALLING FOR HUMIDITY, SENSED BY H-1,
"ON-OFF" TWO-WAY CONTROL VALVE V-3 SHALL REMAIN CLOSED. WHEN
THE DCP IS CALLING FOR HUMIDITY, V-3 SHALL REMAIN OPEN AND V-1
(COOLING COIL CONTROL VALVE) SHALL REMAIN CLOSED.
4.2 THE SPACE HUMIDITY, SENSED BY H-1, SHALL BE MAINTAINED AT
SETPOINT BY THE DCP MODULATING HUMIDITY CONTROL VALVE V-4 TO
MAINTAIN THE DESIRED RELATIVE HUMIDITY. THE DCP SHALL OVERRIDE
THIS CONTROL TO MAINTAIN HUMIDITY OF 80% AS SENSED BY H-2. DCP
SHALL CLOSE VALVE V-3 WHENEVER THE SUPPLY FAN IS OFF. VALVE V-4
SHALL BE INTERLOCKED WITH A TEMPERATURE SWITCH TO KEEP THE
HUMIDIFIER OFF UNTIL CONDENSATE TEMPERATURE APPROACHES STEAM
TEMPERATURE. VALVE V-4 SHALL ALSO BE INTERLOCKED WITH THE
SUPPLY FAN MOTOR STARTER SO THAT, WHEN THE FAN IS OFF, THE
CONTROL SIGNAL TO THE VALVE WILL BLEED TO ATMOSPHERE THROUGH A
SOLENOID VALVE ALLOWING VALVE V-4 TO GO FULLY CLOSED.
5. FREEZE PROTECTION
ALARM SIGNAL SHALL BE INDICATED AT THE DCP AND ECC. IF THE
UNIT SUPPLY FAN SHALL SHUT DOWN (THROUGH A HARDWIRED INTERLOCK
BETWEEN THE FREEZESTAT CONTROL RELAY AND FAN MOTOR STARTER) AND
A CRITICAL ALARM SHALL BE INDICATED AT THE DCP AND ECC.
6. AUTOMATIC SHUTDOWN/RESTART
6.1 WHEN SMOKE IS DETECTED BY DUCT SMOKE DETECTOR F SD, THE SUPPLY
FAN SHALL SHUT "OFF" (THROUGH A HARDWIRED INTERLOCK BETWEEN THE
SHALL CLOSE. EXHAUST FANS SERVING THE SAME SPACE AS THE SUPPLY
7. ENERGY RECOVERY COIL FROST PROTECTION
TO DROP 1 F BELOW SETPOINT FOR 5 MINUTES, THE DCP SHALL OPEN
�RISES 1 F ABOVE SET POINT FOR 5 MINUTES AND THE FACE AND 5.1 IF THE AIR TEMPERATURE, AS SENSED BY T-1, FALLS BELOW 45 F, AN
TEMPERATURE FALLS BELOW 40 F, AS SENSED BY FREEZESTAT T-3, THE
C
STEAM CONTROL VALVE,
TWO-WAY,
OPEN/CLOSE
ENERGIZED BY THE DCP. THE DCP SHALL MONITOR THE UNIT DISCHARGE
AIR TEMPERATURE (T-1). IF THE DISCHARGE AIR TEMPERATURE IS SENSED
WHEN THE COOLING COIL VALVE V-1 IS CLOSED AND THE UNIT DISCHARGE
(REGARDLESS OF OUTDOOR TEMPERATURE).
AIR TEMPERATURE IS SENSED TO BE 1 F BELOW SETPOINT FOR 5
TO FIRE
ALARM
SYSTEM
(SMOKE DETECTOR/SUPPLY FAN INTERLOCK
BY FIRE ALARM CONTRACTOR)
SMOKE DETECTOR AND FAN MOTOR STARTER) AND AN ALARM SIGNAL
SHALL BE TRANSMITTED TO THE ECC AND TO THE FIRE ALARM SYSTEM.
THE OUTSIDE AIR DAMPER AND SMOKE DAMPER IN THE SUPPLY DUCT
T-5
SENSES AND TRANSMITS GLYCOL
RETURN TEMP TO 31-ERC-1 AND
31-ERC-2 FOR DCP CONTROL OF
MIXING VALVE V-5.
DEFROST VALVE,
TEMPERATURE CONTROL
VALVE (3-WAY MIXING)
CHR
CO
OL
IN
G
CO
IL
V-1
CH
ENERGY
RECOVERY
COIL
N.O.
EXISTING 1-AH-11 CONTROL DIAGRAM
FROM
RETURN
AIR
DUCTWORK
OUTSIDE AIR TEMPERATURE
SENSOR (EXISTING GLOBAL POINT)
GLYCOL TEMPERATURE SENSOR TO
ENERGY RECOVERY COIL 1-ERC-9
FAN OR PUMP MOTOR STARTER
(BY ELECTRICAL)
2. TEMPERATURE CONTROL
CIRCULATING PUMP 1-P-11 . THE DCP SHALL MAINTAIN DISCHARGE AIR
TEMPERATURE SETPOINT BY MODULATING THE COOLING COIL VALVE V-1.
WHEN THE OUTSIDE AIR TEMPERATURE IS SENSED TO BE 80 F, THE DCP SHALL
REMAIN ENERGIZED AS LONG AS THE DCP SENSES THE OUTSIDE AIR TEMPERATURE
TO BE 80 F OR ABOVE. DISCHARGE AIR TEMPERATURE WILL CONTINUE TO BE
MAINTAINED BY MODULATION OF THE COOLING COIL VALVE V-1. WHEN
MINUTES, THE DCP SHALL ENERGIZE THE HEAT RECOVERY SYSTEM PUMP
3. AIRFILTER MONITORING
1-ERC-11
PREHEAT COIL
(WITH INTEGRAL
FACE & BY-PASS) FREEZE STAT/SUPPLY
FAN INTERLOCK
FREEZE
ALARM
1-EF-11
1-P-11H
1-SF-11
1-AH-11
SPACE HUMIDITY
SENSOR/TRANSMITTER
BELOW 50 F, THE HEAT RECOVERY SYSTEM PUMP 1-P-11H SHALL BE
ENERGIZE THE ENERGY RECOVERY CIRCULATING PUMP 1-P-11H. THE PUMP SHALL
30 MINUTES, THE DCP SHALL DE-ENERGIZE THE CIRCULATING PUMP 1-P-11H.
7.1 THE 3-WAY MIXING VALVE V-5 SHALL BE
MODULATED BY THE DCP, MIXING SUPPLY AND RETURN GLYCOL TO
MAINTAIN A MINIMUM OF 35 F GLYCOL TEMPERATURE TO ENERGY�
RECOVERY COIL 1-ERC-11 AS SENSED BY THE DCP THROUGH
TEMPERATURE SENSOR T-5.
INTEGRAL FACE & BY-PASS
DAMPER, MODULATING
MODULATES IN RESPONSE TO DCP
IN ORDER TO LIMIT GLYCOL
TEMPERATURE TO EXHAUST AIR
COILS TO PREVENT FROST FROM
BUILDING UP ON COIL FACE
1-ERC-11E
START/STOP
FAN SHALL CONTINUE TO RUN.
VFD VARIABLE FREQUENCY
DRIVE
VFD
VFD
HEATING
COOLING
SIMULTANEOUS HEATING AND COOLING SHALL NOT BE ALLOWED.
FI
NA
L
FI
LT
ER
CONTROLS SHALL PREVENT SIMULTANEOUS HEATING AND COOLING.
H-2 T-1
T-4
H-1 T-5
T-3
I I
DSP
DSP
M
M
G
M
S
CR
S
E
MS
A
5 6
F M
A B C D F G
1 2 3 4 5 6 7 8 9 10
MS
E
H
MS
G
J
G
8. VARIABLE FREQUENCY DRIVES
8.1 THE SUPPLY AND EXHAUST FAN VARIABLE FREQUENCY DRIVES
SHALL MODULATE TO MAINTAIN THE DUCT STATIC
PRESSURE SET POINT OF THEIR RESPECTIVE DUCT
PRESSURE SENSOR.
NOTE:
THIS SHEET INDICATES THE
EXISTING CONTROLS
ARRANGEMENT AND
SEQUENCE OF OPERATION FOR
1-AH-11 AND 1-EF-11. THIS
SHEET IS INTENDED TO
FACILITATE THE WORK OF THE
COMMISSIONING AGENT.
DSP DUCT STATIC PRESSURE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
NO
T
FO
R
CO
NS
TR
UC
TI
ON
3419 PIERSON PLACE
FLUSHING, MI, 48433
(OFFICE) 810-230-6202
VA STATION
Defining
EXCELLENCE
in the 21st Century
HEALTH
CARE
VA Ann Arbor Healthcare System
2215 Fuller Road
Ann Arbor, MI 48105
C:
\U se rs\
Ju lia n.A bu rto -co rte z\D oc um en ts\
_M
_ju lia n.a bu rto -co rte z.r vt 7/2
5/2
2 3 :08
:01 P
M
H-500
HVAC CONTROL DIAGRAMS SUPPLEMENTAL AC IN
LAB AREA
ANN ARBOR, MI
25JUL2022 Checker Author
100% BID DOCUMENTS20-0247 506-21-201
1E
Revisions: Date:
VHACLEFerraJ1 Typewritten Text
File details come from the government source that posted it. Updated .