This solicitation is for a project to supplement the air conditioning in lab areas at a Department of Veterans Affairs medical center. Key details include the solicitation number 36C25023B0011 issued by Veterans Health Administration VISN 10 to provide new variable air volume terminal units, temperature sensors, ductwork, diffusers and related mechanical work. The project number is 506-21-201 and involves areas on the third and fourth floors including labs, offices and other clinical spaces. The work includes replacing existing coils, cleaning and rebalancing existing equipment, and commissioning all systems per the sequence of operation. The bid documents provide schematics, notes and schedules to define the scope of work required to upgrade the HVAC systems in the specified areas.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N

EW

S

VICINITY MAP

NOT TO SCALE

Fuller Rd.

Ann Arbor

Geddes Rd.

Fuller Rd.

Huron Par kway

Glazier Way

Plymouth Rd.

Geddes Ave

N

EW

S

LAKE ERIE

GRAND

RAPIDS

TRAVERSE

CITY

LAKE SUPERIOR

UPPER PENINSULA

MACKINAW

CITY LAKE HURONALPENA

PETOSKEY

GAYLORD

GRAYLING

LA

KE

M

IC

HI

GA

N

SAGINAW

FLINT

LANSING

DETROIT

KALAMAZOO ANN

ARBOR

BATTLE

CREEK

LOCATION MAP

NOT TO SCALE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

NO

T

FO

R

CO

NS

TR

UC

TI

ON

3419 PIERSON PLACE

FLUSHING, MI, 48433

(OFFICE) 810-230-6202

VA STATION

Defining

EXCELLENCE

in the 21st Century

HEALTH

CARE

SIGNATURE DATE

Director

Associated Director

Chief of Staff

Associate Director for Patient Care Services

Chief, FMS

Chief, Engineering Section

Chief, Police Service

Chief, Fire Service

Union Safety Representative

Chief, Environmental Management Section

Infection Control Officer

Patient Safety Manager

GEMS Coordinator

Safety Specialist

Contracting Officer

COR

SIGNATURE BLOCK

POSITION DATESIGNATUREPOSITION

DEPARTMENT OF VETERANS AFFAIRS - VA ANN ARBOR HEALTHCARE SYSTEM

ANN ARBOR, MICHIGAN

VA Ann Arbor Healthcare System

2215 Fuller Road

Ann Arbor, MI 48105

C:

\U se rs\

Ju lia n.A bu rto -co rte z\D oc um en ts\

_M

_ju lia n.a bu rto -co rte z.r vt 7/2

5/2

2 3 :07

:45 P

M

G-001

COVER SHEET SUPPLEMENTAL AC IN

LAB AREA

ANN ARBOR, MI

25JUL2022 JDL Author

100% BID DOCUMENTS20-0247

SUPPLEMENTAL AC IN LAB AREA

506-21-201

25JUL2022

100% BID DOCUMENTS

506-21-201

506-21-201

1E

SHEET LIST

SHEET NO. SHEET NAME

MECHANICAL

G-001 COVER SHEET

MECHANICAL

H-001 MECHANICAL LEGENDS

HD-010 THIRD FLOOR HVAC PLAN - AREA 1 DEMOLITION

HD-015 THIRD FLOOR HVAC PLAN - AREA 2 DEMOLITION

HD-020 FOURTH FLOOR HVAC PLAN - AREA 1 DEMOLITION

HD-025 FOURTH FLOOR HVAC PLAN - AREA 2 DEMOLITION

H-010 THIRD FLOOR HVAC PLAN - AREA 1

H-015 THIRD FLOOR HVAC PLAN - AREA 2

H-020 FOURTH FLOOR HVAC PLAN - AREA 1

H-025 FOURTH FLOOR HVAC PLAN - AREA 2

H-100 HVAC ENLARGED MECHANICAL ROOM PLAN

H-300 HVAC SCHEDULES / DETAILS

H-500 HVAC CONTROL DIAGRAMS

Revisions: Date:

T R

AFF ABOVE FINISHED FLOOR

AHU AIR HANDLING UNIT

BDD BACKDRAFT DAMPER

BHP BRAKE HORSEPOWER

B.O.D. BOTTOM OF DUCT

BTU BRITISH THERMAL UNIT

CFM CUBIC FEET PER MINUTE

CHR CHILLED WATER RETURN

CHS CHILLED WATER SUPPLY

CKT CIRCUIT

Db DRY BULB TEMPERATURE

DN DOWN

EA EXHAUST AIR

EAT ENTERING AIR TEMPERATURE

ECM ELECTRONICALLY COMMUTATED MOTOR

EF EXHAUST FAN

EG EXHAUST GRILLE

EXH EXHAUST

F/SDPR COMBINATION FIRE/SMOKE DAMPER

GPM GALLONS PER MINUTE

HWC HOT WATER COIL

HWR HEATING HOT WATER RETURN

HWS HEATING HOT WATER SUPPLY

HP HORSEPOWER

HRU HEAT RECOVERY UNIT

HVAC HEATING/VENTILATING/AIR CONDITIONING

IN INCH

LAT LEAVING AIR TEMPERATURE

LB POUNDS

LWT LEAVING WATER TEMPERATURE

MAX MAXIMUM

MBH BTU PER HOUR (THOUSAND)

MCC MOTOR CONTROL CENTER

NFPA NATIONAL FIRE PROTECTION ASSOCIATION

OA OUTSIDE AIR

OD OUTSIDE DIAMETER

P PUMP

PSI POUNDS PER SQUARE INCH

P/T PRESSURE/TEMPERATURE

QTY QUANTITY

RA RETURN AIR

RD ROOF DRAIN

RG RETURN GRILLE

RPM ROTATIONS PER MINUTE

SA SUPPLY AIR

SD SUPPLY DIFFUSER

SG SUPPLY GRILLE

SP STATIC PRESSURE

TG TRANSFER GRILLE

TU TERMINAL UNIT

TYP. TYPICAL

V VENT

WB WET BULB TEMPERATURE

X- EXISTING

F/SD

F/SD

NOTE:

ALL ABBREVIATIONS AND SYMBOLS SHOWN ON THIS SHEET MAY NOT

BE USED ON THIS PROJECT.

KEY NOTE - DEMOLITION

KEY NOTE - NEW WORK

CONNECTION POINT, NEW TO

EXISTING

DEMOLITION END POINT

THERMOMETER

PRESSURE GAUGE

PENDANT FIRE PROTECTION

SPRINKLER HEAD

SUPPLY AIR DUCT

RETURN AIR DUCT

EXHAUST AIR DUCT

BALANCE DAMPER

CONICAL TEE

90° TEE WITH 45° APPROACH

TRANSITION CONCENTRIC

TRANSITION ECCENTRIC

RETURN AIR GRILLE WITH INSULATED DUCT BOOT

BELLMOUTH BRANCH TAKE-OFF WITH MANUAL

BALANCING DAMPER

VERTICAL FIRE DAMPER

HORIZONTAL FIRE DAMPER

VERTICAL COMBINATION FIRE SMOKE DAMPER

HORIZONTAL COMBINATION FIRE SMOKE DAMPER

MOTORIZED DAMPER

AIR FLOW DIRECTION

THERMOSTAT

LINE VOLTAGE REVERSE

ACTING THERMOSTAT

TEMPERATURE SENSOR

TIMER OVERRIDE

HUMIDISTAT

COLD WATER

HOT WATER HEATING SUPPLY

DUCT SMOKE DETECTOR. INSTALLED BY

M.T.C. PROVIDED

AND WIRED BY E.T.C.

TEST PORT

1. TRANSMISSION OF RFI's AND SUBMITTALS SHALL BE THROUGH SUBMITTAL EXCHANGE.

THE PRIME CONTRACTOR SHALL HOST SUBMITTAL EXCHANGE THROUGH THE LIFE OF

THE CONTRACT. SEE SPECIFICATION SECTION 013323, 1.6.

2. THE FIRST FIGURE OF DUCT SIZE INDICATES DIMENSION OF FACE SHOWN OR INDICATED.

DUCT SIZES ARE NET INSIDE DIMENSIONS.

3. TOTAL STATIC PRESSURE NOTED IN THE SCHEDULES INCLUDES DUCT SYSTEM,

TERMINAL UNITS, FILTERS, COILS, ETC. LOSS FOR FILTERS SHALL BE FOR FILTERS SHALL

BE FOR FILTERS AT 50% LOADING.

4. WATER PIPE CONNECTIONS TO AIR HEATING AND COOLING COILS SHALL BE MADE TO

PROVIDE COUNTER FLOW BETWEEN WATER AND AIR.

5. ABEL MECHANICAL EQUIPMENT- AIR HANDLING UNITS, EXHAUST FANS, VAV BOXES, ETC.

OUTDOOR LABELING TO BE WEATHER RESISTANT. COORDINATE ALL EQUIPMENT

NUMBERS WITH VA PRIOR TO ORDERING THE LABELING.

6. WHEN EQUIPMENT IS REMOVED FROM SERVICE - TURN OVER VA TAG TO THE COR PRIOR

TO REMOVING THE EQUIPMENT FROM THE SITE. (SO THE VA CAN REMOVE THIS

EQUIPMENT FROM THEIR INVENTORY LIST).

7. CONTRACTORS WORKING AT VA FACILITIES ARE REQUIRED TO PROVIDE A DOCUMENT

STATING THAT ALL WORKERS, PRIME AND SUBS, HAVE HAD THE FLU SHOT FOR THE

CURRENT YEAR OF THE CONTRACT. THIS IS IN COMPLIANCE WITH VA DIRECTIVE 1013,

PREVENTION AND CONTROL OF SEASONAL INFLUENZA WITH VACCINES. ACCORDINGLY,

THE GC SHALL PROVIDE A CERTIFICATION THAT ALL WORKS ON THIS CONTRACT HAVE

BEEN IMMUNIZED IN ACCORDANCE WITH THIS DIRECTIVE.

8. HVAC SYSTEMS SHALL REMAIN OPERATIONAL IN OCCUPIED SPACES AT ALL TIMES

UNLESS A SCHEDULED SHUT DOWN IS APPROVED BY THE COR. PROVIDE TEMPORARY

HVAC SYSTEMS AS NEEDED FOR AREAS THAT WILL HAVE HVAC SYSTEMS "OFF" FOR

MORE THAN FOUR (4) HOURS. AHU-11 AND EF-11 SHUTDOWN SHALL ONLY OCCUR

DECEMBER-MARCH.

9. CONTRACTOR SHALL ADHERE TO VETERAN'S ADMINISTRATION INFECTION CONTROL RISK

ASSESSMENT (ICRA) GUIDELINES WITH CLASS III PRECAUTIONS.

DUCT STATIC PRESSURE SENSORDSP

T

S

SD

T O

M

H

HWS

HWR

CHS

CHR

PUMP

CHECK VALVE

SHUT-OFF VALVE

UNION

STRAINER

PIPE OUT OF BOTTOM

PIPE OUT OF TOP

PIPE TURNED DOWN

PIPE TURNED UP

CHILLED WATER RETURN

CHILLED WATER SUPPLY

HOT WATER HEATING RETURN

CW

SPRINKLER HEAD

UPRIGHT FIRE PROTECTION

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

NO

T

FO

R

CO

NS

TR

UC

TI

ON

3419 PIERSON PLACE

FLUSHING, MI, 48433

(OFFICE) 810-230-6202

VA STATION

Defining

EXCELLENCE

in the 21st Century

HEALTH

CARE

VA Ann Arbor Healthcare System

2215 Fuller Road

Ann Arbor, MI 48105

C:

\U se rs\

Ju lia n.A bu rto -co rte z\D oc um en ts\

_M

_ju lia n.a bu rto -co rte z.r vt 7/2

5/2

2 3 :07

:46 P

M

H-001

MECHANICAL LEGENDS SUPPLEMENTAL AC IN

LAB AREA

ANN ARBOR, MI

25JUL2022 Checker Author

100% BID DOCUMENTS20-0247 506-21-201

1E

1.0

GPM

1.0

GPM

3'-6"

15'-0" x

5'-6"EXHAUST

LOUVER

EXHAUST AIR

PLENUM2'-4"

A.F.F.BUILD AIR TIGHT

TOSERVICE BAY

ROOF

LOUVER

48x22 OPEN

ENDW/MOTORIZED

DAMPER

1-IS-11

1-PF-11

1-AF-11

1-ERC-11

1-HC-11

1-SH-11

1-SF-11

1-AH-11

VERTICAL

AIRTIGHT

SEPARATINGWALL

(TYP)

PLENUM2'-4" A.F.F. X 6'-4"

HIGH

1-SUH-5

1-CC-11

16x10

M

M

OAD

VD

VD

x x x

V D

V D

8x6 8x6 x

V D

8x6 x

8x6 8x6

V D

V D

14x12 x x x

VD

VD

18x6

VD

VD

14x10 x x 14x10 x

VD

VD

x

16x10

18x12 x x

VD

VD

14x8

18x6

V D

VD

14x1212x6 x

12x8 x

24x18 x x

18x10

10x6

12x6

12x6

12x6

14x8 14x8

16x8 x

16x8

18x8 18x81 x

16x8 x x

FD

8x6

18x8

EA

V D V D

V D

V D

8x68x6

8x6 8x6 x x

24x8

24x8

24x8 12x6

20x10 x

14x8

22x20

18x16 x

VD

VD

x

12x12

VD

12x6

V D

VD

T

K L M N P QM.7 N.6 P.9

8.1

8.8

9.7

LAB

E315

OFFICE

E317

OFFICE

E319

BIO SAFETY

AREA

E320

LAB

E315B

COLD ROOM

E315A

STORAGE

E323

STORAGE

E324A STAFF LOUNGE

E324

LAB

E326BLAB

E326A

LAB

E326

BLOOD BANK

E330

LAB

E308

LAB

E310

LAB

E306A

STORAGE

E309B

CART LIFT

(CLEAN)

CL-3

STORAGE

E307A

STORAGE

E307

STORAGE

E309A

STORAGE

E313

LAB

E312

LAB

E318

LAV

E325

LAV

E327

CORRIDOR

C3-14

CORRIDOR

C3-13

CORRIDOR

C3-17

STAIR 07

S-07

MECH

E321

ELEC

E321B

DATA

E321A

BLOOD BANK

E330

LAB

E333

LAB

E308

D1D1

D1D1

D2D2

D1D1

N KEY PLAN

NOT TO SCALE

D E

F1 F2

G1 B

A1 A2

C C

BUILDING

1E

BUILDING

BUILDING

1W

BUILDING

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

NO

T

FO

R

CO

NS

TR

UC

TI

ON

3419 PIERSON PLACE

FLUSHING, MI, 48433

(OFFICE) 810-230-6202

VA STATION

Defining

EXCELLENCE

in the 21st Century

HEALTH

CARE

VA Ann Arbor Healthcare System

2215 Fuller Road

Ann Arbor, MI 48105

C:

\U se rs\

Ju lia n.A bu rto -co rte z\D oc um en ts\

_M

_ju lia n.a bu rto -co rte z.r vt 7/2

5/2

2 3 :08

:03 P

M

HD-010

THIRD FLOOR HVAC PLAN - AREA

1 DEMOLITION

SUPPLEMENTAL AC IN

LAB AREA

ANN ARBOR, MI

25JUL2022 Checker Author

100% BID DOCUMENTS20-0247 506-21-201

1E

MECHANICAL DEMOLITION KEYNOTES

Key Value Keynote Text

D1 REMOVE DUCTWORK, GRILLE/ DIFFUSER AS SHOWN. CAP DUCT AT DEMOLITION TERMINATION POINT.

REMOVE CEILING, PROTECT AND STORE FOR REINSTALLATION.

D2 REMOVE SPACE TEMPERATURE SENSOR AND ASSOCIATED WIRING.

D3 REMOVE THE CONSTANT VOLUME TERMINAL UNIT AND ASSOCIATED DUCTWORK.

D4 REMOVE SUPPLY AIR REGISTER IN WALL AND ASSOCIATED DUCTWORK AND FIRE DAMPER.

D6 PATCH FLOOR OPENING.

1/8" = 1'-0"

THIRD FLOOR HVAC PLAN - AREA 1 DEMOLITION

BENCHTOP

HOOD100 CFM

E/A(FURNISHED BY

OTHERS)

1-CH-3

CFM

E/A

20X12 x x

16x8 x

10x6

VD

VD

VD

x

8x6

14x6 x

10x6 x

VD

VD8

x x x

10x6

V D

14x8

12x612x814x6

12x8 x

8x6

12x6 x

V D

14x8

V D2 x

12x8

8x6

VD

x

14x8

10x6 x x x

8x6

14x8

10x6

10x6

14x12 8x6

VD

VD

FD

FD

FD

14x6

VD

24x8

24x8 x x x x

10" X 6" DUCTDN TO 6"

AFF

8x6

24x8

VD

V D

18x8

18x10

8x6

14x6

VD

V D

V D

12x6

V D

VD

x

10x6

12x6

18x8

8x6 8x6

16x8

VD V

D

10x6 x

16x10

8x6

10x6 x

14x6 8x6

14x10

VD VD

x

10x610x6 FD

1-HD-11

880 CFM

E/A

1-HD-12880 CFM

E/A

12X10

10" x 6" DUCTDN TO 6"

AFF

CFM

HD

K L M N P QM.7 P.9

0.7

1.8

2.1

2.3

2.7

3.4

3.5

R.1RQ.9Q.6Q.1 Q.4 R.2

3.49

OFFICE

C317

OFFICE

C318

OFFICE

C319 OFFICE

C321

STORAGE

C322

EAST SERVICE

ELEVATOR

LOBBY

C3-8

SERVICE

ELEVATOR

SE-1

SERVICE

ELEVATOR

SE-2

OFFICE

C323

OFFICE

C324

CORRIDOR

C3-04

OFFICE

C325

OFFICE

C320A

OFFICE

C320

OFFICE

C316

STORAGE

C37C

OFFICE

C313

OFFICE

C311

OFFICE

C37E

MAIL ROOM

C37D

CHECK-IN

C37B

WAITING ROOM

C37A

CORRIDOR

C3-6

EAST

ELEVATOR

LOBBY

C3-9

ELEVATOR

P-1

ELEVATOR

P-2

FNP ROOM

E336

STAIR 08

S-08

STORAGE

E334A

OFFICE

E335

STORAGE

E334 OFFICE

E330A

BLOOD BANK

E330

LAB

E333

GYN

E338

NON GYN

E337

SPECIAL

STAINS

E339

MICROTOMY

E341

OFFICE

E302

H.A.C.

E304

PROCESSOR

E342

H&E STAINING

E340

LAB

E340

CONFERENCE

E306

LAB

E308

OFFICE

E333A

OFFICE

E333B

WALK-IN

REFRIGERATOR

E308B

CORRIDOR

C3-14

LAB

E305

LAB

E305

OFFICE

E300

READING

ROOM

E301

N KEY PLAN

NOT TO SCALE

D E

F1 F2

G1 B

A1 A2

C C

BUILDING

1E

BUILDING

BUILDING

1W

BUILDING

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

NO

T

FO

R

CO

NS

TR

UC

TI

ON

3419 PIERSON PLACE

FLUSHING, MI, 48433

(OFFICE) 810-230-6202

VA STATION

Defining

EXCELLENCE

in the 21st Century

HEALTH

CARE

VA Ann Arbor Healthcare System

2215 Fuller Road

Ann Arbor, MI 48105

C:

\U se rs\

Ju lia n.A bu rto -co rte z\D oc um en ts\

_M

_ju lia n.a bu rto -co rte z.r vt 7/2

5/2

2 3 :08

:05 P

M

HD-015

THIRD FLOOR HVAC PLAN - AREA

2 DEMOLITION

SUPPLEMENTAL AC IN

LAB AREA

ANN ARBOR, MI

25JUL2022 Checker Author

100% BID DOCUMENTS20-0247 506-21-201

1E

1/8" = 1'-0"

THIRD FLOOR HVAC PLAN - AREA 2 DEMOLITION

Revisions: Date:

MECHANICAL DEMOLITION KEYNOTES

Key Value Keynote Text

D1 REMOVE DUCTWORK, GRILLE/ DIFFUSER AS SHOWN. CAP DUCT AT DEMOLITION TERMINATION POINT.

REMOVE CEILING, PROTECT AND STORE FOR REINSTALLATION.

D2 REMOVE SPACE TEMPERATURE SENSOR AND ASSOCIATED WIRING.

D3 REMOVE THE CONSTANT VOLUME TERMINAL UNIT AND ASSOCIATED DUCTWORK.

D4 REMOVE SUPPLY AIR REGISTER IN WALL AND ASSOCIATED DUCTWORK AND FIRE DAMPER.

D6 PATCH FLOOR OPENING.

�16"

�18" x x x x x

�16"

VD 18x12

V D

14x6

V D

10x8 x x x

VD

x

VD

x

V D

VD

V D

8x6

8x8

VD

"D

IA

x

24x10 x

V D

VD

8x6

10x6

VD

V D x

12x6 x

24x8

16x8

VD

x x

VD

x

6 VD

x

24x8 x x

�22"

28x14

STAINLESS

STEEL

28x14

VD

x

�12" x

1-HF-3

x

�18"

�16"

�18"

20x16 24x20 28x24 30x24 26x22

1-AFCV

-302

1-AFCV

-301

1-AFCV

-305

1-AFCV

-304

1-AFCV

-303

FD

FDFD

FD

FD

FD

20x10 DNTO

1-HD-9

x x

�28"

VD

�26"�24"�20"�12" x

�22"

V D

24x8

FD

x

VD

FD

FD

FD

TU

TU

TU

TU

TU

TU

TU

TU

TU

TU

TU

TU

TU

TU

TU

TU

TU

TU

TU

TU

TU

780 270 1920

59015201530

90590390

1700980

300630

120 1460 120

�12"

14x10

VD

VD

x

�22" x x x

V D

V D x

14x8

V D

16x10

VD

VD

x

FD

8x10 x x x

RUN

OVER

DUCT

x

�20"

�20" x

14x10 14x10

VD

VD

x x

�16" x

14x10 14x10

VD

VD

x x

�8" x x

14x12 x x x x x

�26"

16x15

VD

VD

x

18x8

�24" x

16x10

VD

VD

x x

VD

16x10

16x10 x x

�16"

14x12

VD

x x

VD

VD

x x

�12" x

�20" x x x

18x6

16x10

�16"

20x17

V D

12x6

12x6 x

V D

12x6 12x6 x

12x6 12x6

V D

6"DIA.

VD

x

V D

V D

V D

V

DV

D

FD

FD

FD

FD

x

18x12

DN

x

VDV

D

12x102 x x

16x8

VD

V D

VD

x x

24x8 x

VD

VD

V D x

24X8 x

16x10

OPENEND

DUCT

FD

FD

FD

FD

x x

�24" x x x

FD

TO

EF-11

TO EF-19

AT ROOF

TO EF-20

AT ROOF

TO EF-21

AT ROOFTO EF-18

AT ROOF

TO EF-23

AT ROOF

TO EF-24

AT ROOF

J K L M N P QM.7 N.6 P.9

8.1

8.8

9.7

D6

D3

AFCV

FD

AFCV-E326E1

AFCV-E319E

AFCV-E320E

AFCV-E32527E

AFCV-E317EAFCV-E3152E

AFCV-E312E

AFCV-E3151E

AFCV-E309E1

AFCV-E313E

AFCV-E309E2

AFCV-E307E

AFCV-E308E

AFCV-E308A10E

AFCV-E331E

AFCV-E326E2

AFCV-E324E1

AFCV-E324E2

N KEY PLAN

NOT TO SCALE

D E

F1 F2

G1 B

A1 A2

C C

BUILDING

1E

BUILDING

BUILDING

1W

BUILDING

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

NO

T

FO

R

CO

NS

TR

UC

TI

ON

3419 PIERSON PLACE

FLUSHING, MI, 48433

(OFFICE) 810-230-6202

VA STATION

Defining

EXCELLENCE

in the 21st Century

HEALTH

CARE

VA Ann Arbor Healthcare System

2215 Fuller Road

Ann Arbor, MI 48105

C:

\U se rs\

Ju lia n.A bu rto -co rte z\D oc um en ts\

_M

_ju lia n.a bu rto -co rte z.r vt 7/2

5/2

2 3 :08

:07 P

M

HD-020

FOURTH FLOOR HVAC PLAN -

AREA 1 DEMOLITION

SUPPLEMENTAL AC IN

LAB AREA

ANN ARBOR, MI

25JUL2022 Checker Author

100% BID DOCUMENTS20-0247 506-21-201

1E

MECHANICAL DEMOLITION KEYNOTES

Key Value Keynote Text

D1 REMOVE DUCTWORK, GRILLE/ DIFFUSER AS SHOWN. CAP DUCT AT DEMOLITION TERMINATION POINT.

REMOVE CEILING, PROTECT AND STORE FOR REINSTALLATION.

D2 REMOVE SPACE TEMPERATURE SENSOR AND ASSOCIATED WIRING.

D3 REMOVE THE CONSTANT VOLUME TERMINAL UNIT AND ASSOCIATED DUCTWORK.

D4 REMOVE SUPPLY AIR REGISTER IN WALL AND ASSOCIATED DUCTWORK AND FIRE DAMPER.

D6 PATCH FLOOR OPENING.

1/8" = 1'-0"

FOURTH FLOOR HVAC PLAN - AREA 1 DEMOLITION

x x x x

24x10 x

�22" x x

12x812x6

24"DIA.

x

V D

�28"

VD

�26" x

VD

�24" x

V D 12x6 x

VD

10x6

�20" x

VD

V D x

�12"

�24"

�28" x

V D

18x8

8x6 x

V D

V D

8x6

16x8

VD

x

24x12 x

�24" x

�22"

V D

V D x

8x6 8x6 x

VD

V D

8x6

V D

VD

24x8 x x x x

�22"

12x10

�12" x x x

VD

VD

V D

8x6 x

�18"�18" x

81-AFCV

-306

1-AFCV

-307

FD

FD

FD

FD

FD

VD

TU-12-2

TU-12-4 TU-12-3

TU-10-38

TU

TU

TU

TU

TU

TU

TU

TU

TU

TU

TU

TU

TU

TU

TU

TU

TU

TU

TU

TU

TU

TU

TU

TU

TU-11-54

TU-11-53

TU

TU

TU

TU

TU

TU

TU

TU

TU-11-56

160330

240280140140

1504104904202300

750 140

630 490

330 520 350

2401730

750 130 170300970580 730270750140 300 170

�6" 12x8 x x x

14x12

DROP

10x10 x x x

V D

V D

14x6 12x6 x x

�20" x

12x8 x x x

6VD

�26"

12x8 x x

�24" x x

V D V D

10x6 10x6

�22" x1 x x x

VD

V D

10x6 x

�20" x x

VD

x x x

VDV

D

12x10

�12" x

14x12

�8" x

�20" x

V D

14x8

�18" x x

�14" x x

12x8 12x6

VD

V D x x

�10"

12x10 x

10x6 x x

FDAD

�6"

�24"

V D

V D

V D

V D

VD

x

14x8 V D

VD

12x10

(TYP.)

12x10

(TYP.)

R

IS

E

FD

12"

BOOT

(TYP.)

VD

VD

VD

FD

FD

FD

x

24x8

DN

24x8

DN

x x x x x

V D

VD

24x8

�24"

V D x

V D 24x8 x

VD

�16" x x

10x6 x

FD

FD

FD

16x12

DN

8x6

DN

16x10

OPENEND

DUCTW/WIRE

MESH

SCREEN

FD

x

FD

24x12

22x10

FD

J K L M N P QM.7 P.9

0.7

1.8

2.1

2.3

2.7

3.4

3.5

R.1RQ.9Q.6Q.1 Q.4 R.2

3.49

D4

D4

D4

D3

D3

AFCV-E204E

AFCV-E338E

AFCV-E333EAFCV-E338A

AFCV-E306E

AFCV-2

MD

MD

MD

AFCV-E337E

AFCV-C322E

AFCV-CE8E

AFCV-C37324E

AFCV-C321E

1-AFCV-1

AFCV-C31718

AFCV-C31620E

AFCV-E338EAFCV-E30241E

AFCV-E305E

AFCV-121E

AFCV-106

AFCV-E307E

AFCV-E308E

AFCV-E308A10E

AFCV-E331E

AFCV-E326E2

N KEY PLAN

NOT TO SCALE

D E

F1 F2

G1 B

A1 A2

C C

BUILDING

1E

BUILDING

BUILDING

1W

BUILDING

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

NO

T

FO

R

CO

NS

TR

UC

TI

ON

3419 PIERSON PLACE

FLUSHING, MI, 48433

(OFFICE) 810-230-6202

VA STATION

Defining

EXCELLENCE

in the 21st Century

HEALTH

CARE

VA Ann Arbor Healthcare System

2215 Fuller Road

Ann Arbor, MI 48105

C:

\U se rs\

Ju lia n.A bu rto -co rte z\D oc um en ts\

_M

_ju lia n.a bu rto -co rte z.r vt 7/2

5/2

2 3 :08

:09 P

M

HD-025

FOURTH FLOOR HVAC PLAN -

AREA 2 DEMOLITION

SUPPLEMENTAL AC IN

LAB AREA

ANN ARBOR, MI

25JUL2022 Checker Author

100% BID DOCUMENTS20-0247 506-21-201

1E

1/8" = 1'-0"

FOURTH FLOOR HVAC PLAN - AREA 2 DEMOLITION

MECHANICAL DEMOLITION KEYNOTES

Key Value Keynote Text

D1 REMOVE DUCTWORK, GRILLE/ DIFFUSER AS SHOWN. CAP DUCT AT DEMOLITION TERMINATION POINT.

REMOVE CEILING, PROTECT AND STORE FOR REINSTALLATION.

D2 REMOVE SPACE TEMPERATURE SENSOR AND ASSOCIATED WIRING.

D3 REMOVE THE CONSTANT VOLUME TERMINAL UNIT AND ASSOCIATED DUCTWORK.

D4 REMOVE SUPPLY AIR REGISTER IN WALL AND ASSOCIATED DUCTWORK AND FIRE DAMPER.

D6 PATCH FLOOR OPENING.

1.0

GPM

1.0

GPM

3'-6"

15'-0" x 5'-6"

EXHAUST

LOUVER

15'-0" x 5'-6" INTAKE

LOUVER

OUTDOOR AIR

PLENUM

2'-4" A.F.F. x 6'-4"

HIGH

1-IS-11

1-PF-11

1-AF-11

1-ERC-11

1-HC-11

1-SH-11

1-SF-11

1-AH-11

VERTICAL AIRTIGHT SEPARATING WALL

(TYP)

OUTDOOR AIR

PLENUM

2'-4" A.F.F. X 6'-4"

HIGH

1-SUH-5

1-CC-11

1-HD-7

1120 CFM

E/A

880 CFM

E/A

16x10

M

M

OAD

VD

VD

x x

V D

V D

8x6 8x6 x

V D

8x6 x

8x6 8x6

V D

V D

14x12 x x x

VD

VD

18x6

VD

VD

14x10 x x

14x10 x

VD

VD

x

16x10

18x12 x x

VD

VD

18x6

V D

VD

14x1212x6 x

12x8 x

24x18 x x

18x10

10x6

12x6

12x6

12x6

14x8 14x8

16x8 x

16x8

18x8 18x81 x

16x8 x 6 1 x

FD

8x6

12x6

V D V D

V D

V D

8x68x6

8x6 8x6 x x

24x8

24x8

24x8 12x6

20x10 x

1-HD-8

1-HD-9

1380 CFM

E/A

14x8

22x20

18x16 x

VD

VD

x

12x12

VD

T

K L M N P QM.7 N.6 P.9

8.1

8.8

9.7

LAB

E326

LAB

E326A

LAB

E326B

STAFF LOUNGE

E324

STORAGE

E324A

LAB

E318

LAV

E325

LAV

E327

LAB

E312

LAB

E310

LAB

E306A

LAB

E308

ELEC

E321B

DATA

E321A

MECH

E321

BIO SAFETY

AREA

E320

OFFICE

E319

OFFICE

E317

LAB

E315

LAB

E315B

COLD ROOM

E315A

STORAGE

E313

STORAGE

E309A

STORAGE

E309B

STORAGE

E307

CORRIDOR

C3-17

CORRIDOR

C3-14

CORRIDOR

C3-13

STAIR 07

S-07

CART LIFT

(CLEAN)

CL-3

STORAGE

E307A

STORAGE

E323

320 CFM 320 CFM320 CFM

320 CFM 320 CFM320 CFM 320 CFM

625 CFM

625 CFM

150 CFM

150 CFM

320 CFM

350 CFM

E/A

140 CFM140 CFM

140 CFM

140 CFM 140 CFM

350 CFM

E/A

210 CFM

465 CFM

E/A

210 CFM

400 CFM 400 CFM

880 CFM

E/A

1040 CFM

E/A

940 CFM

E/A

300 CFM

300 CFM

300 CFM300 CFM

300 CFM

300 CFM

250 CFM

E/A

225 CFM

200 CFM

200 CFM

E/A

300 CFM 300 CFM

300 CFM300 CFM

1200 CFM50 CFM

E/A

90 CFM

300 CFM300 CFM

240 CFM

E/A

300 CFM

E/A

380 CFM

E/A

380 CFM300 CFM

1050 CFM

E/A

CFM

CFM

CFM

100 CFM

E/A

490 CFM 490 CFM

500 CFM

400 CFM

400 CFM

400 CFM

400 CFM

580 CFM

580 CFM

120 CFM

120 CFM

140 CFM

E/A

140 CFM

E/A

140 CFM

E/A

490 CFM

490 CFM

140 CFM

130 CFM

E/A

100 CFM

E/A

140 CFM

420 CFM

420 CFM 420 CFM

420 CFM

12"ø

SD-400

400 CFM

12"ø

SD-400

400 CFM

12"ø

SD-400

400 CFM

12"ø

SD-400

400 CFM

1400 CFM 22

22 22

22 33

SD-400

420 CFM

14"x8" SA

1400 CFM 1400 CFM

RG-1420

500 CFM

N KEY PLAN

NOT TO SCALE

D E

F1 F2

G1 B

A1 A2

C C

BUILDING

1E

BUILDING

BUILDING

1W

BUILDING

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

NO

T

FO

R

CO

NS

TR

UC

TI

ON

3419 PIERSON PLACE

FLUSHING, MI, 48433

(OFFICE) 810-230-6202

VA STATION

Defining

EXCELLENCE

in the 21st Century

HEALTH

CARE

VA Ann Arbor Healthcare System

2215 Fuller Road

Ann Arbor, MI 48105

C:

\U se rs\

Ju lia n.A bu rto -co rte z\D oc um en ts\

_M

_ju lia n.a bu rto -co rte z.r vt 7/2

5/2

2 3 :07

:49 P

M

H-010

THIRD FLOOR HVAC PLAN - AREA

SUPPLEMENTAL AC IN

LAB AREA

ANN ARBOR, MI

25JUL2022 Checker Author

100% BID DOCUMENTS20-0247 506-21-201

1E

MECHANICAL KEYNOTES

Key Value Keynote Text

1 RE-BALANCE AND RE-COMMISSION THE EXISTING TERMINAL UNIT. SEE SHEET H-500 FOR

SEQUENCE OF OPERATION.

2 BALANCE THE EXISTING GRILLES AND DIFFUSERS TO THE FLOW RATE INDICATED.

3 NEW TEMPERATURE SENSOR.

4 NEW VARIABLE TERMINAL UNIT. EXTEND HEATING SUPPLY AND RETURN PIPING TO NEW REHEAT

COIL.

5 PROVIDE DUST CONTAINMENT AND EQUIPMENT PROTECTION FOR ALL WORK IN THIS AREA.

RE-INSTALL CEILING UPON COMPLETION OF SHEET METAL WORK.

6 NEW EXHAUST AIR FLOW CONTROL VALVE.

7 NEW CONSTANT VOLUME TERMINAL UNIT. EXTEND HEATING SUPPLY AND RETURN PIPING TO

NEW REHEAT COIL.

8 EXHAUST FAN AND EXHAUST SYSTEM ARE NOT IN THE CONTRACT. DO NOT ADJUST OR MODIFY

AIR FLOW SETTINGS.

9 12"X12" SUPPLY AIR DUCT DROP TO NEW DIFFUSER BOOT.

10 REPLACE THE CHILLED WATER COOLING COIL. SEE THE COIL SCHEDULE H-300.

11 CHECK DAMPERS, ACTUATORS AND LINKAGES FOR PROPER OPERATION. ADJUST AND REPAIR AS

REQUIRED.

12 CLEAN COIL.

13 REMOVE AND REPLACE THE STEAM/CONDENSATE PIPE INSULATION AND JACKET.

14 RE-COMMISSION THE AIR HANDLING UNIT BASED ON THE SEQUENCE OF OPERATION INDICATED

ON SHEET H-500

15 PROVIDE A FIRE DAMPER AT ALL FLOOR PENETRATIONS.

16 EXISTING AIRFLOW CONTROL VALVE WITHOUT AND ACTUATOR. LEAVE IN CURRENT POSITION.

17 REFRAME AND PATCH THE WALL OPENING FOR INSTALLATION OF THE NEW SUPPLY AIR

DIFFUSER.

1/8" = 1'-0"

THIRD FLOOR HVAC PLAN - AREA 1

BENCHTOP

HOOD100 CFM

E/A(FURNISHED BY

OTHERS)

1-CH-31570

CFM

E/A

20X12 x x

16x8 x 6 1 x

10x6

VD

VD

VD

x

8x6

14x6 x

10x6 x

VD

VD8

x x x

10x6

V D

14x8

12x612x814x6

12x8 x

8x6

12x6 x

V D

14x8

V D2 x

12x8

8x6

VD

x

14x8

10x6 x x x

8x6

14x8

10x6

10x6

14x12 8x6

VD

VD

FD

FD

FD

1-HD-10

1130 CFM

E/A

14x6

VD

24x8

24x8 x x x x

10" X 6" DUCTDN TO 6"

AFF

24x8

VD

V D

18x8

18x10

8x6

14x6

V D

V D

12x6

V D

VD

x

10x6

12x6

18x8

8x6 8x6

16x8

VD V

D

10x6 x

16x10

8x6

10x6 x

14x6 8x6

14x10

VD VD

x

10x610x6 FD

1-HD-12880 CFM

E/A

12X10

10" x 6" DUCTDN TO 6"

AFF

T

K L M N P QM.7 P.9

0.7

1.8

2.1

2.3

2.7

3.4

3.5

R.1RQ.9Q.6Q.1 Q.4 R.2

3.49

WAITING ROOM

C37A

OFFICE

C311

OFFICE

C313

CHECK-IN

C37B

OFFICE

C320

OFFICE

C317

OFFICE

C318

OFFICE

C319

OFFICE

C320A

OFFICE

C324

OFFICE

C323

STORAGE

C322

EAST SERVICE

ELEVATOR

LOBBY

C3-8

OFFICE

E335

STORAGE

E334

BLOOD BANK

E330

CONFERENCE

E306

OFFICE

E333A

GYN

E338

H&E STAINING

E340

PROCESSOR

E342

H.A.C.

E304

LAB

E340

NON GYN

E337

SPECIAL

STAINS

E339

MICROTOMY

E341OFFICE

E302

LAB

E333

WALK-IN

REFRIGERATOR

E308B

LAB

E305

OFFICE

E300

CORRIDOR

C3-6

ELEVATOR

P-1

ELEVATOR

P-2

SERVICE

ELEVATOR

SE-2

SERVICE

ELEVATOR

SE-1

OFFICE

E330A

OFFICE

E333B

OFFICE

C321

EAST

ELEVATOR

LOBBY

C3-9

CORRIDOR

C3-04

READING

ROOM

E301

STAIR 08

S-08

OFFICE

C37E

MAIL ROOM

C37D

STORAGE

C37C

OFFICE

C316

OFFICE

C325

STORAGE

E334A

FNP ROOM

E336

465 CFM

E/A

CH 100

CFM

E/A

275 CFM 275 CFM

360 CFM130 CFM

240 CFM

130 CFM

240 CFM

525 CFM

175 CFM 175 CFM

175 CFM

260 CFM

260 CFM

720 CFM

175 CFM 175 CFM

325 CFM

360 CFM

350 CFM

325 CFM 75 CFM (2 EA)

250 CFM

E/A

135 CFM

100 CFM

125 CFM

125 CFM

170 CFM

170 CFM

275 CFM

170 CFM

170 CFM

330 CFM

120 CFM

120 CFM

200 CFM 700 CFM

110 CFM

100 CFM

E/A 110 CFM

500 CFM

300 CFM

100 CFM

130 CFM

E/A

320 CFM

E/A

300 CFM

150 CFM

150 CFM

E/A

320 CFM

E/A

520 CFM

E/A 170 CFM

E/A

170 CFM

E/A

500 CFM

110 CFM

E/A

120 CFM

E/A

200 CFM

400 CFM 400 CFM

880 CFM

E/A

780 CFM

E/A

310 CFM 320 CFM75 CFM

75 CFM

400 CFM

E/A

200 CFM

200 CFM

500 CFM

140 CFM130 CFM

130 CFM

E/A

140 CFM

E/A

370 CFM 380 CFM

470 CFM 470 CFM

470 CFM 470 CFM

22222222

22 22

22 22

22 22 22

HD

600 CFM

650 CFM

135 CFM

N KEY PLAN

NOT TO SCALE

D E

F1 F2

G1 B

A1 A2

C C

BUILDING

1E

BUILDING

BUILDING

1W

BUILDING

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

NO

T

FO

R

CO

NS

TR

UC

TI

ON

3419 PIERSON PLACE

FLUSHING, MI, 48433

(OFFICE) 810-230-6202

VA STATION

Defining

EXCELLENCE

in the 21st Century

HEALTH

CARE

VA Ann Arbor Healthcare System

2215 Fuller Road

Ann Arbor, MI 48105

C:

\U se rs\

Ju lia n.A bu rto -co rte z\D oc um en ts\

_M

_ju lia n.a bu rto -co rte z.r vt 7/2

5/2

2 3 :07

:52 P

M

H-015

THIRD FLOOR HVAC PLAN - AREA

SUPPLEMENTAL AC IN

LAB AREA

ANN ARBOR, MI

25JUL2022 Checker Author

100% BID DOCUMENTS20-0247 506-21-201

1E

1/8" = 1'-0"

THIRD FLOOR HVAC PLAN - AREA 2

MECHANICAL KEYNOTES

Key Value Keynote Text

1 RE-BALANCE AND RE-COMMISSION THE EXISTING TERMINAL UNIT. SEE SHEET H-500 FOR

SEQUENCE OF OPERATION.

2 BALANCE THE EXISTING GRILLES AND DIFFUSERS TO THE FLOW RATE INDICATED.

3 NEW TEMPERATURE SENSOR.

4 NEW VARIABLE TERMINAL UNIT. EXTEND HEATING SUPPLY AND RETURN PIPING TO NEW REHEAT

COIL.

5 PROVIDE DUST CONTAINMENT AND EQUIPMENT PROTECTION FOR ALL WORK IN THIS AREA.

RE-INSTALL CEILING UPON COMPLETION OF SHEET METAL WORK.

6 NEW EXHAUST AIR FLOW CONTROL VALVE.

7 NEW CONSTANT VOLUME TERMINAL UNIT. EXTEND HEATING SUPPLY AND RETURN PIPING TO

NEW REHEAT COIL.

8 EXHAUST FAN AND EXHAUST SYSTEM ARE NOT IN THE CONTRACT. DO NOT ADJUST OR MODIFY

AIR FLOW SETTINGS.

9 12"X12" SUPPLY AIR DUCT DROP TO NEW DIFFUSER BOOT.

10 REPLACE THE CHILLED WATER COOLING COIL. SEE THE COIL SCHEDULE H-300.

11 CHECK DAMPERS, ACTUATORS AND LINKAGES FOR PROPER OPERATION. ADJUST AND REPAIR AS

REQUIRED.

12 CLEAN COIL.

13 REMOVE AND REPLACE THE STEAM/CONDENSATE PIPE INSULATION AND JACKET.

14 RE-COMMISSION THE AIR HANDLING UNIT BASED ON THE SEQUENCE OF OPERATION INDICATED

ON SHEET H-500

15 PROVIDE A FIRE DAMPER AT ALL FLOOR PENETRATIONS.

16 EXISTING AIRFLOW CONTROL VALVE WITHOUT AND ACTUATOR. LEAVE IN CURRENT POSITION.

17 REFRAME AND PATCH THE WALL OPENING FOR INSTALLATION OF THE NEW SUPPLY AIR

DIFFUSER.

�16"

�18" x x x x x

�16"

VD 18x12

V D

14x6

V D

10x8 x x x

VD

x

VD

x

V D

VD

V D

8x6

8x8

VD

"D

IA

x

24x12

24x10 x

V D

VD

8x6

10x6

V D x x

24x8

16x8

VD

x

VD

x

6 VD

x x

VD

24x8 x x

22"

28x14

STAINLESS

STEEL

28x14

VD

x

�12" x

1-HF-3

x

�18"

�16"

�18"

20x16 24x20 28x24 30x24 26x22

1-AFCV

-302

1-AFCV

-301

1-AFCV

-305

1-AFCV

-304

1-AFCV

-303

FD

FD

FD

FDFD

FD

FD

FD

20x10 DNTO

1-HD-9

x x x

�28"

VD

�26"�24"�20"�12" x

�22" x

FD

TU

TU

TU

TU

TU

TU

TU

TU

TU

TU

TU

TU

TU

TU

TU

TU

TU

TU

TU

TU

TU

59015201530

90590390

1700980

300630

120 1460 120 x

VD

VD

x

�20"

�20" x

14x10 14x10

VD

VD

x x

�16" x

14x10 14x10

VD

VD

x x

�8" x x

14x12 x x x x x

�26"

16x15

VD

VD

x

18x8

�24" x

16x10

VD

VD

x x

VD

16x10

16x10 x x

�16"

14x12

VD

x x

VD

VD

x x

�12" x

�20" x x x

18x6

16x10 x

�16"

20x17

V D

12x6

12x6 x

V D

12x6 12x6 x

12x6 12x6

V D

6"

VD

x

V D

V D

V D

V

DV

D

FD

FD

FD

FD

x

18x12

DN

x

VDV

D

12x10

TO EF-18 AT

ROOF

TO EF-19 AT

ROOF

TO EF-21 AT

ROOF

TO EF-20 AT

ROOF

TO EF-11

TO EF-23 AT

ROOF

TO EF-24 AT

ROOF

VD

FD

14"

12x10

K L M N P QM.7 N.6 P.9

8.1

8.8

9.7

MECH

CDE4

STAIR 07

S-07

CART LIFT

(CLEAN)

CL-3

14"x10" SA 18"x12" SA14"x8" SA

14"x8" SA 14"x8" SA

14"x8" SA

18"x12" RA

FD

11 11 11 11

11 11 11

11 11

11 1111 11

11 1111

661515

1515 1515

AFCV-11-21

AFCV-E326E1

AFCV-E319E

AFCV-E320E

AFCV-E32527E

AFCV-E317EAFCV-E3152E

AFCV-E312E

AFCV-E3151E

AFCV-E309E1

AFCV-E313E

AFCV-E309E2

AFCV-E307E

AFCV-E308E

AFCV-E308A10E

AFCV-E331E

AFCV-E326E2

AFCV-E324E1

AFCV-E324E2

N KEY PLAN

NOT TO SCALE

D E

F1 F2

G1 B

A1 A2

C C

BUILDING

1E

BUILDING

BUILDING

1W

BUILDING

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

NO

T

FO

R

CO

NS

TR

UC

TI

ON

3419 PIERSON PLACE

FLUSHING, MI, 48433

(OFFICE) 810-230-6202

VA STATION

Defining

EXCELLENCE

in the 21st Century

HEALTH

CARE

VA Ann Arbor Healthcare System

2215 Fuller Road

Ann Arbor, MI 48105

C:

\U se rs\

Ju lia n.A bu rto -co rte z\D oc um en ts\

_M

_ju lia n.a bu rto -co rte z.r vt 7/2

5/2

2 3 :07

:54 P

M

H-020

FOURTH FLOOR HVAC PLAN -

AREA 1

SUPPLEMENTAL AC IN

LAB AREA

ANN ARBOR, MI

25JUL2022 Checker Author

100% BID DOCUMENTS20-0247 506-21-201

1E

MECHANICAL KEYNOTES

Key Value Keynote Text

1 RE-BALANCE AND RE-COMMISSION THE EXISTING TERMINAL UNIT. SEE SHEET H-500 FOR

SEQUENCE OF OPERATION.

2 BALANCE THE EXISTING GRILLES AND DIFFUSERS TO THE FLOW RATE INDICATED.

3 NEW TEMPERATURE SENSOR.

4 NEW VARIABLE TERMINAL UNIT. EXTEND HEATING SUPPLY AND RETURN PIPING TO NEW REHEAT

COIL.

5 PROVIDE DUST CONTAINMENT AND EQUIPMENT PROTECTION FOR ALL WORK IN THIS AREA.

RE-INSTALL CEILING UPON COMPLETION OF SHEET METAL WORK.

6 NEW EXHAUST AIR FLOW CONTROL VALVE.

7 NEW CONSTANT VOLUME TERMINAL UNIT. EXTEND HEATING SUPPLY AND RETURN PIPING TO

NEW REHEAT COIL.

8 EXHAUST FAN AND EXHAUST SYSTEM ARE NOT IN THE CONTRACT. DO NOT ADJUST OR MODIFY

AIR FLOW SETTINGS.

9 12"X12" SUPPLY AIR DUCT DROP TO NEW DIFFUSER BOOT.

10 REPLACE THE CHILLED WATER COOLING COIL. SEE THE COIL SCHEDULE H-300.

11 CHECK DAMPERS, ACTUATORS AND LINKAGES FOR PROPER OPERATION. ADJUST AND REPAIR AS

REQUIRED.

12 CLEAN COIL.

13 REMOVE AND REPLACE THE STEAM/CONDENSATE PIPE INSULATION AND JACKET.

14 RE-COMMISSION THE AIR HANDLING UNIT BASED ON THE SEQUENCE OF OPERATION INDICATED

ON SHEET H-500

15 PROVIDE A FIRE DAMPER AT ALL FLOOR PENETRATIONS.

16 EXISTING AIRFLOW CONTROL VALVE WITHOUT AND ACTUATOR. LEAVE IN CURRENT POSITION.

17 REFRAME AND PATCH THE WALL OPENING FOR INSTALLATION OF THE NEW SUPPLY AIR

DIFFUSER.

1/8" = 1'-0"

FOURTH FLOOR HVAC PLAN - AREA 1

x x x x x

VD

�22"

" 2 x

12x812x6

24"DIA.

x

V D

�28"

VD

�26"

12x6

VD

�24" x

V D 12x6 x

10x6

�20" x

VD

V D x

�12"

�24"

�28" x

V D

18x8

8x6 x

V D

V D

8x6

16x8

VD

x

24x12 x

14x10

�24" x

�22"

V D

V D x

8x6 8x6 x

VD

V D

8x6

V D

VD

24x8 x x x x

�22"

12x10

�12" x x x

VD

VD

V D

8x6 x

�18"�18" x

81-AFCV

-306

1-AFCV

-307

DROP

FD

FD

FD

FD

FD

x

TU-12-3

TU

TU

TU

TU

TU

TU

TU

TU

TU

TU

TU

TU

TU

TU

TU

TU

TU

TU

TU

TU

TU

TU

TU-11-40

TU

TU-11-54

TU-11-53

TU

TU

TU

TU

TU

TU

TU

TU

TU-11-56

160330

240280140140

1504104904202300

750 140

630 490

330 520 350

2401730

750 130 170300970580 730270750140 300 170 x x x

V D

V D

14x6 12x6 x x

�20" x

12x8 x x x

6VD

�26"

12x8 x x

�24" x x

V D V D

10x6 10x6

�22" x1 x x x

VD

V D

10x6 x

�20" x x

VD

x x x

VDV

D

12x10

�12" x

14x12

�8" x

�20" x

V D

14x8

�18" x x

�14" x x

12x8 12x6

VD

V D x x

�10"

12x10 x

10x6 x x

FDAD

�6"

�24"

V D

V D

V D

V D

VD

x

14x8 V D

VD

R

IS

E

FD

VD

VD

VD

FD

FD

FD

x

24x8

DN

24x8

DN

5 '

V D

V D 24x8

FD

22x10

FD

16"0

CFM

CFM

CFM

18"x18"

CFM

K L M N P QM.7 P.9

0.7

1.8

2.1

2.3

2.7

3.4

3.5

R.1RQ.9Q.6Q.1 Q.4 R.2

3.49

ELEVATOR

P-1

ELEVATOR

P-2

SERVICE

ELEVATOR

SE-2

SERVICE

ELEVATOR

SE-1

STAIR 08

S-08

24"x14" SA

"x1

4" S

A

111111

11 111111111111111111

11 11

11 11

11 11

11 11

1120 CFM

1120 CFM

SD-2500

AFCV-E308A10E

AFCV-121E

AFCV-E305E

AFCV-106

AFCV-E30241E

AFCV-E204E

AFCV-E333E

AFCV-E338E

AFCV-E338A

AFCV-E306E

AFCV-2

MD

MD

MD

AFCV-CE8E

AFCV-C322E

AFCV-C37324E

AFCV-E337E

AFCV-C321E

AFCV-C31718AFCV-C31620E

AFCV-E338E

1-AFCV-1

N KEY PLAN

NOT TO SCALE

D E

F1 F2

G1 B

A1 A2

C C

BUILDING

1E

BUILDING

BUILDING

1W

BUILDING

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

NO

T

FO

R

CO

NS

TR

UC

TI

ON

3419 PIERSON PLACE

FLUSHING, MI, 48433

(OFFICE) 810-230-6202

VA STATION

Defining

EXCELLENCE

in the 21st Century

HEALTH

CARE

VA Ann Arbor Healthcare System

2215 Fuller Road

Ann Arbor, MI 48105

C:

\U se rs\

Ju lia n.A bu rto -co rte z\D oc um en ts\

_M

_ju lia n.a bu rto -co rte z.r vt 7/2

5/2

2 3 :07

:56 P

M

H-025

FOURTH FLOOR HVAC PLAN -

AREA 2

SUPPLEMENTAL AC IN

LAB AREA

ANN ARBOR, MI

25JUL2022 Checker Author

100% BID DOCUMENTS20-0247 506-21-201

1E

1/8" = 1'-0"

FOURTH FLOOR HVAC PLAN - AREA 2

MECHANICAL KEYNOTES

Key Value Keynote Text

1 RE-BALANCE AND RE-COMMISSION THE EXISTING TERMINAL UNIT. SEE SHEET H-500 FOR

SEQUENCE OF OPERATION.

2 BALANCE THE EXISTING GRILLES AND DIFFUSERS TO THE FLOW RATE INDICATED.

3 NEW TEMPERATURE SENSOR.

4 NEW VARIABLE TERMINAL UNIT. EXTEND HEATING SUPPLY AND RETURN PIPING TO NEW REHEAT

COIL.

5 PROVIDE DUST CONTAINMENT AND EQUIPMENT PROTECTION FOR ALL WORK IN THIS AREA.

RE-INSTALL CEILING UPON COMPLETION OF SHEET METAL WORK.

6 NEW EXHAUST AIR FLOW CONTROL VALVE.

7 NEW CONSTANT VOLUME TERMINAL UNIT. EXTEND HEATING SUPPLY AND RETURN PIPING TO

NEW REHEAT COIL.

8 EXHAUST FAN AND EXHAUST SYSTEM ARE NOT IN THE CONTRACT. DO NOT ADJUST OR MODIFY

AIR FLOW SETTINGS.

9 12"X12" SUPPLY AIR DUCT DROP TO NEW DIFFUSER BOOT.

10 REPLACE THE CHILLED WATER COOLING COIL. SEE THE COIL SCHEDULE H-300.

11 CHECK DAMPERS, ACTUATORS AND LINKAGES FOR PROPER OPERATION. ADJUST AND REPAIR AS

REQUIRED.

12 CLEAN COIL.

13 REMOVE AND REPLACE THE STEAM/CONDENSATE PIPE INSULATION AND JACKET.

14 RE-COMMISSION THE AIR HANDLING UNIT BASED ON THE SEQUENCE OF OPERATION INDICATED

ON SHEET H-500

15 PROVIDE A FIRE DAMPER AT ALL FLOOR PENETRATIONS.

16 EXISTING AIRFLOW CONTROL VALVE WITHOUT AND ACTUATOR. LEAVE IN CURRENT POSITION.

17 REFRAME AND PATCH THE WALL OPENING FOR INSTALLATION OF THE NEW SUPPLY AIR

14x8

22x20

18x16

12x12

T

M

M

15'-0" x 5'-6"

EXHAUST LOUVER

EXHAUST AIR PLENUM

2'-4" A.F.F.

BUILD AIR TIGHT TO

SERVICE BAY ROOF

15'-0" x 5'-6"

INTAKE LOUVER

OUTDOOR AIR PLENUM

2'-4" A.F.F. x 6'-4" HIGH

48x22 OPEN END

W/MOTORIZED DAMPER

VERTICAL AIRTIGHT

SEPARATING

WALL (TYP)

OUTDOOR AIR PLENUM

2'-4" A.F.F. X 6'-4" HIGH

3'-6"

1-IS-11

1-PF-11

1-SUH-5

OAD

VD

VD

N P Q

ER-3A

250 CFM

1-AF-11

1-ERC-11

1-HC-11

1-SH-11

1-SF-11

1-AH-11

1-CC-11

x1

A

B

H4.3.6

H4.3.6

14x8

22x20

18x16

TO EF-21

AT ROOF

TO EF-20

AT ROOF

TO EF-19

AT ROOF

TO EF-18

AT ROOF

F

84x50 CONNECTION

TO PLENUM

MATCH

LINESEE H4.4.2 FOR

CONT.

3'-6"

1-AFM-21

1-AFM-20

SD

�7"

�10"

10x8

14x12

OPEN END

W/1/4" x 1/4"

WIRE

MESH

TU-11-57

TU-11-58

M

P QN

HORIZONTAL AIRTIGHT

SEPARATING WALL

AT LEVEL OF

MEZZANINE FLOOR

108x56

60x36

1-SA-11E

60x36

1-EF-11

1-PF-11E

1-ER-11

1-EF-44

EAD

48x36 x6

8x6

10x8

1-ERC-11E

D O W N x1

12x10 x8

24x18

24x18

D O W N

1-SA-11

x1

A H4.3.6

B H4.3.6

N P QM.7 N.6 P.9

8.1

8.8

9.7

1212 1313

1111 1212

8.1

8.8

9.7

N KEY PLAN

NOT TO SCALE

D E

F1 F2

G1 B

A1 A2

C C

BUILDING

1E

BUILDING

BUILDING

1W

BUILDING

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

NO

T

FO

R

CO

NS

TR

UC

TI

ON

3419 PIERSON PLACE

FLUSHING, MI, 48433

(OFFICE) 810-230-6202

VA STATION

Defining

EXCELLENCE

in the 21st Century

HEALTH

CARE

VA Ann Arbor Healthcare System

2215 Fuller Road

Ann Arbor, MI 48105

C:

\U se rs\

Ju lia n.A bu rto -co rte z\D oc um en ts\

_M

_ju lia n.a bu rto -co rte z.r vt 7/2

5/2

2 3 :07

:58 P

M

H-100

HVAC ENLARGED MECHANICAL

ROOM PLAN

SUPPLEMENTAL AC IN

LAB AREA

ANN ARBOR, MI

25JUL2022 Checker Author

100% BID DOCUMENTS20-0247 506-21-201

1E

1/4" = 1'-0"

THIRD FLOOR EAST SERVICE BAY PLAN

1/4" = 1'-0"

FOURTH FLOOR EAST SERVICE BAY PLAN

MECHANICAL KEYNOTES

Key Value Keynote Text

1 RE-BALANCE AND RE-COMMISSION THE EXISTING TERMINAL UNIT. SEE SHEET H-500 FOR

SEQUENCE OF OPERATION.

2 BALANCE THE EXISTING GRILLES AND DIFFUSERS TO THE FLOW RATE INDICATED.

3 NEW TEMPERATURE SENSOR.

4 NEW VARIABLE TERMINAL UNIT. EXTEND HEATING SUPPLY AND RETURN PIPING TO NEW REHEAT

COIL.

5 PROVIDE DUST CONTAINMENT AND EQUIPMENT PROTECTION FOR ALL WORK IN THIS AREA.

RE-INSTALL CEILING UPON COMPLETION OF SHEET METAL WORK.

6 NEW EXHAUST AIR FLOW CONTROL VALVE.

7 NEW CONSTANT VOLUME TERMINAL UNIT. EXTEND HEATING SUPPLY AND RETURN PIPING TO

NEW REHEAT COIL.

8 EXHAUST FAN AND EXHAUST SYSTEM ARE NOT IN THE CONTRACT. DO NOT ADJUST OR MODIFY

AIR FLOW SETTINGS.

9 12"X12" SUPPLY AIR DUCT DROP TO NEW DIFFUSER BOOT.

10 REPLACE THE CHILLED WATER COOLING COIL. SEE THE COIL SCHEDULE H-300.

11 CHECK DAMPERS, ACTUATORS AND LINKAGES FOR PROPER OPERATION. ADJUST AND REPAIR AS

REQUIRED.

12 CLEAN COIL.

13 REMOVE AND REPLACE THE STEAM/CONDENSATE PIPE INSULATION AND JACKET.

14 RE-COMMISSION THE AIR HANDLING UNIT BASED ON THE SEQUENCE OF OPERATION INDICATED

ON SHEET H-500

15 PROVIDE A FIRE DAMPER AT ALL FLOOR PENETRATIONS.

16 EXISTING AIRFLOW CONTROL VALVE WITHOUT AND ACTUATOR. LEAVE IN CURRENT POSITION.

17 REFRAME AND PATCH THE WALL OPENING FOR INSTALLATION OF THE NEW SUPPLY AIR

NOTES:

1. DDC CONTROLLER PROVIDED BY SIEMENS.

2. MAXIMUM NOISE CRITERIA = 35.

3. FIBER FREE LINER.

4. PROVIDE A SOUND ATTENUATOR.

EX. 6" CHR

EX. 6" CHS

EX

. 6

" C

HS

EX

. 6

" C

HR

EX. BALANCING/SHUT-OFF

VALVE (TYP)

EX. 2-WAY CONTROL VALVE

EX. UNION (TYP)

EX. THERMOMETER (TYP)

CHR

CHS

CHR

CHS

CHR

SHUT-OFF VALVE

(TYP)

PETE'S PLUG

(TYP)

HOSE END DRAIN

W/ VALVE (TYP)

AIR VENT (TYP)

EX. 8" CHR

EX. 8" CHR

SHUT-OFF VALVE

(TYP)

UNION (TYP)

REHEAT COIL

BALANCING VALVE

DRAIN VALVE

HR

HS

NOTES:

1. MAX N.C. = 30

2. MAX A.P.D.=0.1"

3. LAY-IN CEILING.

4. WALL MOUNT.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

NO

T

FO

R

CO

NS

TR

UC

TI

ON

3419 PIERSON PLACE

FLUSHING, MI, 48433

(OFFICE) 810-230-6202

VA STATION

Defining

EXCELLENCE

in the 21st Century

HEALTH

CARE

VA Ann Arbor Healthcare System

2215 Fuller Road

Ann Arbor, MI 48105

C:

\U se rs\

Ju lia n.A bu rto -co rte z\D oc um en ts\

_M

_ju lia n.a bu rto -co rte z.r vt 7/2

5/2

2 3 :08

:00 P

M

H-300

HVAC SCHEDULES / DETAILS SUPPLEMENTAL AC IN

LAB AREA

ANN ARBOR, MI

25JUL2022 Checker Author

100% BID DOCUMENTS20-0247 506-21-201

1E

TERMINAL UNIT SCHEDULE

MARK MANUFACTURER MODEL

SERVING

INLET

SIZE

AIRFLOW HYDRONIC RE-HEAT

VOLTAGE (V)

NOTESDESIGN

AIRFLOW (CFM)

MIN AIRFLOW

(CFM)

MAX HEATING

AIRFLOW (CFM)

CAPACITY

(MBH)

EAT

(°F)

LAT

(°F)

FLOW

(GPM)

AFCV-11-21 PHOENIX EXVA-112L-ALEHZ EXHAUST 12" 1420 425 24 V 1,2,3

TU-11-21 PHOENIX MAVA-112L-ALEHZ SUPPLY 12" 2000 480 800 39.6 55 95 2.7 24 V 1,2,3

TU-11-40 TITUS DESV SUPPLY 16" 2500 2500 2500 124 55 100 8.3 24 V 1,2,3,4

WATER COIL SCHEDULE

GENERAL AIRFLOW CHILLED WATER COOLING

NOTESMARK SYSTEM AIR FLOW

(CFM)

MAX.

APD

(IN-WG)

MAX. FACE

VELOCITY

(FPM)

TOTAL CAPACITY

(MBH)

EDB

(°F)

EWB

(°F)

LDB

(°F)

LWB

(°F)

FLOW

(GPM)

MAX. WPD

(FT-HD)

EWT

(°F)

LWT

(°F) FLUID ROWS

1-CC-1 1-AH-11 38250 0.60 500 2736 92 75 54 53.6 456.0 7.50 44 56 WATER 8

NOT TO SCALE1 DUAL CHILLED WATER COIL PIPING DIAGRAM

12" = 1'-0"2 HOW WATER REHEAT COIL PIPING DETAIL - 2 WAY VALVE

Revisions: Date:

DIFFUSER, REGISTER, AND GRILLE SCHEDULE

GENERAL DESCRIPTION FINISH MATERIAL NECK

SIZE NOTESMARK MANUFACTURER MODEL

RG-1420 TITUS 50F 24"X24" EGGCRATE GRILLE WHITE ALUMINUM 24"X24" 1,2,3

SD-400 TITUS OMNI 24"X24" PLAQUE SUPPLY DIFFUSER WHITE ALUMINUM 12" DIA. 1,2,3

SD-2500 TITUS ML-39 14' LONG, 7 SLOT, WALL DIFFUSER WITH PLENUM WHITE ALUMINUM 14'X14" 1,2,4

ZS

P

I

I

P

I

SD

ZS

P

P

P

OUTSIDE

AIR

DAMPER END

SWITCH

OUTSIDE

AIR

PLENUM

N.C.

D-1

EN

ER

GY

RE

CO

VE

RY

CO

IL

FROM DAMPER

SOLENOID

DAMPER END SWITCH/SUPPLY FAN

INTERLOCK

D-2

V-2

MPS

FREEZE STAT/SUPPLY FAN

INTERLOCK

ELECTRICAL

INTERLOCK

V-4 N.C.

V-3

MP

S

HUMIDIFIER

CONTROL VA.

N.C.

TEMP.

SWITCH

INPUT

DCP

OUTPUT

CO

ND

EN

SA

TE

SH

SUPPLY FAN/SMOKE DAMPER

INTERLOCK

SD-1

SUPPLY

AIR

LEGEND

P

G

DIFFERENTIAL PRESSURE

SWITCH

TRANSMITS DIFFERENTIAL PRESSURE

TO DCP TO INDICATE FILTER

CONDITIONS AND STATUS OF FANS.

DCP DISTRIBUTED CONTROL

PANEL

CONTROLS OPERATION OF AIR

HANDLING UNIT IN ACCORDANCE

WITH THE SEQUENCE OF OPERATION.

D-1 OUTSIDE AIR DAMPER 2

POSITION

OPENS WHEN SUPPLY FAN

STARTS AND CLOSES WHEN

SUPPLY FAN STOPS.

D-2

MODULATES AIRFLOW BETWEEN

THE COIL FACE AND THE COIL

BY-PASS IN RESPONSE TO DCP.

F SD

DUCT SMOKE DETECTORS

(FURNISHED AND WIRED TO

FIRE ALARM PANEL BY ELECTRICAL)

PRESSURE GAUGE

(SECTION 15880)

FILTER CONDITION

INDICATOR

H-1 SPACE AIR HUMIDITY

SENSOR

SENSES AND TRANSMITS SPACE

HUMIDITY TO DCP FOR

CONTROL AND INDICATION

H-2 SUPPLY AIR HUMIDITY

SENSOR

SENSES AND TRANSMITS SUPPLY

AIR HUMIDITY TO DCP FOR

CONTROL AND INDICATION

SD-1 SUPPLY AIR SMOKE

DAMPER

CLOSES WHEN UNIT IS SHUT

OFF OR WHENEVER SMOKE

IS DETECTED BY F SD.

T-1 SUPPLY AIR TEMPERATURE

SENSOR

SENSES AND TRANSMITS SUPPLY

AIR DRY BULB TEMPERATURE TO

DCP FOR CONTROL AND INDICATION.

T-2

SENSES AND TRANSMITS OUTSIDE

AIR DRY BULB TEMPERATURE TO

DCP FOR CONTROL AND INDICATION.

SHUTS DOWN FAN SYSTEM AND

ALARMS DCP WHEN TEMP. LEAVING

COIL IS BELOW SETPOINT OF

TEMP. SWITCH.

LEAVING PREHEAT COIL

AIR TEMPERATURE SWITCH

(FREEZE PROTECTION)

T-3

V-1

CHILLED WATER CONTROL VALVE

STRAIGHT THRU MODULATING

TYPE

V-2

PROPORTIONS FLOW OF

CHILLED WATER TO COOLING

COIL IN RESPONSE TO DCP.

V-3 CONTROLS STEAM FLOW

TO HUMIDIFIER

V-4 STEAM CONTROL VALVE

MODULATING TWO WAY

PROPORTIONS FLOW OF

STEAM TO HUMIDIFIER

IN RESPONSE TO DCP.

EXISTING SEQUENCE OF OPERATION

SUPPLY FAN/FACE & BY-PASS DAMPER

INTERLOCK

DAMPER END SWITCH/SUPPLY FAN

INTERLOCK

HUMIDIFIER STEAM SHUT-

OFF VALVE

MS STARTS AND STOPS FAN OR PUMP

IN RESPONSE TO DCP

N.C.

ZS DAMPER END

SWITCH

CLOSES WHEN DAMPER IS OPEN

OPENS WHEN DAMPER BEGINS TO

CLOSE

PR

E-

FI

LT

ER

T-4

LEAVING ENERGY RECOVERY COIL

AIR TEMPERATURE

SENSOR

SENSES AND TRANSMITS ENERGY

RECOVERY COIL DRY BULB

TEMPERATURE TO DCP.

EXHAUST

AIR

NC

NO

V-5

ALARM TO

ECC

DE-ENERGIZES SUPPLY FAN AND

PROVIDES SMOKE ALARM SIGNAL

TO DCP AND FIRE ALARM SYSTEM.

STEAM CONTROL VALVE,

TWO-WAY,

OPEN/CLOSE

STOPS AND STARTS FLOW OF

STEAM TO PREHEAT COIL

IN RESPONSE TO DCP.

V-5

1. GENERAL

1.1 UNIT IS NORMALLY STARTED AND STOPPED BY THE DCP OR REMOTELY AT

THE ECC. H-O-A SWITCH SHALL BE KEPT IN THE "AUTO" POSITION.

"HAND" AND "OFF" SHALL BE USED ONLY FOR MAINTENANCE. WHEN THE

UNIT IS "OFF", D-1 AND SD-1 SHALL BE FULLY CLOSED. WHEN THE

UNIT IS "ON", D1 AND SD-1 SHALL BE FULLY OPEN. SMOKE DAMPER END

SWITCH (ZS) AND OUTSIDE AIR DAMPER END SWITCH (ZS) SHALL PREVENT

FAN OPERATION UNTIL BOTH DAMPERS REACH THEIR FULL OPEN POSITION.

D-2 SHALL MODULATE IN ACCORDANCE WITH THE FOLLOWING SEQUENCE:

2.1 THE SUPPLY AIR TEMPERATURE SENSED BY T-1 SHALL BE MAINTAINED AT

SETPOINT BY THE DCP MODULATING/CONTROLLING THE ENERGY RECOVERY

SYSTEM, THE PRE-HEAT COIL VALVE AND THE FACE AND BY-PASS DAMPERS

AND THE COOLING COIL VALVE AS FOLLOWS:

DURING THE HEATING SEASON WHEN THE OUTSIDE AIR TEMPERATURE IS

PRE-HEAT COIL VALVE V-2. THE DCP SHALL THEN BEGIN MODULATING

THE PRE-HEAT COIL FACE AND BY-PASS DAMPERS TO MAINTAIN THE

DISCHARGE AIR TEMPERATURE. IF THE DISCHARGE AIR TEMPERATURE

BY-PASS DAMPERS ARE IN FULL BY-PASS, THE DCP SHALL CLOSE THE

PRE-HEAT COIL VALVE V-2. WHEN VALVE V-2 IS CLOSED AND THE DCP

SENSES A DISCHARGE AIR TEMPERATURE 2 F ABOVE SETPOINT FOR 15

MINUTES, THE DCP SHALL DE-ENERGIZE THE ENERGY RECOVERY SYSTEM

THE OUTSIDE AIR TEMPERATURE FALLS TO 78 F AND REMAINS THERE FOR

3.1 THE DCP SHALL MONITOR THE UNIT PRE-FILTER/AFTER FILTER AND SHALL

ALARM WHEN THE DIFFERENTIAL PRESSURE SWITCH REACHES ITS SETPOINT

INDICATING THAT THE FILTER IS DIRTY AND SHOULD BE CHANGED.

4. HUMIDITY CONTROL

4.1 WHEN THE DCP IS NOT CALLING FOR HUMIDITY, SENSED BY H-1,

"ON-OFF" TWO-WAY CONTROL VALVE V-3 SHALL REMAIN CLOSED. WHEN

THE DCP IS CALLING FOR HUMIDITY, V-3 SHALL REMAIN OPEN AND V-1

(COOLING COIL CONTROL VALVE) SHALL REMAIN CLOSED.

4.2 THE SPACE HUMIDITY, SENSED BY H-1, SHALL BE MAINTAINED AT

SETPOINT BY THE DCP MODULATING HUMIDITY CONTROL VALVE V-4 TO

MAINTAIN THE DESIRED RELATIVE HUMIDITY. THE DCP SHALL OVERRIDE

THIS CONTROL TO MAINTAIN HUMIDITY OF 80% AS SENSED BY H-2. DCP

SHALL CLOSE VALVE V-3 WHENEVER THE SUPPLY FAN IS OFF. VALVE V-4

SHALL BE INTERLOCKED WITH A TEMPERATURE SWITCH TO KEEP THE

HUMIDIFIER OFF UNTIL CONDENSATE TEMPERATURE APPROACHES STEAM

TEMPERATURE. VALVE V-4 SHALL ALSO BE INTERLOCKED WITH THE

SUPPLY FAN MOTOR STARTER SO THAT, WHEN THE FAN IS OFF, THE

CONTROL SIGNAL TO THE VALVE WILL BLEED TO ATMOSPHERE THROUGH A

SOLENOID VALVE ALLOWING VALVE V-4 TO GO FULLY CLOSED.

5. FREEZE PROTECTION

ALARM SIGNAL SHALL BE INDICATED AT THE DCP AND ECC. IF THE

UNIT SUPPLY FAN SHALL SHUT DOWN (THROUGH A HARDWIRED INTERLOCK

BETWEEN THE FREEZESTAT CONTROL RELAY AND FAN MOTOR STARTER) AND

A CRITICAL ALARM SHALL BE INDICATED AT THE DCP AND ECC.

6. AUTOMATIC SHUTDOWN/RESTART

6.1 WHEN SMOKE IS DETECTED BY DUCT SMOKE DETECTOR F SD, THE SUPPLY

FAN SHALL SHUT "OFF" (THROUGH A HARDWIRED INTERLOCK BETWEEN THE

SHALL CLOSE. EXHAUST FANS SERVING THE SAME SPACE AS THE SUPPLY

7. ENERGY RECOVERY COIL FROST PROTECTION

TO DROP 1 F BELOW SETPOINT FOR 5 MINUTES, THE DCP SHALL OPEN

�RISES 1 F ABOVE SET POINT FOR 5 MINUTES AND THE FACE AND 5.1 IF THE AIR TEMPERATURE, AS SENSED BY T-1, FALLS BELOW 45 F, AN

TEMPERATURE FALLS BELOW 40 F, AS SENSED BY FREEZESTAT T-3, THE

C

STEAM CONTROL VALVE,

TWO-WAY,

OPEN/CLOSE

ENERGIZED BY THE DCP. THE DCP SHALL MONITOR THE UNIT DISCHARGE

AIR TEMPERATURE (T-1). IF THE DISCHARGE AIR TEMPERATURE IS SENSED

WHEN THE COOLING COIL VALVE V-1 IS CLOSED AND THE UNIT DISCHARGE

(REGARDLESS OF OUTDOOR TEMPERATURE).

AIR TEMPERATURE IS SENSED TO BE 1 F BELOW SETPOINT FOR 5

TO FIRE

ALARM

SYSTEM

(SMOKE DETECTOR/SUPPLY FAN INTERLOCK

BY FIRE ALARM CONTRACTOR)

SMOKE DETECTOR AND FAN MOTOR STARTER) AND AN ALARM SIGNAL

SHALL BE TRANSMITTED TO THE ECC AND TO THE FIRE ALARM SYSTEM.

THE OUTSIDE AIR DAMPER AND SMOKE DAMPER IN THE SUPPLY DUCT

T-5

SENSES AND TRANSMITS GLYCOL

RETURN TEMP TO 31-ERC-1 AND

31-ERC-2 FOR DCP CONTROL OF

MIXING VALVE V-5.

DEFROST VALVE,

TEMPERATURE CONTROL

VALVE (3-WAY MIXING)

CHR

CO

OL

IN

G

CO

IL

V-1

CH

ENERGY

RECOVERY

COIL

N.O.

EXISTING 1-AH-11 CONTROL DIAGRAM

FROM

RETURN

AIR

DUCTWORK

OUTSIDE AIR TEMPERATURE

SENSOR (EXISTING GLOBAL POINT)

GLYCOL TEMPERATURE SENSOR TO

ENERGY RECOVERY COIL 1-ERC-9

FAN OR PUMP MOTOR STARTER

(BY ELECTRICAL)

2. TEMPERATURE CONTROL

CIRCULATING PUMP 1-P-11 . THE DCP SHALL MAINTAIN DISCHARGE AIR

TEMPERATURE SETPOINT BY MODULATING THE COOLING COIL VALVE V-1.

WHEN THE OUTSIDE AIR TEMPERATURE IS SENSED TO BE 80 F, THE DCP SHALL

REMAIN ENERGIZED AS LONG AS THE DCP SENSES THE OUTSIDE AIR TEMPERATURE

TO BE 80 F OR ABOVE. DISCHARGE AIR TEMPERATURE WILL CONTINUE TO BE

MAINTAINED BY MODULATION OF THE COOLING COIL VALVE V-1. WHEN

MINUTES, THE DCP SHALL ENERGIZE THE HEAT RECOVERY SYSTEM PUMP

3. AIRFILTER MONITORING

1-ERC-11

PREHEAT COIL

(WITH INTEGRAL

FACE & BY-PASS) FREEZE STAT/SUPPLY

FAN INTERLOCK

FREEZE

ALARM

1-EF-11

1-P-11H

1-SF-11

1-AH-11

SPACE HUMIDITY

SENSOR/TRANSMITTER

BELOW 50 F, THE HEAT RECOVERY SYSTEM PUMP 1-P-11H SHALL BE

ENERGIZE THE ENERGY RECOVERY CIRCULATING PUMP 1-P-11H. THE PUMP SHALL

30 MINUTES, THE DCP SHALL DE-ENERGIZE THE CIRCULATING PUMP 1-P-11H.

7.1 THE 3-WAY MIXING VALVE V-5 SHALL BE

MODULATED BY THE DCP, MIXING SUPPLY AND RETURN GLYCOL TO

MAINTAIN A MINIMUM OF 35 F GLYCOL TEMPERATURE TO ENERGY�

RECOVERY COIL 1-ERC-11 AS SENSED BY THE DCP THROUGH

TEMPERATURE SENSOR T-5.

INTEGRAL FACE & BY-PASS

DAMPER, MODULATING

MODULATES IN RESPONSE TO DCP

IN ORDER TO LIMIT GLYCOL

TEMPERATURE TO EXHAUST AIR

COILS TO PREVENT FROST FROM

BUILDING UP ON COIL FACE

1-ERC-11E

START/STOP

FAN SHALL CONTINUE TO RUN.

VFD VARIABLE FREQUENCY

DRIVE

VFD

VFD

HEATING

COOLING

SIMULTANEOUS HEATING AND COOLING SHALL NOT BE ALLOWED.

FI

NA

L

FI

LT

ER

CONTROLS SHALL PREVENT SIMULTANEOUS HEATING AND COOLING.

H-2 T-1

T-4

H-1 T-5

T-3

I I

DSP

DSP

M

M

G

M

S

CR

S

E

MS

A

5 6

F M

A B C D F G

1 2 3 4 5 6 7 8 9 10

MS

E

H

MS

G

J

G

8. VARIABLE FREQUENCY DRIVES

8.1 THE SUPPLY AND EXHAUST FAN VARIABLE FREQUENCY DRIVES

SHALL MODULATE TO MAINTAIN THE DUCT STATIC

PRESSURE SET POINT OF THEIR RESPECTIVE DUCT

PRESSURE SENSOR.

NOTE:

THIS SHEET INDICATES THE

EXISTING CONTROLS

ARRANGEMENT AND

SEQUENCE OF OPERATION FOR

1-AH-11 AND 1-EF-11. THIS

SHEET IS INTENDED TO

FACILITATE THE WORK OF THE

COMMISSIONING AGENT.

DSP DUCT STATIC PRESSURE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

NO

T

FO

R

CO

NS

TR

UC

TI

ON

3419 PIERSON PLACE

FLUSHING, MI, 48433

(OFFICE) 810-230-6202

VA STATION

Defining

EXCELLENCE

in the 21st Century

HEALTH

CARE

VA Ann Arbor Healthcare System

2215 Fuller Road

Ann Arbor, MI 48105

C:

\U se rs\

Ju lia n.A bu rto -co rte z\D oc um en ts\

_M

_ju lia n.a bu rto -co rte z.r vt 7/2

5/2

2 3 :08

:01 P

M

H-500

HVAC CONTROL DIAGRAMS SUPPLEMENTAL AC IN

LAB AREA

ANN ARBOR, MI

25JUL2022 Checker Author

100% BID DOCUMENTS20-0247 506-21-201

1E

Revisions: Date:

VHACLEFerraJ1 Typewritten Text

File details come from the government source that posted it. Updated .