Drawings_PAT004.pdf
PDF 6 MB Posted
- Solicitation number
- 70Z08221BPAT00400
About this file
This sources sought notice is for roof repair services at various facilities within the U.S. Coast Guard Aviation Training Center in Mobile, AL. The work includes furnishing labor, equipment, materials and tools to repair roofs at Wilks Hall, the fitness center locker room, the Engineering Building, and to recoat roofs at Avionics. Repairs at Wilks Hall include a two-coat cool roof system and rebuilding corner trim. Repairs at the fitness center include infrared scanning, blister repair not exceeding 10% of the roof, and installing a reflective coating. Repairs at Engineering include infrared scanning, blister repair not exceeding 10%, and installing a three-layer restoration system plus sidewall panels. Recoating at Avionics includes installing a roof hatch guard rail and a single coat of elastomeric coating. The estimated value is $250,000 to $500,000 under NAICS 238160. Responses were due by May 6, 2021. The bid opening is scheduled for July 2021 and work must be completed by February 2022. Bonds are required. The solicitation will be set aside for small business on SAM.gov under solicitation number 70Z08221BPAT00400.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
C O
C O
C O
C O
C O
C O
C O
C O
C O
C O
C O
C O
C O
C O
PROJECT
MONTANA
ARIZONA
CALIFORNIA
NEVADA
UTAH
OREGON
IDAHO
WASHINGTON
MINNESOTADAKOTA
MISS.
OKLAHOMA
TEXAS
NEW
MEXICO
ARKANSAS
LOUISIANA
KANSAS
NEBRASKA
COLORADO
WYOMING
DAKOTA
SOUTH
MISSOURI
ILLINOIS
IOWA
WISCONSIN
GEORGIA
ALABAMA
FLA.
YORK
NEW
PENNSYLVANIA
CAROLINA
VIRGINIA
INDIANA
KENTUCKY
TENNESSEE
WEST
VA.
SOUTH
CAROLINA
NORTH
MICHIGAN
OHIO
MARYLAND
RHODE ISLAND
CONNECTICUT
DELAWARE
JERSEY
NEW
MASS.
NORTH
VERMONT
NEW HAMPSHIRE
MAINE
LOCATION
BASE MAP
NORTH
N.T.S.
M A R L
IN
S T R E E T
M A R
IN
E R
W
ILLIAM
S
L E S L
IE
D H
IG
H
GREATHOUSE
D R
IV
E
ROAD
S T R E E T
TA
N N E R
D R
IV
E
FLIGHT TRAINING SYSTEMS BLDG.
GROCERY/EXCHANGE COMPLEX
GATE HOUSE
BEQ/BOQ/GALLEY/MESS FACILITY
IRM CREDIT UNION
FACILITIES ENGINEERING BUILDING
WILKS HALL
FITNESS CENTER & LOCKER RM
AVIONICS BUILDING
PARTIAL BUILDING LEGEND
HANGAR 2
MAIN GATE
CONCRETE HARDSTAND
F E N C E
POND
FENCE
SECTION MARK
DETAIL MARK
DRAWING NOTE
SECTION NUMBER
SHEET NUMBER
REFERENCE LABEL
DETAIL NUMBER
SHEET NUMBER
REFERENCE LABEL
ELEVATION MARK
A-201D2
D1
ELEVATION MARK
ELEVATION
NUMBER(S)
SHEET NUMBER
A-101
SIM
A-101
SIM
Name
Elevation
02 4 8134
SCALE: 1/4"=1'-0"
GRAPHIC SCALE
PLAN NORTH
NORTH ARROW w/TRUE NORTH INDICATION
NUMBERING SYSTEM:
NUMBERING SYSTEM:
A210
DISCIPLINE:
G - GENERAL
C - CIVIL
L - LANDSCAPE
S - STRUCTURAL
A - ARCHITECTURE
F - FIRE PROTECTION
P - PLUMBING
M - MECHANICAL
E - ELECTRICAL
T - TELECOMM
SHEET
NUMBER
WITHIN
SERIES:
SERIES NUMBER:
0 - GENERAL
1 - PLANS
2 - ELEVATIONS
3 - SECTIONS
4 - LARGE-SCALE VIEWS
5 - DETAILS
6 - SCHEDULES & DIAGRAMS
8 - USER DEFINED
9 - 3D REPRESENTATIONS
43o
M
IS
S
IS
S
IP
P I
A
LA
B A
M A
98o
CENTER ENTRANCE
AVIATION TRAINING
U.S. COAST GUARD
o p p10
MOBILE
BAY
GULF OF MEXICO
MOBILE
MUNICIPAL
AIRPORT
TANNER
WILLIAMS RD.
p
FLORIDA
ALABAMA
PROJECT
LOCATION
LOCATION MAP
N.T.S.
NORTH
VICINITY MAP
R O
A D
C O
D Y
ZIEGLER RD
ROAD
R O
A D
OLD SHELL RD.
BOULEVARD
AIRPORT
N.T.S.
SC
H
IL
LI
N G
E R
TANNER
NORTH
MAIN GATE ENTRANCE
U.S. COAST GUARD
AVIATION TRAINING CENTER
MUNICIPAL AIRPORT
BATES FIELD
WILLIAMS
DISCIPLINE/SHT NO
PROJECT NUMBER DRAWING NUMBER
APPROVING OFFICER DATE
PROJ ENGR CNSTR MGR COR
AVIATION TRAINING CENTER
MOBILE AL
EOH JWA RAC
SHEET TITLE
SAM DESIGN P/N:
CAD FILE NAME:
Facilities Engineering Mobile/AL
Mr. Ron Confer: 251 441-6185 Ronald.A.Confer@uscg.mil
U.S. COAST GUARD
U.S. COAST GUARD
8501 TANNER WILLIAMS ROAD
MOBILE AL 36608
FACILITIES ENGINEERING
ATC MOBILE
SCALE:
ISSUE
PLOT SCALE: D SIZE
SHEET OF
.1
.0
.1 \E v o n \F a c E n g D e p \P ro je c ts
\F Y
E x e c u ti o n \1
-R e p a ir
R o o fs
B a s e W id e \1
-R e p a ir
R o o fs
B a s e W id e .r v t
As indicated
13445274
DESIGNED BY: EOH
EDITED BY: RAC
B13445274G001
G001
Title Sheet
DRAWN BY: EOH
CHECKED BY: JWA
LT Brandon Taylor
GENERAL
IN HOUSE
B13445274G001
FEB2021
Repair Roofs Base Wide: BLDG
S63, S06, S10, AND S55
Project Area
Base Bid:
15950235-Repair Roof Wilks Hall (S63): A two-coat reinforced liquid-applied cool roof, roofing system over a standing system metal roof.
The re-roofing work will only be accomplished on the simulator high bay. Contractor/Manufacturer will pay particular attention to the metal panel laps. Work also includes rebuilding northeast corner trim of simulator high bay and reinstallation of 20% of lightning aerial on the whole building.
7817168-Repair Roof Fitness Center Locker Room (S06): Provide roof infrared scan and moisture survey prior to start of any work.
Estimate less than 10 percent of the current roof membrane to be blistered and require cutout and replacement of blister and wet insulation with similar material. This project consists of cleaning roof of all debris and dirt. The application of a reinforced reflective coating renewal system. Provide roof access ladders.
Bid Additive 1.
7820821-Repair Roof Facilities Engineering (S10): Provide roof infrared scan and moisture survey prior to start of any work. Estimate less than 10 percent of roof membrane to be blistered and require cutout and replacement of blister and wet insulation with similar material. This project consists of the application of a reinforced reflective three-layer roof restoration system. Installation of roof sidewall metal siding over CMU face. Re-work lower roof sidewall flashing. Provide roof access ladder.
Bid Additive 2
16926832-Recoat Roofs Avionics S55: This project consists of installation of a roof hatch guard rail, clean roof of all debris and dirt, and provide a single coat of elastomeric white coating.
PROJECT LIST
Project Title Priorrity Page
BASE
15950235 Repair Roof Wilks Hall (S63) BASE Pages 2-5
7817168 Repair Roof Fitness Center Locker Room (S06) BASE Pages 6-9
Additive
7820821 Repair Roof Facilities Engineering (S10) Additive Pages 10-14
16926832 Recoat Roof Avionics (S55) Additive Pages 15-17
ID DATE DESCRIPTION
SECTION MARK
DETAIL MARK
DRAWING NOTE
SECTION NUMBER
SHEET NUMBER
REFERENCE LABEL
DETAIL NUMBER
SHEET NUMBER
REFERENCE LABEL
ROOM NAME, NUMBER
AND SQUARE FEET
ELEVATION MARK
A-201D2
D1
EXTERIOR
ELEVATION MARK
ELEVATION
NUMBER(S)
SHEET NUMBER
A-101
SIM
A-101
SIM
ROOM NAME
150 SF
Name
Elevation
02 4 8134
SCALE: 1/4"=1'-0"
GRAPHIC SCALE
PLAN NORTH
NORTH ARROW w/
TRUE NORTH
INDICATION
NUMBERING SYSTEM:
NUMBERING SYSTEM:
A210
DISCIPLINE:
G - GENERAL
C - CIVIL
L - LANDSCAPE
S - STRUCTURAL
A - ARCHITECTURE
F - FIRE PROTECTION
P - PLUMBING
M - MECHANICAL
E - ELECTRICAL
T - TELECOMM
SHEET
NUMBER
WITHIN
SERIES:
SERIES NUMBER:
0 - GENERAL
1 - PLANS
2 - ELEVATIONS
3 - SECTIONS
4 - LARGE-SCALE VIEWS
5 - DETAILS
6 - SCHEDULES & DIAGRAMS
8 - USER DEFINED
9 - 3D REPRESENTATIONS
MARLIN STREETMARLIN STREET
M A R
IN
E R
M A R
IN
E R
W
IL
L
IA
M S
LESLIE D. HIGH
LESLIE D. HIGH
G R E A T H O U S E
G R E A T H O U S E
D R
IV
E
D R
IV
E
R O A D
STREET
STREET
T A N N E R
DRIVE
DRIVE
MAIN GATE
C O N C R E T E
H A R D S T A N D
F E N C E
P O N D
F E N C E
ATC BASE MAP
N.T.S.
NORTH
o
MISSISSIPPI
ALABAMA98
o
C E
N
TE
R E
N
TR
A N
C E
A V
IA
TIO
N
TR
A
IN
IN
G
U .S
. C O
A S
T G U
A R
D o p p10 M
O B
ILE
B A
Y
G U
LF O
F M
E X
IC
O
M O
B
ILE
M U
N
IC
IP
A
L
A
IR
P O
R T
TA
N
N E
R
W
ILLIA
M S
R D p
FLORIDA
ALABAMA
P R
O
JE
C T
LO
C
A
TIO
NLO
C
A
TIO
N M
A P
N .T.S
N O
R
TH
V
IC
IN
ITY
M A
P
ROADCODY
ZIE
G
LE
R
R D
R O
AD
ROAD
O
LD
S H
E
LL R
D
BO
ULEVAR
D
AIR
P
O
RT
N .T.S.
SCHILLINGER
TANN
ER
N O
R
TH
M A
IN
G
A
TE E
N T
R
AN
C E
U .S
. C O
A
ST
G U
A R
D
A
VIA
TIO
N
TR
A
IN
IN
G C
E N
TE R
M U
N
IC
IP
A
L A
IR
P O
R T
B
AT
ES
FIE
LD
W
ILLIAM
S
DISCIPLINE/SHT NO
PROJECT NUMBER DRAWING NUMBER
APPROVING OFFICER DATE
PROJ ENGR CNSTR MGR COR
AVIATION TRAINING CENTER
MOBILE AL
EOH JWA RAC
SHEET TITLE
SAM DESIGN P/N:
CAD FILE NAME:
Facilities Engineering Mobile/AL
Mr. Ron Confer: 251 441-6185 Ronald.A.Confer@uscg.mil
U.S. COAST GUARD
U.S. COAST GUARD
8501 TANNER WILLIAMS ROAD
MOBILE AL 36608
FACILITIES ENGINEERING
ATC MOBILE
SCALE:
ISSUE
DEPARTMENT OF HOMELAND SECURITY
UNITED STATES COAST GUARD
AVIATION TRAINING CENTER
8501 TANNER WILLIAMS ROAD
MOBILE ALABAMA
PLOT SCALE: D SIZE
SHEET OF
.1
.0
.1 \E v o n \F a c E n g D e p \P ro je c ts
\F Y
E x e c u ti o n \1
-R e p a ir R o o fs
B a s e W id e \1
-R e p a ir
R o o f
W ilk s H a ll
(S
-D
W G
-R e p a ir
R o o f
W ilk s H a ll
(S rv t
As indicated
15950235
Repair Roof Wilks Hall Bldg_S63
DESIGNED BY: EOH
EDITED BY: JWA
S6315950235G101
G101
Cover Sheet
DRAWN BY: EOH
CHECKED BY: RAC
LT Brandon Taylor
GENERAL
IN HOUSE
S6315950235G101
PROJECT NUMBER:15950235
Repair Roof Wilks Hall Bldg_S63
FEB2021
ID DATE DESCRIPTION
GENERAL SCOPE OF WORK
All items are to be completed in a satisfactory workmanlike manner complying with local code requirements, accepted construction practices, OSHA standards, manufacturer’s recommendations for product use and/or installation of materials, and bid specifications.
The Contractor shall perform all construction services for the subject project located at the Wilks Hall Building S63, ATC, Mobile Alabama.
QUALITY ASSURANCE
Specification and Submittal Register will determine the quality of material and workmanship. In addition, workmanship quality will also be determined by employing a Journeyman or master subcontractor.
Individual license and or training certificates may be requested.
Contractor will provide manufactures certification to install their product. Manufactures representative shall inspect roof during installation.
CONTRACT REQUIREMENT
Sheet List
Sheet Number Sheet Name Page
G101 Cover Sheet 2
A101 Roof Plan 3
A201 Elevations 4
A901 ISOMETRIC 5
A201
C1
A201 A1
1/4" / 1'-0"
/4
53' - 7"
DISCIPLINE/SHT NO
PROJECT NUMBER DRAWING NUMBER
APPROVING OFFICER DATE
PROJ ENGR CNSTR MGR COTR
AVIATION TRAINING CENTER
MOBILE AL
EOH JWA RAC
SHEET TITLE
SAM DESIGN P/N:
CAD FILE NAME:
Facilities Engineering Mobile/AL
Mr. Ron Confer: 251 441-6185 Ronald.A.Confer@uscg.mil
U.S. COAST GUARD
U.S. COAST GUARD
8501 TANNER WILLIAMS ROAD
MOBILE AL 36608
FACILITIES ENGINEERING
ATC MOBILE
SCALE:
ISSUE
DESIGNED BY:
DRAWN BY:
EDITED BY:
CHECKED BY:
1 2 3 4 5 6
A
1 2 3 4 5 6
B
C
D
E
A
B
C
D
E
SHEET OF
PLOT SCALE: D SIZE
.1
.0
.1 \E v o n \F a c E n g D e p \P ro je c ts
\F Y
E x e c u ti o n \1
-R e p a ir R o o fs
B a s e W id e \1
-R e p a ir
R o o f
W ilk s H a ll
(S
-D
W G
-R e p a ir
R o o f
W ilk s H a ll
(S rv t
1/8" = 1'-0"
15950235
Repair Roof Wilks Hall Bldg_S63
EOH
JWA
S6315950235A101
A101
Roof Plan
EOH
RAC
LT Brandon Taylor
ARCHITECTURAL
IN HOUSE
S6315950235A101
FEB2021
1/8" = 1'-0"
A1 Roof Plan
P L A
N N
O R
T H
GENERAL NOTES
SHEET KEYNOTES
SCALE AND ORIENTATION
164 8268
SCALE: 1/8"=1'-0"
1 Standing Seam Metal Roof, with R30 Batt insulation under
2 Standing Seam Metal Roof panel lap with mesh reinforcement
3 Provide two-coat reinforced liquid-applied cool roof membrane roofing system.
A two-coat reinforced liquid-applied cool roof membrane roofing system.
1. Deficiencies such as ponded water conditions must be repaired/corrected prior to the installation of a fluid applied coating. For bidding purposes assume less than 10% of modified bitumen roofing surfaces are blistered.
2. Substrate should be washed with a bio-degradable detergent and appropriate power washing or scrubbing equipment.
3. Remove all previous lap repairs per manufacturer’s recommendations.
4. Tighten and replace loose and missing fasteners for field panels and sheet metal details including coping.
5. Apply sealants to fastener heads and joints of all sheet metal details.
6. Priming is required on roof surfaces.
7. Self-adhered flashing tapes may be used for detailing penetrations and seams. Whether to use a self-adhered tape or extra base coat and reinforcement is the manufacturer’s choice.
8. Provide a polyurea coatings. An aromatics base coat (primer), aliphatics topcoat.
Examine substrates prior to application. Use silicone-based coating on silicone coated substrates. Existing substrates is metal.
9. The preferred method is spray unless overspray becomes an issue, then roll. Brush for roof penetrations, parapets.
10. The surface must be exceedingly clean, and seams and penetrations must be properly prepared. The dry film thickness (DFT) is 60 mils more or less dependent on the manufacturers guaranteed life expectancy.
Contractor will dismantle, inspect, seal and reinstall simulator high bay corner trim.
1. Remove fasteners from corner trim.
Document/photograph corner, lower parapet corner transition flashing, and upper flashing detail.
2. Provide continuous butyl sealant bead between wall panel and corner trim from upper parapet to lower parapet. Reinstall corner trim
3. Dismantle and document parapet flashing.
Reconstruct areas dismantled providing a watertight arrangement
Re-secure lightning aerials
1. Re-attach lightning protection system air terminal bonding plates.
2. The lightning protection system does not have to be re-certified.
3. For biding purposes estimate 20 air terminals require securing.
DISCIPLINE/SHT NO
PROJECT NUMBER DRAWING NUMBER
APPROVING OFFICER DATE
PROJ ENGR CNSTR MGR COTR
AVIATION TRAINING CENTER
MOBILE AL
EOH JWA RAC
SHEET TITLE
SAM DESIGN P/N:
CAD FILE NAME:
Facilities Engineering Mobile/AL
Mr. Ron Confer: 251 441-6185 Ronald.A.Confer@uscg.mil
U.S. COAST GUARD
U.S. COAST GUARD
8501 TANNER WILLIAMS ROAD
MOBILE AL 36608
FACILITIES ENGINEERING
ATC MOBILE
SCALE:
ISSUE
DESIGNED BY:
DRAWN BY:
EDITED BY:
CHECKED BY:
1 2 3 4 5 6
A
1 2 3 4 5 6
B
C
D
E
A
B
C
D
E
SHEET OF
PLOT SCALE: D SIZE
.1
.0
.1 \E v o n \F a c E n g D e p \P ro je c ts
\F Y
E x e c u ti o n \1
-R e p a ir R o o fs
B a s e W id e \1
-R e p a ir
R o o f
W ilk s H a ll
(S
-D
W G
-R e p a ir
R o o f
W ilk s H a ll
(S rv t
1/8" = 1'-0"
15950235
Repair Roof Wilks Hall Bldg_S63
EOH
JWA
S6315950235A201
A201
Elevations
EOH
RAC
LT Brandon Taylor
ARCHITECTURAL
IN HOUSE
S6315950235A201
FEB2021
1/8" = 1'-0"A101
A1
C1 Elevation 1 - a
SHEET KEYNOTES
1 Standing Seam Metal Roof, with R30 Batt insulation under
2 Exterior Metal Rib Panel by VARCO PRUDEN, with liner panel on interior face of girts
3 Parapet wall corner tranition. Dismantle and document parapet flashing.
Reconstruct areas dismantled providing a watertight arrangement.
4 Remove fasteners from corner trim, document/photograph corner, lower parapet corner transition flashing, and upper flashing detail.
5 Provide continuous butyl sealant bead between wall panel and corner trim from upper parapet to lower parapet.
6 Provide new fasteners with neoprene washer spaced 12" on center. Or reuse existing screw holes with additional fasteners every other space.
7 High bay roof gutter
1/8" = 1'-0"A101
A1
A1 Elevation 5 - a
ID DATE DESCRIPTION
8 Re-attach lightning protection system air terminal bonding plates. The lightning protection system does not have to be re-certified. For biding purposes estimate 20 air terminals require securing.
DISCIPLINE/SHT NO
PROJECT NUMBER DRAWING NUMBER
APPROVING OFFICER DATE
PROJ ENGR CNSTR MGR COTR
AVIATION TRAINING CENTER
MOBILE AL
EOH JWA RAC
SHEET TITLE
SAM DESIGN P/N:
CAD FILE NAME:
Facilities Engineering Mobile/AL
Mr. Ron Confer: 251 441-6185 Ronald.A.Confer@uscg.mil
U.S. COAST GUARD
U.S. COAST GUARD
8501 TANNER WILLIAMS ROAD
MOBILE AL 36608
FACILITIES ENGINEERING
ATC MOBILE
SCALE:
ISSUE
DESIGNED BY:
DRAWN BY:
EDITED BY:
CHECKED BY:
1 2 3 4 5 6
A
1 2 3 4 5 6
B
C
D
E
A
B
C
D
E
SHEET OF
PLOT SCALE: D SIZE
.1
.0
.1 \E v o n \F a c E n g D e p \P ro je c ts
\F Y
E x e c u ti o n \1
-R e p a ir R o o fs
B a s e W id e \1
-R e p a ir
R o o f
W ilk s H a ll
(S
-D
W G
-R e p a ir
R o o f
W ilk s H a ll
(S rv t
15950235
Repair Roof Wilks Hall Bldg_S63
EOH
JWA
S6315950235A901
A901
ISOMETRIC
EOH
RAC
LT Brandon Taylor
ARCHITECTURAL
IN HOUSE
S6315950235A901
FEB2021
SHEET KEYNOTES
1 Standing Seam Metal Roof, with R30 Batt insulation under
2 Exterior Metal Rib Panel by VARCO PRUDEN, with liner panel on interior face of girts
3 Standing Seam Metal Roof panel lap with mesh reinforcement
4 Remove corner trim with screw fasteners spaced approxiamtely every 18" on center
5 Provide continuous butyl sealant bead between wall panel and corner trim. From upper parapet to lower parapet.
6 Provide new fasteners with neoprene washer spaced 12" on center. Or reuse existing screw holes with additional fasteners every other space.
7 High Bay Roof Gutter
ID DATE DESCRIPTION
8 Re-attach lightning protection system air terminal bonding plates. The lightning protection system does not have to be re-certified. For biding purposes estimate 20 air terminals require securing.
9 Parapet wall corner tranition. Dismantle and document parapet flashing.
Reconstruct areas dismantled providing a watertight arrangement.
C O
C O
C O
C O
C O
C O
C O
C O
C O
C O
C O
C O
C O
BRUSH
TAXIWAY
PARKING APRON
CONC PARKING APRON
RIP-RAP
DENSE TREES
PARKING
DENSE TREES
DENSE TREES
CONC
VEH
IC
LE
STO
R
AG
E
AR
EA
TAN
N
ER W
ILLIAM
S ROAD
M
ARINER
DR
IVE
MARLIN STREET
TANN
ER W
ILLIAM
S ROAD
DETENTION POND
MARLIN STREET
G
REAT H
O U
SE
D R
IVE
BRUSH
TAXIWAY
PARKING APRON
CONC PARKING APRON
RIP-RAP
DENSE TREES
PARKING
DENSE TREES
DENSE TREES
CONC
VEH
IC
LE
STO
R
AG
E
AR
EA
M
ARINER
DR
IVE
MARLIN STREET
TANN
ER W
ILLIAM
S ROAD
DETENTION POND
MARLIN STREET
G
REAT H
O U
SE
D R
IVE
W
IN
D S O C
S
IG
N
W
IN
D S O C
S
IG
N
C O N C
CONC
C O N C
CONC
C O U R T
T E N N
IS
C T
T E N N
IS
C T
T E N N
IS
C T
T E N N
IS
C T
P O O L
POOL
H O O P
H O O P
C O U R T
B A S K E T B A L L V O L L E Y B A L L
C O U R T
T E N N
IS
C T
T E N N
IS
C T
T E N N
IS
C T
T E N N
IS
C T
P O O L
POOL
H O O P
H O O P
C O U R T
B A S K E T B A L L V O L L E Y B A L L
O P E N
S T O R A G E
O P E N
S T O R A G E
D E N S E
T R E E S
D E N S E
T R E E S
D E N S E
T R E E S
D E N S E
T R E E S
B R U S H
B R U S H
B R U S H
D E N S E
T R E E S
D E N S E
T R E E S
B R U S H
D E N S E
T R E E S
D E N S E
T R E E S
D E N S E
T R E E S
D E N S E
T R E E S
D E N S E
T R E E S
D E N S E
T R E E S
B R U S H
B R U S H
B R U S H
D E N S E
T R E E S
D E N S E
T R E E S
B R U S H
D E N S E
T R E E S
D E N S E
T R E E S
T A N K
C A N O P Y
B L E A C H E R S
T A N K
T R
T R
T R
CAN
OPY
C
AN
O P Y
T A N K
T A N K
CAN
OPY
C
AN
O P Y
C
AN
O P Y
T A N K
T R
CAN
OPY
CAN
OPY
CAN
OPY
CAN
OPY
CAN
OPY
CANOPY
T A N K
T A N K
C O N C
C O N C
T A N K
T E R R A C E
T E R R A C E
C O N C
C O N C
H A N G A R
T A N K
C A N O P Y
B L E A C H E R S
T A N K
T R
T R
T R
CAN
OPY
C
AN
O P Y
T A N K
T A N K
CAN
OPY
C
AN
O P Y
C
AN
O P Y
T A N K
T R
CAN
OPY
CAN
OPY
CAN
OPY
CAN
OPY
CAN
OPY
CANOPY
T A N K
T A N K
C O N C
C O N C
T A N K
T E R R A C E
T E R R A C E
C O N C
C O N C
H A N G A R
TAN
N E R
W
IL
LIA
M S
RO
A D
TAN
N E R
W
ILL
IA
M S
R O A D
FOSTER ROAD
TAN
N E R
W
IL
LIA
M S
RO
A D
TAN
N E R
W
ILL
IA
M S
R O A D
FOSTER ROAD
C O N C
APPROX/LOC
C O N C
APPROX/LOC
A P P R O X L O C
A P P R O X L O C
P A R K
IN
G
P A R K
IN
G
P A R K
IN
G
RAMP
P
AR
K
IN
G
C O N C
P A R K
IN
G
P A R K
IN
G
C O N C
P A R K
IN
G
PARKING
A S P H
P A R K
IN
G
A P R O N
U N P A V E D
P A R K
IN
G
P A R K
IN
G
P A R K
IN
G
P A R K
IN
G
P A R K
IN
G
P A R K
IN
G
P A R K
IN
G
P A R K
IN
G
P A R K
IN
G
P A R K
IN
G
P A R K
IN
G
PARKING
P A R K
IN
G
P A R K
IN
G
P
AR
K
IN
G
P A R K
IN
G
P A R K
IN
G
P A R K
IN
G
RAMP
P
AR
K
IN
G
C O N C
P A R K
IN
G
P A R K
IN
G
C O N C
P A R K
IN
G
PARKING
A S P H
P A R K
IN
G
A P R O N
U N P A V E D
P A R K
IN
G
P A R K
IN
G
P A R K
IN
G
P A R K
IN
G
P A R K
IN
G
P A R K
IN
G
P A R K
IN
G
P A R K
IN
G
P A R K
IN
G
P A R K
IN
G
P A R K
IN
G
PARKING
P A R K
IN
G
P A R K
IN
G
P
AR
K
IN
G
R
IP
R A P
R
IP
R A P
R
IP
R A P
R
IP
R A P
R
IP
R A P
R
IP
R A P
R
IP
R A P
R
IP
R A P
R
IP
R A P
R
IP
R A P
A210
DISCIPLINE:
G - GENERAL
C - CIVIL
L - LANDSCAPE
S - STRUCTURAL
A - ARCHITECTURE
F - FIRE PROTECTION
P - PLUMBING
M - MECHANICAL
E - ELECTRICAL
T - TELECOMM
SHEET
NUMBER
WITHIN
SERIES:
SERIES NUMBER:
0 - GENERAL
1 - PLANS
2 - ELEVATIONS
3 - SECTIONS
4 - LARGE-SCALE VIEWS
5 - DETAILS
6 - SCHEDULES & DIAGRAMS
8 - USER DEFINED
9 - 3D REPRESENTATIONS
SECTION MARK
DETAIL MARK
DRAWING NOTE
SECTION NUMBER
SHEET NUMBER
REFERENCE LABEL
DETAIL NUMBER
SHEET NUMBER
REFERENCE LABEL
ROOM NAME, NUMBER
AND SQUARE FEET
ELEVATION MARK
A-201D2
D1
EXTERIOR
ELEVATION MARK
ELEVATION
NUMBER(S)
SHEET NUMBER
A-101
SIM
A-101
SIM
ROOM NAME
150 SF
Name
Elevation
02 4 8134
SCALE: 1/4"=1'-0"
GRAPHIC SCALE
PLAN NORTH
NORTH ARROW w/
TRUE NORTH
INDICATION
NUMBERING SYSTEM:
ATC BASE MAP
N.T.S.
NORTH
o
MISSISSIPPI
ALABAMA98
o
C E
N
TE
R E
N
TR
A N
C E
A V
IA
TIO
N
TR
A
IN
IN
G
U .S
. C O
A S
T G U
A R
D o p p10 M
O B
ILE
B A
Y
G U
LF O
F M
E X
IC
O
M O
B
ILE
M U
N
IC
IP
A
L
A
IR
P O
R T
TA
N
N E
R
W
ILLIA
M S
R D p
FLORIDA
ALABAMA
P R
O
JE
C T
LO
C
A
TIO
NLO
C
A
TIO
N M
A P
N .T.S
N O
R
TH
V
IC
IN
ITY
M A
P
ROADCODY
ZIE
G
LE
R
R D
R O
AD
ROAD
O
LD
S H
E
LL R
D
BO
ULEVAR
D
AIR
P
O
RT
N .T.S.
SCHILLINGER
TANN
ER
N O
R
TH
M A
IN
G
A
TE E
N T
R
AN
C E
U .S
. C O
A
ST
G U
A R
D
A
VIA
TIO
N
TR
A
IN
IN
G C
E N
TE R
M U
N
IC
IP
A
L A
IR
P O
R T
B
AT
ES
FIE
LD
W
ILLIAM
S
DISCIPLINE/SHT NO
PROJECT NUMBER DRAWING NUMBER
APPROVING OFFICER DATE
PROJ ENGR CNSTR MGR COR
AVIATION TRAINING CENTER
MOBILE AL
EOH JWA RAC
SHEET TITLE
SAM DESIGN P/N:
CAD FILE NAME:
Facilities Engineering Mobile/AL
Mr. Ron Confer: 251 441-6185 Ronald.A.Confer@uscg.mil
U.S. COAST GUARD
U.S. COAST GUARD
8501 TANNER WILLIAMS ROAD
MOBILE AL 36608
FACILITIES ENGINEERING
ATC MOBILE
SCALE:
ISSUE
DEPARTMENT OF HOMELAND SECURITY
UNITED STATES COAST GUARD
AVIATION TRAINING CENTER
8501 TANNER WILLIAMS ROAD
MOBILE ALABAMA
PLOT SCALE: D SIZE
SHEET OF
.1
.0
.1 \E v o n \F a c E n g D e p \P ro je c ts
\F Y
E x e c u ti o n \1
-R e p a ir
R o o fs
B a s e W id e \7
-R e p a ir
R o o f
F it n e s s C e n te r L o c k e r
R o o m
S
-D
W G
-R e p a ir
R o o f
F it n e s s C e n te r L o c k e r
R o o m
S rv t
As indicated
7817168
Repair Roof Fitness Center Locker Room (S06)
DESIGNED BY: EOH
EDITED BY: RAC
S067817168G101
G101
Cover Sheet
DRAWN BY: EOH
CHECKED BY: JWA
LT Brandon Taylor
GENERAL
IN HOUSE
S067817168G101
PROJECT NUMBER:7817168
Repair Roof Fitness Center Locker Room (S06)
FEB2021
Index of Drawings
Sht Sheet Title Sheet no
G101 Cover Sheet 6
A101 Roof Plan 7
A201 Elevations 8
A901 Isometric Roof Plan 9
SHEET NUMBERING SYSTEM
ID DATE DESCRIPTION
1 FEB2021 100% Review
CONTRACT REQUIREMENT
GENERAL SCOPE OF WORK
All items are to be completed in a satisfactory workmanlike manner complying with local code requirements, accepted construction practices, OSHA standards, manufacturer’s recommendations for product use and/or installation of materials, and bid specifications.
The Contractor shall perform all construction services for the subject project located at the Fitness Center Locker Room Building S06, ATCMobile, Alabama.
QUALITY ASSURANCE
Specification and Submittal Register will determine the quality of material and workmanship. In addition, workmanship quality will also be determined by employing a Journeyman or master subcontractor.
Individual license and or training certificates may be requested.
Contractor will provide manufactures certification to install their product.
Manufactures representative shall inspect roof during installation.
E1
A201B1
A201
C1
A201 A1
104'-2" 10'-9"
49'-8"
DISCIPLINE/SHT NO
PROJECT NUMBER DRAWING NUMBER
APPROVING OFFICER DATE
PROJ ENGR CNSTR MGR COTR
AVIATION TRAINING CENTER
MOBILE AL
EOH JWA RAC
SHEET TITLE
SAM DESIGN P/N:
CAD FILE NAME:
Facilities Engineering Mobile/AL
Mr. Ron Confer: 251 441-6185 Ronald.A.Confer@uscg.mil
U.S. COAST GUARD
U.S. COAST GUARD
8501 TANNER WILLIAMS ROAD
MOBILE AL 36608
FACILITIES ENGINEERING
ATC MOBILE
SCALE:
ISSUE
DESIGNED BY:
DRAWN BY:
EDITED BY:
CHECKED BY:
1 2 3 4 5 6
A
1 2 3 4 5 6
B
C
D
E
A
B
C
D
E
SHEET OF
PLOT SCALE: D SIZE
.1
.0
.1 \E v o n \F a c E n g D e p \P ro je c ts
\F Y
E x e c u ti o n \1
-R e p a ir
R o o fs
B a s e W id e \7
-R e p a ir
R o o f
F it n e s s C e n te r L o c k e r
R o o m
S
-D
W G
-R e p a ir
R o o f
F it n e s s C e n te r L o c k e r
R o o m
S rv t
3/16" = 1'-0"
7817168
Repair Roof Fitness Center Locker Room (S06)
EOH
RAC
S067817168A101
A101
Roof Plan
EOH
JWA
LT Brandon Taylor
ARCHITECTURAL
IN HOUSE
S067817168A101
FEB2021
3/16" = 1'-0" B1
Proposed Fitness Center & Locker Room
P L A
N N
O R
T H
GENERAL NOTES
SHEET KEYNOTES
SCALE AND ORIENTATION
SCALE: 3/16"=1'-0"
48 8
1 Existing modified bitumen membrane.
Provide a two-coat, reinforced, liquid-applied, cool roofing, membrane roofing system.
2 Existing roof curbs
3 Vent through roof (VTR).
4 Furnace stack
A two-coat, reinforced, liquid-applied, cool roofing, membrane roofing system.
1. Perform an infra-red (IR) roof scan and/or core cuts to determine if there are any problems not readily visible to the naked eye. Remove wet and/or damaged areas identified by an IR scan and/or core cuts and replace with like insulation and membrane.
2. Deficiencies such as blisters, wrinkles and ponded water conditions must be repaired/corrected prior to the installation of a fluid applied coating. For bidding purposes assume less than 10% of modified bitumen roofing surfaces are blistered.
3. Each substrate should be washed with a bio-degradable detergent and appropriate power washing or scrubbing equipment.
4. Repair 100 LF unbonded metal edge stripping.
5. Priming is required on all roof surfaces.
6. For granulated cap sheets pre-treat the seams with a layer of base coat and a reinforcement fabric before the liquid-applied system is installed. An additional flood coat is required to encapsulate the granules on the roof before building the liquid-applied system per manufacturers recommendation.
7. Self-adhered flashing tapes may be used for detailing penetrations and seams. Whether to use a self-adhered tape or extra base coat and reinforcement is typically the manufacturer’ choice.
8. Provide a polyurea coatings. An aromatics base coat (primer), aliphatics topcoat.
Existing substrates is modified bitumen
(MB).
9. The preferred application method is spray unless overspray becomes an issue, then roll. Brush for roof penetrations.
10. The surface must be exceedingly clean, and seams and penetrations must be properly prepared. The dry film thickness (DFT) varies between 40 to 80 mils that would equate to the manufacturers guaranteed life expectancy.
11. Provide signed manufacturers: shop drawings, certifications, weekly project site visits and stensiled warranty.
Provide new roof access ladder
1. Fixed ladder permanently attached to building structure, or piece of equipment.
2. Install according to OSHA 29 CFR
1910.27(d)(1)(ii), 1926.1053(a)(19) and
1019.118 - Fixed Ladders
3. Although a cage or fall protection is NOT required in accordance with the above OSHA parts, to satisfy ATCMobile's base maintenance contractors employee safety policy this contract will provide a fixed ladders, vertical lifeline fall protection system.
5 New roof access ladder
3 3
FW
DISCIPLINE/SHT NO
PROJECT NUMBER DRAWING NUMBER
APPROVING OFFICER DATE
PROJ ENGR CNSTR MGR COTR
AVIATION TRAINING CENTER
MOBILE AL
EOH JWA RAC
SHEET TITLE
SAM DESIGN P/N:
CAD FILE NAME:
Facilities Engineering Mobile/AL
Mr. Ron Confer: 251 441-6185 Ronald.A.Confer@uscg.mil
U.S. COAST GUARD
U.S. COAST GUARD
8501 TANNER WILLIAMS ROAD
MOBILE AL 36608
FACILITIES ENGINEERING
ATC MOBILE
SCALE:
ISSUE
DESIGNED BY:
DRAWN BY:
EDITED BY:
CHECKED BY:
1 2 3 4 5 6
A
1 2 3 4 5 6
B
C
D
E
A
B
C
D
E
SHEET OF
PLOT SCALE: D SIZE
.1
.0
.1 \E v o n \F a c E n g D e p \P ro je c ts
\F Y
E x e c u ti o n \1
-R e p a ir
R o o fs
B a s e W id e \7
-R e p a ir
R o o f
F it n e s s C e n te r L o c k e r
R o o m
S
-D
W G
-R e p a ir
R o o f
F it n e s s C e n te r L o c k e r
R o o m
S rv t
3/16" = 1'-0"
7817168
Repair Roof Fitness Center Locker Room (S06)
EOH
JWA
S067817168A201
A201
Elevations
EOH
RAC
LT Brandon Taylor
ARCHITECTURAL
IN HOUSE
S067817168A201
FEB2021
3/16" = 1'-0"A101
B1
C1 West Elevation
3/16" = 1'-0"A101
B1
A1 South Elevation
SHEET KEYNOTES
3/16" = 1'-0"A101
B1
B1 North Elevation
3/16" = 1'-0"A101
B1
E1 East Elevation
1 New roof access ladder
1 FEB2021 100% Review
APPROVING OFFICER DATE
PROJ ENGR CNSTR MGR COTR
AVIATION TRAINING CENTER
MOBILE AL
EOH JWA RAC
SHEET TITLE
SAM DESIGN P/N:
CAD FILE NAME:
Facilities Engineering Mobile/AL
Mr. Ron Confer: 251 441-6185 Ronald.A.Confer@uscg.mil
U.S. COAST GUARD
U.S. COAST GUARD
8501 TANNER WILLIAMS ROAD
MOBILE AL 36608
FACILITIES ENGINEERING
ATC MOBILE
SCALE:
ISSUE
DESIGNED BY:
DRAWN BY:
EDITED BY:
CHECKED BY:
1 2 3 4 5 6
A
1 2 3 4 5 6
B
C
D
E
A
B
C
D
E
SHEET OF
PLOT SCALE: D SIZE
.1
.0
.1 \E v o n \F a c E n g D e p \P ro je c ts
\F Y
E x e c u ti o n \1
-R e p a ir
R o o fs
B a s e W id e \7
-R e p a ir
R o o f
F it n e s s C e n te r L o c k e r
R o o m
S
-D
W G
-R e p a ir
R o o f
F it n e s s C e n te r L o c k e r
R o o m
S rv t
7817168
Repair Roof Fitness Center Locker Room (S06)
EOH
RAC
S067817168A901
A901
Isometric Roof Plan
EOH
JWA
LT Brandon Taylor
ARCHITECTURAL
IN HOUSE
S067817168A901
FEB2021
A1 Isometric Views
1 FEB2021 100% Review
C O
C O
C O
C O
C O
C O
C O
C O
C O
C O
C O
C O
C O
TAXIW
AY
CONC PARKING APRO
N
RIP-RAP
T A
N N
E R
W
IL
L
IA
M S
R O
A D
M A R
IN
E R
D R
IV
E
MARLIN STREET
T A
N N
E R
W
ILL
IA
M
S R
O A
D
G R
E A
T H
O U
S E
D R
IV
E
TAXIW
AY
RIP-RAP
T A
N N
E R
W
ILL
IA
M
S R
O A
D
W
IN
D S
O C
S
IG
N
W
IN
D S
O C
S
IG
N
T A
N K
C A
N O
P Y
T A
N K
CANOPY
T A
N K
T A
N K
C A
N O
P Y
T A
N K
CANOPY
T A
N K
T A
N N
E R
W
IL
L
IA
M S
R O
A D
FOSTER ROAD
T A
N N
E R
W
IL
L
IA
M S
R O
A D
APPROX/LOC APPROX/LOC
C O
N C
P A
R K
IN
G
P A
R K
IN
G
C O
N C
P A
R K
IN
G
P A
R K
IN
G
NUMBERING SYSTEM:
A210
DISCIPLINE:
G - GENERAL
C - CIVIL
L - LANDSCAPE
S - STRUCTURAL
A - ARCHITECTURE
F - FIRE PROTECTION
P - PLUMBING
M - MECHANICAL
E - ELECTRICAL
T - TELECOMM
SHEET
NUMBER
WITHIN
SERIES:
SERIES NUMBER:
0 - GENERAL
1 - PLANS
2 - ELEVATIONS
3 - SECTIONS
4 - LARGE-SCALE VIEWS
5 - DETAILS
6 - SCHEDULES & DIAGRAMS
8 - USER DEFINED
9 - 3D REPRESENTATIONS
SECTION MARK
DETAIL MARK
DRAWING NOTE
SECTION NUMBER
SHEET NUMBER
REFERENCE LABEL
DETAIL NUMBER
SHEET NUMBER
REFERENCE LABEL
ROOM NAME, NUMBER
AND SQUARE FEET
ELEVATION MARK
A-201D2
D1
EXTERIOR
ELEVATION MARK
ELEVATION
NUMBER(S)
SHEET NUMBER
A-101
SIM
A-101
SIM
ROOM NAME
150 SF
Name
Elevation
SCALE: 3"=1'-0"
04 2
GRAPHIC SCALE
PLAN NORTH
NORTH ARROW w/
TRUE NORTH
INDICATION
NUMBERING SYSTEM:
ATC BASE MAP
N.T.S.
NORTH
o
MISSISSIPPI
ALABAMA98
o
C E
N
TE
R E
N
TR
A N
C E
A V
IA
TIO
N
TR
A
IN
IN
G
U .S
. C O
A S
T G U
A R
D o p p10 M
O B
ILE
B A
Y
G U
LF O
F M
E X
IC
O
M O
B
ILE
M U
N
IC
IP
A
L
A
IR
P O
R T
TA
N
N E
R
W
ILLIA
M S
R D p
FLORIDA
ALABAMA
P R
O
JE
C T
LO
C
A
TIO
NLO
C
A
TIO
N M
A P
N .T.S
N O
R
TH
V
IC
IN
ITY
M A
P
ROADCODY
ZIE
G
LE
R
R D
R O
AD
ROAD
O
LD
S H
E
LL R
D
BO
ULEVAR
D
AIR
P
O
RT
N .T.S.
SCHILLINGER
TANN
ER
N O
R
TH
M A
IN
G
A
TE E
N T
R
AN
C E
U .S
. C O
A
ST
G U
A R
D
A
VIA
TIO
N
TR
A
IN
IN
G C
E N
TE R
M U
N
IC
IP
A
L A
IR
P O
R T
B
AT
ES
FIE
LD
W
ILLIAM
S
DISCIPLINE/SHT NO
PROJECT NUMBER DRAWING NUMBER
APPROVING OFFICER DATE
PROJ ENGR CNSTR MGR COR
AVIATION TRAINING CENTER
MOBILE AL
EOH JWA RAC
SHEET TITLE
SAM DESIGN P/N:
CAD FILE NAME:
Facilities Engineering Mobile/AL
Mr. Ron Confer: 251 441-6185 Ronald.A.Confer@uscg.mil
U.S. COAST GUARD
U.S. COAST GUARD
8501 TANNER WILLIAMS ROAD
MOBILE AL 36608
FACILITIES ENGINEERING
ATC MOBILE
SCALE:
ISSUE
DEPARTMENT OF HOMELAND SECURITY
UNITED STATES COAST GUARD
AVIATION TRAINING CENTER
8501 TANNER WILLIAMS ROAD
MOBILE ALABAMA
PLOT SCALE: D SIZE
SHEET OF
.1
.0
.1 \E v o n \F a c E n g D e p \P ro je c ts
\F Y
E x e c u ti o n \1
-R e p a ir
R o o fs
B a s e W id e \7
-R e p a ir
R o o f
F a c ili ti e s E n g in e e ri n g
S
-D
W G
-R e p a ir
R o o f
F a c ili ti e s
E n g in e e ri n g
S rv t
As indicated
7820821
Repair Roof Facilities Engr Bldg (S10)
DESIGNED BY: EOH
EDITED BY: RAC
S107820821G101
G101
Title Sheet
DRAWN BY: EOH
CHECKED BY: JWA
LT Brandon Taylor
ARCHITECTURAL
IN HOUSE
S107820821G101
PROJECT NUMBER:7820821
Repair Roof Facilities Engr Bldg (S10)
FEB2021
DRAWING INDEX
SHT NO Drawing Title Sheet
G101 Title Sheet 10
A101 Existing Roof Plan 11
A201 Existing Elevation 12
A501 Detail 13
A901 Proposed ISOMETRIC 14
Facilities Engineering Building
Main Entrance To Base
Project Location
CONTRACT REQUIREMENT
GENERAL SCOPE OF WORK
All items are to be completed in a satisfactory workmanlike manner complying with local code requirements, accepted construction practices, OSHA standards, manufacturer’s recommendations for product use and/or installation of materials, and bid specifications.
The Contractor shall perform all construction services for the subject project located at the Facilities Engineering Building S10, ATCMobile, Alabama.
QUALITY ASSURANCE
Specification and Submittal Register will determine the quality of material and workmanship. In addition, workmanship quality will also be determined by employing a Journeyman or master subcontractor.
Individual license and or training certificates may be requested.
Contractor will provide manufactures certification to install their product. Manufactures representative shall inspect roof during installation.
A201 A1
E1
/2
" 1 /2
/2
/2
70' - 9" 60' - 8" 14' - 1"
44' - 0" 21' - 1"
DISCIPLINE/SHT NO
PROJECT NUMBER DRAWING NUMBER
APPROVING OFFICER DATE
PROJ ENGR CNSTR MGR COTR
AVIATION TRAINING CENTER
MOBILE AL
EOH JWA RAC
SHEET TITLE
SAM DESIGN P/N:
CAD FILE NAME:
Facilities Engineering Mobile/AL
Mr. Ron Confer: 251 441-6185 Ronald.A.Confer@uscg.mil
U.S. COAST GUARD
U.S. COAST GUARD
8501 TANNER WILLIAMS ROAD
MOBILE AL 36608
FACILITIES ENGINEERING
ATC MOBILE
SCALE:
ISSUE
DESIGNED BY:
DRAWN BY:
EDITED BY:
CHECKED BY:
1 2 3 4 5 6
A
1 2 3 4 5 6
B
C
D
E
A
B
C
D
E
SHEET OF
PLOT SCALE: D SIZE
.1
.0
.1 \E v o n \F a c E n g D e p \P ro je c ts
\F Y
E x e c u ti o n \1
-R e p a ir
R o o fs
B a s e W id e \7
-R e p a ir
R o o f
F a c ili ti e s E n g in e e ri n g
S
-D
W G
-R e p a ir
R o o f
F a c ili ti e s
E n g in e e ri n g
S rv t
1/8" = 1'-0"
7820821
Repair Roof Facilities Engr Bldg (S10)
EOH
RAC
S107820821A101
A101
Existing Roof Plan
EOH
JWA
LT Brandon Taylor
ARCHITECTURAL
IN HOUSE
S107820821A101
FEB2021
1/8" = 1'-0" D1
Existing Roof Plan
P L A
N N
O R
T H
GENERAL NOTES
SHEET KEYNOTES
SCALE AND ORIENTATION
164 8268
SCALE: 1/8"=1'-0"
A two-coat, reinforced, liquid-applied, cool roofing, membrane roofing system.
1. Perform an infra-red (IR) roof scan and/or core cuts to determine if there are any problems not readily visible to the naked eye.
Remove wet and/or damaged areas identified by an IR scan and/or core cuts and replace with like insulation and membrane.
2. Deficiencies such as blisters, wrinkles and ponded water conditions must be repaired/corrected prior to the installation of a fluid applied coating. For bidding purposes assume less than 10% of modified bitumen roofing surfaces are blistered.
3. Each substrate should be washed with a bio-degradable detergent and appropriate power washing or scrubbing equipment.
4. Repair 100 LF unbonded metal edge stripping.
5. Priming is required on all roof surfaces.
6. For granulated cap sheets pre-treat the seams with a layer of base coat and a reinforcement fabric before the liquid-applied system is installed. An additional flood coat is required to encapsulate the granules on the roof before building the liquid-applied system per manufacturers recommendation.
7. Self-adhered flashing tapes may be used for detailing penetrations and seams. Whether to use a self-adhered tape or extra base coat and reinforcement is typically the manufacturer’ choice.
8. Provide a polyurea coatings. An aromatics base coat (primer), aliphatics topcoat.
Existing substrates is modified bitumen (MB).
9. The preferred application method is spray unless overspray becomes an issue, then roll.
Brush for roof penetrations.
10. The surface must be exceedingly clean, and seams and penetrations must be properly prepared. The dry film thickness (DFT) varies between 40 to 80 mils that would equate to the manufacturers guaranteed life expectancy.
11. Provide signed manufacturers: shop drawings, certifications, weekly project site visits and stensiled warranty.
Provide new roof access ladder
1. Fixed ladder permanently attached to building structure, or piece of equipment.
2. Install according to OSHA 29 CFR
1910.27(d)(1)(ii), 1926.1053(a)(19) and 1019.118
3. Although a cage or fall protection is NOT required in accordance with the above OSHA parts, to satisfy ATCMobile's base maintenance contractors employee safety policy this contract will provide a fixed ladder, vertical lifeline fall protection system.
Provide roof sidewall metal panel
1. Match existing panel color and geometry
Install in accordance with specification section 074213
1 Existing modified bitumen membrane.
Provide a two-coat, reinforced, liquid-applied, roofing system.
2 Existing roof curbs
3 Vent through roof (VTR).
4 Heater Vent
3 3
23 3
5 Re-position ligthning protection cable
32' - 8"
D1
A501
70' - 9"74' - 2"
"1
32' - 8"
D3
A501
DISCIPLINE/SHT NO
PROJECT NUMBER DRAWING NUMBER
APPROVING OFFICER DATE
PROJ ENGR CNSTR MGR COTR
AVIATION TRAINING CENTER
MOBILE AL
EOH JWA RAC
SHEET TITLE
SAM DESIGN P/N:
CAD FILE NAME:
Facilities Engineering Mobile/AL
Mr. Ron Confer: 251 441-6185 Ronald.A.Confer@uscg.mil
U.S. COAST GUARD
U.S. COAST GUARD
8501 TANNER WILLIAMS ROAD
MOBILE AL 36608
FACILITIES ENGINEERING
ATC MOBILE
SCALE:
ISSUE
DESIGNED BY:
DRAWN BY:
EDITED BY:
CHECKED BY:
1 2 3 4 5 6
A
1 2 3 4 5 6
B
C
D
E
A
B
C
D
E
SHEET OF
PLOT SCALE: D SIZE
.1
.0
.1 \E v o n \F a c E n g D e p \P ro je c ts
\F Y
E x e c u ti o n \1
-R e p a ir
R o o fs
B a s e W id e \7
-R e p a ir
R o o f
F a c ili ti e s E n g in e e ri n g
S
-D
W G
-R e p a ir
R o o f
F a c ili ti e s
E n g in e e ri n g
S rv t
As indicated
7820821
Repair Roof Facilities Engr Bldg (S10)
EOH
RAC
S107820821A201
A201
Existing Elevation
EOH
JWA
LT Brandon Taylor
ARCHITECTURAL
IN HOUSE
S107820821A201
FEB2021
1/4" = 1'-0"A201
A1 Existing South
3/16" = 1'-0"A201
E1 Existing West
SHEET KEYNOTES
SCALE: 3/16"=1'-0"
48 8
3/16" = 1'-0"
Proposed West
1/4" = 1'-0" A4
Proposed South
1 New roof access ladder
2 New metal wall panel to match existing
04 8268 02 4 8134
SCALE: 1/4"=1'-0"
3 Re-position ligthning protection grounding cable
4 Pay extra attention to roof wall fashing. It currently leaks
METAL WALL PANEL HEAD
FLASHING UP AND UNDER
EXISTING FASCIA
WATER RESISTANT
BARRIER UNDER BOTTOM
LIP OF FLASHING
METAL WALL TO
MATCH EXISTING
EXISTING METAL FASCIA AND
WOOD NAILER
EXISTING METAL FLASHING
PROVIDE ANCHORS
SPACE AS DEPICTED 16
INCH ON CENTER
EXISTING TWO-PIECE
COUNTERFLASHING.
A501
D5
A501
B5
BASE FLASHING MIN OF 4 INCH ABOVE.
ROOF GRADE. LAPPED UNDER WATER
RESISTANT BARRIER
REINFORCE DRIP AREA PER
MANUFACTURERS RECOMMENDATION
DISCIPLINE/SHT NO
PROJECT NUMBER DRAWING NUMBER
APPROVING OFFICER DATE
PROJ ENGR CNSTR MGR COTR
AVIATION TRAINING CENTER
MOBILE AL
EOH JWA RAC
SHEET TITLE
SAM DESIGN P/N:
CAD FILE NAME:
Facilities Engineering Mobile/AL
Mr. Ron Confer: 251 441-6185 Ronald.A.Confer@uscg.mil
U.S. COAST GUARD
U.S. COAST GUARD
8501 TANNER WILLIAMS ROAD
MOBILE AL 36608
FACILITIES ENGINEERING
ATC MOBILE
SCALE:
ISSUE
DESIGNED BY:
DRAWN BY:
EDITED BY:
CHECKED BY:
1 2 3 4 5 6
A
1 2 3 4 5 6
B
C
D
E
A
B
C
D
E
SHEET OF
PLOT SCALE: D SIZE
.1
.0
.1 \E v o n \F a c E n g D e p \P ro je c ts
\F Y
E x e c u ti o n \1
-R e p a ir
R o o fs
B a s e W id e \7
-R e p a ir
R o o f
F a c ili ti e s E n g in e e ri n g
S
-D
W G
-R e p a ir
R o o f
F a c ili ti e s
E n g in e e ri n g
S rv t
As indicated
7820821
Repair Roof Facilities Engr Bldg (S10)
EOH
EOH
S107820821A501
A501
Detail
EOH
JWA
LT Brandon Taylor
ARCHITECTURAL
IN HOUSE
S107820821A501
FEB2021
3" = 1'-0"A501
D3
D5 Proposed Wall Panel Head Flashing 1" = 1'-0"A201
A1
D1 Typical Existing Roof Sidewall Intersection 1" = 1'-0"A201
A4
D3 Proposed Wall Section
3" = 1'-0"A501
D3
B5 Proposed wall Panel Base Flashing
APPROVING OFFICER DATE
PROJ ENGR CNSTR MGR COTR
AVIATION TRAINING CENTER
MOBILE AL
EOH JWA RAC
SHEET TITLE
SAM DESIGN P/N:
CAD FILE NAME:
Facilities Engineering Mobile/AL
Mr. Ron Confer: 251 441-6185 Ronald.A.Confer@uscg.mil
U.S. COAST GUARD
U.S. COAST GUARD
8501 TANNER WILLIAMS ROAD
MOBILE AL 36608
FACILITIES ENGINEERING
ATC MOBILE
SCALE:
ISSUE
DESIGNED BY:
DRAWN BY:
EDITED BY:
CHECKED BY:
1 2 3 4 5 6
A
1 2 3 4 5 6
B
C
D
E
A
B
C
D
E
SHEET OF
PLOT SCALE: D SIZE
.1
.0
.1 \E v o n \F a c E n g D e p \P ro je c ts
\F Y
E x e c u ti o n \1
-R e p a ir
R o o fs
B a s e W id e \7
-R e p a ir
R o o f
F a c ili ti e s E n g in e e ri n g
S
-D
W G
-R e p a ir
R o o f
F a c ili ti e s
E n g in e e ri n g
S rv t
7820821
Repair Roof Facilities Engr Bldg (S10)
EOH
RAC
S107820821A901
A901
Proposed ISOMETRIC
EOH
JWA
LT Brandon Taylor
ARCHITECTURAL
IN HOUSE
S107820821A901
FEB2021
A1 Prespective NE
PROVIDE CORNER TRIM
ACCORDING TO METAL PANEL
MANUFACTURE
C O
C O
C O
C O
C O
C O
C O
C O
C O
C O
C O
C O
C O
BRUSH
TAXIWAY
PARKING APRON
CONC PARKING APRON
RIP-RAP
DENSE TREES
PARKING
DENSE TREES
DENSE TREES
CONC
VEH
IC
LE
STO
R
AG
E
AR
EA
TAN
N
ER W
ILLIAM
S ROAD
M
ARINER
DR
IVE
MARLIN STREET
TANN
ER W
ILLIAM
S ROAD
DETENTION POND
MARLIN STREET
G
REAT H
O U
SE
D R
IVE
BRUSH
TAXIWAY
PARKING APRON
CONC PARKING APRON
RIP-RAP
DENSE TREES
PARKING
DENSE TREES
DENSE TREES
CONC
VEH
IC
LE
STO
R
AG
E
AR
EA
M
ARINER
DR
IVE
MARLIN STREET
TANN
ER W
ILLIAM
S ROAD
DETENTION POND
MARLIN STREET
G
REAT H
O U
SE
D R
IVE
W
IN
D S O C
S
IG
N
W
IN
D S O C
S
IG
N
C O N C
CONC
C O N C
CONC
C O U R T
T E N N
IS
C T
T E N N
IS
C T
T E N N
IS
C T
T E N N
IS
C T
P O O L
POOL
H O O P
H O O P
C O U R T
B A S K E T B A L L V O L L E Y B A L L
C O U R T
T E N N
IS
C T
T E N N
IS
C T
T E N N
IS
C T
T E N N
IS
C T
P O O L
POOL
H O O P
H O O P
C O U R T
B A S K E T B A L L V O L L E Y B A L L
O P E N
S T O R A G E
O P E N
S T O R A G E
D E N S E
T R E E S
D E N S E
T R E E S
D E N S E
T R E E S
D E N S E
T R E E S
B R U S H
B R U S H
B R U S H
D E N S E
T R E E S
D E N S E
T R E E S
B R U S H
D E N S E
T R E E S
D E N S E
T R E E S
D E N S E
T R E E S
D E N S E
T R E E S
D E N S E
T R E E S
D E N S E
T R E E S
B R U S H
B R U S H
B R U S H
D E N S E
T R E E S
D E N S E
T R E E S
B R U S H
D E N S E
T R E E S
D E N S E
T R E E S
T A N K
C A N O P Y
B L E A C H E R S
T A N K
T R
T R
T R
CAN
OPY
C
AN
O P Y
T A N K
T A N K
CAN
OPY
C
AN
O P Y
C
AN
O P Y
T A N K
T R
CAN
OPY
CAN
OPY
CAN
OPY
CAN
OPY
CAN
OPY
CANOPY
T A N K
T A N K
C O N C
C O N C
T A N K
T E R R A C E
T E R R A C E
C O N C
C O N C
H A N G A R
T A N K
C A N O P Y
B L E A C H E R S
T A N K
T R
T R
T R
CAN
OPY
C
AN
O P Y
T A N K
T A N K
CAN
OPY
C
AN
O P Y
C
AN
O P Y
T A N K
T R
CAN
OPY
CAN
OPY
CAN
OPY
CAN
OPY
CAN
OPY
CANOPY
T A N K
T A N K
C O N C
C O N C
T A N K
T E R R A C E
T E R R A C E
C O N C
C O N C
H A N G A R
TAN
N E R
W
IL
LIA
M S
RO
A D
TAN
N E R
W
ILL
IA
M S
R O A D
FOSTER ROAD
TAN
N E R
W
IL
LIA
M S
RO
A D
TAN
N E R
W
ILL
IA
M S
R O A D
FOSTER ROAD
C O N C
APPROX/LOC
C O N C
APPROX/LOC
A P P R O X L O C
A P P R O X L O C
P A R K
IN
G
P A R K
IN
G
P A R K
IN
G
RAMP
P
AR
K
IN
G
C O N C
P A R K
IN
G
P A R K
IN
G
C O N C
P A R K
IN
G
PARKING
A S P H
P A R K
IN
G
A P R O N
U N P A V E D
P A R K
IN
G
P A R K
IN
G
P A R K
IN
G
P A R K
IN
G
P A R K
IN
G
P A R K
IN
G
P A R K
IN
G
P A R K
IN
G
P A R K
IN
G
P A R K
IN
G
P A R K
IN
G
PARKING
P A R K
IN
G
P A R K
IN
G
P
AR
K
IN
G
P A R K
IN
G
P A R K
IN
G
P A R K
IN
G
RAMP
P
AR
K
IN
G
C O N C
P A R K
IN
G
P A R K
IN
G
C O N C
P A R K
IN
G
PARKING
A S P H
P A R K
IN
G
A P R O N
U N P A V E D
P A R K
IN
G
P A R K
IN
G
P A R K
IN
G
P A R K
IN
G
P A R K
IN
G
P A R K
IN
G
P A R K
IN
G
P A R K
IN
G
P A R K
IN
G
P A R K
IN
G
P A R K
IN
G
PARKING
P A R K
IN
G
P A R K
IN
G
P
AR
K
IN
G
R
IP
R A P
R
IP
R A P
R
IP
R A P
R
IP
R A P
R
IP
R A P
R
IP
R A P
R
IP
R A P
R
IP
R A P
R
IP
R A P
R
IP
R A P
NUMBERING SYSTEM:
A210
DISCIPLINE:
G - GENERAL
C - CIVIL
L - LANDSCAPE
S - STRUCTURAL
A - ARCHITECTURE
F - FIRE PROTECTION
P - PLUMBING
M - MECHANICAL
E - ELECTRICAL
T - TELECOMM
SHEET
NUMBER
WITHIN
SERIES:
SERIES NUMBER:
0 - GENERAL
1 - PLANS
2 - ELEVATIONS
3 - SECTIONS
4 - LARGE-SCALE VIEWS
5 - DETAILS
6 - SCHEDULES & DIAGRAMS
8 - USER DEFINED
9 - 3D REPRESENTATIONS
SECTION MARK
DETAIL MARK
DRAWING NOTE
SECTION NUMBER
SHEET NUMBER
REFERENCE LABEL
DETAIL NUMBER
SHEET NUMBER
REFERENCE LABEL
ROOM NAME, NUMBER
AND SQUARE FEET
ELEVATION MARK
A-201D2
D1
EXTERIOR
ELEVATION MARK
ELEVATION
NUMBER(S)
SHEET NUMBER
A-101
SIM
A-101
SIM
ROOM NAME
150 SF
Name
Elevation
02 4 8134
SCALE: 1/4"=1'-0"
GRAPHIC SCALE
PLAN NORTH
NORTH ARROW w/
TRUE NORTH
INDICATION
NUMBERING SYSTEM:
ATC BASE MAP
N.T.S.
NORTH
o
MISSISSIPPI
ALABAMA98
o
C E
N
TE
R E
N
TR
A N
C E
A V
IA
TIO
N
TR
A
IN
IN
G
U .S
. C O
A S
T G U
A R
D o p p10 M
O B
ILE
B A
Y
G U
LF O
F M
E X
IC
O
M O
B
ILE
M U
N
IC
IP
A
L
A
IR
P O
R T
TA
N
N E
R
W
ILLIA
M S
R D p
FLORIDA
ALABAMA
P R
O
JE
C T
LO
C
A
TIO
NLO
C
A
TIO
N M
A P
N .T.S
N O
R
TH
V
IC
IN
ITY
M A
P
ROADCODY
ZIE
G
LE
R
R D
R O
AD
ROAD
O
LD
S H
E
LL R
D
BO
ULEVAR
D
AIR
P
O
RT
N .T.S.
SCHILLINGER
TANN
ER
N O
R
TH
M A
IN
G
A
TE E
N T
R
AN
C E
U .S
. C O
A
ST
G U
A R
D
A
VIA
TIO
N
TR
A
IN
IN
G C
E N
TE R
M U
N
IC
IP
A
L A
IR
P O
R T
B
AT
ES
FIE
LD
W
ILLIAM
S
DISCIPLINE/SHT NO
PROJECT NUMBER DRAWING NUMBER
APPROVING OFFICER DATE
PROJ ENGR CNSTR MGR COR
AVIATION TRAINING CENTER
MOBILE AL
EOH JWA RAC
SHEET TITLE
SAM DESIGN P/N:
CAD FILE NAME:
Facilities Engineering Mobile/AL
Mr. Ron Confer: 251 441-6185 Ronald.A.Confer@uscg.mil
U.S. COAST GUARD
U.S. COAST GUARD
8501 TANNER WILLIAMS ROAD
MOBILE AL 36608
FACILITIES ENGINEERING
ATC MOBILE
SCALE:
ISSUE
DEPARTMENT OF HOMELAND SECURITY
UNITED STATES COAST GUARD
AVIATION TRAINING CENTER
8501 TANNER WILLIAMS ROAD
MOBILE ALABAMA
PLOT SCALE: D SIZE
SHEET OF
.1
.0
.1 \E v o n \F a c E n g D e p \P ro je c ts
\F Y
E x e c u ti o n \1
-R e p a ir
R o o fs
B a s e
W id e \1
-R e c o a t
R o o fs
B a s e W id e
S
-D
W G
-R e c o a t
R o o fs
B a s e W id e
(S rv t
As indicated
16926832
AVIONICS BLDG S55
DESIGNED BY: EOH
EDITED BY: RAC
S5516926832G101
G101
Cover Sheet
DRAWN BY: EOH
CHECKED BY: JWA
LT Brandon Taylor
GENERAL
IN HOUSE
S5516926832G101
PROJECT NUMBER:16926832
AVIONICS BLDG S55
FEB2021
Project Area
DRAWING INDEX
SHT NO Drawing Title # Sht
G101 Cover Sheet 15
A101 Existing Plan 16
A201 Elevation Plan 17
GENERAL SCOPE OF WORK
All items are to be completed in a satisfactory workmanlike manner complying with local code requirements, accepted construction practices, OSHA standards, manufacturer’s recommendations for product use and/or installation of materials, and bid specifications.
The Contractor shall perform all construction services for the subject project located at the Avionics Building S55, ATCMobile, Alabama.
QUALITY ASSURANCE
Specification and Submittal Register will determine the quality of material and workmanship. In addition, workmanship quality will also be determined by employing a Journeyman or master subcontractor.
Individual license and or training certificates may be requested.
Contractor will provide manufactures certification to install their product.
Manufactures representative shall inspection roof during installation.
ID DATE DESCRIPTION
1 19FEB21 100% Design
CONTRACT REQUIREMENT
A201C1
B1
A201 E1
A201
A1
0" / 12" 0" / 12"
84' - 0"
4' - 0"
DISCIPLINE/SHT NO
PROJECT NUMBER DRAWING NUMBER
APPROVING OFFICER DATE
PROJ ENGR CNSTR MGR COTR
AVIATION TRAINING CENTER
MOBILE AL
EOH JWA RAC
SHEET TITLE
SAM DESIGN P/N:
CAD FILE NAME:
Facilities Engineering Mobile/AL
Mr. Ron Confer: 251 441-6185 Ronald.A.Confer@uscg.mil
U.S. COAST GUARD
U.S. COAST GUARD
8501 TANNER WILLIAMS ROAD
MOBILE AL 36608
FACILITIES ENGINEERING
ATC MOBILE
SCALE:
ISSUE
DESIGNED BY:
DRAWN BY:
EDITED BY:
CHECKED BY:
1 2 3 4 5 6
A
1 2 3 4 5 6
B
C
D
E
A
B
C
D
E
SHEET OF
PLOT SCALE: D SIZE
.1
.0
.1 \E v o n \F a c E n g D e p \P ro je c ts
\F Y
E x e c u ti o n \1
-R e p a ir
R o o fs
B a s e
W id e \1
-R e c o a t
R o o fs
B a s e W id e
S
-D
W G
-R e c o a t
R o o fs
B a s e W id e
(S rv t
3/16" = 1'-0"
16926832
AVIONICS BLDG S55
EOH
RAC
S5516926832A101
A101
Existing Plan
EOH
JWA
LT Brandon Taylor
ARCHITECTURAL
IN HOUSE
S5516926832A101
FEB2021
3/16" = 1'-0" A1
Existing Roof Plan
P L A
N N
O R
T H
GENERAL NOTES
SHEET KEYNOTES
SCALE AND ORIENTATION
SCALE: 3/16"=1'-0"
48 8
A single-coat liquid-applied membrane.
1. Wash substrate with a bio-degradable detergent and appropriate power washing or scrubbing equipment.
2. Verify existing spray polyurethane foam (SPF) roofing coating is compatible with intended product. Provide a silicone coating over, if existing coating is silicone based.
3. The preferred method is spray unless overspray becomes an issue, then roll.
Brush for roof penetrations, parapets and HVAC units.
4. The surface must be exceedingly clean.
Manufacturer’s warranty is not required.
5. Prior to start of work certify that the roof does not currently leak. Certification can be achieved by a registered roofing inspector, and 6 months of maintenance documents.
Install roof hatch guard rail. Rebuild and raise roof hatch if necessary.
1 Roof drain
2 Roof hatch
3 Roof vent
1 1 1 1
3 4
4 Roof Top HVAC unit
APPROVING OFFICER DATE
PROJ ENGR CNSTR MGR COTR
AVIATION TRAINING CENTER
MOBILE AL
EOH JWA RAC
SHEET TITLE
SAM DESIGN P/N:
CAD FILE NAME:
Facilities Engineering Mobile/AL
Mr. Ron Confer: 251 441-6185 Ronald.A.Confer@uscg.mil
U.S. COAST GUARD
U.S. COAST GUARD
8501 TANNER WILLIAMS ROAD
MOBILE AL 36608
FACILITIES ENGINEERING
ATC MOBILE
SCALE:
ISSUE
DESIGNED BY:
DRAWN BY:
EDITED BY:
CHECKED BY:
1 2 3 4 5 6
A
1 2 3 4 5 6
B
C
D
E
A
B
C
D
E
SHEET OF
PLOT SCALE: D SIZE
.1
.0
.1 \E v o n \F a c E n g D e p \P ro je c ts
\F Y
E x e c u ti o n \1
-R e p a ir
R o o fs
B a s e
W id e \1
-R e c o a t
R o o fs
B a s e W id e
S
-D
W G
-R e c o a t
R o o fs
B a s e W id e
(S rv t
1/8" = 1'-0"
16926832
AVIONICS BLDG S55
EOH
RAC
S5516926832A201
A201
Elevation Plan
EOH
NCP
LT Brandon Taylor
ARCHITECTURAL
IN HOUSE
S5516926832A201
FEB2021
164 8268
SCALE: 1/8"=1'-0"
C4 Proposed Isometric View
1/8" = 1'-0"A101
A1
C1 Existing North Elevation
1/8" = 1'-0"A101
A1
B1 Existing East Elevation
1/8" = 1'-0"A101
A1
E1 Existing S Elevation
1/8" = 1'-0"A101
A1
A1 Existing West Elevation
| 13445274-100% DWG-Base Wide Roof Repair |
| Sheets |
| G001 - Title Sheet |
| 15950235-100% DWG-Repair Roof Wilks Hall (S63) |
| Sheets |
| A101 - Roof Plan |
| A201 - Elevations |
| A901 - ISOMETRIC |
| G101 - Cover Sheet |
| 7817168-100% DWG-Repair Roof Fitness Center Locker Room (S06) |
| Sheets |
| A101 - Roof Plan |
| A201 - Elevations |
| A901 - Isometric Roof Plan |
| G101 - Cover Sheet |
| 7820821-100% DWG-Repair Roof Facilities Engineering (S10) |
| Sheets |
| A101 - Existing Roof Plan |
| A201 - Existing Elevation |
| A501 - Detail |
| A901 - Proposed ISOMETRIC |
| G101 - Title Sheet |
| 16926832-100% DWG-Recoat Roofs Base Wide (S55) |
| Sheets |
| A101 - Existing Plan |
| A201 - Elevation Plan |
| G101 - Cover Sheet |
| 7817168-100% DWG-Repair Roof Fitness Center Locker Room (S06).pdf |
| Sheets |
| A101 - Roof Plan |
| A201 - Elevations |
| A901 - Isometric Roof Plan |
| G101 - Cover Sheet |
| 2021-02-16T15:54:27-0600 | |
| HOUSEN.EVON.O.1026573064 |
| 2021-02-24T12:47:03-0600 | |
| ANDERSON.JERRY.W.1247840288 |
| 2021-02-18T16:13:43-0600 | |
| CONFER.RONALD.A.1031942639 |
| 2021-02-22T15:40:20-0600 | |
| TAYLOR.BRANDON.MATTHEW.1386408706 |
| 2021-02-16T16:09:34-0600 | |
| HOUSEN.EVON.O.1026573064 |
| 2021-03-18T09:12:47-0500 | |
| ANDERSON.JERRY.W.1247840288 |
| 2021-02-18T16:17:37-0600 | |
| CONFER.RONALD.A.1031942639 |
| 2021-02-22T15:41:27-0600 | |
| TAYLOR.BRANDON.MATTHEW.1386408706 |
| 2021-02-16T16:09:59-0600 | |
| HOUSEN.EVON.O.1026573064 |
| 2021-03-18T09:18:16-0500 | |
| ANDERSON.JERRY.W.1247840288 |
| 2021-02-18T16:18:58-0600 | |
| CONFER.RONALD.A.1031942639 |
| 2021-02-22T15:43:09-0600 | |
| TAYLOR.BRANDON.MATTHEW.1386408706 |
| 2021-02-16T16:10:44-0600 | |
| HOUSEN.EVON.O.1026573064 |
| 2021-03-18T09:20:49-0500 | |
| ANDERSON.JERRY.W.1247840288 |
| 2021-03-22T10:27:09-0500 | |
| CONFER.RONALD.A.1031942639 |
| 2021-02-22T15:49:25-0600 | |
| TAYLOR.BRANDON.MATTHEW.1386408706 |
| 2021-02-16T16:11:27-0600 | |
| HOUSEN.EVON.O.1026573064 |
| 2021-03-18T09:22:25-0500 | |
| ANDERSON.JERRY.W.1247840288 |
| 2021-03-22T10:28:46-0500 | |
| CONFER.RONALD.A.1031942639 |
| 2021-02-22T15:50:45-0600 | |
| TAYLOR.BRANDON.MATTHEW.1386408706 |
File details come from the government source that posted it. Updated .