Drawings N Whitehill Drive Drainage Improvement - FULL SET_SIGNED_Part1.pdf

PDF 41 MB Posted

Attached to
North Whitehill Drive Drainage Improvements Project-Phase 1
Solicitation number
59659
Issued by
Petersburg City, Virginia

About this file

The document is a set of drawings for the North Whitehill Drive Drainage Improvements Project-Phase 1 in Petersburg City, Virginia. The work involves the installation of grassy swales. This project is being undertaken by the City of Petersburg.

The drawings provide detailed specifications and plans for the drainage improvement work, including the placement and dimensions of the grassy swales. No information is provided regarding response dates, due dates, site visits, bidder's meetings, award dates, or the term of the contract. Pricing terms, set asides, incumbents, funding requirements, and other salient details are also not included in the drawings.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DRAINAGE NOTES

1. ALL PIPE JOINTS ARE TO BE WATERTIGHT ACCORDING TO VDOT STANDARDS AND

SPECIFICATIONS.

2. ALL STORM SEWER PIPES INDICATED ON PLANS SHALL MEET THE STANDARDS LISTED

BELOW, UNLESS NOTED OTHERWISE:

2.1. PERFORATED PVC PIPES SHALL BE 6-INCH RIGID SCHEDULE 40 PVC WITH 3/8-INCH

PERFORATIONS.

2.2. SOLID WALL (NON-PERFORATED) PVC PIPES SHALL BE 6-INCH RIGID SCHEDULE 40

PVC.

3. IF DURING CONSTRUCTION THE EXISTING STORM SEWER OR DITCH INVERT ELEVATIONS

SHOWN ON THESE PLANS ARE FOUND TO DIFFER SIGNIFICANTLY FROM THE ELEVATIONS

IN THE FIELD, NOTIFY THE ENGINEER IMMEDIATELY FOR AN ADJUSTMENT IN

ELEVATIONS.

4. ALL PIPE LENGTHS SHOWN ON PLANS ARE MEASURED FROM CENTER OF CHAMBER TO

CENTER OF CHAMBER, UNLESS NOTED OTHERWISE.

5. TRENCH BOXES SHALL BE USED WHERE EXCAVATIONS EXCEED 5 FEET DEEP.

GENERAL CONSTRUCTION NOTES

1. UTILITY LOCATION SHOWN ON THESE PLANS IS FOR REFERENCE ONLY. PRIOR TO

CONSTRUCTION THE CONTRACTOR SHALL VERIFY THE LOCATION AND ELEVATION OF

ALL UNDERGROUND UTILITIES SHOWN ON THE PLANS IN AREAS OF CONSTRUCTION.

2. CONTRACTOR SHALL COORDINATE WITH THE LOCAL UTILITY COMPANIES PRIOR TO

CONSTRUCTING PORTIONS OF WORK IMMEDIATELY ADJACENT TO UTILITY STRUCTURES.

THE CONTRACTOR IS RESPONSIBLE FOR REPAIRING ANY UNDERGROUND LINES,

FACILITIES, AND STRUCTURES DAMAGED AS A RESULT OF CONSTRUCTION ACTIVITY.

THE COSTS OF POLE AND/OR OTHER STRUCTURE STABILIZATION DURING WORK SHALL

BE BORNE BY THE CONTRACTOR AND INCLUDED IN THE BID FOR THE PROJECT.

3. THE CONTRACTOR SHALL CALL "MISS UTILITY" AT 1-800-552-7001 A MINIMUM OF 72

HOURS PRIOR TO CONSTRUCTION. CONTRACTOR SHALL VERIFY LOCATION AND

ELEVATION OF ALL UNDERGROUND UTILITIES SHOWN ON PLANS IN AREAS OF

CONSTRUCTION PRIOR TO STARTING WORK. CONTACT THE ENGINEER IMMEDIATELY IF

LOCATION OR ELEVATION IS DIFFERENT FROM THAT SHOWN ON THE PLAN, IF THERE

APPEARS TO BE A CONFLICT, AND UPON DISCOVERY OF ANY UTILITY NOT SHOWN ON

PLAN.

4. ALL GRADING SHALL PROVIDE SURFACE DRAINAGE THAT PREVENTS STANDING WATER

AND PROVIDES POSITIVE DRAINAGE TO THE STORM DRAINAGE INLETS, DITCHES, OR

OTHER POINTS OF STORMWATER DISCHARGE. ALL DISTURBED AREAS SHALL MEET

EXISTING GRADING WITH SMOOTH TRANSITIONS.

5. THE CONTRACTOR SHALL PAY FOR AND OBTAIN ALL REQUIRED PERMITS AND DELIVER

COPIES TO THE OWNER AT THE PRE-CONSTRUCTION MEETING.

6. THE CONTRACTOR SHALL HAVE A COMPLETE SET OF CONTRACT DOCUMENTS,

APPROVALS AND PERMITS, ON THE JOB SITE AT ALL TIMES.

7. CONTRACTOR SHALL NOTIFY PROPERTY OWNERS IN WRITING OF ANY WORK

SCHEDULED ADJACENT TO OR THROUGH THEIR PROPERTY A MINIMUM OF ONE WEEK IN

ADVANCE PRIOR TO THE COMMENCEMENT OF ANY STAKING OR CONSTRUCTION

ACTIVITY.

8. HORIZONTAL DATUM: NAD 83

VERTICAL DATUM: NAVD 88

9. NO CONSTRUCTION, EXCAVATION, OR DEMOLITION SHALL BEGIN UNTIL INITIAL EROSION

& SEDIMENT CONTROL (ESC) MEASURES ARE INSTALLED & APPROVED. ALL EROSION

CONTROL MEASURES SHALL BE IN ACCORDANCE WITH THE LATEST VERSION OF THE

VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK .

10. ALL CONSTRUCTION ACTIVITIES SHALL PROCEED ACCORDING TO THE LATEST OSHA

REGULATIONS.

11. THIS PROJECT SHALL BE CONSTRUCTED IN ACCORDANCE WITH VDOT ROAD AND BRIDGE

STANDARDS DATED 2020, ROAD AND BRIDGE SPECIFICATIONS DATED 2020, REVISED

JULY 2022, WORK AREA PROTECTION MANUAL DATED 2011 (REVISION 2.1: NOVEMBER 1,

2020) AND AS AMENDED BY CONTRACT PROVISIONS.

12. THE CONTRACTOR SHALL MAINTAIN SAFE VEHICULAR AND PEDESTRIAN ACCESS TO ALL

PROPERTIES THROUGHOUT CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE

FOR THE INSTALLATION AND MAINTENANCE OF ANY AND ALL SAFETY CONTROL DEVICES

IN ACCORDANCE WITH THE PROVIDED MAINTENANCE OF TRAFFIC PLAN AND AS DEEMED

NECESSARY BY THE CITY AND THE ENGINEER.

13. NO MUD OR CONSTRUCTION DEBRIS SHALL BE ALLOWED TO ACCUMULATE ON ANY

PAVED STREET WHICH IS MAINTAINED BY THE STATE, COUNTY, CITY, OR VDOT.

14. ANY REQUIRED LANE AND/OR ROAD CLOSURES MUST BE APPROVED IN ADVANCE BY THE

CITY ENGINEER. A TEMPORARY EMERGENCY VEHICLE ACCESS ROUTE SHALL BE

INSTALLED AND APPROVED PRIOR TO ANY ROAD CLOSURE OF A STREET.

15. THE CONTRACTOR SHALL FOLLOW THE MAINTENANCE OF TRAFFIC PLANS AND NOTES

PROVIDED WITH THESE CONSTRUCTION DOCUMENTS.

16. SOIL STOCKPILES SHALL NOT BE PERMITTED ON-SITE. CONTRACTOR TO ENSURE ALL

EXCESS MATERIAL AND WASTE IS REMOVED OFFSITE DAILY. CONTRACTOR IS

RESPONSIBLE FOR LOCATING AND GAINING ALL REQUIRED PERMISSIONS & PERMITS

FOR PLACEMENT OF STOCKPILE OFFSITE.

17. THE CONTRACTOR SHALL PROVIDE ADDITIONAL TRAFFIC CONTROL AS DIRECTED BY THE

CITY ENGINEER AND/OR VDOT.

18. AT NO TIME SHALL CONSTRUCTION TAKE PLACE ON BOTH THE RIGHT AND LEFT SIDES

OF VEHICLES UNLESS SPECIFIED BY THE CITY, VDOT OR THE ENGINEER.

19. DUE TO THE SURROUNDING RESIDENTIAL PROPERTIES, NIGHT WORK WILL ONLY BE

PERMITTED FOR SPECIAL SITUATIONS. CITY APPROVAL IS REQUIRED PRIOR TO NIGHT

TIME OPERATIONS. ANY CONDITIONS REQUIRED BY THE CITY FOR NIGHT TIME

OPERATIONS SHALL BE ADHERED TO BY THE CONTRACTOR.

20. MAILBOXES AND STREET SIGNS SHALL BE REPLACED IMMEDIATELY AFTER AREA IS

BACKFILLED AND NO LATER THAN THE CLOSE OF EACH WORK DAY, EVEN IF

REPLACEMENT IS ONLY TEMPORARY.

21. EXCESS EXCAVATION TO BE LEGALLY DISPOSED AT AN APPROVED DISPOSAL SITE.

BORROW MATERIAL SHALL BE OBTAINED FROM AN APPROPRIATELY PERMITTED SITE.

22. STAKING FOR CONSTRUCTION, TO ASSURE PROPER LOCATION OF PROJECT

COMPONENTS, SHALL BE PERFORMED BY A CERTIFIED LAND SURVEYOR IN THE

COMMONWEALTH OF VIRGINIA.

23. ALL EXISTING PROPERTY MARKERS ARE TO REMAIN UNDISTURBED. IF DISTURBANCE

OCCURS, REPLACEMENT MUST BE PERFORMED BY A CERTIFIED LAND SURVEYOR AT

THE CONTRACTOR'S EXPENSE

24. PREVIOUSLY ARRANGED ACCESS EASEMENTS, STAGING AREAS, STORAGE AREAS, ETC.,

IF ANY, ARE SHOWN ON THE DRAWINGS. ADDITIONAL LAND USE RIGHTS SHALL BE THE

RESPONSIBILITY OF THE CONTRACTOR.

25. WORK AREAS SHALL BE KEPT AT ALL TIMES FREE OF DEBRIS AND HAZARDOUS

MATERIAL TO THE SATISFACTION OF THE INSPECTOR.

26. THE CONTRACTOR SHALL COORDINATE STORAGE OF MATERIALS, PARKING OF

VEHICLES, AND RESTRICTIONS OF WORK WITH THE INSPECTOR.

27. ALL DRIVEWAYS, SIDEWALKS, STREET SIGNS, YARD LIGHTS, MAILBOXES, SIGNS, AND

FENCES SO SPECIFIED ARE TO BE PRESERVED OR RESTORED AT THE CONTRACTOR'S

EXPENSE TO ORIGINAL CONDITION OR BETTER PER PLAN SHEETS, OR AS DIRECTED BY

THE CITY OF PETERSBURG REPRESENTATIVE TO THE SATISFACTION OF THE CITY'S

REPRESENTATIVE.

28. ALL WORK SHALL BE SUBJECT TO INSPECTION BY STATE AND LOCAL INSPECTORS.

29. FINAL ACCEPTANCE BY THE OWNER AND STATE WILL NOT BE MADE UNTIL ALL WORK

SHOWN ON THE APPROVED CONTRACT DOCUMENTS IS COMPLETED, INCLUDING PAVING,

GRADING AND ALL ADJUSTMENTS.

30. THE CONTRACTOR SHALL MAINTAIN SAFE VEHICULAR AND PEDESTRIAN ACCESS TO ALL

PROPERTIES THROUGHOUT CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE

FOR THE INSTALLATION AND MAINTENANCE OF ANY AND ALL SAFETY CONTROL DEVICES

IN ACCORDANCE WITH THE PROVIDED MAINTENANCE OF TRAFFIC PLAN AND AS DEEMED

NECESSARY BY THE CITY AND THE ENGINEER.

31. THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING FENCING AND/OR SIGNAGE AS

NECESSARY TO INFORM THE PUBLIC ABOUT AND TO PROTECT THE PUBLIC FROM

ACCESS TO THE CONSTRUCTION ACTIVITIES.

CONSTRUCTION SEQUENCE

1. CONSTRUCT PROJECT ACCORDING TO THE SEQUENCE OF CONSTRUCTION DESCRIBED

BELOW. THE CONTRACTOR SHALL NOT DEVIATE FROM THIS SEQUENCE UNLESS PRIOR

APPROVAL IS OBTAINED FROM THE CITY OF PETERSBURG DEPARTMENT OF PUBLIC

WORKS.

2. ACQUIRE ALL PERMITS PRIOR TO CONSTRUCTION. ALL FEES ASSOCIATED WITH PERMITS

SHALL BE PAID BY THE CONTRACTOR UNLESS OTHERWISE SPECIFIED.

3. VERIFY THE HORIZONTAL AND VERTICAL LOCATION OF ALL EXISTING UTILITIES PRIOR TO

THE START OF CONSTRUCTION.

4. AN ON-SITE PRE-CONSTRUCTION CONFERENCE SHALL BE HELD PRIOR TO ANY WORK

COMMENCING ON THE PROJECT. THE REQUEST TO SCHEDULE THE PRE-CONSTRUCTION

CONFERENCE SHALL BE MADE BY THE CONTRACTOR TO THE CITY A MINIMUM OF 48

HOURS PRIOR TO THE CONFERENCE DATE. A CERTIFIED RESPONSIBLE LAND DISTURBER

(CRLD) MUST BE PRESENT AT THE ON-SITE MEETING WITH THE CITY INSPECTOR.

5. THE CONTRACTOR SHALL DEVELOP A UTILITIES RELOCATION PLAN, AS NECESSARY.

SEQUENCE RELOCATION FOR THE MOST EFFICIENT CONSTRUCTION TO AVOID DELAYS.

NO ADDITIONAL COMPENSATION WILL BE ALLOWED FOR ANY DELAYS RESULTING FROM

THE CONTRACTOR'S FAILURE TO PROPERLY DETERMINE CONFLICTS WITH UTILITIES AND

ADJUSTING THE UTILITY IN ADVANCE OF THE WORK.

6. AFTER THE PRE-CONSTRUCTION MEETING, THE INITIAL EROSION AND SEDIMENT

CONTROL MEASURES (SAFETY FENCE, INLET PROTECTION) SHALL BE INSTALLED IN

ACCORDANCE WITH THE OVERALL EROSION AND SEDIMENT CONTROL PLAN (SEE SHEET

C3.2). LAND DISTURBANCE OUTSIDE THE PRELIMINARY LIMITS OF DISTURBANCE MAY

NOT OCCUR UNTIL THE INITIAL EROSION AND SEDIMENTATION CONTROL MEASURES

HAVE BEEN APPROVED BY THE CITY'S INSPECTOR.

7. PERFORM CONSTRUCTION SURVEY STAKEOUT FOR PROPOSED IMPROVEMENTS. ALL

SURVEYING OPERATIONS MUST BE PERFORMED BY A VIRGINIA LICENSED SURVEYOR.

8. VERIFY ALL TIE IN INVERTS PRIOR TO CONSTRUCTION AND NOTIFY THE ENGINEER

IMMEDIATELY SHOULD ANY INVERT ADJUSTMENTS BE REQUIRED.

9. CONSTRUCT GRASSED SWALE AS INDICATED ON THE PLANS.

10. THE CONTRACTOR SHALL SEED DISTURBED AREAS AS SPECIFIED FOR PERMANENT

STABILIZATION AT REGULAR INTERVALS AS CONSTRUCTION PROGRESSES. TEMPORARY

SEEDING SHALL BE USED IN DISTURBED AREAS THAT WILL REMAIN DORMANT FOR A

PERIOD OF TIME GREATER THAN 14 DAYS. THE CONTRACTOR IS TO WATER NEWLY

SEEDED AREAS DAILY TO ENSURE GERMINATION AND SUPPLY ADEQUATE MOISTURE

THEREAFTER UNTIL PROJECT HAS BEEN DEEMED COMPLETE BY THE CITY.

11. TEMPORARY EROSION CONTROL MEASURES SHALL BE MAINTAINED DURING

CONSTRUCTION ACCORDING TO THE LATEST VERSION OF THE VA EROSION AND

SEDIMENT CONTROL HANDBOOK.

11.1. IN GENERAL, ALL ESC MEASURES SHALL BE CHECKED DAILY AND AFTER EACH

RUNOFF PRODUCING EVENT.

11.2. ADDITIONAL ESC MEASURES SHALL BE INSTALLED AS REQUIRED OR DIRECTED BY

THE CITY OR ENGINEER. ALL PERMIT CONDITIONS SHALL BE MET.

12. EROSION CONTROL MEASURES SHALL BE REMOVED ONLY UPON APPROVAL FROM THE

CITY INSPECTOR.

13. ONCE ALL ESC MEASURES HAVE BEEN REMOVED AND THE SITE HAS BEEN RELEASED BY

THE CITY INSPECTOR, CONTRACTOR IS TO CONTACT THE ENGINEER TO COMPLETE THE

CITY'S SWM/BMP CERTIFICATION FORM. CONTRACTOR TO REMOVE ALL SEDIMENT OR

DEBRIS IN THE BMP PRIOR TO CERTIFICATION.

EXIST. STONE BASE

VARIABLE DEPENDING ON

EXTENT OF IMPACT

** 6" CRUSHER RUN

#26 AGGREGATE

AREA STONE REPLACEMENT DETAIL

GRAVEL DRIVE & GRAVEL PARKING

NO SCALE

EXIST. ROADWAY

W = VARIABLE WIDTH PER EXISTING CONDITIONS.

H = 3' PER SURVEYED FIELD CONDITIONS.

NOTE: CONTRACTOR TO REPLACE FENCE HEIGHT & GATE WIDTH IN KIND PER EXISTING CONDITIONS.

CONTRACTOR SHALL INSTALL HINGES SUCH THAT GATES OPEN INWARDLY TO PROPERTY, PER CITY OF

PETERSBURG CODE OF ORDINANCES SECTION 98-122.

REPLACEMENT DETAIL

CHAIN LINK FENCING & GATE

NO SCALE

LINE POST

CLASS A-3

CONCRETE

FOOTING

12"

3'

H

TOP RAIL

WIRE TIE

LINE POST CAP

TENSION

BAND

RAIL END

RAIL END BAND

GATE

FORK

LATCH

GATE POST CAP

GATE

POST

HOG RING TENSION WIRE

FASTENER (24" O.C.)

BOTTOM

TENSION

WIRE

TENSION

BAR

GATE POST

HINGE

GATE FRAME

HINGE

W

STEEL FABRIC

10' MAX

*FILTER FABRIC NOT SHOWN FOR CLARITY

OBSERVATION WELLS TO INCLUDE THE FOLLOWING:

1. ALL UNDERDRAIN AND CLEANOUT PIPING SHALL BE SCHEDULE 40 SMOOTH WALL PVC PIPE.

2. FOR AN UNDERGROUND FLUSH MOUNTED OBSERVATION WELL / CLEANOUT, PROVIDE A TUBE

MADE OF NON-CORROSIVE MATERIAL, SCHEDULE 40 OR EQUAL, WITH AN INSIDE DIAMETER OF AT

LEAST 6 INCHES.

3. THE TUBE SHALL HAVE A FACTORY ATTACHED CAST IRON OR HIGH IMPACT PLASTIC COLLAR

WITH RIBS TO PREVENT ROTATION WHEN REMOVING SCREW TOP LID. THE SCREW TOP LID

SHALL BE CAST IRON OR HIGH IMPACT PLASTIC THAT WILL WITHSTAND ULTRA-VIOLET RAYS.

4. THE DEPTH OF INVERT SHALL BE MARKED ON CAP.

5. ALL FITTINGS SHALL BE GASKETED.

6. FOR PERFORATED PIPE, A MINIMUM OF 4 ROWS OF PERFORATIONS SHALL BE PROVIDED AROUND

THE DIAMETER OF THE PIPE. PERFORATIONS SHALL BE PLACED 6-IN ON CENTER WITHIN EACH

ROW FOR THE ENTIRE LENGTH OF THE DRAINAGE LATERAL. PERFORATIONS SHALL BE 3/8-IN DIA.

VENTED PANELLA TYPE CLEANOUT WITH

COUNTERSUNK HEAD

SCREW TOP LID

FINISHED GRADE

DRY SWALE CLEANOUT DETAIL

NOT TO SCALE

DEPTH OF INVERT

MARKED ON TOP LID

45-DEGREE WYE

SOLID WALL, 6"X'6"X6"

FILTER MEDIA

SECTION

12"

MIN

45-DEGREE

ELBOW

(SOLID WALL)

CHOKING STONE

(#8 OR #89,

WASHED)

STONE LAYER

(#57, WASHED)

PERFORATED U/D

PVC PIPE

6" PVC CAP

PVC CLEANOUT

RISER

SOLID WALL PIPE

THROUGH MEDIA

** METHOD OF PAYMENT FOR STONE SHALL BE AS #26 CRUSHER RUN, AS SPECIFIED

JOB NO.

SHEET NO.

SCALE

DESIGNED BY

CHECKED BY

D A T E

DRAWN BY

DATE

R E V I S I O

N D

E S C R I P T I O

N

T h e s e p la n s a n d a s s o c ia te d d o c u m e n ts a re t h e e x c lu s iv e p ro p e rt y o f T

IM

M

O N

S G

R O

U P a n d m a y n o t b e r e p ro d u c e d i n w h o le o r in p a rt a n d s h a ll n o t b e u s e d f o r a n y p u rp o s e w h a ts o e v e r, i n c lu s iv e b u t n o t lim it e d t o c o n s tr u c ti o n b id d in g a n d /o r c o n s tr u c ti o n s ta k in g w it h o u t th e e x p re s s w ri tt e n c o n s e n t o f

T

IM

M O

N S

G R

O U

P

04/28/2023

N W

H I T E H

I L L D

R I V E D

R A I N

A G

E I

M P R O

V E M

E N

T C I T Y O

F P

E T E R S B U

R G

V

I R G

I N

I A

51547

L

\5

-W h it e h ill

D r\

D W

G \S w a le

P h a s e \S h e e t\

C D

\5 C

-1 .0

-N T

D T

.d w g P lo tt e d o n

/8 /2

:5 P

M b y K e ls e y R e d m a n

C1.0

C O

N S T R U

C T I O

N N

O T E S

K. REDMAN

S. REEVES

M. CLAUD

AS SHOWN

VDOT ROAD AND BRIDGE STANDARD DETAILS

NYLOPLAST (OR APPROVED EQUAL) DETAILS

*OR APPROVED EQUAL

*OR APPROVED EQUAL

*OR APPROVED EQUAL

*OR APPROVED EQUAL

HDPE TO MANHOLE ADAPTER DETAIL

*OR APPROVED EQUAL

*OR APPROVED EQUAL

*OR APPROVED EQUAL

6" SUMP

DEPTH

36"

STR. U7

36"

36"

10"

6" NO. 26 CRA

BEDDING

NO.

6 REBAR

JOB NO.

SHEET NO.

SCALE

DESIGNED BY

CHECKED BY

D A T E

DRAWN BY

DATE

R E V I S I O

N D

E S C R I P T I O

N

T h e s e p la n s a n d a s s o c ia te d d o c u m e n ts a re t h e e x c lu s iv e p ro p e rt y o f T

IM

M

O N

S G

R O

U P a n d m a y n o t b e r e p ro d u c e d i n w h o le o r in p a rt a n d s h a ll n o t b e u s e d f o r a n y p u rp o s e w h a ts o e v e r, i n c lu s iv e b u t n o t lim it e d t o c o n s tr u c ti o n b id d in g a n d /o r c o n s tr u c ti o n s ta k in g w it h o u t th e e x p re s s w ri tt e n c o n s e n t o f

T

IM

M O

N S

G R

O U

P

04/28/2023

N W

H I T E H

I L L D

R I V E D

R A I N

A G

E I

M P R O

V E M

E N

T C I T Y O

F P

E T E R S B U

R G

V

I R G

I N

I A

51547

L

\5

-W h it e h ill

D r\

D W

G \S w a le

P h a s e \S h e e t\

C D

\5 C

-1 .0

-N T

D T

.d w g P lo tt e d o n

/8 /2

:5 P

M b y K e ls e y R e d m a n

C1.1

C O

N S T R U

C T I O

N D

E T A I L S

K. REDMAN

S. REEVES

M.CLAUD

NO SCALE

S A N

S A N

S A N

S A N

S A N

S A N

S A N

S A N

" R

C P

12" RCP

W W

W W

W W

W W

W W

W W

W W

W

W W

W W

W W

W W

W W

W

WWWWW

S A N

S A N

S A N

S A N

S A N

S A N

S A N

S A N

S A N

S A N

S A N

S A N

S A N

S A N

S A N

S A N

X

X

X

X

OHU

OHU

O H U

OHU

OHU

OHU

OHU

O H U

X

OHU

G

X

X

OHU OHU OHU OHU

O H U

O H U

O H U

O H U

O H U

OHU

O H U

OHU

OHU

X

X

X X

OHU

OHU

O H U

OHU

X

O H U

O H U

O H U

O H U

OHU

OHU

G G

G G

G

W W

W W

WWWW

W W

W

G G

G

LIMITS OF DETAILED SURVEY

JOB NO.

SHEET NO.

SCALE

DESIGNED BY

CHECKED BY

D A T E

DRAWN BY

DATE

R E V I S I O

N D

E S C R I P T I O

N

T h e s e p la n s a n d a s s o c ia te d d o c u m e n ts a re t h e e x c lu s iv e p ro p e rt y o f T

IM

M

O N

S G

R O

U P a n d m a y n o t b e r e p ro d u c e d i n w h o le o r in p a rt a n d s h a ll n o t b e u s e d f o r a n y p u rp o s e w h a ts o e v e r, i n c lu s iv e b u t n o t lim it e d t o c o n s tr u c ti o n b id d in g a n d /o r c o n s tr u c ti o n s ta k in g w it h o u t th e e x p re s s w ri tt e n c o n s e n t o f

T

IM

M O

N S

G R

O U

P

04/28/2023

N W

H I T E H

I L L D

R I V E D

R A I N

A G

E I

M P R O

V E M

E N

T C I T Y O

F P

E T E R S B U

R G

V

I R G

I N

I A

51547

L

\5

-W h it e h ill

D r\

D W

G \S w a le

P h a s e \S h e e t\

C D

\5 C

-2 .0

-K E

Y P

.d w g P lo tt e d o n

/8 /2

:0 P

M b y K e ls e y R e d m a n

C2.0

K E Y P

L A N

K. REDMAN

S. REEVES

M. CLAUD

AS SHOWN

NAD 83

SCALE 1"=20'

40'20'

SHEETS C2.1, C3.2, C4.0

NOTE:

PLANIMETRIC DATA SHOWN ON THIS SHEET, INCLUDING PARCELS, BUILDING FOOTPRINTS, RIGHT OF WAY, ETC, TAKEN FROM CITY OF PETERSBURG GIS DATA AND SHALL BE CONSIDERED APPROXIMATE.

TOPOGRAPHY SHOWN IS A COMPOSITE SURFACE DEVELOPED FROM 2014 VGIN LIDAR AND SURVEY DATA

S A N

S A N

S A N

S A N

S A N

S A N

S A N

S A N

S A N

S A N

S A N

X

X X

X

XX

XXX

XX XX

O H U

OHU

OHU

OHU

OHU

OHU

O H U

O H U

OHU

OHU

XXX

XX

OHU OHU OHU OHU OHU OHU OHU

X

X

X X

X

X X

X X

X

OHU

OHU

OHU

OHU

OHU

OHU

O H U

O H U

O H U

OHU

X

OHU

O H U

O H U

O H U

T

O P

O G

R A

P H

IC

S

U R

V E

Y

2021 TOPOGRAPHIC

SURVEY

T

O P

O G

R A

P H

IC

S U

R V

E Y

T

O P

O G

R A

P H

IC

L

ID

A

R D

A T

A A

N D

G

IS

M A

P P

IN

G

2014 TOPOGRAPHIC LIDAR

DATA AND GIS MAPPING

T

O P

O G

R A

P H

IC

L

ID

A

R

D A

T A

A N

D G

IS

M

A P

P

IN

G

W W

W W

G G

G G

W W

W

W

WWWWWW

W

W W

W W

UGT

G G

G G

G

CAUTION:

OVERHEAD POWER

SEE UTILITY NOTE

REMOVE

24" TREE

SEE DEMOLITION

NOTE 1

CAUTION:

OVERHEAD POWER

SEE UTILITY NOTE

REMOVE 106 LF

OF 3' CHAIN LINK

FENCING & GATES

REMOVE 119 LF

OF 3' CHAIN LINK

FENCING

REMOVE GATE B

SEE NOTE 2

REMOVE GATE A

SEE NOTE 2

REMOVE GATE C

SEE NOTE 2

REMOVE GATE D

SEE NOTE 2

REMOVE &

STORE EX.

NEIGHBORHOOD

WATCH SIGN

UNDERGROUND UTILITY NOTES

1. SUE WORK COMPLETED BY TIMMONS GROUP IN MARCH OF 2022.

2. THERE ARE ABANDONED UNDERGROUND UTILITY LINES IN PROJECT LIMITS.

3. THERE MAY BE UNDERGROUND UTILITIES THAT ARE NON-CONDUCTIVE INSIDE THE PROJECT LIMITS.

4. ALL SIZES AND TYPES OF UNDERGROUND UTILITY LINES ARE TAKEN FROM REFERENCE MAPPING.

5. ALL UNDERGROUND UTILITIES LOCATED DEPICTED AS QLB UNLESS OTHERWISE NOTED.

UTILITY OWNERS:

- CITY OF PETERSBURG WATERLINE

- VERIZON TELEPHONE

- COLUMBIA GAS OF VIRGINIA NATURAL GAS

TOPOGRAPHICAL SURVEY NOTES:

1. TOPOGRAPHICAL SURVEY PREPARED BY TIMMONS GROUP UNDER THE DIRECT AND RESPONSIBLE CHARGE OF, GREG McGLOTHIN, L.S FROM AN ACTUAL GROUND SURVEY MADE 01-21-2022, 01-24-2022, AND 01-28-2022. THE MERIDIAN SOURCE OF THIS TOPOGRAPHIC

SURVEY IS BASED ON (VIRGINIA STATE PLANE COORDINATES, SOUTH ZONE, HORIZONTAL) NAD 83. ELEVATIONS ARE BASED ON NAVD 88.

DATUM ESTABLISHED BY RTK RTCM-REF 0568.

2. MAPPING (BUILDING FOOTPRINTS, SIDEWALK FOOTPRINTS, PARCEL LINES) LOCATED OUTSIDE OF THE LIMITS OF TOPOGRAPHIC

SURVEY IS TAKEN FROM CITY OF PETERSBURG GIS DATA AND SHALL BE CONSIDERED APPROXIMATE.

DEMOLITION NOTES

1. CONTRACTOR SHALL COORDINATE WITH DOMINION POWER TO ESTABLISH AN OVERHEAD UTILITY PROTECTION PLAN. CONTRACTOR SHALL

FOLLOW ALL REQUIREMENTS SET FORTH BY DOMINION POWER FOR UTILITY PROTECTION.

2. GATE PANEL HEIGHTS AND WIDTHS PER SURVEYED CONDITIONS AS SPECIFIED BELOW:

A. SINGLE PANEL, 3' HEIGHT x 3' WIDTH

B. TWO PANELS, 3' HEIGHT x 5.5' WIDTH EACH

C. SINGLE PANEL, 3' HEIGHT x 5' WIDTH

D. SINGLE PANEL, 3' HEIGHT x 3' WIDTH

E. SINGLE PANEL, 3' HEIGHT X 3' WIDTH

*SURVEYED INVERT ELEVATIONS

WERE ADJUSTED IN THE

HYDRAULIC MODELS TO

ESTABLISH POSITIVE DRAINAGE

THROUGH THE STORM SEWER

SYSTEM.

*41.20'

*41.25'

X

DEMOLITION LEGEND

REMOVE PIPE

REMOVE EX. CHAIN

LINK FENCE

JOB NO.

SHEET NO.

SCALE

DESIGNED BY

CHECKED BY

D A T E

DRAWN BY

DATE

R E V I S I O

N D

E S C R I P T I O

N

T h e s e p la n s a n d a s s o c ia te d d o c u m e n ts a re t h e e x c lu s iv e p ro p e rt y o f T

IM

M

O N

S G

R O

U P a n d m a y n o t b e r e p ro d u c e d i n w h o le o r in p a rt a n d s h a ll n o t b e u s e d f o r a n y p u rp o s e w h a ts o e v e r, i n c lu s iv e b u t n o t lim it e d t o c o n s tr u c ti o n b id d in g a n d /o r c o n s tr u c ti o n s ta k in g w it h o u t th e e x p re s s w ri tt e n c o n s e n t o f

T

IM

M O

N S

G R

O U

P

04/28/2023

N W

H I T E H

I L L D

R I V E D

R A I N

A G

E I

M P R O

V E M

E N

T C I T Y O

F P

E T E R S B U

R G

V

I R G

I N

I A

51547

L

\5

-W h it e h ill

D r\

D W

G \S w a le

P h a s e \S h e e t\

C D

\5 C

-2 .0

-E X

S T

.d w g P lo tt e d o n

/8 /2

:0 P

M b y K e ls e y R e d m a n

C2.1

E X I S T I N

G C

O N

D I T I O

N S

D E M

O L I T I O

N P

L A N

K. REDMAN

S. REEVES

M. CLAUD

AS SHOWN

NAD 83

SCALE 1"=20'

40'20'

EROSION CONTROL NARRATIVE

PROJECT DESCRIPTION

THIS PROJECT IS LOCATED IN THE LAKEMONT NEIGHBORHOOD IN THE CITY OF PETERSBURG AND

EXTENDS ALONG NASH STREET. THE PURPOSE OF THIS PROJECT IS TO PROVIDE WATER QUALITY

TREATMENT WITH THE CONSTRUCTION OF A DRY SWALE RETROFIT ALONG NASH ST. PROJECT EXTENTS

TERMINATE AT SOUTH WHITEHILL AVE, EAST OF THE INTERSECTION OF NASH STREET, WHERE THE

PROPOSED SWALE WILL TIE BACK IN TO THE EXISTING STORM SEWER. THE TOTAL DISTURBED AREA

WITHIN THIS PROJECT IS 0.09 AC.

EXISTING SITE CONDITIONS

THE PROJECT SITE IS LOCATED WITHIN THE CITY OF PETERSBURG RIGHT-OF-WAY. LAND COVER WITHIN

THE SITE CONSISTS OF ASPHALT PAVEMENT, MANAGED GRASS AREAS, AND DRIVEWAY CONNECTIONS TO

THE ROADWAY. EXISTING TOPOGRAPHY WITHIN THE SITE IS CHARACTERIZED WITH FLAT SLOPES AND

WITH LONGITUDINAL SLOPES OF LESS THAN 0.5%. DRAINAGE FROM THE ROADWAY IS COLLECTED WITHIN

A STORM DRAIN SYSTEM AND WITHIN ROADSIDE SWALES.

ADJACENT AREAS

TEMPORARY CONSTRUCTION EASEMENT WILL BE REQUIRED ON PARCEL IDs 004290011 AND 004290001.

THE SURROUNDING PROPERTY FOR THE PROJECT IS RESIDENTIAL LAND, RESIDENTIAL STRUCTURES, AND

ROADS.

OFF-SITE AREAS

ANY OFF-SITE LAND-DISTURBING ACTIVITY ASSOCIATED WITH THE PROJECT MUST HAVE AN APPROVED

ESC PLAN. CONTRACTOR SHALL PROVIDE DOCUMENTATION OF THE APPROVED ESC PLAN FOR EACH

OFF-SITE LAND-DISTURBING ACTIVITY.

SOILS

ALL SOILS WITHIN THE PROJECT SITE AND CONTRIBUTING DRAINAGE AREA ARE CLASSIFIED AS FOLLOWS:

MAP UNIT: 7B

EMPORIA-URBAN LAND COMPLEX, 0 TO 6 PERCENT SLOPES, HYDROLOGIC SOIL GROUP C. EMPORIA SOILS

HAVE A USDA TEXTURE OF SANDY LOAM, ARE WELL DRAINED, PERMEABILITY IS MODERATELY SLOW TO

SLOW, AND SURFACE RUNOFF INDEX IS MEDIUM TO HIGH.

MAP UNIT: 20

UDORTHENTS, 0 TO 25 PERCENT SLOPES. HYDROLOGIC SOIL GROUP C. UDORTHENT SOILS ARE

MODERATELY WELL DRAINED. SHRINK SWELL POTENTIAL IS LOW. THIS SOIL IS NOT FLOODED. IT IS NOT

PONDED. THERE IS NO ZONE OF WATER SATURATION WITHIN A DEPTH OF 72 INCHES.

CRITICAL AREAS

THERE ARE NO IDENTIFIED ONSITE CRITICAL AREAS. HOWEVER, THE ULTIMATE OUTFALL FOR THE

STORMWATER CONVEYANCE SYSTEM IS HARRISON CREEK (IMPAIRED WATERWAY), EAST OF THE PROJECT

SITE. THERE ARE ALSO DELINEATED WETLAND AREAS SOUTH OF THE NEIGHBORHOOD. PROJECT IS

LOCATED WITHIN REGULATED CHESAPEAKE BAY PRESERVATION AREA (REGULATED URBAN AREA).

MAINTENANCE OF EROSION AND SEDIMENT CONTROL MEASURES IS CRITICAL FOR PREVENTING THE

DISCHARGE OF SEDIMENT TO THESE AREAS.

EROSION AND SEDIMENT CONTROL MEASURES

UNLESS OTHERWISE INDICATED, ALL VEGETATIVE AND STRUCTURAL EROSION AND SEDIMENT CONTROL

PRACTICES SHALL BE CONSTRUCTED AND MAINTAINED ACCORDING TO MINIMUM STANDARDS AND

SPECIFICATIONS OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK (VESCH). THE MINIMUM

STANDARDS OF THE VESCH SHALL BE ADHERED TO UNLESS OTHERWISE WAIVED OR APPROVED BY A

VARIANCE BY LOCAL AUTHORITIES HAVING JURISDICTION.

1. SAFETY FENCE - 3.01

A PROTECTIVE BARRIER INSTALLED TO PREVENT ACCESS TO AN EROSION CONTROL MEASURE,

USED TO PROHIBIT UNDESIRABLE USE OF AN EROSION CONTROL MEASURE BY THE PUBLIC.

2. STORM DRAIN INLET PROTECTION - 3.07

THE INSTALLATION OF VARIOUS KINDS OF SEDIMENT TRAPPING MEASURES AROUND CURB

INLET STRUCTURES PRIOR TO PERMANENT STABILIZATION OF THE DISTURBED AREA; LIMITED

TO DRAINAGE AREAS NOT EXCEEDING ONE ACRE, AND NOT INTENDED TO CONTROL LARGE,

CONCENTRATED STORMWATER FLOWS.

3. TEMPORARY SEEDING - 3.31

TEMPORARY SEEDING SHALL BE USED ON ALL DISTURBED AREAS THAT WILL NOT BE BROUGHT

TO FINAL GRADE FOR MORE THAN 14 DAYS. TEMPORARY SEEDING SHALL ALSO BE USED ON ALL

CUT AND FILL SLOPES TO REMAIN EARTHEN. TEMPORARY SEEDING SHALL BE MAINTAINED UNTIL

PERMANENT SEEDING AND PERMANENT STABILIZATION IS ACHIEVED.

4. PERMANENT SEEDING - 3.32

PERMANENT SEEDING SHALL BE USED ON ALL CUT AND FILL SLOPES TO REMAIN EARTHEN TO

REDUCE EROSION AND DECREASE SEDIMENT YIELD FROM DISTURBED AREAS. PERMANENT

SEEDING WILL BE USED ON DISTURBED AREAS WHERE PERMANENT, LONG-LIVED VEGETATIVE

COVER IS NEEDED TO STABILIZE THE SOIL.

5. MULCHING - 3.35

APPLICATION OF PLANT RESIDUES OR OTHER SUITABLE MATERIALS TO THE SOIL SURFACE TO

PREVENT EROSION FROM RAINDROP IMPACT, AND TO FOSTER THE GROWTH OF VEGETATION BY

INCREASING AVAILBLE MOISTURE AND PROVIDING INSULATION AGAINST EXTREME HEAT AND

COLD.

6. SOIL STABILIZATION BLANKETS & MATTING - 3.36

INSTALLATION OF A PROTECTIVE COVERING (BLANKET) OR SOIL STABILIZATION MAT ON A

PREPARED PLANTING AREA OF A STEEP SLOPE, CHANNEL, OR SHORELINE TO AID IN EROSION

CONTROL ON CRITICAL AREAS. USE IN AREASE WHERE EROSION HAZARD IS HIGH OR IN

VEGETATED CHANNELS WHERE DESIGN VELOCITY EXCEEDS ALLOWABLE VELOCITY.

PERMANENT STABILIZATION

EXISTING LAND COVER IS PRIMARILY GRASSED RIGHT-OF-WAY, AS WELL AS GRAVEL AND ASPHALT. REFER

TO THE EROSION AND SEDIMENT CONTROL PLAN SHEET (SHEET 3.1) FOR MORE DETAILS.

ESC CONTROL MEASURE MAINTENANCE (REFER TO "MINIMUM STANDARDS"

FOR ADD. INFORMATION).

ALL ESC MEASURES SHALL BE MAINTAINED UNTIL PERMANENT STABILIZATION IS ACHIEVED IN

ACCORDANCE WITH THE CITY OF PETERSBURG ENVIRONMENTAL INSPECTOR.

1. SAFETY FENCE - 3.01:

1.1. SAFETY FENCE SHALL BE CHECKED REGULARLY FOR WEATHER-RELATED OR OTHER

DAMAGE. ANY NECESSARY REPAIRS MUST BE MADE IMMEDIATELY.

1.2. CARE SHOULD BE TAKEN TO SECURE ALL ACCESS POINTS AT THE END OF EACH WORKING

DAY. ALL LOCKING DEVICES MUST BE REPAIRED OR REPLACED AS NECESSARY.

2. STORM DRAIN INLET PROTECTION - 3.07: INLET PROTECTION MUST BE INSTALLED AT ALL INLETS

WITHIN THE PROJECT AREA AS NOTED ON THE PLANS.

2.1. THE STRUCTURE SHALL BE INSPECTED AFTER EACH RAIN AND REPAIRS MADE AS NEEDED.

2.2. SEDIMENT SHALL BE REMOVED AND THE TRAP RESTORED TO ITS ORIGINAL DIMENSIONS

WHEN THE SEDIMENT HAS ACCUMULATED TO ONE-HALF THE DESIGN DEPTH OF THE TRAP.

REMOVED SEDIMENT SHALL BE DEPOSITED IN A SUITABLE AREA AND IN SUCH A MANNER

THAT IT WILL NOT ERODE.

2.3. STRUCTURES SHALL BE REMOVED AND THE AREA STABILIZED WHEN THE REMAINING

DRAINAGE AREA HAS BEEN PROPERLY STABILIZED.

3. TEMPORARY SEEDING - 3.31

3.1. AREAS WHICH FAIL TO ESTABLISH VEGETATIVE COVER ADEQUATE TO PREVENT RILL

EROSION WILL BE RESEEDED AS SOON AS SUCH AREAS ARE IDENTIFIED.

4. PERMANENT SEEDING - 3.32

4.1. WHEN IT IS CLEAR THAT PLANTS HAVE NOT GERMINATED ON AN AREAS OR HAVE DIED,

THESE AREAS MUST BE RESEEDED IMMEDIATELY TO PREVENT EROSION DAMAGE.

5. MULCHING - 3.35

5.1. INSPECT PERIODICALLY AND AFTER RAINSTORMS TO CHECK FOR EROSION. WHERE

EROSION IS OBSERVED IN MULCHED AREAS, ADDITIONAL MULCH SHOULD BE APPLIED. IF

WASHOUTS OR BREAKAGE OCCUR OF NETS AND MATS, RE-INSTALL NETTING OR MATTING

AS NECESSARY AFTER REPAIRING DAMAGE TO THE SLOPE OR DITCH.

6. SOIL STABILIZATION BLANKETS & MATTING - 3.36

6.1. ALL SOIL STABILIZATION BLANKETS AND MATTING SHOULD BE INSPECTED PERIODICALLY

FOLLOWING INSTALLATION, PARTICULARLY AFTER RAINSTORMS TO CHECK FOR EROSION

AND UNDERMINING. ANY DISLOCATION OR FAILURE SHOULD BE REPAIRED IMMEDIATELY. IF

WASHOUTS OR BREAKAGE OCCURS, REINSTALL THE MATERIAL AFTER REPAIRING DAMAGE

TO THE SLOPE OR DITCH.

ESC CALCULATIONS

SEE SHEET C4.0 FOR DRY SWALE CHANNEL VELOCITIES.

STORMWATER MANAGEMENT CONSIDERATIONS

THE PROJECT WILL NOT INCREASE PEAK RUNOFF RATES. THE PROJECT INCLUDES DRY SWALE

CONSTRUCTION. THE PURPOSE OF THE DRY SWALE IS TO PROVIDE WATER QUALITY IMPROVEMENT AND

TO PROMOTE INFILTRATION. THIS PROJECT MEETS CONDITIONS OUTLINED IN 9VAC25-870-76 AND VA DEQ

GUIDANCE MEMO NO. 15-2003 AND IS THEREFORE NOT SUBJECT TO VSMP REGULATIONS.

EROSION & SEDIMENT CONTROL MINIMUM STANDARDS

MS-1: APPLY PERMANENT SOIL STABILIZATION TO DENUDED AREAS WITHIN SEVEN DAYS AFTER FINAL

GRADE IS REACHED ON ANY PORTION OF THE SITE. APPLY TEMPORARY SOIL STABILIZATION WITHIN

SEVEN DAYS TO DENUDED AREAS THAT MAY NOT BE AT FINAL GRADE BUT WILL REMAIN DORMANT

(UNDISTURBED) FOR LONGER THAN 14 DAYS. APPLY PERMANENT STABILIZATION TO AREAS THAT

ARE TO BE LEFT DORMANT FOR MORE THAN ONE YEAR.

MS-2: STABILIZE OR PROTECT TEMPORARY SOIL STOCKPILES WITH SEDIMENT TRAPPING MEASURES.

PROVIDE TEMPORARY PROTECTION AND PERMANENT STABILIZATION OF ALL SOIL STOCKPILES ON

SITE AS WELL AS SOIL TRANSPORTED FROM THE PROJECT SITE.

MS-3: ESTABLISH A PERMANENT VEGETATIVE COVER ON DENUDED AREAS NOT OTHERWISE

PERMANENTLY STABILIZED. PERMANENT VEGETATION SHALL NOT BE CONSIDERED ESTABLISHED

UNTIL A GROUND COVER IS ACHIEVED THAT IN THE OPINION OF THE ARCHITECT/ENGINEER, IS

UNIFORM, MATURE ENOUGH TO SURVIVE AND WILL INHIBIT EROSION.

MS-4: CONSTRUCT SEDIMENT BASINS AND TRAPS, PERIMETER DIKES, SEDIMENT BARRIERS AND OTHER

MEASURES INTENDED TO TRAP SEDIMENT AS A FIRST STEP IN ANY LAND-DISTURBING ACTIVITY AND

MAKE THESE MEASURES FUNCTIONAL BEFORE UP-SLOPE LAND DISTURBANCE OR TIMBERING TAKES

PLACE.

MS-5: APPLY STABILIZATION MEASURES TO EARTHEN STRUCTURES SUCH AS DAMS, DIKES AND

DIVERSIONS IMMEDIATELY AFTER INSTALLATION.

MS-6 DESIGN AND CONSTRUCT SEDIMENT TRAPS AND SEDIMENT BASINS BASED UPON THE TOTAL

DRAINAGE AREA TO BE SERVED BY THE TRAP OR BASIN.

a. DESIGN THE MINIMUM STORAGE CAPACITY OF THE SEDIMENT TRAP TO BE 134 CUBIC YARDS PER

ACRE OF DRAINAGE AREA AND THE MAXIMUM DRAINAGE AREA TO THE TRAP BE LESS THAN

THREE ACRES.

b. DESIGN THE SEDIMENT BASIN TO CONTROL SURFACE RUNOFF FROM DISTURBED AREAS

COMPRISED OF FLOW FROM DRAINAGE AREAS GREATER THAN OR EQUAL TO THREE ACRES.

ENSURE THE MINIMUM STORAGE CAPACITY OF THE SEDIMENT BASIN TO BE 134 CUBIC YARDS

PER ACRE OF DRAINAGE AREA. CONSTRUCT THE OUTFALL SYSTEM TO, AT MINIMUM, MAINTAIN

THE STRUCTURAL INTEGRITY OF THE BASIN DURING A 25-YEAR STORM OF 24-HOUR DURATION.

WHEN COMPLETING RUNOFF CALCULATIONS, APPLY RUNOFF COEFFICIENTS THAT

CORRESPOND TO A BARE EARTH CONDITION OR THOSE CONDITIONS EXPECTED TO EXIST WHILE

THE SEDIMENT BASIN IS UTILIZED.

MS-7: CONSTRUCT CUT AND FILL SLOPES IN A MANNER THAT WILL MINIMIZE EROSION. PROVIDE SLOPES

THAT ARE FOUND TO BE ERODING EXCESSIVELY WITHIN ONE YEAR OF PERMANENT STABILIZATION

WITH ADDITIONAL SLOPE STABILIZING MEASURES UNTIL THE PROBLEM IS CORRECTED.

MS-8: CONCENTRATED RUNOFF SHALL NOT FLOW DOWN CUT OR FILL SLOPES UNLESS CONTAINED WITHIN

AN ADEQUATE TEMPORARY OR PERMANENT CHANNEL, FLUME OR SLOPE DRAIN STRUCTURE.

MS-9: WHENEVER WATER SEEPS FROM A SLOPE FACE, PROVIDE ADEQUATE DRAINAGE OR OTHER

PROTECTION.

MS-10: PROTECT ALL STORM SEWER INLETS THAT ARE MADE OPERABLE DURING CONSTRUCTION SO THAT

SEDIMENT-LADEN WATER CANNOT ENTER THE CONVEYANCE SYSTEM WITHOUT FIRST BEING

FILTERED OR OTHERWISE TREATED TO REMOVE SEDIMENT.

MS-11: BEFORE STORMWATER CONVEYANCE CHANNELS ARE MADE OPERATIONAL, PROVIDE ADEQUATE

OUTLET PROTECTION AND ANY REQUIRED TEMPORARY OR PERMANENT CHANNEL LINING IN BOTH

THE CONVEYANCE CHANNEL AND THE RECEIVING CHANNEL.

MS-12: WHEN WORK IN A LIVE WATERCOURSE IS PERFORMED, TAKE PRECAUTIONS TO MINIMIZE

ENCROACHMENT, CONTROL SEDIMENT TRANSPORT AND STABILIZE THE WORK AREA TO THE

GREATEST EXTENT POSSIBLE DURING CONSTRUCTION. PROVIDE NON-ERODABLE MATERIAL FOR

THE CONSTRUCTION OF CAUSEWAYS AND COFFERDAMS. EARTHEN FILL MAY BE USED FOR THESE

STRUCTURES IF ARMORED BY NON-ERODABLE COVER MATERIALS.

MS-13: WHEN A LIVE WATERCOURSE MUST BE CROSSED BY CONSTRUCTION VEHICLES MORE THAN TWICE

IN ANY SIX-MONTH PERIOD, PROVIDE A TEMPORARY STREAM CROSSING CONSTRUCTED OF

NON-ERODABLE MATERIAL.

MS-14: MEET ALL APPLICABLE FEDERAL, STATE AND LOCAL REGULATIONS PERTAINING TO WORKING IN OR

CROSSING LIVE WATERCOURSES.

MS-15:STABILIZE THE BED AND BANKS OF A WATERCOURSE IMMEDIATELY FOLLOWING AFTER WORK IN

THE WATERCOURSE IS COMPLETED.

MS-16: UNDERGROUND UTILITY LINES SHALL BE INSTALLED IN ACCORDANCE WITH THESE STANDARDS IN

ADDITION TO OTHER APPLICABLE CRITERIA:

a. OPEN NO MORE THAN 500 LINEAR FEET OF TRENCH AT ONE TIME.

b. PLACE EXCAVATED MATERIAL ON THE UPHILL SIDE OF TRENCHES.

c. FILTER EFFLUENT FROM DEWATERING OPERATIONS OR PASS THROUGH AN APPROVED

SEDIMENT TRAPPING DEVICE, OR BOTH, AND DISCHARGE IN A MANNER THAT DOES NOT

ADVERSELY AFFECT FLOWING STREAMS OR OFFSITE PROPERTY.

d. PROPERLY COMPACT MATERIAL USED FOR BACKFILLING TRENCHES IN ORDER TO MINIMIZE

EROSION AND PROMOTE STABILIZATION.

e. ACCOMPLISH RESTABILIZATION IN ACCORDANCE WITH THIS CHAPTER.

f. COMPLY WITH ALL APPLICABLE SAFETY REGULATIONS.

MS-17: WHERE CONSTRUCTION VEHICLE ACCESS ROUTES INTERSECT PAVED PUBLIC ROADS, MAKE

PROVISIONS TO MINIMIZE THE TRANSPORT OF SEDIMENT BY VEHICULAR TRACKING ONTO

THE PAVED SURFACE. WHERE SEDIMENT IS TRANSPORTED ONTO A PUBLIC ROAD SURFACE,

CLEAN THE ROAD THOROUGHLY AT THE END OF EACH DAY. REMOVE SEDIMENT FROM THE

ROADS BY SHOVELING OR SWEEPING AND TRANSPORT TO A SEDIMENT CONTROL DISPOSAL AREA.

STREET WASHING SHALL BE ALLOWED ONLY AFTER SEDIMENT IS REMOVED IN THIS MANNER.

MS-18: REMOVE ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES WITHIN 30 DAYS AFTER

FINAL SITE STABILIZATION OR AFTER THE TEMPORARY MEASURES ARE NO LONGER NEEDED,

UNLESS OTHERWISE AUTHORIZED BY THE LOCAL AUTHORITY HAVING JURISDICTION.

PERMANENTLY STABILIZE TRAPPED SEDIMENT AND THE DISTURBED SOIL AREAS RESULTING FROM

THE DISPOSITION OF TEMPORARY MEASURES TO PREVENT FURTHER EROSION AND

SEDIMENTATION.

MS-19: PROPERTIES AND WATERWAYS DOWNSTREAM FROM DEVELOPMENT SITES SHALL BE PROTECTED

FROM SEDIMENT DEPOSITION, EROSION AND DAMAGE DUE TO INCREASES IN VOLUME, VELOCITY

AND PEAK FLOW RATE OF STORMWATER RUNOFF FOR THE STATED FREQUENCY STORM OF

24-HOUR DURATION IN ACCORDANCE WITH THE FOLLOWING STANDARDS AND CRITERIA:

a. CONCENTRATED STORMWATER RUNOFF LEAVING A DEVELOPMENT SITE SHALL BE DISCHARGED

DIRECTLY INTO AN ADEQUATE NATURAL OR MAN-MADE RECEIVING CHANNEL, PIPE OR STORM

SEWER SYSTEM. FOR THOSE SITES WHERE RUNOFF IS DISCHARGED INTO A PIPE OR PIPE

SYSTEM, DOWNSTREAM STABILITY ANALYSES AT THE OUTFALL OF THE PIPE OR PIPE SYSTEM

SHALL BE PERFORMED.

b. ADEQUACY OF ALL CHANNELS AND PIPES SHALL BE VERIFIED IN THE FOLLOWING MANNER:

(1) THE APPLICANT SHALL DEMONSTRATE THAT THE TOTAL DRAINAGE AREA TO THE POINT OF

ANALYSIS WITHIN THE CHANNEL IS ONE HUNDRED TIMES GREATER THAN THE CONTRIBUTING

DRAINAGE AREA OF THE PROJECT IN QUESTION; OR

(2) (a) NATURAL CHANNELS SHALL BE ANALYZED BY THE USE OF A TWO-YEAR FREQUENCY

STORM TO VERIFY THAT STORMWATER WILL NOT OVERTOP CHANNEL BANKS NOR CAUSE

EROSION OF CHANNEL BED OR BANKS.

(b) ALL PREVIOUSLY CONSTRUCTED MAN-MADE CHANNELS SHALL BE ANALYZED BY THE USE

OF A TEN-YEAR FREQUENCY STORM TO VERIFY THAT STORMWATER WILL NOT OVERTOP ITS

BANKS AND BY THE USE OF A TWO-YEAR STORM TO DEMONSTRATE THAT STORMWATER WILL

NOT CAUSE EROSION OF CHANNEL BED OR BANKS; AND

(c) PIPES AND STORM SEWER SYSTEMS SHALL BE ANALYZED BY THE USE OF A TEN-YEAR

FREQUENCY STORM TO VERIFY THAT STORMWATER WILL BE CONTAINED WITHIN THE PIPE

OR SYSTEM.

c. IF EXISTING NATURAL RECEIVING CHANNELS OR PREVIOUSLY CONSTRUCTED MAN-MADE

CHANNELS OR PIPES ARE NOT ADEQUATE, THE APPLICANT SHALL:

(1) IMPROVE THE CHANNELS TO A CONDITION WHERE A TEN-YEAR FREQUENCY STORM WILL NOT

OVERTOP THE BANKS AND A TWO-YEAR FREQUENCY STORM WILL NOT CAUSE EROSION TO

THE CHANNEL, THE BED, OR BANKS;

(2) IMPROVE THE PIPE OR PIPE SYSTEM TO A CONDITION WHERE THE TEN-YEAR FREQUENCY

STORM IS CONTAINED WITHIN THE APPURTENANCES

(3) DEVELOP A SITE DESIGN THAT WILL NOT CAUSE THE PRE-DEVELOPMENT PEAK RUNOFF RATE

FROM A TWO-YEAR STORM TO INCREASE WHEN RUNOFF OUTFALLS INTO A NATURAL

CHANNEL OR WILL NOT CAUSE THE PRE-DEVELOPMENT PEAK RUNOFF RATE FROM A

TEN-YEAR STORM TO INCREASE WHEN RUNOFF OUTFALLS INTO A MAN-MADE CHANNEL; OR

(4) PROVIDE A COMBINATION OF CHANNEL IMPROVEMENT, STORMWATER

DETENTION/RETENTION OR OTHER MEASURES WHICH IS SATISFACTORY TO THE VESCP

AUTHORITY TO PREVENT DOWNSTREAM EROSION.

d. THE APPLICANT SHALL PROVIDE EVIDENCE OF PERMISSION TO MAKE THE IMPROVEMENTS.

e. ALL HYDROLOGIC ANALYSES SHALL BE BASED ON THE EXISTING WATERSHED

CHARACTERISTICS AND THE ULTIMATE DEVELOPMENT CONDITION OF THE SUBJECT PROJECT.

f. IF THE APPLICANT CHOOSES AN OPTION THAT INCLUDES STORMWATER DETENTION, HE SHALL

OBTAIN APPROVAL FROM THE VESCP OF A PLAN FOR MAINTENANCE OF THE DETENTION

FACILITIES. THE PLAN SHALL SET FORTH THE MAINTENANCE REQUIREMENTS OF THE FACILITY

AND THE PERSON RESPONSIBLE FOR PERFORMING THE MAINTENANCE.

g. OUTFALL FROM A DETENTION FACILITY SHALL BE DISCHARGED TO A RECEIVING CHANNEL, AND

ENERGY DISSIPATERS SHALL BE PLACED AT THE OUTFALL OF ALL DETENTION FACILITIES AS

NECESSARY TO PROVIDE A STABILIZED TRANSITION FROM THE FACILITY TO THE RECEIVING

CHANNEL.

h. ALL ON-SITE CHANNELS MUST BE VERIFIED TO BE ADEQUATE.

i. INCREASED VOLUMES OF SHEET FLOWS THAT MAY CAUSE EROSION OR SEDIMENTATION ON

ADJACENT PROPERTY SHALL BE DIVERTED TO A STABLE OUTLET, ADEQUATE CHANNEL, PIPE OR

PIPE SYSTEM, OR TO A DETENTION FACILITY.

j. IN APPLYING THESE STORMWATER MANAGEMENT CRITERIA, INDIVIDUAL LOTS IN A RESIDENTIAL

SUBDIVISION DEVELOPMENT SHALL NOT BE CONSIDERED TO BE SEPARATE DEVELOPMENT

PROJECTS. INSTEAD, THE RESIDENTIAL SUBDIVISION DEVELOPMENT, AS A WHOLE, SHALL BE

CONSIDERED TO BE A SINGLE DEVELOPMENT PROJECT. HYDROLOGIC PARAMETERS THAT

REFLECT THE ULTIMATE SUBDIVISION DEVELOPMENT SHALL BE USED IN ALL ENGINEERING

CALCULATIONS.

k. ALL MEASURES USED TO PROTECT PROPERTIES AND WATERWAYS SHALL BE EMPLOYED IN A

MANNER WHICH MINIMIZES IMPACTS ON THE PHYSICAL, CHEMICAL AND BIOLOGICAL INTEGRITY

OF RIVERS, STREAMS AND OTHER WATERS OF THE STATE.

l. ANY PLAN APPROVED PRIOR TO JULY 1, 2014, THAT PROVIDES FOR STORMWATER MANAGEMENT

THAT ADDRESSES ANY FLOW RATE CAPACITY AND VELOCITY REQUIREMENTS FOR NATURAL OR

MAN-MADE CHANNELS SHALL SATISFY THE FLOW RATE CAPACITY AND VELOCITY

REQUIREMENTS FOR NATURAL OR MAN-MADE CHANNELS IF THE PRACTICES ARE DESIGNED TO

(I) DETAIN THE WATER QUALITY VOLUME AND TO RELEASE IT OVER 48 HOURS; (II) DETAIN AND

RELEASE OVER A 24-HOUR PERIOD THE EXPECTED RAINFALL RESULTING FROM THE ONE YEAR,

24-HOUR STORM; AND (III) REDUCE THE ALLOWABLE PEAK FLOW RATE RESULTING FROM THE 1.5, 2, AND 10-YEAR, 24-HOUR STORMS TO A LEVEL THAT IS LESS THAN OR EQUAL TO THE PEAK

FLOW RATE FROM THE SITE ASSUMING IT WAS IN A GOOD FORESTED CONDITION, ACHIEVED

THROUGH MULTIPLICATION OF THE FORESTED PEAK FLOW RATE BY A REDUCTION FACTOR

THAT IS EQUAL TO THE RUNOFF VOLUME FROM THE SITE WHEN IT WAS IN A GOOD FORESTED

CONDITION DIVIDED BY THE RUNOFF VOLUME FROM THE SITE IN ITS PROPOSED CONDITION,

AND SHALL BE EXEMPT FROM ANY FLOW RATE CAPACITY AND VELOCITY REQUIREMENTS FOR

NATURAL OR MAN-MADE CHANNELS AS DEFINED IN ANY REGULATIONS PROMULGATED

PURSUANT TO § 62.1-44.15:54 OR 62.1-44.15:65 OF THE ACT.

m. FOR PLANS APPROVED ON AND AFTER JULY 1, 2014, THE FLOW RATE CAPACITY AND VELOCITY

REQUIREMENTS OF § 62.1-44.15:52 A OF THE ACT AND THIS SUBSECTION SHALL BE SATISFIED BY

COMPLIANCE WITH WATER QUANTITY REQUIREMENTS IN THE STORMWATER MANAGEMENT ACT

(§ 62.1-44.15:24 ET SEQ. OF THE CODE OF VIRGINIA) AND ATTENDANT REGULATIONS, UNLESS

SUCH LAND-DISTURBING ACTIVITIES ARE IN ACCORDANCE WITH PROVISIONS FOR THE TIME

LIMITS ON APPLICABILITY OF APPROVED DESIGN CRITERIA IN 9VAC25-870-47 OR

GRANDFATHERING IN 9VAC25-870-48 OF THE VIRGINIA STORMWATER MANAGEMENT PROGRAM

(VSMP) REGULATION, IN WHICH CASE THE FLOW RATE CAPACITY AND VELOCITY REQUIREMENTS

OF § 62.1-44.15:52 A OF THE ACT SHALL APPLY, OR ARE EXEMPT PURSUANT TO § 62.1-44.15:34 C7

OF THE ACT.

n. COMPLIANCE WITH THE WATER QUANTITY MINIMUM STANDARDS SET OUT IN 9VAC25-870-66 OF

THE VIRGINIA STORMWATER MANAGEMENT PROGRAM (VSMP) REGULATIONS SHALL BE DEEMED

TO SATISFY THE REQUIREMENTS OF SUBDIVISION 19 OF THIS SUBSECTION.

GENERAL EROSION AND SEDIMENT CONTROL NOTES

ES-1: UNLESS OTHERWISE INDICATED, CONSTRUCT AND MAINTAIN ALL VEGETATIVE AND STRUCTURAL

EROSION AND SEDIMENT CONTROL PRACTICES ACCORDING TO MINIMUM STANDARDS AND

SPECIFICATIONS OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK AND VIRGINIA

REGULATIONS 9 VAC 25-840-40

ES-2: NOTIFY THE DEPARTMENT OF PUBLIC WORKS ONE WEEK PRIOR TO THE PRE-CONSTRUCTION

CONFERENCE, ONE WEEK PRIOR TO THE COMMENCEMENT OF LAND DISTURBING ACTIVITY, AND

ONE WEEK PRIOR TO THE FINAL INSPECTION.

ES-3: PLACE ALL EROSION AND SEDIMENT CONTROL MEASURES PRIOR TO OR AS THE FIRST STEP IN

CLEARING, GRADING, OR LAND DISTURBANCE.

ES-4: MAINTAIN A COPY OF THE APPROVED EROSION AND SEDIMENT CONTROL PLAN ON THE SITE AT ALL

TIMES.

ES-5: PRIOR TO COMMENCING LAND-DISTURBING ACTIVITIES IN AREAS OTHER THAN INDICATED ON

THESE PLANS (INCLUDING, BUT NOT LIMITED TO, OFFSITE BORROW OR WASTE AREA), THE

CONTRACTOR SHALL SUBMIT A SUPPLEMENTARY EROSION CONTROL PLAN TO THE

ARCHITECT/ENGINEER FOR REVIEW AND APPROVAL BY THE PLAN APPROVING AUTHORITY.

ES-6: PROVIDE ADDITIONAL EROSION CONTROL MEASURES NECESSARY TO PREVENT EROSION AND

SEDIMENTATION AS DETERMINED BY THE DPU INSPECTOR.

ES-7: ALL DISTURBED AREAS ARE TO DRAIN TO APPROVED SEDIMENT CONTROL MEASURES AT ALL

TIMES DURING LAND-DISTURBING ACTIVITIES AND DURING SITE DEVELOPMENT UNTIL FINAL

STABILIZATION IS ACHIEVED.

ES-8: DURING DEWATERING OPERATIONS, PUMP WATER INTO AN APPROVED FILTERING DEVICE.

ES-9: INSPECT ALL EROSION CONTROL MEASURES DAILY AND AFTER EACH RUNOFF-PRODUCING

RAINFALL EVENT. MAKE ANY NECESSARY REPAIRS OR CLEANUP TO MAINTAIN THE EFFECTIVENESS

OF THE EROSION CONTROL DEVICES IMMEDIATELY.

PROJECT AREA

SOILS MAP

SOURCE: NRCS WEB SOIL SURVEY

JOB NO.

SHEET NO.

SCALE

DESIGNED BY

CHECKED BY

D A T E

DRAWN BY

DATE

R E V I S I O

N D

E S C R I P T I O

N

T h e s e p la n s a n d a s s o c ia te d d o c u m e n ts a re t h e e x c lu s iv e p ro p e rt y o f T

IM

M

O N

S G

R O

U P a n d m a y n o t b e r e p ro d u c e d i n w h o le o r in p a rt a n d s h a ll n o t b e u s e d f o r a n y p u rp o s e w h a ts o e v e r, i n c lu s iv e b u t n o t lim it e d t o c o n s tr u c ti o n b id d in g a n d /o r c o n s tr u c ti o n s ta k in g w it h o u t th e e x p re s s w ri tt e n c o n s e n t o f

T

IM

M O

N S

G R

O U

P

04/28/2023

N W

H I T E H

I L L D

R I V E D

R A I N

A G

E I

M P R O

V E M

E N

T C I T Y O

F P

E T E R S B U

R G

V

I R G

I N

I A

51547

L

\5

-W h it e h ill

D r\

D W

G \S w a le

P h a s e \S h e e t\

C D

\5 C

-3 .0

-E C

N D

.d w g P lo tt e d o n

/8 /2

:0 P

M b y K e ls e y R e d m a n

C3.0

E R O

S I O

N

S E D

I M

E N

T C

O N

T R O

L N

O T E S

K. REDMAN

S. REEVES

M. CLAUD

AS SHOWN

council Sticky Note

SPECIFIC APPLICATION

2"X4" WOOD

SEDIMENT

*GRAVEL FILTER

WITH SEDIMENT

RUNOFF WATER

WIRE SCREEN

STUD

OVERFLOW

CURB INLET

FILTERED WATER

CURB INLET

WIRE SCREEN CONC. BLOCK

THIS METHOD OF INLET PROTECTION IS APPLICABLE AT CURB INLETS

WHERE OVERFLOW CAPABILITY IS NECESSARY TO PREVENT EXCESSIVE

PONDING IN FRONT OF THE STRUCTURE.

*GRAVEL SHALL BE VDOT #3, #357, OR #5 COARSE AGGREGATE.

NO SCALE

BLOCK AND GRAVEL CURB INLET SEDIMENT FILTER

PLATE 3.07-3

IP

ADAPTED FROM CONWED PLASTICS AND VDOT

ROAD AND BRIDGE STANDARDS

No Scale

SAFETY FENCESAF

PLATE 3.01-1

5' MIN.

6' MAX.

POLYETHYLENE FABRIC

(ATTACH TO POSTS WITH

METAL TIE WIRES.)

CONVENTIONAL METAL (T)

OR (U) POSTS

TABLE 3.32-E

(REVISED JUNE 2003)

PERMANENT SEEDING SPECIFICATIONS FOR COASTAL PLAIN AREA

LAND USE SPECIES APPLICATION PER ACRE

SEED¹

TALL FESCUE¹

or

BERMUDAGRASS¹

MINIMUM CARE LAWN

(COMMERCIAL OR RESIDENTIAL)

HIGH-MAINTENANCE LAWN

GENERAL SLOPE (3:1 OR LESS)

LOW-MAINTENANCE SLOPE

(STEEPER THAN 3:1)

TALL FESCUE¹

or

BERMUDAGRASS¹ (SEED)

or

BERMUDAGRASS¹ (BY OTHER VEGETATIVE

ESTABLISHMENT METHOD, SEE STD. &

SPEC. 3.34)

TALL FESCUE¹

RED TOP GRASS OR CREEPING RED FESCUE

SEASONAL NURSE CROP²

TALL FESCUE¹

BERMUDAGRASS¹

RED TOP GRASS OR CREEPING RED FESCUE

SEASONAL NURSE CROP²

SERICEA LESPEDEZA³

175 - 200 LBS.

128 LBS.

2 LBS.

20LBS.

TOTAL: 150 LBS.

93 - 108 LBS.

0 - 15 LBS.

2 LBS.

20 LBS.

20 LBS.

TOTAL: 150 LBS.

200-250 LBS.

1 - WHEN SELECTING VARIETIES OF TURFGRASS, USE THE VIRGINIA CROP IMPROVEMENT ASSOCIATION (VCIA)

RECOMMENDED TURFGRASS VARIETY LIST. QUALITY SEED WILL BEAR A LABEL INDICATING THAT THEY ARE

APPROVED BY VCIA. A CURRENT TURFGRASS VARIETY LIST IS AVAILABLE AT THE LOCAL COUNTY EXTENSION

OFFICE OR THROUGH VCIA AT 804-746-4884 OR AT

HTTP://SUDAN.CSES.VT.EDU/HTML/TURF/TURF/PUBLICATIONS/PUBLICATIONS2.HTML

2 - USE SEASONAL NURSE CROP IN ACCORDANCE WITH SEEDING DATES AS STATED BELOW:

FEBRUARY, MARCH - APRIL ......................... ANNUAL RYE

MAY 1ST - AUGUST ....................................... FOXTAIL MILLET

SEPTEMBER, OCTOBER - NOVEMBER 15TH ..... ANNUAL RYE

NOVEMBER 16TH - JANUARY ............................. WINTER RYE

3 - MAY THROUGH OCTOBER, USE HULLED SEED. ALL OTHER PERIODS, USE UNHULLED SEED. IF WEEPING

LOVEGRASS IS USED, INCLUDE IN ANY SLOPE OR LOW MAINTENANCE MIXTURE DURING WARMER SEEDING

PERIODS, INCREASE TO 30 - 40 LBS/ACRE.

FERTILIZER & LIME

· APPLY 10-20-10 FERTILIZER AT A RATE OF 500 LBS. / ACRE (OR 12 LBS. / 1,000 SQ. FT.)

· APPLY PULVERIZED AGRICULTURAL LIMESTONE AT A RATE OF 2 TONS/ACRE (90 LBS. / 1,000 SQ. FT.)

NOTE:

- A SOIL TEST IS NECESSARY TO DETERMINE THE ACTUAL AMOUNT OF LIME REQUIRED TO ADJUST THE SOIL pH

OF SITE.

- INCORPORATE THE LIME AND FERTILIZER INTO THE TOP 4 - 6 INCHES OF THE SOIL BY DISKING OR BY OTHER

MEANS.

- WHEN APPLYING SLOWLY AVAILABLE NITROGEN, USE RATES AVAILABLE IN EROSION & SEDIMENT CONTROL

TECHNICAL BULLETIN #4, 2003 NUTRIENT MANAGEMENT FOR DEVELOPMENT SITES AT

HTTP://WWW.DCR.STATE.VA.US/SW/E&S.HTM#PUBS

75 LBS.

40 LBS.(UNHULLED)

30 LBS. (HULLED)

TABLE 3.31-B

(REVISED JUNE 2003)

TEMPORARY SEEDING SPECIFICATIONS

QUICK REFERENCE FOR ALL REGIONS

APPLICATION DATES SPECIES APPLICATION RATES

SEED

50 -100 (lbs/acre)Sept. 1 - Feb. 15

60 - 100 (lbs/acre)

50 (lbs/acre)

Feb. 16 - Apr. 30

May 1 - Aug. 31

50/50 Mix of Annual Ryegrass (lolium multi-florum) & Cereal (Winter) Rye (Secale cereale)

Annual Ryegrass (lolium multi-florum)

German Millet

FERTILIZER & LIME

· Apply 10-10-10 fertilizer at a rate of 450 lbs / acre (or 10 lbs. / 1,000 sq. ft.)

· Apply Pulverized Agricultural Limestone at a rate of 2 tons / acre (or 90 lbs. / 1,000 sq. ft.)

NOTE:

1. A soil test is necessary to determine the actual amount of lime required to adjust the soil pH of site.

2. Incorporate the lime and fertilizer into the top 4 - 6 inches of the soil by disking or by other means.

3. When applying Slowly Available Nitrogen, use rates available in Erosion & Sediment Control Technical Bulletin

#4, 2003 Nutrient Management for Development Sites at http://www.dcr.state.va.us/sw/e&s.htm#pubs

ON SHALLOW SLOPES, STRIPS OF

NETTING PROTECTIVE COVERINGS

MAY BE APPLIED ACROSS THE

SLOPE.

BERM

IN DITCHES, APPLY PROTECTIVE COVERING

PARALLEL TO THE DIRECTION OF FLOW. USE

CHECK SLOTS AS REQUIRED. AVOID JOINING

MATERIAL IN THE CENTER OF THE DITCH IF

AT ALL POSSIBLE.

ON STEEP SLOPES, APPLY

PROTECTIVE COVERING

PARALLEL TO THE DIRECTION OF

FLOW AND ANCHOR SECURELY.

BRING MATERIAL DOWN TO A LEVEL AREA

BEFORE TERMINATING THE INSTALLATION.

TURN THE END UNDER 4" AND STAPLE AT 12"

INTERVALS.

DITCH FLOW

4"

12"

WHERE THERE IS A BERM AT THE

TOP OF THE SLOPE, BRING THE

MATERIAL OVER THE BERM AND

ANCHOR IT BEHIND THE BERM.

STEEP SLOPE

SHALLOW

SLOPE

No Scale

SOIL STABILIZATION BLANKET - TYPICAL ORIENTATION OF TREATMENT I

PLATE 3.36-1

B/M

AT CORNERS

GATHER EXCESS

PERSPECTIVE VIEWS

2 x 4 WOOD

MIN.

1.5'

FRAME

SPECIFIC APPLICATION

WITH SEDIMENT

RUNOFF WATER

MIN.

3'

BURIED FABRIC

MIN.

1'

FRAME

WITH GRATE

DROP INLET

FABRIC ORIENTATION

ELEVATION OF STAKE AND

WATER

FILTERED

FABRIC

STAKES

THIS METHOD OF INLET PROTECTION IS APPLICABLE WHERE THE INLET DRAINS A

RELATIVELY FLAT AREA (SLOPES NO GREATER THAN 5%) WHERE INLET SHEET OR

OVERLAND FLOWS (NOT EXCEEDING 1 CFS) ARE TYPICAL. THE METHOD SHALL

NOT APPLY TO INLETS RECEIVING CONCENTRATED FLOWS, SUCH AS IN STREET

OR HIGHWAY MEDIANS.

NO SCALE

SILT FENCE DROP INLET PROTECTION

PLATE 3.07-1

IP

JOB NO.

SHEET NO.

SCALE

DESIGNED BY

CHECKED BY

D A T E

DRAWN BY

DATE

R E V I S I O

N D

E S C R I P T I O

N

T h e s e p la n s a n d a s s o c ia te d d o c u m e n ts a re t h e e x c lu s iv e p ro p e rt y o f T

IM

M

O N

S G

R O

U P a n d m a y n o t b e r e p ro d u c e d i n w h o le o r in p a rt a n d s h a ll n o t b e u s e d f o r a n y p u rp o s e w h a ts o e v e r, i n c lu s iv e b u t n o t lim it e d t o c o n s tr u c ti o n b id d in g a n d /o r c o n s tr u c ti o n s ta k in g w it h o u t th e e x p re s s w ri tt e n c o n s e n t o f

T

IM

M O

N S

G R

O U

P

04/28/2023

N W

H I T E H

I L L D

R I V E D

R A I N

A G

E I

M P R O

V E M

E N

T C I T Y O

F P

E T E R S B U

R G

V

I R G

I N

I A

51547

L

\5

-W h it e h ill

D r\

D W

G \S w a le

P h a s e \S h e e t\

C D

\5 C

-3 .0

-E C

N D

.d w g P lo tt e d o n

/8 /2

:0 P

M b y K e ls e y R e d m a n

C3.1

E R O

S I O

N

S E D

I M

E N

T C

O N

T R O

L D

E T A I L S

K. REDMAN

S. REEVES

M. CLAUD

AS SHOWN

G

G G

W W

W

W

WWWWWW

W

W W

W W

UGT

G G

G G

G

46 47

S A N

S A N

S A N

S A N

S A N

S A N

S A N

S A N

S A N

S A N

S A N

X

X X

X

XX

XXX

XX XX

O H U

OHU

OHU

OHU

OHU

OHU

O H U

O H U

OHU

OHU

XXX

XX

OHU OHU OHU OHU OHU OHU OHU

X

X

X X

X

X X

X X

X

OHU

OHU

OHU

OHU

OHU

OHU

O H U

O H U

O H U

OHU

X

OHU

O H U

O H U

O H U

T

O P

O G

R A

P H

IC

S

U R

V E

Y

2021 TOPOGRAPHIC

SURVEY

T

O P

O G

R A

P H

IC

S U

R V

E Y

T

O P

O G

R A

P H

IC

L

ID

A

R D

A T

A A

N D

G

IS

M A

P P

IN

G

2014 TOPOGRAPHIC LIDAR

DATA AND GIS MAPPING

T

O P

O G

R A

P H

IC

L

ID

A

R

D A

T A

A N

D G

IS

M

A P

P

IN

G

U3

U2

6" PVC

U8

15" CLASS III RCP

U4

6" PVC

U6

6" PVCU10

15" HDPE

U1

SAFSAF

SAF

SAF SAF

SAF

SAF

SAF SAF

SAFSAFSAF

S A

F

IP

IP

SAF

B/M

B/M

PSPSLOD

LOD LOD LOD

LOD LOD LOD LOD LOD

LODLODLODLOD

LODLODLOD

IP

PS MU

TS

PS

MU

SOIL STABILIZATION BLANKETS

& MATTING: EC-2, TYPE 2

SAF SAFETY FENCE

INLET PROTECTION

TEMPORARY SEEDING

PERMANENT SEEDING

MULCHING

3.01

3.07

3.31

3.32

3.35

3.36

SYMBOLLABEL STDANDARD NAME SPEC.#

EROSION CONTROL LEGEND

SAF

IP

TS

PS

MU

B/M

QUANTITY

500 LF

3 EA

4.8 LB

14 LB

215 SY

165 SY

LIMITS OF DISTURBANCELOD 0.09 AC

JOB NO.

SHEET NO.

SCALE

DESIGNED BY

CHECKED BY

D A T E

DRAWN BY

DATE

R E V I S I O

N D

E S C R I P T I O

N

T h e s e p la n s a n d a s s o c ia te d d o c u m e n ts a re t h e e x c lu s iv e p ro p e rt y o f T

IM

M

O N

S G

R O

U P a n d m a y n o t b e r e p ro d u c e d i n w h o le o r in p a rt a n d s h a ll n o t b e u s e d f o r a n y p u rp o s e w h a ts o e v e r, i n c lu s iv e b u t n o t lim it e d t o c o n s tr u c ti o n b id d in g a n d /o r c o n s tr u c ti o n s ta k in g w it h o u t th e e x p re s s w ri tt e n c o n s e n t o f

T

IM

M O

N S

G R

O U

P

04/28/2023

N W

H I T E H

I L L D

R I V E D

R A I N

A G

E I

M P R O

V E M

E N

T C I T Y O

F P

E T E R S B U

R G

V

I R G

I N

I A

51547

L

\5

-W h it e h ill

D r\

D W

G \S w a le

P h a s e \S h e e t\

C D

\5 C

-3 .0

-E R

O S

.d w g P lo tt e d o n

/8 /2

:0 P

M b y K e ls e y R e d m a n

C3.2

E R O

S I O

N

S E D

I M

E N

T C

O N

T R O

L P

L A N

K. REDMAN

S. REEVES

M. CLAUD

AS SHOWN

NAD 83

SCALE 1"=20'

40'20'

G G

W W

W

W

WWWWWW

W

W W

W W

UGT

G G

G G

G

46 47

S A

N S

A N

S A

N S

A N

S A

N S

A N

S A

N S

A N

S A

N S

A N

S A

N

X

X X

X

XX

XXX

XX XX

O H

U

OHU

OHU

OHU

OHU

OHU

O H

U

O H

U

OHU

OHU

XXX

XX

OHU OHU OHU OHU OHU OHU OHU

X

X

X X

X

X X

X X

X

OHU

OHU

OHU

OHU

OHU

OHU

O H

U O

H U

O H

U

OHU

X

OHU

O H

U O

H U

O H

U

T

O P

O G

R A

P H

IC

S

U R

V E

Y

2021 TOPOGRAPHIC

SURVEY

T

O P

O G

R A

P H

IC

S U

R V

E Y

T

O P

O G

R A

P H

IC

L

ID

A

R D

A T

A A

N D

G

IS

M A

P P

IN

G

2014 TOPOGRAPHIC LIDAR

DATA AND GIS MAPPING

T

O P

O G

R A

P H

IC

L

ID

A

R

D A

T A

A N

D G

IS

M

A P

P

IN

G

USE CAUTION IN

VICINITY OF EXISTING

FIRE HYDRANT AND

WATER LINE

(DO NOT DISTURB)

UTILITY NOTE: CONTRACTOR SHALL COORDINATE WITH DOMINION POWER TO ESTABLISH AN OVERHEAD UTILITY PROTECTION

PLAN. CONTRACTOR SHALL FOLLOW ALL REQUIREMENTS SET FORTH BY DOMINION POWER FOR UTILITY PROTECTION

REPLACE 76 LF OF 3'

CHAIN LINK FENCING

& TOP RAIL

REPLACE 119 LF 3'

CHAIN LINK FENCING &

TOP RAIL

REPLACE GATE C

REPLACE

GATE B

REPLACE GATE A

REPLACE GATE D

CONTRACTOR TO

COORDINATE

WITH TELEPHONE

TO ADJUST UGT

REINSTALL EX.

NEIGHBORHOOD

WATCH SIGN PER

VDOT STP-1

SEE NOTE 1

REPLACE 260 SF

GRAVEL DRIVEWAY

U1

U2

6" PVC

U3

U6

6" PVC

U8

15" CLASS III RCP

10+00

10+50 11+00 11+50 12+00 12+50 12+91.17 U10

15" HDPE

S E

C T

IO

N

S E

C T

IO

N

U4

6" PVC

SWALE CENTERLINE PROFILE

U6

72' OF 6" PERFORATED PVC

@ 0.50% U10

38' OF 15" HDPE

@ 0.42%

9+90 10+00 10+50 11+00 11+50 12+00 12+50 12+90

DRY SWALE

SECTION B INVERT

DRY SWALE

SECTION A

INVERT

STA 11+42.36

END PERFORATED 6" PVC.

BEGIN SOLID WALL 6" PVC.

USE CAUTION IN

VICINITY OF EX.

FIRE HYDRANT

AND WATER LINE

STA 11+14.80

END PERFORATED 6" PVC.

BEGIN SOLID WALL 6" PVC.

U3

TOP 45.30

INV IN…