Drawings LWM HVAC.pdf
PDF 4 MB Posted
- Solicitation number
- 6973GH-25-R-00054
About this file
This is a set of engineering drawings for an HVAC replacement and roof rehabilitation project at the Lawrence Municipal Airport Air Traffic Control Tower (ATCT) in Lawrence, Massachusetts. The drawings include detailed plans for replacing multiple HVAC units, installing new vibration isolation curbs, and repairing/rehabilitating the roof.
The drawings consist of multiple sheets showing electrical one-line diagrams, panel schedules, mechanical HVAC schedules, mechanical ductwork details, civil demolition plans, and structural details. Key specifications include replacement of an 8.5-ton York rooftop HVAC unit, installation of new package terminal AC units, electric unit heaters, and vibration isolation curbs. The electrical drawings indicate power requirements and circuit configurations for the new equipment. The mechanical drawings provide detailed dimensions and specifications for ductwork modifications, condensate drainage, and equipment placement. The roof repair portion includes elastomeric coating application and addressing damaged regions identified through infrared moisture surveys. The drawings also specify safety requirements, fall protection measures, and coordination requirements with FAA personnel for equipment shutdowns and access.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| LWM RFI Answers_rev1.pdf | ||
| LWM RFI Answers.pdf | ||
| 6973GH-25-R-00054_Amd 0001.pdf | ||
| 6973GH-25-R-00054.pdf | ||
| Offeror Organizational Experience Form.pdf | ||
| Wage Determination_MA20240001_Essex County.pdf | ||
| 6973GH-25-R-00054.pdf | ||
| SF-25_PerformanceBond.pdf | ||
| SOW_LWM HVAC.pdf | ||
| Contractors Release Form DOT F 4220.4.doc | DOC document | |
| Uniform Bipartisan Infrastructure Law Report FAA Form 4400-93.xlsx | XLSX spreadsheet | |
| SF-25A_PaymentBond.pdf | ||
| SF-24_BidBond.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV DESCRIPTION JCN
DATE
REDLINE
APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
/2
/2
:5
:3
A
M P lo tt e d b y S
R V
C -C
A E
G -E
D M
S -C
O O
R D
DATE
APPROVED
lw m -2
-g
.d w g
8 234567
H
G
F
E
D
C
A
B
DRAWING INDEX
DRAWING NO. DRAWING TITLE
LWM-21005021-GOO1 COVER SHEET & INDEX SHEET
ROOF REPAIRS
ELECTRICAL ONE LINE DIAGRAM
ELECTRICAL PANEL SCHEDULE
MECHANICAL HVAC SCHEDULE
MECHANICAL DUCTWORK DETAILS
MECHANICAL HVAC DETAILS
LWM-21005021-C001
LWM-21005021-E001
LWM-21005021-E002
LWM-21005021-M001
LWM-21005021-M002
LWM-21005021-M003
CAB HVAC REPLACEMENT AND ROOF REHAB
AIR TRAFFIC CONTROL TOWER (ATCT)
LAWRENCE MUNICIPAL AIRPORT
LAWRENCE, MASSACHUSETTS
NOT TO SCALE
SITE PLAN
ATCT
HANGER
BASE
BUILDING
CIVIL DEMOLITIONLWM-21005021-D001
MECHANICAL DEMOLITIONLWM-21005021-D002
HVAC AND VIBRATION CURBLWM-21005021-S001
LWM-21005021-GOO2 GENERAL NOTES
VIBRATION CURB CUTSHEETLWM-21005021-M004
IS
S
U E
D F
O R
E D
M
10/23/2023
MGR: ENGINEERING CENTER
LAWRENCE
LWM-21005021-G001
SP
SP
ATCT
HVAC REPLACEMENT AND ROOF REHAB PROJECT
COVER SHEET & INDEX SHEET
lw m -2
-g
.d w g
OPS INFRASTRUCTURE
ENGINEERING SERVICES
ATO - TECHNICAL OPERATIONS EASTERN SERVICE AREA
C O
N S
T R
U C
T
IO
N
LAWRENCE MUNICIPAL AIRPORT
THIS DRAWING PRODUCED ON NEW ENGLAND REGION CAD SYSTEM
PROJECT ENGINEER
21005021
10/23/2023 CONSTRUCTION 21005021
MA
A
T OF TRANSPO
R T A T
IO
N
M
E R
IC
A
OF
STATES
U N
IT
E D
D E P A R
TM
EN
AVIA
T
IO
N
LA
R
E
D E
F
TRAT
IO
N
SI
NI
M
D A
REV DESCRIPTION JCN
DATE
REDLINE
APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
/2
/2
:0
:0
A
M P lo tt e d b y S
R V
C -C
A E
G -E
D M
S -C
O O
R D
DATE
APPROVED
lw m -2
-g
.d w g
8 234567
H
G
F
E
D
C
A
B
DRAWING PREFIXES
GXXX - GENERAL
DXXX - DEMOLITION
CXXX - CIVIL
EXXX - ELECTRICAL/ELECTRONIC
MXXX - MECHANICAL
DEMOLITION NOTES
GENERAL CONSTRUCTION NOTES
ELECTRICAL NOTES
SYMBOLS LEGEND
CONTRACTOR MUST PROVIDE TEMPORARY LIGHTING OVERNIGHT AND DURING OUTAGES15.
CONTRACTOR MUST PROVIDE A DUMPSTER ON SITE FOR ALL CONSTRUCTION DEBRIS.14.
MUST BE SERVICED ON A WEEKLY BASIS.
CONTRACTOR MUST PROVIDE A PORT-A-JOHN FOR THE DURATION OF THE CONSTRUCTION PROJECT. FACILITIES 13.
THE ENVIRONMENTAL CONDITIONS. CONTRACTOR MUST PROVIDE SHELTER IF REQUIRED.
CONTRACTOR MUST STORE NEW EQUIPMENT AND MATERIALS ON SITE IN A MANNER THAT IT IS PROTECTED FROM 12.
CONTRACTOR MUST CONTACT THE CO AND COR PRIOR TO PROCEEDING WITH CONSTRUCTION.
IF CONDITION ONSITE ARE DIFFERENT FROM THOSE INDICATED ON THE DRAWINGS OR SPECIFICATIONS, THE 11.
INDICATED. THE CONTRACTOR MUST BE RESPONSIBLE FOR ALL REQUIRED PERMITS.
THE CONTRACTOR MUST PROVIDE ALL LABOR, EQUIPMENT, AND REQUIRED TEMPORARY POWER UNLESS OTHERWISE
ALL FITTINGS, TRANSITIONS, DAMPERS, VALVES, AND OTHER DEVICES REQUIRED FOR A COMPLETE INSTALLATION.
THE CONTRACTOR MUST PROVIDE ALL MATERIAL UNLESS OTHERWISE INDICATED. THE CONTRACTOR MUST PROVIDE 10.
NECESSARY. PROTECT ALL EXISTING FINISHED FLOORING, WALLS, CEILINGS, DURING DEMOLITION AND CONSTRUCTION.
DAMAGE, IMMEDIATELY NOTIFY THE CO AND COR. THE CONTRACTOR MUST MAKE REPAIRS AND REPLACEMENTS AS
THE CONTRACTOR MUST USE ALL MEANS NECESSARY TO PROTECT EXISTING WORK, AND IN THE EVENT OF 9.
RIGHT TO SUSPEND THE PROJECT SHOULD AN UNSAFE CONDITION EXIST.
THE CONTRACTOR MUST STRICTLY COMPLY WITH ALL OSHA REGULATIONS AT ALL TIMES. THE COR RESERVES THE 8.
THE COR TWO WEEKS PRIOR TO OPERATION.
PROTECTED FROM ALL CONSTRUCTION DEBRIS AT ALL TIMES. ALL SHUTDOWNS MUST SCHEDULED IN WRITING WITH
EQUIPMENT MUST REMAIN OPERATIONAL THROUGHOUT THE PROJECT DURATION. ALL FAA EQUIPMENT MUST BE 7.
MUST BE SUBMITTED FOR THE APPROVED LISTED PURCHASED EQUIPMENT.
WRITTEN INSTRUCTIONS AND RECOMMENDATIONS, UNLESS OTHERWISE NOTED. ALL NEW EQUIPMENT SUPPORTS, CONTRACTOR MUST INSTALL ALL EQUIPMENT AND ACCESSORIES IN ACCORDANCE WITH THE MANUFACTURER'S 6.
CONSTRUCTION START.
CONTRACTOR MUST COMPLY WITH ACCESS ROUTES, STAGING AREAS, AND PARKING AREAS APPROVED PRIOR TO 5.
TO START OF CONSTRUCTION.
BE SCALED TO DETERMINE THE EXACT LOCATIONS OF WORK. CONTRACTOR MUST VERIFY DIMENSIONS ONSITE PRIOR
THE DRAWINGS ARE DIAGRAMMATIC AND ARE TO CONVEY SCOPE, GENERAL ARRANGEMENT ONLY, AND MUST NOT 4.
THE CONDITIONS.
FACILITY. START OF CONSTRUCTION ACTIVITIES WILL NEED TO BE STAGGERED DURING INSTALLATION TO BEST SUITE
CONTRACTOR MUST COORDINATE ALL WORK TO AVOID ANY AND ALL CONFLICTS WITH PERSONNEL WORKING AT THE 3.
AND SIZES OF ALL DUCTWORK, EQUIPMENT, AND ACCESSORIES THAT IS TO BE DEMOLISHED.
BEFORE THE START OF ALL WORK, CONTRACTORS MUST VERIFY THEIR SCOPE OF WORK, LOCATION, ELEVATION, 2.
LAWRENCE, MA.
FOR THE AIR TRAFFIC CONTROL TOWER (ATCT) THAT SERVES THE LAWRENCE MUNICIPAL AIRPORT (LWM), THIS DRAWING PACKAGE INDICATES WORK REQUIRED FOR THE REMOVAL AND INSTALLATION OF A HVAC SYSTEM 1.
COR.
CONTRACTOR MUST RETURN SITE TO ORIGINAL CONDITION PRIOR TO PROJECT COMPLETION WITH ACCEPTANCE OF 6.
REQUIREMENTS FOR PERSONS DISPOSING OF REFRIGERANT. SEE EPA 40 CFR PART 82, SUBPARTS A AND F.
AC EQUIPMENT MUST HAVE REQUIRED CERTIFICATIONS. CONTRACTOR TO MAINTAIN RECORD KEEPING
HVAC SYSTEM. ALL REFRIGERANT RECOVER EQUIPMENT AS WELL AS PERSONNEL DISPOSING OF REFRIGERATION/
INCLUDING, BUT NOT LIMITED TO THE REMOVAL, STORAGE, AND DISPOSAL OF THE REFRIGERANT IN THE EXISTING
CONTRACTOR MUST HANDLE REFRIGERANT ACCORDING TO LOCAL, STATE, AND FEDERAL REQUIREMENTS; 5.
SUBSTANCES.
CONTRACTOR MUST PROVIDE REQUIRED DOCUMENTATION AND MANIFEST FOR THE DISPOSAL OF CONTROLLED 4.
THE FAA.
CONTRACTOR MUST LEGALLY DISPOSE OF ALL MATERIAL AND EQUIPMENT NOT RETURNED TO OR RETAINED BY 3.
POLYTARP), ETC. FAA EQUIPMENT MUST NOT BE DAMAGED DURING DEMOLITION PERIOD.
LIMITED TO, METHODS TO LIMIT DUST PRODUCTION, EXHAUST SYSTEMS, PROTECTIVE COVERS (I.E. 2 MIL
EQUIPMENT DURING CONSTRUCTION AND DEMOLITION ACTIVITIES. DUST MITIGATION PLAN MUST INCLUDE, BUT NOT
CONTRACTOR MUST SUBMIT A DUST MITIGATION PLAN TO COR FOR APPROVAL TO PREVENT DAMAGE TO FAA 2.
CONDITION AT THE END OF EACH WORK SHIFT.
IMPACT SITE OPERATIONS. THE AFFECTED WORK AREAS MUST BE THOROUGHLY CLEANED TO THEIR ORIGINAL
COMPLETION OF THE WORK SHIFT EACH DAY. SITE CONDITIONS THROUGHOUT CONSTRUCTION PERIOD WILL NOT
REMOVE ALL DEBRIS, RUBBISH, SCRAP, DIRT, AND PROTECTIVE COVERINGS FROM THE WORK AREAS UPON 1.
MECHANICAL NOTES
MAINTENANCE, OPERATION, AND SERVICE REQUIREMENTS. COORDINATE TRAINING SCHEDULE WITH COR.
CONTRACTOR MUST PROVIDE A (4) HOUR TRAINING FOR THE FAA PERSONNEL FOR THE NEW HVAC SYSTEM'S 10.
OR TABB QUALIFIED.
COPY OF TEST RESULTS AND REPORT IN CLOSE OUT DOCUMENTS. TAB CONTRACTOR MUST BE EITHER AABC, NEBB, LEVEL OF CAB DURING PACKAGE UNIT OPERATION. PROVIDE COR WITH RESULTS AS WELL AS TAB REPORT. INCLUDE
AIRFLOW, SUPPLY AIR TEMPERATURE, AND RETURN AIR TEMPERATURE AND RECORD RESULTS. MEASURE SOUND
COMPLETED HVAC SYSTEM AND ADJUST AIRFLOW RATES TO THE CFM INDICATED IN DRAWING M002. MEASURE
CONTRACTOR MUST HAVE CERTIFIED PROFESSIONAL PERFORM TESTING, ADJUSTING, AND BALANCING (TAB) OF THE 9.
ENGINEER'S REVIEW AND APPROVAL.
STRUCTURAL COMPONENTS MUST NOT BE CUT, DRILLED OR MODIFIED IN ANY MANNER WITHOUT A STRUCTURAL 8.
CONDENSATE DRAINS MUST BE MADE OF PVC SUITABLE (SCHEDULE 80) FOR THIS APPLICATION.7.
PROVIDE TEMPORARY FIRE EXTINGUISHERS DURING CONSTRUCTION.
PERFORMING THE OPERATION. COMPLY WITH OSHA STANDARDS FOR WELDING IN 29 CFR-1910 AND 29 CFR-1926.
OPERATIONS; PERSON PERFORMING FIRE PROTECTION DUTIES MUST NOT BE THE SAME INDIVIDUAL THAT IS
DESIGNATE A PERSON TO BE RESPONSIBLE FOR FIRE PROTECTION DURING WELDING BRAZING AND CUTTING 6.
WARRANTY FOR EQUIPMENT SUPPLIED.
COPIES OF SERVICE CONTRACTS, CONTRACTOR'S (ONE YEAR) WARRANTY ON INSTALLATION, AND MANUFACTURER'S
MANUAL, INCLUDING MANUFACTURER'S MANUALS FOR ALL EQUIPMENT FURNISHED, A LIST OF EQUIPMENT SUPPLIERS, PRIOR TO PROJECT CLOSE OUT, THE CONTRACTOR MUST FORWARD AN OWNER'S OPERATING AND MAINTENANCE 5.
CONTRACTOR MUST PROVIDE HVAC MANUFACTURER'S FIVE YEAR WARRANTY ON COMPRESSORS AND COILS 4.
NEW INSULATED WALL SLEEVE FOR NEW AC UNITS MUST BE INSTALLED WATER AND WEATHER TIGHT. 3.
MATERIALS OR WORKMANSHIP.
HIS OWN EXPENSE, PROMPTLY CORRECT AND REPAIR ANY AND ALL BREAKS, FAILURES OR WEAR DUE TO FAULTY
CONTRACTOR FOR A PERIOD OF ONE YEAR FROM THE DATE OF FINAL ACCEPTANCE. THE CONTRACTOR MUST, AT
EQUIPMENT, MATERIALS AND WORKMANSHIP OF THE MECHANICAL INSTALLATION MUST BE WARRANTIED BY THE 2.
DRAWINGS, SPECIFICATION, AND AS REQUIRED BY THE CODES AND MANUFACTURER'S INSTALLATION INSTRUCTIONS.
MECHANICAL SYSTEMS; AND MUST MAKE SURE THE NEW MECHANICAL SYSTEMS OPERATES AS INDICATED IN THE
CONTRACTOR MUST PROVIDE ALL MATERIALS, EQUIPMENT, AND LABOR REQUIRED TO COMPLETELY INSTALL THE NEW 1.
ENERGIZE EQUIPMENT.
PROVIDE THEIR OWN LOCK OUT DEVICES. ONLY FAA PERSONNEL ARE ALLOWED TO ENERGIZE/ DE-
CONTRACTOR MUST PROVIDE A LOCK OUT TAG PLAN PRIOR TO START DEMOLITION. CONTRACTOR MUST 10.
CONDUCTORS AND CABLES.
INSULATION MEGGER TESTS MUST BE PERFORMED IN THE PRESENCE OF THE COR ON ALL NEW 9.
ALL NEW CONDUITS MUST BE CLEARED OF DEBRIS AND A PULL STRING INSTALLED.8.
INSTRUCTIONS.
ALL EQUIPMENT AND CABLES MUST BE TESTED AS REQUIRED PER MANUFACTURER'S INSTALLATION 7.
EXTERNAL 6AWG GREEN BONDING CONDUCTOR.
FLEXIBLE LIQUIDTIGHT CONDUIT MUST BE ALL PLASTIC PVC TYPE, WITH FLEXIBLE STEEL CORE AND AN 6.
AT EACH END, IN EACH PULL BOX, AND EVERY 3 FEET WHERE THE CONDUCTOR IS VISIBLE.
ALL INSULATED CONDUCTORS MUST BE PROPERLY AND PERMANENTLY IDENTIFIED AND COLOR CODED 5.
OF POWER AND MUST BE IN THE PRESENCE OF THE COR.
VOLTAGE AND PHASE ROTATION TESTS MUST BE PERFORMED BEFORE AND AFTER ANY DISCONNECTION 4.
THE CONTRACTOR MUST FURNISH ALL LABOR, MATERIAL AND EQUIPMENT UNLESS OTHERWISE INDICATED.3.
RESIDENT ENGINEER AND FAA.
THE COMPLETION OF THE PROJECT. COORDINATE REQUIRED EQUIPMENT SHUTDOWNS WITH THE
CONTRACTOR TO FIELD VERIFY ALL CONDITIONS AND REROUTE CONDUITS AS NECESSARY TO SUPPORT 2.
ELECTRICAL WORK) AND FAA-STD-019. (DOCUMENTATION AVAILABLE AT CONTRACTOR'S REQUEST)
ALL ELECTRICAL WORK MUST COMPLY WITH LATEST EDITION OF SPECIFICATIONS FAA-C-1217 (INTERIOR 1.
CIVIL NOTES
TO THE ATTENTION OF FAA CONTRACTING OFFICER'S REPRESENTATIVE ANY DISCREPANCIES.
DISCREPANCIES: CONTRACTOR MUST VERIFY ALL DIMENSIONS, CONDITIONS AND ELEVATIONS AT JOB SITE AND BRING 6.
THE CONTRACTOR MUST FIELD VERIFY ALL DIMENSIONS AFFECTED BY THE PROJECT.5.
THE CONTRACTOR IS REQUIRED TO MEET OSHA'S FALL PROTECTION AND SAFETY RULES AND REGULATIONS.4.
COR.
OF ANY WORK BEING PERFORMED. ANY DELAYS OR RESCHEDULING OF THE WORK MUST BE COORDINATED WITH THE
A DETAILED WORK SCHEDULE MUST BE PRESENTED FOR APPROVAL TO THE COR AT LEAST 24 HOURS IN ADVANCE 3.
MUST COORDINATE ACCESS TO THE SITE WITH THE FAA AHEAD OF TIME.
CONSTRUCTION SITE ACCESS: THE CONSTRUCTION SITE IS LOCATED WITHIN A GATED FACILITY. THE CONTRACTOR 2.
DRAWINGS, SPECIFICATION, AND AS REQUIRED BY THE CODES AND MANUFACTURER'S INSTALLATION INSTRUCTIONS.
ROOFING SYSTEMS; AND MUST MAKE SURE THE NEW ROOFING SYSTEM MUST BE INSTALLED AS INDICATED IN THE
CONTRACTOR MUST PROVIDE ALL MATERIALS, EQUIPMENT, AND LABOR REQUIRED TO COMPLETELY INSTALL THE NEW 1.
ABBREVIATIONS
CO - CONTRACTING OFFICER
COR - CONTRACTING OFFICER'S REPRESENTATIVE
PEL - PROJECT ENGINEER LEAD
FILLER FOR NOW
SXXX - STRUCTURAL
IS
S
U E
D F
O R
E D
M
10/23/2023
MGR: ENGINEERING CENTER
LAWRENCE
LWM-21005021-G002
SP
SP
ATCT
HVAC REPLACEMENT AND ROOF REHAB PROJECT
GENERAL NOTES
lw m -2
-g
.d w g
OPS INFRASTRUCTURE
ENGINEERING SERVICES
ATO - TECHNICAL OPERATIONS EASTERN SERVICE AREA
C O
N S
T R
U C
T
IO
N
LAWRENCE MUNICIPAL AIRPORT
THIS DRAWING PRODUCED ON NEW ENGLAND REGION CAD SYSTEM
PROJECT ENGINEER
21005021
10/23/2023 CONSTRUCTION 21005021
MA
SUBTITLE REFERENCE
SCALE
ELEVATION CALLOUT REFERENCE
ELEVATION REFERENCE LETTER
SECTION REFERENCE LETTER
DETAIL REFERENCE NUMBER
DETAIL CALLOUT REFERENCE
SECTION CALLOUT REFERENCE
X
XXXXXXXXXXX
SCALE: X=XXX
XXXX
X
XXXX
ELEVATION IS LOCATED
SHEET NUMBER WHERE
DETAIL IS LOCATED
SHEET NUMBER WHERE
SECTION IS LOCATED
SHEET NUMBER WHERE
XXXX
X
XXXX
X
DETAIL, ELEVATION OR SECTION IS/ARE LOCATED
SHEET NUMBER(S) WHERE CALLOUT(S) TO PLAN,
(PLAN, DETAIL, ELEVATION OR SECTION)
REFERENCE NUMBER/LETTER
REV DESCRIPTION JCN
DATE
REDLINE
APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
/2
/2
:0
:1
A
M P lo tt e d b y S
R V
C -C
A E
G -E
D M
S -C
O O
R D
DATE
APPROVED
lw m -2
-e
.d w g
8 234567
H
G
F
E
D
C
A
B
PANEL MDP
120/208 VAC 3ph/4W
SIEMANS S3-400A
300 A MAIN CB
PH CKTCKTEQUIPMENT EQUIPMENT
A
B
6C
A
B
C
A
B
C
AMPS AMPS
125 125
A
B
C
7 8
9 10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
ROOF TOP HVAC
PANEL A
PANEL B
PANEL D
PANEL C
BLANK
BLANK
BLANK
LIFT GATE
BLANK
R/W 32 PAPI
SPARE
PH CKTCKTEQUIPMENT EQUIPMENT
A
B
6C
A
B
C
A
B
C
AMPS AMPS
A
B
C
7 8
9 10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
PANEL A
120/208 VAC 3ph/4W
GE A-SERIES
125 AMP / MLO
LIGHTS-ELECTRIC ROOM
20OUTSIDE LIGHTS
20 CEILOMETER LIGHT
A-PHONE SYSTEM
ELEVATOR SHAFT LIGHTS
SPARE
HVAC - MAIN ELECTRIC ROOM
CENTERFIELD OBS LGTS
STAIRWELL AND EMERGENCY LIGHTS
DOOR HOLDER
FIRE ALARM PANEL
OUTSIDE BLDG RECEPTICLE/ HEAT TAPE
WALL RECEPTACLE-MAIN ROOM
SPARE
EXHAUST FAN & AUTO. LOUVER
STAIRWELL HEATER (GROUND FLOOR)GENERATOR BATTERY CHARGER
PH CKTCKTEQUIPMENT EQUIPMENT
A
B
6C
A
B
C
A
B
C
AMPS AMPS
A
B
C
9 10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
PANEL B
120/208 VAC 3ph/4W
25 26
27 28
29 30
31 32
33 34
35 36
37 38
39 40
41 42
A
B
C
A
B
C
A
B
C
WALL RECEPTACLE IN CAB
DAMPERS
FIRE ALARM CONTROL PANEL
3RD FLR RACK #1 RECEPTACLE
BEACON
ELECTRIC HEATER - 4TH FLOOR
HOT WATER HEATER
RACK #1 PLUG MOLD#1
O/H LIGHTS-OFFICE-2ND LEVEL
WALL RECPT.-OFFICE-2ND LEVEL
WALL RECPT.-OFFICE-3RD LEVEL
O/H LIGHTS-OFFICE-3RD LEVEL
TELRAD - 3RD LEVEL
DVRS AUX (DENRO)
ROOF TOP UNIT ROOF LIGHTS
WALL RECEPTACLE-4TH LEVEL
STVS
PLUGMOLD AT CENTER
DALR AUX
SQUARE - D NQOD
225 AMP/125 AMP MAIN CB
DALR
HVAC -3RD FLOOR ELECTRIC RM.
NOTAM COMPUTER
RACK #2 PLUG MOLD #3
SUBPANEL B
DISC 10/13/00
REFRIERATOR UNIT IN CAB
OBS. LIGHTS, OUTSIDE LIGHTS,
WALL RECEPT. BEHIND CAB
O/H LIGHTS IN TOWER CAB
ROOFTOP UNIT___/ ROOF LIGHTS
STARS RECEPS SPARE
MCI
ASOS ACU STVS
PLUGMOLD AT CENTER
HVAC -4TH FLOOR ELECTRIC RM.
40 20
PH CKTCKTEQUIPMENT EQUIPMENT
A
B
6C
A
B
C
A
B
C
AMPS AMPS
A
B
C
7 8
9 10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
PANEL D
120/208 VAC 3ph/4W
25 26
27 28
29 30
A
B
C
GE A-SERIES
125 AMP / MLO
3600 RACK
STARS
BLANK
ACE-IDS
TELCO RACK RCP
FTI RACK - PRIMARY
119.250 MHZ PRIMARY
SWS
BLANK
FTI RACK - SECONDARY
124.3 MHZ - PRIMARY
DC BUS - PCU 2
HVAC - 2ND FLOOR ELECTRIC ROOM
DC BUS SUPPLY - INVERTER 1
DC BUS SUPPLY - INVERTER 2 20 30
DC BUS - PCU 1
30 30
BLANK
BLANK
BLANK
BLANK
BLANK
BLANK
BLANK
BLANK
BLANK
BLANK
STARS
LOCATION IDENTIFIED BY STAR #1
ELECTRICAL REQUIREMENTS TO EXISTING UNIT'S MOP AND MCA. BREAKER
UNIT FOR THE NEW ROOF TOP PACKAGHE HVAC UNIT. MATCH NEW UNIT'S
REUSE CONDUIT, CONDUCTORS, AND BREAKERS 1,3,5 FROM EXISTING HVAC 1.
MAIN DISTRIBUTION PANEL NOTES
#4
UNIT'S MOP AND MCA. BREAKER LOCATIONS IDENTIFIED BY STAR
MATCH NEW UNIT'S ELECTRICAL REQUIREMENTS TO EXISTING
FROM EXISTING AC UNIT FOR NEW THROUGH THE WALL UNIT.
REUSE CONDUIT, CONDUCTORS, AND BREAKERS 22 AND 24 3.
BREAKER LOCATIONS IDENTIFIED BY STAR #3
ELECTRICAL REQUIREMENTS TO EXISTING UNIT'S MOP AND MCA.
FROM EXISTING EUH FOR NEW EUH-2. MATCH NEW UNIT'S
REUSE CONDUIT, CONDUCTORS, AND BREAKERS 16, 18, AND 20 2.
LOCATIONS IDENTIFIED BY STAR #2
REQUIREMENTS TO EXISTING UNIT'S MOP AND MCA. BREAKER
EXISTING EUH FOR NEW EUH-1. MATCH NEW UNIT'S ELECTRICAL
REUSE CONDUIT, CONDUCTORS, AND BREAKERS 1 AND 2 FROM 2.
PANEL "A" NOTES
MCA. BREAKER LOCATIONS IDENTIFIED BY STAR #7
ELECTRICAL REQUIREMENTS TO EXISTING UNIT'S MOP AND
41 FROM EXISTING EUH FOR NEW EUH-3. MATCH NEW UNIT'S
REUSE CONDUIT, CONDUCTORS, AND BREAKERS 37, 39, and 3.
REFERENCE ONLY.
BREAKERS FOR PTAC-3 (EXISTING UNIT TO REMAIN). FOR
BREAKER LOCATION IDENTIFIED BY STAR #6 INDICATES THE 2.
AND MCA. BREAKER LOCATIONS IDENTIFIED BY STAR #5
UNIT'S ELECTRICAL REQUIREMENTS TO EXISTING UNIT'S MOP
FROM EXISTING AC UNIT FOR NEW PTAC UNIT. MATCH NEW
REUSE CONDUIT, CONDUCTORS, AND BREAKERS 1 AND 3 1.
PANEL "B" AND SUB-PANEL "B" NOTES
BREAKER LOCATIONS IDENTIFIED BY STAR #8
ELECTRICAL REQUIREMENTS TO EXISTING UNIT'S MOP AND MCA.
EXISTING AC UNIT FOR NEW PTAC UNIT. MATCH NEW UNIT'S
REUSE CONDUIT, CONDUCTORS, AND BREAKERS 8 AND 10 FROM 1.
PANEL "D" NOTES
(EUH-1)
ELECTRIC ROOM (2 POLE)
ELECTRIC HEATER IN
THEIR OWN LOCK OUT DEVICES.
COR PRIOR TO ELECTRICAL WORK. CONTRACTOR MUST SUPPLY
CONTRACTOR MUST SUBMIT A LOCK OUT TAG OUT PLAN TO THE ·
ONLY FAA PERSONNEL MAY OPERATE BREAKERS·
TO OUTAGE
COORDINATE ALL EQUIPMENT OUTAGES WITH COR, 48 HOURS PRIOR ·
BE UTILIZED DURING CONSTRUCTION
STARRED NOTES IDENTIFY FEEDERS/ CIRCUIT BREAKERS THAT WILL ·
NOTES:
IS
S
U E
D F
O R
E D
M
10/23/2023
MGR: ENGINEERING CENTER
LAWRENCE
LWM-21005021-E002
SP
SP
ATCT
HVAC REPLACEMENT AND ROOF REHAB PROJECT
ELECTRICAL PANEL SCHEDULE
lw m -2
-e
.d w g
OPS INFRASTRUCTURE
ENGINEERING SERVICES
ATO - TECHNICAL OPERATIONS EASTERN SERVICE AREA
C O
N S
T R
U C
T
IO
N
LAWRENCE MUNICIPAL AIRPORT
THIS DRAWING PRODUCED ON NEW ENGLAND REGION CAD SYSTEM
PROJECT ENGINEER
21005021
10/23/2023 CONSTRUCTION 21005021
MA
REV DESCRIPTION JCN
DATE
REDLINE
APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
/2
/2
:5
:3
A
M P lo tt e d b y S
R V
C -C
A E
G -E
D M
S -C
O O
R D
DATE
APPROVED
lw m -2
-c
.d w g
8 234567
H
G
F
E
D
C
A
B
ROOF TOP
HVAC UNIT & CURB
(SEE NOTE 3)
DAMAGED WALKWAY MATS.
HATCHING INDICATES EXISTING
CREATE A TRAFFIC SURFACE.
ENTIRE ROOF SURFACE TO
COATING WILL BE APPLIED TO
APPLICATION OF GRIT MATERIAL
(SEE NOTE 4)
(OR APPROVED EQUAL)
OF ELASTOMERIC COATING.
LET DRY PRIOR TO APPLICATION
FROM EXISTING ROOF SYSTEM AND
CLEAN LOOSE SAND AND DEBRIS
ALONG THE ROOF LINE
THE NEAREST ROOF DRAIN
CONDENSATE DRAIN PIPED TO
EXISTING TO REMAIN
BILCO ROOF HATCH,
(SEE NOTE 2)
ROOF DRAIN (TYP)
NOTES:
WARRANTY.
MEETS MANURFACTURER'S INSTALLATION REQUIREMENTS AND MUST RECEIVE NEW 20 YEAR ROOF
CONTRACTOR MUST HAVE COATING MANUFACTURER'S REPRESENTATIVE VERIFY THAT NEW ROOFING SYSTEM 8.
ELASTOMERIC COATING
THE EPDM HAS BECOME UN-ADHERED AND WILL NEED TO REPAIRED PRIOR TO THE APPLICATION OF
BELOW THE STEEL BALCONY, THERE ARE AREAS A ROOF DECK THAT IS COVERED IN AN EPDM. SOME OF 7.
WARRANTY.
HVAC FLASHING MUST BE COVERED IN ELASTOMERIC TOPCOAT TO OBTAIN MANUFACTURER'S ROOF 6.
INSTALLATION INSTRUCTIONS.
STAND AS WELL AS THE HATCH. FLASHING COATING MUST BE APPLIED ACCORDING TO MANUFACTURER'S
ELASTOMERIC COATINGS SHALL BE APPLIED UP THE VERTICAL FLASHING OF THE HVAC CURB/SEISMIC 5.
EQUAL).
ELASTOMERIC COATING SHALL BE SIKALASTIC ROOFING PRIMER, REMAT PREMIUM AND 641 (OR APPROVED 4.
HVAC UNIT. ADD GRIT MATERIALS TO FINISHED WALKING AREA.
RE-ADHERE EXISTING LOOSE WALKWAY PADS ON BASE BUILDING FROM LADDER TO HVAC AND AROUND 3.
CONTRACTOR TO CLEAN ROOF DRAINS, AND REMOVE ANY DEBRIS FROM THE AREA.2.
CONTRACTOR TO SUBMIT ALL MATERIALS FOR APPROVAL FOR THE NEW ROOFING SYSTEM1.
OVER EXISTING ROOFING SYSTEM.
APPLY ELASTOMERIC COATING
CONTINUE DOWN THE FACADE
OVER PARAPET WALL AND
APPLY ELASTOMERIC COATING
(SEE NOTE 5 AND 6)
HATCH AND THE HVAC CURBS.
THE VERTICAL SIDES OF THE
APPLY ELASTOMERIC COATING UP
(TYP)
WALKWAY PADS
TO REMAIN
COUNTERPOISE, EXISTING
ROOF HATCH TO
DURING CONSTRUCTION ACTIVITIES
HVAC UNIT. REMOVE AND PROTECT
LUG CONNECTOR TO ATTACH TO NEW
EXISTING TO BE REUSED. USE A 2
ROOFTOP UNIT TO COUNTERPOISE,
(TYP. OF 4 PLACES)
TO ELASTOMERIC COATING
NEED TO REPAIRED, PRIOR
DAMAGED EPDM LAYER WILL
LOWER EXPOSED ROOF WITH
ELASTOMERIC COATING.
APPLICATION OF
ALL RAILINGS PRIOR TO
EXPOSE BARE METAL ON
BUILDING LINK
BASE BUILDING ROOFTOP
HVAC
ROOF
HATCH
CAB ROOF TOP
SUPPLY
RETURN
SEE NOTE 3
WALKWAY PADS
IS
S
U E
D F
O R
E D
M
10/23/2023
MGR: ENGINEERING CENTER
LAWRENCE
LWM-21005021-C001
SP
SP
ATCT
HVAC REPLACEMENT AND ROOF REHAB PROJECT
ROOF REPAIRS
lw m -2
-c
.d w g
OPS INFRASTRUCTURE
ENGINEERING SERVICES
ATO - TECHNICAL OPERATIONS EASTERN SERVICE AREA
C O
N S
T R
U C
T
IO
N
LAWRENCE MUNICIPAL AIRPORT
THIS DRAWING PRODUCED ON NEW ENGLAND REGION CAD SYSTEM
PROJECT ENGINEER
21005021
10/23/2023 CONSTRUCTION 21005021
MA
NOT TO SCALE
ATCT AND BASE BUILDING PLAN VIEW
C001
NOT TO SCALE
CAB PARTIAL ELEVATION
C001
REV DESCRIPTION JCN
DATE
REDLINE
APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
/2
/2
:5
:4
A
M P lo tt e d b y S
R V
C -C
A E
G -E
D M
S -C
O O
R D
DATE
APPROVED
lw m -2
-d
.d w g
8 234567
H
G
F
E
D
C
A
B
BUILDING LINK
SIDEWALK
ROOF
HATCH
PARKING LOT
BASE BUILDING ROOFTOP
CAB ROOF TOP
SIDEWALK
B1
A2
A1
NOTES:
REMOVE AND RE-SET SAFETY RAILINGS AS NEEDED TO APPLY ELASTOMERIC COATING5.
IN PLACE.
INCLUDE, BUT NOT LIMITED TO, SCOPE OF WORK TO BE ACCOMPLISHED AND RISK MITIGATION TO BE PUT
CONTRACTOR MUST SUBMIT A FALL PROTECTION PLAN FOR ROOF WORK TO BE APPROVED. PLAN MUST 4.
NEW INSULATION AND MATERIALS MUST MATCH EXISTING MATERIALS.3.2.
INSTRUCTIONS
NEW INSULATION AND MATERIALS MUST BE INSTALLED ACCORDING MANUFACTURER'S INSTALLATION 3.1.
CONTRACTOR MUST PROVIDE NEW INSULATION AND PATCH WITH DRY ROOF MATERIALS WHERE REMOVED.3.
CONTRACTOR MUST REMOVE WET INSULATION FOUND.2.1.
A1, A2, AND B1.
CONTRACTOR MUST REMOVE SECTIONS OF DETERIORATED ROOF FROM THE INDICATED AREAS MARKED AS 2.
AREA B1 IS APPROX. 3' X 4'1.3.
AREA A2 IS APPROX. 3' X 3'1.2.
AREA A1 IS APPROX. 13' X 8'1.1.
SINCE SURVEY WAS COMPLETED (SURVEY DATE WAS 4/11/2023).
SURVEY TO LOCATE DAMAGED REGIONS. DAMAGED REGIONS MAY HAVE GROWN DUE TO FURTHER MOISTURE
AREAS ARE APPROXIMATE, AND ARE FOR REFERENCE ONLY. USE THE PROVIDED INFRARED ROOF MOISTURE 1.
D001
ATCT AND BASE BUILDING PLAN VIEW
NOT TO SCALE
DETERIORATED ROOFING MATERIALS. ROOF EQUIPMENT NOT SHOWN FOR CLARITY.
NOTE: PLAN VIEW IS DIAGRAMMATIC TO SHOW APPROXIMATE LOCATION OF
HVAC
(TYP. OF 2)
ROOF DRAIN
HVAC
23'-5"
35'-2"
(TO BE DEMOLISHED)
TO ROOF
LADDER
IS
S
U E
D F
O R
E D
M
10/23/2023
MGR: ENGINEERING CENTER
LAWRENCE
LWM-21005021-D001
SP
SP
ATCT
HVAC REPLACEMENT AND ROOF REHAB PROJECT
CIVIL DEMOLITION
lw m -2
-d
.d w g
OPS INFRASTRUCTURE
ENGINEERING SERVICES
ATO - TECHNICAL OPERATIONS EASTERN SERVICE AREA
C O
N S
T R
U C
T
IO
N
LAWRENCE MUNICIPAL AIRPORT
THIS DRAWING PRODUCED ON NEW ENGLAND REGION CAD SYSTEM
PROJECT ENGINEER
21005021
REV DESCRIPTION JCN
DATE
REDLINE
APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
/2
/2
:0
:5
A
M P lo tt e d b y S
R V
C -C
A E
G -E
D M
S -C
O O
R D
DATE
APPROVED
lw m -2
-d
.d w g
8 234567
H
G
F
E
D
C
A
B
D002
EXISTING DUCTWORK LAYOUT
NOT TO SCALE
CONTROL
CAB LEVEL
CEILING
SUSPENDED
CONTROL
C-1 LEVEL
C-2 LEVEL
GROUND LEVEL
C-3 LEVEL
CAB LEVEL
CAB FALSE CEILING
PARAPET
.5
"ROOF DECK
1'-8.5"
D002
ATCT ELEVATION-EXISITNG
NOT TO SCALE
WAC-1
PTAC-1
PTAC-2
PTAC-3
WINDOW AC
UH-1
UH-3
UH-2
REFER TO M001 FOR MECHANICAL REQUIREMENTS·
ALL ELECTRICAL PANELS SHOWN ARE TO REMAIN·
HATCHING INDICATES EQUIPMENT TO BE DEMOLISHED·
ELEVATION VIEW IS DIAGRAMMATIC TO SHOW APPROXIMATE LOCATION OF EQUIPMENT·
NOTE:
EQUIPMENT ROOM
FIRST FLOOR
EQUIPMENT ROOM
SECOND FLOOR
EQUIPMENT ROOM
THIRD FLOOR
EQUIPMENT ROOM
FOURTH FLOOR
D002
ROOFTOP UNIT DEMOLITION DETAIL
NOT TO SCALE
(SEE NOTE 6)
CFR PART 82, SUBPART A AND F
CONTRACTOR TO MAINTAIN RECORD KEEPING REQUIREMENTS FOR PERSONS DISPOSING OF REFRIGERANTS. SEE EPA 40
CERTIFICATIONS. CONTRACTOR MUST HANDLE REFRIGERANT ACCORDING TO LOCAL, STAT, AND FEDERAL REQUIREMENTS.
RECOVERY EQUIPMENT AS WELL AS PERSONNEL DISPOSING OF REFRIGERATION/ AC EQUIPMENT MUST HAVE REQUIRED
CONTRACTOR MUST REMOVE REFRIGERANT FROM EXISTING ROOFTOP UNIT PRIOR TO DEMOLITION. ALL REFRIGERANT 12.
CONTRACTOR MUST MODIFY EXISTING OPENINGS TO ACCOMMODATE NEW AC UNIT INSULATED SLEEVES.11.
CONTRACTOR MUST DEMOLISH THE EXISTING VIBRATION ISOLATION ROOF CURB.10.
CONTRACTOR MUST DEMOLISH ALL EXISTING SUPPLY DUCT CLAMPS AND HANGERS.9.
THERMOSTATS FOR ELECTRIC UNIT HEATERS AND PTAC UNITS.
CONTRACTOR MUST DEMOLISH EXISTING THERMOSTAT FOR CAB ROOFTOP UNIT, AS WELL AS ANY WALL MOUNTED 8.
CONTRACTOR MUST PROTECT ALL EQUIPMENT FROM DEMOLITION 7.
CEILING PANELS THAT GET DAMAGED DURING CONSTRUCTION PERIOD. NEW CEILING PANELS MUST MATCH EXISTING.
CONTRACTOR MUST REMOVE CEILING PANELS TO REMOVE/ INSTALL HVAC SYSTEM. CONTRACTOR MUST REPLACE ANY 6.
AND RESTART THE 72 HOUR TESTING PERIOD.
FAILS TO PROVIDE CONTINUOUS COOLING, DURING 72 HOUR TESTING PERIOD, CONTRACTOR MUST ADDRESS THE ISSUE
SUCCESSFULLY PROVIDED CONTINUOUS COOLING TO THE CONDITIONED SPACED FOR 72 HOURS. IF TEMPORARY UNIT
THE DEMOLITION WORK IS TO COMMENCE AFTER THE TEMPORARY HVAC UNIT AND DUCTWORK ARE IN PLACE AND HAVE 5.
A SCHEDULED OPERATION WITH AN APPROVED PLAN.
SUPPLIED. UNSCHEDULED LOSS OF EQUIPMENT IS UNACCEPTABLE. DISRUPTION OF POWER SHALL ONLY BE ALLOWED AS
ALL SPACES IN CONTROL TOWER ARE OPERATIONAL SPACES. EQUIPMENT WILL GO INTO ALARM IF COOLING IS NOT 4.
TEMPORARY EQUIPMENT THAT IS CONDITIONING THE CAB, IS PROVIDED.
TEMPORARY HVAC EQUIPMENT IS REQUIRED DURING REPLACEMENTS OF ALL (3) PTAC UNITS. SCHEDULE FOR 3.
EQUIPMENT, INSTALL METHOD, AND CUTOVER PROCEDURE.
CONTRACTOR MUST SUBMIT A TEMPORARY HVAC PLAN PRIOR TO DEMOLITION FOR APPROVAL. PLAN MUST INCLUDE 2.
AREAS INDICATED BY HATCHING ARE TO BE DEMOLISHED, EXACT DIMENSIONS TO BE VERIFIED ON SITE.1.
NOTES:
TEMP-1
MARK SERVICE TYPE
UNIT IDENTIFICATION
CFM
NOMINAL
3,000
NO. OF
CIRCUITS
REFRIGERANT
R-410A
HEAT
TYPE STAGES
AMBIENT
VOLTS PHASE HZ
208/230 3 60
THICKNESSTYPE ASHRAE STD
AIR COOLED
KW
EFFICIENCY
FILTER DATA
TEMP.°F
ELECTRICAL DATAEVAPORATOR
AIR
CONDITIONING
COIL 27
CONDENSER
TEMPORARY HEATING AND AIR CONDITIONING SCHEDULE - TEMPORARY EQUIPMENT PROVIDING COOLING TO CAB
MOP
(AMPS)
100 PLEATED
MCA
(AMPS)
HUMDIFIER
2"
NONE
MERV 8
LOW
TONNAGE
COOLING
TOTAL
7.5 102 MBH
TO BE DEMOLISHED:
1. 8.5 TON YORK ROOFTOP HVAC UNIT
2. HVAC VIBRATION ISOLATION CURB
3. ROOFTOP UNIT THERMOSTAT (ALL ASSOCIATED CONTROLS)
4. THROUGH THE WALL AC UNIT - FIRST FLOOR EQUIPMENT ROOM
5. 3 KW ELECTRIC UNIT HEATER - FIRST FLOOR EQUIPMENT ROOM
6. 5 KW ELECTRIC UNIT HEATER - FIRST FLOOR STAIRWELL
7. PACKAGE TERMINAL AC UNIT - SECOND FLOOR EQUIPMENT ROOM
8. PACKAGE TERMINAL AC UNIT - THIRD FLOOR EQUIPMENT ROOM
9. WINDOW AC UNIT - FOURTH FLOOR EQUIPMENT ROOM
10. 10 KW ELECTRIC UNIT HEATER - CAB STAIRWELL
11. FLEX SUPPLY DUCTWORK (8") - TYPICAL OF 12
12. SUPPLY DUCTWORK AND PLENUM
TO REMAIN:
1. PACKAGE TERMINAL AC UNIT - FOURTH FLOOR EQUIPMENT ROOM
2. SUPPLY DROP - HARDLINE DUCT, AND GRILLE
3. RETURN DUCTWORK
4. RETURN GRILLE
5. LINEAR SUPPLY DIFFUSER - TYPICAL OF 12
6. ROOF HATCH AND DROP DOWN STAIRS
7. LIGHTNING RODS - TYPICAL
8. PANEL A
9. PANEL D
10. PANEL B
11. SUB-PANEL B
12. PANEL MDP
IS
S
U E
D F
O R
E D
M
10/23/2023
MGR: ENGINEERING CENTER
LAWRENCE
LWM-21005021-D002
SP
SP
ATCT
HVAC REPLACEMENT AND ROOF REHAB PROJECT
MECHANICAL DEMOLITION
lw m -2
-d
.d w g
OPS INFRASTRUCTURE
ENGINEERING SERVICES
ATO - TECHNICAL OPERATIONS EASTERN SERVICE AREA
C O
N S
T R
U C
T
IO
N
LAWRENCE MUNICIPAL AIRPORT
THIS DRAWING PRODUCED ON NEW ENGLAND REGION CAD SYSTEM
PROJECT ENGINEER
21005021
REV DESCRIPTION JCN
DATE
REDLINE
APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
/2
/2
:5
:5
A
M P lo tt e d b y S
R V
C -C
A E
G -E
D M
S -C
O O
R D
DATE
APPROVED
lw m -2
-e
.d w g
8 234567
H
G
F
E
D
C
A
B
TVSS
GEN
4 #2, 1 #8G
3 #8, 1 #10G
MAIN
DISTRIBUTION
PANEL 1
MDP
208/120VAC
3 PHASE, 4 WIRE
300A, MCBM
240 VAC, 30A
2 POLE, 3 WIRE
30A
10KW ENGINE
GENERATOR SET
240/120 VAC, 3 WIRE
2# 12, 1 #12G
2# 12
208/120VAC
3 PHASE, 4 WIRE
100A MCB
EQUIPMENT ROOM
PANEL
A
PANEL
D
FIRE
ALARM
PANEL
FACP
4 #2, 1 #8G
4 #4, 1 # 8G
LEVEL C-3
CAB ROOF
AHU-1
STAIRWELL
PRESSURIZATION
FAN, SP-1
(240 VAC, 1 PHASE, 3 WIRE)
MOTOR
STARTER
3 #10 & 1# 10G
3 #10, 1 #10G
AUTOMATIC
TRANSFER SWITCH
LEVEL C-2
SUB
PANEL
B
208/120VAC
1 PHASE, 3 WIRE
MLO
PANEL
B
208/120VAC
3 PHASE, 4 WIRE
MLO
PANEL
C
208/120VAC
3 PHASE, 4 WIRE
100A MCB
CAB FLOOR
208/120VAC
3 PHASE, 4 WIRE
90A MLO
(4) #2 AWG, (1) #6AWG GND, 2"C
M
UTILITY COMPANY
2# 12 & 1 #12G
4 - 500 KCMIL, 2G
SURGE
PROTECTOR
3 #10, 1 #10G
UTILITY COMPANY
METER LOCATED
BASE OF TOWER
ONE LINE DIAGRAM
LEVEL C-1
FIRST FLOOR
(3) 1/0 AWG, (1) 6 AWG GND
(3) 1/0 AWG, (1)#6 AWG GND
IN 2" EMT
DC BUS
(2)3 #12, 1 #12G
(2)3 #10, 1 #10G
PAPI
DISC
BASE BUILDING
3 #6, 1 #10G
NON-FUSED INTERNAL DISCONNECT
ROOFTOP HVAC UNIT W/ UNIT MOUNTED
1UH-1
CAB STAIRWELL
10kW UNIT HEATER
QMARK
MODEL MUH108
LOCATED IN CAB
ON/OFF SWITCH
UNIT HEATER
UH
SWITCH
ONE LINE, SCHEMATIC DIAGRAM SYMBOLS
DISCONNECT SWITCH
CONTACT, NORMALLY OPEN
CONTACT, NORMALLY CLOSED
METER
MOTOR
CURRENT TRANSFORMER
BUILDING GROUND
ELECTRICAL ABBREVIATIONS
M
AUTOMATIC TRANSFER SWITCH
M
POWER TRANSFORMER
XXXKVA, OWNED & MAINTAINED
BY LOCAL UTILITY
FUSED
DISCONNECT
SWITCH
CURRENT LIMITING
FUSE, SIZED AS
INDICATED
COMBINATION MAGNETIC
MOTOR STARTER &
DISCONNECT SWITCH
DISCONNECT SWITCH
MOLDED CASE THERMAL MAGNETIC
CIRCUIT BREAKER, POLES
AND SIZE AS INDICATED
FIRE ALARM RADIO
MASTER BOX
A A AMPERE
AC ALTERNATING CURRENT
AF AMPERE FRAME
B BCRP BACKUP
C CB CIRCUIT BREAKER
CKT CIRCUIT
C CONDUIT
D DC DIRECT CURRENT
DISC DISCONNECT
D PNL DISTRIBUTION PANEL
DT DOUBLE THROW
E EG ENGINE GENERATOR
F FSS FUSIBLE SAFETY SWITCH
FDR FEEDER
FLA FULL LOAD AMPERES
G GFM GROUND FAULT MONITOR
H HTR HEATER
K KCMIL THOUSAND CIRCULAR MILS
KV KILOVOLT
KVA KILOVOLT AMPERES
KW KILOWATT
M MDT MAIN DISTRIBUTION TERMINAL
MLO MAIN LUGS ONLY
MCB MAIN CIRCUIT BREAKER
N N NEUTRAL
NEC NATIONAL ELECTRICAL CODE
P P POLE
PF POWER FACTER
PNL PANELBOARD
S ST SHUNT TRIP
SW SWITCH
V V VOLT, VOLTAGE
VA VOLT AMPERE
W W WATT
X XFMR TRANSFORMER
MISCELLANEOUS
O PHASE
CLOUD INDICATES SCOPE OF WORK
WAC-1
PTAC-1
PTAC-2
PTAC-3
UNIT HEATER
GROUND FLOOR
UNIT HEATER
STAIRWELL
GROUND FLOOR
UNIT HEATER
CAB STAIRWELL
WINDOW UNIT
IS
S
U E
D F
O R
E D
M
10/23/2023
MGR: ENGINEERING CENTER
LAWRENCE
LWM-21005021-E001
SP
SP
ATCT
HVAC REPLACEMENT AND ROOF REHAB PROJECT
ELECTRICAL ONE LINE DIAGRAM
lw m -2
-e
.d w g
OPS INFRASTRUCTURE
ENGINEERING SERVICES
ATO - TECHNICAL OPERATIONS EASTERN SERVICE AREA
C O
N S
T R
U C
T
IO
N
LAWRENCE MUNICIPAL AIRPORT
THIS DRAWING PRODUCED ON NEW ENGLAND REGION CAD SYSTEM
PROJECT ENGINEER
21005021
3'-5 1/2 "
6'-2" 3'-2" 1'
4'-5 1/4 " 7'-4 1/2 "
7'-3 1/8 "
4'-5 1/8 "
S001
SCALE: 1/2" = 1'-0"
VIBRATION CURB SECTION
S001
SCALE: 1/2" = 1'-0"
HVAC & CURB SECTION
S001
BUILT UP ROOFING
W
X .5
W
X .5
C6X8.2
C6X8.2
2C12X20.7
W6X8.5
SCALE: 1/2" = 1'-0"
CURB ANCHORS PLAN VIEW
S001
(COORDINATE WITH HVAC MANUF)
BOLT ROOF-TOP UNIT TO CURB
NOTES:
1. FIELD VERIFY EXISTING CONDITIONS AND ROOF OPENING DIMENSIONS BEFORE
STARTING CONSTRUCTION.
2. EQUIPMENT (HVAC, VIBRATION CURB, ETC.) MUST INSTALLED PER MANUFACTURER'S
RECOMMENDATIONS AND INSTRUCTIONS.
3. VIBRATION CURB TO ROOF STEEL PLATE FRAMING TO BE ATTACHED WITH TEKS HEX
HEAD 1/4" DIA. SELF DRILL SELF TAP SCREWS 1" LENGTH WITH STANDARD WASHERS.
PRE-DRILL HOLES IN STEEL PLATE AND USE TOTAL OF SIX (6) SCREWS, THREE (3) ON
TWO SIDES AS SHOWN ON DRAWING.
4. ELASTOMERIC COATING TO BE FIELD INSTALLED ON EXTERIOR OF VIBRATION CURB.
5. APPROXIMATE UNIT WEIGHT OF 300 LBS FOR VIBRATION CURB AND 1200 LBS FOR
HVAC UNIT. FINAL UNIT WEIGHT AND DIMENSIONS PER VENDOR MANUFACTURER.
6. REMOVE ROOFING AND OTHER MATERIALS TO GET DOWN TO STEEL ROOF DECKING.
7. REFER TO M004 FOR VIBRATION ISOLATION CURB DETAILS.
(SEE NOTE 3)
SELF TAPPING SCREWS
HVAC ROOF-TOP UNIT
(SEE NOTE 2)
VIBRATION CURB
UNIT (SEE NOTE 2)
HVAC ROOF-TOP
SCALE: 1" = 1'-0"
CURB CORNER DETAIL
S001
S001
SCALE: 1" = 1'-0"
CURB CORNER DETAIL
S001
S001
S001
ELASTOMERIC COATING (SEE NOTE 4)
EXISTING BUILT UP ROOFING (SEE NOTE 1)
EXISTING 1/4" PL STEEL DECKING
(SEE NOTE 3)
SELF TAPPING SCREWS
ELASTOMERIC COATING (SEE NOTE 4)
BUILT UP ROOFING (SEE NOTE 1)
EXISTING 1/4" PL STEEL DECKING
W
X .5
W
X .5
W
X .5
W
X .5
W
X .5
C
X .2
C
X .2
C
X .2
C
X .2
W
X .5
W
X .5
W
X .5
C
X .2
C
X .2
C6X8.2
C6X8.2
C6X8.2
C6X8.2
W6X8.5
C8x11.5
C8x11.5
2C12X20.7
C X .2
C X .2
W6X8.5
C X .2
C X .2
SCALE: 1/2" = 1'-0"
CAB ROOF FRAMING PLAN
S001
OPEN FOR
HVAC UNIT
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV DESCRIPTION JCN
DATE
REDLINE
APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
/2
/2
:0
:1
A
M P lo tt e d b y S
R V
C -C
A E
G -E
D M
S -C
O O
R D
DATE
APPROVED
lw m -2
-s
.d w g
8 234567
H
G
F
E
D
C
A
B
IS
S
U E
D F
O R
E D
M
10/23/2023
LAWRENCE
LWM-21005021-S001
CJO
CJO
ATCT
HVAC REPLACEMENT AND ROOF REHAB PROJECT
HVAC AND VIBRATION CURB
lw m -2
-s
.d w g
TERMINAL
ENGINEERING SERVICES
ATO - TECHNICAL OPERATIONS EASTERN SERVICE AREA
LAWRENCE MUNICIPAL AIRPORT
THIS DRAWING PRODUCED ON NEW ENGLAND REGION CAD SYSTEM
PROJECT ENGINEER
21005021
10/23/2023 CONSTRUCTION 21005021
MA
1' 0 3' 5'
SCALE: 1/2" = 1'-0"
1' 2' 4'
1' 0 1' 2'
SCALE: 1" = 1'-0"
REV DESCRIPTION JCN
DATE
REDLINE
APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
/2
/2
:0
:2
A
M P lo tt e d b y S
R V
C -C
A E
G -E
D M
S -C
O O
R D
DATE
APPROVED
lw m -2
-m
.d w g
8 234567
H
G
F
E
D
C
A
B
REMARKS:
LOW AMBIENT CONTROLS (DOWN TO 0°F)·
STAINLESS STEEL CONDENSATE DRAIN PAN·
CLOGGED FILTER SWITCH AND CONDENSATE DRAIN PAN OVERFLOW SWITCH·
SUPPLY AIR SMOKE DETECTOR·
DEHUMIDIFICATION COIL: MODULATING HOT GAS REHEAT·
POWERED 15A CONVENIENCE OUTLET·
UNIT MOUNTED CIRCUIT BREAKER·
THROUGH THE BASE ELECTRIC·
STANDARD COIL WITH HAIL GUARD·
INCH MERV 8 FILTERS HINGED ACCESS PANELS/ 2 ·
ADJUSTABLE MANUAL OUTSIDE AIR DAMPER 0-50% ·
27 KW (2 STAGE) ELECTRIC HEAT·
UNIT CONTROLS: SYMBIO 700·
208-230 VOLT/ 60 HZ/ 3 PHASE·
8.5 TON, DUAL COMPRESSOR·
R-410A·
DX COOLING·
INCLUDE THE FOLLOWING OPTIONS AND ACCESSORIES
PACKAGE ROOFTOP AIR CONDITIONER SCHEDULE
MARK MANUFACTURER MODEL
EVAPORATOR
RTU-1 TRANE 3
NOMINAL
CFM
EXT. S.P.
IN H20
1.17
°F
EDB
°F
EWB
67 3400
MBH
TOTAL
MBH
SENSIBLE
105.6 81.0
CONDENSOR
QTY. STAGES
REFRIGERANT
R-410A
HP
FAN
.7
CFM
FAN
SCROLL
MANIFOLD
TYPE
COMPR.
TEMP
AMBIENT
95 °F (32/68/100)
HEAT
27 KW
KWTYPE
ELECTRIC
DEHUMIDIFIER
REHEAT
HOT GAS
MODULATING
ELECTRICAL DATA
PHASE
HZVOLTS
MOCPMCA
107 110
FAN HP
INDOOR
8.8
FAN FLA
INDOOR
RLA
COMPR.
LRA
COMPR.
20.2 136
FLA
FAN
LRA
FAN
3.3 12.3**A1C1A2B0A0B410A
TSJ102A3S0K
FILTER DATA
- 24 X 16 X 2(3)
- 18 X 24 X 2(2)
QUANTITY
STD
ASHRAE
MERV 8COMPR.
WAC-1
MARK TYPE
UNIT IDENTIFICATION
TOTAL
HEATING
3550 WATTS
REFRIGERANT
VOLTS PHASE HZ
208/230 1 60
DESCRIPTION/ REMARKS
ELECTRICAL DATACOOLING
FREDRIECH
WET16A33A
HEATING
AIR CONDITIONER SCHEDULE
MOP
(AMPS)
MCA
(AMPS)
FAN MOTOR
MOISTURE
TONNAGE
COOLING
TOTAL
1.25 15400 BTU
ELECTRIC UNIT HEATER SCHEDULE
MARK MANUFACTURER MODEL
AIR DELIVERY DATA FAN MOTOR DATA ELECTRICAL DATA
TYPE
EUH-1 QMARK MUH0381 800 3
KWCFM FPM RPM
1600 1/100350
ELECTRIC HEAT
SS FIN
TUBULAR
AMPS
14.5
VOLTS PHASE
HZ
1 PHASE208
DELTA T °F
27°
HP
PHYSICAL
EUH-2 QMARK MUH0581 800 51600 1/100350
SS FIN
TUBULAR
24 60 3 PHASE20845°
DIMENSIONS
H X W X D
COMMENTS
16" X 14" X 7.5" ELECTRIC UNIT HEATER, FIRST FLOOR EQUIPMENT ROOM
ELECTRIC UNIT HEATER, FIRST FLOOR STAIRWELL
REFER TO E001 AND E002 FOR ELECTRICAL REQUIREMENTS.9.
CONTRACTOR MUST FIELD LOCATE UNIT HEATER THERMOSTATS.8.
SUBMIT ALL EQUIPMENT AND ACCESSORIES FOR APPROVAL PRIOR TO INSTALLATION.7.
FOR COMPLETE INSTALLATION.
CONTRACTOR MUST PROVIDE AND INSTALL EQUIPMENT AND ACCESSORIES ACCORDING TO MANUFACTURER'S INSTALLATION INSTRUCTIONS 6.
(QMARK CATALOG NUMBER B10).
PROVIDE AND INSTALL MUH108, OR APPROVED EQUAL (EUH-3). PROVIDE AND INSTALL MANUFACTURER WALL MOUNTING BRACKETS 5.
(QMARK CATALOG NUMBER CMB10).
PROVIDE AND INSTALL MUH0581, OR APPROVED EQUAL (EUH-2). PROVIDE AND INSTALL MANUFACTURER CEILING MOUNTING BRACKETS 4.
(QMARK CATALOG NUMBER CMB10).
PROVIDE AND INSTALL MUH0381, OR APPROVED EQUAL (EUH-1). PROVIDE AND INSTALL MANUFACTURER CEILING MOUNTING BRACKETS 3.
AND PTAC-2).
PROVIDE AND INSTALL FREDRIECH PVH09, INSULATED WALL SLEEVE, OR CONDENSATE DRAIN; OR PROVIDE APPROVED EQUAL (PTAC-1 2.
1).
PROVIDE AND INSTALL FREDRIECH WET16A33A, INSULATED WALL SLEEVE, OR CONDENSATE DRAIN; OR PROVIDE APPROVED EQUAL (WAC-1.
NOTES:
REMOVAL
4.8
PTS./HR
R-32
MOTOR
H.P.
INDOOR
CFM
NEMA
PLUG
6-20P 27"W X 17.25"H, FIRST FLOOR EQUIPMENT ROOM, THROUGH-THE-WALL AC UNIT
PTAC-1 3600 WATTS 208/230 1 60
FREDRIECH
PVH09K
20 19.9.75 9400 BTU 1.4R-410A 1/14 400 6-20P
PTAC-2 208/230 1 60
EUH-3 QMARK MUH108 970 101600 1/30650
SS FIN
TUBULAR
48 60 3 PHASE20849° 21.75" X 19" X 7.5"
16" X 14" X 7.5"
STAGED ELECTRIC UNIT HEATER, IN CAB STAIRWELL
ELECTRIC HEAT
WALL UNIT W/
ELECTRIC HEAT
PTAC UNIT W/ 42"W X 16"H, SECOND FLOOR EQUIPMENT ROOM, PACKAGE TERMINAL AC UNIT
ELECTRIC HEAT
PTAC UNIT W/ 3600 WATTSFREDRIECH
PVH09K
20 19.9.75 9400 BTU 1.4R-410A 1/14 400 6-20P 42"W X 16"H, THIRD FLOOR EQUIPMENT ROOM, PACKAGE TERMINAL AC UNIT
AND MODEL
MANUFACTURER
(ADJUSTABLE) OF OUTDOOR AIR.
THE MANUAL OUTSIDE AIR DAMPER MUST BE OPENED ALL FOR APPROXIMATELY 100 CFM ··
COORDINATION OF COR BASED ON LOCATION SHOWN IN DETAIL 3 (M002)
ROOFTOP UNIT'S THERMOSTAT MUST BE INSTALLED IN THE CONDITIONED SPACE, FIELD LOCATE WITH ··
NOTES·
WHEN SUPPLY SMOKE DETECTOR DETECTS SMOKE, THE ROOFTOP UNIT MUST SHUTDOWN6.1.4.
6.1.3.
6.1.2.
6.1.1.
6.1.
CAB LEVEL6.
SETPOINTS OF EXISTING (PTAC-3) UNIT WILL NOT BE ADJUSTED5.1.
FOURTH FLOOR EQUIPMENT ROOM5.
4.1.2.
4.1.1.
4.1.
THIRD FLOOR EQUIPMENT ROOM4.
3.1.2.
3.1.1.
3.1.
SECOND FLOOR EQUIPMENT ROOM3.
2.1.1.
2.1.
FIRST FLOOR STAIRWELL2.
1.1.3.
1.1.2.
1.1.1.
1.1.
FIRST FLOOR EQUIPMENT ROOM 1.
SEQUENCE OF OPERATIONS
REMARKS:
MANUFACTURE'S CONDENSATE DRAIN KIT4.
MANUFACTURE'S INSULATED WALL SLEEVE3.
WASHABLE FILTER2.
AUTO-RESTART1.
INCLUDE THE FOLLOWING OPTIONS AND ACCESSORIES
REMARKS:
WALL MOUNT (QMARK B10)3.
CEILING MOUNT (QMARK CM10)2.
WALL MOUNTED LINE VOLTAGE THERMOSTAT1.
INCLUDE THE FOLLOWING OPTIONS AND ACCESSORIES
IS
S
U E
D F
O R
E D
M
10/23/2023
MGR: ENGINEERING CENTER
LAWRENCE
LWM-21005021-M001
SP
SP
ATCT
HVAC REPLACEMENT AND ROOF REHAB PROJECT
MECHANICAL HVAC SCHEDULE
lw m -2
-m
.d w g
OPS INFRASTRUCTURE
ENGINEERING SERVICES
ATO - TECHNICAL OPERATIONS EASTERN SERVICE AREA
C O
N S
T R
U C
T
IO
N
LAWRENCE MUNICIPAL AIRPORT
THIS DRAWING PRODUCED ON NEW ENGLAND REGION CAD SYSTEM
PROJECT ENGINEER
21005021
REV DESCRIPTION JCN
DATE
REDLINE
APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
/2
/2
:0
:3
A
M P lo tt e d b y S
R V
C -C
A E
G -E
D M
S -C
O O
R D
DATE
APPROVED
lw m -2
-m
.d w g
8 234567
H
G
F
E
D
C
A
B
CONTROL
CAB LEVEL
AIR SUPPLY DROP
RETURN
AIR DUCT
DISTRIBUTION
BOXDISTRIBUTION
BOX
STRIP DIFFUSERS
8" FLEXIBLE
DUCT
A M002
ATCT PARTIAL ELEVATION
NOT TO SCALE
8" FLEXIBLE
DUCT
SUSPENDED
CEILING
HVAC UNIT
M002 NOT TO SCALE
36"X12'H
GALV DUCT
TURNING
VANES (TYP)
36"X12"H
GALV DUCT
8" FLEX DUCT
(TYP OF 12)
MANUAL
VOLUME DAMPER
(TYP OF 12)
SUPPLY
AIR DUCT
36"X12"H
GALV DUCT
DISTRIBUTION
BOX
M002
A
NEW DUCTWORK LAYOUT1
RETURN
AIR DUCT/GRILL
M002
HVAC PLAN
NOT TO SCALE
RETURN
SUPPLY
ROOF
HATCH
S E
R V
IC
E
C L E
A R
A N
C E
S
ROOF HATCH
INSTALL NEW SEISMIC CURB
(TYP OF 12)
SEE NOTE 1 POWERED CONVENIENCE OUTLET
THROUGH THE BASE ELECTRICAL WITH
UNIT MOUNTED CIRCUIT BREAKER
M003
CAB LEVEL
NOT TO SCALE
CAB
EQUIP
HATCH
FLOOR
(SEE NOTE 7)
SHOWN FOR CLARITY.
MUST BE INSTALLED INLINE WITH RETURN DUCTWORK. ONLY FLEX CANVAS DUCT CONNECTOR IN RETURN IS
INSTRUCTIONS. (1) CONNECTOR MUST BE INSTALLED INLINE WITH SUPPLY DUCTWORK AND (1) CONNECTOR
DUCT CONNECTOR ACCORDING TO VIBRATION ISOLATION CURB MANUFACTURER'S INSTALLATION
CONTRACTOR MUST PROVIDE AND INSTALL (2) FLEX CANVAS DUCT CONNECTORS. INSTALL FLEX CANVAS 11.
WITH DUCT SUPPORTS. SEE STATEMENT OF WORK FOR CONSTRUCTION DETAILS.
CONTRACTOR MUST PROVIDE AND INSTALL NEW 16 GAUGE GALV. STEEL SUPPLY DUCTWORK (34" X 12") 10.
SEE STATEMENT OF WORK FOR CONSTRUCTION DETAILS.
CONTRACTOR MUST PROVIDE AND INSTALL NEW INSULATED SUPPLY FLEX DUCT (8") WITH DUCT SUPPORTS. 9.
INSTALL PLASTIC COVER TO PROTECT THERMOSTAT FROM DIRECT SUNLIGHT
CONTRACT MUST PROVIDE AND INSTALL NEW ROOFTOP UNIT THERMOSTAT ON WALL IN CAB. PROVIDE AND 8.
CERTIFICATION PRIOR TO BALANCING, AND PROVIDE BALANCING REPORT AFTER COMPLETION
INSTALLED IN NEW DUCTWORK. BALANCING MUST BE DONE BY CERTIFIED PERSONNEL, PROVIDE
BALANCE ALL (12) LINEAR DIFFUSERS TO 300 CFM, USING THE MANUAL BALANCERS THAT SHALL BE 7.
COMPRESSION LUG ONTO BARE METAL.
CONTRACTOR TO REUSE EXISTING GROUNDING CONDUCTOR. ATTACH TO NEW UNIT USING TWO BOLT 6.
CLEAN ROOF DRAIN, AND REMOVE DEBRIS DURING CONSTRUCTION.5.
INSTALL A NEW PVC CONDENSATE DRAIN ACCORDING TO MANUFACTURER'S INSTRUCTIONS.4.
ISOLATION CURB AND ROOFTOP UNIT
CONTRACTOR MUST PROVIDE COORDINATION DRAWINGS OF THE INSTALLATION OF THE NEW VIBRATION
THE NEW HVAC UNIT MUST FIT ON THE NEW VIBRATION ISOLATION CURB. NEW UNIT MUST BE APPROVED. 3.
WHEN INSTALLING NEW UNIT, THE POWER CONDUCTORS WILL BE RE-USED FROM THE EXISTING UNIT.2.
ALL FLEX DUCTWORK SHALL HAVE A MAXIMUM LENGTH OF 6 FEET.1.
NOTES:
THERMOSTAT
(SEE NOTE 8)
(SEE DETAIL B)
CONDENSATE DRAIN
PANEL ENCLOSURE
.75 INCH NPT FEMALE CONNECTOR
1.5"
B
M002
CONDENSATE DRAIN DETAIL
NOT TO SCALE
(2021 IMC)
CONDENSATE DRAIN MUST HAVE A MINIMUM INNER DIAMETER OF 0.75 INCHES ·
DRAIN MUST BE SLOPE 1/2' PER 10 FEET OF HORIZONTAL RUN.·
ROOF DRAIN.
HORIZONTAL PIPE LENGTH MUST BE LONG ENOUGH TO REACH TO THE CAB ·
INSTRUCTIONS.
CONDENSATE DRAIN ACCORDING TO MANUFACTURER'S INSTALLATION
CONTRACTOR MUST PROVIDE AND INSTALL NEW PVC (SCHEDULE 80) ·
NOTE:
(SEE NOTE 7)
36" 48"
36"
36"
(SEE NOTE 10)
FLEX DUCT
INSULATED
(SEE NOTE 9)
LENGTH CAN BE FIELD DETERMINED
SEE DETAIL NOTES
ISOLATION CURB
HVAC VIBRATION
SEE NOTE 11
(TYP. OF 2)
FLEX CONNECTOR
IS
S
U E
D F
O R
E D
M
10/23/2023
MGR: ENGINEERING CENTER
LAWRENCE
LWM-21005021-M002
SP
SP
ATCT
HVAC REPLACEMENT AND ROOF REHAB PROJECT
MECHANICAL DUCTWORK DETAIL
lw m -2
-m
.d w g
OPS INFRASTRUCTURE
ENGINEERING SERVICES
ATO - TECHNICAL OPERATIONS EASTERN SERVICE AREA
C O
N S
T R
U C
T
IO
N
LAWRENCE MUNICIPAL AIRPORT
THIS DRAWING PRODUCED ON NEW ENGLAND REGION CAD SYSTEM
PROJECT ENGINEER
21005021
REV DESCRIPTION JCN
DATE
REDLINE
APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
/2
/2
:0
:3
A
M P lo tt e d b y S
R V
C -C
A E
G -E
D M
S -C
O O
R D
DATE
APPROVED
lw m -2
-m
.d w g
8 234567
H
G
F
E
D
C
A
B
M003
ATCT ELEVATION
NOT TO SCALE
WAC-1
PTAC-1
PTAC-2
PTAC-3
UH-1
UH-3
ELECTRIC 10KW
ELECTRIC 3KW
UH-2
ELECTRIC 5KW
STAIRWELL
STAIRWELLEQUIP. RM.
REFER TO SCHEDULES ON M001 FOR UNIT SCHEDULES·
MUST VERIFY LOCATIONS AND CONNECTIONS PRIOR TO CONSTRUCTION.
ELEVATION VIEW IS DIAGRAMMATIC TO SHOW APPROXIMATE LOCATIONS. CONTRACTOR ·
NOTE:
FIRST/GROUND FLOOR EQUIPMENT ROOM
SECOND FLOOR EQUIPMENT ROOM
THIRD FLOOR EQUIPMENT ROOM
FOURTH FLOOR EQUIPMENT ROOM
1 HVAC UNIT DIMENSIONS
NOT TO SCALE
27 9/16"
NOT TO SCALE
HVAC UNIT PENETRATION PLAN
S U
P P
L Y
R E
T U
R N
ALL FLANGES 1 1/4"
2 DOWNFLOW DUCT CONNECTIONS
NOT TO SCALE
4 3/16"
32 1/8"
33"
3 7/8"
17 1/2" 17 1/2"
9 13/16"
3 5/8"
RETURN SUPPLY
THROUGH THE
BASE ELECTRICAL
CONDENSER FAN
CONTROL BOX
ACCESS PANEL
CONDENSER COIL WITH
COIL GUARD
UNIT CONRTOL WIRE 7/8" DIA.HOLE
SERVICE GAUGE PORT ACCESS 1 3/8" DIA. HOLE
UNIT POWER WIRE
COMPRESSOR ACCESS
PANEL
CONDENSATE DRAIN (ALT)
3/4" - 14 NPT DIA. HOLE
EVAPORATOR SECTION
ACCESS PANEL
M003
HVAC ELEVATION
NOT TO SCALE
M003
HVAC ELEVATION - ACCESS PANELS
NOT TO SCALE
CONDENSER FAN
4 1/4"
BASERAIL LENGTH
27 9/16"
CONTROL PANEL ACCESS
COMPRESSOR ACCESS PANEL
CONTROL PANEL ACCESS
ACCESS PANEL
SECTION
EVAPORATOR
88 1/2"
4 7/8"
9"
53 1/4"
BASERAIL WIDTH
9 5/8"
11 1/4"
50 15/16"
15 1/4"
52 5/16"
17 3/4"
17 3/4"
TOP PANEL
3/4' 14 NPT DIA.HOLE
CONDENSATE DRAIN
THROUGH THE BASE
5 7/8"
3 3/4"
2 3/4"
5"
33 3/4"
M003
M003
M003
(NEW)
(NEW)
(NEW)
(NEW) (NEW)
(NEW)
DETAIL SHOWS DUCT UPWARDS FOR CLARITY.
NOTE: DIRECTION OF THE DUCT WORK IS DOWNWARDS TOWARDS THE BUILDING.
(EXISTING)
RTU-1
(NEW)
IS
S
U E
D F
O R
E D
M
10/23/2023
MGR: ENGINEERING CENTER
LAWRENCE
LWM-21005021-M003
SP
SP
ATCT
HVAC REPLACEMENT AND ROOF REHAB PROJECT
MECHANICAL HVAC DETAILS
lw m -2
-m
.d w g
OPS INFRASTRUCTURE
ENGINEERING SERVICES
ATO - TECHNICAL OPERATIONS EASTERN SERVICE AREA
C O
N S
T R
U C
T
IO
N
LAWRENCE MUNICIPAL AIRPORT
THIS DRAWING PRODUCED ON NEW ENGLAND REGION CAD SYSTEM
PROJECT ENGINEER
21005021
REV DESCRIPTION JCN
DATE
REDLINE
APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
/2
/2
:0
:2
A
M P lo tt e d b y S
R V
C -C
A E
G -E
D M
S -C
O O
R D
DATE
APPROVED
lw m -2
-m
.d w g
8 234567
H
G
F
E
D
C
A
B
IS
S
U E
D F
O R
E D
M
10/23/2023
MGR: ENGINEERING CENTER
LAWRENCE
LWM-21005021-M004
SP
SP
ATCT
HVAC REPLACEMENT AND ROOF REHAB PROJECT
VIBRATION CURB CUTSHEET
lw m -2
-m
.d w g
OPS INFRASTRUCTURE
ENGINEERING SERVICES
ATO - TECHNICAL OPERATIONS EASTERN SERVICE AREA
LAWRENCE MUNICIPAL AIRPORT
THIS DRAWING PRODUCED ON NEW ENGLAND REGION CAD SYSTEM
PROJECT ENGINEER
21005021
10/23/2023 CONSTRUCTION 21005021
MA
NOTES:
1. CONTRACTOR MUST PROVIDE AND INSTALL NOVIA
VIB CURB III SPRING CURB, TAG: TSJ102, OR
APPROVED EQUAL. CURB MUST BE INSULATED.
INSTALL ACCORDING TO MANUFACTURER'S
REQUIREMENTS.
2. CONTRACTOR MUST PROVIDE COORDINATION
DRAWINGS FOR INSTALLATION OF HVAC
EQUIPMENT ON EXISTING ROOF.
SCALE: NTS
MAIN PLAN VIEW
M004
NOT TO SCALE
DEFLECTION SPRING DETAIL
M004
NOT TO SCALE
SIDES AND CENTERLINES
M004
SCALE: NTS
SIDE DEFLECTION SPRING VIEW
S002
| lwm-21005021-d002.pdf |
| lwm-21005021-d002 |
| lwm-21005021-e001.pdf |
| lwm-21005021-e001 |
| lwm-21005021-e002.pdf |
| lwm-21005021-e002 |
| lwm-21005021-g001.pdf |
| lwm-21005021-g001 |
| lwm-21005021-g002.pdf |
| lwm-21005021-g002 |
| lwm-21005021-c001.pdf |
| lwm-21005021-c001 |
| lwm-21005021-d001.pdf |
| lwm-21005021-d001 |
| lwm-21005021-s001.pdf |
| lwm-21005021-s001 |
| lwm-21005021-m004.pdf |
| lwm-21005021-m004 |
| lwm-21005021-m003.pdf |
| lwm-21005021-m003 |
| lwm-21005021-m002.pdf |
| lwm-21005021-m002 |
| lwm-21005021-m001.pdf |
| lwm-21005021-m001 |
File details come from the government source that posted it. Updated .