Drawings - Lakeland - Part 2.pdf

PDF 3 MB Posted

Attached to
472/20007. RWG-Handlon & Lakeland CF-Fire Alarm System
Solicitation number
RFQ-171-200000000311-2
Issued by
Benzie County, Michigan

About this file

This is a set of architectural and electrical drawings from TowerPinkster for the Michigan Department of Corrections' Lakeland Correctional Facility in Coldwater, Michigan, detailing the replacement of Vigilant fire alarm smoke detectors. The drawings show floor plans and installation details for Buildings A, B, C, D and Building 61 (Powerhouse), including the locations of smoke detectors, heat detectors, pull stations, and other fire alarm system components. The project involves replacing existing smoke detectors with new Kidde model KI-PD heads and KI-SB4 bases while reusing existing wiring. The work must be completed one building at a time to maintain system functionality, with systems fully restored and secured at the end of each workday.

The drawings include detailed installation requirements specifying that all conduit must be EMT with compression fittings, security screws must be Torx with center pin, and devices must have mechanical connections preventing removal without tools. The plans show integration with the facility's StarNet 2 system and central monitoring station. Special requirements include providing a smoke detector cleaning device and handheld programmer for maintenance, having a programming specialist on-site throughout the project, and obtaining permits for work in Building 61. Device locations and mounting heights are specified, along with requirements for firestopping penetrations and maintaining fire ratings.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F F

F F

F

F

F

F

F

F

F

F

F

F

F

F

F F

ML

ML

F

F

F

F

WF

WF

OSY

SD SD

SD SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD SD SD

SD

SD

SD

SD

SD

SD SD

SD

SD

CLOSET

HR OFFICE

WARDEN'S

SECRETARY HR OFFICE

WARDEN'S OFFICE

CONFERENCE

TOILET

ADM ASSISTANCE

TOILET

KITCHENETTE

TOILET

STORAGE

LOCKER RMSTORAGE

JC

FRONT DESK

OFFICE

CLOSET

EVIDENCE RM

DATA

VEST

ARSENAL

OFFICE

STORAGE

MAIL ROOM

RECORDS OFFICE

SUP.

RECORDS OFFICE

TECH

RECORDS OFFICE

TECH

RECORDS OFFICE

HR OFFICE

TOILET

BUSINESS OFFICE

OFFICE

WAITING RM

MUSTER

BREAK

BUBBLE

SGT ARSENAL

OFFICE

VISITING

CLOSET

TOILET

JC

LOCKER RM

NON-CONTACT

VISITING

OFFICE

HEARING

LOBBY

CLOSET

SALLY

F

IL

E N

U M

B E

R

S T

A T

E I

N D

E X

N U

M B

E R

S

C o ns tr uc tio n

F in a l R e co rd

Is su e d f o r

P re lim in a ry

D a te

D E

S

IG

N A

N D

C O

N S

TR

U

C

TI

O N

D

IV

IS

IO

N

D E

P A

R T

M E

N T

O F

T E

C H

N O

L O

G Y

M

A N

A G

E M

E N

T

A N

D B

U D

G E

T S

T A

T E

O F

M

IC

H

IG

A N

R O

B E

R T

C

H A

L L

R A

N

C A

R B

D

IR

E

C T

O R

S T

A T

E F

A C

IL

IT

IE

S

A D

M

IN

IS

T

R A

T

IO

N

E a s t

K a la m a z o o A v e n u e

S u it e

K a la m a z o o

M ic h ig a n

-5

.3

.6

P H

O N

E

.3

.6

F A

X

T O

W E

R P

IN

K

S T

E R

.C O

M

A L L R

IG

H

T S

R E

S E

R V

E D

E a s t

F u lt o n S tr e e t, S u it e

G ra n d R a p id s

M ic h ig a n

.4

.9

P H

O

.4

.5

F A

X

S H

E E

T T

IT

L

E

S H

E E

T N

U M

B E

R

O W

N E

R P

R O

J E

C T

T

IT

L E

D A

T E

B U

IL

D

IN

G

A

F

IR

S T

F L

O O

R F

IR

E

A L A

R M

P L

A N

U

N

IT

.3

E

A

/5 /2

R E

P L A

C E

V

IG

IL

A

N T

F

IR

E A

L A

R M

S M

O K

E D

E T

E C

T O

R S

C o ld w a te r, M ic h ig a n

S T

A T

E O

F M

IC

H

IG

A

N D

E P

A R

T M

E N

T O

F C

O R

R E

C T

IO

N

S

1.

R W

G

/2

/2

/5

/2

GENERAL ELECTRICAL NOTES

LAKELAND CORRECTIONAL FACILITY

KEY PLAN

SCALE: NO SCALE

A

B

C

A/B

C/D

D

E

F

G

H

I

1/8" = 1'-0"

BUILDING A - FIRST FLOOR PLAN - UNIT 1

1 ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CUTTING

AND PATCHING REQUIRED FOR NEW WORK OR WHERE DEVICES ARE

REMOVED AND NOT REPLACED.

2 PATCH ALL PENETRATIONS AS REQUIRED TO MAINTAIN FIRE RATING.

3 WHEN CEILINGS ARE REMOVED ELECTRICAL CONTRACTOR SHALL

PROPERLY SUPPORT ALL CONDUIT AND LOW VOLTAGE WIRING AS

REQUIRED PER NEC.

4 REMOVE CEILINGS AND GRID AS REQUIRED. REPLACE ANY DAMAGED

CEILINGS.

5 PROVIDE LABEL FOR ALL FIRE ALARM DEVICES. NEW LABELING SHALL

FOLLOW THE EXISTING LABELS IN THE SYSTEM. FOR MORE DETAILS,

PLEASE SEE SPECIFICATIONS.

6 ALL SMOKE DETECTORS SHALL BE REPLACED WITH NEW SMOKE

DETECTORS KIDDE MODEL:

HEAD: KI-PD

BASE: KI-SB4

7 ONE BUILDING SHALL BE COMPLETED AT A TIME TO AVOID MULTIPLE

BUILDINGS BEING WITHOUT OPERABLE SYSTEMS AT THE SAME TIME.

THE SYSTEM SHALL BE RESTORED AND FULLY FUNCTIONAL AT THE END

OF EACH WORKDAY, WITH DEVICES FULLY SECURE WITH TAMPER-PROOF

FASTENERS, TO AVOID THE NEED FOR FIRE-WATCH AND TO ENSURE

SECURITY. FACILITY RESOURCES ARE SUCH THAT THERE SHOULD BE NO

CONSIDERATION THAT FIRE-WATCH CAN OR WILL BE PROVIDED BY THE

FACILITY.

8 THE CONTRACTOR SHALL PLAN ON REPLACING ONLY THE NUMBER OF

DETECTORS THAT CAN BE REPROGRAMMED, TESTED, AND FULLY

FUNCTIONAL AT THE END OF THE WORKDAY.

9 THE CONTRACTOR SHALL PROVIDE A SMOKE DETECTOR CLEANING

DEVICE FOR MAINTENANCE PURPOSES, ALONG WITH A NEW HANDHELD

PROGRAMMER.

10 NO DEVICES ARE TO BE RELOCATED. ALL SMOKE DETECTORS SHALL BE

REPLACED.

11 ALL WIRING SHALL BE REUSED.

12 A PROGRAMMING SPECIALIST SHALL BE ON-SITE UNTIL THE END OF THE

PROJECT TO REPROGRAM THE NEW SMOKE DETECTORS AT THE END OF

EACH WORKDAY.

13 THE FACILITY SHALL PROVIDE ASBESTOS REPORT IF PRESENT IN

BUILDINGS WHERE THE CONTRACTOR WILL PERFORM WORK.

14 BUILDING 61 "POWERHOUSE" WILL REQUIRE PERMIT. THE CONTRACTOR

SHALL INCLUDE THIS COST AND PROCESS IN THE SCOPE OF WORK.

ISSUED FOR DATE

1 SMOKE DETECTOR'S HEAD AND BASE HAVE BEEN REPLACED BY THE

FACILITY ALREADY. THE CONTRACTOR SHALL TEST AND MAKE SURE

THAT THIS DEVICE IS FUNCTIONING PROPERLY. PROVIDE

PROGRAMMING AS REQUIRED.

GENERAL ELECTRICAL NOTES

F

F

F

F

F

F

F

F F

F

F

F

F

FF

F

F

F

F

F

F

F

F

F

F

F F

F

F

F

F

F

F

F

F

F

WF

WF

OSY

OSY

WF

WF

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SDSD

SD SD SD SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

F F

F

F

F

SD

HOLDING CELL

HOLDING CELL

COPY RM

HOLDING CELL

INSPECTOR OFFICE

DEP. WARDEN

TOILET

COPY

HEARING

GRIEVANCE COORD.

DEP. WARDENS SEC.

ASSIST. DEP

WARDEN

DEP. WARDEN GOA

CONFERENCE RM

OFFICE

TOILET

JC

IT CLOSET

TRANSP.

STORAGE

LOBBY

OFFICE

STORAGE

TOILET

JC

TRANSP.

OFFICE

STORAGE

TOILET

DISHWASH

BOILER CLOSET

HEALTH UNIT OFFICE

OFFICE

CAFETERIA

BARBER SHOP

CLOSET

NURSING OFFICE

OPTOMETRY OFFICE

PROPERTY

CLOSET

COOLER

CONTROL CENTER

CONTROL CENTER

STAIR

CENTRAL SUPPLY

STORAGE

OFFICE

KITCHEN

FOOD TECH

MOP

MED. RECORDS

FACP

STORAGE

MECH

STORAGE

STAIR

STORAGEHOT WATER BOILER

NAC

F

IL

E N

U M

B E

R

S T

A T

E I

N D

E X

N U

M B

E R

S

C o ns tr uc tio n

F in a l R e co rd

Is su e d f o r

P re lim in a ry

D a te

D E

S

IG

N A

N D

C O

N S

TR

U

C

TI

O N

D

IV

IS

IO

N

D E

P A

R T

M E

N T

O F

T E

C H

N O

L O

G Y

M

A N

A G

E M

E N

T

A N

D B

U D

G E

T S

T A

T E

O F

M

IC

H

IG

A N

R O

B E

R T

C

H A

L L

R A

N

C A

R B

D

IR

E

C T

O R

S T

A T

E F

A C

IL

IT

IE

S

A D

M

IN

IS

T

R A

T

IO

N

E a s t

K a la m a z o o A v e n u e

S u it e

K a la m a z o o

M ic h ig

-5

.3

.6

P H

O

.3

.6

F A

X

T O

W E

R P

IN

K

S T

E R

.C O

M

A L L R

IG

H

T S

R E

S E

R V

E D

E a s t

F u lt o n S tr e e t, S u it e

G ra n d R a p id s

M ic h ig a n

.4

.9

P H

O

.4

.5

F A

X

S H

E E

T T

IT

L

E

S H

E E

T N

U M

B E

R

O W

N E

R P

R O

J E

C T

T

IT

L E

D A

T E

B U

IL

D

IN

G

A

B A

S E

M E

N T

A N

D F

IR

S

T F

L O

O R

F

IR

E A

L A

R M

P L

A N

U

N

IT

.3

E

B

/5 /2

R E

P L A

C E

V

IG

IL

A

N T

F

IR

E A

L A

R M

S M

O K

E D

E T

E C

T O

R S

C o ld w a te r, M ic h ig a n

S T

A T

E O

F M

IC

H

IG

A

N D

E P

A R

T M

E N

T O

F C

O R

R E

C T

IO

N

S

1.

R W

G

/2

/2

/5

/2

LAKELAND CORRECTIONAL FACILITY

KEY PLAN

SCALE: NO SCALE

A

B

C

A/B

C/D

D

E

F

G

H

I

GENERAL ELECTRICAL NOTES

1/8" = 1'-0"

BUILDING A - FIRST FLOOR PLAN - UNIT 2

1/8" = 1'-0"

BUILDING A - BASEMENT PLAN

1 ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CUTTING

AND PATCHING REQUIRED FOR NEW WORK OR WHERE DEVICES ARE

REMOVED AND NOT REPLACED.

2 PATCH ALL PENETRATIONS AS REQUIRED TO MAINTAIN FIRE RATING.

3 WHEN CEILINGS ARE REMOVED ELECTRICAL CONTRACTOR SHALL

PROPERLY SUPPORT ALL CONDUIT AND LOW VOLTAGE WIRING AS

REQUIRED PER NEC.

4 REMOVE CEILINGS AND GRID AS REQUIRED. REPLACE ANY DAMAGED

CEILINGS.

5 PROVIDE LABEL FOR ALL FIRE ALARM DEVICES. NEW LABELING SHALL

FOLLOW THE EXISTING LABELS IN THE SYSTEM. FOR MORE DETAILS,

PLEASE SEE SPECIFICATIONS.

6 ALL SMOKE DETECTORS SHALL BE REPLACED WITH NEW SMOKE

DETECTORS KIDDE MODEL:

HEAD: KI-PD

BASE: KI-SB4

7 ONE BUILDING SHALL BE COMPLETED AT A TIME TO AVOID MULTIPLE

BUILDINGS BEING WITHOUT OPERABLE SYSTEMS AT THE SAME TIME.

THE SYSTEM SHALL BE RESTORED AND FULLY FUNCTIONAL AT THE END

OF EACH WORKDAY, WITH DEVICES FULLY SECURE WITH TAMPER-PROOF

FASTENERS, TO AVOID THE NEED FOR FIRE-WATCH AND TO ENSURE

SECURITY. FACILITY RESOURCES ARE SUCH THAT THERE SHOULD BE NO

CONSIDERATION THAT FIRE-WATCH CAN OR WILL BE PROVIDED BY THE

FACILITY.

8 THE CONTRACTOR SHALL PLAN ON REPLACING ONLY THE NUMBER OF

DETECTORS THAT CAN BE REPROGRAMMED, TESTED, AND FULLY

FUNCTIONAL AT THE END OF THE WORKDAY.

9 THE CONTRACTOR SHALL PROVIDE A SMOKE DETECTOR CLEANING

DEVICE FOR MAINTENANCE PURPOSES, ALONG WITH A NEW HANDHELD

PROGRAMMER.

10 NO DEVICES ARE TO BE RELOCATED. ALL SMOKE DETECTORS SHALL BE

REPLACED.

11 ALL WIRING SHALL BE REUSED.

12 A PROGRAMMING SPECIALIST SHALL BE ON-SITE UNTIL THE END OF THE

PROJECT TO REPROGRAM THE NEW SMOKE DETECTORS AT THE END OF

EACH WORKDAY.

13 THE FACILITY SHALL PROVIDE ASBESTOS REPORT IF PRESENT IN

BUILDINGS WHERE THE CONTRACTOR WILL PERFORM WORK.

14 BUILDING 61 "POWERHOUSE" WILL REQUIRE PERMIT. THE CONTRACTOR

SHALL INCLUDE THIS COST AND PROCESS IN THE SCOPE OF WORK.

ISSUED FOR DATE

1 SMOKE DETECTOR'S HEAD AND BASE HAVE BEEN REPLACED BY THE

FACILITY ALREADY. THE CONTRACTOR SHALL TEST AND MAKE SURE

THAT THIS DEVICE IS FUNCTIONING PROPERLY. PROVIDE

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

WF

WF

OSY

SD

SD SD

SD

SD

SD SD

SD

SD

SD SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD SD

SD SD

SD

SD

SD

SD

SD

SD

SD

SD SD SD

SDSD

SD

SD

SDSDSD

SD SD

SD

SD

OPTOMETRY OFFICE

HOUSING (1

PERSON MAX)

DAY RM

HOUSING (3

PERSON MAX)

HOUSING (3

PERSON MAX)

OFFICE

INMATE RM EXAM RM DAY RM

HOUSING (3

PERSON MAX)

HOUSING (3

PERSON MAX)

HOUSING (5

PERSON MAX)

OFFICE

CLOSET

HOUSING (5

PERSON MAX)

HOUSING (3

PERSON MAX)

HOUSING (1

PERSON MAX)

HOUSING (3

PERSON MAX)

HOUSING (5

PERSON MAX)

HOUSING (3

PERSON MAX)

HOUSING (5

PERSON MAX)

OFFICER STATION

CLOSET

IT CLOSET

EXAM RM

EXAM RM

OFFICE

EXAM RM

EXAM RM

EXAM RM

STORAGE

ATTIC ACCESS

DENTAL

OFFICER STATION

TOILET

WAITING RM

EXAM RM

HOUSING (5

PERSON MAX)

HOUSING (5

PERSON MAX)

HOUSING (2

PERSON MAX)

HOUSING (3

PERSON MAX)

HOUSING (3

PERSON MAX)

HOUSING (4

PERSON MAX)

PHARMACY OFFICE

PHARMACY

HOUSING (2

PERSON MAX)

TOILET

LAUNDRY

JC

TOILET

OFFICER STATION

TOILET

HOUSING (2

PERSON MAX)

HOUSING (3

PERSON MAX)

HOUSING (3

PERSON MAX)

HOUSING (4

PERSON MAX)

HOUSING (5

PERSON MAX)

HOUSING (2

PERSON MAX)

HOUSING (5

PERSON MAX)

GYM

HOUSING (3

PERSON MAX)

MECH

DAY RM

CENTRAL SUPPLY

STORAGE

TOILET TOILET

A-100

TOILET

TOILET

F

IL

E N

U M

B E

R

S T

A T

E I

N D

E X

N U

M B

E R

S

C o ns tr uc tio n

F in a l R e co rd

Is su e d f o r

P re lim in a ry

D a te

D E

S

IG

N A

N D

C O

N S

TR

U

C

TI

O N

D

IV

IS

IO

N

D E

P A

R T

M E

N T

O F

T E

C H

N O

L O

G Y

M

A N

A G

E M

E N

T

A N

D B

U D

G E

T S

T A

T E

O F

M

IC

H

IG

A N

R O

B E

R T

C

H A

L L

R A

N

C A

R B

D

IR

E

C T

O R

S T

A T

E F

A C

IL

IT

IE

S

A D

M

IN

IS

T

R A

T

IO

N

E a s t

K a la m a z o o A v e n u e

S u it e

K a la m a z o o

M ic h ig

-5

.3

.6

P H

O

.3

.6

F A

X

T O

W E

R P

IN

K

S T

E R

.C O

M

A L L R

IG

H

T S

R E

S E

R V

E D

E a s t

F u lt o n S tr e e t, S u it e

G ra n d R a p id s

M ic h ig a n

.4

.9

P H

O

.4

.5

F A

X

S H

E E

T T

IT

L

E

S H

E E

T N

U M

B E

R

O W

N E

R P

R O

J E

C T

T

IT

L E

D A

T E

B U

IL

D

IN

G

A

F

IR

S T

F L

O O

R F

IR

E

A L A

R M

P L

A N

U

N

IT

.3

E

C

/5

/2

R E

P L A

C E

V

IG

IL

A

N T

F

IR

E A

L A

R M

S M

O K

E D

E T

E C

T O

R S

C o ld w a te r, M ic h ig a n

S T

A T

E O

F M

IC

H

IG

A

N D

E P

A R

T M

E N

T O

F C

O R

R E

C T

IO

N

S

1.

R W

G

/2

/2

/5

/2

LAKELAND CORRECTIONAL FACILITY

KEY PLAN

SCALE: NO SCALE

A

B

C

A/B

C/D

D

E

F

G

H

I

GENERAL ELECTRICAL NOTES

1/8" = 1'-0"

BUILDING A - FIRST FLOOR PLAN - UNIT 3

1 ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CUTTING

AND PATCHING REQUIRED FOR NEW WORK OR WHERE DEVICES ARE

REMOVED AND NOT REPLACED.

2 PATCH ALL PENETRATIONS AS REQUIRED TO MAINTAIN FIRE RATING.

3 WHEN CEILINGS ARE REMOVED ELECTRICAL CONTRACTOR SHALL

PROPERLY SUPPORT ALL CONDUIT AND LOW VOLTAGE WIRING AS

REQUIRED PER NEC.

4 REMOVE CEILINGS AND GRID AS REQUIRED. REPLACE ANY DAMAGED

CEILINGS.

5 PROVIDE LABEL FOR ALL FIRE ALARM DEVICES. NEW LABELING SHALL

FOLLOW THE EXISTING LABELS IN THE SYSTEM. FOR MORE DETAILS,

PLEASE SEE SPECIFICATIONS.

6 ALL SMOKE DETECTORS SHALL BE REPLACED WITH NEW SMOKE

DETECTORS KIDDE MODEL:

HEAD: KI-PD

BASE: KI-SB4

7 ONE BUILDING SHALL BE COMPLETED AT A TIME TO AVOID MULTIPLE

BUILDINGS BEING WITHOUT OPERABLE SYSTEMS AT THE SAME TIME.

THE SYSTEM SHALL BE RESTORED AND FULLY FUNCTIONAL AT THE END

OF EACH WORKDAY, WITH DEVICES FULLY SECURE WITH TAMPER-PROOF

FASTENERS, TO AVOID THE NEED FOR FIRE-WATCH AND TO ENSURE

SECURITY. FACILITY RESOURCES ARE SUCH THAT THERE SHOULD BE NO

CONSIDERATION THAT FIRE-WATCH CAN OR WILL BE PROVIDED BY THE

FACILITY.

8 THE CONTRACTOR SHALL PLAN ON REPLACING ONLY THE NUMBER OF

DETECTORS THAT CAN BE REPROGRAMMED, TESTED, AND FULLY

FUNCTIONAL AT THE END OF THE WORKDAY.

9 THE CONTRACTOR SHALL PROVIDE A SMOKE DETECTOR CLEANING

DEVICE FOR MAINTENANCE PURPOSES, ALONG WITH A NEW HANDHELD

PROGRAMMER.

10 NO DEVICES ARE TO BE RELOCATED. ALL SMOKE DETECTORS SHALL BE

REPLACED.

11 ALL WIRING SHALL BE REUSED.

12 A PROGRAMMING SPECIALIST SHALL BE ON-SITE UNTIL THE END OF THE

PROJECT TO REPROGRAM THE NEW SMOKE DETECTORS AT THE END OF

EACH WORKDAY.

13 THE FACILITY SHALL PROVIDE ASBESTOS REPORT IF PRESENT IN

BUILDINGS WHERE THE CONTRACTOR WILL PERFORM WORK.

14 BUILDING 61 "POWERHOUSE" WILL REQUIRE PERMIT. THE CONTRACTOR

SHALL INCLUDE THIS COST AND PROCESS IN THE SCOPE OF WORK.

ISSUED FOR DATE

1 SMOKE DETECTOR'S HEAD AND BASE HAVE BEEN REPLACED BY THE

FACILITY ALREADY. THE CONTRACTOR SHALL TEST AND MAKE SURE

THAT THIS DEVICE IS FUNCTIONING PROPERLY. PROVIDE

F

F

F

F

F

F

F F

F F F

F

F

F

F F

F

F

F

F F

F

F

F

SD SD

SD

SD SD

SD

HD

SD

SD SD

SD SD

SD

HD

SD

SD SD

SD SD

SD

SD

SD

SD

SD SD

SD

SD

SD

SD

SD

HOUSING

GUARD STATION

HOUSING (8

PERSON MAX)

MOPHOUSING (2

PERSON MAX)

HOUSING (2

PERSON MAX)

HOUSING (2

PERSON MAX)

HOUSING (2

PERSON MAX)

SHOWER

TOILET

VEST

HOUSING

HOUSING

TOILET

TOILET

HOUSING (8

PERSON MAX)

GUARD STATION

VEST

HOUSING

SHOWER

HOUSING (2

PERSON MAX)

MOP

HOUSING (2

PERSON MAX)

HOUSING (2

PERSON MAX)

HOUSING (2

PERSON MAX)

HOUSING (4

PERSON MAX) STORAGE OFFICE

B-3 B-2

B-3 B-2

TOILET

1 1

1 1

F

IL

E N

U M

B E

R

S T

A T

E I

N D

E X

N U

M B

E R

S

C o ns tr uc tio n

F in a l R e co rd

Is su e d f o r

P re lim in a ry

D a te

D E

S

IG

N A

N D

C O

N S

TR

U

C

TI

O N

D

IV

IS

IO

N

D E

P A

R T

M E

N T

O F

T E

C H

N O

L O

G Y

M

A N

A G

E M

E N

T

A N

D B

U D

G E

T S

T A

T E

O F

M

IC

H

IG

A N

R O

B E

R T

C

H A

L L

R A

N

C A

R B

D

IR

E

C T

O R

S T

A T

E F

A C

IL

IT

IE

S

A D

M

IN

IS

T

R A

T

IO

N

E a s t

K a la m a z o o A v e n u e

S u it e

K a la m a z o o

M ic h ig

-5

.3

.6

P H

O

.3

.6

F A

X

T O

W E

R P

IN

K

S T

E R

.C O

M

A L L R

IG

H

T S

R E

S E

R V

E D

E a s t

F u lt o n S tr e e t, S u it e

G ra n d R a p id s

M ic h ig a n

.4

.9

P H

O

.4

.5

F A

X

S H

E E

T T

IT

L

E

S H

E E

T N

U M

B E

R

O W

N E

R P

R O

J E

C T

T

IT

L E

D A

T E

B U

IL

D

IN

G

B

F

IR

S T

F L

O O

R F

IR

E

A L A

R M

P L

A N

U

N

IT

A

N D

.3

E

A

/5 /2

R E

P L A

C E

V

IG

IL

A

N T

F

IR

E A

L A

R M

S M

O K

E D

E T

E C

T O

R S

C o ld w a te r, M ic h ig a n

S T

A T

E O

F M

IC

H

IG

A

N D

E P

A R

T M

E N

T O

F C

O R

R E

C T

IO

N

S

1.

R W

G

/2

/2

/5

/2

GENERAL ELECTRICAL NOTES

LAKELAND CORRECTIONAL FACILITY

KEY PLAN

SCALE: NO SCALE

A

B

C

A/B

C/D

D

E

F

G

H

I

611/8" = 1'-0"

BUILDING B - FIRST FLOOR PLAN - UNIT 2 AND 3

1 ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CUTTING

AND PATCHING REQUIRED FOR NEW WORK OR WHERE DEVICES ARE

REMOVED AND NOT REPLACED.

2 PATCH ALL PENETRATIONS AS REQUIRED TO MAINTAIN FIRE RATING.

3 WHEN CEILINGS ARE REMOVED ELECTRICAL CONTRACTOR SHALL

PROPERLY SUPPORT ALL CONDUIT AND LOW VOLTAGE WIRING AS

REQUIRED PER NEC.

4 REMOVE CEILINGS AND GRID AS REQUIRED. REPLACE ANY DAMAGED

CEILINGS.

5 PROVIDE LABEL FOR ALL FIRE ALARM DEVICES. NEW LABELING SHALL

FOLLOW THE EXISTING LABELS IN THE SYSTEM. FOR MORE DETAILS,

PLEASE SEE SPECIFICATIONS.

6 ALL SMOKE DETECTORS SHALL BE REPLACED WITH NEW SMOKE

DETECTORS KIDDE MODEL:

HEAD: KI-PD

BASE: KI-SB4

7 ONE BUILDING SHALL BE COMPLETED AT A TIME TO AVOID MULTIPLE

BUILDINGS BEING WITHOUT OPERABLE SYSTEMS AT THE SAME TIME.

THE SYSTEM SHALL BE RESTORED AND FULLY FUNCTIONAL AT THE END

OF EACH WORKDAY, WITH DEVICES FULLY SECURE WITH TAMPER-PROOF

FASTENERS, TO AVOID THE NEED FOR FIRE-WATCH AND TO ENSURE

SECURITY. FACILITY RESOURCES ARE SUCH THAT THERE SHOULD BE NO

CONSIDERATION THAT FIRE-WATCH CAN OR WILL BE PROVIDED BY THE

FACILITY.

8 THE CONTRACTOR SHALL PLAN ON REPLACING ONLY THE NUMBER OF

DETECTORS THAT CAN BE REPROGRAMMED, TESTED, AND FULLY

FUNCTIONAL AT THE END OF THE WORKDAY.

9 THE CONTRACTOR SHALL PROVIDE A SMOKE DETECTOR CLEANING

DEVICE FOR MAINTENANCE PURPOSES, ALONG WITH A NEW HANDHELD

PROGRAMMER.

10 NO DEVICES ARE TO BE RELOCATED. ALL SMOKE DETECTORS SHALL BE

REPLACED.

11 ALL WIRING SHALL BE REUSED.

12 A PROGRAMMING SPECIALIST SHALL BE ON-SITE UNTIL THE END OF THE

PROJECT TO REPROGRAM THE NEW SMOKE DETECTORS AT THE END OF

EACH WORKDAY.

13 THE FACILITY SHALL PROVIDE ASBESTOS REPORT IF PRESENT IN

BUILDINGS WHERE THE CONTRACTOR WILL PERFORM WORK.

14 BUILDING 61 "POWERHOUSE" WILL REQUIRE PERMIT. THE CONTRACTOR

SHALL INCLUDE THIS COST AND PROCESS IN THE SCOPE OF WORK.

ISSUED FOR DATE

1 SMOKE DETECTOR'S HEAD AND BASE HAVE BEEN REPLACED BY THE

FACILITY ALREADY. THE CONTRACTOR SHALL TEST AND MAKE SURE

THAT THIS DEVICE IS FUNCTIONING PROPERLY. PROVIDE

F

F

F F

F

F

F

F

F

F

F

F

F

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD SD SD

SD

F

WF

WF

OSY

HOUSING (4

PERSON MAX) STORAGE OFFICE

HOUSING (4

PERSON MAX)

HOUSING (4

PERSON MAX)

STAIR 2

TOILET

MECH/IT

HOUSING (8

PERSON MAX)

MUSIC

STAIR

SHOWER

TOILET

TOILET

HOUSING (6

PERSON MAX)

OFFICE

HOUSING (6

PERSON MAX)

HOUSING (6

PERSON MAX)

BREAK

STORAGE

TOILET

MOP

HOUSING (4

PERSON MAX)

B-4 B-1

B-3 B-2

STAIR

STAIR 2

F

IL

E N

U M

B E

R

S T

A T

E I

N D

E X

N U

M B

E R

S

C o ns tr uc tio n

F in a l R e co rd

Is su e d f o r

P re lim in a ry

D a te

D E

S

IG

N A

N D

C O

N S

TR

U

C

TI

O N

D

IV

IS

IO

N

D E

P A

R T

M E

N T

O F

T E

C H

N O

L O

G Y

M

A N

A G

E M

E N

T

A N

D B

U D

G E

T S

T A

T E

O F

M

IC

H

IG

A N

R O

B E

R T

C

H A

L L

R A

N

C A

R B

D

IR

E

C T

O R

S T

A T

E F

A C

IL

IT

IE

S

A D

M

IN

IS

T

R A

T

IO

N

E a s t

K a la m a z o o A v e n u e

S u it e

K a la m a z o o

M ic h ig

-5

.3

.6

P H

O

.3

.6

F A

X

T O

W E

R P

IN

K

S T

E R

.C O

M

A L L R

IG

H

T S

R E

S E

R V

E D

E a s t

F u lt o n S tr e e t, S u it e

G ra n d R a p id s

M ic h ig a n

.4

.9

P H

O

.4

.5

F A

X

S H

E E

T T

IT

L

E

S H

E E

T N

U M

B E

R

O W

N E

R P

R O

J E

C T

T

IT

L E

D A

T E

B U

IL

D

IN

G

B

F

IR

S T

F L

O O

R F

IR

E

A L A

R M

F L O

O R

P L

A N

C

E N

T E

R

.3

E

B

/5 /2

R E

P L A

C E

V

IG

IL

A

N T

F

IR

E A

L A

R M

S M

O K

E D

E T

E C

T O

R S

C o ld w a te r, M ic h ig a n

S T

A T

E O

F M

IC

H

IG

A

N D

E P

A R

T M

E N

T O

F C

O R

R E

C T

IO

N

S

1.

R W

G

/2

/2

/5

/2

LAKELAND CORRECTIONAL FACILITY

KEY PLAN

SCALE: NO SCALE

A

B

C

A/B

C/D

D

E

F

G

H

I

GENERAL ELECTRICAL NOTES

1/8" = 1'-0"

BUILDING B - FIRST FLOOR PLAN - CENTER

1/8" = 1'-0"

BUILDING B - BASEMENT PLAN

1 ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CUTTING

AND PATCHING REQUIRED FOR NEW WORK OR WHERE DEVICES ARE

REMOVED AND NOT REPLACED.

2 PATCH ALL PENETRATIONS AS REQUIRED TO MAINTAIN FIRE RATING.

3 WHEN CEILINGS ARE REMOVED ELECTRICAL CONTRACTOR SHALL

PROPERLY SUPPORT ALL CONDUIT AND LOW VOLTAGE WIRING AS

REQUIRED PER NEC.

4 REMOVE CEILINGS AND GRID AS REQUIRED. REPLACE ANY DAMAGED

CEILINGS.

5 PROVIDE LABEL FOR ALL FIRE ALARM DEVICES. NEW LABELING SHALL

FOLLOW THE EXISTING LABELS IN THE SYSTEM. FOR MORE DETAILS,

PLEASE SEE SPECIFICATIONS.

6 ALL SMOKE DETECTORS SHALL BE REPLACED WITH NEW SMOKE

DETECTORS KIDDE MODEL:

HEAD: KI-PD

BASE: KI-SB4

7 ONE BUILDING SHALL BE COMPLETED AT A TIME TO AVOID MULTIPLE

BUILDINGS BEING WITHOUT OPERABLE SYSTEMS AT THE SAME TIME.

THE SYSTEM SHALL BE RESTORED AND FULLY FUNCTIONAL AT THE END

OF EACH WORKDAY, WITH DEVICES FULLY SECURE WITH TAMPER-PROOF

FASTENERS, TO AVOID THE NEED FOR FIRE-WATCH AND TO ENSURE

SECURITY. FACILITY RESOURCES ARE SUCH THAT THERE SHOULD BE NO

CONSIDERATION THAT FIRE-WATCH CAN OR WILL BE PROVIDED BY THE

FACILITY.

8 THE CONTRACTOR SHALL PLAN ON REPLACING ONLY THE NUMBER OF

DETECTORS THAT CAN BE REPROGRAMMED, TESTED, AND FULLY

FUNCTIONAL AT THE END OF THE WORKDAY.

9 THE CONTRACTOR SHALL PROVIDE A SMOKE DETECTOR CLEANING

DEVICE FOR MAINTENANCE PURPOSES, ALONG WITH A NEW HANDHELD

PROGRAMMER.

10 NO DEVICES ARE TO BE RELOCATED. ALL SMOKE DETECTORS SHALL BE

REPLACED.

11 ALL WIRING SHALL BE REUSED.

12 A PROGRAMMING SPECIALIST SHALL BE ON-SITE UNTIL THE END OF THE

PROJECT TO REPROGRAM THE NEW SMOKE DETECTORS AT THE END OF

EACH WORKDAY.

13 THE FACILITY SHALL PROVIDE ASBESTOS REPORT IF PRESENT IN

BUILDINGS WHERE THE CONTRACTOR WILL PERFORM WORK.

14 BUILDING 61 "POWERHOUSE" WILL REQUIRE PERMIT. THE CONTRACTOR

SHALL INCLUDE THIS COST AND PROCESS IN THE SCOPE OF WORK.

ISSUED FOR DATE

1 SMOKE DETECTOR'S HEAD AND BASE HAVE BEEN REPLACED BY THE

FACILITY ALREADY. THE CONTRACTOR SHALL TEST AND MAKE SURE

THAT THIS DEVICE IS FUNCTIONING PROPERLY. PROVIDE

F

F F

F

F

F

F F

F

F

F

F

FF

F

F

F F

F

F

F F

F

F

F

F

F

F

F

F

F

SD

SDSD

SDSD

SD

HD

SD SD

SD

SD

HD

SD

SD SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD SD

SD

STORAGE

TOILET

MOP

STORAGERUM OFFICE

HOUSING (4

PERSON MAX)

HOUSING (4

PERSON MAX)

RECREATION OFFICE

QUARTER MASTER

OFFICE

HOUSING

TOILET SHOWER

HOUSING (2

PERSON MAX)

HOUSING (2

PERSON MAX)

HOUSING (2

PERSON MAX)

HOUSING (2

PERSON MAX)MOP

HOUSING (8

PERSON MAX)

GUARD STATION

TOILET

VEST

HOUSING

HOUSING

VEST

TOILET

SHOWER

HOUSING (2

PERSON MAX)

HOUSING (2

PERSON MAX)

HOUSING (2

PERSON MAX)

HOUSING (2

PERSON MAX) MOP

HOUSING (8

PERSON MAX)

TOILET

GUARD STATION

HOUSING

B-4 B-1

B-4 B-1

FACP

F

IL

E N

U M

B E

R

S T

A T

E I

N D

E X

N U

M B

E R

S

C o ns tr uc tio n

F in a l R e co rd

Is su e d f o r

P re lim in a ry

D a te

D E

S

IG

N A

N D

C O

N S

TR

U

C

TI

O N

D

IV

IS

IO

N

D E

P A

R T

M E

N T

O F

T E

C H

N O

L O

G Y

M

A N

A G

E M

E N

T

A N

D B

U D

G E

T S

T A

T E

O F

M

IC

H

IG

A N

R O

B E

R T

C

H A

L L

R A

N

C A

R B

D

IR

E

C T

O R

S T

A T

E F

A C

IL

IT

IE

S

A D

M

IN

IS

T

R A

T

IO

N

E a s t

K a la m a z o o A v e n u e

S u it e

K a la m a z o o

M ic h ig

-5

.3

.6

P H

O

.3

.6

F A

X

T O

W E

R P

IN

K

S T

E R

.C O

M

A L L R

IG

H

T S

R E

S E

R V

E D

E a s t

F u lt o n S tr e e t, S u it e

G ra n d R a p id s

M ic h ig a n

.4

.9

P H

O

.4

.5

F A

X

S H

E E

T T

IT

L

E

S H

E E

T N

U M

B E

R

O W

N E

R P

R O

J E

C T

T

IT

L E

D A

T E

B U

IL

D

IN

G

B

F

IR

S T

F L

O O

R F

IR

E

A L A

R M

P L

A N

U

N

IT

A

N D

.3

E

C

/5

/2

R E

P L A

C E

V

IG

IL

A

N T

F

IR

E A

L A

R M

S M

O K

E D

E T

E C

T O

R S

C o ld w a te r, M ic h ig a n

S T

A T

E O

F M

IC

H

IG

A

N D

E P

A R

T M

E N

T O

F C

O R

R E

C T

IO

N

S

1.

R W

G

/2

/2

/5

/2

LAKELAND CORRECTIONAL FACILITY

KEY PLAN

SCALE: NO SCALE

A

B

C

A/B

C/D

D

E

F

G

H

I

GENERAL ELECTRICAL NOTES

1/8" = 1'-0"

BUILDING B - FIRST FLOOR PLAN - UNIT 1 AND 4

1 ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CUTTING

AND PATCHING REQUIRED FOR NEW WORK OR WHERE DEVICES ARE

REMOVED AND NOT REPLACED.

2 PATCH ALL PENETRATIONS AS REQUIRED TO MAINTAIN FIRE RATING.

3 WHEN CEILINGS ARE REMOVED ELECTRICAL CONTRACTOR SHALL

PROPERLY SUPPORT ALL CONDUIT AND LOW VOLTAGE WIRING AS

REQUIRED PER NEC.

4 REMOVE CEILINGS AND GRID AS REQUIRED. REPLACE ANY DAMAGED

CEILINGS.

5 PROVIDE LABEL FOR ALL FIRE ALARM DEVICES. NEW LABELING SHALL

FOLLOW THE EXISTING LABELS IN THE SYSTEM. FOR MORE DETAILS,

PLEASE SEE SPECIFICATIONS.

6 ALL SMOKE DETECTORS SHALL BE REPLACED WITH NEW SMOKE

DETECTORS KIDDE MODEL:

HEAD: KI-PD

BASE: KI-SB4

7 ONE BUILDING SHALL BE COMPLETED AT A TIME TO AVOID MULTIPLE

BUILDINGS BEING WITHOUT OPERABLE SYSTEMS AT THE SAME TIME.

THE SYSTEM SHALL BE RESTORED AND FULLY FUNCTIONAL AT THE END

OF EACH WORKDAY, WITH DEVICES FULLY SECURE WITH TAMPER-PROOF

FASTENERS, TO AVOID THE NEED FOR FIRE-WATCH AND TO ENSURE

SECURITY. FACILITY RESOURCES ARE SUCH THAT THERE SHOULD BE NO

CONSIDERATION THAT FIRE-WATCH CAN OR WILL BE PROVIDED BY THE

FACILITY.

8 THE CONTRACTOR SHALL PLAN ON REPLACING ONLY THE NUMBER OF

DETECTORS THAT CAN BE REPROGRAMMED, TESTED, AND FULLY

FUNCTIONAL AT THE END OF THE WORKDAY.

9 THE CONTRACTOR SHALL PROVIDE A SMOKE DETECTOR CLEANING

DEVICE FOR MAINTENANCE PURPOSES, ALONG WITH A NEW HANDHELD

PROGRAMMER.

10 NO DEVICES ARE TO BE RELOCATED. ALL SMOKE DETECTORS SHALL BE

REPLACED.

11 ALL WIRING SHALL BE REUSED.

12 A PROGRAMMING SPECIALIST SHALL BE ON-SITE UNTIL THE END OF THE

PROJECT TO REPROGRAM THE NEW SMOKE DETECTORS AT THE END OF

EACH WORKDAY.

13 THE FACILITY SHALL PROVIDE ASBESTOS REPORT IF PRESENT IN

BUILDINGS WHERE THE CONTRACTOR WILL PERFORM WORK.

14 BUILDING 61 "POWERHOUSE" WILL REQUIRE PERMIT. THE CONTRACTOR

SHALL INCLUDE THIS COST AND PROCESS IN THE SCOPE OF WORK.

ISSUED FOR DATE

1 SMOKE DETECTOR'S HEAD AND BASE HAVE BEEN REPLACED BY THE

FACILITY ALREADY. THE CONTRACTOR SHALL TEST AND MAKE SURE

THAT THIS DEVICE IS FUNCTIONING PROPERLY. PROVIDE

F

F

F

F

F

F

F

F

F

FF

F

F

F

F

F

F

F

F F

F F

SD SD

SDSD

SDSD

HD

SD SD SD SD

SDSD

SD

HD

SD SD

SD SD

SD

SD

SDSD

SD

SD

SD

SD

SD

SD

SD

SD

HOUSING

GUARD STATION

VEST

HOUSING (8

PERSON MAX)

SHOWER

HOUSING (2

PERSON MAX)

MOP

HOUSING (2

PERSON MAX)

HOUSING (2

PERSON MAX)

HOUSING (2

PERSON MAX)

TOILET

HOUSING HOUSING

VEST

TOILET

GUARD STATION

HOUSING

HOUSING (8

PERSON MAX)

TOILET SHOWER

HOUSING (2

PERSON MAX)

HOUSING (2

PERSON MAX)

HOUSING (2

PERSON MAX)

HOUSING (2

PERSON MAX)MOP

C-3 C-2

C-3 C-2

FACP

1 1

F

IL

E N

U M

B E

R

S T

A T

E I

N D

E X

N U

M B

E R

S

C o ns tr uc tio n

F in a l R e co rd

Is su e d f o r

P re lim in a ry

D a te

D E

S

IG

N A

N D

C O

N S

TR

U

C

TI

O N

D

IV

IS

IO

N

D E

P A

R T

M E

N T

O F

T E

C H

N O

L O

G Y

M

A N

A G

E M

E N

T

A N

D B

U D

G E

T S

T A

T E

O F

M

IC

H

IG

A N

R O

B E

R T

C

H A

L L

R A

N

C A

R B

D

IR

E

C T

O R

S T

A T

E F

A C

IL

IT

IE

S

A D

M

IN

IS

T

R A

T

IO

N

E a s t

K a la m a z o o A v e n u e

S u it e

K a la m a z o o

M ic h ig

-5

.3

.6

P H

O

.3

.6

F A

X

T O

W E

R P

IN

K

S T

E R

.C O

M

A L L R

IG

H

T S

R E

S E

R V

E D

E a s t

F u lt o n S tr e e t, S u it e

G ra n d R a p id s

M ic h ig a n

.4

.9

P H

O

.4

.5

F A

X

S H

E E

T T

IT

L

E

S H

E E

T N

U M

B E

R

O W

N E

R P

R O

J E

C T

T

IT

L E

D A

T E

B U

IL

D

IN

G

C

F

IR

S T

F L

O O

R F

IR

E

A L A

R M

P L A

N

U N

IT

A N

D

.3

E

A

/5 /2

R E

P L A

C E

V

IG

IL

A

N T

F

IR

E A

L A

R M

S M

O K

E D

E T

E C

T O

R S

C o ld w a te r, M ic h ig a n

S T

A T

E O

F M

IC

H

IG

A

N D

E P

A R

T M

E N

T O

F C

O R

R E

C T

IO

N

S

1.

R W

G

/2

/2

/5

/2

GENERAL ELECTRICAL NOTES

LAKELAND CORRECTIONAL FACILITY

KEY PLAN

SCALE: NO SCALE

A

B

C

A/B

C/D

D

E

F

G

H

I

1/8" = 1'-0"

BUILDING C - FIRST FLOOR PLAN - UNIT 2 AND 3

1 ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CUTTING

AND PATCHING REQUIRED FOR NEW WORK OR WHERE DEVICES ARE

REMOVED AND NOT REPLACED.

2 PATCH ALL PENETRATIONS AS REQUIRED TO MAINTAIN FIRE RATING.

3 WHEN CEILINGS ARE REMOVED ELECTRICAL CONTRACTOR SHALL

PROPERLY SUPPORT ALL CONDUIT AND LOW VOLTAGE WIRING AS

REQUIRED PER NEC.

4 REMOVE CEILINGS AND GRID AS REQUIRED. REPLACE ANY DAMAGED

CEILINGS.

5 PROVIDE LABEL FOR ALL FIRE ALARM DEVICES. NEW LABELING SHALL

FOLLOW THE EXISTING LABELS IN THE SYSTEM. FOR MORE DETAILS,

PLEASE SEE SPECIFICATIONS.

6 ALL SMOKE DETECTORS SHALL BE REPLACED WITH NEW SMOKE

DETECTORS KIDDE MODEL:

HEAD: KI-PD

BASE: KI-SB4

7 ONE BUILDING SHALL BE COMPLETED AT A TIME TO AVOID MULTIPLE

BUILDINGS BEING WITHOUT OPERABLE SYSTEMS AT THE SAME TIME.

THE SYSTEM SHALL BE RESTORED AND FULLY FUNCTIONAL AT THE END

OF EACH WORKDAY, WITH DEVICES FULLY SECURE WITH TAMPER-PROOF

FASTENERS, TO AVOID THE NEED FOR FIRE-WATCH AND TO ENSURE

SECURITY. FACILITY RESOURCES ARE SUCH THAT THERE SHOULD BE NO

CONSIDERATION THAT FIRE-WATCH CAN OR WILL BE PROVIDED BY THE

FACILITY.

8 THE CONTRACTOR SHALL PLAN ON REPLACING ONLY THE NUMBER OF

DETECTORS THAT CAN BE REPROGRAMMED, TESTED, AND FULLY

FUNCTIONAL AT THE END OF THE WORKDAY.

9 THE CONTRACTOR SHALL PROVIDE A SMOKE DETECTOR CLEANING

DEVICE FOR MAINTENANCE PURPOSES, ALONG WITH A NEW HANDHELD

PROGRAMMER.

10 NO DEVICES ARE TO BE RELOCATED. ALL SMOKE DETECTORS SHALL BE

REPLACED.

11 ALL WIRING SHALL BE REUSED.

12 A PROGRAMMING SPECIALIST SHALL BE ON-SITE UNTIL THE END OF THE

PROJECT TO REPROGRAM THE NEW SMOKE DETECTORS AT THE END OF

EACH WORKDAY.

13 THE FACILITY SHALL PROVIDE ASBESTOS REPORT IF PRESENT IN

BUILDINGS WHERE THE CONTRACTOR WILL PERFORM WORK.

14 BUILDING 61 "POWERHOUSE" WILL REQUIRE PERMIT. THE CONTRACTOR

SHALL INCLUDE THIS COST AND PROCESS IN THE SCOPE OF WORK.

ISSUED FOR DATE

1 SMOKE DETECTOR'S HEAD AND BASE HAVE BEEN REPLACED BY THE

FACILITY ALREADY. THE CONTRACTOR SHALL TEST AND MAKE SURE

THAT THIS DEVICE IS FUNCTIONING PROPERLY. PROVIDE

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

HD

SD SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

F

F

WF

WF

OSY

HOUSING (2

PERSON MAX)

STORAGE

OFFICE

HOUSING

QUARTER MASTER

TOILET

SHOWER

OFFICER STATION

STORAGE

HOUSING (6

PERSON MAX)

STORAGE

HOUSING (6

PERSON MAX)

HOUSING (6

PERSON MAX)

LAUNDRY

MOP

BREAK

MECH/IT

TOILET

STAIR 2

HOUSING (6

PERSON MAX)

HOUSING (6

PERSON MAX)

HOUSING (2

PERSON MAX)

HOUSING (2

PERSON MAX)

HOUSING (5

PERSON MAX)

C-4 C-1

C-3 C-2

1 1

STAIR

BACK OF DRYERS

STAIR 2

F

IL

E N

U M

B E

R

S T

A T

E I

N D

E X

N U

M B

E R

S

C o ns tr uc tio n

F in a l R e co rd

Is su e d f o r

P re lim in a ry

D a te

D E

S

IG

N A

N D

C O

N S

TR

U

C

TI

O N

D

IV

IS

IO

N

D E

P A

R T

M E

N T

O F

T E

C H

N O

L O

G Y

M

A N

A G

E M

E N

T

A N

D B

U D

G E

T S

T A

T E

O F

M

IC

H

IG

A N

R O

B E

R T

C

H A

L L

R A

N

C A

R B

D

IR

E

C T

O R

S T

A T

E F

A C

IL

IT

IE

S

A D

M

IN

IS

T

R A

T

IO

N

E a s t

K a la m a z o o A v e n u e

S u it e

K a la m a z o o

M ic h ig

-5

.3

.6

P H

O

.3

.6

F A

X

T O

W E

R P

IN

K

S T

E R

.C O

M

A L L R

IG

H

T S

R E

S E

R V

E D

E a s t

F u lt o n S tr e e t, S u it e

G ra n d R a p id s

M ic h ig a n

.4

.9

P H

O

.4

.5

F A

X

S H

E E

T T

IT

L

E

S H

E E

T N

U M

B E

R

O W

N E

R P

R O

J E

C T

T

IT

L E

D A

T E

B U

IL

D

IN

G

C

B A

S E

M E

N T

A N

D F

IR

S

T F

L O

O R

F

IR

E A

L A

R M

P L

A N

C

E N

T E

R

.3

E

B

/5 /2

R E

P L A

C E

V

IG

IL

A

N T

F

IR

E A

L A

R M

S M

O K

E D

E T

E C

T O

R S

C o ld w a te r, M ic h ig a n

S T

A T

E O

F M

IC

H

IG

A

N D

E P

A R

T M

E N

T O

F C

O R

R E

C T

IO

N

S

1.

R W

G

/2

/2

/5

/2

LAKELAND CORRECTIONAL FACILITY

KEY PLAN

SCALE: NO SCALE

A

B

C

A/B

C/D

D

E

F

G

H

I

GENERAL ELECTRICAL NOTES

1/8" = 1'-0"

BUILDING C - FIRST FLOOR PLAN - CENTER

1/8" = 1'-0"

BUILDING C - BASEMENT PLAN

1 ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CUTTING

AND PATCHING REQUIRED FOR NEW WORK OR WHERE DEVICES ARE

REMOVED AND NOT REPLACED.

2 PATCH ALL PENETRATIONS AS REQUIRED TO MAINTAIN FIRE RATING.

3 WHEN CEILINGS ARE REMOVED ELECTRICAL CONTRACTOR SHALL

PROPERLY SUPPORT ALL CONDUIT AND LOW VOLTAGE WIRING AS

REQUIRED PER NEC.

4 REMOVE CEILINGS AND GRID AS REQUIRED. REPLACE ANY DAMAGED

CEILINGS.

5 PROVIDE LABEL FOR ALL FIRE ALARM DEVICES. NEW LABELING SHALL

FOLLOW THE EXISTING LABELS IN THE SYSTEM. FOR MORE DETAILS,

PLEASE SEE SPECIFICATIONS.

6 ALL SMOKE DETECTORS SHALL BE REPLACED WITH NEW SMOKE

DETECTORS KIDDE MODEL:

HEAD: KI-PD

BASE: KI-SB4

7 ONE BUILDING SHALL BE COMPLETED AT A TIME TO AVOID MULTIPLE

BUILDINGS BEING WITHOUT OPERABLE SYSTEMS AT THE SAME TIME.

THE SYSTEM SHALL BE RESTORED AND FULLY FUNCTIONAL AT THE END

OF EACH WORKDAY, WITH DEVICES FULLY SECURE WITH TAMPER-PROOF

FASTENERS, TO AVOID THE NEED FOR FIRE-WATCH AND TO ENSURE

SECURITY. FACILITY RESOURCES ARE SUCH THAT THERE SHOULD BE NO

CONSIDERATION THAT FIRE-WATCH CAN OR WILL BE PROVIDED BY THE

FACILITY.

8 THE CONTRACTOR SHALL PLAN ON REPLACING ONLY THE NUMBER OF

DETECTORS THAT CAN BE REPROGRAMMED, TESTED, AND FULLY

FUNCTIONAL AT THE END OF THE WORKDAY.

9 THE CONTRACTOR SHALL PROVIDE A SMOKE DETECTOR CLEANING

DEVICE FOR MAINTENANCE PURPOSES, ALONG WITH A NEW HANDHELD

PROGRAMMER.

10 NO DEVICES ARE TO BE RELOCATED. ALL SMOKE DETECTORS SHALL BE

REPLACED.

11 ALL WIRING SHALL BE REUSED.

12 A PROGRAMMING SPECIALIST SHALL BE ON-SITE UNTIL THE END OF THE

PROJECT TO REPROGRAM THE NEW SMOKE DETECTORS AT THE END OF

EACH WORKDAY.

13 THE FACILITY SHALL PROVIDE ASBESTOS REPORT IF PRESENT IN

BUILDINGS WHERE THE CONTRACTOR WILL PERFORM WORK.

14 BUILDING 61 "POWERHOUSE" WILL REQUIRE PERMIT. THE CONTRACTOR

SHALL INCLUDE THIS COST AND PROCESS IN THE SCOPE OF WORK.

ISSUED FOR DATE

1 SMOKE DETECTOR'S HEAD AND BASE HAVE BEEN REPLACED BY THE

FACILITY ALREADY. THE CONTRACTOR SHALL TEST AND MAKE SURE

THAT THIS DEVICE IS FUNCTIONING PROPERLY. PROVIDE

F

F

F

F

F

F

F

FF

F F

F

F

F

F

F

FF

F

F

F

F

HD

SD SD

SDSD

SD SD

SDSD

SD

HD

SD

SD

SD SD

SDSDSD SD

SDSD

SD SD

SD

SD

SD

SD SD

SD

SD

HOUSING

TOILET SHOWER

HOUSING (2

PERSON MAX)

HOUSING (2

PERSON MAX)

HOUSING (2

PERSON MAX)

HOUSING (8

PERSON MAX)

MOP

HOUSING (2

PERSON MAX)

GUARD STATION

TOILET

HOUSING

HOUSING

TOILETSHOWER

HOUSING (2

PERSON MAX)

HOUSING (2

PERSON MAX)

HOUSING (2

PERSON MAX)

HOUSING (2

PERSON MAX) MOP

HOUSING (8

PERSON MAX)

TOILET

GUARD STATION

HOUSING

VEST

C-4 C-1

C-4 C-1

VEST

1 1

1 1

1 1

F

IL

E N

U M

B E

R

S T

A T

E I

N D

E X

N U

M B

E R

S

C o ns tr uc tio n

F in a l R e co rd

Is su e d f o r

P re lim in a ry

D a te

D E

S

IG

N A

N D

C O

N S

TR

U

C

TI

O N

D

IV

IS

IO

N

D E

P A

R T

M E

N T

O F

T E

C H

N O

L O

G Y

M

A N

A G

E M

E N

T

A N

D B

U D

G E

T S

T A

T E

O F

M

IC

H

IG

A N

R O

B E

R T

C

H A

L L

R A

N

C A

R B

D

IR

E

C T

O R

S T

A T

E F

A C

IL

IT

IE

S

A D

M

IN

IS

T

R A

T

IO

N

E a s t

K a la m a z o o A v e n u e

S u it e

K a la m a z o o

M ic h ig

-5

.3

.6

P H

O

.3

.6

F A

X

T O

W E

R P

IN

K

S T

E R

.C O

M

A L L R

IG

H

T S

R E

S E

R V

E D

E a s t

F u lt o n S tr e e t, S u it e

G ra n d R a p id s

M ic h ig a n

.4

.9

P H

O

.4

.5

F A

X

S H

E E

T T

IT

L

E

S H

E E

T N

U M

B E

R

O W

N E

R P

R O

J E

C T

T

IT

L E

D A

T E

B U

IL

D

IN

G

C

F

IR

S T

F L

O O

R F

IR

E

A L A

R M

P L A

N

U N

IT

A N

D

.3

E

C

/5

/2

R E

P L A

C E

V

IG

IL

A

N T

F

IR

E A

L A

R M

S M

O K

E D

E T

E C

T O

R S

C o ld w a te r, M ic h ig a n

S T

A T

E O

F M

IC

H

IG

A

N D

E P

A R

T M

E N

T O

F C

O R

R E

C T

IO

N

S

1.

R W

G

/2

/2

/5

/2

LAKELAND CORRECTIONAL FACILITY

KEY PLAN

SCALE: NO SCALE

A

B

C

A/B

C/D

D

E

F

G

H

I

GENERAL ELECTRICAL NOTES

1/8" = 1'-0"

BUILDING C - FIRST FLOOR PLAN - UNIT 1 AND 4

1 ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CUTTING

AND PATCHING REQUIRED FOR NEW WORK OR WHERE DEVICES ARE

REMOVED AND NOT REPLACED.

2 PATCH ALL PENETRATIONS AS REQUIRED TO MAINTAIN FIRE RATING.

3 WHEN CEILINGS ARE REMOVED ELECTRICAL CONTRACTOR SHALL

PROPERLY SUPPORT ALL CONDUIT AND LOW VOLTAGE WIRING AS

REQUIRED PER NEC.

4 REMOVE CEILINGS AND GRID AS REQUIRED. REPLACE ANY DAMAGED

CEILINGS.

5 PROVIDE LABEL FOR ALL FIRE ALARM DEVICES. NEW LABELING SHALL

FOLLOW THE EXISTING LABELS IN THE SYSTEM. FOR MORE DETAILS,

PLEASE SEE SPECIFICATIONS.

6 ALL SMOKE DETECTORS SHALL BE REPLACED WITH NEW SMOKE

DETECTORS KIDDE MODEL:

HEAD: KI-PD

BASE: KI-SB4

7 ONE BUILDING SHALL BE COMPLETED AT A TIME TO AVOID MULTIPLE

BUILDINGS BEING WITHOUT OPERABLE SYSTEMS AT THE SAME TIME.

THE SYSTEM SHALL BE RESTORED AND FULLY FUNCTIONAL AT THE END

OF EACH WORKDAY, WITH DEVICES FULLY SECURE WITH TAMPER-PROOF

FASTENERS, TO AVOID THE NEED FOR FIRE-WATCH AND TO ENSURE

SECURITY. FACILITY RESOURCES ARE SUCH THAT THERE SHOULD BE NO

CONSIDERATION THAT FIRE-WATCH CAN OR WILL BE PROVIDED BY THE

FACILITY.

8 THE CONTRACTOR SHALL PLAN ON REPLACING ONLY THE NUMBER OF

DETECTORS THAT CAN BE REPROGRAMMED, TESTED, AND FULLY

FUNCTIONAL AT THE END OF THE WORKDAY.

9 THE CONTRACTOR SHALL PROVIDE A SMOKE DETECTOR CLEANING

DEVICE FOR MAINTENANCE PURPOSES, ALONG WITH A NEW HANDHELD

PROGRAMMER.

10 NO DEVICES ARE TO BE RELOCATED. ALL SMOKE DETECTORS SHALL BE

REPLACED.

11 ALL WIRING SHALL BE REUSED.

12 A PROGRAMMING SPECIALIST SHALL BE ON-SITE UNTIL THE END OF THE

PROJECT TO REPROGRAM THE NEW SMOKE DETECTORS AT THE END OF

EACH WORKDAY.

13 THE FACILITY SHALL PROVIDE ASBESTOS REPORT IF PRESENT IN

BUILDINGS WHERE THE CONTRACTOR WILL PERFORM WORK.

14 BUILDING 61 "POWERHOUSE" WILL REQUIRE PERMIT. THE CONTRACTOR

SHALL INCLUDE THIS COST AND PROCESS IN THE SCOPE OF WORK.

ISSUED FOR DATE

1 SMOKE DETECTOR'S HEAD AND BASE HAVE BEEN REPLACED BY THE

FACILITY ALREADY. THE CONTRACTOR SHALL TEST AND MAKE SURE

THAT THIS DEVICE IS FUNCTIONING PROPERLY. PROVIDE

F

F F

F F

F

F

F

F

F

F

F

F

F

F

F F

F

F F

F

F

F

F

FFF

F

F

F

F F

F

F

F

DD

SD

HD

SDSD

SDSD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD SD

SDSD

SD SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

F

F

OSY

WF

GROUP

OFFICE

OFFICE

PSYCH OFFICE

TOILET

OFFICE

STORAGE

OFFICE

TOILET

OFFICE

CLASSROOM

OFFICE

CLASSROOM

TOILET

OFFICE CLASSROOM

CLASSROOM

OFFICE

STORAGE

VEST

STAIR

MOP

MECH

LOCKER RM

TOILET

OFFICER STATION

CELL

CELL CELL

SEGRAGATED

SHOWER

HOUSING

HOUSINGUNOCCUPIED

HOUSING

HOUSING

HOUSING

FACP

STORAGE

FAA

STAIR

ELEC.

F

IL

E N

U M

B E

R

S T

A T

E I

N D

E X

N U

M B

E R

S

C o ns tr uc tio n

F in a l R e co rd

Is su e d f o r

P re lim in a ry

D a te

D E

S

IG

N A

N D

C O

N S

TR

U

C

TI

O N

D

IV

IS

IO

N

D E

P A

R T

M E

N T

O F

T E

C H

N O

L O

G Y

M

A N

A G

E M

E N

T

A N

D B

U D

G E

T S

T A

T E

O F

M

IC

H

IG

A N

R O

B E

R T

C

H A

L L

R A

N

C A

R B

D

IR

E

C T

O R

S T

A T

E F

A C

IL

IT

IE

S

A D

M

IN

IS

T

R A

T

IO

N

E a s t

K a la m a z o o A v e n u e

S u it e

K a la m a z o o

M ic h ig

-5

.3

.6

P H

O

.3

.6

F A

X

T O

W E

R P

IN

K

S T

E R

.C O

M

A L L R

IG

H

T S

R E

S E

R V

E D

E a s t

F u lt o n S tr e e t, S u it e

G ra n d R a p id s

M ic h ig a n

.4

.9

P H

O

.4

.5

F A

X

S H

E E

T T

IT

L

E

S H

E E

T N

U M

B E

R

O W

N E

R P

R O

J E

C T

T

IT

L E

D A

T E

B U

IL

D

IN

G

D

B A

S E

M E

N T

A N

D F

IR

S

T F

L O

O R

F

IR

E A

L A

R M

F L

O O

R P

L A

N

.3

E

/5

/2

R E

P L A

C E

V

IG

IL

A

N T

F

IR

E A

L A

R M

S M

O K

E D

E T

E C

T O

R S

C o ld w a te r, M ic h ig a n

S T

A T

E O

F M

IC

H

IG

A

N D

E P

A R

T M

E N

T O

F C

O R

R E

C T

IO

N

S

1.

R W

G

/2

/2

/5

/2

GENERAL ELECTRICAL NOTES

LAKELAND CORRECTIONAL FACILITY

KEY PLAN

SCALE: NO SCALE

A

B

C

A/B

C/D

D

E

F

G

H

I

1/8" = 1'-0"

BUILDING D - FIRST FLOOR PLAN

1/8" = 1'-0"

BUILDING D - BASEMENT PLAN

1 ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CUTTING

AND PATCHING REQUIRED FOR NEW WORK OR WHERE DEVICES ARE

REMOVED AND NOT REPLACED.

2 PATCH ALL PENETRATIONS AS REQUIRED TO MAINTAIN FIRE RATING.

3 WHEN CEILINGS ARE REMOVED ELECTRICAL CONTRACTOR SHALL

PROPERLY SUPPORT ALL CONDUIT AND LOW VOLTAGE WIRING AS

REQUIRED PER NEC.

4 REMOVE CEILINGS AND GRID AS REQUIRED. REPLACE ANY DAMAGED

CEILINGS.

5 PROVIDE LABEL FOR ALL FIRE ALARM DEVICES. NEW LABELING SHALL

FOLLOW THE EXISTING LABELS IN THE SYSTEM. FOR MORE DETAILS,

PLEASE SEE SPECIFICATIONS.

6 ALL SMOKE DETECTORS SHALL BE REPLACED WITH NEW SMOKE

DETECTORS KIDDE MODEL:

HEAD: KI-PD

BASE: KI-SB4

7 ONE BUILDING SHALL BE COMPLETED AT A TIME TO AVOID MULTIPLE

BUILDINGS BEING WITHOUT OPERABLE SYSTEMS AT THE SAME TIME.

THE SYSTEM SHALL BE RESTORED AND FULLY FUNCTIONAL AT THE END

OF EACH WORKDAY, WITH DEVICES FULLY SECURE WITH TAMPER-PROOF

FASTENERS, TO AVOID THE NEED FOR FIRE-WATCH AND TO ENSURE

SECURITY. FACILITY RESOURCES ARE SUCH THAT THERE SHOULD BE NO

CONSIDERATION THAT FIRE-WATCH CAN OR WILL BE PROVIDED BY THE

FACILITY.

8 THE CONTRACTOR SHALL PLAN ON REPLACING ONLY THE NUMBER OF

DETECTORS THAT CAN BE REPROGRAMMED, TESTED, AND FULLY

FUNCTIONAL AT THE END OF THE WORKDAY.

9 THE CONTRACTOR SHALL PROVIDE A SMOKE DETECTOR CLEANING

DEVICE FOR MAINTENANCE PURPOSES, ALONG WITH A NEW HANDHELD

PROGRAMMER.

10 NO DEVICES ARE TO BE RELOCATED. ALL SMOKE DETECTORS SHALL BE

REPLACED.

11 ALL WIRING SHALL BE REUSED.

12 A PROGRAMMING SPECIALIST SHALL BE ON-SITE UNTIL THE END OF THE

PROJECT TO REPROGRAM THE NEW SMOKE DETECTORS AT THE END OF

EACH WORKDAY.

13 THE FACILITY SHALL PROVIDE ASBESTOS REPORT IF PRESENT IN

BUILDINGS WHERE THE CONTRACTOR WILL PERFORM WORK.

14 BUILDING 61 "POWERHOUSE" WILL REQUIRE PERMIT. THE CONTRACTOR

SHALL INCLUDE THIS COST AND PROCESS IN THE SCOPE OF WORK.

ISSUED FOR DATE

1 SMOKE DETECTOR'S HEAD AND BASE HAVE BEEN REPLACED BY THE

FACILITY ALREADY. THE CONTRACTOR SHALL TEST AND MAKE SURE

THAT THIS DEVICE IS FUNCTIONING PROPERLY. PROVIDE

UP

F

F

F F F

F F F

F

F F

TO MEZZ

DOWN

DOWN

UP

UPUPUP

DOWN

F

F F

F F

F

F

F

F

F F

F F F

HD

SD

SD

F F

OPEN AREA

OPEN AREA

S TRNS SUBINL

OFFICE

BREAK ROOM

LOCKER ROOM

OFFICE

TOOLS ROOM

FLOOR

OPENING

OPEN AREA

FACP

SD SHALL BE INSTALLED ON THE WALL

ABOVE THE PANEL, WITHIN 5'-0"

INSTALL SMOKE DETECTOR ON THE

METAL STRUCTURE BUT NOT

ABOVE THE FLOOR OPENING.

DEVICE SHALL BE ACCESSIBLE FOR

MAINTENANCE PURPOSES.

SHOWER

TOILET

HALF WALL

ULTRALINK

TOILET

BOILER BOILER BOILER

INSTALL HD (SET FOR 197) ON

THE METAL STRUCTURE,

ACCESSIBLE FOR MAINTENANCE

STORAGE

STORAGE

F

IL

E N

U M

B E

R

S T

A T

E I

N D

E X

N U

M B

E R

S

C o ns tr uc tio n

F in a l R e co rd

Is su e d f o r

P re lim in a ry

D a te

D E

S

IG

N A

N D

C O

N S

TR

U

C

TI

O N

D

IV

IS

IO

N

D E

P A

R T

M E

N T

O F

T E

C H

N O

L O

G Y

M

A N

A G

E M

E N

T

A N

D B

U D

G E

T S

T A

T E

O F

M

IC

H

IG

A N

R O

B E

R T

C

H A

L L

R A

N

C A

R B

D

IR

E

C T

O R

S T

A T

E F

A C

IL

IT

IE

S

A D

M

IN

IS

T

R A

T

IO

N

E a s t

K a la m a z o o A v e n u e

S u it e

K a la m a z o o

M ic h ig

-5

.3

.6

P H

O

.3

.6

F A

X

T O

W E

R P

IN

K

S T

E R

.C O

M

A L L R

IG

H

T S

R E

S E

R V

E D

E a s t

F u lt o n S tr e e t, S u it e

G ra n d R a p id s

M ic h ig a n

.4

.9

P H

O

.4

.5

F A

X

S H

E E

T T

IT

L

E

S H

E E

T N

U M

B E

R

O W

N E

R P

R O

J E

C T

T

IT

L E

D A

T E

B U

IL

D

IN

G

P O

W E

R H

O U

S E

B A

S E

M E

N T

A N

D F

IR

S

T F

L O

O R

F

IR

E A

L A

R M

P L A

N

.3

E

/5

/2

R E

P L A

C E

V

IG

IL

A

N T

F

IR

E A

L A

R M

S M

O K

E D

E T

E C

T O

R S

C o ld w a te r, M ic h ig a n

S T

A T

E O

F M

IC

H

IG

A

N D

E P

A R

T M

E N

T O

F C

O R

R E

C T

IO

N

S

1.

R W

G

/2

/2

/5

/2

GENERAL ELECTRICAL NOTES

LAKELAND CORRECTIONAL FACILITY

KEY PLAN

SCALE: NO SCALE

A

B

C

A/B

C/D

D

E

F

G

H

I

1 ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CUTTING

AND PATCHING REQUIRED FOR NEW WORK OR WHERE DEVICES ARE

REMOVED AND NOT REPLACED.

2 PATCH ALL PENETRATIONS AS REQUIRED TO MAINTAIN FIRE RATING.

3 WHEN CEILINGS ARE REMOVED ELECTRICAL CONTRACTOR SHALL

PROPERLY SUPPORT ALL CONDUIT AND LOW VOLTAGE WIRING AS

REQUIRED PER NEC.

4 REMOVE CEILINGS AND GRID AS REQUIRED. REPLACE ANY DAMAGED

CEILINGS.

5 PROVIDE LABEL FOR ALL FIRE ALARM DEVICES. NEW LABELING SHALL

FOLLOW THE EXISTING LABELS IN THE SYSTEM. FOR MORE DETAILS,

PLEASE SEE SPECIFICATIONS.

6 ALL SMOKE DETECTORS SHALL BE REPLACED WITH NEW SMOKE

DETECTORS KIDDE MODEL:

HEAD: KI-PD

BASE: KI-SB4

7 ONE BUILDING SHALL BE COMPLETED AT A TIME TO AVOID MULTIPLE

BUILDINGS BEING WITHOUT OPERABLE SYSTEMS AT THE SAME TIME.

THE SYSTEM SHALL BE RESTORED AND FULLY FUNCTIONAL AT THE END

OF EACH WORKDAY, WITH DEVICES FULLY SECURE WITH TAMPER-PROOF

FASTENERS, TO AVOID THE NEED FOR FIRE-WATCH AND TO ENSURE

SECURITY. FACILITY RESOURCES ARE SUCH THAT THERE SHOULD BE NO

CONSIDERATION THAT FIRE-WATCH CAN OR WILL BE PROVIDED BY THE

FACILITY.

8 THE CONTRACTOR SHALL PLAN ON REPLACING ONLY THE NUMBER OF

DETECTORS THAT CAN BE REPROGRAMMED, TESTED, AND FULLY

FUNCTIONAL AT THE END OF THE WORKDAY.

9 THE CONTRACTOR SHALL PROVIDE A SMOKE DETECTOR CLEANING

DEVICE FOR MAINTENANCE PURPOSES, ALONG WITH A NEW HANDHELD

PROGRAMMER.

10 NO DEVICES ARE TO BE RELOCATED. ALL SMOKE DETECTORS SHALL BE

REPLACED.

11 ALL WIRING SHALL BE REUSED.

12 A PROGRAMMING SPECIALIST SHALL BE ON-SITE UNTIL THE END OF THE

PROJECT TO REPROGRAM THE NEW SMOKE DETECTORS AT THE END OF

EACH WORKDAY.

13 THE FACILITY SHALL PROVIDE ASBESTOS REPORT IF PRESENT IN

BUILDINGS WHERE THE CONTRACTOR WILL PERFORM WORK.

14 BUILDING 61 "POWERHOUSE" WILL REQUIRE PERMIT. THE CONTRACTOR

SHALL INCLUDE THIS COST AND PROCESS IN THE SCOPE OF WORK.

GENERAL ELECTRICAL NOTES

1/8" = 1'-0"

BUILDING 61 "POWERHOUSE" - BASEMENT PLAN

1/8" = 1'-0"

BUILDING 61 "POWERHOUSE" - FIRST FLOOR PLAN

1 PROVIDE NEW FIRE ALARM PANEL EDWARDS MODEL EST-3.

2 FIRE ALARM PANEL SHALL BE FED FROM S TRNS SUBINL PANEL,

LOCATED IN THE BASEMENT. PROVIDE NEW BREAKER AND CIRCUIT

BREAKER LOCKOUT DEVICE FOR THE CIRCUIT.

3 PANEL KEY SHALL MATCH THE EXISTING FIRE ALARM PANEL KEYING.

4 PULL STATION SHALL BE COMPATIBLE WITH EDWARDS SYSTEM, SINGLE

ACTION, AND KEYED TO RESET. NEW PULL STATION KEY SHALL MATCH

THE EXISTING KEYING.

1/8" = 1'-0"

MEZZANINE

ISSUED FOR DATE

FACP

DD

RT

HD

F

SD

F

IAMIAM

V

OSYOSY

FIRE ALARM RISER NOTES:

1. REFERENCE SPECIFICATION SECTION 283100 FOR ADDITIONAL

REQUIREMENTS.

2. COORDINATE FIBER CONNECTIONS WITH OWNER. PROVIDE ALL

REQUIRED EQIUPMENT FOR A COMPLETE INSTALLATION. FIRE ALARM

PANELS SHALL COMMUNICATE VIA STARTNET 2 SYSTEM, PROVIDE ALL

REQUIRED EQUIPMENT AND PROGRAMMING AS REQUIRED.

3. PROVIDE CONNECTION TO EXISTING CENTRAL CONTROL STATION.

PROVIDE ALL REQUIRED EQUIPMENT FOR A COMPLETE INSTALLATION.

4. ZAM MODULE IS PROGRAMMED TO FOLLOW ACTION OF THE

DETECTORS AT THE SHUTTER.

5. INSTALL WIRING AND CABLES IN ACCORDANCE WITH SPECIFICATIONS

DUCT

DUCT DETECTOR

RESET/TEST

DETECT.

DETECTORS

PULL

STATIONS

DETECTORS

HEATSMOKE

FIRE ALARM

CONTROL PANEL

60 HZ CKT.

DEDICATED

120 VAC

EMERGENCY

STATION

WATER FLOW SWITCHES

TO ADDITIONAL

DEVICES (TYP.)

DEVICES (TYP.)

TO ADDITIONAL

#8 AWG.

EQUIPMENT GROUND

BUILDING SERVICE

HORN STROBE STROBE

SD ELEVATOR SMOKE DETECTORS, CONNECT

SECOND OUTPUT TO ELEVATOR, COORDINATE

WITH ELEVATOR MANUFACTURER. PROVIDE ALL

REQUIRED EQUIPMENT AND PROGRAMMING AS

REQUIRED FOR A COMPLETE INSTALLATION.

E

FACP

FIRE ALARM

CONTROL PANEL

60 HZ CKT.

DEDICATED

120 VAC

EMERGENCY

#8 AWG.

EQUIPMENT GROUND

BUILDING SERVICE

TO BUILDING DEVICES

CONNECT TO NEW

STARNET 2 SYSTEM

FACP

FIRE ALARM

CONTROL PANEL

60 HZ CKT.

DEDICATED

120 VAC

EMERGENCY

#8 AWG.

EQUIPMENT GROUND

BUILDING SERVICE

TO BUILDING DEVICES

CONNECT NEW FIRE ALARM PANEL TO EXISTING STARNET 2/SENSTAR SYSTEM.

COORDINATE EXACT LOCATION IN THE FIELD. PROVIDE ALL REQUIRED

EQUIPMENT, WIRING AND PROGRAMMING TO REPORT ALARM AND TROUBLE

BACK TO CENTRAL MONITORING.

BUILDING A

UNIT 2

CONNECT TO NEW

STARNET 2 SYSTEM

CONNECT TO NEW

STARNET 2 SYSTEM

FACP

FIRE ALARM

CONTROL PANEL

60 HZ CKT.

DEDICATED

120 VAC

EMERGENCY

#8 AWG.

EQUIPMENT GROUND

BUILDING SERVICE

TO BUILDING DEVICES

CONNECT TO NEW

STARNET 2 SYSTEM

FACP

FIRE ALARM

CONTROL PANEL

60 HZ CKT.

DEDICATED

120 VAC

EMERGENCY

#8 AWG.

EQUIPMENT GROUND

BUILDING SERVICE

TO BUILDING DEVICES

CONNECT TO NEW

STARNET 2 SYSTEM

NEW FACP

FIRE ALARM

CONTROL PANEL

60 HZ CKT.

DEDICATED

120 VAC

EMERGENCY

#8 AWG.

EQUIPMENT GROUND

BUILDING SERVICE

TO BUILDING DEVICES

CONNECT TO NEW

STARNET 2 SYSTEM

BUILDING B

UNIT 4

BUILDING C

UNIT 2

BUILDING D BUILDING 61

"POWERHOUSE"

STICKER NOTES:

1. FOR EXAMPLE PURPOSE ONLY

2. COORDINATE EXACT WORDING AND PROCEDURE WITH EACH MANUFACTURER

3. STICKER SUGGESTED SIZE: 10-12" SQUARE

4. FONT AND BACKGROUND COLOR: WHITE AND RED RESPECTIVELY

5. IT SHOULD BE LOCATED OUTSIDE OF THE FIRE ALARM PANEL

CONNECT TO NEW

STARNET 2 SYSTEM

F

IL

E N

U M

B E

R

S T

A T

E I

N D

E X

N U

M B

E R

S

C o ns tr uc tio n

F in a l R e co rd

Is su e d f o r

P re lim in a ry

D a te

D E

S

IG

N A

N D

C O

N S

TR

U

C

TI

O N

D

IV

IS

IO

N

D E

P A

R T

M E

N T

O F

T E

C H

N O

L O

G Y

M

A N

A G

E M

E N

T

A N

D B

U D

G E

T S

T A

T E

O F

M

IC

H

IG

A N

R O

B E

R T

C

H A

L L

R A

N

C A

R B

D

IR

E

C T

O R

S T

A T

E F

A C

IL

IT

IE

S

A D

M

IN

IS

T

R A

T

IO

N

E a s t

K a la m a z o o A v e n u e

S u it e

K a la m a z o o

M ic h ig

-5

.3

.6

P H

O

.3

.6

F A

X

T O

W E

R P

IN

K

S T

E R

.C O

M

A L L R

IG

H

T S

R E

S E

R V

E D

E a s t

F u lt o n S tr e e t, S u it e

G ra n d R a p id s

M ic h ig a n

.4

.9

P H

O

.4

.5

F A

X

S H

E E

T T

IT

L

E

S H

E E

T N

U M

B E

R

O W

N E

R P

R O

J E

C T

T

IT

L E

D A

T E

F

IR

E A

L A

R M

R

IS

E R

D

IA

G R

A M

.3

E

/5

/2

R E

P L A

C E

V

IG

IL

A

N T

F

IR

E A

L A

R M

S M

O K

E D

E T

E C

T O

R S

C o ld w a te r, M ic h ig a n

S T

A T

E O

F M

IC

H

IG

A

N D

E P

A R

T M

E N

T O

F C

O R

R E

C T

IO

N

S

1.

R W

G

/2

/2

/5

/2

FIRE

M

A

XI

M U

M

DOOR

FINISHED FLOOR

PULL STATION

CEILING

TYPICAL:

TWO HOLE STRAP

WITH SECUTIRY

FASTERNER

M

A

XI

M U

M

WALL

TYPICAL: 3/4" EMT CONDUIT

TYPICAL:

INSTALL FIRESTOPPING

AT PENETRATIONS,

PATCH AND PAINT

PROVIDE NYLON NUT

ON TOP OF BEAM CLAMP

BULKHEAD /

LOWERED CEILING

TWO HOLE STRAP

WITH SECUTIRY

FASTERNER

LB TYPE FITTING WITH COMPRESSION

TYPE CONDUIT FITTINGS AND TORX

WITH CENTER PIN SCREWS

BACKBOX WITH NO

KNOCK OUTS. RECESS

BOX WHERE POSSIBLE.

SIZE TO DEVICE SO

THERE ARE NOT ANY

OPENINGS

FIRE ALARM

DEVICE

12" MAXIMUM

FACP

FAA

M

A

XI

M U

M

M

A

XI

M U

M

"I" BEAM

SUPPORT

ROD

WALL-MOUNTED

NOTIFICATION

APPLIANCE

FIRE

3/4" CONDUIT,

CONCEALED IF

POSSIBLE

A P P

LI

A N C

E

TO

P N

O T

LE

S

S T

H A N

M

IN

"I" BEAM

M

A

XI

M U

M

MAXIMUM 5' FROM THE EDGE OF THE DOOR

TAMPER SWITCH

WATER FLOW

SWTICH

3/4" COMPRESSION

TYPE CONNECTOR

3/4" METAL

FLEXIBLE

CONDUIT

3/4" COMPRESSION

TYPE CONNECTOR

3/4" METAL

FLEXIBLE

CONDUIT

PROVIDE NYLON NUT

BETWEEN THE BEAM

CLAMP AND THE BEAM

TORX HEAD WITH

CENTER PIN

3/4" CONDUIT

LAY-IN CEILING

FIRE ALARM DEVICE

(RECESS AND LEAVE

NO GAPS BETWEEN

SPANNER AND DEVICE)

SPANNER BOX WITH

NO KNOCK OUTS

DECK ABOVE

LIMITED TO

ONE DEVICE

PER SPANNER

3/4" COMPRESSION

TYPE CONNECTOR

3/4" METAL

FLEXIBLE

CONDUIT

DUCT DETECTOR

DUCT

36" MAXIMUM36" MAXIMUM

J HOOK. CONTRACTOR

TO PROVIDE SUPPORT AS

REQUIRED TO KEEP CABLE

OFF CEILING AND ALL OTHER

EQUIPMENT ABOVE CEILING

CABLE

NOTIFICATION

APPLIANCE

FIRE

CUSTOMIZIBLE BACK

PLATE FOR

WALL-MOUNTED

DEVICES

DETAIL FOR WHEN EXISTING

DEVICE IS BIGGER THAN THE

NEW ONE TO BE INSTALLED

DETAIL FOR FITTING DEMOLITION

BELOW GRADE

INTERIOR WALL

EXTERNAL 3/4"

CONDUIT TO

BE DEMOLISHED

GRADE

EARTH

TWO HOLE STRAP

WITH SECUTIRY

FASTERNER

ALL WIRES NEEDS TO BE PULLED OUT

AND CONDUIT SHALL BE DEMOLISHED

MINIMUM 16" BELOW GRADE

CONDUIT TO

REMAIN IN THE

DEMOLITION

I BEAM INSTALLATION DETAIL LAY-IN CEILING INSTALLATION DETAIL

DUCT DETECTOR INSTALLATION DETAIL

DECK ABOVE

M

IN

IM

U

N

OUTSIDE THE BUILDING

J HOOK. CONTRACTOR

TO PROVIDE SUPPORT AS

REQUIRED TO KEEP CABLE

OFF CEILING AND ALL OTHER

EQUIPMENT ABOVE CEILING

CABLE

DETAIL FOR TAMPER AND

WATER FLOW SWITCHES

F

IL

E N

U M

B E

R

S T

A T

E I

N D

E X

N U

M B

E R

S

C o ns tr uc tio n

F in a l R e co rd

Is su e d f o r

P re lim in a ry

D a te

D E

S

IG

N A

N D

C O

N S

TR

U

C

TI

O N

D

IV

IS

IO

N

D E

P A

R T

M E

N T

O F

T E

C H

N O

L O

G Y

M

A N

A G

E M

E N

T

A N

D B

U D

G E

T S

T A

T E

O F

M

IC

H

IG

A N

R O

B E

R T

C

H A

L L

R A

N

C A

R B

D

IR

E

C T

O R

S T

A T

E F

A C

IL

IT

IE

S

A D

M

IN

IS

T

R A

T

IO

N

E a s t

K a la m a z o o A v e n u e

S u it e

K a la m a z o o

M ic h ig

-5

.3

.6

P H

O

.3

.6

F A

X

T O

W E

R P

IN

K

S T

E R

.C O

M

A L L R

IG

H

T S

R E

S E

R V

E D

E a s t

F u lt o n S tr e e t, S u it e

G ra n d R a p id s

M ic h ig a n

.4

.9

P H

O

.4

.5

F A

X

S H

E E

T T

IT

L

E

S H

E E

T N

U M

B E

R

O W

N E

R P

R O

J E

C T

T

IT

L E

D A

T E

IN

S

T A

L L

A T

IO

N

D R

A W

IN

G

.3

E

/5

/2

R E

P L A

C E

V

IG

IL

A

N T

F

IR

E A

L A

R M

S M

O K

E D

E T

E C

T O

R S

C o ld w a te r, M ic h ig a n

S T

A T

E O

F M

IC

H

IG

A

N D

E P

A R

T M

E N

T O

F C

O R

R E

C T

IO

N

S

1.

R W

G

/2

/2

/5

/2

GENERAL INSTALLATION NOTES

1 ALL CONDUIT SHALL BE EMT, COMPRESSION FITTING TYPE, WITH

2-HOLE STRAPS 3' ON CENTER AND WITHIN 12" OF A JOINT OR

JUNCTION BOX. ALL JUNCTION BOXES SHALL HAVE NO KNOCK OUTS.

2 SECURITY TYPE SCREWS SHALL BE TORX WITH CENTER PIN.

3 ALL FIRE ALARM DEVICES SHALL HAVE MECHANICAL CONNECTION SO

DEVICE OR FACE CANNOT BE REMOVED WITHOUT REMOVING THE

SCREW. THE SCREW SHALL BE SECURITY TYPE.

4 APPLY FIRESTOPPING TO PENETRATIONS OF FIRE-RATED FLOOR AND

WALL ASSEMBLIES FOR ELECTRICAL INSTALLATIONS TO RESTORE

ORIGINAL FIRE-RESISTANCE RATING OF ASSEMBLY.

5 MINIMUM CONDUCTOR SIZE FOR POWER WIRING #12AWG.

6 CONCEAL CABLES IN FINISHED WALLS, CEILINGS, AND FLOORS,

UNLESS OTHERWISE INDICATED.

7 TIGHTEN ELECTRICAL CONNECTORS AND TERMINALS ACCORDING TO

MANUFACTURER'S PUBLISHED TOQUE-TIGHTENING VALUES.

8 AFTER INSTALLING CONDUCTORS AND CABLES AND BEFORE

ELECTRICAL CIRCUITRY HAS ENERGIZED, TEST FOR COMPLIANCE WITH

REQUIREMENTS.

9 PERFORM EACH VISUAL AND MECHANICAL INSPECTION AND

ELECTRICAL TEST STATED IN NETA ACCEPTANCE TESTING

SPECIFICATION. CERTIFY COMPLIANCE WITH TEST PARAMETERS.

10 REMOVE AND REPLACE MALFUNCTIONING UNITS AND RETEST AS

SPECIFIED ABOVE.

11 ALL DEVICES SHALL HAVE NO KNOCKOUTS WHEN UNDER 10' AND IN

PRISONERS ACCESSED AREAS.

12 RACEWAYS: EXPOSED IN UNFINISHED UTILITY SPACES (MECHANICAL

ROOM, ELECTRICAL ROOMS AND TUNNELS) = EMT. EXPOSED IN

FINISHED SPACES = ALL CONDUITS SHALL BE CONCEALED UNLESS

INDICATED ON PLANS.

13 MINIMUM RACEWAY SIZE: 3/4-INCH TRADE SIZE (16mm)

14 KEEP RACEWAYS AT LEAST 6 INCHES (150mm) AWAY FROM PARALLEL

RUNS ON FUELS AND STEAM OR HOT-WATER PIPES. INSTALL

HORIZONTAL RACEWAY RUNS ABOVE WATER AND STEAM PIPING.

15 MAKE BENDS AND OFFSETS SO ID IS NOT REDUCED. KEEP LEGS OF

BENDS IN SAME PLANE AND KEEP STRAIGHT LEGS OF OFFSETS

PARALLEL, UNLESS OTHERWISE INDICATED.

16 CONDUIT AND EMT MAY BE SURFACE MOUTED IN MECHANICAL AND

ELECTRICAL ROOMS.

17 WHERE RACEWAYS ARE TERMINATED WITH LOCKNUTS AND BUSHINGS,

ALIGN RACEWAYS TO ENTER SQUARELY AND INSTALL LOCKNUTS WITH

DISHED PART AGAINST BOX. USE TWO LOCKNUTS, ONE INSIDE AND

ONE OUTSIDE BOX.

18 COLOR-CODING: PAINT FIRE ALARM SYSTEM JUNCTION BOXES AND

COVERS RED.

19 RECESSED BACK-TO-BACK BOXES ARE NOT PERMITED IN THE SAME

WALL. ARRANGE BOXES WITH AT LEAST 12 INCHES OF HORIZONTAL

SPACING.

20 LOCATE BOXES SO THAT COVER OR PLATE WILL NOT SPAN DIFFERENT

BUILDING FINISHES.

21 PROVIDE STAINLESS STEEL COVER PLATES ON ALL ABANDONED BOXES

THAT REMAIN FROM SELECTIVE DEMOLITION.

22 PROVIDE PROGRAMMER AS REQUIRED FOR CHANGING OUT SMOKE

DETECTORS IN THE FIELD. THE OWNER WANTS THE ABILITY TO REPLACE

SMOKE AND HEAT DETECTORS ON THEIR OWN. THE BASE BID SHALL

REQUIRE ALL REQUIRED EQUIPMENT TO FACILITATE THIS.

23 PULL STATIONS DRAWINGS SHALL BE SUBMITTED FOR APPROVAL.

24 PULL STATIONS SHALL BE MOUNTED SEMIFLUSHED IN RECESSED BACK

BOXES.

25 PROVIDE SMOKE DETECTORS WHERE REQUIRED FOR ALL FACP AND

NAC PANELS.

26 LABEL EVERY ADDRESSABLE DEVICE WITH ITS ADDRESS IN A VISIBLE

LOCATION. ADHESIVE-ATTACHED LABELING MATERIAL SHALL BE USED.

MINIMUM LETTER HEIGHT SHALL BE 3/8 INCH (10mm).

File details come from the government source that posted it. Updated .