Drawings - Lakeland - Part 2.pdf
PDF 3 MB Posted
- Solicitation number
- RFQ-171-200000000311-2
- Issued by
- Benzie County, Michigan
About this file
This is a set of architectural and electrical drawings from TowerPinkster for the Michigan Department of Corrections' Lakeland Correctional Facility in Coldwater, Michigan, detailing the replacement of Vigilant fire alarm smoke detectors. The drawings show floor plans and installation details for Buildings A, B, C, D and Building 61 (Powerhouse), including the locations of smoke detectors, heat detectors, pull stations, and other fire alarm system components. The project involves replacing existing smoke detectors with new Kidde model KI-PD heads and KI-SB4 bases while reusing existing wiring. The work must be completed one building at a time to maintain system functionality, with systems fully restored and secured at the end of each workday.
The drawings include detailed installation requirements specifying that all conduit must be EMT with compression fittings, security screws must be Torx with center pin, and devices must have mechanical connections preventing removal without tools. The plans show integration with the facility's StarNet 2 system and central monitoring station. Special requirements include providing a smoke detector cleaning device and handheld programmer for maintenance, having a programming specialist on-site throughout the project, and obtaining permits for work in Building 61. Device locations and mounting heights are specified, along with requirements for firestopping penetrations and maintaining fire ratings.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F F
F F
F
F
F
F
F
F
F
F
F
F
F
F
F F
ML
ML
F
F
F
F
WF
WF
OSY
SD SD
SD SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD SD SD
SD
SD
SD
SD
SD
SD SD
SD
SD
CLOSET
HR OFFICE
WARDEN'S
SECRETARY HR OFFICE
WARDEN'S OFFICE
CONFERENCE
TOILET
ADM ASSISTANCE
TOILET
KITCHENETTE
TOILET
STORAGE
LOCKER RMSTORAGE
JC
FRONT DESK
OFFICE
CLOSET
EVIDENCE RM
DATA
VEST
ARSENAL
OFFICE
STORAGE
MAIL ROOM
RECORDS OFFICE
SUP.
RECORDS OFFICE
TECH
RECORDS OFFICE
TECH
RECORDS OFFICE
HR OFFICE
TOILET
BUSINESS OFFICE
OFFICE
WAITING RM
MUSTER
BREAK
BUBBLE
SGT ARSENAL
OFFICE
VISITING
CLOSET
TOILET
JC
LOCKER RM
NON-CONTACT
VISITING
OFFICE
HEARING
LOBBY
CLOSET
SALLY
F
IL
E N
U M
B E
R
S T
A T
E I
N D
E X
N U
M B
E R
S
C o ns tr uc tio n
F in a l R e co rd
Is su e d f o r
P re lim in a ry
D a te
D E
S
IG
N A
N D
C O
N S
TR
U
C
TI
O N
D
IV
IS
IO
N
D E
P A
R T
M E
N T
O F
T E
C H
N O
L O
G Y
M
A N
A G
E M
E N
T
A N
D B
U D
G E
T S
T A
T E
O F
M
IC
H
IG
A N
R O
B E
R T
C
H A
L L
R A
N
C A
R B
D
IR
E
C T
O R
S T
A T
E F
A C
IL
IT
IE
S
A D
M
IN
IS
T
R A
T
IO
N
E a s t
K a la m a z o o A v e n u e
S u it e
K a la m a z o o
M ic h ig a n
-5
.3
.6
P H
O N
E
.3
.6
F A
X
T O
W E
R P
IN
K
S T
E R
.C O
M
A L L R
IG
H
T S
R E
S E
R V
E D
E a s t
F u lt o n S tr e e t, S u it e
G ra n d R a p id s
M ic h ig a n
.4
.9
P H
O
.4
.5
F A
X
S H
E E
T T
IT
L
E
S H
E E
T N
U M
B E
R
O W
N E
R P
R O
J E
C T
T
IT
L E
D A
T E
B U
IL
D
IN
G
A
F
IR
S T
F L
O O
R F
IR
E
A L A
R M
P L
A N
U
N
IT
.3
E
A
/5 /2
R E
P L A
C E
V
IG
IL
A
N T
F
IR
E A
L A
R M
S M
O K
E D
E T
E C
T O
R S
C o ld w a te r, M ic h ig a n
S T
A T
E O
F M
IC
H
IG
A
N D
E P
A R
T M
E N
T O
F C
O R
R E
C T
IO
N
S
1.
R W
G
/2
/2
/5
/2
GENERAL ELECTRICAL NOTES
LAKELAND CORRECTIONAL FACILITY
KEY PLAN
SCALE: NO SCALE
A
B
C
A/B
C/D
D
E
F
G
H
I
1/8" = 1'-0"
BUILDING A - FIRST FLOOR PLAN - UNIT 1
1 ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CUTTING
AND PATCHING REQUIRED FOR NEW WORK OR WHERE DEVICES ARE
REMOVED AND NOT REPLACED.
2 PATCH ALL PENETRATIONS AS REQUIRED TO MAINTAIN FIRE RATING.
3 WHEN CEILINGS ARE REMOVED ELECTRICAL CONTRACTOR SHALL
PROPERLY SUPPORT ALL CONDUIT AND LOW VOLTAGE WIRING AS
REQUIRED PER NEC.
4 REMOVE CEILINGS AND GRID AS REQUIRED. REPLACE ANY DAMAGED
CEILINGS.
5 PROVIDE LABEL FOR ALL FIRE ALARM DEVICES. NEW LABELING SHALL
FOLLOW THE EXISTING LABELS IN THE SYSTEM. FOR MORE DETAILS,
PLEASE SEE SPECIFICATIONS.
6 ALL SMOKE DETECTORS SHALL BE REPLACED WITH NEW SMOKE
DETECTORS KIDDE MODEL:
HEAD: KI-PD
BASE: KI-SB4
7 ONE BUILDING SHALL BE COMPLETED AT A TIME TO AVOID MULTIPLE
BUILDINGS BEING WITHOUT OPERABLE SYSTEMS AT THE SAME TIME.
THE SYSTEM SHALL BE RESTORED AND FULLY FUNCTIONAL AT THE END
OF EACH WORKDAY, WITH DEVICES FULLY SECURE WITH TAMPER-PROOF
FASTENERS, TO AVOID THE NEED FOR FIRE-WATCH AND TO ENSURE
SECURITY. FACILITY RESOURCES ARE SUCH THAT THERE SHOULD BE NO
CONSIDERATION THAT FIRE-WATCH CAN OR WILL BE PROVIDED BY THE
FACILITY.
8 THE CONTRACTOR SHALL PLAN ON REPLACING ONLY THE NUMBER OF
DETECTORS THAT CAN BE REPROGRAMMED, TESTED, AND FULLY
FUNCTIONAL AT THE END OF THE WORKDAY.
9 THE CONTRACTOR SHALL PROVIDE A SMOKE DETECTOR CLEANING
DEVICE FOR MAINTENANCE PURPOSES, ALONG WITH A NEW HANDHELD
PROGRAMMER.
10 NO DEVICES ARE TO BE RELOCATED. ALL SMOKE DETECTORS SHALL BE
REPLACED.
11 ALL WIRING SHALL BE REUSED.
12 A PROGRAMMING SPECIALIST SHALL BE ON-SITE UNTIL THE END OF THE
PROJECT TO REPROGRAM THE NEW SMOKE DETECTORS AT THE END OF
EACH WORKDAY.
13 THE FACILITY SHALL PROVIDE ASBESTOS REPORT IF PRESENT IN
BUILDINGS WHERE THE CONTRACTOR WILL PERFORM WORK.
14 BUILDING 61 "POWERHOUSE" WILL REQUIRE PERMIT. THE CONTRACTOR
SHALL INCLUDE THIS COST AND PROCESS IN THE SCOPE OF WORK.
ISSUED FOR DATE
1 SMOKE DETECTOR'S HEAD AND BASE HAVE BEEN REPLACED BY THE
FACILITY ALREADY. THE CONTRACTOR SHALL TEST AND MAKE SURE
THAT THIS DEVICE IS FUNCTIONING PROPERLY. PROVIDE
PROGRAMMING AS REQUIRED.
GENERAL ELECTRICAL NOTES
F
F
F
F
F
F
F
F F
F
F
F
F
FF
F
F
F
F
F
F
F
F
F
F
F F
F
F
F
F
F
F
F
F
F
WF
WF
OSY
OSY
WF
WF
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SDSD
SD SD SD SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
F F
F
F
F
SD
HOLDING CELL
HOLDING CELL
COPY RM
HOLDING CELL
INSPECTOR OFFICE
DEP. WARDEN
TOILET
COPY
HEARING
GRIEVANCE COORD.
DEP. WARDENS SEC.
ASSIST. DEP
WARDEN
DEP. WARDEN GOA
CONFERENCE RM
OFFICE
TOILET
JC
IT CLOSET
TRANSP.
STORAGE
LOBBY
OFFICE
STORAGE
TOILET
JC
TRANSP.
OFFICE
STORAGE
TOILET
DISHWASH
BOILER CLOSET
HEALTH UNIT OFFICE
OFFICE
CAFETERIA
BARBER SHOP
CLOSET
NURSING OFFICE
OPTOMETRY OFFICE
PROPERTY
CLOSET
COOLER
CONTROL CENTER
CONTROL CENTER
STAIR
CENTRAL SUPPLY
STORAGE
OFFICE
KITCHEN
FOOD TECH
MOP
MED. RECORDS
FACP
STORAGE
MECH
STORAGE
STAIR
STORAGEHOT WATER BOILER
NAC
F
IL
E N
U M
B E
R
S T
A T
E I
N D
E X
N U
M B
E R
S
C o ns tr uc tio n
F in a l R e co rd
Is su e d f o r
P re lim in a ry
D a te
D E
S
IG
N A
N D
C O
N S
TR
U
C
TI
O N
D
IV
IS
IO
N
D E
P A
R T
M E
N T
O F
T E
C H
N O
L O
G Y
M
A N
A G
E M
E N
T
A N
D B
U D
G E
T S
T A
T E
O F
M
IC
H
IG
A N
R O
B E
R T
C
H A
L L
R A
N
C A
R B
D
IR
E
C T
O R
S T
A T
E F
A C
IL
IT
IE
S
A D
M
IN
IS
T
R A
T
IO
N
E a s t
K a la m a z o o A v e n u e
S u it e
K a la m a z o o
M ic h ig
-5
.3
.6
P H
O
.3
.6
F A
X
T O
W E
R P
IN
K
S T
E R
.C O
M
A L L R
IG
H
T S
R E
S E
R V
E D
E a s t
F u lt o n S tr e e t, S u it e
G ra n d R a p id s
M ic h ig a n
.4
.9
P H
O
.4
.5
F A
X
S H
E E
T T
IT
L
E
S H
E E
T N
U M
B E
R
O W
N E
R P
R O
J E
C T
T
IT
L E
D A
T E
B U
IL
D
IN
G
A
B A
S E
M E
N T
A N
D F
IR
S
T F
L O
O R
F
IR
E A
L A
R M
P L
A N
U
N
IT
.3
E
B
/5 /2
R E
P L A
C E
V
IG
IL
A
N T
F
IR
E A
L A
R M
S M
O K
E D
E T
E C
T O
R S
C o ld w a te r, M ic h ig a n
S T
A T
E O
F M
IC
H
IG
A
N D
E P
A R
T M
E N
T O
F C
O R
R E
C T
IO
N
S
1.
R W
G
/2
/2
/5
/2
LAKELAND CORRECTIONAL FACILITY
KEY PLAN
SCALE: NO SCALE
A
B
C
A/B
C/D
D
E
F
G
H
I
GENERAL ELECTRICAL NOTES
1/8" = 1'-0"
BUILDING A - FIRST FLOOR PLAN - UNIT 2
1/8" = 1'-0"
BUILDING A - BASEMENT PLAN
1 ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CUTTING
AND PATCHING REQUIRED FOR NEW WORK OR WHERE DEVICES ARE
REMOVED AND NOT REPLACED.
2 PATCH ALL PENETRATIONS AS REQUIRED TO MAINTAIN FIRE RATING.
3 WHEN CEILINGS ARE REMOVED ELECTRICAL CONTRACTOR SHALL
PROPERLY SUPPORT ALL CONDUIT AND LOW VOLTAGE WIRING AS
REQUIRED PER NEC.
4 REMOVE CEILINGS AND GRID AS REQUIRED. REPLACE ANY DAMAGED
CEILINGS.
5 PROVIDE LABEL FOR ALL FIRE ALARM DEVICES. NEW LABELING SHALL
FOLLOW THE EXISTING LABELS IN THE SYSTEM. FOR MORE DETAILS,
PLEASE SEE SPECIFICATIONS.
6 ALL SMOKE DETECTORS SHALL BE REPLACED WITH NEW SMOKE
DETECTORS KIDDE MODEL:
HEAD: KI-PD
BASE: KI-SB4
7 ONE BUILDING SHALL BE COMPLETED AT A TIME TO AVOID MULTIPLE
BUILDINGS BEING WITHOUT OPERABLE SYSTEMS AT THE SAME TIME.
THE SYSTEM SHALL BE RESTORED AND FULLY FUNCTIONAL AT THE END
OF EACH WORKDAY, WITH DEVICES FULLY SECURE WITH TAMPER-PROOF
FASTENERS, TO AVOID THE NEED FOR FIRE-WATCH AND TO ENSURE
SECURITY. FACILITY RESOURCES ARE SUCH THAT THERE SHOULD BE NO
CONSIDERATION THAT FIRE-WATCH CAN OR WILL BE PROVIDED BY THE
FACILITY.
8 THE CONTRACTOR SHALL PLAN ON REPLACING ONLY THE NUMBER OF
DETECTORS THAT CAN BE REPROGRAMMED, TESTED, AND FULLY
FUNCTIONAL AT THE END OF THE WORKDAY.
9 THE CONTRACTOR SHALL PROVIDE A SMOKE DETECTOR CLEANING
DEVICE FOR MAINTENANCE PURPOSES, ALONG WITH A NEW HANDHELD
PROGRAMMER.
10 NO DEVICES ARE TO BE RELOCATED. ALL SMOKE DETECTORS SHALL BE
REPLACED.
11 ALL WIRING SHALL BE REUSED.
12 A PROGRAMMING SPECIALIST SHALL BE ON-SITE UNTIL THE END OF THE
PROJECT TO REPROGRAM THE NEW SMOKE DETECTORS AT THE END OF
EACH WORKDAY.
13 THE FACILITY SHALL PROVIDE ASBESTOS REPORT IF PRESENT IN
BUILDINGS WHERE THE CONTRACTOR WILL PERFORM WORK.
14 BUILDING 61 "POWERHOUSE" WILL REQUIRE PERMIT. THE CONTRACTOR
SHALL INCLUDE THIS COST AND PROCESS IN THE SCOPE OF WORK.
ISSUED FOR DATE
1 SMOKE DETECTOR'S HEAD AND BASE HAVE BEEN REPLACED BY THE
FACILITY ALREADY. THE CONTRACTOR SHALL TEST AND MAKE SURE
THAT THIS DEVICE IS FUNCTIONING PROPERLY. PROVIDE
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
WF
WF
OSY
SD
SD SD
SD
SD
SD SD
SD
SD
SD SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD SD
SD SD
SD
SD
SD
SD
SD
SD
SD
SD SD SD
SDSD
SD
SD
SDSDSD
SD SD
SD
SD
OPTOMETRY OFFICE
HOUSING (1
PERSON MAX)
DAY RM
HOUSING (3
PERSON MAX)
HOUSING (3
PERSON MAX)
OFFICE
INMATE RM EXAM RM DAY RM
HOUSING (3
PERSON MAX)
HOUSING (3
PERSON MAX)
HOUSING (5
PERSON MAX)
OFFICE
CLOSET
HOUSING (5
PERSON MAX)
HOUSING (3
PERSON MAX)
HOUSING (1
PERSON MAX)
HOUSING (3
PERSON MAX)
HOUSING (5
PERSON MAX)
HOUSING (3
PERSON MAX)
HOUSING (5
PERSON MAX)
OFFICER STATION
CLOSET
IT CLOSET
EXAM RM
EXAM RM
OFFICE
EXAM RM
EXAM RM
EXAM RM
STORAGE
ATTIC ACCESS
DENTAL
OFFICER STATION
TOILET
WAITING RM
EXAM RM
HOUSING (5
PERSON MAX)
HOUSING (5
PERSON MAX)
HOUSING (2
PERSON MAX)
HOUSING (3
PERSON MAX)
HOUSING (3
PERSON MAX)
HOUSING (4
PERSON MAX)
PHARMACY OFFICE
PHARMACY
HOUSING (2
PERSON MAX)
TOILET
LAUNDRY
JC
TOILET
OFFICER STATION
TOILET
HOUSING (2
PERSON MAX)
HOUSING (3
PERSON MAX)
HOUSING (3
PERSON MAX)
HOUSING (4
PERSON MAX)
HOUSING (5
PERSON MAX)
HOUSING (2
PERSON MAX)
HOUSING (5
PERSON MAX)
GYM
HOUSING (3
PERSON MAX)
MECH
DAY RM
CENTRAL SUPPLY
STORAGE
TOILET TOILET
A-100
TOILET
TOILET
F
IL
E N
U M
B E
R
S T
A T
E I
N D
E X
N U
M B
E R
S
C o ns tr uc tio n
F in a l R e co rd
Is su e d f o r
P re lim in a ry
D a te
D E
S
IG
N A
N D
C O
N S
TR
U
C
TI
O N
D
IV
IS
IO
N
D E
P A
R T
M E
N T
O F
T E
C H
N O
L O
G Y
M
A N
A G
E M
E N
T
A N
D B
U D
G E
T S
T A
T E
O F
M
IC
H
IG
A N
R O
B E
R T
C
H A
L L
R A
N
C A
R B
D
IR
E
C T
O R
S T
A T
E F
A C
IL
IT
IE
S
A D
M
IN
IS
T
R A
T
IO
N
E a s t
K a la m a z o o A v e n u e
S u it e
K a la m a z o o
M ic h ig
-5
.3
.6
P H
O
.3
.6
F A
X
T O
W E
R P
IN
K
S T
E R
.C O
M
A L L R
IG
H
T S
R E
S E
R V
E D
E a s t
F u lt o n S tr e e t, S u it e
G ra n d R a p id s
M ic h ig a n
.4
.9
P H
O
.4
.5
F A
X
S H
E E
T T
IT
L
E
S H
E E
T N
U M
B E
R
O W
N E
R P
R O
J E
C T
T
IT
L E
D A
T E
B U
IL
D
IN
G
A
F
IR
S T
F L
O O
R F
IR
E
A L A
R M
P L
A N
U
N
IT
.3
E
C
/5
/2
R E
P L A
C E
V
IG
IL
A
N T
F
IR
E A
L A
R M
S M
O K
E D
E T
E C
T O
R S
C o ld w a te r, M ic h ig a n
S T
A T
E O
F M
IC
H
IG
A
N D
E P
A R
T M
E N
T O
F C
O R
R E
C T
IO
N
S
1.
R W
G
/2
/2
/5
/2
LAKELAND CORRECTIONAL FACILITY
KEY PLAN
SCALE: NO SCALE
A
B
C
A/B
C/D
D
E
F
G
H
I
GENERAL ELECTRICAL NOTES
1/8" = 1'-0"
BUILDING A - FIRST FLOOR PLAN - UNIT 3
1 ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CUTTING
AND PATCHING REQUIRED FOR NEW WORK OR WHERE DEVICES ARE
REMOVED AND NOT REPLACED.
2 PATCH ALL PENETRATIONS AS REQUIRED TO MAINTAIN FIRE RATING.
3 WHEN CEILINGS ARE REMOVED ELECTRICAL CONTRACTOR SHALL
PROPERLY SUPPORT ALL CONDUIT AND LOW VOLTAGE WIRING AS
REQUIRED PER NEC.
4 REMOVE CEILINGS AND GRID AS REQUIRED. REPLACE ANY DAMAGED
CEILINGS.
5 PROVIDE LABEL FOR ALL FIRE ALARM DEVICES. NEW LABELING SHALL
FOLLOW THE EXISTING LABELS IN THE SYSTEM. FOR MORE DETAILS,
PLEASE SEE SPECIFICATIONS.
6 ALL SMOKE DETECTORS SHALL BE REPLACED WITH NEW SMOKE
DETECTORS KIDDE MODEL:
HEAD: KI-PD
BASE: KI-SB4
7 ONE BUILDING SHALL BE COMPLETED AT A TIME TO AVOID MULTIPLE
BUILDINGS BEING WITHOUT OPERABLE SYSTEMS AT THE SAME TIME.
THE SYSTEM SHALL BE RESTORED AND FULLY FUNCTIONAL AT THE END
OF EACH WORKDAY, WITH DEVICES FULLY SECURE WITH TAMPER-PROOF
FASTENERS, TO AVOID THE NEED FOR FIRE-WATCH AND TO ENSURE
SECURITY. FACILITY RESOURCES ARE SUCH THAT THERE SHOULD BE NO
CONSIDERATION THAT FIRE-WATCH CAN OR WILL BE PROVIDED BY THE
FACILITY.
8 THE CONTRACTOR SHALL PLAN ON REPLACING ONLY THE NUMBER OF
DETECTORS THAT CAN BE REPROGRAMMED, TESTED, AND FULLY
FUNCTIONAL AT THE END OF THE WORKDAY.
9 THE CONTRACTOR SHALL PROVIDE A SMOKE DETECTOR CLEANING
DEVICE FOR MAINTENANCE PURPOSES, ALONG WITH A NEW HANDHELD
PROGRAMMER.
10 NO DEVICES ARE TO BE RELOCATED. ALL SMOKE DETECTORS SHALL BE
REPLACED.
11 ALL WIRING SHALL BE REUSED.
12 A PROGRAMMING SPECIALIST SHALL BE ON-SITE UNTIL THE END OF THE
PROJECT TO REPROGRAM THE NEW SMOKE DETECTORS AT THE END OF
EACH WORKDAY.
13 THE FACILITY SHALL PROVIDE ASBESTOS REPORT IF PRESENT IN
BUILDINGS WHERE THE CONTRACTOR WILL PERFORM WORK.
14 BUILDING 61 "POWERHOUSE" WILL REQUIRE PERMIT. THE CONTRACTOR
SHALL INCLUDE THIS COST AND PROCESS IN THE SCOPE OF WORK.
ISSUED FOR DATE
1 SMOKE DETECTOR'S HEAD AND BASE HAVE BEEN REPLACED BY THE
FACILITY ALREADY. THE CONTRACTOR SHALL TEST AND MAKE SURE
THAT THIS DEVICE IS FUNCTIONING PROPERLY. PROVIDE
F
F
F
F
F
F
F F
F F F
F
F
F
F F
F
F
F
F F
F
F
F
SD SD
SD
SD SD
SD
HD
SD
SD SD
SD SD
SD
HD
SD
SD SD
SD SD
SD
SD
SD
SD
SD SD
SD
SD
SD
SD
SD
HOUSING
GUARD STATION
HOUSING (8
PERSON MAX)
MOPHOUSING (2
PERSON MAX)
HOUSING (2
PERSON MAX)
HOUSING (2
PERSON MAX)
HOUSING (2
PERSON MAX)
SHOWER
TOILET
VEST
HOUSING
HOUSING
TOILET
TOILET
HOUSING (8
PERSON MAX)
GUARD STATION
VEST
HOUSING
SHOWER
HOUSING (2
PERSON MAX)
MOP
HOUSING (2
PERSON MAX)
HOUSING (2
PERSON MAX)
HOUSING (2
PERSON MAX)
HOUSING (4
PERSON MAX) STORAGE OFFICE
B-3 B-2
B-3 B-2
TOILET
1 1
1 1
F
IL
E N
U M
B E
R
S T
A T
E I
N D
E X
N U
M B
E R
S
C o ns tr uc tio n
F in a l R e co rd
Is su e d f o r
P re lim in a ry
D a te
D E
S
IG
N A
N D
C O
N S
TR
U
C
TI
O N
D
IV
IS
IO
N
D E
P A
R T
M E
N T
O F
T E
C H
N O
L O
G Y
M
A N
A G
E M
E N
T
A N
D B
U D
G E
T S
T A
T E
O F
M
IC
H
IG
A N
R O
B E
R T
C
H A
L L
R A
N
C A
R B
D
IR
E
C T
O R
S T
A T
E F
A C
IL
IT
IE
S
A D
M
IN
IS
T
R A
T
IO
N
E a s t
K a la m a z o o A v e n u e
S u it e
K a la m a z o o
M ic h ig
-5
.3
.6
P H
O
.3
.6
F A
X
T O
W E
R P
IN
K
S T
E R
.C O
M
A L L R
IG
H
T S
R E
S E
R V
E D
E a s t
F u lt o n S tr e e t, S u it e
G ra n d R a p id s
M ic h ig a n
.4
.9
P H
O
.4
.5
F A
X
S H
E E
T T
IT
L
E
S H
E E
T N
U M
B E
R
O W
N E
R P
R O
J E
C T
T
IT
L E
D A
T E
B U
IL
D
IN
G
B
F
IR
S T
F L
O O
R F
IR
E
A L A
R M
P L
A N
U
N
IT
A
N D
.3
E
A
/5 /2
R E
P L A
C E
V
IG
IL
A
N T
F
IR
E A
L A
R M
S M
O K
E D
E T
E C
T O
R S
C o ld w a te r, M ic h ig a n
S T
A T
E O
F M
IC
H
IG
A
N D
E P
A R
T M
E N
T O
F C
O R
R E
C T
IO
N
S
1.
R W
G
/2
/2
/5
/2
GENERAL ELECTRICAL NOTES
LAKELAND CORRECTIONAL FACILITY
KEY PLAN
SCALE: NO SCALE
A
B
C
A/B
C/D
D
E
F
G
H
I
611/8" = 1'-0"
BUILDING B - FIRST FLOOR PLAN - UNIT 2 AND 3
1 ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CUTTING
AND PATCHING REQUIRED FOR NEW WORK OR WHERE DEVICES ARE
REMOVED AND NOT REPLACED.
2 PATCH ALL PENETRATIONS AS REQUIRED TO MAINTAIN FIRE RATING.
3 WHEN CEILINGS ARE REMOVED ELECTRICAL CONTRACTOR SHALL
PROPERLY SUPPORT ALL CONDUIT AND LOW VOLTAGE WIRING AS
REQUIRED PER NEC.
4 REMOVE CEILINGS AND GRID AS REQUIRED. REPLACE ANY DAMAGED
CEILINGS.
5 PROVIDE LABEL FOR ALL FIRE ALARM DEVICES. NEW LABELING SHALL
FOLLOW THE EXISTING LABELS IN THE SYSTEM. FOR MORE DETAILS,
PLEASE SEE SPECIFICATIONS.
6 ALL SMOKE DETECTORS SHALL BE REPLACED WITH NEW SMOKE
DETECTORS KIDDE MODEL:
HEAD: KI-PD
BASE: KI-SB4
7 ONE BUILDING SHALL BE COMPLETED AT A TIME TO AVOID MULTIPLE
BUILDINGS BEING WITHOUT OPERABLE SYSTEMS AT THE SAME TIME.
THE SYSTEM SHALL BE RESTORED AND FULLY FUNCTIONAL AT THE END
OF EACH WORKDAY, WITH DEVICES FULLY SECURE WITH TAMPER-PROOF
FASTENERS, TO AVOID THE NEED FOR FIRE-WATCH AND TO ENSURE
SECURITY. FACILITY RESOURCES ARE SUCH THAT THERE SHOULD BE NO
CONSIDERATION THAT FIRE-WATCH CAN OR WILL BE PROVIDED BY THE
FACILITY.
8 THE CONTRACTOR SHALL PLAN ON REPLACING ONLY THE NUMBER OF
DETECTORS THAT CAN BE REPROGRAMMED, TESTED, AND FULLY
FUNCTIONAL AT THE END OF THE WORKDAY.
9 THE CONTRACTOR SHALL PROVIDE A SMOKE DETECTOR CLEANING
DEVICE FOR MAINTENANCE PURPOSES, ALONG WITH A NEW HANDHELD
PROGRAMMER.
10 NO DEVICES ARE TO BE RELOCATED. ALL SMOKE DETECTORS SHALL BE
REPLACED.
11 ALL WIRING SHALL BE REUSED.
12 A PROGRAMMING SPECIALIST SHALL BE ON-SITE UNTIL THE END OF THE
PROJECT TO REPROGRAM THE NEW SMOKE DETECTORS AT THE END OF
EACH WORKDAY.
13 THE FACILITY SHALL PROVIDE ASBESTOS REPORT IF PRESENT IN
BUILDINGS WHERE THE CONTRACTOR WILL PERFORM WORK.
14 BUILDING 61 "POWERHOUSE" WILL REQUIRE PERMIT. THE CONTRACTOR
SHALL INCLUDE THIS COST AND PROCESS IN THE SCOPE OF WORK.
ISSUED FOR DATE
1 SMOKE DETECTOR'S HEAD AND BASE HAVE BEEN REPLACED BY THE
FACILITY ALREADY. THE CONTRACTOR SHALL TEST AND MAKE SURE
THAT THIS DEVICE IS FUNCTIONING PROPERLY. PROVIDE
F
F
F F
F
F
F
F
F
F
F
F
F
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD SD SD
SD
F
WF
WF
OSY
HOUSING (4
PERSON MAX) STORAGE OFFICE
HOUSING (4
PERSON MAX)
HOUSING (4
PERSON MAX)
STAIR 2
TOILET
MECH/IT
HOUSING (8
PERSON MAX)
MUSIC
STAIR
SHOWER
TOILET
TOILET
HOUSING (6
PERSON MAX)
OFFICE
HOUSING (6
PERSON MAX)
HOUSING (6
PERSON MAX)
BREAK
STORAGE
TOILET
MOP
HOUSING (4
PERSON MAX)
B-4 B-1
B-3 B-2
STAIR
STAIR 2
F
IL
E N
U M
B E
R
S T
A T
E I
N D
E X
N U
M B
E R
S
C o ns tr uc tio n
F in a l R e co rd
Is su e d f o r
P re lim in a ry
D a te
D E
S
IG
N A
N D
C O
N S
TR
U
C
TI
O N
D
IV
IS
IO
N
D E
P A
R T
M E
N T
O F
T E
C H
N O
L O
G Y
M
A N
A G
E M
E N
T
A N
D B
U D
G E
T S
T A
T E
O F
M
IC
H
IG
A N
R O
B E
R T
C
H A
L L
R A
N
C A
R B
D
IR
E
C T
O R
S T
A T
E F
A C
IL
IT
IE
S
A D
M
IN
IS
T
R A
T
IO
N
E a s t
K a la m a z o o A v e n u e
S u it e
K a la m a z o o
M ic h ig
-5
.3
.6
P H
O
.3
.6
F A
X
T O
W E
R P
IN
K
S T
E R
.C O
M
A L L R
IG
H
T S
R E
S E
R V
E D
E a s t
F u lt o n S tr e e t, S u it e
G ra n d R a p id s
M ic h ig a n
.4
.9
P H
O
.4
.5
F A
X
S H
E E
T T
IT
L
E
S H
E E
T N
U M
B E
R
O W
N E
R P
R O
J E
C T
T
IT
L E
D A
T E
B U
IL
D
IN
G
B
F
IR
S T
F L
O O
R F
IR
E
A L A
R M
F L O
O R
P L
A N
C
E N
T E
R
.3
E
B
/5 /2
R E
P L A
C E
V
IG
IL
A
N T
F
IR
E A
L A
R M
S M
O K
E D
E T
E C
T O
R S
C o ld w a te r, M ic h ig a n
S T
A T
E O
F M
IC
H
IG
A
N D
E P
A R
T M
E N
T O
F C
O R
R E
C T
IO
N
S
1.
R W
G
/2
/2
/5
/2
LAKELAND CORRECTIONAL FACILITY
KEY PLAN
SCALE: NO SCALE
A
B
C
A/B
C/D
D
E
F
G
H
I
GENERAL ELECTRICAL NOTES
1/8" = 1'-0"
BUILDING B - FIRST FLOOR PLAN - CENTER
1/8" = 1'-0"
BUILDING B - BASEMENT PLAN
1 ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CUTTING
AND PATCHING REQUIRED FOR NEW WORK OR WHERE DEVICES ARE
REMOVED AND NOT REPLACED.
2 PATCH ALL PENETRATIONS AS REQUIRED TO MAINTAIN FIRE RATING.
3 WHEN CEILINGS ARE REMOVED ELECTRICAL CONTRACTOR SHALL
PROPERLY SUPPORT ALL CONDUIT AND LOW VOLTAGE WIRING AS
REQUIRED PER NEC.
4 REMOVE CEILINGS AND GRID AS REQUIRED. REPLACE ANY DAMAGED
CEILINGS.
5 PROVIDE LABEL FOR ALL FIRE ALARM DEVICES. NEW LABELING SHALL
FOLLOW THE EXISTING LABELS IN THE SYSTEM. FOR MORE DETAILS,
PLEASE SEE SPECIFICATIONS.
6 ALL SMOKE DETECTORS SHALL BE REPLACED WITH NEW SMOKE
DETECTORS KIDDE MODEL:
HEAD: KI-PD
BASE: KI-SB4
7 ONE BUILDING SHALL BE COMPLETED AT A TIME TO AVOID MULTIPLE
BUILDINGS BEING WITHOUT OPERABLE SYSTEMS AT THE SAME TIME.
THE SYSTEM SHALL BE RESTORED AND FULLY FUNCTIONAL AT THE END
OF EACH WORKDAY, WITH DEVICES FULLY SECURE WITH TAMPER-PROOF
FASTENERS, TO AVOID THE NEED FOR FIRE-WATCH AND TO ENSURE
SECURITY. FACILITY RESOURCES ARE SUCH THAT THERE SHOULD BE NO
CONSIDERATION THAT FIRE-WATCH CAN OR WILL BE PROVIDED BY THE
FACILITY.
8 THE CONTRACTOR SHALL PLAN ON REPLACING ONLY THE NUMBER OF
DETECTORS THAT CAN BE REPROGRAMMED, TESTED, AND FULLY
FUNCTIONAL AT THE END OF THE WORKDAY.
9 THE CONTRACTOR SHALL PROVIDE A SMOKE DETECTOR CLEANING
DEVICE FOR MAINTENANCE PURPOSES, ALONG WITH A NEW HANDHELD
PROGRAMMER.
10 NO DEVICES ARE TO BE RELOCATED. ALL SMOKE DETECTORS SHALL BE
REPLACED.
11 ALL WIRING SHALL BE REUSED.
12 A PROGRAMMING SPECIALIST SHALL BE ON-SITE UNTIL THE END OF THE
PROJECT TO REPROGRAM THE NEW SMOKE DETECTORS AT THE END OF
EACH WORKDAY.
13 THE FACILITY SHALL PROVIDE ASBESTOS REPORT IF PRESENT IN
BUILDINGS WHERE THE CONTRACTOR WILL PERFORM WORK.
14 BUILDING 61 "POWERHOUSE" WILL REQUIRE PERMIT. THE CONTRACTOR
SHALL INCLUDE THIS COST AND PROCESS IN THE SCOPE OF WORK.
ISSUED FOR DATE
1 SMOKE DETECTOR'S HEAD AND BASE HAVE BEEN REPLACED BY THE
FACILITY ALREADY. THE CONTRACTOR SHALL TEST AND MAKE SURE
THAT THIS DEVICE IS FUNCTIONING PROPERLY. PROVIDE
F
F F
F
F
F
F F
F
F
F
F
FF
F
F
F F
F
F
F F
F
F
F
F
F
F
F
F
F
SD
SDSD
SDSD
SD
HD
SD SD
SD
SD
HD
SD
SD SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD SD
SD
STORAGE
TOILET
MOP
STORAGERUM OFFICE
HOUSING (4
PERSON MAX)
HOUSING (4
PERSON MAX)
RECREATION OFFICE
QUARTER MASTER
OFFICE
HOUSING
TOILET SHOWER
HOUSING (2
PERSON MAX)
HOUSING (2
PERSON MAX)
HOUSING (2
PERSON MAX)
HOUSING (2
PERSON MAX)MOP
HOUSING (8
PERSON MAX)
GUARD STATION
TOILET
VEST
HOUSING
HOUSING
VEST
TOILET
SHOWER
HOUSING (2
PERSON MAX)
HOUSING (2
PERSON MAX)
HOUSING (2
PERSON MAX)
HOUSING (2
PERSON MAX) MOP
HOUSING (8
PERSON MAX)
TOILET
GUARD STATION
HOUSING
B-4 B-1
B-4 B-1
FACP
F
IL
E N
U M
B E
R
S T
A T
E I
N D
E X
N U
M B
E R
S
C o ns tr uc tio n
F in a l R e co rd
Is su e d f o r
P re lim in a ry
D a te
D E
S
IG
N A
N D
C O
N S
TR
U
C
TI
O N
D
IV
IS
IO
N
D E
P A
R T
M E
N T
O F
T E
C H
N O
L O
G Y
M
A N
A G
E M
E N
T
A N
D B
U D
G E
T S
T A
T E
O F
M
IC
H
IG
A N
R O
B E
R T
C
H A
L L
R A
N
C A
R B
D
IR
E
C T
O R
S T
A T
E F
A C
IL
IT
IE
S
A D
M
IN
IS
T
R A
T
IO
N
E a s t
K a la m a z o o A v e n u e
S u it e
K a la m a z o o
M ic h ig
-5
.3
.6
P H
O
.3
.6
F A
X
T O
W E
R P
IN
K
S T
E R
.C O
M
A L L R
IG
H
T S
R E
S E
R V
E D
E a s t
F u lt o n S tr e e t, S u it e
G ra n d R a p id s
M ic h ig a n
.4
.9
P H
O
.4
.5
F A
X
S H
E E
T T
IT
L
E
S H
E E
T N
U M
B E
R
O W
N E
R P
R O
J E
C T
T
IT
L E
D A
T E
B U
IL
D
IN
G
B
F
IR
S T
F L
O O
R F
IR
E
A L A
R M
P L
A N
U
N
IT
A
N D
.3
E
C
/5
/2
R E
P L A
C E
V
IG
IL
A
N T
F
IR
E A
L A
R M
S M
O K
E D
E T
E C
T O
R S
C o ld w a te r, M ic h ig a n
S T
A T
E O
F M
IC
H
IG
A
N D
E P
A R
T M
E N
T O
F C
O R
R E
C T
IO
N
S
1.
R W
G
/2
/2
/5
/2
LAKELAND CORRECTIONAL FACILITY
KEY PLAN
SCALE: NO SCALE
A
B
C
A/B
C/D
D
E
F
G
H
I
GENERAL ELECTRICAL NOTES
1/8" = 1'-0"
BUILDING B - FIRST FLOOR PLAN - UNIT 1 AND 4
1 ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CUTTING
AND PATCHING REQUIRED FOR NEW WORK OR WHERE DEVICES ARE
REMOVED AND NOT REPLACED.
2 PATCH ALL PENETRATIONS AS REQUIRED TO MAINTAIN FIRE RATING.
3 WHEN CEILINGS ARE REMOVED ELECTRICAL CONTRACTOR SHALL
PROPERLY SUPPORT ALL CONDUIT AND LOW VOLTAGE WIRING AS
REQUIRED PER NEC.
4 REMOVE CEILINGS AND GRID AS REQUIRED. REPLACE ANY DAMAGED
CEILINGS.
5 PROVIDE LABEL FOR ALL FIRE ALARM DEVICES. NEW LABELING SHALL
FOLLOW THE EXISTING LABELS IN THE SYSTEM. FOR MORE DETAILS,
PLEASE SEE SPECIFICATIONS.
6 ALL SMOKE DETECTORS SHALL BE REPLACED WITH NEW SMOKE
DETECTORS KIDDE MODEL:
HEAD: KI-PD
BASE: KI-SB4
7 ONE BUILDING SHALL BE COMPLETED AT A TIME TO AVOID MULTIPLE
BUILDINGS BEING WITHOUT OPERABLE SYSTEMS AT THE SAME TIME.
THE SYSTEM SHALL BE RESTORED AND FULLY FUNCTIONAL AT THE END
OF EACH WORKDAY, WITH DEVICES FULLY SECURE WITH TAMPER-PROOF
FASTENERS, TO AVOID THE NEED FOR FIRE-WATCH AND TO ENSURE
SECURITY. FACILITY RESOURCES ARE SUCH THAT THERE SHOULD BE NO
CONSIDERATION THAT FIRE-WATCH CAN OR WILL BE PROVIDED BY THE
FACILITY.
8 THE CONTRACTOR SHALL PLAN ON REPLACING ONLY THE NUMBER OF
DETECTORS THAT CAN BE REPROGRAMMED, TESTED, AND FULLY
FUNCTIONAL AT THE END OF THE WORKDAY.
9 THE CONTRACTOR SHALL PROVIDE A SMOKE DETECTOR CLEANING
DEVICE FOR MAINTENANCE PURPOSES, ALONG WITH A NEW HANDHELD
PROGRAMMER.
10 NO DEVICES ARE TO BE RELOCATED. ALL SMOKE DETECTORS SHALL BE
REPLACED.
11 ALL WIRING SHALL BE REUSED.
12 A PROGRAMMING SPECIALIST SHALL BE ON-SITE UNTIL THE END OF THE
PROJECT TO REPROGRAM THE NEW SMOKE DETECTORS AT THE END OF
EACH WORKDAY.
13 THE FACILITY SHALL PROVIDE ASBESTOS REPORT IF PRESENT IN
BUILDINGS WHERE THE CONTRACTOR WILL PERFORM WORK.
14 BUILDING 61 "POWERHOUSE" WILL REQUIRE PERMIT. THE CONTRACTOR
SHALL INCLUDE THIS COST AND PROCESS IN THE SCOPE OF WORK.
ISSUED FOR DATE
1 SMOKE DETECTOR'S HEAD AND BASE HAVE BEEN REPLACED BY THE
FACILITY ALREADY. THE CONTRACTOR SHALL TEST AND MAKE SURE
THAT THIS DEVICE IS FUNCTIONING PROPERLY. PROVIDE
F
F
F
F
F
F
F
F
F
FF
F
F
F
F
F
F
F
F F
F F
SD SD
SDSD
SDSD
HD
SD SD SD SD
SDSD
SD
HD
SD SD
SD SD
SD
SD
SDSD
SD
SD
SD
SD
SD
SD
SD
SD
HOUSING
GUARD STATION
VEST
HOUSING (8
PERSON MAX)
SHOWER
HOUSING (2
PERSON MAX)
MOP
HOUSING (2
PERSON MAX)
HOUSING (2
PERSON MAX)
HOUSING (2
PERSON MAX)
TOILET
HOUSING HOUSING
VEST
TOILET
GUARD STATION
HOUSING
HOUSING (8
PERSON MAX)
TOILET SHOWER
HOUSING (2
PERSON MAX)
HOUSING (2
PERSON MAX)
HOUSING (2
PERSON MAX)
HOUSING (2
PERSON MAX)MOP
C-3 C-2
C-3 C-2
FACP
1 1
F
IL
E N
U M
B E
R
S T
A T
E I
N D
E X
N U
M B
E R
S
C o ns tr uc tio n
F in a l R e co rd
Is su e d f o r
P re lim in a ry
D a te
D E
S
IG
N A
N D
C O
N S
TR
U
C
TI
O N
D
IV
IS
IO
N
D E
P A
R T
M E
N T
O F
T E
C H
N O
L O
G Y
M
A N
A G
E M
E N
T
A N
D B
U D
G E
T S
T A
T E
O F
M
IC
H
IG
A N
R O
B E
R T
C
H A
L L
R A
N
C A
R B
D
IR
E
C T
O R
S T
A T
E F
A C
IL
IT
IE
S
A D
M
IN
IS
T
R A
T
IO
N
E a s t
K a la m a z o o A v e n u e
S u it e
K a la m a z o o
M ic h ig
-5
.3
.6
P H
O
.3
.6
F A
X
T O
W E
R P
IN
K
S T
E R
.C O
M
A L L R
IG
H
T S
R E
S E
R V
E D
E a s t
F u lt o n S tr e e t, S u it e
G ra n d R a p id s
M ic h ig a n
.4
.9
P H
O
.4
.5
F A
X
S H
E E
T T
IT
L
E
S H
E E
T N
U M
B E
R
O W
N E
R P
R O
J E
C T
T
IT
L E
D A
T E
B U
IL
D
IN
G
C
F
IR
S T
F L
O O
R F
IR
E
A L A
R M
P L A
N
U N
IT
A N
D
.3
E
A
/5 /2
R E
P L A
C E
V
IG
IL
A
N T
F
IR
E A
L A
R M
S M
O K
E D
E T
E C
T O
R S
C o ld w a te r, M ic h ig a n
S T
A T
E O
F M
IC
H
IG
A
N D
E P
A R
T M
E N
T O
F C
O R
R E
C T
IO
N
S
1.
R W
G
/2
/2
/5
/2
GENERAL ELECTRICAL NOTES
LAKELAND CORRECTIONAL FACILITY
KEY PLAN
SCALE: NO SCALE
A
B
C
A/B
C/D
D
E
F
G
H
I
1/8" = 1'-0"
BUILDING C - FIRST FLOOR PLAN - UNIT 2 AND 3
1 ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CUTTING
AND PATCHING REQUIRED FOR NEW WORK OR WHERE DEVICES ARE
REMOVED AND NOT REPLACED.
2 PATCH ALL PENETRATIONS AS REQUIRED TO MAINTAIN FIRE RATING.
3 WHEN CEILINGS ARE REMOVED ELECTRICAL CONTRACTOR SHALL
PROPERLY SUPPORT ALL CONDUIT AND LOW VOLTAGE WIRING AS
REQUIRED PER NEC.
4 REMOVE CEILINGS AND GRID AS REQUIRED. REPLACE ANY DAMAGED
CEILINGS.
5 PROVIDE LABEL FOR ALL FIRE ALARM DEVICES. NEW LABELING SHALL
FOLLOW THE EXISTING LABELS IN THE SYSTEM. FOR MORE DETAILS,
PLEASE SEE SPECIFICATIONS.
6 ALL SMOKE DETECTORS SHALL BE REPLACED WITH NEW SMOKE
DETECTORS KIDDE MODEL:
HEAD: KI-PD
BASE: KI-SB4
7 ONE BUILDING SHALL BE COMPLETED AT A TIME TO AVOID MULTIPLE
BUILDINGS BEING WITHOUT OPERABLE SYSTEMS AT THE SAME TIME.
THE SYSTEM SHALL BE RESTORED AND FULLY FUNCTIONAL AT THE END
OF EACH WORKDAY, WITH DEVICES FULLY SECURE WITH TAMPER-PROOF
FASTENERS, TO AVOID THE NEED FOR FIRE-WATCH AND TO ENSURE
SECURITY. FACILITY RESOURCES ARE SUCH THAT THERE SHOULD BE NO
CONSIDERATION THAT FIRE-WATCH CAN OR WILL BE PROVIDED BY THE
FACILITY.
8 THE CONTRACTOR SHALL PLAN ON REPLACING ONLY THE NUMBER OF
DETECTORS THAT CAN BE REPROGRAMMED, TESTED, AND FULLY
FUNCTIONAL AT THE END OF THE WORKDAY.
9 THE CONTRACTOR SHALL PROVIDE A SMOKE DETECTOR CLEANING
DEVICE FOR MAINTENANCE PURPOSES, ALONG WITH A NEW HANDHELD
PROGRAMMER.
10 NO DEVICES ARE TO BE RELOCATED. ALL SMOKE DETECTORS SHALL BE
REPLACED.
11 ALL WIRING SHALL BE REUSED.
12 A PROGRAMMING SPECIALIST SHALL BE ON-SITE UNTIL THE END OF THE
PROJECT TO REPROGRAM THE NEW SMOKE DETECTORS AT THE END OF
EACH WORKDAY.
13 THE FACILITY SHALL PROVIDE ASBESTOS REPORT IF PRESENT IN
BUILDINGS WHERE THE CONTRACTOR WILL PERFORM WORK.
14 BUILDING 61 "POWERHOUSE" WILL REQUIRE PERMIT. THE CONTRACTOR
SHALL INCLUDE THIS COST AND PROCESS IN THE SCOPE OF WORK.
ISSUED FOR DATE
1 SMOKE DETECTOR'S HEAD AND BASE HAVE BEEN REPLACED BY THE
FACILITY ALREADY. THE CONTRACTOR SHALL TEST AND MAKE SURE
THAT THIS DEVICE IS FUNCTIONING PROPERLY. PROVIDE
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
HD
SD SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
F
F
WF
WF
OSY
HOUSING (2
PERSON MAX)
STORAGE
OFFICE
HOUSING
QUARTER MASTER
TOILET
SHOWER
OFFICER STATION
STORAGE
HOUSING (6
PERSON MAX)
STORAGE
HOUSING (6
PERSON MAX)
HOUSING (6
PERSON MAX)
LAUNDRY
MOP
BREAK
MECH/IT
TOILET
STAIR 2
HOUSING (6
PERSON MAX)
HOUSING (6
PERSON MAX)
HOUSING (2
PERSON MAX)
HOUSING (2
PERSON MAX)
HOUSING (5
PERSON MAX)
C-4 C-1
C-3 C-2
1 1
STAIR
BACK OF DRYERS
STAIR 2
F
IL
E N
U M
B E
R
S T
A T
E I
N D
E X
N U
M B
E R
S
C o ns tr uc tio n
F in a l R e co rd
Is su e d f o r
P re lim in a ry
D a te
D E
S
IG
N A
N D
C O
N S
TR
U
C
TI
O N
D
IV
IS
IO
N
D E
P A
R T
M E
N T
O F
T E
C H
N O
L O
G Y
M
A N
A G
E M
E N
T
A N
D B
U D
G E
T S
T A
T E
O F
M
IC
H
IG
A N
R O
B E
R T
C
H A
L L
R A
N
C A
R B
D
IR
E
C T
O R
S T
A T
E F
A C
IL
IT
IE
S
A D
M
IN
IS
T
R A
T
IO
N
E a s t
K a la m a z o o A v e n u e
S u it e
K a la m a z o o
M ic h ig
-5
.3
.6
P H
O
.3
.6
F A
X
T O
W E
R P
IN
K
S T
E R
.C O
M
A L L R
IG
H
T S
R E
S E
R V
E D
E a s t
F u lt o n S tr e e t, S u it e
G ra n d R a p id s
M ic h ig a n
.4
.9
P H
O
.4
.5
F A
X
S H
E E
T T
IT
L
E
S H
E E
T N
U M
B E
R
O W
N E
R P
R O
J E
C T
T
IT
L E
D A
T E
B U
IL
D
IN
G
C
B A
S E
M E
N T
A N
D F
IR
S
T F
L O
O R
F
IR
E A
L A
R M
P L
A N
C
E N
T E
R
.3
E
B
/5 /2
R E
P L A
C E
V
IG
IL
A
N T
F
IR
E A
L A
R M
S M
O K
E D
E T
E C
T O
R S
C o ld w a te r, M ic h ig a n
S T
A T
E O
F M
IC
H
IG
A
N D
E P
A R
T M
E N
T O
F C
O R
R E
C T
IO
N
S
1.
R W
G
/2
/2
/5
/2
LAKELAND CORRECTIONAL FACILITY
KEY PLAN
SCALE: NO SCALE
A
B
C
A/B
C/D
D
E
F
G
H
I
GENERAL ELECTRICAL NOTES
1/8" = 1'-0"
BUILDING C - FIRST FLOOR PLAN - CENTER
1/8" = 1'-0"
BUILDING C - BASEMENT PLAN
1 ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CUTTING
AND PATCHING REQUIRED FOR NEW WORK OR WHERE DEVICES ARE
REMOVED AND NOT REPLACED.
2 PATCH ALL PENETRATIONS AS REQUIRED TO MAINTAIN FIRE RATING.
3 WHEN CEILINGS ARE REMOVED ELECTRICAL CONTRACTOR SHALL
PROPERLY SUPPORT ALL CONDUIT AND LOW VOLTAGE WIRING AS
REQUIRED PER NEC.
4 REMOVE CEILINGS AND GRID AS REQUIRED. REPLACE ANY DAMAGED
CEILINGS.
5 PROVIDE LABEL FOR ALL FIRE ALARM DEVICES. NEW LABELING SHALL
FOLLOW THE EXISTING LABELS IN THE SYSTEM. FOR MORE DETAILS,
PLEASE SEE SPECIFICATIONS.
6 ALL SMOKE DETECTORS SHALL BE REPLACED WITH NEW SMOKE
DETECTORS KIDDE MODEL:
HEAD: KI-PD
BASE: KI-SB4
7 ONE BUILDING SHALL BE COMPLETED AT A TIME TO AVOID MULTIPLE
BUILDINGS BEING WITHOUT OPERABLE SYSTEMS AT THE SAME TIME.
THE SYSTEM SHALL BE RESTORED AND FULLY FUNCTIONAL AT THE END
OF EACH WORKDAY, WITH DEVICES FULLY SECURE WITH TAMPER-PROOF
FASTENERS, TO AVOID THE NEED FOR FIRE-WATCH AND TO ENSURE
SECURITY. FACILITY RESOURCES ARE SUCH THAT THERE SHOULD BE NO
CONSIDERATION THAT FIRE-WATCH CAN OR WILL BE PROVIDED BY THE
FACILITY.
8 THE CONTRACTOR SHALL PLAN ON REPLACING ONLY THE NUMBER OF
DETECTORS THAT CAN BE REPROGRAMMED, TESTED, AND FULLY
FUNCTIONAL AT THE END OF THE WORKDAY.
9 THE CONTRACTOR SHALL PROVIDE A SMOKE DETECTOR CLEANING
DEVICE FOR MAINTENANCE PURPOSES, ALONG WITH A NEW HANDHELD
PROGRAMMER.
10 NO DEVICES ARE TO BE RELOCATED. ALL SMOKE DETECTORS SHALL BE
REPLACED.
11 ALL WIRING SHALL BE REUSED.
12 A PROGRAMMING SPECIALIST SHALL BE ON-SITE UNTIL THE END OF THE
PROJECT TO REPROGRAM THE NEW SMOKE DETECTORS AT THE END OF
EACH WORKDAY.
13 THE FACILITY SHALL PROVIDE ASBESTOS REPORT IF PRESENT IN
BUILDINGS WHERE THE CONTRACTOR WILL PERFORM WORK.
14 BUILDING 61 "POWERHOUSE" WILL REQUIRE PERMIT. THE CONTRACTOR
SHALL INCLUDE THIS COST AND PROCESS IN THE SCOPE OF WORK.
ISSUED FOR DATE
1 SMOKE DETECTOR'S HEAD AND BASE HAVE BEEN REPLACED BY THE
FACILITY ALREADY. THE CONTRACTOR SHALL TEST AND MAKE SURE
THAT THIS DEVICE IS FUNCTIONING PROPERLY. PROVIDE
F
F
F
F
F
F
F
FF
F F
F
F
F
F
F
FF
F
F
F
F
HD
SD SD
SDSD
SD SD
SDSD
SD
HD
SD
SD
SD SD
SDSDSD SD
SDSD
SD SD
SD
SD
SD
SD SD
SD
SD
HOUSING
TOILET SHOWER
HOUSING (2
PERSON MAX)
HOUSING (2
PERSON MAX)
HOUSING (2
PERSON MAX)
HOUSING (8
PERSON MAX)
MOP
HOUSING (2
PERSON MAX)
GUARD STATION
TOILET
HOUSING
HOUSING
TOILETSHOWER
HOUSING (2
PERSON MAX)
HOUSING (2
PERSON MAX)
HOUSING (2
PERSON MAX)
HOUSING (2
PERSON MAX) MOP
HOUSING (8
PERSON MAX)
TOILET
GUARD STATION
HOUSING
VEST
C-4 C-1
C-4 C-1
VEST
1 1
1 1
1 1
F
IL
E N
U M
B E
R
S T
A T
E I
N D
E X
N U
M B
E R
S
C o ns tr uc tio n
F in a l R e co rd
Is su e d f o r
P re lim in a ry
D a te
D E
S
IG
N A
N D
C O
N S
TR
U
C
TI
O N
D
IV
IS
IO
N
D E
P A
R T
M E
N T
O F
T E
C H
N O
L O
G Y
M
A N
A G
E M
E N
T
A N
D B
U D
G E
T S
T A
T E
O F
M
IC
H
IG
A N
R O
B E
R T
C
H A
L L
R A
N
C A
R B
D
IR
E
C T
O R
S T
A T
E F
A C
IL
IT
IE
S
A D
M
IN
IS
T
R A
T
IO
N
E a s t
K a la m a z o o A v e n u e
S u it e
K a la m a z o o
M ic h ig
-5
.3
.6
P H
O
.3
.6
F A
X
T O
W E
R P
IN
K
S T
E R
.C O
M
A L L R
IG
H
T S
R E
S E
R V
E D
E a s t
F u lt o n S tr e e t, S u it e
G ra n d R a p id s
M ic h ig a n
.4
.9
P H
O
.4
.5
F A
X
S H
E E
T T
IT
L
E
S H
E E
T N
U M
B E
R
O W
N E
R P
R O
J E
C T
T
IT
L E
D A
T E
B U
IL
D
IN
G
C
F
IR
S T
F L
O O
R F
IR
E
A L A
R M
P L A
N
U N
IT
A N
D
.3
E
C
/5
/2
R E
P L A
C E
V
IG
IL
A
N T
F
IR
E A
L A
R M
S M
O K
E D
E T
E C
T O
R S
C o ld w a te r, M ic h ig a n
S T
A T
E O
F M
IC
H
IG
A
N D
E P
A R
T M
E N
T O
F C
O R
R E
C T
IO
N
S
1.
R W
G
/2
/2
/5
/2
LAKELAND CORRECTIONAL FACILITY
KEY PLAN
SCALE: NO SCALE
A
B
C
A/B
C/D
D
E
F
G
H
I
GENERAL ELECTRICAL NOTES
1/8" = 1'-0"
BUILDING C - FIRST FLOOR PLAN - UNIT 1 AND 4
1 ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CUTTING
AND PATCHING REQUIRED FOR NEW WORK OR WHERE DEVICES ARE
REMOVED AND NOT REPLACED.
2 PATCH ALL PENETRATIONS AS REQUIRED TO MAINTAIN FIRE RATING.
3 WHEN CEILINGS ARE REMOVED ELECTRICAL CONTRACTOR SHALL
PROPERLY SUPPORT ALL CONDUIT AND LOW VOLTAGE WIRING AS
REQUIRED PER NEC.
4 REMOVE CEILINGS AND GRID AS REQUIRED. REPLACE ANY DAMAGED
CEILINGS.
5 PROVIDE LABEL FOR ALL FIRE ALARM DEVICES. NEW LABELING SHALL
FOLLOW THE EXISTING LABELS IN THE SYSTEM. FOR MORE DETAILS,
PLEASE SEE SPECIFICATIONS.
6 ALL SMOKE DETECTORS SHALL BE REPLACED WITH NEW SMOKE
DETECTORS KIDDE MODEL:
HEAD: KI-PD
BASE: KI-SB4
7 ONE BUILDING SHALL BE COMPLETED AT A TIME TO AVOID MULTIPLE
BUILDINGS BEING WITHOUT OPERABLE SYSTEMS AT THE SAME TIME.
THE SYSTEM SHALL BE RESTORED AND FULLY FUNCTIONAL AT THE END
OF EACH WORKDAY, WITH DEVICES FULLY SECURE WITH TAMPER-PROOF
FASTENERS, TO AVOID THE NEED FOR FIRE-WATCH AND TO ENSURE
SECURITY. FACILITY RESOURCES ARE SUCH THAT THERE SHOULD BE NO
CONSIDERATION THAT FIRE-WATCH CAN OR WILL BE PROVIDED BY THE
FACILITY.
8 THE CONTRACTOR SHALL PLAN ON REPLACING ONLY THE NUMBER OF
DETECTORS THAT CAN BE REPROGRAMMED, TESTED, AND FULLY
FUNCTIONAL AT THE END OF THE WORKDAY.
9 THE CONTRACTOR SHALL PROVIDE A SMOKE DETECTOR CLEANING
DEVICE FOR MAINTENANCE PURPOSES, ALONG WITH A NEW HANDHELD
PROGRAMMER.
10 NO DEVICES ARE TO BE RELOCATED. ALL SMOKE DETECTORS SHALL BE
REPLACED.
11 ALL WIRING SHALL BE REUSED.
12 A PROGRAMMING SPECIALIST SHALL BE ON-SITE UNTIL THE END OF THE
PROJECT TO REPROGRAM THE NEW SMOKE DETECTORS AT THE END OF
EACH WORKDAY.
13 THE FACILITY SHALL PROVIDE ASBESTOS REPORT IF PRESENT IN
BUILDINGS WHERE THE CONTRACTOR WILL PERFORM WORK.
14 BUILDING 61 "POWERHOUSE" WILL REQUIRE PERMIT. THE CONTRACTOR
SHALL INCLUDE THIS COST AND PROCESS IN THE SCOPE OF WORK.
ISSUED FOR DATE
1 SMOKE DETECTOR'S HEAD AND BASE HAVE BEEN REPLACED BY THE
FACILITY ALREADY. THE CONTRACTOR SHALL TEST AND MAKE SURE
THAT THIS DEVICE IS FUNCTIONING PROPERLY. PROVIDE
F
F F
F F
F
F
F
F
F
F
F
F
F
F
F F
F
F F
F
F
F
F
FFF
F
F
F
F F
F
F
F
DD
SD
HD
SDSD
SDSD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD SD
SDSD
SD SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
F
F
OSY
WF
GROUP
OFFICE
OFFICE
PSYCH OFFICE
TOILET
OFFICE
STORAGE
OFFICE
TOILET
OFFICE
CLASSROOM
OFFICE
CLASSROOM
TOILET
OFFICE CLASSROOM
CLASSROOM
OFFICE
STORAGE
VEST
STAIR
MOP
MECH
LOCKER RM
TOILET
OFFICER STATION
CELL
CELL CELL
SEGRAGATED
SHOWER
HOUSING
HOUSINGUNOCCUPIED
HOUSING
HOUSING
HOUSING
FACP
STORAGE
FAA
STAIR
ELEC.
F
IL
E N
U M
B E
R
S T
A T
E I
N D
E X
N U
M B
E R
S
C o ns tr uc tio n
F in a l R e co rd
Is su e d f o r
P re lim in a ry
D a te
D E
S
IG
N A
N D
C O
N S
TR
U
C
TI
O N
D
IV
IS
IO
N
D E
P A
R T
M E
N T
O F
T E
C H
N O
L O
G Y
M
A N
A G
E M
E N
T
A N
D B
U D
G E
T S
T A
T E
O F
M
IC
H
IG
A N
R O
B E
R T
C
H A
L L
R A
N
C A
R B
D
IR
E
C T
O R
S T
A T
E F
A C
IL
IT
IE
S
A D
M
IN
IS
T
R A
T
IO
N
E a s t
K a la m a z o o A v e n u e
S u it e
K a la m a z o o
M ic h ig
-5
.3
.6
P H
O
.3
.6
F A
X
T O
W E
R P
IN
K
S T
E R
.C O
M
A L L R
IG
H
T S
R E
S E
R V
E D
E a s t
F u lt o n S tr e e t, S u it e
G ra n d R a p id s
M ic h ig a n
.4
.9
P H
O
.4
.5
F A
X
S H
E E
T T
IT
L
E
S H
E E
T N
U M
B E
R
O W
N E
R P
R O
J E
C T
T
IT
L E
D A
T E
B U
IL
D
IN
G
D
B A
S E
M E
N T
A N
D F
IR
S
T F
L O
O R
F
IR
E A
L A
R M
F L
O O
R P
L A
N
.3
E
/5
/2
R E
P L A
C E
V
IG
IL
A
N T
F
IR
E A
L A
R M
S M
O K
E D
E T
E C
T O
R S
C o ld w a te r, M ic h ig a n
S T
A T
E O
F M
IC
H
IG
A
N D
E P
A R
T M
E N
T O
F C
O R
R E
C T
IO
N
S
1.
R W
G
/2
/2
/5
/2
GENERAL ELECTRICAL NOTES
LAKELAND CORRECTIONAL FACILITY
KEY PLAN
SCALE: NO SCALE
A
B
C
A/B
C/D
D
E
F
G
H
I
1/8" = 1'-0"
BUILDING D - FIRST FLOOR PLAN
1/8" = 1'-0"
BUILDING D - BASEMENT PLAN
1 ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CUTTING
AND PATCHING REQUIRED FOR NEW WORK OR WHERE DEVICES ARE
REMOVED AND NOT REPLACED.
2 PATCH ALL PENETRATIONS AS REQUIRED TO MAINTAIN FIRE RATING.
3 WHEN CEILINGS ARE REMOVED ELECTRICAL CONTRACTOR SHALL
PROPERLY SUPPORT ALL CONDUIT AND LOW VOLTAGE WIRING AS
REQUIRED PER NEC.
4 REMOVE CEILINGS AND GRID AS REQUIRED. REPLACE ANY DAMAGED
CEILINGS.
5 PROVIDE LABEL FOR ALL FIRE ALARM DEVICES. NEW LABELING SHALL
FOLLOW THE EXISTING LABELS IN THE SYSTEM. FOR MORE DETAILS,
PLEASE SEE SPECIFICATIONS.
6 ALL SMOKE DETECTORS SHALL BE REPLACED WITH NEW SMOKE
DETECTORS KIDDE MODEL:
HEAD: KI-PD
BASE: KI-SB4
7 ONE BUILDING SHALL BE COMPLETED AT A TIME TO AVOID MULTIPLE
BUILDINGS BEING WITHOUT OPERABLE SYSTEMS AT THE SAME TIME.
THE SYSTEM SHALL BE RESTORED AND FULLY FUNCTIONAL AT THE END
OF EACH WORKDAY, WITH DEVICES FULLY SECURE WITH TAMPER-PROOF
FASTENERS, TO AVOID THE NEED FOR FIRE-WATCH AND TO ENSURE
SECURITY. FACILITY RESOURCES ARE SUCH THAT THERE SHOULD BE NO
CONSIDERATION THAT FIRE-WATCH CAN OR WILL BE PROVIDED BY THE
FACILITY.
8 THE CONTRACTOR SHALL PLAN ON REPLACING ONLY THE NUMBER OF
DETECTORS THAT CAN BE REPROGRAMMED, TESTED, AND FULLY
FUNCTIONAL AT THE END OF THE WORKDAY.
9 THE CONTRACTOR SHALL PROVIDE A SMOKE DETECTOR CLEANING
DEVICE FOR MAINTENANCE PURPOSES, ALONG WITH A NEW HANDHELD
PROGRAMMER.
10 NO DEVICES ARE TO BE RELOCATED. ALL SMOKE DETECTORS SHALL BE
REPLACED.
11 ALL WIRING SHALL BE REUSED.
12 A PROGRAMMING SPECIALIST SHALL BE ON-SITE UNTIL THE END OF THE
PROJECT TO REPROGRAM THE NEW SMOKE DETECTORS AT THE END OF
EACH WORKDAY.
13 THE FACILITY SHALL PROVIDE ASBESTOS REPORT IF PRESENT IN
BUILDINGS WHERE THE CONTRACTOR WILL PERFORM WORK.
14 BUILDING 61 "POWERHOUSE" WILL REQUIRE PERMIT. THE CONTRACTOR
SHALL INCLUDE THIS COST AND PROCESS IN THE SCOPE OF WORK.
ISSUED FOR DATE
1 SMOKE DETECTOR'S HEAD AND BASE HAVE BEEN REPLACED BY THE
FACILITY ALREADY. THE CONTRACTOR SHALL TEST AND MAKE SURE
THAT THIS DEVICE IS FUNCTIONING PROPERLY. PROVIDE
UP
F
F
F F F
F F F
F
F F
TO MEZZ
DOWN
DOWN
UP
UPUPUP
DOWN
F
F F
F F
F
F
F
F
F F
F F F
HD
SD
SD
F F
OPEN AREA
OPEN AREA
S TRNS SUBINL
OFFICE
BREAK ROOM
LOCKER ROOM
OFFICE
TOOLS ROOM
FLOOR
OPENING
OPEN AREA
FACP
SD SHALL BE INSTALLED ON THE WALL
ABOVE THE PANEL, WITHIN 5'-0"
INSTALL SMOKE DETECTOR ON THE
METAL STRUCTURE BUT NOT
ABOVE THE FLOOR OPENING.
DEVICE SHALL BE ACCESSIBLE FOR
MAINTENANCE PURPOSES.
SHOWER
TOILET
HALF WALL
ULTRALINK
TOILET
BOILER BOILER BOILER
INSTALL HD (SET FOR 197) ON
THE METAL STRUCTURE,
ACCESSIBLE FOR MAINTENANCE
STORAGE
STORAGE
F
IL
E N
U M
B E
R
S T
A T
E I
N D
E X
N U
M B
E R
S
C o ns tr uc tio n
F in a l R e co rd
Is su e d f o r
P re lim in a ry
D a te
D E
S
IG
N A
N D
C O
N S
TR
U
C
TI
O N
D
IV
IS
IO
N
D E
P A
R T
M E
N T
O F
T E
C H
N O
L O
G Y
M
A N
A G
E M
E N
T
A N
D B
U D
G E
T S
T A
T E
O F
M
IC
H
IG
A N
R O
B E
R T
C
H A
L L
R A
N
C A
R B
D
IR
E
C T
O R
S T
A T
E F
A C
IL
IT
IE
S
A D
M
IN
IS
T
R A
T
IO
N
E a s t
K a la m a z o o A v e n u e
S u it e
K a la m a z o o
M ic h ig
-5
.3
.6
P H
O
.3
.6
F A
X
T O
W E
R P
IN
K
S T
E R
.C O
M
A L L R
IG
H
T S
R E
S E
R V
E D
E a s t
F u lt o n S tr e e t, S u it e
G ra n d R a p id s
M ic h ig a n
.4
.9
P H
O
.4
.5
F A
X
S H
E E
T T
IT
L
E
S H
E E
T N
U M
B E
R
O W
N E
R P
R O
J E
C T
T
IT
L E
D A
T E
B U
IL
D
IN
G
P O
W E
R H
O U
S E
B A
S E
M E
N T
A N
D F
IR
S
T F
L O
O R
F
IR
E A
L A
R M
P L A
N
.3
E
/5
/2
R E
P L A
C E
V
IG
IL
A
N T
F
IR
E A
L A
R M
S M
O K
E D
E T
E C
T O
R S
C o ld w a te r, M ic h ig a n
S T
A T
E O
F M
IC
H
IG
A
N D
E P
A R
T M
E N
T O
F C
O R
R E
C T
IO
N
S
1.
R W
G
/2
/2
/5
/2
GENERAL ELECTRICAL NOTES
LAKELAND CORRECTIONAL FACILITY
KEY PLAN
SCALE: NO SCALE
A
B
C
A/B
C/D
D
E
F
G
H
I
1 ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CUTTING
AND PATCHING REQUIRED FOR NEW WORK OR WHERE DEVICES ARE
REMOVED AND NOT REPLACED.
2 PATCH ALL PENETRATIONS AS REQUIRED TO MAINTAIN FIRE RATING.
3 WHEN CEILINGS ARE REMOVED ELECTRICAL CONTRACTOR SHALL
PROPERLY SUPPORT ALL CONDUIT AND LOW VOLTAGE WIRING AS
REQUIRED PER NEC.
4 REMOVE CEILINGS AND GRID AS REQUIRED. REPLACE ANY DAMAGED
CEILINGS.
5 PROVIDE LABEL FOR ALL FIRE ALARM DEVICES. NEW LABELING SHALL
FOLLOW THE EXISTING LABELS IN THE SYSTEM. FOR MORE DETAILS,
PLEASE SEE SPECIFICATIONS.
6 ALL SMOKE DETECTORS SHALL BE REPLACED WITH NEW SMOKE
DETECTORS KIDDE MODEL:
HEAD: KI-PD
BASE: KI-SB4
7 ONE BUILDING SHALL BE COMPLETED AT A TIME TO AVOID MULTIPLE
BUILDINGS BEING WITHOUT OPERABLE SYSTEMS AT THE SAME TIME.
THE SYSTEM SHALL BE RESTORED AND FULLY FUNCTIONAL AT THE END
OF EACH WORKDAY, WITH DEVICES FULLY SECURE WITH TAMPER-PROOF
FASTENERS, TO AVOID THE NEED FOR FIRE-WATCH AND TO ENSURE
SECURITY. FACILITY RESOURCES ARE SUCH THAT THERE SHOULD BE NO
CONSIDERATION THAT FIRE-WATCH CAN OR WILL BE PROVIDED BY THE
FACILITY.
8 THE CONTRACTOR SHALL PLAN ON REPLACING ONLY THE NUMBER OF
DETECTORS THAT CAN BE REPROGRAMMED, TESTED, AND FULLY
FUNCTIONAL AT THE END OF THE WORKDAY.
9 THE CONTRACTOR SHALL PROVIDE A SMOKE DETECTOR CLEANING
DEVICE FOR MAINTENANCE PURPOSES, ALONG WITH A NEW HANDHELD
PROGRAMMER.
10 NO DEVICES ARE TO BE RELOCATED. ALL SMOKE DETECTORS SHALL BE
REPLACED.
11 ALL WIRING SHALL BE REUSED.
12 A PROGRAMMING SPECIALIST SHALL BE ON-SITE UNTIL THE END OF THE
PROJECT TO REPROGRAM THE NEW SMOKE DETECTORS AT THE END OF
EACH WORKDAY.
13 THE FACILITY SHALL PROVIDE ASBESTOS REPORT IF PRESENT IN
BUILDINGS WHERE THE CONTRACTOR WILL PERFORM WORK.
14 BUILDING 61 "POWERHOUSE" WILL REQUIRE PERMIT. THE CONTRACTOR
SHALL INCLUDE THIS COST AND PROCESS IN THE SCOPE OF WORK.
GENERAL ELECTRICAL NOTES
1/8" = 1'-0"
BUILDING 61 "POWERHOUSE" - BASEMENT PLAN
1/8" = 1'-0"
BUILDING 61 "POWERHOUSE" - FIRST FLOOR PLAN
1 PROVIDE NEW FIRE ALARM PANEL EDWARDS MODEL EST-3.
2 FIRE ALARM PANEL SHALL BE FED FROM S TRNS SUBINL PANEL,
LOCATED IN THE BASEMENT. PROVIDE NEW BREAKER AND CIRCUIT
BREAKER LOCKOUT DEVICE FOR THE CIRCUIT.
3 PANEL KEY SHALL MATCH THE EXISTING FIRE ALARM PANEL KEYING.
4 PULL STATION SHALL BE COMPATIBLE WITH EDWARDS SYSTEM, SINGLE
ACTION, AND KEYED TO RESET. NEW PULL STATION KEY SHALL MATCH
THE EXISTING KEYING.
1/8" = 1'-0"
MEZZANINE
ISSUED FOR DATE
FACP
DD
RT
HD
F
SD
F
IAMIAM
V
OSYOSY
FIRE ALARM RISER NOTES:
1. REFERENCE SPECIFICATION SECTION 283100 FOR ADDITIONAL
REQUIREMENTS.
2. COORDINATE FIBER CONNECTIONS WITH OWNER. PROVIDE ALL
REQUIRED EQIUPMENT FOR A COMPLETE INSTALLATION. FIRE ALARM
PANELS SHALL COMMUNICATE VIA STARTNET 2 SYSTEM, PROVIDE ALL
REQUIRED EQUIPMENT AND PROGRAMMING AS REQUIRED.
3. PROVIDE CONNECTION TO EXISTING CENTRAL CONTROL STATION.
PROVIDE ALL REQUIRED EQUIPMENT FOR A COMPLETE INSTALLATION.
4. ZAM MODULE IS PROGRAMMED TO FOLLOW ACTION OF THE
DETECTORS AT THE SHUTTER.
5. INSTALL WIRING AND CABLES IN ACCORDANCE WITH SPECIFICATIONS
DUCT
DUCT DETECTOR
RESET/TEST
DETECT.
DETECTORS
PULL
STATIONS
DETECTORS
HEATSMOKE
FIRE ALARM
CONTROL PANEL
60 HZ CKT.
DEDICATED
120 VAC
EMERGENCY
STATION
WATER FLOW SWITCHES
TO ADDITIONAL
DEVICES (TYP.)
DEVICES (TYP.)
TO ADDITIONAL
#8 AWG.
EQUIPMENT GROUND
BUILDING SERVICE
HORN STROBE STROBE
SD ELEVATOR SMOKE DETECTORS, CONNECT
SECOND OUTPUT TO ELEVATOR, COORDINATE
WITH ELEVATOR MANUFACTURER. PROVIDE ALL
REQUIRED EQUIPMENT AND PROGRAMMING AS
REQUIRED FOR A COMPLETE INSTALLATION.
E
FACP
FIRE ALARM
CONTROL PANEL
60 HZ CKT.
DEDICATED
120 VAC
EMERGENCY
#8 AWG.
EQUIPMENT GROUND
BUILDING SERVICE
TO BUILDING DEVICES
CONNECT TO NEW
STARNET 2 SYSTEM
FACP
FIRE ALARM
CONTROL PANEL
60 HZ CKT.
DEDICATED
120 VAC
EMERGENCY
#8 AWG.
EQUIPMENT GROUND
BUILDING SERVICE
TO BUILDING DEVICES
CONNECT NEW FIRE ALARM PANEL TO EXISTING STARNET 2/SENSTAR SYSTEM.
COORDINATE EXACT LOCATION IN THE FIELD. PROVIDE ALL REQUIRED
EQUIPMENT, WIRING AND PROGRAMMING TO REPORT ALARM AND TROUBLE
BACK TO CENTRAL MONITORING.
BUILDING A
UNIT 2
CONNECT TO NEW
STARNET 2 SYSTEM
CONNECT TO NEW
STARNET 2 SYSTEM
FACP
FIRE ALARM
CONTROL PANEL
60 HZ CKT.
DEDICATED
120 VAC
EMERGENCY
#8 AWG.
EQUIPMENT GROUND
BUILDING SERVICE
TO BUILDING DEVICES
CONNECT TO NEW
STARNET 2 SYSTEM
FACP
FIRE ALARM
CONTROL PANEL
60 HZ CKT.
DEDICATED
120 VAC
EMERGENCY
#8 AWG.
EQUIPMENT GROUND
BUILDING SERVICE
TO BUILDING DEVICES
CONNECT TO NEW
STARNET 2 SYSTEM
NEW FACP
FIRE ALARM
CONTROL PANEL
60 HZ CKT.
DEDICATED
120 VAC
EMERGENCY
#8 AWG.
EQUIPMENT GROUND
BUILDING SERVICE
TO BUILDING DEVICES
CONNECT TO NEW
STARNET 2 SYSTEM
BUILDING B
UNIT 4
BUILDING C
UNIT 2
BUILDING D BUILDING 61
"POWERHOUSE"
STICKER NOTES:
1. FOR EXAMPLE PURPOSE ONLY
2. COORDINATE EXACT WORDING AND PROCEDURE WITH EACH MANUFACTURER
3. STICKER SUGGESTED SIZE: 10-12" SQUARE
4. FONT AND BACKGROUND COLOR: WHITE AND RED RESPECTIVELY
5. IT SHOULD BE LOCATED OUTSIDE OF THE FIRE ALARM PANEL
CONNECT TO NEW
STARNET 2 SYSTEM
F
IL
E N
U M
B E
R
S T
A T
E I
N D
E X
N U
M B
E R
S
C o ns tr uc tio n
F in a l R e co rd
Is su e d f o r
P re lim in a ry
D a te
D E
S
IG
N A
N D
C O
N S
TR
U
C
TI
O N
D
IV
IS
IO
N
D E
P A
R T
M E
N T
O F
T E
C H
N O
L O
G Y
M
A N
A G
E M
E N
T
A N
D B
U D
G E
T S
T A
T E
O F
M
IC
H
IG
A N
R O
B E
R T
C
H A
L L
R A
N
C A
R B
D
IR
E
C T
O R
S T
A T
E F
A C
IL
IT
IE
S
A D
M
IN
IS
T
R A
T
IO
N
E a s t
K a la m a z o o A v e n u e
S u it e
K a la m a z o o
M ic h ig
-5
.3
.6
P H
O
.3
.6
F A
X
T O
W E
R P
IN
K
S T
E R
.C O
M
A L L R
IG
H
T S
R E
S E
R V
E D
E a s t
F u lt o n S tr e e t, S u it e
G ra n d R a p id s
M ic h ig a n
.4
.9
P H
O
.4
.5
F A
X
S H
E E
T T
IT
L
E
S H
E E
T N
U M
B E
R
O W
N E
R P
R O
J E
C T
T
IT
L E
D A
T E
F
IR
E A
L A
R M
R
IS
E R
D
IA
G R
A M
.3
E
/5
/2
R E
P L A
C E
V
IG
IL
A
N T
F
IR
E A
L A
R M
S M
O K
E D
E T
E C
T O
R S
C o ld w a te r, M ic h ig a n
S T
A T
E O
F M
IC
H
IG
A
N D
E P
A R
T M
E N
T O
F C
O R
R E
C T
IO
N
S
1.
R W
G
/2
/2
/5
/2
FIRE
M
A
XI
M U
M
DOOR
FINISHED FLOOR
PULL STATION
CEILING
TYPICAL:
TWO HOLE STRAP
WITH SECUTIRY
FASTERNER
M
A
XI
M U
M
WALL
TYPICAL: 3/4" EMT CONDUIT
TYPICAL:
INSTALL FIRESTOPPING
AT PENETRATIONS,
PATCH AND PAINT
PROVIDE NYLON NUT
ON TOP OF BEAM CLAMP
BULKHEAD /
LOWERED CEILING
TWO HOLE STRAP
WITH SECUTIRY
FASTERNER
LB TYPE FITTING WITH COMPRESSION
TYPE CONDUIT FITTINGS AND TORX
WITH CENTER PIN SCREWS
BACKBOX WITH NO
KNOCK OUTS. RECESS
BOX WHERE POSSIBLE.
SIZE TO DEVICE SO
THERE ARE NOT ANY
OPENINGS
FIRE ALARM
DEVICE
12" MAXIMUM
FACP
FAA
M
A
XI
M U
M
M
A
XI
M U
M
"I" BEAM
SUPPORT
ROD
WALL-MOUNTED
NOTIFICATION
APPLIANCE
FIRE
3/4" CONDUIT,
CONCEALED IF
POSSIBLE
A P P
LI
A N C
E
TO
P N
O T
LE
S
S T
H A N
M
IN
"I" BEAM
M
A
XI
M U
M
MAXIMUM 5' FROM THE EDGE OF THE DOOR
TAMPER SWITCH
WATER FLOW
SWTICH
3/4" COMPRESSION
TYPE CONNECTOR
3/4" METAL
FLEXIBLE
CONDUIT
3/4" COMPRESSION
TYPE CONNECTOR
3/4" METAL
FLEXIBLE
CONDUIT
PROVIDE NYLON NUT
BETWEEN THE BEAM
CLAMP AND THE BEAM
TORX HEAD WITH
CENTER PIN
3/4" CONDUIT
LAY-IN CEILING
FIRE ALARM DEVICE
(RECESS AND LEAVE
NO GAPS BETWEEN
SPANNER AND DEVICE)
SPANNER BOX WITH
NO KNOCK OUTS
DECK ABOVE
LIMITED TO
ONE DEVICE
PER SPANNER
3/4" COMPRESSION
TYPE CONNECTOR
3/4" METAL
FLEXIBLE
CONDUIT
DUCT DETECTOR
DUCT
36" MAXIMUM36" MAXIMUM
J HOOK. CONTRACTOR
TO PROVIDE SUPPORT AS
REQUIRED TO KEEP CABLE
OFF CEILING AND ALL OTHER
EQUIPMENT ABOVE CEILING
CABLE
NOTIFICATION
APPLIANCE
FIRE
CUSTOMIZIBLE BACK
PLATE FOR
WALL-MOUNTED
DEVICES
DETAIL FOR WHEN EXISTING
DEVICE IS BIGGER THAN THE
NEW ONE TO BE INSTALLED
DETAIL FOR FITTING DEMOLITION
BELOW GRADE
INTERIOR WALL
EXTERNAL 3/4"
CONDUIT TO
BE DEMOLISHED
GRADE
EARTH
TWO HOLE STRAP
WITH SECUTIRY
FASTERNER
ALL WIRES NEEDS TO BE PULLED OUT
AND CONDUIT SHALL BE DEMOLISHED
MINIMUM 16" BELOW GRADE
CONDUIT TO
REMAIN IN THE
DEMOLITION
I BEAM INSTALLATION DETAIL LAY-IN CEILING INSTALLATION DETAIL
DUCT DETECTOR INSTALLATION DETAIL
DECK ABOVE
M
IN
IM
U
N
OUTSIDE THE BUILDING
J HOOK. CONTRACTOR
TO PROVIDE SUPPORT AS
REQUIRED TO KEEP CABLE
OFF CEILING AND ALL OTHER
EQUIPMENT ABOVE CEILING
CABLE
DETAIL FOR TAMPER AND
WATER FLOW SWITCHES
F
IL
E N
U M
B E
R
S T
A T
E I
N D
E X
N U
M B
E R
S
C o ns tr uc tio n
F in a l R e co rd
Is su e d f o r
P re lim in a ry
D a te
D E
S
IG
N A
N D
C O
N S
TR
U
C
TI
O N
D
IV
IS
IO
N
D E
P A
R T
M E
N T
O F
T E
C H
N O
L O
G Y
M
A N
A G
E M
E N
T
A N
D B
U D
G E
T S
T A
T E
O F
M
IC
H
IG
A N
R O
B E
R T
C
H A
L L
R A
N
C A
R B
D
IR
E
C T
O R
S T
A T
E F
A C
IL
IT
IE
S
A D
M
IN
IS
T
R A
T
IO
N
E a s t
K a la m a z o o A v e n u e
S u it e
K a la m a z o o
M ic h ig
-5
.3
.6
P H
O
.3
.6
F A
X
T O
W E
R P
IN
K
S T
E R
.C O
M
A L L R
IG
H
T S
R E
S E
R V
E D
E a s t
F u lt o n S tr e e t, S u it e
G ra n d R a p id s
M ic h ig a n
.4
.9
P H
O
.4
.5
F A
X
S H
E E
T T
IT
L
E
S H
E E
T N
U M
B E
R
O W
N E
R P
R O
J E
C T
T
IT
L E
D A
T E
IN
S
T A
L L
A T
IO
N
D R
A W
IN
G
.3
E
/5
/2
R E
P L A
C E
V
IG
IL
A
N T
F
IR
E A
L A
R M
S M
O K
E D
E T
E C
T O
R S
C o ld w a te r, M ic h ig a n
S T
A T
E O
F M
IC
H
IG
A
N D
E P
A R
T M
E N
T O
F C
O R
R E
C T
IO
N
S
1.
R W
G
/2
/2
/5
/2
GENERAL INSTALLATION NOTES
1 ALL CONDUIT SHALL BE EMT, COMPRESSION FITTING TYPE, WITH
2-HOLE STRAPS 3' ON CENTER AND WITHIN 12" OF A JOINT OR
JUNCTION BOX. ALL JUNCTION BOXES SHALL HAVE NO KNOCK OUTS.
2 SECURITY TYPE SCREWS SHALL BE TORX WITH CENTER PIN.
3 ALL FIRE ALARM DEVICES SHALL HAVE MECHANICAL CONNECTION SO
DEVICE OR FACE CANNOT BE REMOVED WITHOUT REMOVING THE
SCREW. THE SCREW SHALL BE SECURITY TYPE.
4 APPLY FIRESTOPPING TO PENETRATIONS OF FIRE-RATED FLOOR AND
WALL ASSEMBLIES FOR ELECTRICAL INSTALLATIONS TO RESTORE
ORIGINAL FIRE-RESISTANCE RATING OF ASSEMBLY.
5 MINIMUM CONDUCTOR SIZE FOR POWER WIRING #12AWG.
6 CONCEAL CABLES IN FINISHED WALLS, CEILINGS, AND FLOORS,
UNLESS OTHERWISE INDICATED.
7 TIGHTEN ELECTRICAL CONNECTORS AND TERMINALS ACCORDING TO
MANUFACTURER'S PUBLISHED TOQUE-TIGHTENING VALUES.
8 AFTER INSTALLING CONDUCTORS AND CABLES AND BEFORE
ELECTRICAL CIRCUITRY HAS ENERGIZED, TEST FOR COMPLIANCE WITH
REQUIREMENTS.
9 PERFORM EACH VISUAL AND MECHANICAL INSPECTION AND
ELECTRICAL TEST STATED IN NETA ACCEPTANCE TESTING
SPECIFICATION. CERTIFY COMPLIANCE WITH TEST PARAMETERS.
10 REMOVE AND REPLACE MALFUNCTIONING UNITS AND RETEST AS
SPECIFIED ABOVE.
11 ALL DEVICES SHALL HAVE NO KNOCKOUTS WHEN UNDER 10' AND IN
PRISONERS ACCESSED AREAS.
12 RACEWAYS: EXPOSED IN UNFINISHED UTILITY SPACES (MECHANICAL
ROOM, ELECTRICAL ROOMS AND TUNNELS) = EMT. EXPOSED IN
FINISHED SPACES = ALL CONDUITS SHALL BE CONCEALED UNLESS
INDICATED ON PLANS.
13 MINIMUM RACEWAY SIZE: 3/4-INCH TRADE SIZE (16mm)
14 KEEP RACEWAYS AT LEAST 6 INCHES (150mm) AWAY FROM PARALLEL
RUNS ON FUELS AND STEAM OR HOT-WATER PIPES. INSTALL
HORIZONTAL RACEWAY RUNS ABOVE WATER AND STEAM PIPING.
15 MAKE BENDS AND OFFSETS SO ID IS NOT REDUCED. KEEP LEGS OF
BENDS IN SAME PLANE AND KEEP STRAIGHT LEGS OF OFFSETS
PARALLEL, UNLESS OTHERWISE INDICATED.
16 CONDUIT AND EMT MAY BE SURFACE MOUTED IN MECHANICAL AND
ELECTRICAL ROOMS.
17 WHERE RACEWAYS ARE TERMINATED WITH LOCKNUTS AND BUSHINGS,
ALIGN RACEWAYS TO ENTER SQUARELY AND INSTALL LOCKNUTS WITH
DISHED PART AGAINST BOX. USE TWO LOCKNUTS, ONE INSIDE AND
ONE OUTSIDE BOX.
18 COLOR-CODING: PAINT FIRE ALARM SYSTEM JUNCTION BOXES AND
COVERS RED.
19 RECESSED BACK-TO-BACK BOXES ARE NOT PERMITED IN THE SAME
WALL. ARRANGE BOXES WITH AT LEAST 12 INCHES OF HORIZONTAL
SPACING.
20 LOCATE BOXES SO THAT COVER OR PLATE WILL NOT SPAN DIFFERENT
BUILDING FINISHES.
21 PROVIDE STAINLESS STEEL COVER PLATES ON ALL ABANDONED BOXES
THAT REMAIN FROM SELECTIVE DEMOLITION.
22 PROVIDE PROGRAMMER AS REQUIRED FOR CHANGING OUT SMOKE
DETECTORS IN THE FIELD. THE OWNER WANTS THE ABILITY TO REPLACE
SMOKE AND HEAT DETECTORS ON THEIR OWN. THE BASE BID SHALL
REQUIRE ALL REQUIRED EQUIPMENT TO FACILITATE THIS.
23 PULL STATIONS DRAWINGS SHALL BE SUBMITTED FOR APPROVAL.
24 PULL STATIONS SHALL BE MOUNTED SEMIFLUSHED IN RECESSED BACK
BOXES.
25 PROVIDE SMOKE DETECTORS WHERE REQUIRED FOR ALL FACP AND
NAC PANELS.
26 LABEL EVERY ADDRESSABLE DEVICE WITH ITS ADDRESS IN A VISIBLE
LOCATION. ADHESIVE-ATTACHED LABELING MATERIAL SHALL BE USED.
MINIMUM LETTER HEIGHT SHALL BE 3/8 INCH (10mm).