Drawings - Lakeland - Part 1.pdf

PDF 3 MB Posted

Attached to
472/20007. RWG-Handlon & Lakeland CF-Fire Alarm System
Solicitation number
RFQ-171-200000000311-2
Issued by
Benzie County, Michigan

About this file

This is a set of construction drawings from the State of Michigan Department of Technology, Management and Budget's State Facilities Administration Design and Construction Division for replacing Vigilant fire alarm smoke detectors at the Lakeland Correctional Facility in Coldwater, Michigan. The project, dated August 5, 2020, involves replacing fire alarm smoke detectors throughout multiple buildings (Buildings A, B, C, and D) at the correctional facility located at 141 1st Street. The drawings include detailed electrical demolition plans and new installation plans for fire alarm systems across multiple floors and units within each building, following 2016 NFPA 72 National Fire Alarm Code and 2017 National Electrical Code with Michigan amendments.

The drawings provide comprehensive floor plans showing the locations of existing smoke detectors to be demolished and replaced, including ceiling-mounted and duct-type detectors, as well as other fire alarm system components like manual pull stations, control panels, and audio/visual alarms. The plans include mounting height specifications for various devices (ranging from 40" to 80" depending on device type) and detailed demolition notes requiring functional testing of each building's system prior to work, completing one building at a time, and ensuring systems remain fully operational at the end of each workday to maintain facility security and safety requirements.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

F

IL

E N

U M

B E

R

S T

A T

E I

N D

E X

N U

M B

E R

S

C o ns tr uc tio n

F in a l R e co rd

Is su e d f o r

P re lim in a ry

D a te

D E

S

IG

N A

N D

C O

N S

TR

U

C

TI

O N

D

IV

IS

IO

N

D E

P A

R T

M E

N T

O F

T E

C H

N O

L O

G Y

M

A N

A G

E M

E N

T

A N

D B

U D

G E

T S

T A

T E

O F

M

IC

H

IG

A N

R O

B E

R T

C

H A

L L

R A

N

C A

R B

D

IR

E

C T

O R

S T

A T

E F

A C

IL

IT

IE

S

A D

M

IN

IS

T

R A

T

IO

N

DESIGN TEAM

ARCHITECT/ENGINEER

E a s t

K a la m a z o o A v e n u e

S u it e

K a la m a z o o

M ic h ig a n

-5

.3

.6

P H

O N

E

.3

.6

F A

X

T O

W E

R P

IN

K

S T

E R

.C O

M

A L L R

IG

H

T S

R E

S E

R V

E D

E a s t

F u lt o n S tr e e t, S u it e

G ra n d R a p id s

M ic h ig a n

.4

.9

P H

O

.4

.5

F A

X

S H

E E

T T

IT

L

E

S H

E E

T N

U M

B E

R

O W

N E

R P

R O

J E

C T

T

IT

L E

D A

T E

REPLACE VIGILANT FIRE ALARM SMOKE DETECTORS

STATE OF MICHIGAN

DEPARTMENT OF CORRECTIONS

Coldwater, Michigan

CONSTRUCTION DOCUMENTS

C O

V E

R S

H E

E T

.3

G

/5

/2

R E

P L A

C E

V

IG

IL

A

N T

F

IR

E A

L A

R M

S M

O K

E D

E T

E C

T O

R S

C o ld w a te r, M ic h ig a n

S T

A T

E O

F M

IC

H

IG

A

N D

E P

A R

T M

E N

T O

F C

O R

R E

C T

IO

N

S

1.

R W

G

/2

/2

/5

/2

REFERENCED CODES MAP

DRAWING INDEX

SITE ADDRESS

LAKELAND CORRECTIONAL FACILITY

141 1ST STREET

COLDWATER, MI 49036

ELECTRICAL:

FIRE ALRM: 2016 NFPA 72 NATIONAL FIRE ALARM CODE

2017 NATIONAL ELECTRICAL CODE WITH MICHIGAN AMENDMENTS

ELECTRICAL SITE

ES 101 ELECTRICAL SITE PLAN

ELECTRICAL DEMOLITION

ED 101A BUILDING "A" - FIRST FLOOR FIRE ALARM DEMOLITION PLAN - UNIT 1

ED 101B BUILDING "A" - BASEMENT AND FIRST FLOOR FIRE ALARM DEMOLITION PLAN - UNIT 2

ED 101C BUILDING "A" - FIRST FLOOR FIRE ALARM DEMOLITION PLAN - UNIT 3

ED 102A BUILDING "B" - FIRST FLOOR FIRE ALARM DEMOLITION PLAN - UNIT 2 AND UNIT 3

ED 102B BUILDING "B" - BASEMENT AND FIRST FLOOR FIRE ALARM DEMOLITION PLAN - CENTER

ED 102C BUILDING "B" - FIRST FLOOR FIRE ALARM DEMOLITION PLAN - UNIT 1 AND UNIT 4

ED 103A BUILDING "C" - FIRST FLOOR FIRE ALARM DEMOLITION PLAN - UNIT 2 AND UNIT 3

ED 103B BUILDING "C" - BASEMENT AND FIRST FLOOR FIRE ALARM DEMOLITION PLAN - CENTER

ED 103C BUILDING "C" - FIRST FLOOR FIRE ALARM DEMOLITION PLAN - UNIT 1 AND UNIT 4

ED 104 BUILDING "D" - FIRST FLOOR FIRE ALARM DEMOLITION PLAN

ELECTRICAL

E 101A BUILDING "A" - FIRST FLOOR FIRE ALARM PLAN - UNIT 1

E 101B BUILDING "A" - BASEMENT AND FIRST FLOOR FIRE ALARM PLAN - UNIT 2

E 101C BUILDING "A" - FIRST FLOOR FIRE ALARM PLAN - UNIT 3

E 102A BUILDING "B" - FIRST FLOOR FIRE ALARM PLAN - UNIT 2 AND 3

E 102B BUILDING "B" - FIRST FLOOR FIRE ALARM FLOOR PLAN - CENTER

E 102C BUILDING "B" - FIRST FLOOR FIRE ALARM PLAN - UNIT 1 AND 4

E 103A BUILDING "C" - FIRST FLOOR FIRE ALARM PLAN - UNIT 2 AND 3

E 103B BUILDING "C" - BASEMENT AND FIRST FLOOR FIRE ALARM PLAN - CENTER

E 103C BUILDING "C" - FIRST FLOOR FIRE ALARM PLAN - UNIT 1 AND 4

E 104 BUILDING "D" - BASEMENT AND FIRST FLOOR FIRE ALARM FLOOR PLAN

E 105 BUILDING 61 "POWERHOUSE" - BASEMENT AND FIRST FLOOR FIRE ALARM PLAN

ELECTRICAL DETAILS

E 401 FIRE ALARM RISER DIAGRAM

E 402 INSTALLATION DRAWING

242 EAST KALAMAZOO

SUITE 200

KALAMAZOO, MICHIGAN 49007

PHONE: 269.343.6133

FAX: 269.343.6633

ISSUED FOR DATE

D

C

B

A

WF

FIRE ALARM SYMBOLS

SYMBOL DESCRIPTION MOUNTING HEIGHTS

NOTES:

DH

FS

SD

SD

HD

DD

F

V

BD

V

F

F

RT

F

OSY

F

MAGNETIC DOOR HOLDER

ELECTRICAL SYMBOLS

FIRE ALARM SMOKE DETECTOR - DUCT TYPE

FIRE ALARM SMOKE DETECTOR - CEILING TYPE

FIRE ALARM HEAT DETECTOR - CEILING TYPE

FIRE ALARM DUCT DETECTOR REMOTE TEST STATION

FIRE ALARM MANUAL PULL STATION

SPRINKLER VALVE MONITOR SWITCH

SPRINKLER SYSTEM FLOW SWITCH

FIRE ALARM ANNUNCIATOR PANEL REMOTE - FLUSH MTD.

FIRE ALARM - VISUAL ALARM, CANDELA INDICATED

FIRE ALARM CONTROL PANEL - FLUSH MTD.

FIRE ALARM AUDIO/VISUAL ALARM, WALL MTD., CANDELA INDICATED

FIRE ALARM - BELL

FACP

FIRE SHUTTER

SMOKE/FIRE DAMPER

60" TO TOP

72" TO TOP

80"

80"

40"

60"

MOUNT DEVICES AT HEIGHTS INDICATED UNLESS INDICATED

OTHERWISE ON PLANS. HEIGHTS ARE TO BOTTOM OF DEVICE.

FIRE ALARM - VISUAL ALARM, CEILING MTD., CANDELA INDICATED

FIRE ALARM AUDIO/VISUAL ALARM, CEILING MTD., CANDELA INDICATED

STROBE PANEL

NAC

72" TO TOP

FAA

FIRE ALARM MANUAL PULL STATION - INSTITUTIONAL W/KEY 40"K

BEAM DETECTOR

S FIRE ALARM SPEAKER

SD

FIRE ALARM SMOKE DETECTOR - ELEVATOR TYPE, CONNECT TO FIRE

ALARM SYSTEM AND TO ELEVATOR CONTROL PANEL. COORDINATE WITH

ELEVATOR MANUFACTURER.

E

F

IL

E N

U M

B E

R

S T

A T

E I

N D

E X

N U

M B

E R

S

C o ns tr uc tio n

F in a l R e co rd

Is su e d f o r

P re lim in a ry

D a te

D E

S

IG

N A

N D

C O

N S

TR

U

C

TI

O N

D

IV

IS

IO

N

D E

P A

R T

M E

N T

O F

T E

C H

N O

L O

G Y

M

A N

A G

E M

E N

T

A N

D B

U D

G E

T S

T A

T E

O F

M

IC

H

IG

A N

R O

B E

R T

C

H A

L L

R A

N

C A

R B

D

IR

E

C T

O R

S T

A T

E F

A C

IL

IT

IE

S

A D

M

IN

IS

T

R A

T

IO

N

E a s t

K a la m a z o o A v e n u e

S u it e

K a la m a z o o

M ic h ig

-5

.3

.6

P H

O

.3

.6

F A

X

T O

W E

R P

IN

K

S T

E R

.C O

M

A L L R

IG

H

T S

R E

S E

R V

E D

E a s t

F u lt o n S tr e e t, S u it e

G ra n d R a p id s

M ic h ig a n

.4

.9

P H

O

.4

.5

F A

X

S H

E E

T T

IT

L

E

S H

E E

T N

U M

B E

R

O W

N E

R P

R O

J E

C T

T

IT

L E

D A

T E

E L E

C T

R

IC

A L S

IT

E

P L A

N

.3

E S

/5

/2

R E

P L A

C E

V

IG

IL

A

N T

F

IR

E A

L A

R M

S M

O K

E D

E T

E C

T O

R S

C o ld w a te r, M ic h ig a n

S T

A T

E O

F M

IC

H

IG

A

N D

E P

A R

T M

E N

T O

F C

O R

R E

C T

IO

N

S

1.

R W

G

/2

/2

/5

/2

1" = 80'-0"

FACILITY SITE PLAN

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F F

F F

F

F

F

F

F

F

F

F

F

F

F

F

F F

ML

ML

F

F

F

F

WF

WF

OSY

SD SD

SD SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD SD SD

SD

SD

SD

SD

SD

SD SD

SD

SD

CLOSET

HR OFFICE

WARDEN'S

SECRETARY HR OFFICE

WARDEN'S OFFICE

CONFERENCE

TOILET

ADM ASSISTANCE

TOILET

KITCHENETTE

TOILET

STORAGE

LOCKER RMSTORAGE

JC

FRONT DESK

OFFICE

CLOSET

EVIDENCE RM

DATA

VEST

ARSENAL

OFFICE

STORAGE

MAIL ROOM

RECORDS OFFICE

SUP.

RECORDS OFFICE

TECH

RECORDS OFFICE

TECH

RECORDS OFFICE

HR OFFICE

TOILET

BUSINESS OFFICE

OFFICE

WAITING RM

MUSTER

BREAK

BUBBLE

SGT ARSENAL

OFFICE

VISITING

CLOSET

TOILET

JC

LOCKER RM

NON-CONTACT

VISITING

OFFICE

HEARING

LOBBY

CLOSET

SALLY

F

IL

E N

U M

B E

R

S T

A T

E I

N D

E X

N U

M B

E R

S

C o ns tr uc tio n

F in a l R e co rd

Is su e d f o r

P re lim in a ry

D a te

D E

S

IG

N A

N D

C O

N S

TR

U

C

TI

O N

D

IV

IS

IO

N

D E

P A

R T

M E

N T

O F

T E

C H

N O

L O

G Y

M

A N

A G

E M

E N

T

A N

D B

U D

G E

T S

T A

T E

O F

M

IC

H

IG

A N

R O

B E

R T

C

H A

L L

R A

N

C A

R B

D

IR

E

C T

O R

S T

A T

E F

A C

IL

IT

IE

S

A D

M

IN

IS

T

R A

T

IO

N

E a s t

K a la m a z o o A v e n u e

S u it e

K a la m a z o o

M ic h ig

-5

.3

.6

P H

O

.3

.6

F A

X

T O

W E

R P

IN

K

S T

E R

.C O

M

A L L R

IG

H

T S

R E

S E

R V

E D

E a s t

F u lt o n S tr e e t, S u it e

G ra n d R a p id s

M ic h ig a n

.4

.9

P H

O

.4

.5

F A

X

S H

E E

T T

IT

L

E

S H

E E

T N

U M

B E

R

O W

N E

R P

R O

J E

C T

T

IT

L E

D A

T E

B U

IL

D

IN

G

A

F

IR

S T

F L O

O R

F

IR

E A

L A

R M

D E

M O

L

IT

IO

N

P L

A N

U

N

IT

.3

E D

A

/5 /2

R E

P L A

C E

V

IG

IL

A

N T

F

IR

E A

L A

R M

S M

O K

E D

E T

E C

T O

R S

C o ld w a te r, M ic h ig a n

S T

A T

E O

F M

IC

H

IG

A

N D

E P

A R

T M

E N

T O

F C

O R

R E

C T

IO

N

S

1.

R W

G

/2

/2

/5

/2

GENERAL ELECTRICAL DEMOLITION NOTES

LAKELAND CORRECTIONAL FACILITY

KEY PLAN

SCALE: NO SCALE

A

B

C

A/B

C/D

D

E

F

G

H

I

1/8" = 1'-0"

BUILDING A - FIRST FLOOR DEMOLITION PLAN - UNIT 1

1 ALL SMOKE DETECTORS SHALL BE DEMOLISHED.

2 ALL OTHER FIRE ALARM DEVICES ARE EXISTING TO REMAIN.

3 PROVIDE FUNCTIONAL TEST OF EACH BUILDING AND ASSOCIATED

PANEL PRIOR TO BEGINNING WORK.

4 ONE BUILDING SHALL BE COMPLETED AT A TIME TO AVOID MULTIPLE

BUILDINGS BEING WITHOUT OPERABLE SYSTEMS AT THE SAME TIME.

5 THE SYSTEM SHALL BE RESTORED AND FULLY FUNCTIONAL AT THE END

OF EACH WORKDAY, WITH DEVICES FULLY SECURE WITH

TAMPER-PROOF FASTENERS, TO AVOID THE NEED FOR FIRE-WATCH

AND TO ENSURE SECURITY. FACILITY RESOURCES ARE SUCH THAT

THERE SHOULD BE NO CONSIDERATION THAT FIRE-WATCH CAN OR

WILL BE PROVIDED BY THE FACILITY.

6 PROVIDE ALL REQUIRED PROGRAMMING INCLUDING ADJUSTING

SENSITIVITY SETTINGS TO THE CODE MAXIMUM.

DEMOLITION KEYED NOTES

1 SMOKE DETECTOR'S HEAD AND BASE HAVE BEEN REPLACED BY THE

FACILITY ALREADY. THE CONTRACTOR SHALL TEST AND MAKE SURE

THAT THIS DEVICE IS FUNCTIONING PROPERLY. PROVIDE

PROGRAMMING AS REQUIRED.

F

F

F

F

F

F

F

F F

F

F

F

F

FF

F

F

F

F

F

F

F

F

F

F

F F

F

F

F

F

F

F

F

F

F

WF

WF

OSY

OSY

WF

WF

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SDSD

SD SD SD SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

F F

F

F

F

SD

HOLDING CELL

HOLDING CELL

COPY RM

HOLDING CELL

INSPECTOR OFFICE

DEP. WARDEN

TOILET

COPY

HEARING

GRIEVANCE COORD.

DEP. WARDENS SEC.

ASSIST. DEP

WARDEN

DEP. WARDEN GOA

CONFERENCE RM

OFFICE

TOILET

JC

IT CLOSET

TRANSP.

STORAGE

LOBBY

OFFICE

STORAGE

TOILET

JC

TRANSP.

OFFICE

STORAGE

TOILET

DISHWASH

BOILER CLOSET

HEALTH UNIT OFFICE

OFFICE

CAFETERIA

BARBER SHOP

CLOSET

NURSING OFFICE

OPTOMETRY OFFICE

PROPERTY

CLOSET

COOLER

CONTROL CENTER

CONTROL CENTER

STAIR

CENTRAL SUPPLY

STORAGE

OFFICE

KITCHEN

FOOD TECH

MOP

MED. RECORDS

FACP

STORAGE

MECH

STORAGE

STAIR

STORAGE

NAC

F

IL

E N

U M

B E

R

S T

A T

E I

N D

E X

N U

M B

E R

S

C o ns tr uc tio n

F in a l R e co rd

Is su e d f o r

P re lim in a ry

D a te

D E

S

IG

N A

N D

C O

N S

TR

U

C

TI

O N

D

IV

IS

IO

N

D E

P A

R T

M E

N T

O F

T E

C H

N O

L O

G Y

M

A N

A G

E M

E N

T

A N

D B

U D

G E

T S

T A

T E

O F

M

IC

H

IG

A N

R O

B E

R T

C

H A

L L

R A

N

C A

R B

D

IR

E

C T

O R

S T

A T

E F

A C

IL

IT

IE

S

A D

M

IN

IS

T

R A

T

IO

N

E a s t

K a la m a z o o A v e n u e

S u it e

K a la m a z o o

M ic h ig

-5

.3

.6

P H

O

.3

.6

F A

X

T O

W E

R P

IN

K

S T

E R

.C O

M

A L L R

IG

H

T S

R E

S E

R V

E D

E a s t

F u lt o n S tr e e t, S u it e

G ra n d R a p id s

M ic h ig a n

.4

.9

P H

O

.4

.5

F A

X

S H

E E

T T

IT

L

E

S H

E E

T N

U M

B E

R

O W

N E

R P

R O

J E

C T

T

IT

L E

D A

T E

B U

IL

D

IN

G

A

B A

S E

M E

N T

A N

D F

IR

S

T F

L O

O R

F

IR

E A

L A

R M

D E

M O

L

IT

IO

N

P L

A N

U

N

IT

.3

E D

B

/5 /2

R E

P L A

C E

V

IG

IL

A

N T

F

IR

E A

L A

R M

S M

O K

E D

E T

E C

T O

R S

C o ld w a te r, M ic h ig a n

S T

A T

E O

F M

IC

H

IG

A

N D

E P

A R

T M

E N

T O

F C

O R

R E

C T

IO

N

S

1.

R W

G

/2

/2

/5

/2

LAKELAND CORRECTIONAL FACILITY

KEY PLAN

SCALE: NO SCALE

A

B

C

A/B

C/D

D

E

F

G

H

I

GENERAL ELECTRICAL DEMOLITION NOTES

1/8" = 1'-0"

BUILDING A - FIRST FLOOR DEMOLITION PLAN - UNIT 2

3/32" = 1'-0"

BUILDING A - BASEMENT DEMOLITION PLAN - UNIT 2

1 ALL SMOKE DETECTORS SHALL BE DEMOLISHED.

2 ALL OTHER FIRE ALARM DEVICES ARE EXISTING TO REMAIN.

3 PROVIDE FUNCTIONAL TEST OF EACH BUILDING AND ASSOCIATED

PANEL PRIOR TO BEGINNING WORK.

4 ONE BUILDING SHALL BE COMPLETED AT A TIME TO AVOID MULTIPLE

BUILDINGS BEING WITHOUT OPERABLE SYSTEMS AT THE SAME TIME.

5 THE SYSTEM SHALL BE RESTORED AND FULLY FUNCTIONAL AT THE END

OF EACH WORKDAY, WITH DEVICES FULLY SECURE WITH

TAMPER-PROOF FASTENERS, TO AVOID THE NEED FOR FIRE-WATCH

AND TO ENSURE SECURITY. FACILITY RESOURCES ARE SUCH THAT

THERE SHOULD BE NO CONSIDERATION THAT FIRE-WATCH CAN OR

WILL BE PROVIDED BY THE FACILITY.

6 PROVIDE ALL REQUIRED PROGRAMMING INCLUDING ADJUSTING

SENSITIVITY SETTINGS TO THE CODE MAXIMUM.

DEMOLITION KEYED NOTES

1 SMOKE DETECTOR'S HEAD AND BASE HAVE BEEN REPLACED BY THE

FACILITY ALREADY. THE CONTRACTOR SHALL TEST AND MAKE SURE

THAT THIS DEVICE IS FUNCTIONING PROPERLY. PROVIDE

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

WF

WF

OSY

SD SD

SD

SD

SD SD

SD

SD

SD SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD SD

SD SD

SD

SD

SD

SD

SD

SD

SD

SD SD SD

SDSD

SD

SD

SDSDSD

SD SD

SD

SD

OPTOMETRY OFFICE

HOUSING (1

PERSON MAX)

DAY RM

HOUSING (3

PERSON MAX)

HOUSING (3

PERSON MAX)

OFFICE

INMATE RM EXAM RM DAY RM

HOUSING (3

PERSON MAX)

HOUSING (3

PERSON MAX)

HOUSING (5

PERSON MAX)

OFFICE

CLOSET

HOUSING (5

PERSON MAX)

HOUSING (3

PERSON MAX)

HOUSING (1

PERSON MAX)

HOUSING (3

PERSON MAX)

HOUSING (5

PERSON MAX)

HOUSING (3

PERSON MAX)

HOUSING (5

PERSON MAX)

OFFICER STATION

CLOSET

IT CLOSET

EXAM RM

EXAM RM

OFFICE

EXAM RM

EXAM RM

EXAM RM

STORAGE

ATTIC ACCESS

DENTAL

OFFICER STATION

TOILET

WAITING RM

EXAM RM

HOUSING (5

PERSON MAX)

HOUSING (5

PERSON MAX)

HOUSING (2

PERSON MAX)

HOUSING (3

PERSON MAX)

HOUSING (3

PERSON MAX)

HOUSING (4

PERSON MAX)

PHARMACY OFFICE

PHARMACY

HOUSING (2

PERSON MAX)

TOILET

LAUNDRY

JC

TOILET

OFFICER STATION

TOILET

HOUSING (2

PERSON MAX)

HOUSING (3

PERSON MAX)

HOUSING (3

PERSON MAX)

HOUSING (4

PERSON MAX)

HOUSING (5

PERSON MAX)

HOUSING (2

PERSON MAX)

HOUSING (5

PERSON MAX)

GYM

HOUSING (3

PERSON MAX)

MECH

DAY RM

CENTRAL SUPPLY

STORAGE

TOILET TOILET

A-100

TOILET

TOILET

F

IL

E N

U M

B E

R

S T

A T

E I

N D

E X

N U

M B

E R

S

C o ns tr uc tio n

F in a l R e co rd

Is su e d f o r

P re lim in a ry

D a te

D E

S

IG

N A

N D

C O

N S

TR

U

C

TI

O N

D

IV

IS

IO

N

D E

P A

R T

M E

N T

O F

T E

C H

N O

L O

G Y

M

A N

A G

E M

E N

T

A N

D B

U D

G E

T S

T A

T E

O F

M

IC

H

IG

A N

R O

B E

R T

C

H A

L L

R A

N

C A

R B

D

IR

E

C T

O R

S T

A T

E F

A C

IL

IT

IE

S

A D

M

IN

IS

T

R A

T

IO

N

E a s t

K a la m a z o o A v e n u e

S u it e

K a la m a z o o

M ic h ig

-5

.3

.6

P H

O

.3

.6

F A

X

T O

W E

R P

IN

K

S T

E R

.C O

M

A L L R

IG

H

T S

R E

S E

R V

E D

E a s t

F u lt o n S tr e e t, S u it e

G ra n d R a p id s

M ic h ig a n

.4

.9

P H

O

.4

.5

F A

X

S H

E E

T T

IT

L

E

S H

E E

T N

U M

B E

R

O W

N E

R P

R O

J E

C T

T

IT

L E

D A

T E

B U

IL

D

IN

G

A

F

IR

S T

F L O

O R

F

IR

E A

L A

R M

D E

M O

L

IT

IO

N

P L

A N

U

N

IT

.3

E D

C

/5

/2

R E

P L A

C E

V

IG

IL

A

N T

F

IR

E A

L A

R M

S M

O K

E D

E T

E C

T O

R S

C o ld w a te r, M ic h ig a n

S T

A T

E O

F M

IC

H

IG

A

N D

E P

A R

T M

E N

T O

F C

O R

R E

C T

IO

N

S

1.

R W

G

/2

/2

/5

/2

LAKELAND CORRECTIONAL FACILITY

KEY PLAN

SCALE: NO SCALE

A

B

C

A/B

C/D

D

E

F

G

H

I

GENERAL ELECTRICAL DEMOLITION NOTES

1/8" = 1'-0"

BUILDING A - FIRST FLOOR DEMOLITION PLAN - UNIT 3

1 ALL SMOKE DETECTORS SHALL BE DEMOLISHED.

2 ALL OTHER FIRE ALARM DEVICES ARE EXISTING TO REMAIN.

3 PROVIDE FUNCTIONAL TEST OF EACH BUILDING AND ASSOCIATED

PANEL PRIOR TO BEGINNING WORK.

4 ONE BUILDING SHALL BE COMPLETED AT A TIME TO AVOID MULTIPLE

BUILDINGS BEING WITHOUT OPERABLE SYSTEMS AT THE SAME TIME.

5 THE SYSTEM SHALL BE RESTORED AND FULLY FUNCTIONAL AT THE END

OF EACH WORKDAY, WITH DEVICES FULLY SECURE WITH

TAMPER-PROOF FASTENERS, TO AVOID THE NEED FOR FIRE-WATCH

AND TO ENSURE SECURITY. FACILITY RESOURCES ARE SUCH THAT

THERE SHOULD BE NO CONSIDERATION THAT FIRE-WATCH CAN OR

WILL BE PROVIDED BY THE FACILITY.

6 PROVIDE ALL REQUIRED PROGRAMMING INCLUDING ADJUSTING

SENSITIVITY SETTINGS TO THE CODE MAXIMUM.

DEMOLITION KEYED NOTES

1 SMOKE DETECTOR'S HEAD AND BASE HAVE BEEN REPLACED BY THE

FACILITY ALREADY. THE CONTRACTOR SHALL TEST AND MAKE SURE

THAT THIS DEVICE IS FUNCTIONING PROPERLY. PROVIDE

F

F

F

F

F

F

F F

F F F

F

F

F

F F

F

F

F

F F

F

F

F

SD SD

SD SD

SD SD

SD

SD

SD

HD

SD SD

SD SD

SD

SD SD

SD SD

SD

SD

SD

HD SD

SD SD

SD SD

SD SD

HOUSING

GUARD STATION

HOUSING (8

PERSON MAX)

MOP

HOUSING (2

PERSON MAX)

VEST

SHOWER

HOUSING (2

PERSON MAX)

HOUSING (2

PERSON MAX)

HOUSING (2

PERSON MAX)

TOILET

TOILET

HOUSING HOUSING

HOUSING (4

PERSON MAX) STORAGE OFFICE

TOILET

VEST

TOILET

HOUSING (8

PERSON MAX)

GUARD STATION

HOUSING

SHOWER

MOP

HOUSING (2

PERSON MAX)

HOUSING (2

PERSON MAX)

HOUSING (2

PERSON MAX)

HOUSING (2

PERSON MAX)

B-3 B-2

B-3 B-2B-3 B-2

1 1

1 1

F

IL

E N

U M

B E

R

S T

A T

E I

N D

E X

N U

M B

E R

S

C o ns tr uc tio n

F in a l R e co rd

Is su e d f o r

P re lim in a ry

D a te

D E

S

IG

N A

N D

C O

N S

TR

U

C

TI

O N

D

IV

IS

IO

N

D E

P A

R T

M E

N T

O F

T E

C H

N O

L O

G Y

M

A N

A G

E M

E N

T

A N

D B

U D

G E

T S

T A

T E

O F

M

IC

H

IG

A N

R O

B E

R T

C

H A

L L

R A

N

C A

R B

D

IR

E

C T

O R

S T

A T

E F

A C

IL

IT

IE

S

A D

M

IN

IS

T

R A

T

IO

N

E a s t

K a la m a z o o A v e n u e

S u it e

K a la m a z o o

M ic h ig

-5

.3

.6

P H

O

.3

.6

F A

X

T O

W E

R P

IN

K

S T

E R

.C O

M

A L L R

IG

H

T S

R E

S E

R V

E D

E a s t

F u lt o n S tr e e t, S u it e

G ra n d R a p id s

M ic h ig a n

.4

.9

P H

O

.4

.5

F A

X

S H

E E

T T

IT

L

E

S H

E E

T N

U M

B E

R

O W

N E

R P

R O

J E

C T

T

IT

L E

D A

T E

B U

IL

D

IN

G

B

F

IR

S T

F L

O O

R F

IR

E

A L A

R M

D E

M O

L

IT

IO

N

P L A

N

U N

IT

A N

D U

N

IT

.3

E D

A

/5 /2

R E

P L A

C E

V

IG

IL

A

N T

F

IR

E A

L A

R M

S M

O K

E D

E T

E C

T O

R S

C o ld w a te r, M ic h ig a n

S T

A T

E O

F M

IC

H

IG

A

N D

E P

A R

T M

E N

T O

F C

O R

R E

C T

IO

N

S

1.

R W

G

/2

/2

/5

/2

GENERAL ELECTRICAL DEMOLITION NOTES

LAKELAND CORRECTIONAL FACILITY

KEY PLAN

SCALE: NO SCALE

A

B

C

A/B

C/D

D

E

F

G

H

I

1/8" = 1'-0"

BUILDING B - FIRST FLOOR DEMOLITION PLAN - UNIT 2 AND UNIT 3

1 ALL SMOKE DETECTORS SHALL BE DEMOLISHED.

2 ALL OTHER FIRE ALARM DEVICES ARE EXISTING TO REMAIN.

3 PROVIDE FUNCTIONAL TEST OF EACH BUILDING AND ASSOCIATED

PANEL PRIOR TO BEGINNING WORK.

4 ONE BUILDING SHALL BE COMPLETED AT A TIME TO AVOID MULTIPLE

BUILDINGS BEING WITHOUT OPERABLE SYSTEMS AT THE SAME TIME.

5 THE SYSTEM SHALL BE RESTORED AND FULLY FUNCTIONAL AT THE END

OF EACH WORKDAY, WITH DEVICES FULLY SECURE WITH

TAMPER-PROOF FASTENERS, TO AVOID THE NEED FOR FIRE-WATCH

AND TO ENSURE SECURITY. FACILITY RESOURCES ARE SUCH THAT

THERE SHOULD BE NO CONSIDERATION THAT FIRE-WATCH CAN OR

WILL BE PROVIDED BY THE FACILITY.

6 PROVIDE ALL REQUIRED PROGRAMMING INCLUDING ADJUSTING

SENSITIVITY SETTINGS TO THE CODE MAXIMUM.

DEMOLITION KEYED NOTES

1 SMOKE DETECTOR'S HEAD AND BASE HAVE BEEN REPLACED BY THE

FACILITY ALREADY. THE CONTRACTOR SHALL TEST AND MAKE SURE

THAT THIS DEVICE IS FUNCTIONING PROPERLY. PROVIDE

F

F

F F

F

F

F

F

F

F

F

F

F

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD SD SD

SD

F

WF

WF

OSY

HOUSING (4

PERSON MAX) STORAGE OFFICE

HOUSING (4

PERSON MAX)

HOUSING (4

PERSON MAX)

HOUSING (8

PERSON MAX)

MECH/IT

TOILET

STAIR

MUSIC

SHOWER

HOUSING (6

PERSON MAX)

OFFICE

TOILET

TOILET

BREAK

HOUSING (6

PERSON MAX)

HOUSING (6

PERSON MAX)

HOUSING (4

PERSON MAX)

MOP

TOILET

STORAGE

B-3 B-2

B-4 B-1

B-3 B-2

B-4 B-1

STAIR 2

STAIR

STAIR 2

F

IL

E N

U M

B E

R

S T

A T

E I

N D

E X

N U

M B

E R

S

C o ns tr uc tio n

F in a l R e co rd

Is su e d f o r

P re lim in a ry

D a te

D E

S

IG

N A

N D

C O

N S

TR

U

C

TI

O N

D

IV

IS

IO

N

D E

P A

R T

M E

N T

O F

T E

C H

N O

L O

G Y

M

A N

A G

E M

E N

T

A N

D B

U D

G E

T S

T A

T E

O F

M

IC

H

IG

A N

R O

B E

R T

C

H A

L L

R A

N

C A

R B

D

IR

E

C T

O R

S T

A T

E F

A C

IL

IT

IE

S

A D

M

IN

IS

T

R A

T

IO

N

E a s t

K a la m a z o o A v e n u e

S u it e

K a la m a z o o

M ic h ig

-5

.3

.6

P H

O

.3

.6

F A

X

T O

W E

R P

IN

K

S T

E R

.C O

M

A L L R

IG

H

T S

R E

S E

R V

E D

E a s t

F u lt o n S tr e e t, S u it e

G ra n d R a p id s

M ic h ig a n

.4

.9

P H

O

.4

.5

F A

X

S H

E E

T T

IT

L

E

S H

E E

T N

U M

B E

R

O W

N E

R P

R O

J E

C T

T

IT

L E

D A

T E

B U

IL

D

IN

G

B

B A

S E

M E

N T

A N

D F

IR

S

T F

L O

O R

F

IR

E A

L A

R M

D E

M O

L

IT

IO

N

P L

A N

C

E N

T E

R

.3

E D

B

/5 /2

R E

P L A

C E

V

IG

IL

A

N T

F

IR

E A

L A

R M

S M

O K

E D

E T

E C

T O

R S

C o ld w a te r, M ic h ig a n

S T

A T

E O

F M

IC

H

IG

A

N D

E P

A R

T M

E N

T O

F C

O R

R E

C T

IO

N

S

1.

R W

G

/2

/2

/5

/2

LAKELAND CORRECTIONAL FACILITY

KEY PLAN

SCALE: NO SCALE

A

B

C

A/B

C/D

D

E

F

G

H

I

GENERAL ELECTRICAL DEMOLITION NOTES

1/8" = 1'-0"

BUILDING B - FIRST FLOOR DEMOLITION PLAN - CENTER

1/8" = 1'-0"

BUILDING B - BASEMENT DEMOLITION PLAN

1 ALL SMOKE DETECTORS SHALL BE DEMOLISHED.

2 ALL OTHER FIRE ALARM DEVICES ARE EXISTING TO REMAIN.

3 PROVIDE FUNCTIONAL TEST OF EACH BUILDING AND ASSOCIATED

PANEL PRIOR TO BEGINNING WORK.

4 ONE BUILDING SHALL BE COMPLETED AT A TIME TO AVOID MULTIPLE

BUILDINGS BEING WITHOUT OPERABLE SYSTEMS AT THE SAME TIME.

5 THE SYSTEM SHALL BE RESTORED AND FULLY FUNCTIONAL AT THE END

OF EACH WORKDAY, WITH DEVICES FULLY SECURE WITH

TAMPER-PROOF FASTENERS, TO AVOID THE NEED FOR FIRE-WATCH

AND TO ENSURE SECURITY. FACILITY RESOURCES ARE SUCH THAT

THERE SHOULD BE NO CONSIDERATION THAT FIRE-WATCH CAN OR

WILL BE PROVIDED BY THE FACILITY.

6 PROVIDE ALL REQUIRED PROGRAMMING INCLUDING ADJUSTING

SENSITIVITY SETTINGS TO THE CODE MAXIMUM.

DEMOLITION KEYED NOTES

1 SMOKE DETECTOR'S HEAD AND BASE HAVE BEEN REPLACED BY THE

FACILITY ALREADY. THE CONTRACTOR SHALL TEST AND MAKE SURE

THAT THIS DEVICE IS FUNCTIONING PROPERLY. PROVIDE

F

F F

F

F

F

F F

F

F

F

F

FF

F

F

F F

F

F

F F

F

F

F

F

F

F

F

F

F

SD

SD

SD

SD

SDSDSD

SD

SDSDSD

SD

SD

SD

HD

SD

SD

SD

SD SD

SDSD

SD SD

SDHD

SD

SD

SD

SD SD

SD SD

SDSD

HOUSING (4

PERSON MAX)

MOP

TOILET

STORAGE

RUM OFFICE STORAGE

RECREATION OFFICE

QUARTER MASTER

HOUSING (4

PERSON MAX)

OFFICE

HOUSING

HOUSING

VEST

TOILETSHOWERHOUSING (2

PERSON MAX)

HOUSING (2

PERSON MAX)

HOUSING (2

PERSON MAX)

HOUSING (2

PERSON MAX)

MOP

HOUSING (8

PERSON MAX)

TOILET

GUARD STATION

HOUSING

VEST

TOILET

SHOWER

HOUSING (2

PERSON MAX)

HOUSING (2

PERSON MAX)

HOUSING (2

PERSON MAX)

MOP

HOUSING (8

PERSON MAX)

GUARD STATION

TOILET

HOUSING (2

PERSON MAX)

HOUSING

B-4 B-1

B-4 B-1

B-4 B-1

FACP

F

IL

E N

U M

B E

R

S T

A T

E I

N D

E X

N U

M B

E R

S

C o ns tr uc tio n

F in a l R e co rd

Is su e d f o r

P re lim in a ry

D a te

D E

S

IG

N A

N D

C O

N S

TR

U

C

TI

O N

D

IV

IS

IO

N

D E

P A

R T

M E

N T

O F

T E

C H

N O

L O

G Y

M

A N

A G

E M

E N

T

A N

D B

U D

G E

T S

T A

T E

O F

M

IC

H

IG

A N

R O

B E

R T

C

H A

L L

R A

N

C A

R B

D

IR

E

C T

O R

S T

A T

E F

A C

IL

IT

IE

S

A D

M

IN

IS

T

R A

T

IO

N

E a s t

K a la m a z o o A v e n u e

S u it e

K a la m a z o o

M ic h ig

-5

.3

.6

P H

O

.3

.6

F A

X

T O

W E

R P

IN

K

S T

E R

.C O

M

A L L R

IG

H

T S

R E

S E

R V

E D

E a s t

F u lt o n S tr e e t, S u it e

G ra n d R a p id s

M ic h ig a n

.4

.9

P H

O

.4

.5

F A

X

S H

E E

T T

IT

L

E

S H

E E

T N

U M

B E

R

O W

N E

R P

R O

J E

C T

T

IT

L E

D A

T E

B U

IL

D

IN

G

B

F

IR

S T

F L

O O

R F

IR

E

A L A

R M

D E

M O

L

IT

IO

N

P L A

N

U N

IT

A N

D U

N

IT

.3

E D

C

/5

/2

R E

P L A

C E

V

IG

IL

A

N T

F

IR

E A

L A

R M

S M

O K

E D

E T

E C

T O

R S

C o ld w a te r, M ic h ig a n

S T

A T

E O

F M

IC

H

IG

A

N D

E P

A R

T M

E N

T O

F C

O R

R E

C T

IO

N

S

1.

R W

G

/2

/2

/5

/2

LAKELAND CORRECTIONAL FACILITY

KEY PLAN

SCALE: NO SCALE

A

B

C

A/B

C/D

D

E

F

G

H

I

GENERAL ELECTRICAL DEMOLITION NOTES

1/8" = 1'-0"

BUILDING B - FIRST FLOOR DEMOLITION PLAN - UNIT 1 AND UNIT 4

1 ALL SMOKE DETECTORS SHALL BE DEMOLISHED.

2 ALL OTHER FIRE ALARM DEVICES ARE EXISTING TO REMAIN.

3 PROVIDE FUNCTIONAL TEST OF EACH BUILDING AND ASSOCIATED

PANEL PRIOR TO BEGINNING WORK.

4 ONE BUILDING SHALL BE COMPLETED AT A TIME TO AVOID MULTIPLE

BUILDINGS BEING WITHOUT OPERABLE SYSTEMS AT THE SAME TIME.

5 THE SYSTEM SHALL BE RESTORED AND FULLY FUNCTIONAL AT THE END

OF EACH WORKDAY, WITH DEVICES FULLY SECURE WITH

TAMPER-PROOF FASTENERS, TO AVOID THE NEED FOR FIRE-WATCH

AND TO ENSURE SECURITY. FACILITY RESOURCES ARE SUCH THAT

THERE SHOULD BE NO CONSIDERATION THAT FIRE-WATCH CAN OR

WILL BE PROVIDED BY THE FACILITY.

6 PROVIDE ALL REQUIRED PROGRAMMING INCLUDING ADJUSTING

SENSITIVITY SETTINGS TO THE CODE MAXIMUM.

DEMOLITION KEYED NOTES

1 SMOKE DETECTOR'S HEAD AND BASE HAVE BEEN REPLACED BY THE

FACILITY ALREADY. THE CONTRACTOR SHALL TEST AND MAKE SURE

THAT THIS DEVICE IS FUNCTIONING PROPERLY. PROVIDE

F

F

F

F

F

F

F

F

F

FF

F

F

F

F

F

F

F

F F

F

F

SD SD

SDSD

SDSD

SD

SD

HD

SD

SD SD SD SD

SDSDSD

SD

SD

SD

HD

SD

SD

SD

SD SD

SD SD

SD SD

SD

HOUSING

GUARD STATION

HOUSING (8

PERSON MAX)

SHOWER TOILET

TOILET

VEST

MOP

HOUSING (2

PERSON MAX)

HOUSING (2

PERSON MAX)

HOUSING (2

PERSON MAX)

HOUSING (2

PERSON MAX)

HOUSING

HOUSING

TOILET

VEST

TOILET

GUARD STATION

HOUSING (8

PERSON MAX)

SHOWER

HOUSING (2

PERSON MAX)

MOP

HOUSING (2

PERSON MAX)

HOUSING (2

PERSON MAX)

HOUSING (2

PERSON MAX)

HOUSING

C-3 C-2

C-3 C-2

1 1

1 1

FACP

F

IL

E N

U M

B E

R

S T

A T

E I

N D

E X

N U

M B

E R

S

C o ns tr uc tio n

F in a l R e co rd

Is su e d f o r

P re lim in a ry

D a te

D E

S

IG

N A

N D

C O

N S

TR

U

C

TI

O N

D

IV

IS

IO

N

D E

P A

R T

M E

N T

O F

T E

C H

N O

L O

G Y

M

A N

A G

E M

E N

T

A N

D B

U D

G E

T S

T A

T E

O F

M

IC

H

IG

A N

R O

B E

R T

C

H A

L L

R A

N

C A

R B

D

IR

E

C T

O R

S T

A T

E F

A C

IL

IT

IE

S

A D

M

IN

IS

T

R A

T

IO

N

E a s t

K a la m a z o o A v e n u e

S u it e

K a la m a z o o

M ic h ig

-5

.3

.6

P H

O

.3

.6

F A

X

T O

W E

R P

IN

K

S T

E R

.C O

M

A L L R

IG

H

T S

R E

S E

R V

E D

E a s t

F u lt o n S tr e e t, S u it e

G ra n d R a p id s

M ic h ig a n

.4

.9

P H

O

.4

.5

F A

X

S H

E E

T T

IT

L

E

S H

E E

T N

U M

B E

R

O W

N E

R P

R O

J E

C T

T

IT

L E

D A

T E

B U

IL

D

IN

G

C

F

IR

S T

F L

O O

R F

IR

E

A L A

R M

D E

M O

L

IT

IO

N

P L A

N

U N

IT

A N

D U

N

IT

.3

E D

A

/5 /2

R E

P L A

C E

V

IG

IL

A

N T

F

IR

E A

L A

R M

S M

O K

E D

E T

E C

T O

R S

C o ld w a te r, M ic h ig a n

S T

A T

E O

F M

IC

H

IG

A

N D

E P

A R

T M

E N

T O

F C

O R

R E

C T

IO

N

S

1.

R W

G

/2

/2

/5

/2

GENERAL ELECTRICAL DEMOLITION NOTES

LAKELAND CORRECTIONAL FACILITY

KEY PLAN

SCALE: NO SCALE

A

B

C

A/B

C/D

D

E

F

G

H

I

1/8" = 1'-0"

BUILDING C - FIRST FLOOR DEMOLITION PLAN - UNIT 2 AND UNIT 3

1 ALL SMOKE DETECTORS SHALL BE DEMOLISHED.

2 ALL OTHER FIRE ALARM DEVICES ARE EXISTING TO REMAIN.

3 PROVIDE FUNCTIONAL TEST OF EACH BUILDING AND ASSOCIATED

PANEL PRIOR TO BEGINNING WORK.

4 ONE BUILDING SHALL BE COMPLETED AT A TIME TO AVOID MULTIPLE

BUILDINGS BEING WITHOUT OPERABLE SYSTEMS AT THE SAME TIME.

5 THE SYSTEM SHALL BE RESTORED AND FULLY FUNCTIONAL AT THE END

OF EACH WORKDAY, WITH DEVICES FULLY SECURE WITH

TAMPER-PROOF FASTENERS, TO AVOID THE NEED FOR FIRE-WATCH

AND TO ENSURE SECURITY. FACILITY RESOURCES ARE SUCH THAT

THERE SHOULD BE NO CONSIDERATION THAT FIRE-WATCH CAN OR

WILL BE PROVIDED BY THE FACILITY.

6 PROVIDE ALL REQUIRED PROGRAMMING INCLUDING ADJUSTING

SENSITIVITY SETTINGS TO THE CODE MAXIMUM.

DEMOLITION KEYED NOTES

1 SMOKE DETECTOR'S HEAD AND BASE HAVE BEEN REPLACED BY THE

FACILITY ALREADY. THE CONTRACTOR SHALL TEST AND MAKE SURE

THAT THIS DEVICE IS FUNCTIONING PROPERLY. PROVIDE

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

SD

SD

SD

SD

SD

SD

SD

HD

SD SD SD

SDSD

SD

SD

SD

SD

SD

SD SD

SD

SD

SD

SD

SDSD

SD

SD

SD

SD

SD

F

F

WF

WF

OSY

HOUSING (2

PERSON MAX)

STORAGE

OFFICE

HOUSING

OFFICER STATION

STORAGE

SHOWER

TOILET

QUARTER MASTER

BREAK

BACK OF DRYERS

LAUNDRY

MOP

HOUSING (6

PERSON MAX)

STORAGE

HOUSING (6

PERSON MAX)

HOUSING (6

PERSON MAX)

MECH/IT

TOILET

STAIR 2

HOUSING (6

PERSON MAX)

HOUSING (6

PERSON MAX)

HOUSING (2

PERSON MAX)

HOUSING (2

PERSON MAX)

HOUSING (5

PERSON MAX)

C-4 C-1

C-3 C-2

1 1

STAIR

STAIR 2

STAIR

F

IL

E N

U M

B E

R

S T

A T

E I

N D

E X

N U

M B

E R

S

C o ns tr uc tio n

F in a l R e co rd

Is su e d f o r

P re lim in a ry

D a te

D E

S

IG

N A

N D

C O

N S

TR

U

C

TI

O N

D

IV

IS

IO

N

D E

P A

R T

M E

N T

O F

T E

C H

N O

L O

G Y

M

A N

A G

E M

E N

T

A N

D B

U D

G E

T S

T A

T E

O F

M

IC

H

IG

A N

R O

B E

R T

C

H A

L L

R A

N

C A

R B

D

IR

E

C T

O R

S T

A T

E F

A C

IL

IT

IE

S

A D

M

IN

IS

T

R A

T

IO

N

E a s t

K a la m a z o o A v e n u e

S u it e

K a la m a z o o

M ic h ig

-5

.3

.6

P H

O

.3

.6

F A

X

T O

W E

R P

IN

K

S T

E R

.C O

M

A L L R

IG

H

T S

R E

S E

R V

E D

E a s t

F u lt o n S tr e e t, S u it e

G ra n d R a p id s

M ic h ig a n

.4

.9

P H

O

.4

.5

F A

X

S H

E E

T T

IT

L

E

S H

E E

T N

U M

B E

R

O W

N E

R P

R O

J E

C T

T

IT

L E

D A

T E

B U

IL

D

IN

G

C

B A

S E

M E

N T

A N

D F

IR

S

T F

L O

O R

F

IR

E A

L A

R M

D E

M O

L

IT

IO

N

P L

A N

C

E N

T E

R

.3

E D

B

/5 /2

R E

P L A

C E

V

IG

IL

A

N T

F

IR

E A

L A

R M

S M

O K

E D

E T

E C

T O

R S

C o ld w a te r, M ic h ig a n

S T

A T

E O

F M

IC

H

IG

A

N D

E P

A R

T M

E N

T O

F C

O R

R E

C T

IO

N

S

1.

R W

G

/2

/2

/5

/2

GENERAL ELECTRICAL DEMOLITION NOTES

LAKELAND CORRECTIONAL FACILITY

KEY PLAN

SCALE: NO SCALE

A

B

C

A/B

C/D

D

E

F

G

H

I

1/8" = 1'-0"

BUILDING C - FIRST FLOOR DEMOLITION PLAN - CENTER

3/32" = 1'-0"

BUILDING C - BASEMENT DEMOLITION PLAN

1 ALL SMOKE DETECTORS SHALL BE DEMOLISHED.

2 ALL OTHER FIRE ALARM DEVICES ARE EXISTING TO REMAIN.

3 PROVIDE FUNCTIONAL TEST OF EACH BUILDING AND ASSOCIATED

PANEL PRIOR TO BEGINNING WORK.

4 ONE BUILDING SHALL BE COMPLETED AT A TIME TO AVOID MULTIPLE

BUILDINGS BEING WITHOUT OPERABLE SYSTEMS AT THE SAME TIME.

5 THE SYSTEM SHALL BE RESTORED AND FULLY FUNCTIONAL AT THE END

OF EACH WORKDAY, WITH DEVICES FULLY SECURE WITH

TAMPER-PROOF FASTENERS, TO AVOID THE NEED FOR FIRE-WATCH

AND TO ENSURE SECURITY. FACILITY RESOURCES ARE SUCH THAT

THERE SHOULD BE NO CONSIDERATION THAT FIRE-WATCH CAN OR

WILL BE PROVIDED BY THE FACILITY.

6 PROVIDE ALL REQUIRED PROGRAMMING INCLUDING ADJUSTING

SENSITIVITY SETTINGS TO THE CODE MAXIMUM.

DEMOLITION KEYED NOTES

1 SMOKE DETECTOR'S HEAD AND BASE HAVE BEEN REPLACED BY THE

FACILITY ALREADY. THE CONTRACTOR SHALL TEST AND MAKE SURE

THAT THIS DEVICE IS FUNCTIONING PROPERLY. PROVIDE

F

F

F

F

F

F

F

FF

F F

F

F

F

F

F

FF

F

F

F F

SD HD

SD

SD

SD

SD SD

SDSD

SD SD

SDSD

SD

SD

HD

SD

SD

SD

SD

SD SD

SDSDSD SD

SDSD

SD SD

HOUSING (2

PERSON MAX)

HOUSING (2

PERSON MAX)

HOUSING (5

PERSON MAX)

HOUSING

TOILET

SHOWER

HOUSING (2

PERSON MAX)

HOUSING (2

PERSON MAX)

HOUSING (2

PERSON MAX)

HOUSING (2

PERSON MAX)MOP

HOUSING (8

PERSON MAX)

TOILET

GUARD STATIONVEST

HOUSING

HOUSING

VEST

TOILETSHOWER

HOUSING (2

PERSON MAX)

HOUSING (2

PERSON MAX)

HOUSING (2

PERSON MAX)

HOUSING (2

PERSON MAX) MOP

HOUSING (8

PERSON MAX)

GUARD STATION

TOILET

HOUSING

C-4 C-1

C-4 C-1

1 1

1 1

1 111

1 1

F

IL

E N

U M

B E

R

S T

A T

E I

N D

E X

N U

M B

E R

S

C o ns tr uc tio n

F in a l R e co rd

Is su e d f o r

P re lim in a ry

D a te

D E

S

IG

N A

N D

C O

N S

TR

U

C

TI

O N

D

IV

IS

IO

N

D E

P A

R T

M E

N T

O F

T E

C H

N O

L O

G Y

M

A N

A G

E M

E N

T

A N

D B

U D

G E

T S

T A

T E

O F

M

IC

H

IG

A N

R O

B E

R T

C

H A

L L

R A

N

C A

R B

D

IR

E

C T

O R

S T

A T

E F

A C

IL

IT

IE

S

A D

M

IN

IS

T

R A

T

IO

N

E a s t

K a la m a z o o A v e n u e

S u it e

K a la m a z o o

M ic h ig

-5

.3

.6

P H

O

.3

.6

F A

X

T O

W E

R P

IN

K

S T

E R

.C O

M

A L L R

IG

H

T S

R E

S E

R V

E D

E a s t

F u lt o n S tr e e t, S u it e

G ra n d R a p id s

M ic h ig a n

.4

.9

P H

O

.4

.5

F A

X

S H

E E

T T

IT

L

E

S H

E E

T N

U M

B E

R

O W

N E

R P

R O

J E

C T

T

IT

L E

D A

T E

B U

IL

D

IN

G

C

F

IR

S T

F L

O O

R F

IR

E

A L A

R M

D E

M O

L

IT

IO

N

P L A

N

U N

IT

A N

D U

N

IT

.3

E D

C

/5

/2

R E

P L A

C E

V

IG

IL

A

N T

F

IR

E A

L A

R M

S M

O K

E D

E T

E C

T O

R S

C o ld w a te r, M ic h ig a n

S T

A T

E O

F M

IC

H

IG

A

N D

E P

A R

T M

E N

T O

F C

O R

R E

C T

IO

N

S

1.

R W

G

/2

/2

/5

/2

LAKELAND CORRECTIONAL FACILITY

KEY PLAN

SCALE: NO SCALE

A

B

C

A/B

C/D

D

E

F

G

H

I

GENERAL ELECTRICAL DEMOLITION NOTES

1/8" = 1'-0"

BUILDING C - FIRST FLOOR DEMOLITION PLAN - UNIT 1 AND UNIT 4

1 ALL SMOKE DETECTORS SHALL BE DEMOLISHED.

2 ALL OTHER FIRE ALARM DEVICES ARE EXISTING TO REMAIN.

3 PROVIDE FUNCTIONAL TEST OF EACH BUILDING AND ASSOCIATED

PANEL PRIOR TO BEGINNING WORK.

4 ONE BUILDING SHALL BE COMPLETED AT A TIME TO AVOID MULTIPLE

BUILDINGS BEING WITHOUT OPERABLE SYSTEMS AT THE SAME TIME.

5 THE SYSTEM SHALL BE RESTORED AND FULLY FUNCTIONAL AT THE END

OF EACH WORKDAY, WITH DEVICES FULLY SECURE WITH

TAMPER-PROOF FASTENERS, TO AVOID THE NEED FOR FIRE-WATCH

AND TO ENSURE SECURITY. FACILITY RESOURCES ARE SUCH THAT

THERE SHOULD BE NO CONSIDERATION THAT FIRE-WATCH CAN OR

WILL BE PROVIDED BY THE FACILITY.

6 PROVIDE ALL REQUIRED PROGRAMMING INCLUDING ADJUSTING

SENSITIVITY SETTINGS TO THE CODE MAXIMUM.

DEMOLITION KEYED NOTES

1 SMOKE DETECTOR'S HEAD AND BASE HAVE BEEN REPLACED BY THE

FACILITY ALREADY. THE CONTRACTOR SHALL TEST AND MAKE SURE

THAT THIS DEVICE IS FUNCTIONING PROPERLY. PROVIDE

F

F F

F F

F

F

F

F

F

F

F

F

F

F

F F

F

F F

F

F

F

F

FFF

F

F

F

F F

F

F

F

DD

SDSD

SDSD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD SD

SDSD

SD SD

SD

SD

SD

SD

SDSD

SD

SD

SD

HD

SD

SD

SD

F

F

OSY

WF

OFFICE

OFFICE

TOILET

CLASSROOM

OFFICE

OFFICE

OFFICE

TOILET

STORAGE

CLASSROOM

CLASSROOM

OFFICE

STORAGE

MECH

MOP

STAIR

VEST

CLASSROOMOFFICE

TOILET

HOUSING

UNOCCUPIED

HOUSING

HOUSING

HOUSING

HOUSING

SEGRAGATED

SHOWER

CELL

CELL

CELL

LOCKER RM

OFFICER STATION

TOILET

PSYCH OFFICE

OFFICE

GROUP

FAA

FACP

STAIR

F

IL

E N

U M

B E

R

S T

A T

E I

N D

E X

N U

M B

E R

S

C o ns tr uc tio n

F in a l R e co rd

Is su e d f o r

P re lim in a ry

D a te

D E

S

IG

N A

N D

C O

N S

TR

U

C

TI

O N

D

IV

IS

IO

N

D E

P A

R T

M E

N T

O F

T E

C H

N O

L O

G Y

M

A N

A G

E M

E N

T

A N

D B

U D

G E

T S

T A

T E

O F

M

IC

H

IG

A N

R O

B E

R T

C

H A

L L

R A

N

C A

R B

D

IR

E

C T

O R

S T

A T

E F

A C

IL

IT

IE

S

A D

M

IN

IS

T

R A

T

IO

N

E a s t

K a la m a z o o A v e n u e

S u it e

K a la m a z o o

M ic h ig

-5

.3

.6

P H

O

.3

.6

F A

X

T O

W E

R P

IN

K

S T

E R

.C O

M

A L L R

IG

H

T S

R E

S E

R V

E D

E a s t

F u lt o n S tr e e t, S u it e

G ra n d R a p id s

M ic h ig a n

.4

.9

P H

O

.4

.5

F A

X

S H

E E

T T

IT

L

E

S H

E E

T N

U M

B E

R

O W

N E

R P

R O

J E

C T

T

IT

L E

D A

T E

B U

IL

D

IN

G

D

F

IR

S T

F L

O O

R F

IR

E

A L A

R M

D E

M O

L

IT

IO

N

P L

A N

.3

E D

/5

/2

R E

P L A

C E

V

IG

IL

A

N T

F

IR

E A

L A

R M

S M

O K

E D

E T

E C

T O

R S

C o ld w a te r, M ic h ig a n

S T

A T

E O

F M

IC

H

IG

A

N D

E P

A R

T M

E N

T O

F C

O R

R E

C T

IO

N

S

1.

R W

G

/2

/2

/5

/2

GENERAL ELECTRICAL DEMOLITION NOTES

LAKELAND CORRECTIONAL FACILITY

KEY PLAN

SCALE: NO SCALE

A

B

C

A/B

C/D

D

E

F

G

H

I

1/8" = 1'-0"

BUILDING D - FIRST FLOOR DEMOLITION PLAN

1/8" = 1'-0"

BUILDING D - BASEMENT DEMOLITION PLAN

1 ALL SMOKE DETECTORS SHALL BE DEMOLISHED.

2 ALL OTHER FIRE ALARM DEVICES ARE EXISTING TO REMAIN.

3 PROVIDE FUNCTIONAL TEST OF EACH BUILDING AND ASSOCIATED

PANEL PRIOR TO BEGINNING WORK.

4 ONE BUILDING SHALL BE COMPLETED AT A TIME TO AVOID MULTIPLE

BUILDINGS BEING WITHOUT OPERABLE SYSTEMS AT THE SAME TIME.

5 THE SYSTEM SHALL BE RESTORED AND FULLY FUNCTIONAL AT THE END

OF EACH WORKDAY, WITH DEVICES FULLY SECURE WITH

TAMPER-PROOF FASTENERS, TO AVOID THE NEED FOR FIRE-WATCH

AND TO ENSURE SECURITY. FACILITY RESOURCES ARE SUCH THAT

THERE SHOULD BE NO CONSIDERATION THAT FIRE-WATCH CAN OR

WILL BE PROVIDED BY THE FACILITY.

6 PROVIDE ALL REQUIRED PROGRAMMING INCLUDING ADJUSTING

SENSITIVITY SETTINGS TO THE CODE MAXIMUM.

DEMOLITION KEYED NOTES

1 SMOKE DETECTOR'S HEAD AND BASE HAVE BEEN REPLACED BY THE

FACILITY ALREADY. THE CONTRACTOR SHALL TEST AND MAKE SURE

THAT THIS DEVICE IS FUNCTIONING PROPERLY. PROVIDE

Sheets
G 001 - COVER SHEET
ES 101 - ELECTRICAL SITE PLAN
ED 101A - BUILDING "A" - FIRST FLOOR FIRE ALARM DEMOLITION PLAN - UNIT 1
ED 101B - BUILDING "A" - BASEMENT AND FIRST FLOOR FIRE ALARM DEMOLITION PLAN - UNIT 2
ED 101C - BUILDING "A" - FIRST FLOOR FIRE ALARM DEMOLITION PLAN - UNIT 3
ED 102A - BUILDING "B" - FIRST FLOOR FIRE ALARM DEMOLITION PLAN - UNIT 2 AND UNIT 3
ED 102B - BUILDING "B" - BASEMENT AND FIRST FLOOR FIRE ALARM DEMOLITION PLAN - CENTER
ED 102C - BUILDING "B" - FIRST FLOOR FIRE ALARM DEMOLITION PLAN - UNIT 1 AND UNIT 4
ED 103A - BUILDING "C" - FIRST FLOOR FIRE ALARM DEMOLITION PLAN - UNIT 2 AND UNIT 3
ED 103B - BUILDING "C" - BASEMENT AND FIRST FLOOR FIRE ALARM DEMOLITION PLAN - CENTER
ED 103C - BUILDING "C" - FIRST FLOOR FIRE ALARM DEMOLITION PLAN - UNIT 1 AND UNIT 4
ED 104 - BUILDING "D" - FIRST FLOOR FIRE ALARM DEMOLITION PLAN
E 101A - BUILDING "A" - FIRST FLOOR FIRE ALARM PLAN - UNIT 1
E 101B - BUILDING "A" - BASEMENT AND FIRST FLOOR FIRE ALARM PLAN - UNIT 2
E 101C - BUILDING "A" - FIRST FLOOR FIRE ALARM PLAN - UNIT 3
E 102A - BUILDING "B" - FIRST FLOOR FIRE ALARM PLAN - UNIT 2 AND 3
E 102B - BUILDING "B" - FIRST FLOOR FIRE ALARM FLOOR PLAN - CENTER
E 102C - BUILDING "B" - FIRST FLOOR FIRE ALARM PLAN - UNIT 1 AND 4
E 103A - BUILDING "C" - FIRST FLOOR FIRE ALARM PLAN - UNIT 2 AND 3
E 103B - BUILDING "C" - BASEMENT AND FIRST FLOOR FIRE ALARM PLAN - CENTER
E 103C - BUILDING "C" - FIRST FLOOR FIRE ALARM PLAN - UNIT 1 AND 4
E 104 - BUILDING "D" - BASEMENT AND FIRST FLOOR FIRE ALARM FLOOR PLAN
E 105 - BUILDING 61 "POWERHOUSE" - BASEMENT AND FIRST FLOOR FIRE ALARM PLAN
E 401 - FIRE ALARM RISER DIAGRAM
E 402 - INSTALLATION DRAWING

File details come from the government source that posted it. Updated .