Drawings - Gate Replacement - Wilmington ATCT.pdf
PDF 601 KB Posted
- Attached to
- Gate and Operator Replacement at Wilmington, NC, ATCT Federal contract opportunity
- Solicitation number
- 697DCK-25-R-00159
About this file
This is a set of technical drawings for replacing vehicle and pedestrian gates at the Wilmington International Airport Air Traffic Control Tower (ATCT) in North Carolina. The drawings detail the specifications for replacing the existing cantilever slide gate and pedestrian gate with new equipment.
The plans show installation of an 18' vertical pivot gate for vehicles and a 4-foot swing gate for pedestrians, along with associated card readers, detection loops, gate opener, bollards, and electrical conduits. Specific technical details include two 1.5" conduits for gate power and control, concrete pad requirements for the gate opener, grounding and lightning protection specifications, and perimeter fence modifications. The drawings include site plans showing the ATCT base building layout, detailed elevations of both gates, and specific construction details like pipe bollard installations and gate grounding requirements. The project appears to be managed by the FAA Washington District office, with drawings dated January 2024.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Wage Determination - NC20250009 - 1.3.25.pdf | ||
| 697DCK-25-R-00159.pdf | ||
| Combined spec sections ILM front gate Rev1.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SHEET 001 COVER
| SHEET 002 SITE PLAN |
| SHEET 003 EXISTING CONDITIONS DEMO |
| SHEET 004 NEW SITE PLAN |
| SHEET 005 SITE DETAILS |
| SHEET 006 PIVOT GATE SITE PLAN AND ELEVATION |
| SHEET 007 GROUNDING AND LIGHTNING PROTECTION |
File details come from the government source that posted it. Updated .