Drawings.pdf
PDF 5 MB Posted
- Solicitation number
- CMB010279
- Issued by
- Fairfield County, Bridgeport City, Connecticut
About this file
This file consists of mechanical drawings and specifications for a boiler replacement project at the Barnum Museum located at 820 Main Street, Bridgeport, Connecticut, prepared by Antinozzi Associates, P.C. for the City of Bridgeport. The primary scope of work involves the replacement of existing hot water boilers with new condensing hot water boilers, removal of existing hydronic equipment from the basement, and installation of new hot water piping, boiler pumps, expansion tanks, air separators, and associated valves and controls. The contractor is responsible for complete demolition of existing equipment, installation of new condensing gas boilers, plumbing modifications for natural gas piping, combustion air piping and venting systems, hot water piping insulation, electrical work to support new mechanical equipment, integration into the building automation system, system startup with manufacturer support, hydrostatic testing, water testing and balancing, and submission of shop drawings and as-built documentation. The project includes four hours of owner training on the new mechanical equipment and controls. Electronic bid submissions are due by 2:00 pm on Friday, September 11, 2026, through the City's OpenGov e-Procurement portal, with the question cutoff date set for 5:00 pm on Thursday, August 27, 2026.
The specifications detail equipment requirements including condensing gas boilers meeting ASME "H" stamp certification and 97% minimum combustion and thermal efficiency, with manufacturers identified as Lochinvar, Peter and Kelly, Burnham, or Patterson-Kelly. Circulation pumps are specified as ECOcirc XL models or equivalents from B&G, Taco, or Grundfos, featuring integrated variable frequency drives and modbus or bacnet communication protocols. The project requires expansion tanks rated for 150 PSI working pressure, positive pressure venting systems constructed of flame-resistant polypropylene, and comprehensive piping in copper and black steel with appropriate fittings and insulation. All work must comply with state and local codes, NFPA standards, ASHRAE 90.1 energy efficiency requirements, and industry standards including AABC and NEBB. The contractor must obtain all necessary licenses and permits, conduct site visits prior to bidding, perform hydrostatic testing at 125 PSI minimum, and provide testing, adjusting, and balancing services by AABC or NEBB-licensed contractors within plus or minus 10% of design specifications. All equipment carries a one-year warranty, with the boiler heat exchanger assembly carrying a ten-year limited warranty.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONDENSATE DRAIN PIPING
TAKEOFF FROM TOP OF MAIN PIPE
TAKEOFF FROM BOTTOM OF MAIN PIPE
CW COLD WATER (DOMESTIC)
PIPE ELBOW (UP & DN)
THERMOSTATT'STAT
STRAINER WITH BLOW-DOWN VALVE
HOT WATER RETURN
ROOM HUMIDITY SENSOR OR HUMIDISTAT
ROOM THERMOSTAT OR TEMPERATURE SENSOR
HOT WATER SUPPLY
HWR
HWS
CAPPED END OF PIPE
HOT WATER RETURN PIPING
HOT WATER SUPPLY PIPING
TWO-WAY CONTROL VALVE
THREE-WAY CONTROL VALVE
PRESSURE REDUCING VALVE
PRESSURE RELIEF VALVE
PUMP (SCHEMATIC)
AIR VENT (MANUAL OR AUTOMATIC)
FLEXIBLE CONNECTOR
PRESSURE GAUGE WTH SHUT-OFF COCK
THERMOMETER
BREAK FLANGES
DIRECTION OF FLUID FLOW
BUTTERFLY VALVE
BALANCING VALVE WITH 100% SHUTOFF
BALL VALVE
CHECK VALVE
OS & Y VALVE
GATE VALVE
GLOBE VALVE
UNION
RECTANGULAR, FLAT OVAL OR ROUND
MECHANICAL SYMBOLS
AIR DUCT (PLAN VIEW)
CONDENSER WATER SUPPLY PIPING
CONDENSER WATER RETURN PIPING
EXISTING(E)
FLOW SWITCH
DUCT SMOKE DETECTOR (SD)
POINT OF CONNECTION
AS AIR SEPARATOR
B BOILER
ET EXPANSION TANK
BP BOILER PUMP
SYMBOLS,
MECHANICAL DESCRIPTION,
ADAS NOTED TEN
LEGEND AND NOTES
M-001
DATE DESCRIPTION
REVISIONS:
DATE: JOB NUMBER:
DRAWING TITLE:
DRAWING NO.
SCALE: DRAWN BY: REVIEWED BY:
These documents have been prepared specifically for this project. Reproduction or other use of these documents is prohibited without the approval of the Architect.
COPYRIGHT 2026 BY:
ANTINOZZI ASSOCIATES, P.C.
271 Fairfield Avenue Bridgeport, Connecticut 06604 Tel: (203) 377-1300 Fax: (203) 378-3002 www.antinozzi.com
CERTIFICATION:
CONSULTANT:
B
OI
LE
R
RE
PL
AC
EM
EN
T by th e C
IT
Y of
BR
ID
GE
PO
RT
0 M
AI
N
ST
RE
ET
BR
ID
GE
PO
RT
, C
ON
NE
CT
IC
UT
05.08.'26 BID Documents
MAY 8, 2026 16058.15
FACILITIES
GROUP, INC.
LANDMARK
(203) 866-8019 Fax
(203) 866-4626 Tel Norwalk, CT 06855 252 East Avenue
AutoCAD SHX Text
HOA
AutoCAD SHX Text
HAND-OFF-AUTO STARTER
AutoCAD SHX Text
DPS
AutoCAD SHX Text
DIFF. PRESSURE SWITCH
AutoCAD SHX Text
VFD
AutoCAD SHX Text
VARIABLE FREQUENCY DRIVE
AutoCAD SHX Text
DPT
AutoCAD SHX Text
DIFF. PRESSURE TRANSMITTER
AutoCAD SHX Text
SD
AutoCAD SHX Text (E)
AutoCAD SHX Text
NEW DUCTWORK (BOLD LINE)
AutoCAD SHX Text
EXISTING
AutoCAD SHX Text
EXISTING DUCTWORK (FINE LINE)
AutoCAD SHX Text
ZONE DESIGNATION
AutoCAD SHX Text
HAND OFF AUTO
AutoCAD SHX Text
NORMALLY OPEN
AutoCAD SHX Text
START/STOP
AutoCAD SHX Text
ISOLATION VALVE
AutoCAD SHX Text
MOTORIZED OPERATOR
AutoCAD SHX Text
ZONE DAMPER
AutoCAD SHX Text
TEMPERATURE TRANSMITTER
AutoCAD SHX Text
HUMIDITY TRANSMITTER
AutoCAD SHX Text
DIFFERENTIAL PRESSURE SWITCH
AutoCAD SHX Text
NORMALLY CLOSED
AutoCAD SHX Text
FLOW SWITCH
AutoCAD SHX Text
LOW LIMIT SWITCH (FREEZESTAT)
AutoCAD SHX Text
VARIABLE FREQUENCY DRIVE
AutoCAD SHX Text
SMOKE DETECTOR
AutoCAD SHX Text
CONTROL VALVE (MODULATING)
AutoCAD SHX Text
BAS INTERFACE POINT
AutoCAD SHX Text X-X
AutoCAD SHX Text
XX
AutoCAD SHX Text
NO
AutoCAD SHX Text
NC
AutoCAD SHX Text
SS
AutoCAD SHX Text
DPS
AutoCAD SHX Text
VFD
AutoCAD SHX Text
ZD
AutoCAD SHX Text
CV
AutoCAD SHX Text M
AutoCAD SHX Text
SD
AutoCAD SHX Text
LL
AutoCAD SHX Text
TT
AutoCAD SHX Text
HT
AutoCAD SHX Text
FS
AutoCAD SHX Text
HOA
AutoCAD SHX Text
FAN OR PUMP
AutoCAD SHX Text
LEGEND
AutoCAD SHX Text
RUN INDICATOR
AutoCAD SHX Text
RI
AutoCAD SHX Text
PT
AutoCAD SHX Text
PRESSURE TRANSDUCER
AutoCAD SHX Text
HOT WATER SUPPLY
AutoCAD SHX Text
HWS
AutoCAD SHX Text
AIR HANDLING UNIT
AutoCAD SHX Text
AHU
AutoCAD SHX Text
FAN COIL UNIT
AutoCAD SHX Text
FCU
AutoCAD SHX Text
RETURN AIR
AutoCAD SHX Text R/A
AutoCAD SHX Text
SUPPLY AIR
AutoCAD SHX Text S/A
AutoCAD SHX Text
OUTSIDE AIR
AutoCAD SHX Text O/A
AutoCAD SHX Text
, MD
AutoCAD SHX Text
POINT OF CONNECTION,
AutoCAD SHX Text
NEW WORK TO EXISTING
AutoCAD SHX Text
EXISTING
AutoCAD SHX Text (E)
AutoCAD SHX Text
VOLUME DAMPER
AutoCAD SHX Text
VD
AutoCAD SHX Text
EXHAUST FAN
AutoCAD SHX Text
EF
AutoCAD SHX Text X-X
AutoCAD SHX Text
NEW
AutoCAD SHX Text (N)
AutoCAD SHX Text
FIRE DAMPER
AutoCAD SHX Text
FD
AutoCAD SHX Text
THERMOSTAT
AutoCAD SHX Text T
AutoCAD SHX Text
FACTORY CONTROL PANEL
AutoCAD SHX Text
FCP
AutoCAD SHX Text
SC
AutoCAD SHX Text
FAN OR PUMP
AutoCAD SHX Text
HOT WATER RETURN
AutoCAD SHX Text
HWR
AutoCAD SHX Text
%%UPROJECT NOTES:
AutoCAD SHX Text
SMOKE DETECTOR (DUCT MOUNTED)
AutoCAD SHX Text
SD
AutoCAD SHX Text
SPEED CONTROL
AutoCAD SHX Text
%%UPROJECT DESCRIPTION
AutoCAD SHX Text
SR
AutoCAD SHX Text
SPEED REFERENCE
AutoCAD SHX Text
DF
AutoCAD SHX Text
DRIVE FAULT
AutoCAD SHX Text
CARBON DIOXIDE LEVEL SENSOR
AutoCAD SHX Text C02
AutoCAD SHX Text
FM
AutoCAD SHX Text
AIR OR WATER FLOW METER
AutoCAD SHX Text
(NEW UNLESS OTHERWISE NOTED)
AutoCAD SHX Text
1. REFER TO WRITTEN (BOOK) SPECIFICATIONS FOR ADDITIONAL INFORMATION. 2. BIDDERS SHALL NOTE THAT ALL EQUIPMENT WILL BE PURCHASE BY THE CONTRACTOR. ALL COSTS FOR TRANSPORTATION, HANDLING, STORAGE AND RIGGING OF BOILERS SHALL BE CARRIED IN CONTRACTOR'S BASE BID. 3. ALL BIDDERS SHALL VISIT PROJECT SITE TO THOROUGHLY FAMILIARIZE THEMSELVES WITH EXISTING CONDITIONS. CLAIMS FOR EXTRA PAYMENTS FOR WORK, WHICH COULD HAVE BEEN IDENTIFIED VIA CAREFUL SITE INSPECTION, WILL NOT BE ACKNOWLEDGED.
AutoCAD SHX Text
4. CONTRACTOR SHALL WORK ONLY AT TIMES AND IN AREAS DESIGNATED BY THE OWNER. 5. ALL DDC CONTROLS WORK SHALL BE PERFORMED BY BUILDING ATC CONTRACTOR:
AutoCAD SHX Text THE PRIMARY INTENT OF THIS PROJECT IS TO REPLACE HOT WATER BOILER, WITH NEW CONDENSING HOT WATER BOILERS, REMOVE HW/CHW PUMPS AND HYDRONIC EQUIPMENT FROM BASEMENT AND INSTALL NEW HOT WATER EQUIPMENT: BOILER PUMPS, OTHER HW EQUIPMENT AND CONTROLS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR A COMPLETE INSTALLATION INCLUDING (BUT NOT LIMITED TO) THE FOLLOWING: - DEMO OF ALL EXISTING HOT WATER EQUIPMENT AND PIPING. - DISCONNECTION, REMOVAL AND SAFE DISPOSAL OF EXISTING BOILERS. - RIGGING AND INSTALLATION OF NEW CONDENSING GAS BOILERS. - INSTALLATION OF NEW HOT WATER PIPING AS INDICATED. - INSTALLATION OF NEW BOILER PUMPS, EXPANSION TANK, AIR SEPARATOR AND ALL ASSOCIATED VALVES AND TRIM. - PLUMBING WORK INCLUDING MODIFICATION OF NATURAL GAS PIPING TO ACCOMMODATE NEW BOILERS. - COMBUSTION AIR PIPING AND VENT FOR NEW CONDENSING COMBUSTION AIR PIPING AND VENT FOR NEW CONDENSING GAS BOILERS. - HOT WATER PIPING INSULATION HOT WATER PIPING INSULATION - LABELING OF NEW & EXIST'G PIPING IN BOILER ROOM LABELING OF NEW & EXIST'G PIPING IN BOILER ROOM - ALL ASSOCIATED ELECTRICAL WORK TO SUPPORT NEW ALL ASSOCIATED ELECTRICAL WORK TO SUPPORT NEW MECHANICAL EQUIPMENT AS DEPICTED ON PLANS. - INTEGRATION OF NEW MECHANICAL EQUIPMENT INTO BUILDING AUTOMATION SYSTEM (BAS) AND NEW COMMUNICATION WIRING FOR REMOTE MONITORING OF NEW BOILERS BY BOILER VENDOR. - STARTUP OF BOILERS AND PUMPS WITH SUPPORT FROM STARTUP OF BOILERS AND PUMPS WITH SUPPORT FROM MANUFACTURER REPRESENTATIVES - HYDROSTATIC TESTING OF NEW PIPING PRIOR TO SYSTEM HYDROSTATIC TESTING OF NEW PIPING PRIOR TO SYSTEM FILL - WATER TESTING AND BALANCING. WATER TESTING AND BALANCING. - PIPING SHOP DRAWINGS. PIPING SHOP DRAWINGS. - PIPING AS-BUILT DRAWINGS. PIPING AS-BUILT DRAWINGS. - PROJECT O&M MANUALS AT PROJECT CLOSEOUT - 4HRS OF OWNER TRAINING ON NEW MECHANICAL EQUIPMENT 4HRS OF OWNER TRAINING ON NEW MECHANICAL EQUIPMENT AND CONTROLS.
AutoCAD SHX Text F
AutoCAD SHX Text L
AutoCAD SHX Text G
UP
UP
MECHANICAL PLAN
ADAS NOTED TEN
M-100
DATE DESCRIPTION
REVISIONS:
DATE: JOB NUMBER:
DRAWING TITLE:
DRAWING NO.
SCALE: DRAWN BY: REVIEWED BY:
These documents have been prepared specifically for this project. Reproduction or other use of these documents is prohibited without the approval of the Architect.
COPYRIGHT 2026 BY:
ANTINOZZI ASSOCIATES, P.C.
271 Fairfield Avenue Bridgeport, Connecticut 06604 Tel: (203) 377-1300 Fax: (203) 378-3002 www.antinozzi.com
CERTIFICATION:
CONSULTANT:
B
OI
LE
R
RE
PL
AC
EM
EN
T by th e C
IT
Y of
BR
ID
GE
PO
RT
0 M
AI
N
ST
RE
ET
BR
ID
GE
PO
RT
, C
ON
NE
CT
IC
UT
05.08.'26 BID Documents
MAY 8, 2026 16058.15
FACILITIES
GROUP, INC.
LANDMARK
(203) 866-8019 Fax
(203) 866-4626 Tel Norwalk, CT 06855 252 East Avenue
AutoCAD SHX Text HW BOILERS, EXPANSION TANK AND AIR SEPARATOR TO BE SET ON (N) 6" CONCRETE PAD. SEE DIMENSIONS ON THE DRAWINGS. (N) HYDRO SEPARATOR (SEE SCHEDULE). (N) EXPANSION TANKS (SEE SCHEDULE). INSTALL POLYPROPYLENE VENT IN (E) CHIMNEY TO ROOF AS PER MECHANICAL SPECS. COORDINATE WITH (E) PIPING, GAS PIPING AND CONDUITS. 2" BOILER PIPING INSTALL IN VERTICAL RISERS WITH PUMPS AND VALVES. (N) 3" HW PIPE FOR HWP-1A AND -1B (SEE SCHEDULES). REMOVE (E) OA DAMPER. 4" PVC COMBUSTION AIR PIPES UP TO COMBUSTION AIR PLENUM AND TERMINATE NEXT TO INTERIOR SIDE OF OUTSIDE AIR LOUVER (TYP.2). PROVIDE BLANK OFF S/M AROUND 4" PIPES IN PLACE OF (E) OA DAMPER. CONDENSATE DRAIN TRAP CONNECT TO (N) NEUTRALIZE KIT (NT). DISCHARGE FROM NT TO NEAREST FLOOR DRAIN. (TYP.2) CONNECT 3" HWS AND HWR PIPES TO (E) PIPES. CONNECT (N) GAS PIPES TO (E) GAS MAIN (REFER TO PLUMBING DRAWINGS). CONNECT (N) FEED VALVE AND RPZ TO (E) CW LINE (REFER TO PLUMBING DRAWINGS). INSTALL CLEARWATER TREATMENT UNIT. CONTRACTOR SHALL ENGAGE DISTRICT WATER TREATMENT VENDOR (CLEARWATER) TO MAKE SITE VISIT TO TREAT CLOSED LOOP AT TIME OF BOILER STARTUP.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
1. ALL HW PIPING (4" AND ABOVE) AND SUSPENDED EQUIPMENT SHALL BE SUPPORTED USING THREADED ROD CLEVIS HANGERS WITH SPRING ISOLATORS. 2. NAT. GAS PIPING SHOW FOR COORDINATION ONLY. SEE PLUMBING DRAWINGS FOR DETAILS.
AutoCAD SHX Text
AutoCAD SHX Text
%%UKEY NOTES:
AutoCAD SHX Text
%%UNOTES:
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text B-1
AutoCAD SHX Text
BP-1
AutoCAD SHX Text
ET-1
AutoCAD SHX Text
HWP-1A
AutoCAD SHX Text
FUTURE CHW EQUIPMENT
AutoCAD SHX Text
(E) FSS
AutoCAD SHX Text
(E) 2" HWS&R UP
AutoCAD SHX Text
(E)24X10 EA
AutoCAD SHX Text
(E)24X10 OA
AutoCAD SHX Text
(E) EA
AutoCAD SHX Text
(E) OA
AutoCAD SHX Text
3"HWS&R
AutoCAD SHX Text
4"PVC CA
AutoCAD SHX Text
4"PVC CA
AutoCAD SHX Text B-2
AutoCAD SHX Text
BP-2
AutoCAD SHX Text
AutoCAD SHX Text
ET-2
AutoCAD SHX Text
HWP-1B
AutoCAD SHX Text
HS-1
AutoCAD SHX Text
CHW/HWS TO BUILDING UP
AutoCAD SHX Text
CHW/HWR FROM BUILDING UP
AutoCAD SHX Text
(E) 4" CHW FROM/TO CH-1 UP
AutoCAD SHX Text
3"HWS&R
AutoCAD SHX Text
6" VENT PIPE (TYP.2)
AutoCAD SHX Text
(E) HWR
AutoCAD SHX Text
CAP (E) PIPE
AutoCAD SHX Text
CAP (E) PIPE
AutoCAD SHX Text
CAP (E) PIPE
AutoCAD SHX Text
AutoCAD SHX Text 38X22
AutoCAD SHX Text
AutoCAD SHX Text 14X20
AutoCAD SHX Text
AutoCAD SHX Text 50X60
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
8" VENT PIPE UP THROUGH CHIMNEY
AutoCAD SHX Text
AutoCAD SHX Text
6" VENT PIPE (TYP.2)
AutoCAD SHX Text
SEC-A
AutoCAD SHX Text
SEC-B
AutoCAD SHX Text
SEC-C
AutoCAD SHX Text
DN.
AutoCAD SHX Text
DN.
AutoCAD SHX Text ladder to platform above
AutoCAD SHX Text
6" CPC VENT PIPE UP (TYP.2)
AutoCAD SHX Text
AutoCAD SHX Text
SCALE: 3/8" = 1'-0"
AutoCAD SHX Text
%%UMECHANICAL BOILER ROOM PLAN
AutoCAD SHX Text
SCALE: 3/8" = 1'-0"
AutoCAD SHX Text
%%UMECHANICAL ROOF PLAN
AutoCAD SHX Text F
AutoCAD SHX Text L
MECHANICAL SECTIONS
ADAS NOTED TEN
M-200
DATE DESCRIPTION
REVISIONS:
DATE: JOB NUMBER:
DRAWING TITLE:
DRAWING NO.
SCALE: DRAWN BY: REVIEWED BY:
These documents have been prepared specifically for this project. Reproduction or other use of these documents is prohibited without the approval of the Architect.
COPYRIGHT 2026 BY:
ANTINOZZI ASSOCIATES, P.C.
271 Fairfield Avenue Bridgeport, Connecticut 06604 Tel: (203) 377-1300 Fax: (203) 378-3002 www.antinozzi.com
CERTIFICATION:
CONSULTANT:
B
OI
LE
R
RE
PL
AC
EM
EN
T by th e C
IT
Y of
BR
ID
GE
PO
RT
0 M
AI
N
ST
RE
ET
BR
ID
GE
PO
RT
, C
ON
NE
CT
IC
UT
05.08.'26 BID Documents
MAY 8, 2026 16058.15
FACILITIES
GROUP, INC.
LANDMARK
(203) 866-8019 Fax
(203) 866-4626 Tel Norwalk, CT 06855 252 East Avenue
AutoCAD SHX Text HW BOILERS, EXPANSION TANK AND AIR SEPARATOR TO BE SET ON (N) 6" CONCRETE PAD. SEE DIMENSIONS ON THE DRAWINGS. (N) HYDRO SEPARATOR (SEE SCHEDULE). (N) EXPANSION TANKS (SEE SCHEDULE). INSTALL POLYPROPYLENE VENT IN (E) CHIMNEY TO ROOF AS PER MECHANICAL SPECS. COORDINATE WITH (E) PIPING, GAS PIPING AND CONDUITS. 2" BOILER PIPING INSTALL IN VERTICAL RISERS WITH PUMPS AND VALVES. (N) 3" HW PIPE FOR HWP-1A AND -1B (SEE SCHEDULES). REMOVE (E) OA DAMPER. 4" PVC COMBUSTION AIR PIPES UP TO COMBUSTION AIR PLENUM AND TERMINATE NEXT TO INTERIOR SIDE OF OUTSIDE AIR LOUVER (TYP.2). PROVIDE BLANK OFF S/M AROUND 4" PIPES IN PLACE OF (E) OA DAMPER. CONDENSATE DRAIN TRAP CONNECT TO (N) NEUTRALIZE KIT (NT). DISCHARGE FROM NT TO NEAREST FLOOR DRAIN. (TYP.2) CONNECT 3" HWS AND HWR PIPES TO (E) PIPES. CONNECT (N) GAS PIPES TO (E) GAS MAIN (REFER TO PLUMBING DRAWINGS). CONNECT (N) FEED VALVE AND RPZ TO (E) CW LINE (REFER TO PLUMBING DRAWINGS). INSTALL CLEARWATER TREATMENT UNIT. CONTRACTOR SHALL ENGAGE DISTRICT WATER TREATMENT VENDOR (CLEARWATER) TO MAKE SITE VISIT TO TREAT CLOSED LOOP AT TIME OF BOILER STARTUP.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
%%UKEY NOTES:
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
ET-2
AutoCAD SHX Text
HS-1
AutoCAD SHX Text B-2
AutoCAD SHX Text B-1
AutoCAD SHX Text
BP-1
AutoCAD SHX Text
BP-2
AutoCAD SHX Text
HWP-1B
AutoCAD SHX Text
HWP-1A
AutoCAD SHX Text
3"HWS&R
AutoCAD SHX Text
3"HWS
AutoCAD SHX Text
3"HWS
AutoCAD SHX Text
3"HWR
AutoCAD SHX Text
2.5"HWS
AutoCAD SHX Text
2.5"HWS
AutoCAD SHX Text
2.5"HWR
AutoCAD SHX Text
2.5"HWR
AutoCAD SHX Text 8"V
AutoCAD SHX Text 6"V
AutoCAD SHX Text 6"V
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
(E)24X10 OA
AutoCAD SHX Text
(E)24X10 EA
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text B-2
AutoCAD SHX Text B-1
AutoCAD SHX Text 8"V
AutoCAD SHX Text 6"V
AutoCAD SHX Text 6"V
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SLOPE DN
AutoCAD SHX Text 8"V
AutoCAD SHX Text
8" VENT PIPE
AutoCAD SHX Text
8" COLLAR
AutoCAD SHX Text
CHIMNEY CAP
AutoCAD SHX Text B-2
AutoCAD SHX Text B-1
AutoCAD SHX Text
4"CA
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SLOPE DN
AutoCAD SHX Text
(E)24X10 OA
AutoCAD SHX Text
(E)24X10 EA
AutoCAD SHX Text
4"CA (2)
AutoCAD SHX Text
4"CA (2)
AutoCAD SHX Text
(E) COMBUSTION AIR PLENUM
AutoCAD SHX Text
(E) OAI LOUVER
AutoCAD SHX Text
SCALE: 3/4" = 1'-0"
AutoCAD SHX Text
%%USECTION A-A
AutoCAD SHX Text F
AutoCAD SHX Text L
AutoCAD SHX Text G
AutoCAD SHX Text
SCALE: 3/4" = 1'-0"
AutoCAD SHX Text
%%USECTION B-B
AutoCAD SHX Text
SCALE: 3/4" = 1'-0"
%%USECTION C-C
MECHANICAL
SCHEDULES
M-300
DATE DESCRIPTION
REVISIONS:
DATE: JOB NUMBER:
DRAWING TITLE:
DRAWING NO.
SCALE: DRAWN BY: REVIEWED BY:
These documents have been prepared specifically for this project. Reproduction or other use of these documents is prohibited without the approval of the Architect.
COPYRIGHT 2026 BY:
ANTINOZZI ASSOCIATES, P.C.
271 Fairfield Avenue Bridgeport, Connecticut 06604 Tel: (203) 377-1300 Fax: (203) 378-3002 www.antinozzi.com
CERTIFICATION:
CONSULTANT:
B
OI
LE
R
RE
PL
AC
EM
EN
T by th e C
IT
Y of
BR
ID
GE
PO
RT
0 M
AI
N
ST
RE
ET
BR
ID
GE
PO
RT
, C
ON
NE
CT
IC
UT
05.08.'26 BID Documents
MAY 8, 2026 16058.15
FACILITIES
GROUP, INC.
LANDMARK
(203) 866-8019 Fax
(203) 866-4626 Tel Norwalk, CT 06855 252 East Avenue
AutoCAD SHX Text N.T.S.
AutoCAD SHX Text
%%UMECHANICAL SCHEDULES
AutoCAD SHX Text F
AutoCAD SHX Text L
MECHANICAL DETAILS
M-400
DATE DESCRIPTION
REVISIONS:
DATE: JOB NUMBER:
DRAWING TITLE:
DRAWING NO.
SCALE: DRAWN BY: REVIEWED BY:
These documents have been prepared specifically for this project. Reproduction or other use of these documents is prohibited without the approval of the Architect.
COPYRIGHT 2026 BY:
ANTINOZZI ASSOCIATES, P.C.
271 Fairfield Avenue Bridgeport, Connecticut 06604 Tel: (203) 377-1300 Fax: (203) 378-3002 www.antinozzi.com
CERTIFICATION:
CONSULTANT:
B
OI
LE
R
RE
PL
AC
EM
EN
T by th e C
IT
Y of
BR
ID
GE
PO
RT
0 M
AI
N
ST
RE
ET
BR
ID
GE
PO
RT
, C
ON
NE
CT
IC
UT
05.08.'26 BID Documents
MAY 8, 2026 16058.15
FACILITIES
GROUP, INC.
LANDMARK
(203) 866-8019 Fax
(203) 866-4626 Tel Norwalk, CT 06855 252 East Avenue
AutoCAD SHX Text
PIPE SIZE
AutoCAD SHX Text
6" THRU 12"
AutoCAD SHX Text
4" THRU 5"
AutoCAD SHX Text
%%UCLEVIS HANGER
AutoCAD SHX Text
HORIZONTAL RUNS
AutoCAD SHX Text
HANGER ROD SCHEDULE
AutoCAD SHX Text
HEAVY DUTY
AutoCAD SHX Text
CLEVIS HANGER
AutoCAD SHX Text
AS REQUIRED
AutoCAD SHX Text
INSULATION
AutoCAD SHX Text
VAPOR BARRIER
AutoCAD SHX Text
2 1/2" THRU 3"
AutoCAD SHX Text
PIPE SIZE
AutoCAD SHX Text
UP TO 2"
AutoCAD SHX Text
ROD SIZE
AutoCAD SHX Text
1/2" DIA.
AutoCAD SHX Text
3/8" DIA.
AutoCAD SHX Text
PIPE
AutoCAD SHX Text
ROD SIZE
AutoCAD SHX Text
7/8" DIA.
AutoCAD SHX Text
5/8" DIA.
AutoCAD SHX Text
HANGER ROD
AutoCAD SHX Text
LOCKING NUT
AutoCAD SHX Text
(12" LONG MINIMUM)
AutoCAD SHX Text
SHEET STEEL SADDLE
AutoCAD SHX Text
16 GAGE ZINC COATED
AutoCAD SHX Text
SUPPORT NUT
AutoCAD SHX Text
SPRING AND NEOPRENE HANGER DETAIL. N.T.S.
AutoCAD SHX Text
PROVIDE SPRING ISOLATOR FOR PIPES 4" DIA AND LARGER
AutoCAD SHX Text
BUTTERFLY VALVE
AutoCAD SHX Text
HORIZONTAL IN-LINE PUMP DETAIL
AutoCAD SHX Text
NO SCALE
AutoCAD SHX Text
STRAINER
AutoCAD SHX Text
INSULATION SHIELD
AutoCAD SHX Text
VICTAULIC FLEX
AutoCAD SHX Text
COUPLING (TYP.6)
AutoCAD SHX Text
BOILER
AutoCAD SHX Text
%%UB-1
AutoCAD SHX Text
AutoCAD SHX Text
%%UBOILER PIPING DETAIL
AutoCAD SHX Text
AutoCAD SHX Text
%%UKEY
AutoCAD SHX Text
HIGH LIMIT AND LOW WATER CUTOFFS (TYP)
AutoCAD SHX Text
RELIEF VALVE PIPE TO 3" ABV. FLOOR (TYP)
AutoCAD SHX Text
THERMOMETER (TYP)
AutoCAD SHX Text
PRESSURE GAGE (TYP)
AutoCAD SHX Text
SHUT-OFF VALVE (TYP)
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text N.T.S.
AutoCAD SHX Text
NEW
AutoCAD SHX Text
INLINE HOT WATER PUMP
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
INLINE STRAINER
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text P
AutoCAD SHX Text P
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
DRAIN VALVE
AutoCAD SHX Text
AutoCAD SHX Text
BOILER CONDENSATE CONNECTION WITH NEUTRALIZER AND PIPING ROUTED TO FLOOR DRAIN
AutoCAD SHX Text
BOILER
AutoCAD SHX Text
%%UB-2
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
NEW
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text P
AutoCAD SHX Text P
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
HW SUPPLY & RETURN PIPING
AutoCAD SHX Text
PRESSURE GAUGE
AutoCAD SHX Text
PRESSURE GAUGE
AutoCAD SHX Text
CHECK VALVE
AutoCAD SHX Text
BUTTERFLY VALVE
AutoCAD SHX Text
PIPE TO
AutoCAD SHX Text
FLOOR DRAIN
AutoCAD SHX Text
BYPASS/FILL
AutoCAD SHX Text 1"
AutoCAD SHX Text
AutoCAD SHX Text
SELF CONTAINED
AutoCAD SHX Text
PRESSURE GAUGE (TYP.)
AutoCAD SHX Text
PRESSURE-REDUCING VALVE
AutoCAD SHX Text
BACKFLOW PREVENTER WITH AIR GAP
AutoCAD SHX Text
REDUCED PRESSURE ZONE PRINCIPLE
AutoCAD SHX Text
TO FLOOR DRAIN
AutoCAD SHX Text 1"
AutoCAD SHX Text
AutoCAD SHX Text
TO FLOOR DRAIN
AutoCAD SHX Text
2" BLOWDOWN
AutoCAD SHX Text
1" COLD WATER FILL LINE
AutoCAD SHX Text
HW PIPING
AutoCAD SHX Text
#7 AIR VENT
AutoCAD SHX Text
B&G MODEL
AutoCAD SHX Text
CAPACITY AIR VENT
AutoCAD SHX Text
B&G ROLAIRTROL
AutoCAD SHX Text
MODEL R-4 FOR HW SYSTEM
AutoCAD SHX Text
B&G MODEL 107 HIGH
AutoCAD SHX Text
PIPING
AutoCAD SHX Text
AutoCAD SHX Text
PUMPS
AutoCAD SHX Text
TO SYSTEM
AutoCAD SHX Text
DEFLECTION
AutoCAD SHX Text
NO SCALE
AutoCAD SHX Text
PRESSURE GAGE
AutoCAD SHX Text
SELECTED FOR 0.2"
AutoCAD SHX Text
MASON SUPER W PAD
AutoCAD SHX Text
MODEL D-240V OR D-240
AutoCAD SHX Text
B&G BLADDER EXPANSION TANK
AutoCAD SHX Text
HW
AutoCAD SHX Text
4" CONCRETE PAD
AutoCAD SHX Text %%uEXPANSION TANK CONNECTION DETAIL
AutoCAD SHX Text
TYPICAL FOR HOT WATER SYSTEMS
AutoCAD SHX Text
3/4" BALL VALVE
AutoCAD SHX Text
W/ HOSE CONNECTION
AutoCAD SHX Text
FOR HW SYSTEM
AutoCAD SHX Text
HS-1 AIR SEPARATOR LOW LOSS HEADER
AutoCAD SHX Text
2.5" HWS(SECONDARY LOOP)
AutoCAD SHX Text
2.5" HWR(SECONDARY LOOP)
AutoCAD SHX Text
2" HWR (TO B-1)
AutoCAD SHX Text
BP-1
AutoCAD SHX Text
BP-2
AutoCAD SHX Text
ET-1
AutoCAD SHX Text
HOT WATER PIPING
AutoCAD SHX Text
2" HWR (TO B-2)
AutoCAD SHX Text
HWP-1A
AutoCAD SHX Text
HYDRO SEPARATOR DETAIL PIPING DIAGRAM
AutoCAD SHX Text
TO H.W. PIPING SYSTEM (SECONDARY LOOP)
AutoCAD SHX Text
MAKEUP WATER
AutoCAD SHX Text
2" HWR (PRIMARY LOOP)
AutoCAD SHX Text
2" HWS (PRIMARY LOOP)
AutoCAD SHX Text
2" HWS (FROM B-1)
AutoCAD SHX Text
2" HWR (FROM B-2)
AutoCAD SHX Text
HWP-1B
AutoCAD SHX Text
SCALE: N.T.S.
AutoCAD SHX Text
%%UMECHANICAL DETAILS
AutoCAD SHX Text F
AutoCAD SHX Text L
MECHANICAL SCHEMATIC
DIAGRAM
M-500
DATE DESCRIPTION
REVISIONS:
DATE: JOB NUMBER:
DRAWING TITLE:
DRAWING NO.
SCALE: DRAWN BY: REVIEWED BY:
These documents have been prepared specifically for this project. Reproduction or other use of these documents is prohibited without the approval of the Architect.
COPYRIGHT 2026 BY:
ANTINOZZI ASSOCIATES, P.C.
271 Fairfield Avenue Bridgeport, Connecticut 06604 Tel: (203) 377-1300 Fax: (203) 378-3002 www.antinozzi.com
CERTIFICATION:
CONSULTANT:
B
OI
LE
R
RE
PL
AC
EM
EN
T by th e C
IT
Y of
BR
ID
GE
PO
RT
0 M
AI
N
ST
RE
ET
BR
ID
GE
PO
RT
, C
ON
NE
CT
IC
UT
05.08.'26 BID Documents
MAY 8, 2026 16058.15
FACILITIES
GROUP, INC.
LANDMARK
(203) 866-8019 Fax
(203) 866-4626 Tel Norwalk, CT 06855 252 East Avenue
AutoCAD SHX Text
BOILER
AutoCAD SHX Text B-2
AutoCAD SHX Text
HWP-1A
AutoCAD SHX Text
TDV
AutoCAD SHX Text
TT
AutoCAD SHX Text
AutoCAD SHX Text
TT
AutoCAD SHX Text
HS-1
AutoCAD SHX Text
AutoCAD SHX Text
FROM H.W. BUILDING
AutoCAD SHX Text
SYSTEM
AutoCAD SHX Text
AutoCAD SHX Text
TO H.W. BUILDING
AutoCAD SHX Text
SYSTEM
AutoCAD SHX Text
TT
AutoCAD SHX Text
AutoCAD SHX Text
TT
AutoCAD SHX Text
BP-2
AutoCAD SHX Text
TT
AutoCAD SHX Text
AutoCAD SHX Text
OUTSIDE AIR
AutoCAD SHX Text
ET-1
AutoCAD SHX Text P
AutoCAD SHX Text
ET-2
AutoCAD SHX Text P
AutoCAD SHX Text
ECM
AutoCAD SHX Text S/S
AutoCAD SHX Text
RI
AutoCAD SHX Text
BP2
AutoCAD SHX Text
BP2
AutoCAD SHX Text
SC
AutoCAD SHX Text
BP2
AutoCAD SHX Text
FCP
AutoCAD SHX Text
FCP
AutoCAD SHX Text B-2
AutoCAD SHX Text
BOILER
AutoCAD SHX Text B-1
AutoCAD SHX Text
BP-1
AutoCAD SHX Text
ECM
AutoCAD SHX Text S/S
AutoCAD SHX Text
RI
AutoCAD SHX Text
BP1
AutoCAD SHX Text
BP1
AutoCAD SHX Text
SC
AutoCAD SHX Text
BP1
AutoCAD SHX Text
FCP
AutoCAD SHX Text
FCP
AutoCAD SHX Text B-1
AutoCAD SHX Text S/S
AutoCAD SHX Text
AutoCAD SHX Text
RI
AutoCAD SHX Text
AutoCAD SHX Text
ECM
AutoCAD SHX Text
HWP-1A
AutoCAD SHX Text
TDV
AutoCAD SHX Text S/S
AutoCAD SHX Text
AutoCAD SHX Text
RI
AutoCAD SHX Text
AutoCAD SHX Text
ECM
AutoCAD SHX Text
SCALE: N.T.S.
AutoCAD SHX Text
%%UHOT WATER PIPING AND CONTROLS SCHEMATIC DIAGRAM
AutoCAD SHX Text F
AutoCAD SHX Text L
MECHANICAL
ADAS NOTED TEN
SPECIFICATIONS
M-600
DATE DESCRIPTION
REVISIONS:
DATE: JOB NUMBER:
DRAWING TITLE:
DRAWING NO.
SCALE: DRAWN BY: REVIEWED BY:
These documents have been prepared specifically for this project. Reproduction or other use of these documents is prohibited without the approval of the Architect.
COPYRIGHT 2026 BY:
ANTINOZZI ASSOCIATES, P.C.
271 Fairfield Avenue Bridgeport, Connecticut 06604 Tel: (203) 377-1300 Fax: (203) 378-3002 www.antinozzi.com
CERTIFICATION:
CONSULTANT:
B
OI
LE
R
RE
PL
AC
EM
EN
T by th e C
IT
Y of
BR
ID
GE
PO
RT
0 M
AI
N
ST
RE
ET
BR
ID
GE
PO
RT
, C
ON
NE
CT
IC
UT
05.08.'26 BID Documents
MAY 8, 2026 16058.15
FACILITIES
GROUP, INC.
LANDMARK
(203) 866-8019 Fax
(203) 866-4626 Tel Norwalk, CT 06855 252 East Avenue
AutoCAD SHX Text SECTION 15000 - BASIC MECHANICAL REQUIREMENTS PART 1 - GENERAL 1.1 - SUMMARY A. THE ABBREVIATION “G.C.” SHALL REFER TO THE GENERAL CONTRACTOR IN THESE MECHANICAL THE ABBREVIATION “G.C.” SHALL REFER TO THE GENERAL CONTRACTOR IN THESE MECHANICAL G.C.” SHALL REFER TO THE GENERAL CONTRACTOR IN THESE MECHANICAL SHALL REFER TO THE GENERAL CONTRACTOR IN THESE MECHANICAL DRAWINGS AND SPECIFICATIONS. B. DRAWINGS AND GENERAL PROVISIONS OF THE CONTRACT, INCLUDING GENERAL AND DRAWINGS AND GENERAL PROVISIONS OF THE CONTRACT, INCLUDING GENERAL AND SUPPLEMENTARY CONDITIONS AND ALL OTHER SPECIFICATION SECTIONS, APPLY TO THIS AND THE OTHER SECTIONS OF DIVISION 15. C. THE CONTRACTOR FOR THIS DIVISION OF WORK IS REQUIRED TO READ THE SPECIFICATIONS AND THE CONTRACTOR FOR THIS DIVISION OF WORK IS REQUIRED TO READ THE SPECIFICATIONS AND REVIEW DRAWINGS FOR ALL DIVISIONS OF WORK AND IS RESPONSIBLE FOR THE COORDINATION OF THEIR WORK AND THE WORK OF THEIR SUBCONTRACTORS WITH ALL DIVISIONS OF WORK. IT IS THE CONTRACTOR'S RESPONSIBILITY TO PROVIDE THEIR SUBCONTRACTORS WITH A COMPLETE SET OF BID DOCUMENTS. D. REFER TO RESPONSIBILITY MATRIX ON THE MECHANICAL DRAWINGS FOR INFORMATION IN REGARD REFER TO RESPONSIBILITY MATRIX ON THE MECHANICAL DRAWINGS FOR INFORMATION IN REGARD TO RESPONSIBILITY OF WORK OR ITEMS WHICH MAY AFFECT BID. E. THE CONTRACTOR SHALL OBTAIN AND PAY FOR ALL LICENSES, PERMITS, INSPECTIONS, AND THE CONTRACTOR SHALL OBTAIN AND PAY FOR ALL LICENSES, PERMITS, INSPECTIONS, AND FEES REQUIRED OR RELATED TO THEIR WORK. F. THE DRAWINGS AND SPECIFICATIONS ARE INTENDED TO SUPPLEMENT EACH OTHER AND ANY THE DRAWINGS AND SPECIFICATIONS ARE INTENDED TO SUPPLEMENT EACH OTHER AND ANY MATERIAL OR LABOR CALLED FOR IN ONE SHALL BE FURNISHED AND INSTALLED EVEN THOUGH NOT SPECIFICALLY MENTIONED IN BOTH. ANY MATERIAL OR LABOR WHICH IS NEITHER SHOWN ON THE DRAWINGS NOR CALLED FOR IN THE SPECIFICATIONS, BUT WHICH IS OBVIOUSLY NECESSARY TO COMPLETE THE WORK, AND WHICH IS USUALLY INCLUDED IN WORK OF SIMILAR CHARACTER, SHALL BE FURNISHED AND INSTALLED AS PART OF CONTRACT. G. WHERE THE DRAWINGS OR SPECIFICATIONS CALL FOR ITEMS WHICH EXCEED CODES , THE WHERE THE DRAWINGS OR SPECIFICATIONS CALL FOR ITEMS WHICH EXCEED CODES , THE CONTRACTOR IS RESPONSIBLE FOR FURNISHING AND INSTALLING THE SYSTEM WITH THE MORE STRINGENT REQUIREMENTS AS DESIGNED AND DESCRIBED ON THESE DRAWINGS, UNLESS SPECIFICALLY NOTED OTHERWISE. H. ALL MECHANICAL WORK SHALL BE INSTALLED TO BE READILY ACCESSIBLE FOR OPERATING, ALL MECHANICAL WORK SHALL BE INSTALLED TO BE READILY ACCESSIBLE FOR OPERATING, SERVICING, MAINTAINING, AND REPAIRING. THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING SUFFICIENT SERVICE ACCESS TO ALL EQUIPMENT. I. ALL WORK SHALL BE PERFORMED IN A NEAT PROFESSIONAL MANNER USING GOOD ENGINEERING ALL WORK SHALL BE PERFORMED IN A NEAT PROFESSIONAL MANNER USING GOOD ENGINEERING AND CONSTRUCTION PRACTICES. 1.2 - RELEVANT CODES AND CRITERIA A. ALL WORK SHALL BE PERFORMED IN A NEAT AND PROFESSIONAL MANNER AND CONFORM TO ALL WORK SHALL BE PERFORMED IN A NEAT AND PROFESSIONAL MANNER AND CONFORM TO THE LATEST ADOPTED EDITION OF THE FOLLOWING: 1) STATE CODES 2) LOCAL CODES AND ORDINANCES 3) HEALTH AND SAFETY CODES 4) NFPA 5) UNDERWRITER'S LABORATORIES 6) ENERGY CODES 7) ALL OTHER APPLICABLE CODES AND REQUIREMENTS B. THE CONTRACTOR SHALL INQUIRE INTO AND COMPLY WITH ALL APPLICABLE CODES, ORDINANCES, THE CONTRACTOR SHALL INQUIRE INTO AND COMPLY WITH ALL APPLICABLE CODES, ORDINANCES, AND REGULATIONS. THE CONTRACTOR SHALL INCLUDE ANY CHANGES REQUIRED BY CODES IN THE BID AND IF THESE CHANGES ARE NOT INCLUDED IN THE BID, THEY MUST BE QUALIFIED AS A SEPARATE LINE ITEM IN THE BID AFTER CONTRACT IS ISSUED, NO ADDITIONAL COST DUE TO CODE ISSUES SHALL BE REIMBURSED BY THE OWNER TO THE CONTRACTOR. C. UNLESS SPECIFICALLY NOTED OTHERWISE, MATERIALS, PRODUCTS, AND EQUIPMENT, INCLUDING UNLESS SPECIFICALLY NOTED OTHERWISE, MATERIALS, PRODUCTS, AND EQUIPMENT, INCLUDING ALL COMPONENTS THEREOF, SHALL BE NEW, UNDERWRITERS LABORATORIES LISTED AND LABELED AND SIZED IN CONFORMITY WITH REQUIREMENTS OF STATE AND LOCAL CODES, WHICHEVER IS MORE STRINGENT. 1.3 - SUBMITTALS A. SHOP DRAWINGS SHOP DRAWINGS 1) CONTRACTOR SHALL COMPLETE SHOP DRAWINGS NECESSARY TO INSTALL THE MECHANICAL SYSTEMS IN COMPLIANCE WITH THE CONTRACT DRAWINGS. SHOP DRAWINGS DO NOT NEED TO BE SUBMITTED FOR REVIEW UNLESS NOTED OTHERWISE. 2) SUBMIT STRUCTURAL AND/OR SEISMIC CALCULATIONS AS REQUIRED. B. RECORD DRAWINGS RECORD DRAWINGS 1) THE CONTRACTOR SHALL MAINTAIN ONE COPY OF DRAWINGS ON THE JOB SITE TO RECORD THE CONTRACTOR SHALL MAINTAIN ONE COPY OF DRAWINGS ON THE JOB SITE TO RECORD DEVIATIONS FROM CONTRACT DRAWINGS, SUCH AS: a. LOCATION OF CONCEALED PIPING VALVES AND DUCTS. b. REVISIONS, ADDENDUMS, AND CHANGE ORDERS. c. SIGNIFICANT DEVIATIONS MADE NECESSARY BY FIELD CONDITIONS, APPROVED EQUIPMENT SUBSTITUTIONS, AND CONTRACTOR'S COORDINATION WITH OTHER TRADES. 2) AT COMPLETION OF THE PROJECT AND BEFORE FINAL APPROVAL, THE CONTRACTOR SHALL AT COMPLETION OF THE PROJECT AND BEFORE FINAL APPROVAL, THE CONTRACTOR SHALL MAKE ANY FINAL CORRECTIONS TO DRAWINGS AND CERTIFY THE ACCURACY OF EACH PRINT BY SIGNATURE THEREON. ONE COPY OF THE MOST RECENT SET OF DRAWINGS WITH TEMPERATURE CONTROL DRAWINGS INCLUDED SHALL BE STAMPED "DO NOT REMOVE" AND PLACED IN DRAWING TUBE LOCATED NEXT TO THE ELECTRICAL PANELS. 3) CONTRACTOR TO PROVIDE A SET OF MARKUPS TO CONSTRUCTION MANAGER. CONTRACTOR TO PROVIDE A SET OF MARKUPS TO CONSTRUCTION MANAGER. C. DISCREPANCIES IN DOCUMENTS DISCREPANCIES IN DOCUMENTS 1) DRAWINGS (PLANS, SPECIFICATIONS, AND DETAILS) ARE DIAGRAMMATIC AND INDICATE THE DRAWINGS (PLANS, SPECIFICATIONS, AND DETAILS) ARE DIAGRAMMATIC AND INDICATE THE GENERAL LOCATION AND INTENT OF THE MECHANICAL SYSTEMS. WHERE DRAWINGS, EXISTING SITE CONDITIONS, SPECIFICATIONS OR OTHER TRADES CONFLICT OR ARE UNCLEAR, ADVISE THE G.C.'S CONSTRUCTION MANAGER, IN WRITING OF VARIATIONS TO CONTRACT DOCUMENTS PRIOR TO SUBMISSION OF BID. OTHERWISE, THE G.C.'S CONSTRUCTION MANAGER'S INTERPRETATION OF CONTRACT DOCUMENTS OR CONDITIONS SHALL BE FINAL WITH NO ADDITIONAL COMPENSATION PERMITTED. D. SUBSTITUTIONS SUBSTITUTIONS 1) WHERE TRADE NAMES AND MANUFACTURERS ARE USED ON THE DRAWINGS OR IN THE WHERE TRADE NAMES AND MANUFACTURERS ARE USED ON THE DRAWINGS OR IN THE SPECIFICATIONS, THE EXACT EQUIPMENT SHALL BE USED AS A MINIMUM FOR THE BASE BID. ANY PROPOSED SUBSTITUTIONS MUST BE PRE-QUALIFIED, LISTED IN THE CONTRACTOR'S BID AND HAVE A COST SAVINGS FOR THE OWNER OF AT LEAST $500 PER TYPE OF EQUIPMENT. ADDITIONALLY, ONLY MANUFACTURERS CONSIDERED AS AN EQUAL OR BETTER IN ALL ASPECTS TO THAT SPECIFIED WILL BE REVIEWED. ALL SUBSTITUTIONS ARE SUBJECT TO APPROVAL IN WRITING, THROUGH THE SHOP DRAWING PROCESS, BY THE G.C.'S CONSTRUCTION MANAGER PRIOR TO ACCEPTANCE. THE OWNER RESERVES THE RIGHT TO REJECT ANY PROPOSED SUBSTITUTIONS. THE USE OF ANY UNAUTHORIZED EQUIPMENT SHALL BE SUBJECT TO REMOVAL AND REPLACEMENT AT THE CONTRACTOR'S EXPENSE. 2) THE MECHANICAL CONTRACTOR SHALL SUBMIT PROJECT SUBMITTALS PER THE REQUIRED THE MECHANICAL CONTRACTOR SHALL SUBMIT PROJECT SUBMITTALS PER THE REQUIRED SUBMITTAL TABLE ON THE PROJECT DOCUMENTS AND SUBSTITUTION REQUESTS TO THE G.C.'S CONSTRUCTION MANAGER FOR APPROVAL. SUBSTITUTION SUBMISSIONS SHALL BE MADE TO ALLOW FOUR (4) WORKING DAYS FOR THE CONSTRUCTION MANAGER'S REVIEW WITHOUT CAUSING DELAYS OR CONFLICTS TO THE JOB'S PROGRESS. SUBMITTALS SHALL BEAR THE STAMP OF THE G.C.'S OFFICE AND THE SUB-CONTRACTOR SHOWING THAT THEY HAVE REVIEWED AND CONFIRMED THAT THE SUBMITTALS ARE IN CONFORMANCE WITH THE CONTRACT DRAWINGS AND SPECIFICATIONS OR INDICATE WHERE EXCEPTIONS HAVE BEEN TAKEN. 1.4 - QUALITY ASSURANCE A. FURNISH TO THE G.C.'S CONSTRUCTION MANAGER ALL CERTIFICATES OF INSPECTION AND FINAL FURNISH TO THE G.C.'S CONSTRUCTION MANAGER ALL CERTIFICATES OF INSPECTION AND FINAL INSPECTION APPROVAL AT COMPLETION OF PROJECT. 1.5 - PROJECT SITE/CONDITIONS A. THE CONTRACTOR IS RESPONSIBLE FOR SCHEDULING THE COMPLETION AND INSPECTION OF THE CONTRACTOR IS RESPONSIBLE FOR SCHEDULING THE COMPLETION AND INSPECTION OF THEIR WORK AND THE WORK OF THEIR SUBCONTRACTORS TO COMPLY WITH THE SCHEDULE AND THE PROJECT COMPLETION DATE. B. THE CONTRACTOR SHALL VISIT THE SITE PRIOR TO SUBMITTAL OF BID TO DETERMINE THE CONTRACTOR SHALL VISIT THE SITE PRIOR TO SUBMITTAL OF BID TO DETERMINE CONDITIONS AFFECTING THE WORK. ANY ITEMS WHICH ARE NOT COVERED IN THE BID DOCUMENTS OR ANY PROPOSED SUBSTITUTIONS SHALL BE LISTED SEPARATELY AND QUALIFIED IN THE CONTRACTORS BID. SUBMITTAL OF BID SHALL SERVE AS EVIDENCE OF KNOWLEDGE OF EXISTING CONDITIONS AND ANY MODIFICATIONS WHICH ARE REQUIRED TO MEET THE INTENT OF THE DRAWINGS AND SPECIFICATIONS. FAILURE TO VISIT THE SITE DOES NOT RELIEVE THE CONTRACTOR OF RESPONSIBILITY IN PERFORMANCE OF WORK. C. RELOCATION OF EXISTING DUCT OR PIPING MAINS OR BRANCHES TO MEET STORE DESIGN RELOCATION OF EXISTING DUCT OR PIPING MAINS OR BRANCHES TO MEET STORE DESIGN CRITERIA MUST BE INCLUDED IN BID PROPOSAL. 1.6 - WARRANTY A. THE CONTRACTOR SHALL GUARANTEE ALL MATERIALS AND WORK PROVIDED UNDER THEIR THE CONTRACTOR SHALL GUARANTEE ALL MATERIALS AND WORK PROVIDED UNDER THEIR CONTRACT AND SHALL REPAIR OR REPLACE, AT THEIR OWN EXPENSE, ANY DEFECTIVE WORK, MATERIAL, OR EQUIPMENT WHICH MAY BE DISCOVERED WITHIN A PERIOD OF 12 MONTHS FROM THE DATE OF ACCEPTANCE (IN WRITING) OF THE INSTALLATION BY THE GENERAL CONTRACTOR'S CONSTRUCTION MANAGER. EXTENDED WARRANTIES ARE AS SPECIFIED WITH INDIVIDUAL EQUIPMENT. B. THE OWNER SHALL PROVIDE A COMPLETE 12-MONTH WARRANTY FOR ALL PARTS ON EQUIPMENT THE OWNER SHALL PROVIDE A COMPLETE 12-MONTH WARRANTY FOR ALL PARTS ON EQUIPMENT PROVIDED BY THE OWNER AND ITS VENDORS. THE CONTRACTOR SHALL NOT BEAR ADDITIONAL WARRANTIES BEYOND A COMPLETE WORKING SYSTEM, AND AS SUCH, NO ADDITIONAL MONIES SHOULD BE INCLUDED IN THE BID. PART 2 - PRODUCTS 2.1 - EQUIPMENT A. THE CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, EQUIPMENT, SERVICES, TOOLS, THE CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, EQUIPMENT, SERVICES, TOOLS, TRANSPORTATION, INCIDENTALS AND DETAILS NECESSARY TO PROVIDE A COMPLETE MECHANICAL SYSTEM AS SHOWN ON THE DRAWINGS, CALLED FOR IN THE SPECIFICATIONS, AND AS REQUIRED BY JOB CONDITIONS. ALL WORK NOT SPECIFICALLY NOTED AS BEING BY OWNER SHALL BE PROVIDED BY THE MECHANICAL CONTRACTOR. CLOSELY COORDINATE THE ENTIRE INSTALLATION WITH THE OWNER AND THE G.C. CONSTRUCTION MANAGER, AS REQUIRED. PART 3 - EXECUTION 3.1 - PHASING REQUIREMENTS A. THE CONTRACTOR IS TO INCLUDE IN HIS BID ALL NECESSARY SERVICE REQUIRED TO KEEP THE THE CONTRACTOR IS TO INCLUDE IN HIS BID ALL NECESSARY SERVICE REQUIRED TO KEEP THE OPERATING PHASE OF THE STORE'S HVAC, AND PLUMBING SERVICE IN OPERATION. CONTRACTOR MUST SCHEDULE WITH THE G.C.'S CONSTRUCTION MANAGER ONE WEEK PRIOR TO ANY SHUT DOWN OF THE HVAC, PLUMBING SYSTEMS. 3.2 - DEMOLITION A. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE COORDINATION OF THE DEMOLITION OF THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE COORDINATION OF THE DEMOLITION OF EXISTING WORK AND THE DEMOLITION PROVIDED BY THE G.C. B. CONTRACTOR SHALL COORDINATE WITH THE G.C. ANY EXISTING EQUIPMENT REQUIRED TO BE CONTRACTOR SHALL COORDINATE WITH THE G.C. ANY EXISTING EQUIPMENT REQUIRED TO BE LEFT INTACT. C. EACH CONTRACTOR SHALL VERIFY SCOPE OF WORK WITH THE G.C. FOR THE REMOVAL OF ALL EACH CONTRACTOR SHALL VERIFY SCOPE OF WORK WITH THE G.C. FOR THE REMOVAL OF ALL EXISTING PLUMBING FIXTURES, PIPING, HVAC UNITS, REFRIGERANT RECAPTURE, EXHAUST FANS, ETC. AND ASSOCIATED ROOF CURBS NOT BEING REUSED ON THIS PROJECT, UNLESS SPECIFICALLY NOTED OTHERWISE. D. THE CONTRACTOR MUST VERIFY WITH THE LANDLORD ALL PRESUMED ABANDONED EQUIPMENT, THE CONTRACTOR MUST VERIFY WITH THE LANDLORD ALL PRESUMED ABANDONED EQUIPMENT, PIPES, DUCTWORK, AND EQUIPMENT PRIOR TO REMOVAL. E. ALL EXTRANEOUS ITEMS IN THE SPACE OR ON THE ROOF NOT APPLICABLE TO THE NEW WORK ALL EXTRANEOUS ITEMS IN THE SPACE OR ON THE ROOF NOT APPLICABLE TO THE NEW WORK MUST BE REMOVED AND ROOF/WALL/FLOOR PATCHED/REPAIRED TO MATCH EXISTING STRUCTURE. F. EXISTING ABANDONED PIPES, DUCTS, OR EQUIPMENT IN THE FLOOR, EMBEDDED IN CONCRETE, EXISTING ABANDONED PIPES, DUCTS, OR EQUIPMENT IN THE FLOOR, EMBEDDED IN CONCRETE, OR OTHERWISE INACCESSIBLE SHALL BE CUT OFF AND SEALED BELOW OR WITHIN FLOOR OR WALL LEVEL WHEN THEY SHALL NOT BE REUSED IN THIS PROJECT. IF REQUIRED BY OWNER OR CODES, ABANDONED PIPING AND/OR DUCTWORK MUST BE REMOVED TO POINT OF ORIGIN. CONFIRM THE EXTENT OF DEMOLITION WITH THE G.C. PRIOR TO BID AND INCLUDE IN BID PROPOSAL AS DIRECTED BY THE G.C. 3.3 - SLEEVES A. THE CONTRACTOR SHALL PROVIDE SLEEVES TO PROTECT EQUIPMENT OR FACILITIES IN THE THE CONTRACTOR SHALL PROVIDE SLEEVES TO PROTECT EQUIPMENT OR FACILITIES IN THE INSTALLATION. EACH SLEEVE SHALL EXTEND THROUGH ITS RESPECTIVE FLOOR, WALL OR PARTITION AND SHALL BE CUT FLUSH WITH EACH SURFACE EXCEPT SLEEVES THAT PENETRATE THE FLOOR, WHICH SHALL EXTEND 2 INCHES ABOVE THE FLOOR. CONTRACTOR MUST COORDINATE THROUGH THE LANDLORD ANY CORE DRILLING OR CUTTING OF OPENINGS IN MASONRY FLOORS OR WALLS. B. ALL SLEEVES AND OPENINGS THROUGH FIRE RATED WALLS AND/OR FLOORS SHALL BE FIRE ALL SLEEVES AND OPENINGS THROUGH FIRE RATED WALLS AND/OR FLOORS SHALL BE FIRE SEALED WITH CALCIUM SILICATE, SILICONE "RTV" FOAM, "3M" FIRE RATED SEALANTS OR EQUAL, SO AS TO RETAIN THEIR FIRE RATING. C. SLEEVES IN BEARING AND MASONRY WALLS, FLOORS, AND PARTITIONS SHALL BE STANDARD SLEEVES IN BEARING AND MASONRY WALLS, FLOORS, AND PARTITIONS SHALL BE STANDARD WEIGHT STEEL PIPE FINISHED WITH SMOOTH EDGES. FOR OTHER THAN MASONRY PARTITIONS, THROUGH SUSPENDED CEILINGS, OR FOR CONCEALED VERTICAL PIPING, SLEEVES SHALL BE MINIMUM 22 GAGE GALVANIZED STEEL. 3.4 - HANGERS A. HANGERS SHALL INCLUDE ALL MISCELLANEOUS STEEL SUCH AS ANGLE IRON, BANDS, C-CLAMPS HANGERS SHALL INCLUDE ALL MISCELLANEOUS STEEL SUCH AS ANGLE IRON, BANDS, C-CLAMPS WITH RETAINING CLIPS, CHANNELS, HANGER RODS, ETC., NECESSARY FOR THE INSTALLATION OF WORK. B. HANGERS SHALL BE FASTENED TO BUILDING STEEL, CONCRETE, OR MASONRY, BUT NOT TO HANGERS SHALL BE FASTENED TO BUILDING STEEL, CONCRETE, OR MASONRY, BUT NOT TO PIPING. HANGING FROM METAL DECK IS NOT PERMITTED. HANGERS MUST BE ATTACHED TO UPPER CHORD OF BAR JOIST. WHERE INTERFERENCES OCCUR, AND IN ORDER TO SUPPORT DUCTWORK OR PIPING, THE CONTRACTOR MUST INSTALL TRAPEZE TYPE HANGERS OR SUPPORTS WHICH SHALL BE LOCATED WHERE THEY DO NOT INTERFERE WITH ACCESS TO FIRE DAMPERS, VALVES, AND OTHER EQUIPMENT. HANGER TYPES AND INSTALLATION METHODS ARE ALSO SUBJECT TO LANDLORD CRITERIA. C. HANGERS FOR ALL INSULATED PIPING SHALL BE SIZED AND INSTALLED FOR THE OUTER HANGERS FOR ALL INSULATED PIPING SHALL BE SIZED AND INSTALLED FOR THE OUTER DIAMETER OF INSULATION. INSTALL 6 INCH LONG GALVANIZED SADDLE BETWEEN THE HANGER AND THE PIPE INSULATION. D. HANGERS AND PIPING OF DISSIMILAR METALS SHALL BE DI-ELECTRICALLY SEPARATED. HANGERS AND PIPING OF DISSIMILAR METALS SHALL BE DI-ELECTRICALLY SEPARATED. 3.5 - HVAC CONTROLS A. PROVIDE HOME RUNS BETWEEN ALL CONTROL DEVICES. SPLICING WILL NOT BE ALLOWED. PROVIDE HOME RUNS BETWEEN ALL CONTROL DEVICES. SPLICING WILL NOT BE ALLOWED. B. ALL CONTROL WIRING TO BE RUN IN CONDUIT TO ABOVE CEILING OR COMPLETELY IF REQUIRED ALL CONTROL WIRING TO BE RUN IN CONDUIT TO ABOVE CEILING OR COMPLETELY IF REQUIRED BY CODE. END OF SECTION 15000
AutoCAD SHX Text SECTION 15500 - HEATING, VENTILATION, AND AIR CONDITIONING PART 1 - GENERAL 1.1 - SUMMARY - SUMMARY A. THE CONTRACTOR SHALL FURNISH ALL LABOR, MATERIALS, EQUIPMENT, SERVICES, TOOLS, THE CONTRACTOR SHALL FURNISH ALL LABOR, MATERIALS, EQUIPMENT, SERVICES, TOOLS, TRANSPORTATION AND FACILITIES NECESSARY FOR, REASONABLY IMPLIED AND INCIDENTAL TO, THE FURNISHING, INSTALLATION, COMPLETION AND TESTING OF ALL THE WORK FOR THE MECHANICAL SYSTEMS AS SHOWN ON THE DRAWINGS, CALLED FOR IN THE SPECIFICATIONS, AND AS REQUIRED BY JOB CONDITIONS, TO INCLUDE, BUT NOT BE LIMITED TO THE FOLLOWING: 1) HVAC UNITS, EQUIPMENT, AND APPURTENANCES, AS APPLICABLE. HVAC UNITS, EQUIPMENT, AND APPURTENANCES, AS APPLICABLE. 2) PIPING, FITTINGS, VALVES, AND INSULATION. PIPING, FITTINGS, VALVES, AND INSULATION. 3) HOT WATER PIPING SYSTEMS, AS APPLICABLE. HOT WATER PIPING SYSTEMS, AS APPLICABLE. 4) TEMPERATURE/LIGHTING CONTROLS. TEMPERATURE/LIGHTING CONTROLS. B. PRIMARY HEATING AND AIR CONDITIONING UNITS SHALL BE FURNISHED BY THE OWNER AS PRIMARY HEATING AND AIR CONDITIONING UNITS SHALL BE FURNISHED BY THE OWNER AS SCHEDULED UNLESS NOTED OTHERWISE. REFER TO PLANS AND SCHEDULES FOR REQUIREMENTS. C. ALL EQUIPMENT SHALL BE COMPLETE IN EVERY RESPECT WITH ALL DEVICES, ALL EQUIPMENT SHALL BE COMPLETE IN EVERY RESPECT WITH ALL DEVICES, APPURTENANCES, AND ACCESSORIES PROVIDED TO MEET THE DESIGN INTENT AND OPERATION OF THE SYSTEMS SHOWN ON THE DRAWINGS AND SPECIFIED HEREIN. 1.2 - RELEVANT CODES AND CRITERIA - RELEVANT CODES AND CRITERIA A. WORK SHALL MEET THE REQUIREMENTS OF THE FOLLOWING STANDARDS: WORK SHALL MEET THE REQUIREMENTS OF THE FOLLOWING STANDARDS: 1) STANDARDS REFERENCED IN SPECIFICATION SECTION 15000. STANDARDS REFERENCED IN SPECIFICATION SECTION 15000. 2) SMACNA "HVAC DUCT CONSTRUCTION STANDARDS" OR THE MOST STRINGENT APPLICABLE SMACNA "HVAC DUCT CONSTRUCTION STANDARDS" OR THE MOST STRINGENT APPLICABLE CODE ENFORCED. 1.3 - SUBMITTALS - SUBMITTALS A. SHOP DRAWINGS SHOP DRAWINGS 1) NO DUCTWORK SHALL BE FABRICATED PRIOR TO JOB SITE VISIT AND APPROVAL BY THE NO DUCTWORK SHALL BE FABRICATED PRIOR TO JOB SITE VISIT AND APPROVAL BY THE G.C. SIGNIFICANT DEVIATIONS IN ROUTING OR SIZING OF THE DUCTWORK AND/OR PIPING SYSTEMS MUST BE CLOUDED AND NOTED ON THE SHOP DRAWINGS. THESE SIGNIFICANT DEVIATIONS MUST BE APPROVED BY THE OWNER'S ENGINEER PRIOR TO FABRICATION OR INSTALLATION. 2) SUBMIT MANUFACTURERS DUCT SYSTEM CATALOG DATA FOR REVIEW AND APPROVAL. SUBMIT MANUFACTURERS DUCT SYSTEM CATALOG DATA FOR REVIEW AND APPROVAL. SUBMITTAL SHALL INCLUDE DUCT, FITTING, AND SELF SEALING GASKET CATALOG INFORMATION. B. SUBSTITUTIONS SUBSTITUTIONS 1) ALTERNATE CONDENSATE PIPING MATERIALS ARE ACCEPTABLE AS A SUBSTITUTION WHEN ALTERNATE CONDENSATE PIPING MATERIALS ARE ACCEPTABLE AS A SUBSTITUTION WHEN THEIR USE IS PERMITTED BY THE LOCAL CODES AND BUILDING DEPARTMENT OFFICIALS AND DOES NOT AFFECT OTHER TRADES. 2) ALL SUBSTITUTIONS MUST BE LISTED AND QUALIFIED IN BID. ALL SUBSTITUTIONS MUST BE LISTED AND QUALIFIED IN BID. 1.4 - PROJECT SITE/CONDITIONS - PROJECT SITE/CONDITIONS A. BEFORE STARTING WORK, THE CONTRACTOR SHALL VISIT THE JOBSITE AND EXAMINE THE BEFORE STARTING WORK, THE CONTRACTOR SHALL VISIT THE JOBSITE AND EXAMINE THE ARCHITECTURAL, STRUCTURAL, MECHANICAL AND ELECTRICAL PLANS AND SPECIFICATIONS TO SEQUENCE, COORDINATE, AND INTEGRATE THE VARIOUS ELEMENTS OF THE HVAC SYSTEM, MATERIALS, AND EQUIPMENT WITH OTHER CONTRACTORS TO AVOID INTERFERENCES AND CONFRONTATIONS. B. CONTRACTOR MUST PREPARE AND SUBMIT A COMPLETE H.W. PIPING SCHEMATIC TO THE CONTRACTOR MUST PREPARE AND SUBMIT A COMPLETE H.W. PIPING SCHEMATIC TO THE ENGINEER FOR APPROVAL PRIOR TO BEGINNING INSTALLATION. C. PRIOR TO CONNECTION TO THE OWNER SYSTEM, CONTRACTOR SHALL OBTAIN WRITTEN PRIOR TO CONNECTION TO THE OWNER SYSTEM, CONTRACTOR SHALL OBTAIN WRITTEN CONFIRMATION FROM THE OWNER FIELD REPRESENTATIVE, THAT ALL TESTING, FLUSHING, AND PROPER FILLING OF THE TENANT'S SYSTEM HAS BEEN COMPLETED IN ACCORDANCE TO THE OWNER REQUIREMENTS AND THAT THE TENANT'S SYSTEM IS READY TO BE CONNECTED TO THE OWNER SYSTEM. 1.5 - WARRANTY - WARRANTY A. ALL HVAC EQUIPMENT SHALL INCLUDE A ONE (1) YEAR WARRANTY. ALL HVAC EQUIPMENT SHALL INCLUDE A ONE (1) YEAR WARRANTY. PART 2 - PRODUCTS 2.1 - BOILER (MANUFACTURER: LOCHINVAR, PETER AND KELLY, BURNHAM, PATTERSON-KELLY) BOILER SHALL BEAR THE ASME "H" STAMP FOR 160 PSI WORKING PRESSURE AND SHALL BE NATIONAL BOARD LISTED. THE BOILER SHALL HAVE A FULLY WELDED, STAINLESS STEEL, WATER TUBE HEAT EXCHANGER. MULTIPLE PRESSURE VESSELS IN A SINGLE ENCLOSURE ARE NOT ACCEPTABLE. THERE SHALL BE NO BANDING MATERIAL, BOLTS, GASKETS OR "O" RINGS IN THE PRESSURE VESSEL CONSTRUCTION. THE HEAT EXCHANGER SHALL BE DESIGNED FOR A SINGLE-PASS WATER FLOW TO LIMIT THE WATER SIDE PRESSURE DROP. PRESSURE DROP SHALL BE NO GREATER THAN 2.2 PSI AT 75 GPM. THE CONDENSATE COLLECTION BASIN SHALL BE CONSTRUCTED OF WELDED STAINLESS STEEL. THE COMPLETE HEAT EXCHANGER ASSEMBLY SHALL CARRY A TEN (10) YEAR LIMITED WARRANTY. THE BOILER SHALL BE CERTIFIED AND LISTED BY C.S.A. INTERNATIONAL UNDER THE LATEST EDITION OF THE HARMONIZED ANSI Z21.13 TEST STANDARD FOR THE U.S. AND CANADA. THE BOILER SHALL COMPLY WITH THE ENERGY EFFICIENCY REQUIREMENTS OF THE LATEST EDITION OF ASHRAE 90.1 AND THE MINIMUM EFFICIENCY REQUIREMENTS OF THE LATEST EDITION OF THE AHRI BTS-2000 STANDARD AS DEFINED BY THE DEPARTMENT OF ENERGY IN 10 CFR PART 431. THE BOILER SHALL OPERATE AT A MINIMUM OF 97% COMBUSTION AND THERMAL EFFICIENCY AT FULL FIRE AS REGISTERED WITH AHRI. THE BOILER SHALL BE CERTIFIED FOR INDOOR INSTALLATION. THE BOILER SHALL BE CONSTRUCTED WITH A HEAVY GAUGE STEEL JACKET ASSEMBLY, PRIMED AND PRE-PAINTED ON BOTH SIDES. THE COMBUSTION CHAMBER SHALL BE SEALED AND COMPLETELY ENCLOSED, INDEPENDENT OF THE OUTER JACKET ASSEMBLY, SO THAT INTEGRITY OF THE OUTER JACKET DOES NOT AFFECT A PROPER SEAL. A BURNER/FLAME OBSERVATION PORT SHALL BE PROVIDED FOR OBSERVING THE BURNER FLAME AND COMBUSTION CHAMBER. THE BURNER SHALL BE A PREMIX DESIGN CONSTRUCTED OF HIGH TEMPERATURE STAINLESS STEEL WITH A WOVEN FECRALLOY OUTER COVERING TO PROVIDE SMOOTH OPERATION AT ALL MODULATING FIRING RATES. THE BOILER SHALL BE SUPPLIED WITH A NEGATIVE PRESSURE REGULATION GAS VALVE AND BE EQUIPPED WITH A PULSE WIDTH MODULATION BLOWER SYSTEM TO PRECISELY CONTROL THE FUEL/AIR MIXTURE TO THE BURNER. THE BOILER SHALL OPERATE IN A SAFE CONDITION WITH GAS SUPPLY PRESSURES AS LOW AS 4 INCHES OF WATER COLUMN. THE BURNER FLAME SHALL BE IGNITED BY DIRECT SPARK IGNITION WITH FLAME MONITORING VIA A FLAME SENSOR. THE BOILER SHALL UTILIZE A 24 VAC CONTROL CIRCUIT AND COMPONENTS. THE CONTROL SYSTEM SHALL HAVE A FACTORY INSTALLED DISPLAY FOR BOILER SET-UP, BOILER STATUS, AND BOILER DIAGNOSTICS. ALL COMPONENTS SHALL BE EASILY ACCESSED AND SERVICEABLE FROM THE FRONT AND TOP OF THE JACKET. THE BOILER SHALL BE EQUIPPED WITH A TEMPERATURE/PRESSURE GAUGE; HIGH LIMIT TEMPERATURE CONTROL WITH MANUAL RESET; ASME CERTIFIED PRESSURE RELIEF VALVE SET FOR 50 PSI (STANDARD); OUTLET WATER TEMPERATURE SENSOR WITH A DUAL THERMISTOR TO VERIFY ACCURACY; SYSTEM SUPPLY WATER TEMPERATURE SENSOR; OUTDOOR AIR SENSOR, FLUE TEMPERATURE SENSOR WITH DUAL THERMISTOR TO VERIFY ACCURACY; LOW WATER CUT OFF WITH MANUAL RESET, BLOCKED DRAIN SWITCH AND A CONDENSATE TRAP FOR THE HEAT EXCHANGER CONDENSATE DRAIN. THE BOILER SHALL FEATURE THE “SMART TOUCH ” CONTROL WITH CON-X-US WHICH IS STANDARD SMART TOUCH ” CONTROL WITH CON-X-US WHICH IS STANDARD CONTROL WITH CON-X-US WHICH IS STANDARD AND FACTORY INSTALLED WITH AN 7” LIQUID CRYSTAL TOUCH SCREEN DISPLAY, PASSWORD LIQUID CRYSTAL TOUCH SCREEN DISPLAY, PASSWORD SECURITY, OUTDOOR AIR RESET, PUMP DELAY WITH FREEZE PROTECTION, PUMP EXERCISE, RAMP DELAY FEATURING SIX STEPS, DOMESTIC HOT WATER PRIORITIZATION WITH LIMITING CAPABILITIES AND PC PORT CONNECTION. A SECONDARY CONTROL THAT IS FIELD MOUNTED OUTSIDE OR INSIDE THE APPLIANCE IS NOT ACCEPTABLE. THE BOILER SHALL HAVE ALARM CONTACTS FOR ANY FAILURE, RUNTIME CONTACTS AND DATA LOGGING OF RUNTIME AT GIVEN MODULATION RATES, IGNITION ATTEMPTS AND IGNITION FAILURES. THE BOILER SHALL HAVE A BUILT-IN “CASCADE” TO CASCADE” TO TO SEQUENCE AND ROTATE WHILE MAINTAINING MODULATION OF UP TO EIGHT BOILERS OF DIFFERENT BTU INPUTS WITHOUT UTILIZATION OF AN EXTERNAL CONTROLLER. THE INTERNAL “CASCADE” CASCADE” FUNCTION SHALL BE CAPABLE OF LEAD-LAG, EFFICIENCY OPTIMIZATION, FRONT-END LOADING, AND ROTATION OF LEAD BOILER EVERY 24 HOURS. THE CONTROL MUST INCLUDE CASCADE REDUNDANCY TO ALLOW A MEMBER BOILER TO BECOME THE TEMPORARY LEADER IF THE ORIGINAL LEAD BOILER SHALL LOOSE COMMUNICATION WITH THE MEMBERS. THE BOILER SHALL BE CAPABLE OF CONTROLLING AN ISOLATION VALVE (VALVE SHALL BE OFFERED BY MANUFACTURER) DURING HEATING OPERATION AND ROTATION OF OPEN VALVES IN STANDBY OPERATION FOR FULL FLOW APPLICATIONS. THE CONTROL MUST BE EQUIPPED WITH STANDARD BACNET MSTP AND MODBUS COMMUNICATION PROTOCOL WITH A MINIMUM 55 READABLE POINTS. THE BOILER SHALL HAVE AN OPTIONAL GATEWAY DEVICE WHICH WILL ALLOW INTEGRATION WITH LON OR BACNET (IP) PROTOCOLS. THE SMART TOUCH CONTROL SHALL INCLUDE CON-X-US COMMUNICATION PLATFORM THAT WILL ALLOW REMOTE ACCESS VIA A SMART PHONE OR TABLET. THIS WILL ALLOW THE ABILITY TO MONITOR AND MANAGE MULTIPLE KNIGHT XL BOILERS AND SEND ALERTS VIA TEXT OR E-MAIL NOTIFYING OF CHANGES IN SYSTEM STATUS. A USER SHALL HAVE THE ABILITY TO CHECK SYSTEM STATUS OR RE-PROGRAM ANY BOILER FUNCTION REMOTELY. THE SMART TOUCH CONTROL SHALL INCREASE FAN SPEED TO BOOST FLAME SIGNAL WHEN A WEAK FLAME SIGNAL IS DETECTED DURING NORMAL OPERATION. A 0 -10 VDC OUTPUT SIGNAL SHALL CONTROL A VARIABLE SPEED BOILER PUMP (PUMP TO BE OFFERED BY MANUFACTURER) TO KEEP A FIXED DELTA T ACROSS THE BOILER REGARDLESS OF THE MODULATION RATE. THE BOILER SHALL HAVE THE CAPABILITY TO RECEIVE A 0 - 10 VDC INPUT SIGNAL FROM A VARIABLE SPEED SYSTEM PUMP TO ANTICIPATE CHANGES IN SYSTEM HEAT LOAD IN ORDER TO PREVENT FLOW RELATED ISSUES AND ERRATIC TEMPERATURE CYCLING. THE BOILER SHALL BE EQUIPPED WITH TWO TERMINAL STRIPS FOR ELECTRICAL CONNECTION. A LOW VOLTAGE CONNECTION BOARD WITH 44 CONNECTION POINTS FOR SAFETY AND OPERATING CONTROLS, I.E., ALARM CONTACTS, RUNTIME CONTACTS, LOUVER PROVING SWITCH, TANK THERMOSTAT, DOMESTIC HOT WATER BUILDING RECIRCULATION PUMP CONTACTS, DOMESTIC HOT WATER BUILDING RECIRCULATION TEMPERATURE SENSOR CONTACTS, REMOTE ENABLE/DISABLE, SYSTEM SUPPLY TEMPERATURE SENSOR, OUTDOOR TEMPERATURE SENSOR, TANK TEMPERATURE SENSOR, MODBUS BUILDING MANAGEMENT SYSTEM SIGNAL AND CASCADE CONTROL CIRCUIT. A HIGH VOLTAGE TERMINAL STRIP SHALL BE PROVIDED FOR SUPPLY VOLTAGE. SUPPLY VOLTAGE SHALL BE 120 VOLT / 60 HERTZ / SINGLE PHASE ON ALL MODELS. THE HIGH VOLTAGE TERMINAL STRIP PLUS INTEGRAL RELAYS ARE PROVIDED FOR INDEPENDENT PUMP CONTROL OF THE SYSTEM PUMP, THE BOILER PUMP AND THE DOMESTIC HOT WATER PUMP. THE BOILER SHALL BE INSTALLED AND VENTED WITH A (SELECT ONE): VENT SYSTEM WITH VERTICAL ROOFTOP EXHAUST AND HORIZONTAL SIDEWALL AIR INTAKE WITH THE COMBUSTION AIR INTAKE IN A DIFFERENT PRESSURE ZONE. THE FLUE SHALL BE CATEGORY IV APPROVED MATERIAL CONSTRUCTED OF PVC, CPVC, POLYPROPYLENE OR STAINLESS STEEL. A SEPARATE PIPE SHALL SUPPLY COMBUSTION AIR DIRECTLY TO THE BOILER FROM THE OUTSIDE IN A DIFFERENT PRESSURE ZONE FROM THAT OF THE EXHAUST VENT. THE BOILER'S TOTAL COMBINED AIR INTAKE LENGTH SHALL NOT EXCEED 150 EQUIVALENT FEET. THE BOILER'S TOTAL COMBINED EXHAUST VENTING LENGTH SHALL NOT EXCEED 150 EQUIVALENT FEET.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .