Drawings.pdf
PDF 8 MB Posted
- Attached to
- Selfridge ANGB, MI - Paving Repair
- Solicitation number
- GNFR-FC-SEL-26-26229
- Issued by
-
Department of Defense
About this file
This file is a 100% Corrected Final Submittal set of design and construction drawings for a Receiving Area Parking Surface Replacement project at the Commissary Building, Selfridge Air National Guard Base (ANGB), Michigan. The project is identified as EA24MR01, dated April 14, 2026, and was prepared by Tetra Tech for the Defense Commissary Agency (DECA), Directorate of Facilities, Fort Lee, Virginia, and the Design and Construction Division, Lackland AFB, Texas.
The project scope involves complete demolition and replacement of asphalt and concrete pavement in the receiving area parking lot serving the commissary building. Key work elements include: removal of existing asphalt and concrete pavement, removal of a trash compactor and its foundation, installation of new 8-inch Portland cement concrete (PCC) pavement and 4-inch bituminous (HMA) pavement with proper base course, aggregate, and subbase preparation, installation of new bollards with concrete foundations, adjustment of storm drain and sanitary sewer structures to final grades, installation of concrete collars around utilities, and comprehensive grading and erosion control measures. The project incorporates phased construction (Phase A: east of loading ramp; Phase B: west of loading ramp) to maintain building access. Construction documents include detailed specifications for soil compaction, utilities protection and relocation coordination, environmental compliance (SESC measures, hazardous materials management, dewatering procedures), and specific requirements for utility disconnection and reconnection. The contract documents specify adherence to Michigan Department of Transportation (MDOT) material standards, Selfridge ANGB design standards, and federal regulatory requirements including soil relocation guidance and PFAS screening protocols.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Proposal Package.pdf | ||
| Specifications.pdf | ||
| Wage Determination.pdf | ||
| Agreement.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
___3_
HALL RD.
SN
O
VE
R
R D
FA
IR
C H
IL
D
R D
JE
FF
ER
SO
N A
VE
IR
W
IN
R
D
RIVER RD.
DR.
TU
C
KE
R
C
LI
N
TO
N T
W P.
GPGP GP
GP GP GP
GP
GP GP
GPGP GP
GP
GP
GP
GP
GP GP
TETRA TECH
IF DRAWING IS NOT 30" X 42", SCALE ACCORDINGLY.
PROJECT NUMBER:
DEFENSE COMMISSARY AGENCY
DESIGNED BY:
DRAWN BY:
SUBMITTED BY:
ARCHITECT/ENGINEER:
REVIEWED BY:
DRAWING NUMBER:
SOL NUMBER: DATE:
SHEET:
SEQUENCE
NUMBER:
SYMBOL DATE DESCRIPTION OF REVISIONSACTIOND O NO
APRIL 14, 2026
RECEIVING AREA PARKING SURFACE REPLACEMENT
COMMISSARY BUILDING, SELFRIDGE ANGB, MI
100% CORRECTED FINAL SUBMITTAL
EA24MR01
711 Navarro Street Suite 560 San Antonio, Texas 75205-1739
DIRECTORATE OF FACILITIES
FT. LEE, VIRGINIA
DESIGN AND CONSTRUCTION DIVISION
LACKLAND AFB, TEXAS
OF 184/
/2
2:
P
M
G-0011
A. DYKMAN
R. BUSHAW
K. JOZWIK
K. JOZWIK
COVER SHEET
VICINITY MAP
LOCATION MAP
AREA MAP
DECA PROJECT NO. EA24MR01
COMMISSARY BUILDING, SELFRIDGE ANGB, MI
DEFENSE COMMISSARY AGENCY
DIRECTORATE OF FACILITIES, FORT LEE, VIRGINIA
DESIGN & CONSTRUCTION DIVISION, LACKLAND AFB, TEXAS
14 APRIL 2026
RECEIVING AREA PARKING SURFACE REPLACEMENT
PROJECT LOCATION
PROJECT LOCATION
PROJECT LOCATION
NOT TO SCALE
NOT TO SCALE
NOT TO SCALE
JE
FF
ER
SO
N A
VE
JE
FF
ER
SO
N A
VE
W
IL
LO
W
S T.
O
AK
S T.
LAKE ST.
LAKE ST.
LUKE ST.
JOHNSON ST.
GEORGE AVE.
SHEET INDEX
Sheet Number Sheet Title
G-001 COVER SHEET
V-101 EXISTING TOPOGRAPHIC PLAN
B-101 SOIL BORING LOCATION MAP
B-601 SOIL BORING LOGS
C-001 GENERAL NOTES
C-002 CONTRACTOR STAGING PLAN
C-003 CONTRACTOR PHASING PLAN
CD101 DEMOLITION PLAN
CD102 DEMOLITION PLAN PHOTOS
CS101 SITE PLAN
CS501 DETAILS SITE
CG101 GRADING PLAN - WEST
CG102 GRADING PLAN -EAST
CG501 DETAILS GRADING
CP101 JOINT PLAN
CU101 UTILITY PLAN - STORM SEWER
CU201 UTILITY PROFILE - STORM SEWER
CU501 DETAILS UTILITIES
SDSDSDSDSDSDSDSDSDSDSD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD SD SD
SD
SD
W W
W W
W W
W W W W W W W W W W W W W W W
W W
SA
N
SAN SAN SAN SAN SAN SAN
SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN
SAN
COMM COMM COMM C
O
M M
C O
M M
C O
M M
C O
M M
C O
M M
COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM
COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM
SAN
SAN
SAN
SAN
SDSDSDSDSDSDSDSD
SD
SD
SD
SD
SD
CP1
CP2
4.1
4.5
4.0
4.0
4.1
3.9
3.8
3.9
3.7
3.8
573.92
4.1
FFE=578.38
4.1
3.9
3.8
3.5
573.50
3.8
3.8
4.1
S
GREASE TRAP
RIM=574.10
9.55 FEET DEEP
CO
CONDUIT
4.0
3.8
3.8
573.80
573.08
573.76
573.60
3.3
573.50
573.84
574.04
574.15
3.5
573.59
3.7
3.7
6.0
6.0
8.2
8.2
8.3
578.31
FFE=578.40
FFE=578.38
TB-5
TB-4
WATER SPIGOT
578.36
573.18
TB-3
4.2
574.22
FFE=578.43
FFE=578.44
4.0
3.8
3.4
573.49
3.8
4.0
4.4
CONDUIT
SERVICE BOX
SERVICE BOX
AC
CONDUIT
CONDUIT
574.28
4.2
3.7
2573.78
TB-2
3.7
4.
4.
4.2
TB-1 FDC
FDC
FDC
4.
4.7
4.
4.
4.
3.9
573.81
3.8
573.94
3.6
3.9
4.2
574.33
3.9
3.8
4.1
4.1
4.0
4.0
4.2
574.45
CONDUIT
4.3
4.8
4.3
574.12
4.3
4.
3.
3.
3.6
3.6
CB
CB278
RIM=573.48
6" E 571.48
573.78
D
SDMH281
RIM=574.06
18" E 568.96 18" W 569.06
12" STEEL ENCLOSED PIPE
N AND S 570.96 TOP OF PIPE
S
SSMH283
RIM=573.75
FULL OF WATER TO RIM
CB
CB284
RIM=572.83
15" S 569.03 18" E 568.93 18" W 568.83
CB
CB285
RIM=573.18
12" WSW 569.83
12" S 569.88 18" E 569.98
6"WSW 570.78
C
S
SSMH294
RIM=574.57
FULL OF WATER TO RIM
CONDUIT
574.79
574.73
574.75
EP
PANEL
EP
PANEL
8.
578.19
578.11
8.3
4.
36574.52
UP
CP
UP
E E
E E
E E
E E
E E
GGGGGG
GGGGGGGGGGGGGG
E E
E E
E E
E E
E
E E
E E
E E
E E
E E
E E
E E
E
18" RCP
STEEL
STEEL
18" RCP
12" RCP
6" PVC
" R
C P
" R
C P
TRASH COMPACTOR
OVERHANG
/CANOPY
BUILDING
CONCRETE
ASPHALT
ASPHALT
CONCRETE
STEPS
CONCRETE
RAMP
ELECTRICAL
EQUIPMENT
HAND RAIL
GATE
CONC.
DECK
CONC.
DECK
LIMITS OF SURVEY
G G
G G
G G
G G
G G
G G
G G
G G
GGGGGGGGGGGGGGGGGGGGGGGGGGGGGGG
UP
E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E EUP
CP
PRIVACY FENCE
PRIVACY FENCE
CONC
CONC NOT
LOCATED BY
SURVEY
LOAD BAY
LOAD BAY
LOAD BAY
LOAD BAY
SANITARY
PUMP
STATION
TETRA TECH
IF DRAWING IS NOT 30" X 42", SCALE ACCORDINGLY.
PROJECT NUMBER:
DEFENSE COMMISSARY AGENCY
DESIGNED BY:
DRAWN BY:
SUBMITTED BY:
ARCHITECT/ENGINEER:
REVIEWED BY:
DRAWING NUMBER:
SOL NUMBER: DATE:
SHEET:
SEQUENCE
NUMBER:
SYMBOL DATE DESCRIPTION OF REVISIONSACTIOND O NO
APRIL 14, 2026
RECEIVING AREA PARKING SURFACE REPLACEMENT
COMMISSARY BUILDING, SELFRIDGE ANGB, MI
100% CORRECTED FINAL SUBMITTAL
EA24MR01
711 Navarro Street Suite 560 San Antonio, Texas 75205-1739
DIRECTORATE OF FACILITIES
FT. LEE, VIRGINIA
DESIGN AND CONSTRUCTION DIVISION
LACKLAND AFB, TEXAS
OF 18
1. TOPOGRAPHIC SURVEY PROVIDED BY MUXLOW SURVEYING, 3503 VAN DYKE,
MARLETTE, MICHIGAN 48453. DATE OF SURVEY JULY 17, 2024.
2. HORIZONTAL CONTROL: MICHIGAN STATE PLANE COORDINATES, NAD83,
2011, SOUTH ZONE, INTERNATIONAL FEET, GEOID18.
3. VERTICAL CONTROL: NORTH AMERICAN VERTICAL DATUM OF 1988 (NAVD88).
4. THE UTILITIES SHOWN ARE FROM OBSERVED EVIDENCE, WHERE MARKED BY
MISSDIG OR SUBCONTRACTED GPR, OR FROM PLANS PROVIDED BY CLIENT
OR MISSDIG DESIGN TICKET AND RECEIVED BEFORE THE DATE OF THIS
DRAWING WAS PUBLISHED. NO GUARANTEE IS GIVEN TO THE EXACT SIZE,
LOCATION OR COMPLETENESS. CONTACT LOCAL UTILITY COMPANY PRIOR
TO CONSTRUCTION OR EXCAVATION.
5. THIS TOPOGRAPHIC SURVEY WAS PREPARED WITHOUT THE BENEFIT OF A
LAND TITLE SEARCH. NO PARCEL BOUNDARIES, EASEMENTS, RIGHT OF
WAYS OR OTHER RECORDED INSTRUMENTS ARE DEPICTED OR IMPLIED.
6. ADDITIONAL EXISTING SITE FEATURES OUTSIDE THE LIMITS OF SURVEY ARE
BASED ON AERIAL IMAGERY. LOCATIONS SHOWN ARE APPROXIMATE AND
MAY NOT SHOW ALL FEATURES OUTSIDE THE LIMITS OF SURVEY. SOURCE
OF AERIAL IMAGERY IS NEARMAP.COM, DATE OF CAPTURE MAY 2024.
GENERAL NOTES
EXISTING LEGEND
SURVEY CONTROL POINT
COMMUNICATIONS MANHOLE
COMMUNICATIONS PEDESTAL/RISER
ELECTRICAL MANHOLE
ELECTRICAL PEDESTAL/PANEL
TRANSFORMER
UTILITY POLE
HVAC UNIT
SANITARY SEWER MANHOLE
CLEANOUT
STORM SEWER MANHOLE
CATCH BASIN
FIRE HYDRANT
FIRE DEPARTMENT CONNECTION (FDC)
UTILITY VALVE
UNIDENTIFIED UTILITY FEATURE
GUARD POST/BOLLARD
SPOT ELEVATION
EXIST. CONTOUR MAJOR
EXIST. CONTOUR MINOR
FENCE
HAND/GUARD RAIL
UNDERGROUND COMMUNICATION
OVERHEAD ELECTRIC
UNDERGROUND ELECTRIC
WATER MAIN
SANITARY SEWER
STORM SEWER
OVERHEAD DOOR
EXISTING BUILDING OR STRUCTURE EXTENTS AT GROUND
CB
D
S
CO
AC
EP
CP
E
C
FDC
COMM
EE
EE
WW
SAN
SD
UP
CONTROL POINTS
SET 1/2" X 18" REBAR WITH MUXLOW CONTROL CAP
PT. NO. NORTHING(Y) EASTING(X) ELEV(Z) DESCRIPTION
1 409557.41 13539312.92 574.55 CP
2 409560.80 13539150.76 575.09 CP
SCALE: 1" = 10'
EXISTING TOPOGRAPHIC PLAN1 10' 20'0
PLAN
NORTH
2/
/2
2:
P
M
V-1012
A. DYKMAN
R. BUSHAW
K. JOZWIK
K. JOZWIK
EXISTING TOPOGRAPHIC PLAN
TETRA TECH
IF DRAWING IS NOT 30" X 42", SCALE ACCORDINGLY.
PROJECT NUMBER:
DEFENSE COMMISSARY AGENCY
DESIGNED BY:
DRAWN BY:
SUBMITTED BY:
ARCHITECT/ENGINEER:
REVIEWED BY:
DRAWING NUMBER:
SOL NUMBER: DATE:
SHEET:
SEQUENCE
NUMBER:
SYMBOL DATE DESCRIPTION OF REVISIONSACTIOND O NO
APRIL 14, 2026
RECEIVING AREA PARKING SURFACE REPLACEMENT
COMMISSARY BUILDING, SELFRIDGE ANGB, MI
100% CORRECTED FINAL SUBMITTAL
EA24MR01
711 Navarro Street Suite 560 San Antonio, Texas 75205-1739
DIRECTORATE OF FACILITIES
FT. LEE, VIRGINIA
DESIGN AND CONSTRUCTION DIVISION
LACKLAND AFB, TEXAS
OF 181/
/2
:1
PM
B-1013
A. DYKMAN
R. BUSHAW
K. JOZWIK
K. JOZWIK
SOIL BORING LOCATION MAP
1. GETECHNICAL INVESTIGATION REPORT (PROJECT NUMBER 24-099) PERFORMED BY FK ENGINEERING, DATED SEPTEMBER 3, 2024.
2. FK ENGINEERING REPORT INDICATES THE PRESENCE OF GROUND WATER AT AN APPROXIMATE DEPTH OF 6 INCHES TO 18
INCHES FROM THE EXISTING GROUND SURFACE ELEVATIONS.
GENERAL NOTES
PROJECT NUMBER:
DEFENSE COMMISSARY AGENCY
DESIGNED BY:
DRAWN BY:
SUBMITTED BY:
ARCHITECT/ENGINEER:
REVIEWED BY:
DRAWING NUMBER:
SOL NUMBER: DATE:
SHEET:
SEQUENCE
NUMBER:
SYMBOL DATE DESCRIPTION OF REVISIONSACTIOND O NO
APRIL 14, 2026
RECEIVING AREA PARKING SURFACE REPLACEMENT
COMMISSARY BUILDING, SELFRIDGE ANGB, MI
100% CORRECTED FINAL SUBMITTAL
EA24MR01
711 Navarro Street Suite 560 San Antonio, Texas 75205-1739
DIRECTORATE OF FACILITIES
FT. LEE, VIRGINIA
DESIGN AND CONSTRUCTION DIVISION
LACKLAND AFB, TEXAS
OF 182/
/2
:1
PM
B-6014
A. DYKMAN
R. BUSHAW
K. JOZWIK
SOIL BORING LOGS
PROJECT NUMBER:
DEFENSE COMMISSARY AGENCY
DESIGNED BY:
DRAWN BY:
SUBMITTED BY:
ARCHITECT/ENGINEER:
REVIEWED BY:
DRAWING NUMBER:
SOL NUMBER: DATE:
SHEET:
SEQUENCE
NUMBER:
SYMBOL DATE DESCRIPTION OF REVISIONSACTIOND O NO
APRIL 14, 2026
RECEIVING AREA PARKING SURFACE REPLACEMENT
COMMISSARY BUILDING, SELFRIDGE ANGB, MI
100% CORRECTED FINAL SUBMITTAL
EA24MR01
711 Navarro Street Suite 560 San Antonio, Texas 75205-1739
DIRECTORATE OF FACILITIES
FT. LEE, VIRGINIA
DESIGN AND CONSTRUCTION DIVISION
LACKLAND AFB, TEXAS
OF 184/
/2
3:
P
M
C-0015
A. DYKMAN
R. BUSHAW
K. JOZWIK
K. JOZWIK
GENERAL NOTES
GENERAL NOTES
1. FOR THE PURPOSE OF THE GENERAL NOTES BELOW, THE TERM SANGB SHALL MEAN
"SELFRIDGE AIR NATIONAL GUARD BASE".
2. ALL LABOR, MATERIALS, AND METHODS OF CONSTRUCTION SHALL BE IN STRICT
ACCORDANCE WITH THE MINIMUM ENGINEERING AND CONSTRUCTION STANDARDS
ADOPTED BY THE U.S, AIR NATIONAL GUARD (ANG). WHERE CONFLICTS OR OMISSIONS
EXIST, THE ANG STANDARDS SHALL DICTATE. SUBSTITUTIONS AND DEVIATION FROM
PLANS AND SPECIFICATIONS SHALL BE PERMITTED ONLY WHEN WRITTEN APPROVAL
HAS BEEN ISSUED BY THE CONTRACTING OFFICER.
3. SHOP DRAWINGS OF ALL MATERIALS BEING USED SHALL BE SUBMITTED AS PER
SPECIFICATIONS (SUBMITTALS).
4. IT WILL BE THE RESPONSIBILITY OF THE CONTRACTOR TO ENSURE THAT ALL
REQUIRED PERMITS ARE OBTAINED AND IN HAND BEFORE BEGINNING ANY
CONSTRUCTION INCLUDING BASE SPECIFIC DIG PERMITS. NO CONSTRUCTION,
EXCAVATION, OR FABRICATION OF ANY ITEM SHALL BEGIN UNTIL THE CONTRACTOR
HAS RECEIVED ALL PLANS AND ANY OTHER DOCUMENTATION FROM ALL OF THE
PERMITTING AND ANY OTHER REGULATORY AUTHORITIES. ANY PENALTIES, STOP
WORK ORDERS OR ADDITIONAL WORK RESULTING FROM THE CONTRACTOR BEING IN
VIOLATION OF THE REQUIREMENTS ABOVE, SHALL BE FULLY BORNE BY THE
CONTRACTOR.
5. THE LOCATION OF ALL EXISTING UTILITIES AND STORM DRAINAGE SHOWN ON THE
PLANS HAVE BEEN DETERMINED FROM THE BEST INFORMATION AVAILABLE AND ARE
GIVEN FOR THE CONVENIENCE OF THE CONTRACTOR. THE ENGINEER ASSUMES NO
RESPONSIBILITY FOR INACCURACY. PRIOR TO THE START OF ANY CONSTRUCTION
ACTIVITY IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE
VARIOUS UTILITIES AND TO MAKE THE NECESSARY ARRANGEMENTS FOR ANY
RELOCATION OF THESE UTILITIES WITH THE OWNER OF THE UTILITY. THE
CONTRACTOR SHALL EXERCISE CAUTION WHEN CROSSING UNDERGROUND UTILITIES,
WHETHER SHOWN ON THE PLAN OR LOCATED BY THE UTILITY COMPANY. ALL
UNFORESEEN UTILITIES WHICH INTERFERE WITH THE PROPOSED CONSTRUCTION
SHALL BE BROUGHT TO THE ATTENTION OF THE BASE ENGINEER FIRST. ANY FEES
ASSOCIATED WITH UTILITY RELOCATIONS SHALL BE BORNE IN ACCORDANCE WITH
RESPECTIVE UTILITY COMPANY STANDARDS. IT IS REQUESTED THAT UTILITY
COMPANIES MOVE THEIR PARTICULAR UTILITIES. ANY DELAY OR INCONVENIENCE
CAUSED TO THE CONTRACTOR BY THE RELOCATION OF THE VARIOUS UTILITIES
SHALL BE INCIDENTAL TO THE CONTRACT AND NO EXTRA COMPENSATION TO THE
CONTRACTOR WILL BE ALLOWED.
6. FOR THE PROTECTION OF UNDERGROUND UTILITIES AND IN CONFORMANCE WITH
PUBLIC ACT 174 OF 2013, THE CONTRACTOR SHALL CONTACT MISS DIG SYSTEM, INC.
BY PHONE AT 811 OR 800-482-7171 OR VIA THE WEB AT EITHER ELOCATE.MISSDIG.ORG
OR SINGLE ADDRESS OR RTE.MISSDIG.ORG A MINIMUM OF 3 BUSINESS DAYS PRIOR
TO EXCAVATING, EXCLUDING WEEKENDS AND HOLIDAYS.
7. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PREVENTING ANY CONSTRUCTION
ACTIVITIES FROM TAKING PLACE OUTSIDE OF THE CONTRACTOR WORK LIMITS
SHOWN ON THE PLANS. ALL AREAS DISTURBED BY CONTRACTOR OR
SUBCONTRACTOR (EQUIPMENT AND/OR PERSONNEL VEHICLES) SHALL BE RESTORED
TO ORIGINAL CONDITION OR BETTER, UNLESS OTHERWISE NOTED IN THE
CONSTRUCTION DOCUMENTS.
8. THE CONTRACTOR SHALL MAINTAIN A CURRENT SET OF CONSTRUCTION DOCUMENTS
AND ALL PERMITS ON THE JOB SITE DURING ALL PHASES OF CONSTRUCTION.
9. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING THE NECESSARY
TESTING TO ASSURE THAT THE PROPER COMPACTION HAS BEEN ACHIEVED ON THE
SUBGRADE, BASE, AND ALL OTHER PERTINENT AREAS THAT HAVE BEEN COMPLETED.
THE CONTRACTOR SHALL BEAR ALL COSTS ASSOCIATED WITH TESTING AND
RETESTING OF THE AREAS AND SHALL PROVIDE THE OWNER AND THE CONTRACTING
OFFICER WITH COPIES OF THE CERTIFICATION OF COMPACTION FROM THE TESTING
COMPANY.
10. CONTRACTOR TO DETERMINE IF ANY OFF-SITE MATERIALS WILL NEED TO BE
IMPORTED TO ACHIEVE THE GRADES SPECIFIED ON THE PLANS.
11. CONTRACTOR SHALL USE HAUL ROUTE SHOWN UNLESS DIRECTED OTHERWISE BY
THE CONTRACTING OFFICER.
12. CONTRACTOR IS TO COORDINATE ALL WORK WITH OTHER ONGOING CONSTRUCTION.
DEMOLITION NOTES
1. CONTRACTOR IS REQUIRED TO SUBMIT A DEWATERING WORK PLAN, AS REQUIRED BY
SPECIFICATION SECTION 31 00 00, TO THE SELFRIDGE ENVIRONMENTAL OFFICE. THE
DEWATERING PLAN MUST BE APPROVED BY THE ENVIRONMENTAL OFFICE PRIOR TO
CONSTRUCTION ACTIVITIES. A DEWATERING PERMIT FROM THE STATE OF MICHIGAN
ENVIRONMENT, GREAT LAKES, AND ENERGY (EGLE) IS REQUIRED, IF DEWATERING
DISCHARGE OCCURS OVER A 2.0 MILLION GALLONS PER DAY WITHDRAWAL CAPACITY.
2. THE CONTRACTOR SHALL NOTIFY ALL UTILITY COMPANIES OR LOCAL AUTHORITIES
FURNISHING ELECTRICAL, POWER SERVICE SO THEY CAN REMOVE, RELOCATE,
DISCONNECT, CAP OR PLUG THEIR EQUIPMENT IN ORDER TO FACILITATE DEMOLITION.
ALL OTHER UTILITIES (WATER, TELEPHONE OR SEWER) SHALL BE DISCONNECTED,
CAPPED OR PLUGGED BY THE CONTRACTOR AS DIRECTED BY THE CONTRACTING
OFFICER.
3. THE CONTRACTOR SHALL PROTECT ALL UTILITIES AND OTHER IMPROVEMENTS
SHOWN ON THESE PLANS AND UTILITIES AND OTHER IMPROVEMENTS NOT SHOWN.
THE CONTRACTOR SHALL ASSUME RESPONSIBILITY FOR REPAIRS OF UTILITIES AND
OTHER IMPROVEMENTS DAMAGED DURING CONSTRUCTION AND SHALL MAINTAIN
SUFFICIENT PROTECTION FOR ALL UTILITIES REQUIRED TO PROTECT THEM FROM
DAMAGE AND TO PROTECT THE SANGB FACILITIES DURING CONSTRUCTION.
4. THE CONTRACTOR IS RESPONSIBLE FOR THE PROTECTION OF ALL TREES,
STRUCTURES, AND UTILITIES NOT MARKED FOR REMOVAL OR DEMOLITION AND
SHALL PROMPTLY REPAIR ANY DAMAGE AS DIRECTED BY THE CONTRACTING
OFFICER AT NO COST TO OWNER.
5. THE CONTRACTOR SHALL REMOVE PAVING MARKED FOR DEMOLITION WHICH
INCLUDES ALL ASPHALT, CONCRETE AND BASE.
6. THE CONTRACTOR SHALL SAW-CUT A SMOOTH STRAIGHT EDGE ON ANY PAVEMENT
PROPOSED FOR DEMOLITION PRIOR TO ITS REMOVAL AS DIRECTED IN THE DETAILS
AND SPECIFICATIONS. PRIOR TO CONNECTING PROPOSED PAVEMENT TO EXISTING
PAVEMENT, THE CONTRACTOR SHALL ENSURE THAT THE EDGE OF THE EXISTING
PAVEMENT IS STRAIGHT AND UNIFORM THROUGH FULL DEPTH TO BOTTOM OF BASE.
7. CONTRACTOR TO DIVERT SOLID WASTE FROM THE LANDFILL AS REQUIRED IN THE
SPECIFICATIONS. RECYCLE MATERIAL TO BE SEPARATED AND DIVERTED TO
RECYCLING FACILITY. SOLID WASTE THAT CAN'T BE DIVERTED SHALL GO TO A STATE
CERTIFIED LANDFILL.
8. CHANGES OR ADDITIONS TO DEMOLITION REQUIREMENTS SHOWN ARE SUBJECT TO
APPROVAL FROM THE CONTRACTING OFFICER.
9. STAGING AREAS ARE TO BE RESTORED TO PRE-CONSTRUCTION CONDITIONS OR
BETTER AS APPROVED BY THE CONTRACTING OFFICER.
SITE UTILITY NOTES
1. CONTRACTOR SHALL MAKE NECESSARY ARRANGEMENTS WITH THE CONTRACTING
OFFICER FOR UTILITY LOCATES AND UTILITY SHUT-OFFS. ALL SHUT-OFFS REQUIRE
WRITTEN NOTICE, A MINIMUM OF 14 CALENDAR DAYS PRIOR TO WORK BEING
PERFORMED. CONTRACTOR IS REQUIRED TO PERFORM NECESSARY PREPARATORY
WORK AND EXCAVATION REQUIRED TO ALLOW SERVICE CONNECTIONS TO BE
CONSTRUCTED AND/OR TERMINATED. RESTORE DISTURBED SURFACES TO MEET OR
EXCEED EXISTING CONDITIONS IMMEDIATELY FOLLOWING CONSTRUCTION
2. CONTRACTOR SHALL IMMEDIATELY REPAIR ANY UNDERGROUND UTILITIES DAMAGED
BY CONSTRUCTION OPERATIONS. PAY ANY AND ALL DAMAGES ASSOCIATED WITH THE
CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND PRESERVE UNDERGROUND
FACILITIES AND UTILITIES.
3. EXISTING FIRE HYDRANTS TO BE PRESERVED SHALL BE MADE ACCESSIBLE TO FIRE
DEPARTMENT ACCESS, UNLESS WRITTEN PERMISSION FROM THE FIRE DEPARTMENT
IS OBTAINED.
4. CONTRACTOR SHALL MAKE NECESSARY ARRANGEMENTS WITH THE CONTRACTING
OFFICER AND FIRE DEPARTMENT FOR ANY DISRUPTION OF WATER TO FIRE
HYDRANTS.
5. COMMUNICATION LINES THAT ARE MARKED IN THE FIELD ARE APPROXIMATE.
CONTRACTOR IS REQUIRED TO HAND DIG A MINIMUM OF 3-FEET ON EACH SIDE OF
THE FIELD MARKED UTILITY.
DIG PERMIT NOTES
1. THE CONTRACTOR IS TO PROVIDE THE CONTRACTING OFFICER WITH THE FOLLOWING
INFORMATION WITH A COMPLETED FORM 332 (WORK REQUEST) INDICATING THE NEED
FOR A DIG PERMIT.
A.NAME, PHONE NUMBER AND ORGANIZATION/BUSINESS OF THE REQUESTER.
B.PURPOSE OF THE EXCAVATION.
C.DATE EXCAVATION IS EXPECTED TO COMMENCE.
D. A DRAWING OF THE EXCAVATION AREA.
E.DEPTH OF EXCAVATION.
2. THE CONTRACTOR IS TO ENSURE PROPOSED EXCAVATION SITE IS PHYSICALLY
MARKED WITH WHITE PAINT OR FLAGS.
3. THE CONTRACTOR IS TO OPEN A DIG TICKET W/MISS DIG, (TEL#: 800-482-7171,
HTTPS://WWW.MISSDIG811.ORG/) FOR GAS AND TELEPHONE LOCATING. ENSURE A
CORRECT ADDRESS AND DETAILED MAP OF DIG SITE IS INCLUDED.
4. EACH AGENCY WITH UTILITIES IN THE AREA OF EXCAVATION, AFTER MARKING THE
AREA, WILL ANNOTATE ON FORM 103, “MARKED” AND SIGN THE FORM, COMPLETING
THEIR REQUIREMENT FOR THE DIG PERMIT. AREAS OF EXCAVATION THAT ARE CLEAR
OF UTILITIES, WILL BE ANNOTATED “CLEAR” AND SIGNED IN THE APPROPRIATE BLOCK
FOR THAT AGENCY. ALL UTILITIES IN THE VICINITY OF THE EXCAVATION WILL BE
PHYSICALLY LOCATED AND MARKED WITH FLUORESCENT PAINT USING THE
FOLLOWING UNDERGROUND UTILITY COLOR CODES:
A.RED. ELECTRIC POWER LINES, CABLES, CONDUITS, AND LIGHTING CABLES.
B. YELLOW. GAS, OIL, STEAM, PETROLEUM, OR GASEOUS MATERIALS.
C.ORANGE. COMMUNICATIONS, ALARM/SIGNAL LINES, CABLES/CONDUIT AND CATV.
D.BLUE. WATER, IRRIGATION, OR SLURRY LINES.
E. GREEN. SEWER AND DRAIN LINES.
F. WHITE. PROPOSED EXCAVATION.
G. PINK. RESERVED FOR SURVEYING PURPOSES ONLY.
5. REQUESTER MUST BE THE PRIME CONTRACTOR AND MUST COMPLY WITH ALL
DIRECTIVES FROM THE BASE CIVIL ENGINEER.
6. CONTRACTOR IS REQUIRED TO MAINTAIN A MINIMUM CLEARANCE OF 24 INCHES
BETWEEN THE UNDERGROUND UTILITY AND THE CUTTING EDGE OR POINT OF ANY
POWER OPERATED EXCAVATING OR EARTHMOVING EQUIPMENT. IF UTILITY IS NOT
FOUND WITHIN 24 INCHES OF LOCATE MARKS, IMMEDIATELY NOTIFY 127TH CES WORK
CONTROL FOR SHOP/CONTRACTOR ASSISTANCE ON LOCATING/IDENTIFYING LINES.
CONTRACTOR IS REQUIRED TO MAINTAIN A MINIMUM OF 36 INCHES FOR
TELECOMMUNICATION LINES BETWEEN THE MARKED UNDERGROUND UTILITY AND
THE CUTTING EDGE OR POINT OF ANY POWER OPERATED EXCAVATING OR
EARTHMOVING EQUIPMENT.
7. IF EXCAVATION IS REQUIRED WITHIN 24 INCHES HORIZONTALLY OF ANY MARKING (36
INCHES FOR TELECOMMUNICATIONS), THE EXCAVATION SHOULD BE PERFORMED
USING HAND TOOLS OR VACUUM EXCAVATION WITH EXTREME CARE AND WITHOUT
DAMAGING THE MARKED UTILITY.
8. IF, DURING THE COURSE OF EXCAVATION, A UTILITY HAS BEEN EXPOSED, IT IS THE
EXCAVATOR'S RESPONSIBILITY TO SUPPORT THESE UTILITIES. THE EXCAVATOR ALSO
MUST BE CERTAIN THE UTILITIES HAVE NOT BEEN STRUCK OR DAMAGED IN ANY
CAPACITY, INCLUDING BEING PULLED OR “KINKED”.
9. IF DAMAGE OF ANY KIND IS DISCOVERED, OR IF A UTILITY IS CONTACTED, IT IS THE
EXCAVATOR'S RESPONSIBILITY TO DIRECTLY AND IMMEDIATELY NOTIFY THE BASE
CIVIL ENGINEER'S CUSTOMER SERVICE SECTION (586-239-4354) AND CONTRACTING
OFFICER.
10. ANY EXCAVATION ATTEMPTED WITHOUT A PROPER APPROVED DIGGING PERMIT MAY
SUBJECT EXCAVATOR TO LIABILITY FOR REIMBURSEMENT.
SOIL AND GROUNDWATER TESTING
1. ALL SOIL RELOCATION WITHIN THE INSTALLATION REQUIRES COORDINATION WITH
AND APPROVAL FROM THE ANGB ENVIRONMENTAL MANAGEMENT OFFICE.
2. ALL SOILS RELOCATED/REMOVED FROM THE INSTALLATION MUST BE SAMPLED,
CHARACTERIZED, AND PROPERLY TRANSPORTED TO A LICENSED DISPOSAL FACILITY.
NO SOILS DEPARTING THE INSTALLATION MAY BE USED AT BORROW PITS, OR SENT
FOR ANY FORM OF RECYCLE/REUSE. SEE SPECIFICATION ATTACHMENT “SOIL
RELOCATION GUIDANCE MEMO FOR SANGB, DATE 11-FEB-2025” FOR ADDITIONAL
INFORMATION.
3. SOILS REMOVED FROM THE PROJECT LIMITS MUST BE SCREENED FOR TOLERANCES
AGAINST ABIOTIC STRESSES CAUSED BY SALINITY, PH, TEMPERATURE, LEAD AND
PFAS CONTAMINATION. THE MICHIGAN DEPARTMENT OF ENVIRONMENT, GREAT
LAKES, AND ENERGY (EGLE) PROHIBITS TRANSFER OF CONTAMINATED SOILS FROM
ONE LOCATION TO ANOTHER LOCATION ON BASE UNLESS DETERMINED IMPACTS ARE
BELOW CRITERIA. SEE SPECIFICATION SECTION 01 30 00 FOR SOIL AND
GROUNDWATER DISPOSAL FORMS.
4. CROCK WELLS AND GROUNDWATER WELLS FOR ANY WATER USE IS NOT ALLOWED.
5. IF GROUNDWATER CONCENTRATIONS EXCEED CLEANUP CRITERIA REQUIREMENTS
FOR RESPONSE ACTIVITY (FORMERLY THE PART 201 GENERIC CLEANUP CRITERIA
AND SCREENING LEVELS) IDENTIFIED, DEWATERED GROUNDWATER SHALL BE
CONTAINERIZED AND PROPERLY DISPOSED VIA OFF-SITE DISPOSAL TO A LICENSED
FACILITY AND/OR VIA GREAT LAKES WATER AUTHORITY (GLWA) SANITARY SEWER
SYSTEM WITH APPROVAL OF A SPECIAL DISCHARGE PERMIT.
SOIL EROSION AND SEDIMENTATION
CONTROL (SESC) NOTES
1. EROSION AND ANY SEDIMENTATION FROM WORK ON THIS SITE SHALL BE CONTAINED ON
THE SITE AND NOT ALLOWED TO COLLECT ON ANY OFF-SITE AREAS OR IN WATERWAYS.
WATERWAYS INCLUDE BOTH NATURAL AND MAN-MADE OPEN DITCHES, STREAMS, STORM
DRAINS, LAKES AND PONDS.
2. STAGING THE WORK WILL BE DONE BY THE CONTRACTOR AS DIRECTED IN THESE PLANS AND
AS REQUIRED TO ENSURE PROGRESSIVE STABILIZATION OF DISTURBED EARTH CHANGE.
3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR INSTALLATION AND MAINTENANCE OF SOIL
EROSION AND SEDIMENTATION CONTROL DEVICES.
4. THE CONTRACTOR SHALL IMPLEMENT AND MAINTAIN THE SOIL EROSION CONTROL
MEASURES AS SHOWN ON THE PLANS BEFORE AND AT ALL TIMES DURING CONSTRUCTION
ON THIS PROJECT. ANY MODIFICATIONS OR ADDITIONS TO SOIL EROSION CONTROL
MEASURES DUE TO CONSTRUCTION OR CHANGED CONDITIONS SHALL BE COMPLIED WITH AS
REQUIRED OR DIRECTED BY THE CONTRACTING OFFICER.
5. IF ANY OF THE SESC MEASURES ON THE SITE ARE DEEMED INADEQUATE OR INEFFECTIVE, THE
CONTRACTING OFFICER HAS THE RIGHT TO REQUIRE ADDITIONAL SESC MEASURES AT THE
EXPENSE OF THE CONTRACTOR.
6. INSTALL A CRUSHED CONCRETE ACCESS DRIVE PLACED ON GEOTEXTILE FABRIC AS INDICATED
ON THE PLAN. NEW LAYERS OF CRUSHED CONCRETE WILL BE ADDED AS OLD LAYERS BECOME
COMPACTED.
7. INSTALL SILT FENCE AS INDICATED ON THE PLAN AND AT ADDITIONAL AREAS AS NECESSARY.
A.SILT FENCE SHALL BE INSTALLED PER DETAIL.
B. BUILD UP OF SEDIMENT SHALL BE REMOVED WHEN SEDIMENT ACCUMULATES TO 1/3
TO 1/2 OF THE HEIGHT OF THE SILT FENCE.
C. IF SILT FENCE FABRIC DECOMPOSES OR BECOMES INEFFECTIVE PRIOR TO THE END OF
EXPECTED USABLE LIFE AND THE BARRIER IS STILL REQUIRED, THE SILT FENCE SHALL BE
REPLACED PROMPTLY.
D. SILT FENCE SHALL BE INSPECTED WEEKLY UNDER NORMAL CONDITIONS, WITHIN 24
HOURS OF RAINFALL AND DAILY DURING A PROLONGED RAIN EVENT. REQUIRED
MAINTENANCE SHALL BE PROVIDED PROMPTLY.
8. INSTALL INLET FILTER ON ALL PAVEMENT CATCH BASINS PER DETAIL.
A.INLET FILTERS SHALL BE INSPECTED WEEKLY UNDER NORMAL CONDITIONS, WITHIN 24
HOURS OF A RAINFALL AND DAILY DURING A PROLONGED RAIN EVENT.
B. BUILDUP OF SEDIMENT AND DEBRIS SHALL BE REMOVED PROMPTLY.
C. IF FABRIC DECOMPOSES OR BECOMES INEFFECTIVE PRIOR TO THE END OF EXPECTED
USABLE LIFE AND THE BARRIER IS STILL REQUIRED, THE FABRIC SHALL BE REPLACED
PROMPTLY.
9. INSTALL INLET PROTECTION ON ALL CATCH BASINS PER DETAIL, SEED OR SOD THE AREA
BETWEEN THE SILT FENCE AND THE INLET.
A.INLET PROTECTION SHALL BE INSPECTED WEEKLY UNDER NORMAL CONDITIONS, WITHIN
24 HOURS OF RAINFALL AND DURING A PROLONGED RAIN EVENT.
B. BUILD UP OF SEDIMENT SHALL BE REMOVED WHEN SEDIMENT ACCUMULATES TO 1/3
TO 1/2 OF THE HEIGHT OF THE SILT FENCE
C. IF FABRIC DECOMPOSES OR BECOME INEFFECTIVE PRIOR TO THE END OF EXPECTED
USABLE LIFE AND THE BARRIER IS STILL REQUIRED, THE SILT FENCE SHALL BE REPLACED
PROMPTLY.
10. INLET SEDIMENT TRAPS AND ALL DITCH SEDIMENT TRAPS SHALL BE INSPECTED DAILY. THE
SEDIMENT PITS SHALL BE CLEANED OUT WHEN HALF FULL, OR AS DIRECTED BY THE
CONTRACTING OFFICER.
11. ALL STOCKPILED SOILS SHALL BE MAINTAINED IN SUCH A WAY AS TO PREVENT EROSION
FROM LEAVING THE SITE. IF THE STOCKPILE WILL BE ON SITE FOR MORE THAN 30 DAYS, THEN
THE STOCKPILE MUST BE SEEDED. SILT FENCE MUST BE INSTALLED AROUND THE PERIMETER
OF THE STOCKPILE.
12. IMMEDIATELY AFTER SEEDING, MULCH ALL SEEDED AREAS WITH UNWEATHERED SMALL
GRAIN STRAW, SPREAD UNIFORMLY AT THE RATE OF 1 TO 2 TONS PER ACRE OR 100 POUNDS
(2-3 BALES) PER 1000 SQUARE FEET. THIS MULCH SHOULD BE ANCHORED WITH DISC TYPE
MULCH ANCHORING TOOL OR OTHER MEANS AS APPROVED BY THE
13. MACOMB COUNTY PUBLIC WORKS OFFICE MULCH MATTING MAY BE USED IN LIEU OF LOOSE
MULCH.
14. IF ANY DEWATERING IS NEEDED, IT SHALL BE DISCHARGED THROUGH A FILTER BAG OVER A
WELL-VEGETATED AREA. THE PUMP MUST DISCHARGE AT A NON-EROSIVE VELOCITY. IF
NECESSARY, AN APPROVED ENERGY DISSIPATER MAY BE USED.
15. ALL DIRT TRACKED ONTO ANY ROADWAY SHALL BE REMOVED IMMEDIATELY.
16. STREETS AND OR PARKING AREAS WILL BE SCRAPED ON A DAILY BASIS AND SWEPT AT A
MINIMUM OF ONCE PER WEEK BY THE CONTRACTOR.
17. DURING DRY PERIODS, ALL DISTURBED AREAS SHALL BE WATERED FOR DUST CONTROL.
18. PERMANENT SOIL EROSION CONTROL MEASURES FOR ALL SLOPES, CHANNELS, DITCHES, OR
ANY DISTURBED LAND AREA SHALL BE COMPETED WITHIN 5 CALENDAR DAYS AFTER FINAL
GRADING OR THE FINAL EARTH CHANGE HAS BEEN COMPLETED. WHEN IT IS NOT POSSIBLE
TO PERMANENTLY STABILIZE A DISTURBED AREA AFTER EARTH CHANGE
19. ACTIVITY CEASES, TEMPORARILY SOIL EROSION CONTROL MEASURES SHALL BE
IMPLEMENTED IMMEDIATELY. ALL TEMPORARY SOIL EROSION CONTROL SHALL BE
MAINTAINED UNTIL PERMANENT SOIL EROSION CONTROL MEASURES ARE IMPLEMENTED.
ALL PERMANENT SOIL EROSION CONTROL MEASURES WILL BE IMPLEMENTED AND
ESTABLISHED BEFORE A CERTIFICATE OF COMPLIANCE IS ISSUED.
20. FINAL GRADE, ESTABLISH VEGETATION AND OR LANDSCAPE ALL DISTURBED AREAS NOT BUILT
OR PAVED UPON.
21. REMOVE ALL TEMPORARY SOIL EROSION DEVICES AFTER PERMANENT STABILIZATION IS
ESTABLISHED.
22. NAME OF NEAREST WATERCOURSE: LAKE ST. CLAIR
23. DISTANCE TO NEAREST WATERCOURSE IN FEET: +/- 1010' EAST OF THE PROJECT AREA.
24. TOTAL ACRES DISTURBED = 0.49 ACRES
SESC SEQUENCE OF CONSTRUCTION
1. THE FOLLOWING SEQUENCE OF CONSTRUCTION SHALL BE FOLLOWED:
A.INSTALL SILT FENCE AS SHOWN ON THE PLANS.
B. INSTALL A TEMPORARY MUD TRACKING DEVICE AT INGRESS/EGRESS POINTS TO THE
SITE.
C. CONTRACTOR AND COR SHALL AGREE ON TREE PROTECTION MEASURES PRIOR TO
BEGINNING MASS GRADING.
D.NO TREES SHALL BE REMOVED OUTSIDE OF GRADING LIMITS.
E. INSTALL AND MAINTAIN EROSION CONTROL MEASURES AS WORK PROGRESSES.
F. PROVIDE EROSION CONTROL MEASURES AT CATCH BASINS.
G.CLEAN PAVEMENT, WALKS, CULVERTS, WATERCOURSES, AND STORM SEWER SYSTEMS
OF ALL ACCUMULATED SEDIMENT IN CONJUNCTION WITH THE REMOVAL OF ALL
TEMPORARY EROSION CONTROL MEASURES WHEN GROUND COVER HAS BEEN
ESTABLISHED.
SPILL CONTROLNOTES
1. IN ADDITION TO THE GOOD HOUSEKEEPING AND MATERIAL MANAGEMENT PRACTICES
DISCUSSED IN THE PREVIOUS NOTES OF THIS PLAN, THE FOLLOWING PRACTICES WILL BE
FOLLOWED FOR SPILL PREVENTION AND CLEANUP:
A.MANUFACTURERS' RECOMMENDED METHODS FOR SPILL CLEANUP WILL BE CLEARLY
POSTED AND SITE PERSONNEL WILL BE MADE AWARE OF THE PROCEDURES AND THE
LOCATION OF THE INFORMATION AND CLEANUP SUPPLIES.
B. ALL SPILLS WILL BE CLEANED UP IMMEDIATELY AFTER DISCOVERY.
C. SPILLS OF TOXIC OR HAZARDOUS MATERIAL WILL BE REPORTED TO THE APPROPRIATE
BASE ENVIRONMENTAL FLIGHT, REGARDLESS OF SIZE.
D. THE SPILL PREVENTION PLAN MUST BE ADJUSTED TO INCLUDE MEASURES TO PREVENT
THIS TYPE OF SPILL FROM REOCCURRING AND HOW TO CLEAN UP THE SPILL IF THERE IS
ANOTHER ONE. A DESCRIPTION OF THE SPILL, WHAT CAUSED IT, AND THE CLEANUP
MEASURES WILL ALSO BE INCLUDED.
E. THE SITE SUPERINTENDENT IS RESPONSIBLE FOR THE DAY-TO-DAY SITE OPERATIONS
WILL BE THE SPILL PREVENTION AND CLEANUP COORDINATOR.
HAZARDOUS MATERIAL NOTES
1. CONTRACTORS USING HAZARDOUS MATERIALS, AS DEFINED IN SELFRIDGE DESIGN
STANDARDS (2017), MUST REPORT THE TYPES AND QUANTITIES USED WHILE LOCATED AT
SANGB USING FORM 23 - CONTRACTOR HAZMAT IDENTIFICATION (SEE SECTION 01 30 00).
2. FORM 23 - CONTRACTOR HAZMAT IDENTIFICATION AND SAFETY DATA SHEETS (SDS) FOR
EACH MATERIAL MUST ACCOMPANY THE FORM PRIOR TO MATERIALS BROUGHT ON BASE.
MATERIAL SHALL BE APPROVED BY BASE ENVIRONMENTAL PRIOR BEING TRANSPORTED ON
BASE.
3. CONTRACTORS ARE REQUIRED TO REPORT THE AMOUNT OF USED AND UNUSED HAZARDOUS
MATERIALS ON-BASE AT THE BEGINNING, MID-POINT, AND END OF THE CONSTRUCTION
PROJECT. CONTRACTORS MUST ALSO REPORT ANY LARGE HAZARDOUS MATERIAL TYPE OR
QUANTITY CHANGES.
4. ALL MATERIALS RECYCLED OR DISPOSED OFF-SITE OF THE INSTALLATION SHALL BE
QUANTIFIED ON THE AIR FORCE FORM 72 - SOLID WASTE AND DIVERSION TRACKING FORM
(SEE SECTION 01 30 00).
5. CONTAINERS USED TO STORE AND TRANSPORT HAZARDOUS WASTE MUST MEET
DEPARTMENT OF TRANSPORTATION (DOT) 49 CFR 172 SPECIFICATIONS. CONTAINERS MUST
BE KEPT CLOSED AT ALL TIMES EXCEPT WHEN FILLING EMPTYING ETC.
6. EACH HAZARDOUS WASTE CONTAINER MUST BE PROPERLY LABELED USING AN EPA
HAZARDOUS WASTE LABEL. CONTRACTOR MUST SHIP ALL HW WITHIN 90 DAYS FOR PROPER
DISPOSAL.
7. HAZARDOUS MATERIAL FOR THE PURPOSE OF THESE STANDARDS SHALL MEAN ANY ITEM:
A. THAT IS A HEALTH HAZARD OR PHYSICAL HAZARD AS DEFINED IN 29 CFR, 1910.1200I.
B. AND/OR ITS DISPOSAL THAT IS REGULATED BY EPA UNDER 40 CFR.
C. THAT IS HAZARDOUS IN ACCORDANCE WITH DOT REGULATIONS UNDER 49 CFR.
D. THAT IS HAZARDOUS IN ACCORDANCE WITH THE DANGEROUS GOODS REGULATIONS OF
THE INTERNATIONAL AIR TRANSPORT ASSOCIATION.
E. THAT IS CLASSIFIED AS HAZARDOUS IN AFJMAN 24-204.
F. THAT CONTAINS ASBESTOS, MERCURY OR POLYCHLORINATED BIPHENYL'S (PCBS.)
G.THAT IS MAGNETIC AND REGULATED UNDER 49 CFR.
PROJECT NUMBER:
DEFENSE COMMISSARY AGENCY
DESIGNED BY:
DRAWN BY:
SUBMITTED BY:
ARCHITECT/ENGINEER:
REVIEWED BY:
DRAWING NUMBER:
SOL NUMBER: DATE:
SHEET:
SEQUENCE
NUMBER:
SYMBOL DATE DESCRIPTION OF REVISIONSACTIOND O NO
APRIL 14, 2026
RECEIVING AREA PARKING SURFACE REPLACEMENT
COMMISSARY BUILDING, SELFRIDGE ANGB, MI
100% CORRECTED FINAL SUBMITTAL
EA24MR01
711 Navarro Street Suite 560 San Antonio, Texas 75205-1739
DIRECTORATE OF FACILITIES
FT. LEE, VIRGINIA
DESIGN AND CONSTRUCTION DIVISION
LACKLAND AFB, TEXAS
OF 182/
/2
:1
AM
C-0026
A. DYKMAN
R. BUSHAW
K. JOZWIK
K. JOZWIK
CONTRACTOR STAGING PLAN
SCALE: 1" = 50'
CONTRACTOR STAGING PLAN2 50' 100'0
PLAN
NORTH
NOT TO SCALE
PROPOSED HAUL ROUTE1
PLAN
NORTH
CONTRACTOR STAGING AREA
PROPOSED HAUL ROUTE
PROJECT LOCATION
PROJECT NUMBER:
DEFENSE COMMISSARY AGENCY
DESIGNED BY:
DRAWN BY:
SUBMITTED BY:
ARCHITECT/ENGINEER:
REVIEWED BY:
DRAWING NUMBER:
SOL NUMBER: DATE:
SHEET:
SEQUENCE
NUMBER:
SYMBOL DATE DESCRIPTION OF REVISIONSACTIOND O NO
APRIL 14, 2026
RECEIVING AREA PARKING SURFACE REPLACEMENT
COMMISSARY BUILDING, SELFRIDGE ANGB, MI
100% CORRECTED FINAL SUBMITTAL
EA24MR01
711 Navarro Street Suite 560 San Antonio, Texas 75205-1739
DIRECTORATE OF FACILITIES
FT. LEE, VIRGINIA
DESIGN AND CONSTRUCTION DIVISION
LACKLAND AFB, TEXAS
OF 182/
/2
:4
PM
C-0037
A. DYKMAN
R. BUSHAW
K. JOZWIK
K. JOZWIK
CONTRACTOR PHASING PLAN
SCALE: 1" = 10'
CONTRACTOR PHASING PLAN1
PLAN
NORTH
PHASE B
10' 20'0
PHASE A
1. THE PROJECT WILL BE COMPLETED IN TWO PHASES; PHASE A - EAST OF THE
LOADING RAMP AND PHASE B - WEST OF THE LOADING RAMP.
2. PHASE A INCLUDES REPLACING THE PAVEMENT AREA ON THE EAST SIDE OF
THE LOADING RAMP AND REMOVING THE TRASH COMPACTOR. ALL TRAFFIC
WILL ENTER AND EXIT FROM THE WEST END OF THE BUILDING.
3. PHASE B INCLUDES REPLACING THE PAVEMENT AREA ON THE WEST SIDE OF
THE LOADING RAMP. ALL TRAFFIC WILL ENTER AND EXIT FROM THE EAST
END OF THE BUILDING.
4. CONTRACTOR SHALL INSTALL TEMPORARY CHAIN LINK FENCE ENCLOSURE
AROUND THE CONTRACTOR STAGING AREA.
GENERAL NOTES
LOADING RAMP
TRASH COMPACTOR
SDSDSDSDSDSDSDSDSDSDSD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD SD SD
SD
SD
W W
W W
W W
W W W W W W W W W W W W W W W
W W
SA
N
SAN SAN SAN SAN SAN SAN
SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN
SAN
COMM COMM COMM COMM
C O
M M
C O
M M
C O
M M
C O
M M
COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM
COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM
SAN
SAN
SAN
SAN
SDSDSDSDSDSDSDSD
SD
SD
SD
SD
SD
CP1
CP2
FFE=578.38
S
GREASE TRAP
RIM=574.10
9.55 FEET DEEP
CO
CONDUIT
FFE=578.40
FFE=578.38
TB-5
TB-4
WATER SPIGOT
TB-3
FFE=578.43
FFE=578.44
CONDUIT
SERVICE BOX
SERVICE BOX
AC
CONDUIT
CONDUIT
TB-2
TB-1 FDC
FDC
FDC
CONDUIT
CB
CB278
RIM=573.48
6" E 571.48
D
SDMH281
RIM=574.06
18" E 568.96 18" W 569.06
12" STEEL ENCLOSED PIPE
N AND S 570.96 TOP OF PIPE
S
SSMH283
RIM=573.75
FULL OF WATER TO RIM
CB
CB284
RIM=572.83
15" S 569.03 18" E 568.93 18" W 568.83
CB
CB285
RIM=573.18
12" WSW 569.83
12" S 569.88 18" E 569.98
6"WSW 570.78
C
S
SSMH294
RIM=574.57
FULL OF WATER TO RIM
CONDUIT
EP
PANEL
EP
PANEL
UP
CP
UP
E E
E
E E
E E
E
GGGGGG
GGGGGGGGGGGGGG
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E
18" RCP
STEEL
STEEL
18" RCP
12" RCP
6" PVC
" R
C P
" R
C P
TRASH COMPACTOR
OVERHANG
/CANOPY
BUILDING
CONCRETE
ASPHALT
ASPHALT
CONCRETE
STEPS
CONCRETE
RAMP
ELECTRICAL
EQUIPMENT
HAND RAIL
GATE
CONC.
DECK
CONC.
DECK
LIMITS OF SURVEY
G G
G G
G G
G G
G G
G G
G G
G G
GGGGGGGGGGGGGGGGGGGGGGGGGGGGGGG
UP
E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E EUP
CP
PRIVACY FENCE
PRIVACY FENCE
CONC
CONC NOT
LOCATED BY
SURVEY
LOAD BAY
LOAD BAY
LOAD BAY
LOAD BAY
SANITARY
PUMP
STATION
.5
7'
101.82'
PROTECT MECHANICAL
EQUIPMENT (TYP)
PROTECT EXISTING
TRANSFORMER
PROTECT STEPS
AND DECK
PROTECT RAMP
AND DECK
PROTECT
CONC. STEP
5.84'
5.42'
4.64'
30.98'13.72' 117.80'
.2
5'
.8 8'
.7
8'
.7 2'
4.84'
.5
4'
.2 0'
.0
0'
114.78'
3.45'
.7
6'
PROTECT ELECTRICAL
EQUIPMENT (TYP)5
6 4N: 409501.0078 E: 13539037.9333
N: 409438.2176 E: 13539037.9333
N: 409438.3285 E: 13539082.6487
N: 409455.9457 E: 13539082.9759
N: 409438.3828 E: 13539102.8828
N: 409457.4540 E: 13539138.3380
N: 409437.5540 E: 13539138.0110
N: 409437.0587 E: 13539178.4016
N: 409447.5006 E: 13539178.5297
N: 409447.2209 E: 13539201.3421
N: 409436.6579 E: 13539211.0796
N: 409435.3080 E: 13539318.3267
N: 409503.4459 E: 13539319.7300
N: 409514.5968 E: 13539323.3997
N: 409524.5955 E: 13539323.5593
N: 409528.6035 E: 13539160.4302
N: 409511.3545 E: 13539160.3723
N: 409512.7114 E: 13539037.9333
N: 409565.1739 E: 13539015.8969
N: 409436.9082 E: 13539015.8969
N: 409421.5353 E: 13539312.2468
N: 409458.0730 E: 13539103.2300
TETRA TECH
IF DRAWING IS NOT 30" X 42", SCALE ACCORDINGLY.
PROJECT NUMBER:
DEFENSE COMMISSARY AGENCY
DESIGNED BY:
DRAWN BY:
SUBMITTED BY:
ARCHITECT/ENGINEER:
REVIEWED BY:
DRAWING NUMBER:
SOL NUMBER: DATE:
SHEET:
SEQUENCE
NUMBER:
SYMBOL DATE DESCRIPTION OF REVISIONSACTIOND O NO
APRIL 14, 2026
RECEIVING AREA PARKING SURFACE REPLACEMENT
COMMISSARY BUILDING, SELFRIDGE ANGB, MI
100% CORRECTED FINAL SUBMITTAL
EA24MR01
711 Navarro Street Suite 560 San Antonio, Texas 75205-1739
DIRECTORATE OF FACILITIES
FT. LEE, VIRGINIA
DESIGN AND CONSTRUCTION DIVISION
LACKLAND AFB, TEXAS
OF 18
SCALE: 1" = 10'
DEMOLITION PLAN1 10' 20'0
PLAN
NORTH
1. REFER TO SHEET V-101 FOR EXISTING CONDITIONS LEGEND.
2. UNLESS OTHERWISE NOTED ON THESE PLANS THE CONTRACTOR SHALL
PROTECT ALL BUILDING AND DOCK MOUNTED APPURTENANCES INCLUDING
BUT NOT LIMITED TO CONDUIT, UTILITY PANELS/METERS, ROOF DRAINS,
DOCK BUMPERS, TRANSFORMERS, MECHANICAL EQUIPMENT, FIRE
SUPPRESSION AND WATER CONNECTIONS. ANY DAMAGE SHALL BE
REPAIRED BY THE CONTRACTOR TO PRE-CONSTRUCTION CONDITION AT NO
ADDITIONAL COST.
3. CONCRETE REMOVALS SHALL BE PROVIDED TO THE NEXT CLOSEST JOINT
OR SAW FULL DEPTH AS NOTED.
4. REMOVAL OF TRASH COMPACTOR WILL RESULT IN AN OPENING IN THE
EXTERIOR WALL OF THE COMMISSARY BUILDING THAT WILL NEED TO BE
REPAIRED. CONTRACTOR SHALL SAW CUT THE TRASH SHOOT CLOSE TO THE
EXTERIOR WALL AND PROVIDE A TEMPORARY PLYWOOD COVERING WITH
WATERPROOFING TO THE WALL OPENING. ALL WORK ASSOCIATED WITH THE
BUILDING FACADE REPAIR WILL BE DONE BY OTHERS.
5. UNLESS OTHERWISE NOTED ON THESE PLANS, THE CONTRACTOR SHALL
PROTECT IN PLACE ALL BUILDING UTILITIES (UNDERGROUND AND/OR
OVERHEAD) INSIDE AND OUTSIDE OF WORK LIMITS WERE WARRANTED
INCLUDING BUT NOT LIMITED TO; STORM SEWER, COMMUNICATIONS,
ELECTRICAL, WATER, ETC. ANY DAMAGE SHALL BE REPAIRED BY THE
CONTRACTOR TO PRE-CONSTRUCTION CONDITION AT NO ADDITIONAL COST.
GENERAL NOTES
SHEET KEYNOTES
1. BULKHEAD AND ABANDON STORM SEWER.
2. REMOVE TRASH COMPACTOR, FOUNDATION AND ASSOCIATED
APPURTENANCES. COORDINATE DISPOSAL WITH CONTRACT OFFICER.
3. REMOVE ASPHALT PAVEMENT, FULL DEPTH.
4. REMOVE CONCRETE PAVEMENT, FULL DEPTH.
5. SAW CUT PAVEMENT, FULL DEPTH.
6. REMOVE BOLLARD AND CONCRETE FOUNDATION.
7. CLEAN EXPOSED SURFACES OF CONCRETE EQUIPMENT PAD. VERTICAL
SURFACES SHALL BE GROUND FLUSH TO PROVIDE SMOOTH SURFACE FOR
ISOLATION JOINT AND SEALANT AT NEW CONCRETE.
8. REMOVE STORM DRAINAGE STRUCTURE.
9. REMOVE STORM SEWER.
10. PROTECT OIL/WATER SEPARATOR AND CLEAN-OUT. HAND DIG 24-INCHES
AROUND STRUCTURE. REMOVE EXISTING CONCRETE COLLAR IN
PREPARATION FOR NEW CONCRETE COLLAR. ADJUST MANHOLE FRAME TO
PROPOSED GRADE.
11. EXISTING UTILITIES PROTECT IN PLACE. HAND DIG 24-INCHES AROUND
STRUCTURES AND UTILITY LINES.
LEGEND
REMOVE ASPHALT
REMOVE CONCRETE
CONSTRUCTION WORK LIMITS
REMOVE LINEAR FEATURE AS NOTED
4/
/2
3:
P
M
CD1018
A. DYKMAN
R. BUSHAW
K. JOZWIK
DEMOLITION PLAN
PROJECT NUMBER:
DEFENSE COMMISSARY AGENCY
DESIGNED BY:
DRAWN BY:
SUBMITTED BY:
ARCHITECT/ENGINEER:
REVIEWED BY:
DRAWING NUMBER:
SOL NUMBER: DATE:
SHEET:
SEQUENCE
NUMBER:
SYMBOL DATE DESCRIPTION OF REVISIONSACTIOND O NO
APRIL 14, 2026
RECEIVING AREA PARKING SURFACE REPLACEMENT
COMMISSARY BUILDING, SELFRIDGE ANGB, MI
100% CORRECTED FINAL SUBMITTAL
EA24MR01
711 Navarro Street Suite 560 San Antonio, Texas 75205-1739
DIRECTORATE OF FACILITIES
FT. LEE, VIRGINIA
DESIGN AND CONSTRUCTION DIVISION
LACKLAND AFB, TEXAS
OF 182/
/2
3:
P
M
CD1029
A. DYKMAN
R. BUSHAW
K. JOZWIK
K. JOZWIK
DEMOLITION PLAN PHOTOS
TRASH COMPACTOR TO BE REMOVED1
BOLLARDS TO BE REMOVED, PROTECT EXISTING TRANSFORMER2
PROTECT EXISTING MECHANICAL EQUIPMENT3
CP1
CP2
FFE=578.38
S
CO
FFE=578.40
FFE=578.38
TB-5
TB-4TB-3
FFE=578.43
FFE=578.44
AC
TB-2
TB-1 FDC
FDC
FDC
D
S
CB
CB
C
S
EP
PANEL
EP
PANEL
UP
CP
UP
BUILDING
CONC.
DECK
CONC.
DECK
LIMITS OF SURVEY
UP
UP
CP
GPGP GP
GP
GP GP
GP
.6
3'
40.25'
.1
7'
101.42' 159.91'
17.62'
2.07'
35.11' 40.16'20.26'
.4
5'
.4
9'
N: 409506.7119 E: 13539042.5876
N: 409512.7114 E: 13539037.9333
N: 409438.2176 E: 13539041.3356
N: 409438.2214 E: 13539042.7714
N: 409511.3545 E: 13539160.3723
N: 409528.6035 E: 13539160.4302
N: 409524.5955 E: 13539323.5593
N: 409514.5968 E: 13539323.3997
N: 409503.4459 E: 13539319.7300
N: 409435.3080 E: 13539318.3267
N: 409435.4090 E: 13539312.9170
N: 409503.5167 E: 13539313.7235
N: 409452.9179 E: 13539070.0056 N: 409452.9300 E: 13539074.5056
N: 409452.9421 E: 13539079.0056
N: 409457.4476 E: 13539081.5035
N: 409459.5992 E: 13539101.7567
N: 409458.9274 E: 13539139.8624
N: 409449.0268 E: 13539177.0563
GP GP
CB
S
S
CO
CO
COCOCOCO
CO
COCOCO
CO
COCO
CO
COCOCOCOCO
CO
COCO
CO
CO
D
CB
CB CB
CB
CB
CB CB
CB
TETRA TECH
IF DRAWING IS NOT 30" X 42", SCALE ACCORDINGLY.
PROJECT NUMBER:
DEFENSE COMMISSARY AGENCY
DESIGNED BY:
DRAWN BY:
SUBMITTED BY:
ARCHITECT/ENGINEER:
REVIEWED BY:
DRAWING NUMBER:
SOL NUMBER: DATE:
SHEET:
SEQUENCE
NUMBER:
SYMBOL DATE DESCRIPTION OF REVISIONSACTIOND O NO
APRIL 14, 2026
RECEIVING AREA PARKING SURFACE REPLACEMENT
COMMISSARY BUILDING, SELFRIDGE ANGB, MI
100% CORRECTED FINAL SUBMITTAL
EA24MR01
711 Navarro Street Suite 560 San Antonio, Texas 75205-1739
DIRECTORATE OF FACILITIES
FT. LEE, VIRGINIA
DESIGN AND CONSTRUCTION DIVISION
LACKLAND AFB, TEXAS
OF 18
GENERAL NOTES
SHEET KEYNOTES
1. CONCRETE PAVEMENT, 8 INCH. SEE DETAIL 2, SHEET CS501.
2. BOLLARD / GUARD POST. SEE DETAIL 1, SHEET CS501.
3. BITUMINOUS PAVEMENT. SEE DETAIL 3, SHEET CS501.
4. CONCRETE COLLAR. SEE DETAIL 6, SHEET CS501.
LEGEND
CONCRETE PAVEMENT
BITUMINOUS PAVEMENT
CONSTRUCTION WORK LIMITS
1. REFER TO SHEET V-101 FOR EXISTING CONDITIONS LEGEND.
SCALE: 1" = 10'
SITE PLAN1 10' 20'0
PLAN
NORTH
2/
/2
1:
P
M
CS10110
A. DYKMAN
R. BUSHAW
K. JOZWIK
SITE PLAN
1" ROUNDED CROWN
TOP OF CONCRETE
CROWN BASE
12" x 12" x 1/4" STEEL
PLATE WELDED TO PIPE
8" DIA. GALVANIZED STANDARD
STEEL PIPE BOLLARD, 7'-6" LONG,
PAINTED SAFETY YELLOW. FILL
WITH CONCRETE.
6" 3'
-6
4' -0
2'-6"
4000 PSI CONCRETE
PAVEMENT
EXPANSION JOINT. REFER TO
DETAIL 5, SHEET CS501 FOR
JOINT DETAIL.
SCALE: NONE
BOLLARD DETAIL1
CONCRETE COURSE
AGGREGATE BASE
NOTES:
1. ALL MATERIALS SHALL MEET MICHIGAN DEPARTMENT OF TRANSPORTATION (MDOT) MATERIAL
SPECIFICATIONS.
2. CONCRETE PAVEMENT SHALL BE MDOT 3500 OR 3500 HP MIX, REFER TO SPECIFICATION 32 13 13.
3. AGGREGATE BASE COURSE SHALL BE MDOT, 21 AA, LIMESTONE, COMPACT TO 95% MODIFIED PROCTOR
DRY DENSITY, REFER TO SPECIFICATION 31 00 00
4. SAND SUBBASE SHALL BE MDOT WASHED 2NS SAND.
5. COMPACT SUBGRADE TO 95% MODIFIED PROCTOR DRY DENSITY, REFER TO SPECIFICATION 31 00 00.
8"
4" SAND SUBBASE COURSE
SCALE: NONE
PORTLAND CEMENT CONCRETE (PCC) 2
SCALE: NONE
SAWED CONTRACTION JOINT4 SCALE: NONE
EXPANSION JOINT 5
PREFORMED NON-EXTRUDING
JOINT FILLER
SCALE: NONE
BITUMINOUS PAVEMENT SECTION3
4"
HMA, SURFACE COURSE
AGGREGATE BASE COURSE
SAND SUBBASE COURSE
HMA, BASE COURSE
TACK COAT
NOTES:
1. ALL MATERIALS SHALL MEET MICHIGAN DEPARTMENT OF TRANSPORTATION (MDOT) MATERIAL
SPECIFICATIONS.
2. HMA, SURFACE COURSE SHALL BE MDOT 4C, PG 64-28, REFER TO SPECIFICATION 32 12 17.
3. HMA, BASE COURSE SHALL BE MDOT 3C, PG 64-28, REFER TO SPECIFICATION 32 12 17.
4. AGGREGATE BASE COURSE SHALL BE MDOT 21 AA, LIMESTONE, COMPACT TO 95% MODIFIED PROCTOR
DRY DENSITY, REFER TO SPECIFICATION 31 00 00.
5. SAND SUBBASE SHALL BE MDOT WASHED 2NS SAND.
6. COMPACT SUBGRADE TO 95% MODIFIED PROCTOR DRY DENSITY, REFER TO SPECIFICATION 31 00 00.
3.
5"
1.
5"
JOINT BOTTOM
1/8" WIDE INITIAL
SAWCUT OR INSERT
CRACK
PAVEMENT
SURFACE
1/4"
1/
4" T
YP
M
IN
. T /3
(2 " T
YP
T=
TH
IC
KN
ES
S
(S
EE
P
LA
N
REFER TO SPECIFICATION
SECTION 32 13 13, AND 32 13 73
PAVEMENT
SURFACE
JW
D S
T=
TH
IC
KN
ES
S
(S
EE
P
LA
N
JOINT FILLER
BACKER MATERIAL
POURED JOINT
SEALER
REFER TO SPECIFICATION
SECTION 32 13 13 AND 32 13 73
RECESS JOINT
SEALER 1/8" TO
1/4" BELOW PVMT
NOTES:
1. "JW" (JOINT WIDTH) = 3/4 INCH UNLESS NOTED
OTHERWISE.
2. "DS" (DEPTH OF SEALANT) = 1 TO 1.5 TIMES "W"
UNLESS OTHERWISE SPECIFIED BY THE
SEALANT MANUFACTURER.
3. JOINT SEALANT SHALL BE FUEL RESISTANT, HOT
POURED RUBBER ASPHALT CONFORMING TO
ASTM D-6690
4. BACKER ROD/MATERIAL SHALL BE
NON-MOISTURE ABSORPTIVE, NON-REACTIVE
AND PROVIDE SNUG FIT IN JOINT TO PREVENT
SEALANT FROM FLOWING OUT.
GEOTEXTILE FABRIC
SEPARATOR.
GEOTEXTILE FABRIC
SEPARATOR.
COMPACTED SUBGRADE
COMPACTED SUBGRADE
THICKENED CONCRETE
CONTROL JOINT (TYP)
MANHOLE OR CATCH
BASIN COVER
8" CONC. COLLAR (4000 PSI)
CAST-IN-PLACE. SEE
SPECIFICATION 32 13 13
2' -0
" M
IN
1/2" ISOLATION JOINT
WITH PRE-MOLDED
JOINT FILLER (TYP)
SCALE: NONE
CONCRETE COLLAR6
SCALE: NONE
BITIMINOUS / PCC PAVEMENT JOINT7
T
CS501
ASPHALT
PAVEMENT
PORTLAND CEMENT
CONCRETE PAVEMENT
TETRA TECH
IF DRAWING IS NOT 30" X 42", SCALE ACCORDINGLY.
PROJECT NUMBER:
DEFENSE COMMISSARY AGENCY
DESIGNED BY:
DRAWN BY:
SUBMITTED BY:
ARCHITECT/ENGINEER:
REVIEWED BY:
DRAWING NUMBER:
SOL NUMBER: DATE:
SHEET:
SEQUENCE
NUMBER:
SYMBOL DATE DESCRIPTION OF REVISIONSACTIOND O NO
APRIL 14, 2026
RECEIVING AREA PARKING SURFACE REPLACEMENT
COMMISSARY BUILDING, SELFRIDGE ANGB, MI
100% CORRECTED FINAL SUBMITTAL
EA24MR01
711 Navarro Street Suite 560 San Antonio, Texas 75205-1739
DIRECTORATE OF FACILITIES
FT. LEE, VIRGINIA
DESIGN AND CONSTRUCTION DIVISION
LACKLAND AFB, TEXAS
OF 184/
/2
3:
P
M
CS50111
A. DYKMAN
R. BUSHAW
K. JOZWIK
DETAILS SITE
GPGP GP
GP
GP GP
GP
N: 409506.7119 E: 13539042.5876
N: 409512.7114 E: 13539037.9333
N: 409438.2176 E: 13539041.3356
N: 409438.2214 E: 13539042.7714
N: 409511.3545 E: 13539160.3723
N: 409528.6035 E: 13539160.4302
N: 409524.5955 E: 13539323.5593
N: 409514.5968 E: 13539323.3997
N: 409503.4459 E: 13539319.7300
N: 409435.3080 E: 13539318.3267
N: 409435.4090 E: 13539312.9170
N: 409503.5167 E: 13539313.7235
N: 409452.9179 E: 13539070.0056 N: 409452.9300 E: 13539074.5056
N: 409452.9421 E: 13539079.0056
N: 409457.4476 E: 13539081.5035
N: 409459.5992 E: 13539101.7567
N: 409458.9274 E: 13539139.8624
N: 409449.0268 E: 13539177.0563
GP GP
CP1
CP2
FFE=578.38
S
GREASE TRAP
RIM=574.10
9.55 FEET DEEP
CO
FFE=578.40
FFE=578.38
TB-5
TB-4TB-3
FFE=578.43
FFE=578.44
AC
TB-2
TB-1
D
S
SSMH283
RIM=573.75
FULL OF WATER TO RIM
CB
CB
C
S
SSMH294
RIM=574.57
FULL OF WATER TO RIM
EP
PANEL
EP
PANEL
UP
CP
UP
BUILDING
CONC.
DECK
CONC.
DECK
LIMITS OF SURVEY
UP
UP
CP
H.P.
573.95
H.P.
573.88
574.34
574.30 574.12
574.16
574.25
574.38 574.27
574.15
574.22
573.50
573.63
573.74
573.78
573.93573.91
574.27
574.03
574.35 574.47 574.55
573.33 573.51 573.65
573.71 573.99
573.89
574.00
574.14574.14574.22574.33574.44
573.63 H.P.
573.74
573.60
TOP
574.08
TOP
573.96
TOP
573.70
TOP
573.94
TOP
574.21
TOP
574.22
TOP
574.15
TOP
574.11
TOP
573.97
TOP
574.01
TOP
574.05
TOP
574.07
TOP
573.93
TOP
573.50
TOP
573.51
TOP
573.61
TOP
573.55
TOP
573.83
TOP
574.03
TOP
573.98
TOP
574.08
ADJUST
573.86
ADJUST
573.78
TOP
573.96
TOP
573.92
TOP
573.38
TOP
573.69
TOP
573.55
TOP
573.50
TOP
573.33
ADJUST
573.60
TOP
573.23
TOP
572.83
TOP
573.18
3 3
-1 .2
8%
-1.23%
-1.40%
-1.49% -1.36% -1.50% -1.54%
-1.54%
-1 .5
3%-1 .8
7%
-1 .3
3%
573.73
-1 .0
0%
-1 .36
-1 .2
2%
-1.19%
-1 .9
8%
-2 .0
0%
-1.59%
-1 .5
1%
-1 .5
3%
-1.48%
-1.41% -1.90%-1.61%-1.18%
-1 .0
0%
-1 .8
0%
3 3
IP
IP
IP
IP
IP
IP
IPIPIP
SB
SB
MATCH EXISTING (TYP)
MATCH EXISTING (TYP)
N: 409498.4633 E: 13539084.1000
N: 409497.5933 E: 13539142.0253
N: 409485.6235 E: 13539261.9074
MATCH EXISTING (TYP)
MATCH EXISTING (TYP)
TOP
573.86
50' MIN.
S
S
CO
CO
COCOCOCO
CO
COCOCO
CO
COCO
CO
COCOCOCOCO
CO
COCO
CO
CO
D
CB
CB CB
CB
CB
CB CB
CB
TETRA TECH
IF DRAWING IS NOT 30" X 42", SCALE ACCORDINGLY.
PROJECT NUMBER:
DEFENSE COMMISSARY AGENCY
DESIGNED BY:
DRAWN BY:
SUBMITTED BY:
ARCHITECT/ENGINEER:
REVIEWED BY:
DRAWING NUMBER:
SOL NUMBER: DATE:
SHEET:
SEQUENCE
NUMBER:
SYMBOL DATE DESCRIPTION OF REVISIONSACTIOND O NO
APRIL 14, 2026
RECEIVING AREA PARKING SURFACE REPLACEMENT
COMMISSARY BUILDING, SELFRIDGE ANGB, MI
100% CORRECTED FINAL SUBMITTAL
EA24MR01
711 Navarro Street Suite 560 San Antonio, Texas 75205-1739
DIRECTORATE OF FACILITIES
FT. LEE, VIRGINIA
DESIGN AND CONSTRUCTION DIVISION
LACKLAND AFB, TEXAS
OF 18
SCALE: 1" = 10'
GRADING PLAN - WEST1 10' 20'0
PLAN
NORTH
GENERAL NOTES
1. REFER TO SHEET V-101 FOR EXISTING CONDITIONS LEGEND.
2. CONTRACTOR SHALL VERIFY ALL DISTURBED AREAS HAVE POSITIVE
DRAINAGE TO A STORM WATER COLLECTION STRUCTURE, BASIN OR
DRAINAGE CHANNEL.
3. UNLESS OTHERWISE NOTED CONTRACTOR SHALL PROVIDE A MINIMUM
OF 4" TOPSOIL, SEED AND MULCH TO ALL AREAS DISTURBED DURING
CONSTRUCTION.
4. SOIL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE
INSTALLED IN ACCORDANCE WITH MACOMB COUNTY STANDARDS
PRIOR TO ANY WORK OR GROUND BREAKING ACTIVITY.
SHEET KEYNOTES
IP
SB
LEGEND
INLET PROTECTION
SEDIMENT BARRIER
SILT FENCE
FILTER SOCK
CONSTRUCTION LIMITS
SF
4/
/2
5:
P
M
CG10112
A. DYKMAN
R. BUSHAW
K. JOZWIK
K. JOZWIK
GRADING PLAN - WEST
M
AT
C H
LI
N
E
- S
EE
S
H
EE
TCG
1. CONSTRUCTION ENTRANCE. SEE DETAIL 3, SHEET CG501.
2. FILTER SOCK. SEE DETAIL 4, SHEET CG501.
3. INLET PROTECTION. SEE DETAIL 2, SHEET CG501.
4. ADJUST RIM ELEVATION TO MATCH NEW SURFACE GRADE.
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SB
IP
N: 409523.1972 E: 13539422.8133
N: 409468.6902 E: 13539422.8152
N: 409557.7688 E: 13539370.6541
N: 409420.9249 E: 13539367.0264
TETRA TECH
IF DRAWING IS NOT 30" X 42", SCALE ACCORDINGLY.
PROJECT NUMBER:
DEFENSE COMMISSARY AGENCY
DESIGNED BY:
DRAWN BY:
SUBMITTED BY:
ARCHITECT/ENGINEER:
REVIEWED BY:
DRAWING NUMBER:
SOL NUMBER: DATE:
SHEET:
SEQUENCE
NUMBER:
SYMBOL DATE DESCRIPTION OF REVISIONSACTIOND O NO
APRIL 14, 2026
RECEIVING AREA PARKING SURFACE REPLACEMENT
COMMISSARY BUILDING, SELFRIDGE ANGB, MI
100% CORRECTED FINAL SUBMITTAL
EA24MR01
711 Navarro Street Suite 560 San Antonio, Texas 75205-1739
DIRECTORATE OF FACILITIES
FT. LEE, VIRGINIA
DESIGN AND CONSTRUCTION DIVISION
LACKLAND AFB, TEXAS
OF 18
SCALE: 1" = 10'
GRADING PLAN -EAST1 10' 20'0
PLAN
NORTH
4/
/2
5:
P
M
CG10213
A. DYKMAN
R. BUSHAW
K. JOZWIK
K. JOZWIK
GRADING PLAN - EAST
M
AT
C H
LI
N
E
- S
EE
S
H
EE
TCG
1. SILT FENCE. SEE DETAIL 1, SHEET CG501.
2. FILTER SOCK. SEE DETAIL 4, SHEET CG501.
3. INLET PROTECTION. SEE DETAIL 2, SHEET CG501
GENERAL NOTES
1. REFER TO SHEET V-101 FOR EXISTING CONDITIONS LEGEND.
2. CONTRACTOR SHALL VERIFY ALL DISTURBED AREAS HAVE POSITIVE
DRAINAGE TO A STORM WATER COLLECTION STRUCTURE, BASIN OR
DRAINAGE CHANNEL.
3. UNLESS OTHERWISE NOTED CONTRACTOR SHALL PROVIDE A MINIMUM
OF 4" TOPSOIL, SEED AND MULCH TO ALL AREAS DISTURBED DURING
CONSTRUCTION.
4. SOIL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE
INSTALLED IN ACCORDANCE WITH MACOMB COUNTY STANDARDS
PRIOR TO ANY WORK OR GROUND BREAKING ACTIVITY.
SHEET KEYNOTES
IP
SB
LEGEND
INLET PROTECTION
SEDIMENT BARRIER
SILT FENCE
FILTER SOCK
CONSTRUCTION LIMITS
NOTE:
1. THE SPACING OF THE TIEBACKS SHALL EQUAL THE SPACING OF THE POST.
ADDITIONAL POST DEPTH OR TIEBACKS MAY BE REQUIRED IN UNSTABLE SOILS.
SILT FENCE B
SILT FENCE A
SHEET FLOW
ROLL JOINTS
SCALE: NONE
SILT FENCE1
ROLL JOINT
METAL, SYNTHETIC OR
WOOD POSTS DRIVEN
INTO GROUND
FABRIC TO BE
WRAPPED AROUND
FENCE POST
GEOTEXTILE FILTER FABRIC
FASTENED ON UPHILL SIDE,
TOWARDS EARTH DISRUPTION
RIDGE OF COMPACTED
EARTH ON UPHILL SIDE
OF FILTER FABRIC
UNDISTURBED
VEGETATION
6"x6" ANCHOR TRENCH
SPACING 6' MAX.
3' M
AX
M
IN
6" A
N C
H O
R
TR
EN
C
H
" M
IN
NOTE:
1. ADJUST BASKET DIMENSIONS TO FIT STORMWATER INLET TYPE.
2. INLET BASKET TO BE REMOVED AFTER PROJECT COMPLETION.
C O
N C
R
ET
E C
U R
B
FILTER FABRIC
ROADWAY
VARIES
VA
R
IE
S
C O
N C
R
ET
E C
U R
B
STORM WATER INLET
BOWL OR CATCH
BASIN CORBEL
SCALE: NONE
INLET PROTECTION BASKET2
STABILIZED ROAD - AS SHOWN ON DRAWINGS (50' MIN.)
' M
IN
' M
IN
' M
IN
STABILIZED ROAD - AS SHOWN ON DRAWINGS (50' MIN.)
PROFILE
PLAN VIEWNOTES:
1. ESTABLISH STABILIZED CONSTRUCTION ENTRANCE PRIOR TO THE
INITIATION OF SITE CONSTRUCTION ACTIVITIES.
2. CARE SHOULD BE TAKEN TO PREVENT MATERIAL MOVEMENT INTO
ADJACENT WETLANDS/WATERBODIES.
3. CARE SHOULD BE TAKEN TO MAINTAIN EXISTING ROADSIDE DRAINAGE
VIA CULVERT INSTALLATION, WITH SEDIMENT SUMP PLACED DOWN
FLOW OF CULVERT.
R2 5'
12" THICK (1"-3" CRUSHED CONCRETE OR CRUSHED LIMESTONE)
EXISTING GROUNDNON-WOVEN GEOTEXTILE FABRIC
SCALE: NONE
CONSTRUCTION ROAD STABILIZATION3
2" X 2" X 36" WOODEN
STAKES PLACED 10' OC.
12" FILTER SOCK
WORK AREA AREA TO BE
PROTECTED
" M
IN
SECTION
PLAN - NON-PAVEMENT AREAS
FLOW
WORK
AREA
AREA TO BE
PROTECTED
12" FILTER SOCK2" X 2" X 36" WOODEN
STAKES PLACED 10' OC
NOTES:
COMPOST MATERIAL TO BE DISPERSED ON SITE, AS DETERMINED
BY OWNER ONCE PERIMETER CONTROL IS NO LONGER NEEDED.
SCALE: NONE
FILTER SOCK4
TETRA TECH
IF DRAWING IS NOT 30" X 42", SCALE ACCORDINGLY.
PROJECT NUMBER:
DEFENSE COMMISSARY AGENCY
DESIGNED BY:
DRAWN BY:
SUBMITTED BY:
ARCHITECT/ENGINEER:
REVIEWED BY:
DRAWING NUMBER:
SOL NUMBER: DATE:
SHEET:
SEQUENCE
NUMBER:
SYMBOL DATE DESCRIPTION OF REVISIONSACTIOND O NO
APRIL 14, 2026
RECEIVING AREA PARKING SURFACE REPLACEMENT
COMMISSARY BUILDING, SELFRIDGE ANGB, MI
100% CORRECTED FINAL SUBMITTAL
EA24MR01
711 Navarro Street Suite 560 San Antonio, Texas 75205-1739
DIRECTORATE OF FACILITIES
FT. LEE, VIRGINIA
DESIGN AND CONSTRUCTION DIVISION
LACKLAND AFB, TEXAS
OF 182/
/2
2:
P
M
CG50114
A. DYKMAN
R. BUSHAW
K. JOZWIK
DETAILS GRADING
FFE=578.38
FFE=578.40
FFE=578.38
FFE=578.43
FFE=578.44
AC
D
CB
CB
UP
UP
BUILDING
CONC.
DECK
CONC.
DECK
UP
UP
GPGP GP
GP
GP GP
GP
GP GP
CB
S
S
CO
CO
COCOCOCO
CO
COCOCO
CO
COCO
CO
COCOCOCOCO
CO
COCO
CO
CO
D
CB
CB CB
CB
CB
CB CB
CB
CJ
CJ
CJ
CJ
EJ
CJCJCJCJ
CJ
CJ
CJ
CJ
EJ C
J
C J
EJ
EJ
EJ
EJ
EJ
EJ
CJ
C J
EJ EJ
EJ
EJ
EJ
EJ
S
EJ
EJ
CJ
CJ
C J
C J
EJ
C J
C J
EJ
C J
C J
C J
EJ C
J
C J
EJ C
J C
J
EJ C
J
EJ
C J
C J
EJ C
J
CJ
CJ
CJ
EJ
CJ CJ CJ
C
JC
J
CJ CJ
EJ
EJ
CJ
S S
S S
10.44' 11.00' 10.82' 14.50' 14.50' 4.16' 4.34' 14.50' 13.73' 11.40' 9.14' 12.00' 11.20' 14.00' 13.82' 14.50' 14.40' 12.14'
9.69' 9.25' 9.29'
9.82' 14.00' 13.82' 14.50' 14.50' 14.50' 14.50'
13.73' 14.40' 12.14' 12.00' 10.90'
.0
0'
.6 2'
.2
4'
.2 6'
9.
7.
.4
5'
.5 0'
.4
2' 7.
.4
4' 9.
.2
0'
.5 0'
.4
2'
9.
.2 0'
.5
0'
.4 2'
7.
9.
9.
11.86'
.0
0'
.6 2'
.2
4' EJEJ EJ
EJ EJ
EJ
EJ
EJ
EJ
EJ
EJ
EJ
EJ
EJ
EJ
EJ
EJ
EJ
EJEJEJ
EJ
S
EJ
CJ
CJ
CJCJ
CJ
CJ
CJ
CJ
CJ
CJ
CJ
CJ
C J
C J
C J
EJ C
J
C J
C J
C J
C J
C J
C
JEJC
JC
JC
J
C J
S S
EJ EJ
.6
2'
.5 0'
.0
0'
.0 0'
.9
7'
.6
2'
.5 0'
.0
0'
.0 0'
.0
3'
11.89' 13.00' 11.60' 13.40' 13.40' 11.60' 14.00' 12.60' 10.00' 8.60' 8.60' 11.00'
4.
4.
.4
2'
12.05' 13.00' 11.60' 13.40' 13.40' 11.60' 14.00' 12.64'
EJ
TETRA TECH
IF DRAWING IS NOT 30" X 42", SCALE ACCORDINGLY.
PROJECT NUMBER:
DEFENSE COMMISSARY AGENCY
DESIGNED BY:
DRAWN BY:
SUBMITTED BY:
ARCHITECT/ENGINEER:
REVIEWED BY:
DRAWING NUMBER:
SOL NUMBER: DATE:
SHEET:
SEQUENCE
NUMBER:
SYMBOL DATE DESCRIPTION OF…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .