DRAWINGS.pdf
PDF 10 MB Posted
- Attached to
- T-Hangar E Renovation State and local contract opportunity
- Solicitation number
- 11-26-AIR
- Issued by
- Volusia County, Florida
About this file
This is a construction drawings document (Civil sheets C001, C101, C102, and C103) for the T-Hangar E Renovation project at New Smyrna Beach Municipal Airport in Volusia County, Florida, prepared by the City of New Smyrna Beach. The project encompasses complete renovation of a 16,600 square foot hangar structure including site improvements, taxiway markings (continuous taxiway edge markings in 6-inch wide yellow and taxiway centerline markings), pavement work, drainage provisions, landscaping modifications with granite decorative beds, and utility modifications. The scope is divided into two work areas (Work Area A and Work Area B), each limited to 30 calendar days with working hours of Monday-Friday, 7:00 a.m. to 5:00 p.m. The contractor must notify the owner two weeks in advance of starting either work area. Taxiway C and Taxiway E will be partially closed during construction. The total project duration is capped at 60 consecutive calendar days from the Notice to Proceed, with liquidated damages of $250 per calendar day assessed for delays. A non-mandatory pre-bid meeting and site visit was scheduled for March 9, 2026 at 10:30 a.m. at the gate to Hangar E; sealed bids were due March 31, 2026 at 5:00 p.m. through the City's eProcurement Portal with public opening on April 1, 2026; and City Commission award recommendation was scheduled for April 28, 2026.
The contractor bears responsibility for utility location, field verification of existing utilities and structures, restoration of all disturbed areas to original or better condition, payment of failed quality assurance testing, protection of survey monumentation, obtaining all necessary permits and scheduling required inspections, compliance with FAA Advisory Circular AC 150/5370-2 and FDOT specifications, and maintaining a clean and secure jobsite with proper coordination of concurrent airport projects. The project is federally funded through a Florida Department of Transportation (FDOT) grant combined with local share, with contract award contingent upon FDOT concurrence. Disadvantaged business enterprise (DBE) participation requirements apply. Qualified contractors must be licensed, submit a bid bond of no less than ten percent of the bid amount, provide performance and payment bonds equal to one hundred percent of the contract price within fourteen days of bid acceptance, maintain comprehensive insurance coverage with the City named as additional insured, comply with Davis-Bacon Act prevailing wage provisions and E-Verify employment verification requirements, and execute the contract within fifteen calendar days of award notification. A mobilization, procurement, and submittal phase of 45 consecutive calendar days is required prior to construction start, during which the contractor must submit all required submittals, establish survey control, and complete preconstruction activities.
View the file
Other files for this state and local contract opportunity
| File | Type | Posted |
|---|---|---|
| T-Hangar_E_Renovation_(Addendum_#4_Revision).pdf | ||
| T-Hangar_E_Renovation_(Addendum_#3_Revision).pdf | ||
| T-Hangar_E_Renovation_(Addendum_#1_Revision).pdf | ||
| DRAWINGS.pdf | ||
| DRAWINGS.pdf | ||
| City_Forms_.pdf | ||
| City_Forms_.pdf | ||
| City_Forms_.pdf | ||
| Draft_Contract.pdf | ||
| Draft_Contract.pdf | ||
| Draft_Contract.pdf | ||
| SPECIFICATIONS.pdf | ||
| SPECIFICATIONS.pdf | ||
| SPECIFICATIONS.pdf | ||
| Bond_Forms.pdf | ||
| Bond_Forms.pdf | ||
| Bond_Forms.pdf | ||
| Federal_Contract_Provisions.pdf | ||
| Federal_Contract_Provisions.pdf | ||
| Federal_Contract_Provisions.pdf | ||
| Public_Records.pdf | ||
| Public_Records.pdf | ||
| Public_Records.pdf |
Show all 23
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CIVIL
C001 GENERAL NOTES, LEGEND & QUANTITIES
C101 CONSTRUCTION SAFETY AND PHASING PLAN
C102 CIVIL SITE PLAN
C103 CIVIL NOTES AND DETAILS
ALB
NOVEMBER, 2025
2025.287.03
JEG
Checked By:
Date:
Project No.:
Drawn By:
REVISIONS:
100% Construction Documents vo ic e
7.
0.
w w w
.k m ad g.
ne t
AR
N
EW
S M
YR
N
A B
EA
C
H A
IR
PO
R T
H an ga r
"E
R en o va ti o n
Sk yl in e
D riv e N ew S m yr na B ea ch
, F L
C001
GENERAL NOTES:
1. LOCATIONS, ELEVATIONS, AND DIMENSIONS OF EXISTING UTILITIES, STRUCTURES AND
OTHER FEATURES ARE SHOWN ACCORDING TO THE BEST INFORMATION AVAILABLE AT THE
TIME OF PREPARATION OF THESE PLANS. THE CONTRACTOR SHALL FIELD LOCATE, VERIFY,
AND FURTHER IDENTIFY THE LOCATIONS, ELEVATIONS, AND DIMENSIONS OF ALL EXISTING
UTILITIES, STRUCTURES, AND OTHER FEATURES (IDENTIFIED ON THE PLANS OR NOT)
AFFECTING ANY COMPONENT OF WORK HEREIN PRIOR TO THE START OF ANY
CONSTRUCTION. DISCREPANCIES, CONFLICTS, OR POTENTIAL DEVIATIONS SHALL BE
BROUGHT TO THE ATTENTION OF THE ENGINEER PRIOR TO THE START OF ANY
CONSTRUCTION.
2. THE CONTRACTOR SHALL CHECK PLANS FOR CONFLICTS AND DISCREPANCIES PRIOR TO
THE START OF ANY CONSTRUCTION. SPECIAL ATTENTION SHALL BE TAKEN WITH THOSE
EXISTING UTILITIES, STRUCTURES OR FEATURES (IDENTIFIED ON THE PLANS OR NOT) THAT
MAY POTENTIALLY CONFLICT OR CROSS PROPOSED DESIGN COMPONENTS (I.E., AIRFIELD
ELECTRICAL, STORM SEWERS, SANITARY SEWERS, WATER MAINS, COMMUNICATION LINES,
HIGH POWER TRANSMISSION LINES, BUILDING FOUNDATIONS, ETC) AND ANY
DISCREPANCIES, CONFLICTS, OR POTENTIAL DEVIATIONS SHALL BE BROUGHT TO THE
ATTENTION OF THE ENGINEER PRIOR TO THE START OF ANY CONSTRUCTION. ANY COST
ASSOCIATED WITH THE LOCATION OF EXISTING UTILITIES AS OUTLINED ABOVE IS THE
RESPONSIBILITY OF THE CONTRACTOR.
3. ERRORS OR OMISSIONS - DO NOT TAKE ADVANTAGE OF ANY APPARENT ERROR OR
OMISSION DISCOVERED IN THE CONTRACT DOCUMENTS, BUT IMMEDIATELY NOTIFY THE
ENGINEER OF SUCH DISCOVERY. THE ENGINEER WILL THEN MAKE SUCH CORRECTIONS
AND INTERPRETATIONS AS NECESSARY TO REFLECT THE ACTUAL SPIRIT AND INTENT OF
THE CONTRACT DOCUMENTS.
4. THE CONTRACTOR SHALL EXERCISE EXTREME CAUTION IN AREAS OF BURIED UTILITIES AND
SHALL PROVIDE AT LEAST 48-HOURS NOTICE TO THE UTILITY COMPANIES PRIOR TO
CONSTRUCTION TO OBTAIN FIELD LOCATIONS OF EXISTING UNDERGROUND UTILITIES.
5. THE CONTRACTOR IS RESPONSIBLE FOR REPAIRING ANY DAMAGE TO EXISTING FACILITIES, ABOVE OR BELOW GROUND, THAT MAY OCCUR AS A RESULT OF THE WORK PERFORMED BY
THE CONTRACTOR CALLED FOR IN THIS CONTRACT. CONTRACTOR SHALL BE RESPONSIBLE
FOR PROTECTING ALL EXISTING SURVEY MONUMENTATION, AND ANY DISTURBED
MONUMENTATION SHALL BE RESTORED AT CONTRACTOR'S EXPENSE BY A SURVEYOR
SELECTED BY THE OWNER.
6. ALL UNDERGROUND UTILITIES MUST BE IN PLACE AND PASS ALL TESTING OR INSPECTION
REQUIREMENTS PRIOR TO ROAD BASE AND/OR SURFACE IMPROVEMENT CONSTRUCTION.
7. IT IS THE CONTRACTOR'S RESPONSIBILITY TO BECOME FAMILIAR WITH THE PERMITS AND
INSPECTION REQUIREMENTS SPECIFIED BY THE VARIOUS GOVERNMENTAL AGENCIES AND
THE ENGINEER. THE CONTRACTOR SHALL OBTAIN ALL NECESSARY PERMITS PRIOR TO
CONSTRUCTION, AND SCHEDULE INSPECTIONS AND TESTING ACCORDING TO AGENCY
REQUIREMENTS.
8. ALL WORK PERFORMED SHALL COMPLY WITH THE CODES, STANDARDS, REGULATIONS AND
REQUIREMENTS OF THE CITY OF LEESBURG LAND DEVELOPMENT CODE AND ENGINEERING
STANDARDS, PLUS THE CURRENT EDITION OF THE FDOT STANDARD SPECIFICATIONS FOR
ROAD, BRIDGE AND UTILITY CONSTRUCTION, PLUS THE CURRENT EDITION OF THE FAA
ADVISORY CIRCULARS, PLUS THE REGULATIONS AND ORDINANCES OF THE VARIOUS OTHER
GOVERNMENTAL AGENCIES HAVING JURISDICTION OVER THE WORK.
9. CONTRACTOR SHALL KEEP ENGINEER ADVISED OF CONSTRUCTION SCHEDULE CHANGES
SO THAT ENGINEER CAN PROVIDE CONSTRUCTION CERTIFICATIONS TO JURISDICTIONAL
AGENCIES.
10. SAFETY - DURING THE CONSTRUCTION AND/OR MAINTENANCE OF THIS PROJECT, ALL
SAFETY REGULATIONS ARE TO BE ENFORCED. THE CONTRACTOR OR THEIR
REPRESENTATIVE SHALL BE RESPONSIBLE FOR THE CONTROL AND SAFETY OF THE
TRAVELING PUBLIC AND THE SAFETY OF HIS PERSONNEL. LABOR SAFETY REGULATIONS
SHALL CONFORM TO THE PROVISIONS SET FORTH BY OSHA IN THE FEDERAL REGISTER OF
THE DEPARTMENT OF TRANSPORTATION.
11. "AS-BUILT" PLANS FOR THE PROPOSED CONSTRUCTION SHALL BE PROVIDED UPON
COMPLETION OF CONSTRUCTION, THE CONTRACTOR SHALL FURNISH THE OWNER'S
ENGINEER WITH COMPLETE "AS-BUILT" INFORMATION CERTIFIED BY A FLORIDA
REGISTERED PROFESSIONAL SURVEYOR.
12. THESE DRAWINGS HAVE BEEN PREPARED, IN PART, BASED UPON RECORD DRAWINGS
AND/OR CAD FILES FURNISHED BY OTHERS. WHILE THIS INFORMATION IS BELIEVED TO BE
RELIABLE, THOSE UTILIZING THE INFORMATION ON THESE DRAWINGS ARE ADVISED TO
OBTAIN INDEPENDENT VERIFICATION OF ITS ACCURACY BEFORE USING IT FOR ANY
PURPOSE.
13. ALL AREAS DISTURBED AS A RESULT OF THE CONTRACTOR'S STAGING AND CONSTRUCTION
OPERATIONS SHALL BE RESTORED EQUAL TO OR BETTER THAN ORIGINAL CONDITION AT
THE CONTRACTOR'S EXPENSE.
14. ALL DIRT, DUST, STONES AND LOOSE DEBRIS SHALL BE CONTINUOUSLY REMOVED FROM
ALL PAVED SURFACES DURING THIS CONTRACT.
15. ALL OF THE CONTRACTOR'S OPERATIONS SHALL REMAIN ON AIRPORT PROPERTY AT ALL
TIMES. UNDER NO CIRCUMSTANCES WILL THE CONTRACTOR BE ALLOWED ON ADJACENT
PROPERTY.
16. THE CONTRACT DOES NOT ALLOW FOR PRICE INCREASES DUE TO ESCALATION IN COST OF
UNIT BID ITEMS. THE CONTRACTOR SHALL TAKE THIS INTO CONSIDERATION WHEN
PREPARING UNIT PRICES FOR BID.
17. THE CITY OF NEW SMYRNA BEACH RESERVES THE RIGHT TO ELIMINATE ANY ITEMS OF THE
CONTRACT AND PERFORM THESE ITEMS WITH COUNTY SUPPLIED FORCES AND MATERIALS.
18. THE CONTRACTOR SHALL BE AWARE THAT OTHER CONCURRENT PROJECTS MAY BE UNDER
CONSTRUCTION ON THE AIRPORT. IT WILL BE THE CONTRACTOR'S RESPONSIBILITY TO
COORDINATE THEIR ACTIVITIES WITH THE OTHER CONTRACTORS ON THE AIRPORT. THIS
COORDINATION WILL NOT BE PAID SEPARATELY AND IS CONSIDERED A NECESSARY AND
INCIDENTAL PORTION OF THE WORK.
19. ALL ELEVATIONS REFERENCE NAVD 88 VERTICAL DATUM. COORDINATES REFERENCE NAD
83 HORIZONTAL DATUM.
20. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PAYMENT OF ALL FAILED QUALITY
ASSURANCE TESTING.
RESTORATION NOTES:
1. FOR PROPOSED WORK ITEMS OUTSIDE OF THE WORK AREA LIMITS SHOWN IN THE PLANS,
RESTORATION SHALL BE INCIDENTAL TO THE LINE ITEM ASSOCIATED WITH THE
CORRESPONDING WORK. ALL AREAS SHALL BE RESTORED TO EQUAL TO OR BETTER THAN
EXISTING CONDITIONS.
2. AREAS OUTSIDE OF THE PROJECT LIMITS THAT ARE DISTURBED BY THE CONTRACTOR'S
WORK SHALL BE REPAIRED/REGRADED/RESTORED BY THE CONTRACTOR AT NO
ADDITIONAL COST TO THE OWNER. ALL DISTURBED AREAS OUTSIDE OF THE PROJECT
GRADING LIMITS SHALL BE RESTORED EQUAL TO OR GREATER THAN THE EXISTING
CONDITION REGARDLESS OF MATERIAL. ALL ASSOCIATED COSTS SHALL BE BORNE BY THE
CONTRACTOR.
3. ALL GRADING AREAS SHALL BE RESTORED WITH SOD, IN ACCORDANCE WITH ITEM T-904.
ALL AREAS OF SODDING SHALL BE SMOOTH AND FREE OF RUTTING AT THE COMPLETION OF
THE PROJECT.
4. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO ENSURE THE ADEQUATE GROWTH OF
GRASS FOR ALL AREAS RESTORED WITH SOD. CONTRACTOR SHALL WATER AND MAINTAIN
THE RESTORATION AREA.
5. SOD THAT DIES DUE TO INSUFFICIENT WATERING SHALL BE REMOVED AND REPLACED WITH
NEW SOD AT NO ADDITIONAL COST TO THE OWNER.
STORMWATER SYSTEM NOTES:
1. THE CONTRACTOR SHALL MAKE ALL NECESSARY PROVISIONS TO MAINTAIN EXISTING
STORM SEWER SYSTEM IN SERVICE.
2. SURFACE DRAINAGE SHALL BE DIVERTED FROM EXCAVATIONS, AND STOCKPILE AREAS
SUCH THAT PROPER SITE CONDITIONS ARE MAINTAINED AND EROSION DUE TO RAIN
RUN-OFF OR SEEPAGE IS PREVENTED OR MINIMIZED.
ELECTRICAL NOTES:
1. ABANDONED CABLES MAY EXIST IN THE VICINITY OF THE PROPOSED WORK. IF
ENCOUNTERED, CONTRACTOR SHALL VERIFY THAT THEY ARE ABANDONED PRIOR TO
REMOVAL. IF THEY ARE NOT ABANDONED, CABLES SHALL BE REPAIRED AT THE
CONTRACTOR'S EXPENSE.
2. ALL ELECTRICAL EQUIPMENT REMOVED WHICH IS DESIRED BY THE OWNER TO BE
SALVAGED SHALL BE TURNED OVER TO THE OWNER. THE EQUIPMENT SHALL BE
STOCKPILED AT A LOCATION DESIGNATED BY THE OWNER IN PROPER WORKING
CONDITION. ALL OTHER MATERIALS SHALL BE SPOILED OFF AIRPORT PROPERTY AT A
PROPER DISPOSAL SITE AT THE CONTRACTOR'S EXPENSE.
ABAN. - ABANDONED
APPROX. - APPROXIMATE
ASPH. - ASPHALT
BL - BASELINE
BLDG. - BUILDING
BM - BENCHMARK
CL - CENTERLINE
CCR - CONSTANT CURRENT REGULATOR
CIP - CAST IRON PIPE
CMP - CORRUGATED METAL PIPE
CONC. - CONCRETE
CSP - CORRUGATED STEEL PIPE
D - DIAMETER
E - EASTING
ELL - ELBOW/ARM
ELEV, - ELEVATION
FND. - FOUNDATION
HP - HIGH POINT
INV. - INVERT
JCP - JUNCTION CAN PLAZA
LT - LEFT
LP - LOW POINT
MAX. - MAXIMUM
MES - MITERED END SECTION
M.E.G. - MEET EXISTING GRADE
MIN. - MINIMUM
N - NORTHING
NA - NOT ACCEPTABLE
NFPA - NATIONAL FIRE PROTECTION
ASSOCIATION
OFA - OBJECT FREE AREA
O.C - ON CENTER
PAV'T - PAVEMENT
PC - POINT OF CURVATURE
PCC - PORTLAND CEMENT CONCRETE
PAVEMENT
PI - POINT OF INTERSECTION
PL - PROPERTY LINE
PVI - POINT OF VERTICAL INTERSECTION
PVC - POLYVINYL CHLORIDE PIPE
PET - CROSSLINKED POLYETHYLENE
PRESSURE TUBING
PVT - POINT OF TANGENCY (VERTICAL
CURVE)
R - RADIUS
RCP - REINFORCED CONCRETE PIPE
RGS - RIGID GALVANIZED STEEL
ROFA - RUNWAY OBJECT FREE AREA
RSA - RUNWAY SAFETY AREA
ROW - RIGHT OF WAY
RPZ - RUNWAY PROTECTION ZONE
RT - RIGHT
RWY - RUNWAY
SHDR - SHOULDER
SICPP - SMOOTH INTERIOR CORRUGATED
POLYETHYLENE PIPE
STA - STATION
TLOFA - TAXILANE OBJECT FREE AREA
TOFA - TAXIWAY OBJECT FREE AREA
TSA - TAXIWAY SAFETY AREA
TWY - TAXIWAY
TYP - TYPICAL
UG - UNDERGROUND
GENERAL NOTES
ABBREVIATIONS
BID SCHEDULELEGEND
BUILDING
TREE/BUSH
ELECTRICAL TRANSFORMER
DITCH TOP OF BANK
DITCH CENTERLINE
AIRPORT FENCELINE
TSA TAXIWAY SAFETY AREA
TOFA TAXIWAY OBJECT FREE AREA
TAXIWAY CENTERLINE MARKING
DRAINAGE PIPE
AIRPORT PROPERTY LINE
TO BE INCLUDED WITH
CONFORMED CONSTRUCTION
DOCUMENTS
( SEE OPENGOV FOR
PROJECT BID SCHEDULE)
This item has been digitally signed and sealed by
Daniel J. Nickols, Jr., PE, on the date adjacent to the seal. Signature must be verified on any electronic copies.
TSA
TSA
TSA
TSA
TSA TSA TSA
TS
A
TS
A
TS
A
TS
A
TS
A
TS
A
TSA
TSA
TSA TSA TSA
TS
A
TS
A
TO
FA
TO
FA
TO
FA
TO
FA
TO
FA
TO
FA
TOFA
TOFA TOFA TOFA TOFA
TO
FA
TO
FA
TO
FA
TO
FA
TO
FA
TO
FA
CB
CB
CB
CB
CB
CB
CB
CB
CB
TO
FA
TO
FA
TOFATOFATOFA
TO
FA 0
GRAPHIC SCALE (FT)
120'60'30'
NORTH
ALB
NOVEMBER, 2025
2025.287.03
JEG
Checked By:
Date:
Project No.:
Drawn By:
REVISIONS:
100% Construction Documents vo ic e
7.
0.
w w w
.k m ad g.
ne t
AR
N
EW
S M
YR
N
A B
EA
C
H A
IR
PO
R T
H an ga r
"E
R en o va ti o n
Sk yl in e
D riv e N ew S m yr na B ea ch
, F L
C101
CONSTRUCTION SAFETY AND PHASING PLAN CONSTRUCTION SAFETY AND PHASING NOTES
SHEET LEGEND
WORK AREA A
1. WORK AREA A SHALL CONSIST OF ALL PROJECT RELATED SCOPE WITHIN THE WORK AREA LIMITS, INCLUDING, BUT NOT LIMITED TO MARKING OPERATIONS. WORK AREA A SHALL BE LIMITED TO 30 CALENDAR DAYS. WORKING HOURS SHALL BE MONDAY-FRIDAY, 7:00AM-5:00PM. THE OWNER SHALL
BE NOTIFIED TWO WEEKS IN ADVANCE OF THE START OF WORK AREA A.
2. TAXIWAY C AND TAXIWAY E SHALL BE PARTIALLY CLOSED FOR THE DURATION OF THIS WORK AREA.
WORK AREA B
1. WORK AREA B SHALL CONSIST OF ALL PROJECT RELATED SCOPE WITHIN THE WORK AREA LIMITS, INCLUDING, BUT NOT LIMITED TO MARKING OPERATIONS. WORK AREA B SHALL BE LIMITED TO 30 CALENDAR DAYS. WORKING HOURS SHALL BE MONDAY-FRIDAY, 7:00AM-5:00PM. THE OWNER SHALL
BE NOTIFIED TWO WEEKS IN ADVANCE OF THE START OF WORK AREA B.
2. TAXIWAY C AND TAXIWAY E SHALL BE PARTIALLY CLOSED FOR THE DURATION OF THIS WORK AREA.
SHEET NOTES:
1. THE CONTRACTOR SHALL BE REQUIRED TO MAINTAIN A SAFE AND SECURE JOB SITE AT ALL TIMES.
2. UNDER NO CIRCUMSTANCE SHALL THE CONTRACTOR LEAVE THE DESIGNATED WORK AREA
WITHOUT PRIOR APPROVAL OR PROPER COORDINATION WITH THE ENGINEER/RPR. DOING SO MAY
RESULT IN THE PERMANENT EXPULSION OF THE CONTRACTOR FROM THE AIRPORT.
3. THE CONTRACTOR SHALL TAKE NOTE OF THE EXISTING CONDITIONS OF ANY AIRPORT OWNED FENCING THAT IS USED FOR CONSTRUCTION ACCESS. IF DAMAGED, ANY EXISTING AIRPORT FENCE SHALL BE REPLACED OR RESTORED TO ITS ORIGINAL CONDITIONS AT NOT ADDITIONAL COST TO
THE OWNER.
4. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO COORDINATE WITH THE ENGINEER
AND/OR RPR REGARDING CONSTRUCTION SCHEDULE AND PLANNING. NOTAMS FOR LOCALIZED
CLOSURES SHALL BE PLANNED AND COORDINATED WITH THE OWNER IN ADVANCE OF THE START
OF WORK. THE CONTRACTOR SHALL HAVE A QUALIFIED REPRESENTATIVE CAPABLE OF
COMMUNICATING WITH THE LOCAL AIR TRAFFIC AND KNOWLEDGEABLE ABOUT MOVEMENT ON
ACTIVE AIRFIELD PAVEMENT AREAS. THE CONTRACTOR SHALL CLOSELY COORDINATE ACCESS ON AND ACROSS OPEN AND ACTIVE AIRFIELD PAVEMENT WITH THE AIRPORT, AIR TRAFFIC, AND THE
RESIDENT ENGINEER.
WORK AREA A BOUNDARY, (TYP.)
LOW PROFILE BARRICADES INTENDED FOR WORK AREA A, SEE DETAIL
1/C103, ON SHEET C103 FOR MORE INFORMATION.
CONTRACTOR ACCESS ROUTE, (TYP.)
WORK AREA B BOUNDARY, (TYP.)
LOW PROFILE BARRICADES INTENDED FOR WORK AREA B, SEE DETAIL
1/C103, ON SHEET C103 FOR MORE INFORMATION.
EXISTING FENCE
LINE, (TYP.)
EXISTING
AIRCRAFT
PARKING
APRON
D
IR
T AC
C
ESS R
O
AD
HANGAR
HANGAR
HANGAR
CONTRACTOR STAGING, STOCKPILE AND LAYDOWN AREA, (TYP.)
INDUSTRIAL PARK AVE
INDUSTRIAL PARK AVE
INDUSTRIAL APARK AVE
PARKING LOT
EXISTING
AIRCRAFT
PARKING
APRON
BUILDING
BUILDING
BUILDING
BUILDING
BUILDING
BUILDINGBUILDING
BUILDING
BUILDING
BUILDING
BUILDING
BUILDING
PARKING LOT
PARKING LOT
EXISTING AIRPORT
PROPERTY LINE, (TYP.)
TA
XI
W
AY
C
TA
XI
W
AY
C
TA
XI
W
AY
E
TA
XI
W
AY
E
TA
XI
W
AY
E
BUILDING
TAXIWAY SAFETY
AREA, (TYP.)
TAXIWAY OBJECT
FREE AREA, (TYP.)
ACCESS ROAD
HANGAR E
CONTRACTOR SHALL REFRAIN
FROM USING THIS ENTRANCE.
ENTRANCE AND EXIT FOR FIRE
DEPARTMENT USE ONLY.
ACCESS GATE
R25
TSA
TSA
TSA
TSA
TSA TSA TSA
TS
A
TS
A
TS
A
TS
A
TS
A
TS
A
TSA
TSA
TSA TSA TSA
TS
A
TS
A
TO
FA
TO
FA
TO
FA
TO
FA
TO
FA
TO
FA
TOFA
TOFA TOFA TOFA TOFA
TO
FA
TO
FA
TO
FA
TO
FA
TO
FA
TO
FA
CB
CB
CB
CB
CB
CB
CB
CB
CB
TO
FA
TO
FA
TOFATOFATOFA
TO
FA
N: 1714151.824 E: 675034.030
N: 1714152.266 E: 675034.926
N: 1713994.575 E: 675163.229
N: 1713995.480 E: 675162.795
N: 1714282.901 E: 675559.453
N: 1714377.665 E: 675493.435
N: 1714159.232 E: 675049.046
RAD. #3:
N: 1714245.182 E: 675487.591
#2 R47'#1 R30'
RAD. #1:
N: 1714037.069 E: 675141.796
RAD. #2:
N: 1714037.314 E: 675142.732
32'
(TYP.) N: 1714282.424
E: 675558.464
N: 1714180.238 E: 675525.873
N: 1714181.133 E: 675525.428
N: 1714201.446 E: 675513.679
N: 1714200.698 E: 675514.343
# 3 R64'# 4 R59'
RAD. #4:
N: 1714238.998 E: 675506.528
N: 1714267.612 E: 675528.239
N: 1714268.041 E: 675529.104
R25'
R25
R25'
ALB
NOVEMBER, 2025
2025.287.03
JEG
Checked By:
Date:
Project No.:
Drawn By:
REVISIONS:
100% Construction Documents vo ic e
7.
0.
w w w
.k m ad g.
ne t
AR
N
EW
S M
YR
N
A B
EA
C
H A
IR
PO
R T
H an ga r
"E
R en o va ti o n
Sk yl in e
D riv e N ew S m yr na B ea ch
, F L
C102
CIVIL SITE PLAN CIVIL SITE PLAN NOTES
CONTINUOUS TAXIWAY EDGE MARKING
TAXIWAY CENTERLINE MARKING
SHEET NOTES:
1. IF REQUESTED, AUTOCAD FILES MAY BE PROVIDED TO THE CONTRACTOR FOR ASSISTANCE
WITH LAYOUT AND PROJECT STAKING, HOWEVER, THE AUTOCAD FILES SHALL BE USED FOR
REFERENCE ONLY.
2. CONTRACTOR SHALL VERIFY EXISTING BENCHMARK INFORMATION PRIOR TO LAYOUT AND
STAKING IN ACCORDANCE WITH THE PLANS. CONTRACTOR SHALL PROVIDE THE ENGINEER
WITH WRITTEN DOCUMENTATION THAT SURVEY CONTROL WAS ESTABLISHED IN
ACCORDANCE WITH THE PLANS AND DETAILS PRIOR TO LAYOUT AND STAKING OF
PROPOSED WORK.
MARKING NOTES:
1. HALF-RATE PAVEMENT MARKINGS SHALL BE APPLIED UPON COMPLETION OF THE FINAL
PLACEMENT OF ASPHALT SURFACE COURSE, ITEM P-620, HALF-RATE PAVEMENT MARKINGS,
WATERBORNE PAINT, WITHOUT REFLECTIVE MEDIA.
2. HALF-RATE MARKING SHALL NOT CONTAIN ANY REFLECTIVE MEDIA AND ONLY CONSIST OF
YELLOW AND WHITE MARKINGS, WITHOUT BLACK BORDERS.
3. PRIOR TO APPLICATION OF PAINT MARKINGS, THE CONTRACTOR LAYOUT SHALL BE
REVIEWED AND APPROVED BY THE ENGINEER.
4. ANY MARKINGS OBSCURED BY CONSTRUCTION OPERATIONS OUTSIDE OF THE SCOPE OF
WORK SHALL BE RESTORED BY THE CONTRACTOR. IF ANY EXISTING MARKINGS ARE
DISTURBED OUTSIDE OF THE SCOPE OF WORK THE CONTRACTOR SHALL BE RESPONSIBLE
FOR ANY ADDITIONAL MARKING COST.
5. PRIOR TO THE APPLICATION OF PAINT THE CONTRACTOR SHALL SWEEP THE PAVEMENT
AND REMOVE ANY ASPHALT SCABS BEFORE PROCEEDING WITH THE MARKING LAYOUT.
NOTES:
1. GLASS BEADS SHALL BE TYPE I IN ACCORDANCE WITH ITEM P-620 AND SHALL
BE APPLIED IMMEDIATELY AFTER THE APPLICATION OF PAINT. GLASS BEADS
SHALL NOT BE APPLIED TO BLACK PAINT.
TAXIWAY C/L
6" WIDE YELLOW TAXIWAY CENTERLINE
MARKING WITH TYPE I REFLECTIVE
MEDIA, ITEM P-620 TAXIWAY MARKINGS,
WATERBORNE PAINT WITH TYPE I
REFLECTIVE MEDIA.
PROPOSED TAXIWAY CENTERLINE MARKING,
ITEM P-620, (TYP.). SEE DETAIL 2/C102, ON
THIS SHEET FOR ADDITIONAL INFORMATION.
TIE INTO EXISTING
CENTERLINE MARKING, (TYP.)
NOTES:
1. GLASS BEADS SHALL BE TYPE I IN ACCORDANCE WITH ITEM P-620 AND
SHALL BE APPLIED IMMEDIATELY AFTER THE APPLICATION OF PAINT. GLASS
BEADS SHALL NOT BE APPLIED TO BLACK PAINT.
PAVEMENT AREA
TAXIWAY PAVEMENT
TAXIWAY EDGE
OF PAVEMENT
MARKING
CENTERLINE,
(TYP.)
PROPOSED TAXIWAY EDGE MARKING,
ITEM P-620, (TYP.). SEE DETAIL 1/C102,
ON THIS SHEET FOR ADDITIONAL
INFORMATION.
EXISTING FENCE
LINE, (TYP.)
D
IR
T AC
C
ESS R
O
AD
HANGAR
HANGAR
INDUSTRIAL PARK AVE
INDUSTRIAL PARK AVE
INDUSTRIAL APARK AVE
PARKING LOT
BUILDING
BUILDING
BUILDING
BUILDING
BUILDING
BUILDING
BUILDING
BUILDING
BUILDING
BUILDING
BUILDING
BUILDING
PARKING LOT
PARKING LOT
EXISTING AIRPORT
PROPERTY LINE, (TYP.)
TA
XI
W
AY
C
TA
XI
W
AY
C
TA
XI
W
AY
E
TA
XI
W
AY
E
TA
XI
W
AY
E
BUILDING
TAXIWAY SAFETY
AREA, (TYP.)
TAXIWAY OBJECT
FREE AREA, (TYP.)
ACCESS ROAD
PROPOSED GRANITE BED, (TYP.). SEE
DETAIL 4/C103, ON SHEET C103 FOR
ADDITIONAL INFORMATION.
PROPOSED HOSE BIB LOCATION,
(TYP.). SEE DETAIL 3/C103, ON
SHEET C103 FOR ADDITIONAL
INFORMATION.
PROPOSED GRANITE BED, (TYP.). SEE
DETAIL 5/C103, ON SHEET C103 FOR
ADDITIONAL INFORMATION.
HANGAR E
EXISTING
AIRCRAFT
PARKING
APRON
EXISTING
AIRCRAFT
PARKING
APRON
GRAPHIC SCALE (FT)
120'60'30'
NORTH
C102
C102
CONTINUOUS DOUBLE TAXIWAY EDGE
MARKING, 6" WIDE, YELLOW, ITEM P-620
TAXIWAY MARKINGS, WATERBORNE PAINT
WITH TYPE I REFLECTIVE MEDIA.
6" (T
YP
HANGAR
ALB
NOVEMBER, 2025
2025.287.03
JEG
Checked By:
Date:
Project No.:
Drawn By:
REVISIONS:
100% Construction Documents vo ic e
7.
0.
w w w
.k m ad g.
ne t
AR
N
EW
S M
YR
N
A B
EA
C
H A
IR
PO
R T
H an ga r
"E
R en o va ti o n
Sk yl in e
D riv e N ew S m yr na B ea ch
, F L
C103
CONSTRUCTION SAFETY AND PHASING PLAN NOTES LOW BARRICADE NOTE DETAIL
(N.T.S)
HOSE BIB DETAIL
(N.T.S)
NOTES:
1. BARRICADES SHALL BE 6" X 8' AIRPORT LOW PROFILE
BARRICADE (ORANGE) AS MANUFACTURED BY NEUBERT
AERO CORP OR AN APPROVED EQUIVALENT.
2. FLAT, BIDIRECTIONAL WARNING LIGHTS WILL NOT BE
ACCEPTABLE.
3. BARRICADES SHALL BE PLACED IN THE LOCATIONS
IDENTIFIED ON SHEETS C102 AND SHALL BE APPROVED
BY THE RPR IN THE FIELD.
4. BARRICADES SHALL BE WATER FILLED OR WEIGHTED IN
A WAY TO PREVENT MOVEMENT DUE TO WIND, JET
BLAST, OR PROP WASH.
5. PLACEMENT, MAINTENANCE, AND REMOVAL OF
BARRICADES SHALL NOT BE PAID SEPARATELY AND
SHALL BE INCIDENTAL TO ITEM GP-80, CONSTRUCTION
SAFETY AND PHASING PLAN COMPLIANCE.
360° SOLAR-POWERED
FLASHING RED WARNING
LIGHT
SAFETY ORANGE AND WHITE,
HIGH IMPACT, UV RESISTANT,
HDPE WATER-FILLED BARRICADE
6" X 6' ORANGE AND WHITE
REFLECTIVE SHEETING, CLASS B
CONNECTOR TO
NEXT UNIT, (TYP.)
8' (TYP.)
6" (T
YP
GENERAL SAFETY AND PHASING NOTES
1. THERE WILL BE A 45 CONSECUTIVE CALENDAR DAY MOBILIZATION, PROCUREMENT,
AND SUBMITTAL PHASE PRIOR TO THE START OF CONSTRUCTION. DURING THIS TIME,
THE CONTRACTOR SHALL SUBMIT ALL REQUIRED SUBMITTALS AND SHOP DRAWINGS
FOR REVIEW BY THE ENGINEER. ADDITIONALLY, THE CONTRACTOR SHALL COMPLETE
ALL NECESSARY PRECONSTRUCTION ACTIVITIES, INCLUDING CONTROL POINT AND
SURVEY VERIFICATION, STAGING AREA SETUP, ACCESS COORDINATION, AND OTHER
PREPARATORY TASKS.
2. ALL VEHICLES IN THE CONSTRUCTION AREA MUST BE EQUIPPED WITH AN ORANGE
AND WHITE CHECKERED FLAG ON THE HIGHEST POINT OF THE VEHICLE, PLEASE SEE
DETAIL 2/C103, ON THIS SHEET FOR ADDITIONAL INFORMATION. A FLASHING/ROTATING
AMBER CONSTRUCTION BEACON IS ALSO ACCEPTABLE.
3. ACCESS TO THIS PROJECT REQUIRES USE OF EXISTING CITY AND AIRPORT ROADS. IT
SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO ENSURE THAT ALL ACCESS
SURFACES REMAIN CLEAN AND CLEAR OF DIRT AND DEBRIS AT ALL TIMES.
4. ADDITIONALLY, THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIRING ANY AND
ALL DAMAGE INFLICTED UPON THE ACCESS ROUTES OVER THE DURATION OF THE
PROJECT. THE ENGINEER/OWNER SHALL DOCUMENT THE EXISTING CONDITION AND
POST-CONDITION OF ALL ACCESS ROUTES. ANY MEASURABLE DAMAGE SHALL BE
REPAIRED BY THE CONTRACTOR AT NO ADDITIONAL COST TO THE OWNER.
5. THE CONTRACTOR SHALL CONDUCT ALL WORK IN ACCORDANCE WITH FAA ADVISORY
CIRCULAR AC 150/5370-2, LATEST EDITION AND FDOT MOT SPECIFICATIONS WHEN
NECESSARY.
6. THE CONTRACTOR SHALL CONTACT THE ENGINEER FOR CONTACT INFORMATION OF
KEY AIRPORT PERSONNEL.
7. THE BARRICADES INDICATED ON THE PLAN REPRESENT THE TRAFFIC CONTROL
REQUIRED DURING CONSTRUCTION. IN THE EVENT THAT MORE TRAFFIC CONTROL IS
REQUIRED DURING CONSTRUCTION, IT IS THE CONTRACTOR'S RESPONSIBILITY TO
DETERMINE THE NUMBER AND LOCATION OF BARRICADES REQUIRED TO KEEP THE
ACTIVE WORK AREA PROTECTED.
8. THE CONTRACTOR IS REQUIRED TO SUBMIT A SAFETY PLAN COMPLIANCE
CERTIFICATION (SPCC). THIS DOCUMENT CERTIFIES THAT THE CONTRACTOR HAS
READ AND UNDERSTANDS THE SAFETY AND PHASING REQUIREMENTS OF THE
PROJECT. ADDITIONALLY THE CONTRACTOR AGREES TO FOLLOW THE RULES AND
REQUIREMENTS OF THIS SAFETY AND PHASING PLAN, THE CONTRACT DOCUMENTS
AND THE REQUIREMENTS OF FAA ADVISORY CIRCULAR 150/5370-2, LATEST EDITION. A
NOTICE TO PROCEED (NTP) WILL NOT BE ISSUED UNTIL THE SPCC IS SUBMITTED.
9. NO BADGING IS REQUIRED FOR THIS PROJECT/AIRPORT, HOWEVER THE CONTRACTOR
SHALL BE REQUIRED TO COORDINATE WITH THE OWNER FOR ACCESS THROUGH THE
AUTOMATED GATES.
10. ANY STOCKPILED MATERIALS AND EQUIPMENT VEHICLES ON SITE ARE NOT PERMITTED
WITHIN THE TSA OR TOFA OF AN OPERATIONAL RUNWAY, UNLESS GIVEN PROPER
APPROVAL FROM THE RPR, AIRPORT STAFF AND ATCT.
11. THE CONTRACTOR SHALL BE REQUIRED TO HAVE A QUALIFIED REPRESENTATIVE ON
SITE THAT CAN PROPERLY COMMUNICATE WITH THE ATCT STAFF VIA RADIO
COMMUNICATIONS AT ALL TIMES. RADIO FREQUENCY SHALL BE SET TO 119.675 AT ALL
TIMES DURING CONSTRUCTION OPERATION DAYS. ANY CONTRACTOR VEHICLES
PRESENT ON THE CONSTRUCTION SITE WILL BE REQUIRED TO HAVE THEIR VEHICLES
EQUIPPED WITH RADIOS. BASED ON THE RESPECTIVE WORK AREA, PORTIONS OR ALL
OF THE AIRPORT WILL REMAIN OPEN AND ACTIVE DURING THE COURSE OF THIS
PROJECT. MAINTAINING OPEN LINES OF COMMUNICATION WITH THE TOWER IS
REQUIRED AT ALL TIMES.
12. THE CONTRACTOR SHALL TAKE ALL NECESSARY MEASURES TO PROTECT THE
EXISTING ASPHALT FROM ANY OIL SPILLS, GAS LEAKS, ETC. ANY DAMAGE TO THE
ASPHALT DUE TO THE MARKER, SHALL BE REPAIRED. ALL COSTS ASSOCIATED WITH
THE REPAIR SHALL BE BOURNE BY THE CONTRACTOR.
13. DURING THE COURSE OF THIS PROJECT THE CONTRACTOR WILL HAVE TO CROSS
OVER EXISTING ASPHALT PAVEMENT AREAS TO ACCESS THE DESIGNATED PLAN WORK
AREAS. CONTRACTOR SHALL TAKE EXTRA PRECAUTIONS TO AVOID PAVEMENT
DAMAGES. ANY PAVEMENT AREAS OUTSIDE OF THE PROJECT RECONSTRUCTION
LIMITS THAT HAS BEEN ALTERED OR DAMAGED AS A RESULT OF WORK WILL BE
RESTORED TO ORIGINAL CONDITION OR BETTER, AT THE CONTRACTOR'S EXPENSE.
14. IN THE EVENT THAT BARRICADING AND PROVIDING ESCORTS ARE INSUFFICIENT IN
RESTRICTING MOVEMENT OF CONSTRUCTION VEHICLES AND PERSONNEL TO
PERMITTED CONSTRUCTION AREAS, FLAGGERS MAY BE NECESSARY. IN SUCH EVENT,
FLAGGERS SHALL BE AS REQUIRED BY THE OWNER AND FAA ADVISORY CIRCULARS.
THE COST FOR PROVIDING FLAGGERS SHALL BE INCIDENTAL TO ITEM C-106,
CONSTRUCTION SAFETY AND PHASING PLAN COMPLIANCE.
15. THE CONTRACTOR SHALL KEEP ALL ACTIVE PAVEMENT SURFACES (AIRSIDE AND
LANDSIDE) CLEAN AND FREE OF DEBRIS. A POWER BROOM AND/OR SWEEPER TRUCK
SHALL BE ON SITE AND AVAILABLE AT ALL TIMES FOR CLEANING OF PAVEMENT
SURFACES. NO DIRECT PAYMENT SHALL BE MADE FOR THE CLEANING AND
MAINTAINING OF EXISTING PAVEMENT SURFACES, AS IT IS A NECESSARY AND
INCIDENTAL PORTION OF THE WORK.
16. IT SHALL THE RESPONSIBILITY OF THE CONTRACTOR TO MAINTAIN A SAFE AND
SECURE AIRFIELD. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING SITE
ACCESS AND PROPER SECURITY OF CONSTRUCTION ACCESS GATES.
17. THE START DATE FOR PROPOSED WORK SHALL BE COORDINATED WITH THE OWNER
AND ENGINEER AT LEAST 72 HOURS IN ADVANCE.
18. IN THE EVENT THAT THE CONTRACTOR'S ACCESS ROUTE IS UNAVAILABLE AT THE TIME
OF CONSTRUCTION, IT IS THE CONTRACTOR'S RESPONSIBILITY TO DETERMINE THE
BEST WAY TO ACCESS THE CONTRACTOR'S STAGING, LAY-DOWN, STOCKPILE, AND
PERSONAL VEHICLE PARKING AREA.
19. THE CONTRACTOR IS RESPONSIBLE FOR ALL TRAFFIC CONTROL DEVICES NECESSARY
TO BE INSTALLED ALONG THE NEW AIRPORT FDOT ROADWAY DURING CONSTRUCTION
AND FDOT MAINTENANCE OF TRAFFIC REQUIREMENTS.
20. EXISTING PAVEMENT DISTURBED BY WORK IN THE DESIGNATED WORK AREA SHALL BE
RESTORED TO ORIGINAL CONDITION OR BETTER. ALL COSTS ASSOCIATED WITH THE
RESTORATION OF ANY DISTURBED PAVEMENT SHALL BE BORNE BY THE CONTRACTOR.
INSPECTION REQUIREMENTS
1. AT THE END OF EACH DAY, THE CONSTRUCTION AREA SHALL BE INSPECTED FOR ANY
FOD ON AIRFIELD OR NON AIRFIELD PAVEMENTS.
2. AT THE BEGINNING OF EACH CONSTRUCTION DAY, THE CONTRACTOR SHALL VERIFY
ALL BARRICADES ARE PLACED CORRECTLY.
SAFETY REQUIREMENTS
1. THE CONTRACTOR SHALL TAKE ALL PRECAUTIONS NECESSARY TO ENSURE THE
SAFETY OF OPERATING AIRCRAFT AS WELL AS THAT OF THEIR OWN EQUIPMENT AND
PERSONNEL. THE CONTRACTOR SHALL OBEY ALL INSTRUCTIONS AS TO ROUTES TO BE
TAKEN BY EQUIPMENT TRAVELING WITHIN THE AIRPORT AREA. THE CONTRACTOR
SHALL MAKE HIS OWN ESTIMATE OF ALL DIFFICULTIES TO BE ENCOUNTERED.
2. EQUIPMENT NOT IN OPERATION SHALL BE KEPT CLEAR OF ACTIVE OPERATIONAL
AREAS; PERSONNEL SHALL NOT ENTER OR OPERATE EQUIPMENT WITHIN ACTIVE
OPERATIONAL AREAS OF THE AIRPORT WITHOUT SPECIFIC PERMISSION FROM THE
OFFICE OF THE AIRPORT REPRESENTATIVE.
3. UNAUTHORIZED ENTRANCE OF CONTRACTOR EMPLOYEES AND EQUIPMENT INTO AN
AIR OPERATIONS AREA WILL BE CAUSE FOR IMMEDIATE ACTION AS PROVIDED FOR IN
GENERAL PROVISIONS SUBSECTION TITLED CHARACTER OF WORKERS METHODS AND
EQUIPMENT OF ITEM GP-80, CONSTRUCTION SAFETY AND PHASING PLAN COMPLIANCE.
4. OPEN TRENCHES, EXCAVATIONS AND STOCKPILED MATERIAL AT THE CONSTRUCTION
SITE SHALL BE PROMINENTLY MARKED WITH ORANGE FLAGS AND LIGHTED BY LIGHT
UNITS OR LOW PROFILE LIGHTED BARRICADES DURING HOURS OF RESTRICTED
VISIBILITY AND/OR DARKNESS.
CONTRACTOR DAILY CLEAN UP AND INSPECTION
1. AFTER ALL WORK HAS BEEN COMPLETED FOR THE DAY AND PRIOR TO DEPARTING THE
PROJECT AREA, THE CONTRACTOR OR THEIR SUPERINTENDENT SHALL SEE THAT:
1.1. ALL TOOLS, EQUIPMENT AND CONSTRUCTION MATERIALS HAVE BEEN REMOVED
AND PROPERLY STORED AT THE STAGING AREA.
1.2. PLACE BARRICADES, RAILINGS, PLACE COVERS OVER HOLES AND TRENCHES,
ROPE OFF AREAS AND TAKE OTHER PRECAUTIONS NECESSARY TO MINIMIZE THE
POSSIBILITY OF INJURY TO ANY PERSON(S) WHO MAY FOR ANY REASON ENTER
THE PROJECT WORK AREA.
1.3. OPEN TRENCHES, EXCAVATIONS AND STOCKPILED MATERIAL AT THE
CONSTRUCTION SITE SHALL BE PROMINENTLY MARKED WITH LIGHTS DURING
HOURS OF DARKNESS.
AVIATION ORANGE
AVIATION WHITE
3' MIN.
3' M
IN
NOTES:
1. THE CONTRACTOR SHALL PROMINENTLY DISPLAY AVIATION
SAFETY FLAGS ON ALL CONSTRUCTION VEHICLES AND
EQUIPMENT AT THE HIGHEST POINT ON EACH PIECE OF
CONSTRUCTION EQUIPMENT.
2. COST SHALL BE INCIDENTAL TO GP-80, CONSTRUCTION
SAFETY AND PHASING PLAN COMPLIANCE.
AVIATION FLAG DETAIL
(N.T.S)
HOSE BIB W/ 34" HOSE CONN. WITH
VACUUM BREAKER
4" 90° GALVANIZED
STEEL ELBOW
EXISTING WATER MAIN
TO TIE INTO
4" X 36" GALVANIZED
STEEL PIPE
GRANITE BED DETAIL, HANGAR E WESTERN FACE
(N.T.S)
EXISTING
SUBGRADE
NO. 57 GRANITE
DECORATIVE BED,
(TYP.)
HANGAR E
OUTER WALL
BLACK PLASTIC
EDGING
LANDSCAPING
SECTION, (TYP.)
GEOTEXTILE
FABRIC
2'
GRANITE BED DETAIL, HANGAR E EASTERN FACE
(N.T.S)
EXISTING
SUBGRADE
NO. 57 GRANITE
DECORATIVE BED,
(TYP.)
HANGAR E
OUTER WALL
EXISTING TRANSFORMER
BLACK PLASTIC
EDGING
LANDSCAPING
SECTION, (TYP.)
CONCRETE PAD
GEOTEXTILE
FABRIC
2'
C103
C103
C103
C103
C103
File details come from the government source that posted it. Updated .