Drawings.pdf
PDF 9 MB Posted
- Solicitation number
- 140P5420R0007
About this file
This set of documents includes engineering drawings and specifications for the rehabilitation of the Flamingo Waste Water Treatment Plant at Everglades National Park. The project involves replacing underground conduit runs with new overhead conduit on a support structure, installing new air conditioners and flowmeters connected to the PLC, replacing the influent screen and controls, and furnishing and installing new mixers in the aeration tank. The work must be performed in accordance with project specifications and applicable codes. The related federal contract opportunity is solicitation number 140P5420R0007 issued by the Department of the Interior National Park Service Southeast Region for the rehabilitation of the Flamingo Waste Water Treatment Plant.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NOT IN
CONTRACT
EMERGENCY
HOLDING
LAGOON
5'-0"
VENT
OPENING
E
I MBRVFD-C
PLC
OVERHEAD CONDUIT
TO NEW A/C UNIT
1'-6"
T
MBR EQUIPMENT
BUILDING
MBR TANK EQUAUZATION TANK AND MBR FILTER TANK
NOTES:
1. HAZARDOUS BOUNDARIES
SHALL BE IN · ACCORDANCE
WITH NFPA 820. -
DIVISION 1 DIVISION 2
TYPICAL HAZARDOUS BOUNDARIES
D
UNCLASSIFIED
VERHEAD CONDUIT
RUNS BETWEEN MBR
EQUIPMENT BUILDING,
GENERATOR, MBR TANK,
AND EQUALIZATION TANK
� - BR TANK
�BR BO�
CODED NOTES: (j)
CONNECT TO EXISTING
EQUIPM ENT ON MBR TANK
SC20�
0 CONTROLL� 7
r-. ONNECT TO NEW MIXER
� . COMBINATION MOTOR
STARTERS
// I
CONNECT TO NEW INFLUENT
SCREEN CONTROL PANEL
1. FURNISH AND INSTALL NEW FLOWMETER INSTRUMENT/TRANSMITTER. SEE DETAIL
1 /E6. FOR FLOWMETER TRANSM ITTER MOUNTING SEE DETAIL 6/E6.
2. FURNISH AND INSTALL NEW AIR CONDITIONING UNIT AS DETAILED ON SHEET E4.
3. CONTRACTOR SHALL VERIFY EXISTING FEED TO PLC CONTROL PANEL. IF FEED IS
SUFFICIENT TO SUPPORT NEW A/C UNIT, ADD NEW 20A BREAKER TO PLC
CONTROL PANEL FOR NEW A/C. OTHERWISE, FURNISH AND INSTALL NEW
INDEPENDENT FEED FROM LP-3 TO NEW A/C UNIT AS SHOWN.
4. SEE DETAILS 2/E6, 3/E6 AND 5/E6 FOR TYPICAL DETAILS OF CONDUIT RUNS
AND SUPPORTS FOR CONDUITS ON AND INSIDE MBR EQUIPMENT BUILDING.
5. FURNISH AND INSTALL NEW CONTRASHER INFLUENT SCREEN AS SHOWN HEREIN.
NEW CONTRASHEAR SHALL INCLUDE CONTROL PANEL WITH STARTER AND HOA
CONTROLS IN NEMA 4X ENCLOSURE TO BE MOUNTED ON OR NEXT TO THE NEW
CONTRASHEAR. FURNISH AND INSTALL CONDUIT & CONTROL WIRE TO PLC
CONTROL PANEL FOR AUTOM ATIC ·CONTROL AND MONITORING. REFER TO P&ID
AND RISER DIAGRAM FOR DETAIL. PROGRAM PLC AS REQUIRED. EXISTING
STARTER AND CONTROLS TO EXISTING CONTRASHEAR SHALL BE DISCONNECTED
AND LOCKED OUT.
6. CONNECT FLOWMETER TRANSM ITTERS TO THE PLC CONTROL PANEL. CONNECTION
SHALL BE HARDWIRE #16 TSP. OR COMPATIBLE ETHERNET CONNECTION.
PROVIDE SURGE SUPPRESSION FOR 4-20mA SIGNAL TO PROTECT PLC.
7. COM BINATION MOTOR STARTERS FOR NEW MIXERS SHALL BE IN NEMA 4X
STAINLESS STEEL ENCLOSURE. STARTER SHALL BE PAD-LOCKABLE IN THE OFF
POSITION.
GENERAL NOTES:
1 . ALL WORK SHALL BE IN ACCORDANCE WITH PROJECT SPECIFICATIONS.
2. ALL CONDUITS IN MBR TANK AREA SHALL HAVE EYS-TYPE CONDUIT SEAL-OFF
FITTINGS. THIS INCLUDES CONDUIT RUNS IN UNCLASSIFIED AREAS.
3. WHEN REPLACING EXISTING CONDUCTORS, THEY SHALL BE REPLACED WITH NEW,
OF EQUAL SIZE AND TYPE AS EXISTING, UNLESS OTHERWISE SPECIFIED HEREIN
OR REQUIRED BY CODE.
4. SUMMARY OF ELECTRICAL WORK:
A. FURNISH AND INSTALL SIDE MOUNT AIR CONDITIONER ON PLC CONTROL
PANEL, AND REPLACE AIR CONDITIONER ON MBR-VFD-CP WITH NEW.
B. FURNISH AND INSTALL INSTALL NEW INFLUENT AND OVERFLOW
FLOWMETERS AS SHOWN IN PLANS. CONNECT FLOWM ETERS TO PLC AND
PROGRAM NEW TREND SCREENS AS DESCRIBED ON P&ID DRAWING.
C. REPLACE EXISTING CONTRASHEAR INFLUENT SCREEN WITH NEW INFLUENT
SCREEN AND CONTROLS. PROGRAM NEW PLC AS REQUIRED TO INTEGRATE
NEW INFLUENT SCREEN.
D. REPLACE UNDERGROUND CONDUIT RUNS BETWEEN THE GENERATOR,
WWTP TANKS, AND MBR EQUIPMENT BUILDING WITH NEW OVERHEAD
CONDUIT RUNS ON A NEW CONDUIT SUPPORT STRUCTURE. REPLACE
EXISTING CONDUITS, CONDUCTORS AND JUNCTION BOXES IN AS SHOWN,
WITH NEW.
E. REPLACE/REMOVE MISCELLANEOUS ELECTRICAL EQUIPM ENT AS SHOWN
HEREIN.
F. FURNISH AND INSTALL NEW MIXERS IN AERATION TANK AS SHOWN HEREIN.
DESIGNED;
BCB
@1i.E0
DLS
EVIEW;
/MWSCR£tu
GDLIGHTING ROD RELOCATION
E3
10 0
SCALE OF FEET
SUB SHEET NO.
Edwin J ,,,1,m11m,,,,,, ,,,,''..., J. MAJ;>!/_!1,,, M •
.t�':�� .......... <�,,,,_ a rt1 n ez �tfy..- 0cENsl" ·-.�� f ( No.61692 \ \ 2018 06 0=*· * ·*- • • \'t·. STATE OF / j
I
��·-. -"LOR\\)I'-/�,� 8 10•24•45 "'�,, ifs� o ·· ·•··•· --�;r.,� ,.$' • •
"/1,,11 NAL £.,,,,,,,, ..
"'"""'"""" -04'00'
TITLE OF SHEET DRAWING NO.
ELECTRICAL
SITE PLAN.
143,392 PMIS/PKG NO. 8. RE-LOCATE EXISTING LIGHTING ROD FROM HANDRAIL (TO BE DEMOLISHED PER
E3 MECHANICAL PLANS) TO NEW HANDRAIL AS SHOWN. BOND TO TOEPLATE AND
� EXISTING LIGHTING PROTECTION SYSTEM WITH 4/0 WIRE (SAME AS EXISTING). DATE, FLAMINGO WWTS
SHEET
�'---------------------------------------------------------------------------------''--M _M:..../ _DD_,/_YY_..__ ___ ---1. ____ EV_E _R_G_LA_D_E _S_N _AT _IO_N_A _L_PA_R_K ___ -'-":::;1:::;Q=-o-'r:::;1:::;8= ffi ffi ffi ffi ffi avaldes Cross-Out avaldes Cross-Out avaldes Cross-Out avaldes Cross-Out avaldes Line avaldes Line avaldes Cross-Out g
[iJ;
q� �lil
�j �ti I a.
�fi -G�
�i j;--:-
� 6 ./I
,/u.J
1i j� �� �:g
3-� N5 c:: a.
ii if 0,/ cc :
GROUP 1
REMOVE UNUSED FLOWMETER
TRANSMITTER AND CONDUIT .
ABANDON REMAINING CONDUIT
UNDERGROUND. SUNSHIELD
AND EQUIPMENT RACK TO
REMAIN FOR FUTURE USE
REMOVE EXISTING UNUSED
CONDUITS THAT STUB UP
FROM UNDERGROUND.
ABANDON UNDERGROUND
CONDUIT RUN IN PLACE.
REPLACE CORRODED
CONDUIT SUPPORTS.
GROUP 4 CONDUITS
REPLACE ALL
UNDERGROUND
CONDUIT RUNS
IN GROUP 2
WITH NEW.
GROUP 2 CONDUITS
GROUP 5
ALL CORRODED ELECTRICAL
BOXES, CONNECTORS AND
CONDUIT AROUND THE
MEMBRANE FILTER BASIN
SHALL BE REPLACED WITH
NEW. REFER TO E10 FOR
DETAILS OF CONDUITS AND
JUNCTION BOXES AROUND
MEMBRANE FILTER BASIN THAT
ARE TO BE REPLACED.
CORRODED AND BROKEN
CONDUIT AND FITTINGS TO
BE REPLACED WITH NEW
GENERATOR CONDUITS
REPLACE GROUP 3
CONDUITS WITH
NEW. REFER TO
ONE-LINE DIAGRAM
FOR CONDUIT AND
CONDUCTOR
REQUIREMENTS FOR
NEW INFLUENT
SCREEN.
REMOVE EXISTING ELECTRICAL
FEEDER AND CONTROLS FOR
CONTRASHEAR. lt4s=FALL FEESER Atm SotHROL PAtiEL FOR UEW SotHRASI IEAR. SotffROL PAtiEL
51 IALL BE PR01v'IBED B¥ Tl IE MAW:JFASTl:JRER OF Tl IE
SOtffRASI IEAR.
GROUP 3 CONDUITS
REPLACE
UNDERGROUND
CONDUIT RUNS
FROM GENERATOR
TO ATS-A WITH
NEW.
GENERATOR
CONDUITS
GENERAL NOTES:
1. REFER TO DRAWINGS E10 AND E11 FOR SUPPLEMENTAL
INFORMATION ON EXISTING CONDUITS AND CONDUCTORS.
2. ALL UNDERGROUND CONDUIT RUNS SHALL BE REPLACED
WITH NEW OVERHEAD CONDUIT RUNS. CONDUIT RUNS
FROM WWTP (PROCESS AREA) TO MBR BUILDING, JB, OR
CONTROL PANEL SHALL HAVE NEW EYS TYPE CONDUIT
SEAL OFF FITTINGS. NEW CONDUIT RUNS IN
UNCLASSIFIED AREAS SHALL BE SCH-80 PVC. ALL NEW
JUNCTION BOXES IN UNCLASSIFIED LOCATIONS SHALL BE
NEMA 4X 316 STAINLESS STEEL.
DESIGNED: SUB SHEET NO. TITLE OF SHEET DRAWING NO.
BCB ELECTRICAL
� 143,392
DLS
E5
MODIFICATIONS PMIS/PKG NO.
TECH. REVIEW:
SHEET
DATE: FLAMINGO WWTS ��
�iL __________________________________________________________________________ ----'-...;.;,;.;.��.;..;...-'--------'---------------------12A OF -1§_ MM/DD/YY EVERGLADES NATIONAL PARK
File details come from the government source that posted it. Updated .