These are bid documents for a construction project to construct a new bed tower connector at the Veterans Affairs Medical Center (VAMC) in Tampa, Florida. The project number is 673-21-145, located at 13000 Bruce B. Downs Blvd. The project involves removing the existing ICU patient rooms and nurse station, and constructing a corridor to connect the Surgery area with the Bed Tower. The documents include comprehensive architectural, mechanical, electrical, plumbing, and fire protection plans for the second floor renovation, with detailed demolition and new work plans across multiple disciplines.
The bid documents are fully sprinklered and include extensive technical specifications adhering to numerous national codes and standards, including NFPA, International Building Code, and VA design guidelines. The project scope encompasses architectural modifications, HVAC system updates, electrical system reconfigurations, plumbing modifications, and fire alarm system integration. The drawings provide precise details on room layouts, equipment placement, demolition sequences, and new construction requirements, with specific attention to maintaining hospital operations and safety during the renovation process.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SHEET INDEX
GI001
SHEET
NO. DRAWING TITLE
GENERAL
GI002
ARCHITECTURAL
SHEET
NO.
COVER SHEET
NOTES, ABBREVIATIONS AND LEGEND
CONSTRUCT NEW BED TOWER CONNECTOR
PROJECT NUMBER: 673-21-145
BID DOCUMENTS
VAMC TAMPA
13000 BRUCE B. DOWNS BLVD.
TAMPA, FL 33612
SECOND FLOOR DEMO PLANAD101
PLUMBING
PLUMBING, LEGEND, ABBREVIATIONS AND NOTESP001
MECHANICAL
MECHANICAL LEGEND, ABBREVIATIONS, AND NOTESM001
SECOND FLOOR HVAC DEMOLITION PLANMD101
M101
PARTIAL SECOND FLOOR OVERALL PLUMBING PLAN - DEMOLITIONPD101
ENLARGED SECOND FLOOR PLUMBING PLAN SECTION A - DEMOLITIONPD401
LOCATION MAP
NOT TO SCALE
AREA MAP
NOT TO SCALE
TRUE
NORTH
TRUE
NORTH
PLAN
NORTH
PLAN
NORTH
PROJECT LOCATION
PROJECT LOCATION
SECOND FLOOR HVAC NEW WORK PLAN
M501 MECHANICAL DETAILS, SCHEDULE, AND CONTROLS
ENLARGED SECOND FLOOR PLUMBING PLAN SECTION B - DEMOLITIONPD402
PARTIAL SECOND FLOOR OVERALL PLUMBING PLAN - NEW WORKP101
ENLARGED SECOND FLOOR PLUMBING SECTION A - NEW WORKP401
ENLARGED SECOND FLOOR PLUMBING SECTION B - NEW WORKP402
SECOND FLOOR DEMO RCPAD111
SECOND FLOOR PLANAE101
SECOND FLOOR RCPAE111
ELECTRICAL
ELECTRICAL GENERAL NOTES AND ABBREVIATIONSE-001
ELECTRICAL LEGENDE-002
ED101 SECOND FLOOR ELECTRICAL DEMOLITION PLAN
ED103 SECOND FLOOR LIGHTING DEMOLITION PLAN
AE501 PARTITION TYPES AND DETAILS
GI003 SECOND FLOOR PHASE ONE PLANS
AE601 SCHEDULES, NOTES AND DETAILS
EL101 SECOND FLOOR LIGHTING PLAN
MECHANICAL NOTESM002
FIRE PROTECTION
FIRE PROTECTION LEGEND, ABBREVIATIONS AND NOTESFP001
PARTIAL SECOND FLOOR OVREALL FIRE PROTECTION - DEMOLITIONFPD101
PARITAL SECOND FLOOR OVERALL FIRE PROTECTION - NEW FP101
GI004 SECOND FLOOR PHASE TWO PLANS
ED102 SECOND FLOOR SYSTEMS DEMOLITION PLAN
EP101 SECOND FLOOR ELECTRICAL PLAN
E-600 ELECTRICAL SCHEDULES
FIRE DETECTION AND ALARM
FIRE ALARM NOTES AND LEGENDFA001
FIRE ALARM DEMOLITION PLANFD101
FA101 FIRE ALARM FLOOR PLANS AND RISER
SECOND FLOOR LIFE SAFETY PLANLS101
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
DATE:
Drawing Title:
Approved Project Director
Project Title:
1 2 3 4 5 6 7 8 9
BID DOCUMENTS
512 MEANS STREET NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 400
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and
Facilities Management
Drawn
SJ MC/KB
673-21-145
10-27-2025REVISIONS:
A
B
C
D
E
F
CONSTRUCT NEW BED TOWER
CONNECTOR
13000 BRUCE B DOWNS BLVD
COVER SHEET
GI001
ARCHITECTURAL ABBREVIATIONSARCHITECTURAL LEGEND
GENERAL ARCHITECTURAL NOTES
GENERAL PROJECT NOTES
A
GA4
A301
A201
A401
ROOM
NAME
+ 0'-6"
F.E.C.
AIR CONDITIONING
ACOUSTICAL CEILING TILE
ABOVE FINISH FLOOR
ALUMINUM
BATT INSULATION
BOTTOM OF
CEMENTITIOUS BACKER BOARD
CEMENTITIOUS CRYSTALLINE WATERPROOFING
COLD-FORMED METAL FRAMING
CORNER GUARD
CENTERLINE
CONCRETE MASONRY UNIT
CASED OPENING
COMMUNICATION
CONCRETE
SEALED CONCRETE
CONTINUOUS
CONTRACTING OFFICER'S REPRESENTATIVE
CERAMIC TILE
CERAMIC TILE BASE
CARPET
DIAMETER
EXPANSION JOINT
ELECTRICAL
EPOXY FLOORING
EXPOSED STRUCTURE
ET CETERA
EXISTING
EXPOSED
FACTORY FINISH
FLOOR DRAIN
FIRE EXTINGUISHER CABINET
FIRE HOSE CABINET
FINISHED FLOOR
FINISH
FLOOR
FACE OF
FIELD VERIFY
FABRIC WALLCOVERING
GAGE
GRANITE
GYPSUM (WALL) BOARD
HANDICAPPED
HOLLOW METAL
HANDRAIL
HEATING VENTILATION AND AIR-CONDITIONING
MATERIAL
MAXIMUM
MECHANICAL
MANUFACTURER
MINIMUM
MASONRY OPENING
METAL
NOT IN CONTRACT
NOT TO SCALE
ON CENTER
OPPOSITE HAND
PLASTER
PLASTIC LAMINATE
PORCELAIN TILE
PAIR
PAINT
QUARRY TILE
RESILIENT BASE
REFRIGERATOR
REQUIRED
RESINOUS FLOORING
RESINOUS EPOXY WALL-CEILING
ROUGH OPENING
RUBBER FLOORING
RECESSED PAPER HOLDER
SEALED HIGH BUILD GLAZED COATING
SOLID CORE WOOD
SIMILAR
SPECIAL FACED
STAINLESS STEEL
STEEL
SUBSTRATE
SHEET VINYL
SOLID VINYL TILE
TELEPHONE
TOP OF
TYPICAL
UNLESS NOTED OTHERWISE
VINYL COMPOSITION TILE
VINYL WALL COVERING
WALL COVERING
WALL PROTECTION
WOOD
WELDED SEAM SHEET FLOORING
AC
AT
AFF
AL
BATT
BO
CBB
CCW
CFMF
CG
C
CMU
CO
COMM
CONC
SCONC
CONT
COR
CT
CTB
CP
DIA
EJ
ELEC
EPY
ES
ETC
EXIST
EXP
FAC FIN
FD
FEC
FHC
FF
FIN
FLR
FO
FV
FWC
GA
GRA
GYP BD/GWB
HC
HM
HR
HVAC
MATL
MAX
MECH
MFR
MIN
MO
MTL
NIC
NTS
OC
OH
PLS
PL
PT
PR
P
QT
RB
REF
REQ'D
RES
RES-W
RO
RF
RPH
SC
SCW
SIM
SP
SS
STL
SUBS
SV
SVT
TELE
TO
TYP
UNO
VCT
VWC
WC
WP
WD
WSF
L
FIRE EXTINGUISHER CABINET
ROOM NAME AND NUMBER
DOOR NUMBER
KEY NOTE
WINDOW TYPE
PARTITION TYPE
DETAIL CALLOUT
DETAIL NUMBER
SHEET WHERE DETAIL IS DRAWN
SECTION CALLOUT
VERTICAL ELEVATION
COLUMN CENTERLINE DESIGNATION
DEMOLITION KEY NOTE
DETAIL NUMBER
SHEET WHERE DETAIL IS DRAWN
INTERIOR ELEVATION CALLOUT
DETAIL NUMBER
SHEET WHERE DETAIL IS DRAWN
CARD READER/ CRASH RAILCR
HIGH-PRESSURE LAMINATEHPL
LUXURY VINYL TILELVT
EDGE OF DECKEOD
DOWNSPOUTDS
CONTROL JOINTCJ
DRINKING FOUNTAINDF
FIRE RETARDANT TREATEDFRT
EXTERIOR INSULATION FINISHING SYSTEMEIFS
WATER RESISTANTWR
J1
SECTION CUT
HEAD/JAMB/SILL DETAIL NUMBER EQUALEQ
CARPET TILECPT
REFLECTED CEILING PLANRCP
SOLID SURFACE MATERIALSSM
X1045 EQUIPMENT TAG
ALUMINUM COMPOSITE METAL PANELSACMP
A. DIMENSIONS, UNLESS OTHERWISE INDICATED, ARE TO:
• FACE OF EXISTING WALL SURFACE
• FACE OF MASONRY
• FACE OF WALL STUDS
• TOP OF SLAB
• TOP OF MASONRY
• ALIGN WALLS WITH EXISTING WHERE NOT OTHERWISE INDICATED.
B. COORDINATE WITH ALL DISCIPLINES DRAWINGS FOR ADDITIONAL REQUIREMENTS.
C. COORDINATE OPENINGS IN SLABS, ROOF, AND WALLS. WHERE HOLES IN EXISTING WALLS
AND SLABS ARE CREATED FOR PENETRATIONS, COORDINATE SIZE AND LOCATION. PATCH
HOLES CAUSED BY THE REMOVAL OF EQUIPMENT, PIPING, CONDUIT, DUCT, GRILLES, ETC.
WITH MATERIALS MATCHING EXISTING SLAB OR WALL IN STRUCTURE, MATERIAL,
THICKNESS, ALIGNMENT, GRADES, AND QUALITY.
D. COORDINATE AND PROVIDE GALVANIZED METAL BACKER PLATE OR SOLID FIRE
RETARDANT TREATED WOOD BLOCKING FOR WALL-MOUNTED ITEMS. COORDINATE
LOCATIONS WITH COR FOR GOVERNMENT PROVIDED/CONTRACTOR INSTALLED
EQUIPMENT AND ACCESSORIES.
E. `PROVIDE' IS DEFINED AS PROVIDING MATERIALS, DELIVERY, STORAGE, HANDLING,
INSTALLATION, ADJUSTMENT, AND CLEANING FOR THE ITEM INDICATED.
F. SEAL PIPE PENETRATIONS THROUGH SLABS, MASONRY, SMOKE RATED PARTITIONS AND
FIRE-RATED PARTITIONS WITH THE APPROPRIATE FIRESTOP TO MAINTAIN THE RATING OF
THE WALL OR SLAB. SUBMIT CUT SHEETS AND SPECIFICATIONS TO THE COR FOR
APPROVAL PRIOR TO INSTALLATION. PROVIDE UL LISTED ASSEMBLIES.
G. SKIM COAT ALL DAMAGED EXISTING WALL SURFACES THAT REQUIRE PAINTING.
H. REMOVED MATERIALS WHICH ARE INDICATED TO BE TURNED OVER TO THE COR SHALL BE
DELIVERED BY THE CONTRACTOR TO A PLACE INDICATED BY THE COR .
I. REMOVE COMPLETELY ALL MATERIALS AS INDICATED ON THE DRAWINGS AND AS
REQUIRED FOR CONSTRUCTION. EDGES AND FACES OF REMOVED AREAS SHALL BE
REPAIRED TO ACCEPT NEAT INSTALLATION OF CONSTRUCTION OR FINISHES. WHERE
EXISTING MATERIALS ARE TO BE REPLACED (WALLS, INSULATION, FLOORING, ETC.)
EXISTING MATERIALS, ADHESIVES, ETC. SHALL BE REMOVED AND EXPOSED SURFACES
SHALL BE PREPARED AS INDICATED OR SPECIFIED PRIOR TO INSTALLATION OF
MATERIALS.
J. PREVENT DAMAGE TO MATERIALS AND FINISHES TO REMAIN. REPAIR DAMAGES FROM
CONSTRUCTION ACTIVITIES TO EXISTING ITEMS TO REMAIN, AT NO ADDITIONAL COST
WHERE SUCH EXPOSED MATERIALS OR FINISHES TO REMAIN ARE DAMAGED.
K. CONTRACTOR SHALL DOCUMENT AND REPORT TO THE COR ANY PRE-EXISTING DAMAGE
OR UNSEALED PENETRATIONS AT THE START OF WORK.
A. THE CONTRACTOR SHALL BE PREPARED TO STOP ANY WORK AND CLEAN UP THE WORK AREA AS
DIRECTED IN MEDICAL SITUATIONS REQUIRING SUCH ACTION.
B. THE CONTRACTOR SHALL NOT ORDER OR INSTALL ANY MATERIALS OR EQUIPMENT UNTIL
SUBMITTALS FOR SUCH HAVE BEEN APPROVED.
C. ALL TOOLS AND MATERIALS USED IN THIS PROJECT SHALL BE PROPERLY SECURED AT ALL TIMES BY THE CONTRACTOR TO REDUCE THE POSSIBILITY OF ANY OF THESE TOOLS BEING A HAZARD TO
PATIENTS, VISITORS AND STAFF.
D. THE CONTRACTOR WILL BE RESPONSIBLE FOR ACQUIRING I.D. BADGES FOR EACH MEMBER OF HIS WORK FORCE. VALID FORMS OF I.D. ARE REQUIRED TO RECEIVE BADGES. COORDINATE WITH COR.
E. THE CONTRACTOR, AT HIS EXPENSE, WILL BE RESPONSIBLE FOR TRAINING EACH MEMBER OF HIS
WORK FORCE ON VA POLICIES FOR ON-SITE WORK BEFORE ANY MEMBER WILL BE ALLOWED TO
PERFORM WORK ON VA PREMISES.
F. ABSOLUTELY NO VA TOOLS, MATERIALS OR EQUIPMENT WILL BE LOANED OR GIVEN BY THE VA TO
ANY MEMBER OF THE CONTRACTOR'S WORK FORCE AT ANY TIME.
G. ANY SMOKE DETECTORS HAVING ANY POTENTIAL FOR EXPOSURE TO CONSTRUCTION SMOKE, DUST
AND DEBRIS SHALL BE SUITABLY PROTECTED TO PREVENT ACCIDENTAL ALARM DURING
CONSTRUCTION. ALL SUCH ACTION MUST BE FIRST COORDINATED AN CLEARED WITH THE COR AND THE VA SAFETY OFFICER. ALL FUNCTIONAL FIRE ALARM DEVICES SHALL BE ACTIVE WHENEVER THE
CONTRACTOR'S FORCES ARE NOT PRESENT IN THE WORK AREA.
H. THE CONTRACTOR MUST PROVIDE WRITTEN FIRE SAFETY CHECKLIST AT THE END OF EVERY WORK
DAY TO THE COR CERTIFYING THAT ALL WORK AREAS HAVE BEEN SURVEYED AND FOUND TO BE
SECURE, SAFE AND FREE OF ANY FLAMMABLE LIQUIDS.
I. CONTRACTOR SHALL COORDINATE ONLY WITH THE COR AND CONTRACTING OFFICER.
J. SEE SPECIFICATIONS SECTIONS 01 00 00 AND 01 35 26 FOR INTERIM LIFE SAFETY MEASURES.
K. ALL FINISH COLORS TO BE SELECTED BY COR/ VA INTERIOR DESIGNER WHERE NOT OTHERWISE
INDICATED. CONTRACTOR SHALL SUBMIT COLORS FROM THE MANUFACTURER'S FULL RANGE OF
COLORS.
L. PROVIDE 24"X24" ACCESS PANELS IN HARD CEILINGS WHERE DUCTS AND DAMPERS OR OTHER
PIPES REQUIRE ACCESS AS REQUIRED. COORDINATE EXACT LOCATIONS WITH THE COR.
M. THE CONTRACTOR SHALL NOT OPERATE ANY EXISTING VA EQUIPMENT WITHOUT AUTHORIZATION
FROM VAMC ENGINEERING SERVICE UNLESS AN EMERGENCY SITUATION OCCURS.
N. CONTRACTOR SHALL MAINTAIN ALL FIRE-RATED ASSEMBLIES WITHIN THE PROJECT AREA DURING
PERFORMANCE OF THE WORK.
O. CONTRACTOR SHALL PROVIDE AND MAINTAIN ALL REQUIRED EXIT LIGHTING AND SIGNAGE
REQUIRED FOR EGRESS WITHIN AND ADJACENT TO THE PROJECT AREA DURING PERFORMANCE OF THE WORK. SUBMITTAL FOR ALL EQUIPMENT AND MATERIAL MUST BE APPROVED BY COR PRIOR TO
PURCHASE/DELIVERY.
P. INDICATED EXISTING CONDITIONS ARE BASED UPON LIMITED FIELD INVESTIGATION AND DID NOT INCLUDE DESTRUCTIVE INVESTIGATION OR TESTING. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS INCLUDING DIMENSIONS OF THE INSTALLED CONSTRUCTION PRIOR TO COMMENCING WITH THE WORK. IF DISCREPANCIES ARE DISCOVERED, THE CONTRACTOR SHALL NOTIFY THE COR
FOR INTERPRETATION AND DIRECTION PRIOR TO PROCEEDING WITH THE WORK.
Q. COORDINATE WORK WITH EQUIPMENT SUPPLIER/ INSTALLER CONTRACTED SEPARATELY WITH THE GOVERNMENT. SUBMITTAL FOR ALL EQUIPMENT/ MATERIAL MUST BE APPROVED BY COR PRIOR TO
PURCHASE/ DELIVERY.
R. CONTRACTOR SHALL PROTECT ALL SITE AND BUILDING AREAS SUBJECT TO PROJECT-RELATED
VEHICULAR TRAFFIC AND DEMOLITION WORK.
S. THE CONTRACTOR SHALL DISPOSE OF ALL DEMOLISHED MATERIALS IN AN APPROVED. RECORD OF
WASTE, DISPOSAL MUST BE TURNED TO COR MONTHLY. OFFSITE LANDFILL EXCEPT WHERE
OTHERWISE REQUIRED FOR SALVAGE OR RECYCLING.
T. THE CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS INCLUDING DIMENSIONS OF INSTALLED
CONSTRUCTION PRIOR TO COMMENCING WITH THE WORK. IN THE EVENT THAT ANY
DISCREPANCIES BETWEEN THE INDICATED WORK AND EXISTING CONDITIONS ARE DISCOVERED,
THE CONTRACTOR SHALL NOTIFY THE COTR FOR INTERPRETATON AND DIRECTION PRIOR TO
PROCEDING WITH THE WORK.
1 SIGNAGE TYPE
SCOPE OF WORK STATEMENT
A. REMOVE EXISTING ICU (PATIENT ROOMS AND NURSE STATION INCLUDING WALLS, FLOORS,
CEILINGS, AND OTHER ITEMS ASSOCIATED TO THEM AS NEEDED) AND CONSTRUCT A CORRIDOR TO
CONNECT SURGERY WITH BED TOWER IN ACCORDANCE WITH THE CONTRACT, VA TIL AND
STATEMENT OF WORK.
CODE, STANDARDS AND EXECUTIVE ORDERS
A. VA DESIGN GUIDES – TECHNICAL INFORMATION LIBRARY
B. PG 18-3 VA DESIGN AND CONSTRUCTION PROCEDURES, TOPIC 1
C. 2024 NPFA 1 FIRE CODE
D. 2022 NFPA 10 STANDARD FOR PORTABLE FIRE EXTINGUISHERS
E. 2025 NFPA 13 STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS
F. 2023 NFPA 70 NATIONAL ELECTRIC CODE (NEC)
G. 2025 NFPA 72 NATIONAL FIRE ALARM SIGNALING CODE
H. 2024 NFPA 90A INSTALLATION OF AIR-CONDITIONING AND VENTILATING SYSTEMS
I. 2024 NFPA 90B INSTALLATION OF WARM AIR HEATING AND AIR-CONDITIONING SYSTEMS
J. 2024 NFPA 99 HEALTHCARE FACILITIES CODE
K. 2024 NFPA 101 LIFE SAFETY CODE (LSC)
L. 2024 NFPA 220 STANDARD ON TYPES OF BUILDING CONSTRUCTION
M. 2022 NFPA 241 STANDARD FOR SAFE GUARDING CONSTRUCTION ALTERATION, AND DEMOLITION
OPERATIONS
N. 2024 INTERNATIONAL BUILDING CODE (IBC)
O. 2024 INTERNATIONAL PLUMBING CODE (IPC)
P. 2024 INTERNATIONAL MECHANICAL CODE (IMC)
Q. 2022 ASHRAE 90.1
R. 2024 INTERNATIONAL ENERGY CONSERVATION CODE (IECC)
S. BARRIER FREE DESIGN STANDARD
T. ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARDS (ABAAS)
U. VA BARRIER FREE DESIGN GUIDE (PG-18-13)
V. RESOURCE CONSERVATION AND RECOVERY ACT (RCRA) (42 U.S.C.6901, ET SEQ)
W. THE NATIONAL ENERGY CONSERVATION POLICY ACT
X. EXECUTIVE ORDER 131468 PF APRIL 21, 2000, GREENING THE GOVERNMENT THROUGH LEADERSHIP IN
ENVIRONMENTAL MANAGEMENT.
Y. EXECUTIVE ORDER 13101 OF SEPTEMBER 14, 1998, GREENING THE GOVERNMENT
Z. THROUGH WASTE PREVENTION, RECYCLING, AND FEDERAL ACQUISITION; AND EXECUTIVE ORDER
13123 OF JUNE 1999, GREENING THE GOVERNMENT THROUGH EFFICIENT ENERGY MANAGEMENT.
MOUNTING HEIGHTS
PROVIDE BLOCKING AT ALL WALL MOUNTED EQUIPMENT AND ACCESSORIES
ACCESSIBILITY REQUIREMENTS
FRONT APPROACHES
HINGE-SIDE APPROACHES
LATCH-SIDE APPROACHES
USE EITHER
OPTION 1 OR
OPTION 2
ALL DOOR ASSEMBLIES SHALL BE CONSTRUCTED TO MEET THE
INDICATED MINIMUM CLEARANCES AS APPLICABLE.
1'-0" IF DOOR HAS BOTH
A CLOSER AND A
LATCH
5' -0
1'-6"
3' -6
4'-6"
4' -0
O P
TI
O
N
5' -0
OPTION 1
3'-0"
O P
TI
O
N
4' -6
OPTION 2
3'-6"
2'-0"
4' -0
2'-0"
3' -6
4' -0
4' -6
W / C
LO
S
E R
4' -0
W / C
LO
S
E R
W /C
LO
S
E R
A N
D L
A
TC
H
ALL WORK SHALL COMPLY WITH FEDERAL ABA,
LOCAL, AND STATE ACCESSIBILITY CODES AND
REQUIREMENTS.
DOOR LOCATIONS
TYPICAL DETAILS
TYP DOOR LOCATION
SEE DOOR SCHEDULE
6"
TYP
TYP. WALL PROTECTION, HANDRAIL/ CRASH RAIL INTERIOR
ELEVATION DIAGRAM
CRASH RAIL
HANDRAIL/ WALL GUARD
RETURNED TO WALL @ END
2"2"
2"
BASE AS SCHEDULED
CORNER GUARD
DOOR FRAME OR OPENING
3' -4
CL
FEC
TYPICAL SIGNAGE MOUTING HEIGHTS
A A
5' -0
4' -9
EQ EQ
2' -1
0"4' -0
WALL PROTECTION
UL DETAIL C-AJ-1254UL DETAIL W-L-2038
NOTE: ANY UL ASSEMBLY MEETING CRITERIA MAY
BE UTILIZED. ASSEMBLIES INDICATED ON THIS
SHEET ARE FOR INFORMATION ONLY.WALL
FLOOR
AND
WALL
FLOOR
AND
WALL
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
DATE:
Drawing Title:
Approved Project Director
Project Title:
1 2 3 4 5 6 7 8 9
BID DOCUMENTS
512 MEANS STREET NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 400
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and
Facilities Management
Drawn
SJ MC/KB
673-21-145
10-27-2025REVISIONS:
A
B
C
D
E
F
CONSTRUCT NEW BED TOWER
CONNECTOR
13000 BRUCE B DOWNS BLVD
NOTES, ABBREVIATIONS AND LEGENDS
GI002
CG CG CGCG CGCGCG CGCG CGCG CGCG
C G
C G
C G
C G
PHASE ONE PLAN LEGEND
EXISTING CONSTRUCTION
TO REMAIN
EXISTING CONSTRUCTION
TO BE REMOVED
AREA IN SCOPE OF WORK
TEMPORARY PATH OF TRAVEL
TEMPORARY ICRA
BARRIER/ ENTRANCE DOOR
PHASE ONE PLAN GENERAL NOTES
A. PROVIDE ICRA BARRIERS AND ENTRANCE DOORS AS REQUIRED AND INDICATED ON FLOOR PLANS.
COORDINATE LOCATIONS WITH COR. REFER TO DETAILS 11/AE501 AND 12/AE501. BASIS OF DESIGN:
STARC REALWALL, ONE HOUR RATED, CLASS IV SYSTEMS WITH HEPA FILTRATIION AND MONITORING AS DIRECTED BY THE COR. CONTACT: MAX DANSKY; OFFICE: 207-844-2789; CELL: 978-502-9689; EMAIL:
MDANSKY@STARCSYSTEMS.COM.
B. DEMOLISH AND INSTALL WORK LOCATED WITHIN THE TEMPORARY BARRIERS.
C. COORDINATE AND SCHEDULE AFTER HOURS AND WEEKEND WORK WITH COR.
EXISTING DOOR AND FRAME ASSEMBLY TO REMAIN.
PHASE ONE DEMO PLAN KEY NOTES #
CONSTRUCTION
PHASE ONE PLAN KEY NOTES #
COMPLETE WORK ON EXISITNG DOOR AND FRAME ASSEMBLY TO REMAIN AS
PART OF PHASE ONE. THIS WORK SHALL BE LIMITED TO AFTER HOURS AND
WEEKENDS AT THE DIRECTION OF THE COR.
LIMITS OF WORK TO BE
REMOVED
SMOKE PARTITION
1-HOUR FIRE BARRIER
EXIST 2-HOUR FIRE BARRIER
EXIST SMOKE PARTITION
EXIST 1-HOUR FIRE BARRIER
EXIST SMOKE BARRIER
8 9 10 11 12 13 14 15 16 17
A
B
C
STORAGE
2D-251A
STORAGE
2D-251
H.A.C.
2D-252A
OPERATING
ROOM #5
2D-239
OPERATING
ROOM #6
2D-240
OPERATING
ROOM #7
2D-241
CORRIDOR
C2-37-1
MENS
VESTIBULE
V2-04-01
RESTROOM
2D-249
WOMENS
LOCKER
ROOM
2D-247
WOMENS
VESTIBULE
V2-03-01
OFFICE
2D-245
RECEPTION
2D-246
PATIENT
ROOM #14
ISOLATION
2D-252V
RT WORK
ROOM
2D-252W
PATIENT
ROOM #15
ISOLATION
2D-252U
CORRIDOR
C2-47-1
RESTROOM
2D-253A
LOUNGE
2D-253
STAIR #1
S2-01-1
ELECTRICAL
2D-254
TELEPHONE
2D-255C
SIGNAL
2D-255B
FIRE
2D-55A
COMM
2D-252S
EQUIPMENT
STORAGE
2D-252T
CLEAN
LINEN
2D-259
ELECTRICAL
2D-258
SICU &
SURGERY
WAITING
ROOM
2D-256
CONSULT
2D-257
COMM
2D-256A
RESTROOM
2D-256B
ON CALL
2D-288
RESTROOM
2D-252P
PATIENT
ROOM #4
2D-252L
RETAIL
STORE
2A-201
FREEZER
2A-205D
REFRIGERATOR
2A-205C
OFFICE
2A-205A
COMPUTER
ROOM
2A-205B
KITCHEN
2A-205
FOOD
COURT
2A-214A
PIZZA
SHOP
2A-210
CORRIDOR
C2-49-1
KITCHEN
STORAGE
2A-209
GENERAL
STORAGE
2A-207
GENERAL
STORAGE
2A-206
PATIENT
ROOM #5
2D-252K
PATIENT
ROOM #6
2D-252J
PATIENT
ROOM #7
2D-252I
PATIENT
ROOM #8
2D-252H
HEAD
NURSE
2D-252G
PATIENT
ROOM #9
2D-252F
PATIENT
ROOM #10
2D-252E
PATIENT
ROOM #11
2D-252D
PATIENT
ROOM #12
2D-252C
CORRIDOR
C2-43-1
CONNECTOR
ENTRY TO NEW
BED TOWER
PATIENT
ROOM #13
2D-252B
NURSE
STATION
2D-252
TEMPORARY ACCESS CORRIDOR
DURING CONSTRUCTION
D
E
ROOF
BELOW
OPEN TO
BELOW
ELEVATOR
LOBBY
2D-201
CORRIDOR
C2-35-1
CORRIDOR
C2-48-1 CORRIDOR
C2-42-1
CORRIDOR
C2-42A-1
CORRIDOR
C2-01-1
OPEN TO
BELOW
ROOF
BELOW
INTERIOR
ROOF
BELOW
8 9 10 11 12 13 14 15 16 17
A
B
C
D
E
STORAGE
2D-251A
STORAGE
2D-251
H.A.C.
2D-252A
OPERATING
ROOM #5
2D-239
OPERATING
ROOM #6
2D-240
OPERATING
ROOM #7
2D-241
CORRIDOR
C2-37-1
MENS
VESTIBULE
V2-04-01
RESTROOM
2D-249
WOMENS
LOCKER
ROOM
2D-247
WOMENS
VESTIBULE
V2-03-01
OFFICE
2D-245
RECEPTION
2D-246
PATIENT
ROOM #14
ISOLATION
2D-252V
RT WORK
ROOM
2D-252W
PATIENT
ROOM #15
ISOLATION
2D-252U
CORRIDOR
C2-47-1
RESTROOM
2D-253A
LOUNGE
2D-253
STAIR #1
S2-01-1
ELECTRICAL
2D-254
TELEPHONE
2D-255C
SIGNAL
2D-255B
FIRE
2D-55A
COMM
2D-252S
EQUIPMENT
STORAGE
2D-252T
CLEAN
LINEN
2D-259
ELECTRICAL
2D-258
SICU &
SURGERY
WAITING
ROOM
2D-256
CONSULT
2D-257
COMM
2D-256A
RESTROOM
2D-256B
ON CALL
2D-288
RESTROOM
2D-252P
RETAIL
STORE
2A-201
FREEZER
2A-205D
REFRIGERATOR
2A-205C
OFFICE
2A-205A
COMPUTER
ROOM
2A-205B
KITCHEN
2A-205
FOOD
COURT
2A-214A
PIZZA
SHOP
2A-210
CORRIDOR
C2-49-1
KITCHEN
STORAGE
2A-209
GENERAL
STORAGE
2A-207
GENERAL
STORAGE
2A-206
CONNECTOR
ENTRY TO NEW
BED TOWER
NURSE
STATION
2D-252
TEMPORARY ACCESS CORRIDOR
DURING CONSTRUCTION
ROOF
BELOW
OPEN TO
BELOW
ELEVATOR
LOBBY
2D-201
CORRIDOR
C2-35-1
CORRIDOR
C2-48-1
CORRIDOR
C2-42-1
CORRIDOR
C2-01-1
6' -0
" M
IN
EQUIPMENT
STORAGE
2D-252B
EQUIPMENT
STORAGE
2D-252C
CORRIDOR
C2-44-2
CORRIDOR
C2-44-1
OPEN TO
BELOW
ROOF
BELOW
INTERIOR
ROOF
BELOW
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
DATE:
Drawing Title:
Approved Project Director
Project Title:
1 2 3 4 5 6 7 8 9
BID DOCUMENTS
512 MEANS STREET NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 400
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and
Facilities Management
Drawn
SJ MC/KB
673-21-145
10-27-2025REVISIONS:
A
B
C
D
E
F
CONSTRUCT NEW BED TOWER
CONNECTOR
13000 BRUCE B DOWNS BLVD
SECOND FLOOR PHASE ONE PLANS
GI003
3/32" = 1'-0"GI003
1 SECOND FLOOR PHASE ONE DEMOLITION PLAN
3/32" = 1'-0"GI003
2 SECOND FLOOR PHASE ONE CONTRUCTION PLAN
CGCG
CG CG CGCG CGCGCG CGCGCG CGCG CGCG
C G
C G
C G
C G
TRUE
NORTH
PLAN
NORTH
PROJECT AREA
KEY PLAN
NTS
PHASE TWO PLAN LEGEND
EXISTING CONSTRUCTION
TO REMAIN
EXISTING CONSTRUCTION
TO BE REMOVED
AREA IN SCOPE OF WORK
TEMPORARY PATH OF TRAVEL
PHASE TWO PLAN GENERAL NOTES
A. PROVIDE ICRA BARRIERS AND ENTRANCE DOORS AS REQUIRED AND INDICATED ON FLOOR PLANS.
COORDINATE LOCATIONS WITH COR. REFER TO DETAILS 11/AE501 AND 12/AE501. BASIS OF DESIGN: STARC REALWALL, ONE HOUR RATED, CLASS IV SYSTEMS WITH HEPA FILTRATION AND MONITORING AS DIRECTED BY
THE COR. CONTACT: MAX DANSKY; OFFICE: 207-844-2789; CELL: 978-502-9689; EMAIL:
MDANSKY@STARCSYSTEMS.COM.
B. DEMOLITION AND WORK INCLUDED IN PHASE TWO WILL BE SEQUENCED AND COMPLETED AFTER HOURS AND WEEKENDS. WORK TO BE SCHEDULED, COORDINATED AND APPROVED BY THE COR TO MAINTAIN HOSPITAL OPERATIONS. THE CONTRACTOR SHALL REVIEW MEANS AND METHODS AND ADJUST AS REQUIRED TO
ACCOMPLISH THE WORK. PROPOSED SEQUENCING IS PROVIDED BELOW.
a. CONSTRUCT REMAINING PARTITION NOT INCLUDED IN PHASE ONE.
b. REMOVE EXISTING FLOORING AND WALL BASE; AND INSTALL AND EXTEND FLOOR AND WALL BASE
MATERIAL.
c. COMPLETE CEILING DEMOLITION WORK AND INSTALL CEILING SYSTEM.
d. COMPLETE WALL PROTECTION AND CORNER GUARD WORK.
e. COMPLETE REMAINING FINISH WORK.
REMAINING FLOOR AND CEILING DEMOLITION AND CONSTRUCTION TO BE COMPLETED
AFTER HOURS AND WEEKENDS AS DIRECTED BY THE COR.
PHASE TWO DEMO PLAN KEY NOTES #
CONSTRUCTION
PROVIDE AND INSTALL REMAINING PERMANENT CORRIDOR WORK. PROVIDE
TEMPORARY CONSTRUCTION AS REQUIRED FOR CORRIDOR TO REMAIN IN OPERATION
DURING NORMAL HOSPITAL HOURS. PATCH AND REPAIR ADJACENT CONSTRUCTION
WITH MATCHING MATERIALS AND FINISHES IMPACTED BY THE WORK. WORK IN THIS
AREA IS LIMITED TO AFTER HOURS AND WEEKENDS AS DIRECTED BY THE COR. REFER
TO GENERAL NOTES THIS SHEET FOR PROPOSED SEQUENCING AND ADDITIONAL ICRA
BARRIER INFORMATION.
PHASE TWO PLAN KEY NOTES #
LIMITS OF WORK TO BE
REMOVED
LIMITS OF WORK TO BE
INSTALL
SMOKE PARTITION
1-HOUR FIRE BARRIER
EXIST 2-HOUR FIRE BARRIER
EXIST SMOKE PARTITION
EXIST 1-HOUR FIRE BARRIER
EXIST SMOKE BARRIER
8 9 10
A
B
C
ON CALL
2D-288
FREEZER
2A-205D
REFRIGERATOR
2A-205C
OFFICE
2A-205A
COMPUTER
ROOM
2A-205B
KITCHEN
2A-205
GENERAL
STORAGE
2A-206
CONNECTOR
ENTRY TO NEW
BED TOWER
8 9 10 11 12 13 14 15 16 17
A
B
C
D
E
STORAGE
2D-251A
STORAGE
2D-251
H.A.C.
2D-252A
OPERATING
ROOM #5
2D-239
OPERATING
ROOM #6
2D-240
OPERATING
ROOM #7
2D-241
CORRIDOR
C2-37-1
MENS
VESTIBULE
V2-04-01
RESTROOM
2D-249
WOMENS
LOCKER
ROOM
2D-247
WOMENS
VESTIBULE
V2-03-01
OFFICE
2D-245
RECEPTION
2D-246
PATIENT
ROOM #14
ISOLATION
2D-252V
RT WORK
ROOM
2D-252W
PATIENT
ROOM #15
ISOLATION
2D-252U
CORRIDOR
C2-47-1
RESTROOM
2D-253A
LOUNGE
2D-253
STAIR #1
S2-01-1
ELECTRICAL
2D-254
TELEPHONE
2D-255C
SIGNAL
2D-255B
FIRE
2D-55A
COMM
2D-252S
EQUIPMENT
STORAGE
2D-252T
CLEAN
LINEN
2D-259
ELECTRICAL
2D-258
SICU &
SURGERY
WAITING
ROOM
2D-256
CONSULT
2D-257
COMM
2D-256A
RESTROOM
2D-256B
ON CALL
2D-288
RETAIL
STORE
2A-201
FREEZER
2A-205D
REFRIGERATOR
2A-205C
OFFICE
2A-205A
COMPUTER
ROOM
2A-205B
KITCHEN
2A-205
PIZZA
SHOP
2A-210
KITCHEN
STORAGE
2A-209
GENERAL
STORAGE
2A-206
CONNECTOR
ENTRY TO NEW
BED TOWER
NURSE
STATION
2D-252
PERMANENT ACCESS CORRIDOR
PATH OF TRAVEL
ROOF
BELOW
OPEN TO
BELOW
ELEVATOR
LOBBY
2D-201
CORRIDOR
C2-35-1
CORRIDOR
C2-48-1
CORRIDOR
C2-42-1
CORRIDOR
C2-01-1
CORRIDOR
C2-44-2
EQUIPMENT
STORAGE
2D-252B
EQUIPMENT
STORAGE
2D-252C
OPEN TO
BELOW
ROOF
BELOW
INTERIOR
ROOF
BELOW
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
DATE:
Drawing Title:
Approved Project Director
Project Title:
1 2 3 4 5 6 7 8 9
BID DOCUMENTS
512 MEANS STREET NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 400
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and
Facilities Management
Drawn
SJ MC/KB
673-21-145
10-27-2025REVISIONS:
A
B
C
D
E
F
CONSTRUCT NEW BED TOWER
CONNECTOR
13000 BRUCE B DOWNS BLVD
SECOND FLOOR PHASE TWO PLANS
GI004
0' 4' 8' 16' 24'
SCALE: 1/8" = 1' - 0"
3/32" = 1'-0"GI004
1 SECOND FLOOR PHASE TWO DEMOLITION PLAN
3/32" = 1'-0"GI004
2 SECOND FLOOR PHASE TWO CONSTRUCTION PLAN
CG CG CGCG CGCGCG CG CGCG CGCG CGCG
FEC
FEC
FEC
C G
C G
C G
C G
8 9 10 11 12 13 14 15 16 17
A
B
C
D
E
199' - 0"
198' - 0"
LOUNGE
2D-253
ELECTRICAL
2D-254
SICU &
SURGERY
WAITING
ROOM
2D-256
EQUIPMENT
STORAGE
2D-252T
PATIENT
ROOM #15
ISOLATION
2D-252U
PATIENT
ROOM #14
ISOLATION
2D-252V
RT WORK
ROOM
2D-252W
EQUIPMENT
STORAGE
2D-252B
EQUIPMENT
STORAGE
2D-252C
STORAGE
2D-251A
STORAGE
2D-251
MENS
VESTIBULE
V2-04-01
H.A.C.
2D-252A
RESTROOM
2D-249
RESTROOM
2D-248
WOMENS
LOCKER
ROOM
2D-247
CORRIDOR
C2-47-1
RESTROOM
2D-253A
STAIR #1
S2-01-1
RESTROOM
2D-256B
COMM
2D-256A
SOILED
LINEN
2D-260
PATIENT
ROOM #1
2D-252R
CLEAN
LINEN
2D-259
ELECTRICAL
2D-258
CONSULT
2D-257
COMM
2D-252S
CORRIDOR
C2-44-1
CORRIDOR
C2-44-2
RETAIL
STORE
2A-201
ON CALL
2D-288
RESTROOM
2D-252P
CORRIDOR
C2-49-1
FREEZER
2A-205D
COMPUTER
ROOM
2A-205B
OFFICE
2A-205A
GENERAL
STORAGE
2A-206
GENERAL
STORAGE
2A-207
LOCKER
ROOM
2A-208
KITCHEN
STORAGE
2A-209
PIZZA
SHOP
2A-210
PATIENT
ROOM #2
2D-252Q
CORRIDOR
C2-01-1
ELEVATOR LOBBY
2D-201
CORRIDOR
C2-35-1
CORRIDOR
C2-48-1
CORRIDOR
C2-37-1
STAIR 1
LEVEL 2
ICU PATIENT
ROOM 8
CONNECTOR
ENTRY TO NEW
BED TOWER
STAIR #2
S2-02-1
FOOD
COURT
2A-214A
188' - 0"
132'-8"
ROOF
BELOW
OPEN TO
BELOWM
AX. DISTANCE
R 75'-0"
MAX. DISTANCE
R 75'-0"
OPEN TO
BELOW
ROOF
BELOW
INTERIOR
ROOF
BELOW
EXISTING CONSTRUCTION TO REMAIN
CONSTRUCTION
EXIT SIGN
TOTAL TRAVEL DISTANCE
FULLY RECESSED FIRE
EXTINGUISHER CABINET FEC
SMOKE PARTITION
1-HOUR FIRE BARRIER
STARTING POINT OF TRAVEL
LIFE SAFETY LEGEND
TOTAL TRAVEL DISTANCE
TRAVEL DISTANCE TO EXIT = 199' - 0" < 200' - 0"
FULLY RECESSED EXIST FIRE
EXTINGUISHER CABINETFEC
EXIST 2-HOUR FIRE BARRIER
EXIST SMOKE PARTITION
EXIST 1-HOUR FIRE BARRIER
EXIST SMOKE BARRIER
KEY PLAN
NTS
PROJECT AREA
TRUE
NORTH
PLAN
NORTH
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
DATE:
Drawing Title:
Approved Project Director
Project Title:
1 2 3 4 5 6 7 8 9
BID DOCUMENTS
512 MEANS STREET NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 400
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and
Facilities Management
Drawn
SJ MC/KB
673-21-145
10-27-2025REVISIONS:
A
B
C
D
E
F
CONSTRUCT NEW BED TOWER
CONNECTOR
13000 BRUCE B DOWNS BLVD
SECOND FLOOR LIFE SAFETY PLAN
LS101
1" = 10'-0"LS101
1 SECOND FLOOR LIFE SAFETY PLAN
DEMOLITION PLAN LEGEND
EXISTING CONSTRUCTION
TO REMAIN
EXISTING CONSTRUCTION
TO BE REMOVED
LIMITS OF PROJECT AREA
UNLESS NOTED OTHERWISE
EXISTING WINDOW TO BE
REMOVED
LIMITS OF WORK TO BE
REMOVED
EXIST 2-HOUR FIRE BARRIER
EXIST SMOKE PARTITION
EXIST 1-HOUR FIRE BARRIER
EXIST SMOKE BARRIER
TRUE
NORTH
PLAN
NORTH
9 10 11 12 13 14 15 16 17
A
B
C
STORAGE
2D-251A
STORAGE
2D-251
H.A.C.
2D-252A
CORRIDOR
C2-37-1
MENS
VESTIBULE
V2-04-01
RESTROOM
2D-249
PATIENT
ROOM #14
ISOLATION
2D-252V
RT WORK
ROOM
2D-252W
PATIENT
ROOM #15
ISOLATION
2D-252U
COMM
2D-252S
EQUIPMENT
STORAGE
2D-252T
CLEAN
LINEN
2D-259
ON CALL
2D-288
RESTROOM
2D-252P
PATIENT
ROOM #4
2D-252L
FREEZER
2A-205D
OFFICE
2A-205A
COMPUTER
ROOM
2A-205B
CORRIDOR
C2-49-1
GENERAL
STORAGE
2A-207
GENERAL
STORAGE
2A-206
PATIENT
ROOM #5
2D-252K
PATIENT
ROOM #6
2D-252J
PATIENT
ROOM #7
2D-252I
PATIENT
ROOM #8
2D-252H
HEAD
NURSE
2D-252G
PATIENT
ROOM #9
2D-252F
PATIENT
ROOM #10
2D-252E
PATIENT
ROOM #11
2D-252D
PATIENT
ROOM #12
2D-252C
CORRIDOR
C2-43-1
CONNECTOR
ENTRY TO NEW
BED TOWER
PATIENT
ROOM #13
2D-252B
NURSE
STATION
2D-252
D
ROOF
BELOW
OPEN TO
BELOW
3 4
REF
TYP
TYP
TYP
TYP
A S
R E
Q 'D
TYP9999 99
9 9
TYP
NURSE
STATION
2D-252
CORRIDOR
C2-44-1
OPEN TO
BELOW
ROOF
BELOW
INTERIOR
ROOF
BELOW
PROJECT AREA
KEY PLAN
NTS
DEMO PLAN GENERAL NOTES
A. REFER TO GENERAL PROJECT NOTES, ARCHITECTURAL NOTES, SYMBOLS,
LEGENDS AND ABBREVIATIONS ON SHEET GI002.
B. THE CONTRACTOR SHALL REMOVE ALL EXISTING CONSTRUCTION REQUIRED
TO INSTALL WORK.
C. REFER TO AND COORDINATE WORK WITH OTHER DISCIPLINE'S DRAWINGS FOR
ADDITIONAL INFORMATION AND REQUIREMNETS.
D. REMOVE EXISTING FINISHES AND WALL MOUNTED ITEMS/ ACCESSORIES/
EQUIPMENT IN PROJECT AREA AS REQUIRED TO INSTALL NEW WORK UNLESS
NOTED OTHERWISE.
E. REMOVE EXISTING DAMAGED SUBSTRATE AND UNDERLAYMENT AS REQUIRED
TO INSTALL NEW WORK.
REMOVE EXISTING WINDOW ASSEMBLY.
REMOVE EXISTING SLIDING DOOR AND WINDOW ASSEMEBLY.
REMOVE EXISTING NURSE STATION MILLWORK.
REMOVE EXISTING COUNTER TOP, CASEWORK, FIXTURES AND OTHER WALL
MOUNTED EQUIPMENT/ ACCESSORIES.
REMOVE EXISTING POWER COLUMN AND MONITOR BOOM. TURN OVER TO THE
GOVERMENT AND RELOCATE TO A COR APPROVED LOCATION.
REMOVE EXISTING HANDRAILS AND CRASHRAILS.
LINE INDICATES LIMIT OF FLOORING FINISH TO BE REMOVED AND PREPARED TO
INSTALL WORK. FLOORING BEYOND THIS LINE TO REMAIN.
EXISTING DOOR AND FRAME ASSEMBLY TO REMAIN.
REMOVE EXISTING FINISHES AND WALL MOUNTED ITEMS/ ACCESSORIES/
FIXTURES/ EQUIPMENT AS REQUIRED TO INSTALL WORK UNLESS NOTED
OTHERWISE.
REMOVE EXISTING WALL FINISHES AND WALL PROTECTION AT WALLS AND
COLUMNS IN PROJECT AREA AS REQUIRED TO INSTALL THE WORK.
DEMO PLAN KEY NOTES #
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
DATE:
Drawing Title:
Approved Project Director
Project Title:
1 2 3 4 5 6 7 8 9
BID DOCUMENTS
512 MEANS STREET NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 400
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and
Facilities Management
Drawn
SJ MC/KB
673-21-145
10-27-2025REVISIONS:
A
B
C
D
E
F
CONSTRUCT NEW BED TOWER
CONNECTOR
13000 BRUCE B DOWNS BLVD
SECOND FLOOR DEMO PLAN
AD101
0' 4' 8' 16' 24'
SCALE: 1/8" = 1' - 0"
1/8" = 1'-0"AD101
1 SECOND FLOOR DEMOLITON PLAN
DEMO RCP LEGEND
DOWNLIGHT
SUPPLY DIFFUSER/
RETURN AIR GRILLE
ACOUSTICAL CEILING
GWB/PLASTER CEILING
EXIT SIGN
LAY-IN LIGHT FIXTURE
SPRINKLER HEAD
SMOKE DETECTOR
CURTAIN TRACK
LIMITS OF PROJECT AREA
UNLESS NOTED OTHERWISE
DUCT SMOKE DETECTORS
COVE LIGHT STRIP
EXIST 2-HOUR FIRE BARRIER
EXIST SMOKE PARTITION
EXIST 1-HOUR FIRE BARRIER
EXIST SMOKE BARRIER
9 10 11 12 13 14 15 16 17
A
B
C
CONNECTOR
ENTRY TO NEW
BED TOWER
D
1 111111
A S
R E
Q 'D
7"
TRUE
NORTH
PLAN
NORTH
PROJECT AREA
KEY PLAN
NTS
DEMO RCP GENERAL NOTES
A. REFER TO GENERAL PROJECT NOTES, ARCHITECTURAL NOTES,
SYMBOLS, LEGENDS AND ABBREVIATIONS ON SHEET GI002.
B. REFER TO AND COORDINATE DEMOLITON WORK OF ALL DISIPLINES.
C. REMOVE ALL CEILING SYSTEMS, GWB SOFFITS AND ASSOCIATED
FRAMING IN ALL THE AREAS SHOWN TO BE REMOVED.
D. EXISTING CEILINGS TO REMAIN OUTSIDE OF PROJECT AREA
DEMO RCP KEY NOTES #
REMOVE EXISTING GWB BULKHEAD ABOVE NURSE STATION TO THE
EXTENT REQUIRED TO INSTALL WORK.
REMOVE EXISTING COVE LIGHTING AND PRIVACY CURTAIN TRACK,
TYPICAL ALL LOCATIONS.
REMOVE EXISTING SUSPENDED CEILING SYSTEM, FIXTURES,
EQUIPMENT, DEVICES, POWER COLUMN, PATIENT LIFTS, PRIVACY
CURTAIN TRACKS, IV TRACKS, AND OTHER CEILING MOUNTED ITEMS
AS REQUIRED TO INSTALL WORK. TURN OVER PATIENT LIFTS AND
POWER COLUMNS TO THE GOVERNMENT AND RELOCATE TO A COR
APPROVED LOCATION.
EXISTING SUSPENDED CEILING SYSTEM AND OTHER CEILING
MOUNTED DEVICES IN THE INDICATED AREA TO BE REMOVED AND
STORED FOR REINSTALLATION.
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
DATE:
Drawing Title:
Approved Project Director
Project Title:
1 2 3 4 5 6 7 8 9
BID DOCUMENTS
512 MEANS STREET NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 400
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and
Facilities Management
Drawn
SJ MC/KB
673-21-145
10-27-2025REVISIONS:
A
B
C
D
E
F
CONSTRUCT NEW BED TOWER
CONNECTOR
13000 BRUCE B DOWNS BLVD
SECOND FLOOR DEMO RCP
AD111
1/8" = 1'-0"AD111
1 SECOND FLOOR DEMO RCP
0' 4' 8' 16' 24'
SCALE: 1/8" = 1' - 0"
CG CG CG CG CGCG CG CG CGCG CGCG CGCG
FEC
FEC
C G
C G
C G
C G
FLOOR PLAN LEGEND
EXISTING CONSTRUCTION TO REMAIN
CONSTRUCTION
LIMITS OF PROJECT AREA
UNLESS NOTED OTHERWISE
LVT-# INDICATES DIRECTION OF SCHEDULED
LUXURY VINYL TILE PLANK FLOORING
INDICATES SIGNAGE LOCATION AND TYPE#
LIMITS OF FLOOR WORK
SMOKE PARTITION
1-HOUR FIRE BARRIER
EXIST 2-HOUR FIRE BARRIER
EXIST SMOKE PARTITION
EXIST 1-HOUR FIRE BARRIER
EXIST SMOKE BARRIER
9 10 11 12 13 14 15 16 17
A
B
C
STORAGE
2D-251A
CORRIDOR
C2-37-1
H.A.C.
2D-252A
STORAGE
2D-251
RESTROOM
2D-249
RT WORK
ROOM
2D-252W
PATIENT
ROOM #14
ISOLATION
2D-252V
PATIENT
ROOM #15
ISOLATION
2D-252U
EQUIPMENT
STORAGE
2D-252T
COMM
2D-252S
CLEAN
LINEN
2D-259
ON CALL
2D-288
RESTROOM
2D-252P
FREEZER
2A-205D
COMPUTER
ROOM
2A-205B
OFFICE
2A-205A
GENERAL
STORAGE
2A-206
GENERAL
STORAGE
2A-207
CORRIDOR
C2-49-1
CONNECTOR
ENTRY TO NEW
BED TOWER
EQUIPMENT
STORAGE
2D-252C
C2-44-2
EQUIPMENT
STORAGE
2D-252B
2D-252C
2D-252B
NURSE
STATION
2D-252
GG6
GG4
ROOF
BELOW
OPEN TO
BELOW
D
OPEN TO
BELOW
4TYP
TYPLVT-1
LV
T-
LV
T-
LV
T-
LV
T-
LV
T-
LV
T-
LV
T-
LVT-1
LVT-1 LVT-1 LVT-1 LVT-1
LVT-1
LVT-1
LVT-3
GI4
GI4
GI4
GI4
ALIGN
ALIGN
GI4
GI4
GI4
LV
T-
LV
T-
TYP
2D -2
A
8'-4"
FV
62'-5"
C
LE
A R
8' -0
4'-4 1/2"
CORRIDOR
C2-44-1
CORRIDOR
C2-44-25
TYP
TYP
GG6GI4
GI4
132'-8"
AE601
AE601
AE601
TYP
TYP
TYP
GI4
GC6
GC6 GC6
GG6
TYP
AE601
4' -0
" M
IN
ROOF
BELOW
INTERIOR
ROOF
BELOW
TRUE
NORTH
PLAN
NORTH
PROJECT AREA
KEY PLAN
NTS
FLOOR PLAN GENERAL NOTES
A. REFER TO GENERAL PROJECT NOTES, ARCHITECTURAL NOTES,
SYMBOLS, LEGENDS AND ABBREVIATIONS ON SHEET GI002.
B. REFER TO AND COORDINATE WITH OTHER DISCIPLINE DRAWINGS FOR
ADDITIONAL REQUIREMENTS.
C. PATCH EXISTING RETAINED CONSTRUCTION ADJACENT TO NEW WORK.
D. REFER TO AE501 FOR PARTITION TYPES AND DETAILS.
E. REFER TO AE601 FOR ROOM FINISH SCHEDULE, BASIS OF DESIGN FINISH
LEGEND, DOOR AND FRAME SCHEDULE AND DETAILS.
F. REFER TO AE601 FOR SIGNAGE SCHEDULE AND TYPES.
G. REFER TO GI002 FOR SIGNAGE MOUNTING HEIGHT
PROVIDE WALL PROTECTION, CORNER GUARDS, HAND RAILS AND CRASH
RAILS AS SCHEDULED. OMIT HAND RAIL WHERE WINDOWS PROHIBIT
INSTALLATION. REFER TO GI002 FOR TYPICAL WALL PROTECTION DIAGRAM
AND ABBREVIATIONS, AE501 FOR DETAILS AND AE601 FOR BASIS OF
DESIGN FINISH LEGEND.
PROVIDE FLOORING AND WALL BASE TO MATCH EXISTING.
INFILL EXISTING OPENING AT REMOVED WINDOW AS INDICATED. MATCH
ADJACENT CONSTRUCTION AND FINISHES.
LINE OF LVT-2 ACCENT FLOORING SEAM TO REFLECT BULKHEAD ABOVE.
SEE AE111 AND AE601 FOR ADDITIONAL INFORMATION.
PROVIDE HOLD OPENS AT EXISTING DOOR TO REMAIN.
PROVIDE SIGNAGE, TYPICAL. REFER TO AE601 FOR SIGNAGE SCHEDULE
AND TYPES. REFER TO SHEET GI002 FOR MOUNTING HEIGHT.
PROVIDE FLUSH MOUNTED FIRE EXTINGUISHER CABINET, TYPICAL ALL
LOCATIONS. SEE DETAIL 3/AE601 AND SHEET GI002 FOR MOUNTING HEIGHT.
PROVIDE DOOR AND FRAME ASSEMBLY, TYPICAL ALL LOCATIONS. REFER
TO AE601 FOR DOOR AND FRAME SCHEDULE AND DETAILS.
FLOOR PLAN KEY NOTES
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
DATE:
Drawing Title:
Approved Project Director
Project Title:
1 2 3 4 5 6 7 8 9
BID DOCUMENTS
512 MEANS STREET NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 400
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and
Facilities Management
Drawn
SJ MC/KB
673-21-145
10-27-2025REVISIONS:
A
B
C
D
E
F
CONSTRUCT NEW BED TOWER
CONNECTOR
13000 BRUCE B DOWNS BLVD
SECOND FLOOR PLAN
AE101
1/8" = 1'-0"AE101
1 SECOND FLOOR PLAN
0' 4' 8' 16' 24'
SCALE: 1/8" = 1' - 0"
G
C G
C G
C G
RCP LEGEND
SUPPLY DIFFUSER/ RETURN AIR GRILLE
ACOUSTICAL GRID CEILING (2'x2')
EXIT SIGN
LAY-IN LIGHT FIXTURE
SPRINKLER HEAD
DOWN LIGHT FIXTURE
GWB BULKHEAD/ SOFFIT
OCCUPANCY SENSOROS
LIMITS OF PROJECT AREA
UNLESS NOTED OTHERWISE
SMOKE PARTITION
1-HOUR FIRE BARRIER
EXIST 2-HOUR FIRE BARRIER
EXIST SMOKE PARTITION
EXIST 1-HOUR FIRE BARRIER
EXIST SMOKE BARRIER
9 10 11 12 13 14 15 16 17
A
B
C
CONNECTOR
ENTRY TO NEW
BED TOWER
D
CORRIDOR
C2-44-2
EQUIPMENT
STORAGE
2D-252C
EQUIPMENT
STORAGE
2D-252B
2 2
A
LI
G N
A
LI
G N
TY
P
AE111
OS
OSOS
AT-1
9'-0" AFF
AT-1
9'-0" AFF
AT-1
9'-0" AFF
TYP
UNO
BULKHEAD HEIGHT
TO BE 8'-8" AFF,
TYP
E Q
4' -0
E
Q
E Q
4' -0
E
Q
4 5
TYP. TYP.
TYP.
TYP.
AT-2
9'-0" AFF
AT-2
9'-0" AFF
AT-2
9'-0" AFF
AT-2
9'-0" AFF
TYP.
EQ EQ
TRUE
NORTH
PLAN
NORTH
PROJECT AREA
KEY PLAN
NTS
RCP GENERAL NOTES
A. REFER TO GENERAL PROJECT NOTES, ARCHITECTURAL NOTES, SYMBOLS,
LEGENDS AND ABBREVIATIONS ON SHEET GI002.
B. COORDINATE WORK INDICATED ON THIS DRAWING WITH ALL DISCIPLINE'S
DRAWINGS AND DOCUMENTS.
C. PATCH EXISTING RETAINED CONSTRUCTION ADJACENT TO NEW WORK
WITH MATCHING MATERIALS AND FINISHES.
D. PROVIDE AND INSTALL SUSPENDED ACOUSTICAL CEILING SYSTEM AS
INDICATED AND SCHEDULED.
E. REFER TO AE601 FOR ROOM FINISH SCHEDULE AND BASIS OF DESIGN
FINISH LEGEND.
RCP KEY NOTES
REINSTALL EXISTING STORED SUSPENDED ACOUSTICAL CEILING
SYSTEM AND OTHER CEILING MOUNTED DEVICES REMOVED TO INSTALL
ABOVE CEILING WORK. REPAIR ANY DAMAGED WITH MATCHING
MATERIALS.
PROVIDE AND INSTALL SUSPENDED CELING SYSTEM.
PATCH AND REPAIR EXISTING CEILING AT RELOCATED SPRINKLER HEAD
TO MATCH EXISTING ADJACENT FINISHES.
PROVIDE LIGHT FIXTURES, TYPICAL ALL LOCATION. REFER TO OTHER
DISCLIPINE DRAWINGS FOR ADDITIONAL INFORMATION.
PROVIDE DIFFUSERS / AIR GRILLE, TYPICAL ALL LOCATION. REFER TO
OTHER DISCLIPINE DRAWINGS FOR ADDITIONAL INFORMATION.
PROVIDE SPRINKER HEAD, TYPICAL ALL LOCATION. REFER TO OTHER
DISCLIPINE DRAWINGS FOR ADDITIONAL INFORMATION.
PROVIDE OCCUPANCY SENSOR, TYPICAL ALL LOCATION. REFER TO
OTHER DISCLIPINE DRAWINGS FOR ADDITIONAL INFORMATION.
PROVIDE EXIT LIGHT, TYPICAL ALL LOCATION. REFER TO OTHER
DISCLIPINE DRAWINGS FOR ADDITIONAL INFORMATION.
4" 4"
EXIST DECK ABOVE
CONT METAL STUD TRACK
METAL STUD BRACING
@ 48" OC
5/8" GWB ON 4" METAL
STUDS @ 16" OC
ACT CEILING
AS SCHEDULED
SEE RCP
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
DATE:
Drawing Title:
Approved Project Director
Project Title:
1 2 3 4 5 6 7 8 9
BID DOCUMENTS
512 MEANS STREET NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 400
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and
Facilities Management
Drawn
SJ MC/KB
673-21-145
10-27-2025REVISIONS:
A
B
C
D
E
F
CONSTRUCT NEW BED TOWER
CONNECTOR
13000 BRUCE B DOWNS BLVD
SECOND FLOOR RCP
AE111
1/8" = 1'-0"AE111
1 SECOND FLOOR RCP
0' 4' 8' 16' 24'
SCALE: 1/8" = 1' - 0"
1 1/2" = 1'-0"AE111
2 TYPICAL BULKHEAD DETAIL
1 1/2" = 1'-0"
WALL FRAMING DETAIL
1 1/2" = 1'-0"
HANDRAIL/CRASH RAIL DETAIL
1 1/2" = 1'-0"
WALL PENETRATION DETAIL
1 1/2" = 1'-0"
WALL PENETRATIL DETAIL
1 1/2" = 1'-0"
PENETRATION DETAIL
RATED PARTITION
UL W-L-2038
GWB PER PARTITION TYPE
ONE-PART FIRE-
STOPPING SEALANT
WIRE MESH
ELEC CONDUIT MAX
1-1/4" DIA
RATED PARTITION
MTL STUD TRACK WHERE
SLEEVE EXCEEDS 3" DIA
GWB PER
PARTITION TYPE
STL SLEEVE
ONE-PART FIRESTOPPING
SEALANT
INSULATION
(NOT REQUIRED AT ELEC.
CONDUITS)
CONDUIT (LARGER
THAN 1-1/4" DIA OR PIPE)
ACOUSTICAL SEALANT ALL
AROUND EA SIDE
NON-RATED
PARTITION
ACOUSTICAL SEALANT ALL
AROUND EA SIDE
MTL STUD TRACK WHERE
PIPE EXCEEDS 3" DIA
CONDUIT SPRINKLER PIPE
OR INSUL PIPE - SEE
MEP DWGS
HANDRAIL
(OMIT WHERE WINDOWS
PROHIBIT INSTALLATION)
LAG SCREW FASTENERS
MOUNTING BRACKETS @
32" OC
RETAINER CLIP
CRASH RAIL
FRT WOOD
2x8 BLOCKING
LAG SCREW FASTENERS @
32" OC
WALL BASE
2 ROWS 1-1/2" COLD-ROLLED
CHANNEL BRIDGING IN STUD
PUNCHOUTS - ATTACH TO STUDS
W/ SCREWS THRU 18 GA SHEET
METAL CLIP ANGLES
PROVIDE PUNCHED OPENINGS IN
STUDS FOR INSTALLATION OF
BRIDGING
LINE OF GWB JOINT - ALTERNATE
JOINTS EACH SIDE OF WALL, TYP
DOUBLE METAL TRACK
(2) ROWS 1-1/2" COLD-ROLLED
CHANNEL BRIDGING IN STUDS W/
SCREWS THRU 18 GA SHEET
METAL ANGLES - ATTACH TO MIN
(2) STUDS
PROVIDE DOUBLE STUD AT HINGE
JAMB ONLY WHEN INTERESECTING
PARTITION IS WITHIN 12" OF
DOOR JAMB
STRIKE JAMB
- DOUBLE
STUD W/
1/2" BETWEEN
HINGE JAMB
- TRIPLE
STUD W/1/2"
BETWEEN
STUDS
METAL TRACK
1 1/2"
2' -1
0"
2"
16" MAX 16" MAX
M A
X
A502
A502 A502
A502
A502
1 1/2" = 1'-0"
WALL PENETRATION DETAIL
1 1/2" = 1'-0"
RATED WALL PRIORITY DETAIL
LOWEST PRIORITY
TAPE AND JOINT
COMPOUND, TYP
HIGHEST PRIORITY
HM DOOR FRAME
TAPE AND JOINT
COMPOUND, TYP
LOWEST
PRIORITY
HIGHEST
PRIORIT
Y WALL PRIORITY LEGEND
TWO HOUR FIRE & SMOKE WALL
TWO HOUR FIRE RATED WALL
TWO HOUR SHAFTWALL
ONE HOUR FIRE & SMOKE WALL
ONE HOUR FIRE RATED WALL
NON-RATED WALL
PRIORITY 1 - HIGHEST
PRIORITY 2
PRIORITY 3
PRIORITY 4
PRIORITY 5 - LOWEST
ELEVATION
x
M
IN
G
W B
P
A
TC
H W
/ S C
R E
W S
A T
6" O
C A
R O
U N
D P
E R
IM
E
TE
R
RATED PARTITION
UL W-L-2038
MTL STUD TRACK
MTL STUD TRACK
5/8" GWB
GWB PER
PARTITION TYPE
ELECTRICAL
CONDUIT
ONE-PART
FIRESTOPPING
SEALANT
WIRE MESH
2-PIECE GWB
PATCH
15" x 30" MIN GWB-
PATCH W/ SCREWS @ 6"
OC AROUND PERIMETER
6" M
IN
2" 2" 2"
2"
A502
A502
1 1/2" = 1'-0"
WALL PENETRATION DETAIL
1 1/2" = 1'-0"
WALL OUTLET PARTITION DETAIL
NOTE: REQUIREMENTS SHOWN IN THIS DETAIL ARE TO BE CONSIDERED AS MINIMUM
REQUIREMENTS FOR INSTALLATION OF FIRE DAMPERS. INSTALLATION MUST ALSO CONFORM
TO FIRE DAMPER MANUFACTURER'S "UL" APPROVED INSTALLATION INSTRUCTIONS.
RATED PARTITION - SEE MECH DRAWINGS
ACCESS PANEL
1/4" TO 1/2"
CLEARANCE
MTL STUD TRACK
DUCT
1" MIN OVERLAP
ALL SIDES
FIRE OR SMOKE
DAMPER - SEE
MECH
"S" LOCK DUCT
CONNECTIONS FACTORY-FABRICATED SLEEVE (1)
GAGE HEAVIER THAN APPROPRIATE
SMACNA GAGE FOR CONNECTING
DUCT STEEL
ANGLE ALL AROUND BOTH SIDES
OF WALL - MITER AND WELD ALL
CORNERS
ELECTRICAL BOX
JOINT
ACOUSTICAL SEALANT ALL
AROUND AT SOUND RATED WALLS
NOTES:
1. DRYWALL IS APPLIED VERTICALLY.
2. STUDS ARE 16" OC.
3. JOINTS SHALL RECEIVE JOINT TAPE AND COMPOUND.
4. ALL INSULATION HAS BEEN OMITTED FOR CLARITY.
5. OFFSET BACK-TO-BACK ELECTRICAL BOXES 24"
OC MIN AT FIRE RATED PARTITIONS.
24"
A502
A502
1 1/2" = 1'-0"
FRAMING BLOCKING DETAIL
NOTE: PROVIDE BLOCKING AS SHOWN FOR GRAB BARS, HANDRAILS, CABINETS,
SHELF STANDARDS, TACK BOARDS AND OTHER WALL MOUNTED EQUIPMENT AND
FOR SECURING PLUMBING PIPING AND OTHER ITEMS CONCEALED IN WALL.
MTL STUDS
KERF BLOCKING TO
CLEAR
BACK-BEND ON STUD
FLANGE
SCREW THRU
STUD TO
ANCHOR
BLOCKING
2x8 FR WOOD
BLOCKING OR
METAL BACKER
PLATE
A502
PLAN
4' -0
WALL
PROTECTION
STRUCTURAL DECK
BACKER ROD AND
ACOUSTICAL SEALANT,
BOTH SIDES
CEILING PER FINISH
SCHEDULE
6" MTL
STUDS
GC6
GC
ACOUSTICAL INSULATION
STC 45
PARTITION TYPES
20 GA MTL STUDS @ 16"
OC
5/8" TYPE "X" GWB, BOTH
SIDES (CBB AT TILE
FINISH)
BASE AND FLOOR FINISH
PER SCHEDULE
BACKER ROD AND
ACOUSTICAL SEALANT,
BOTH SIDES
SET RUNNERS ON
SEALANT, TYP
STRUCTURAL DECK
BACKER ROD AND
ACOUSTICAL SEALANT,
BOTH SIDES
CEILING PER FINISH
SCHEDULE
GG
4" MTL
STUDS
GG4
1-HOUR FIRE RATED
UL U495
20 GA MTL STUDS @ 16"
OC
5/8" TYPE "X" GWB, BOTH
SIDES (CBB AT TILE
FINISH)
BASE AND FLOOR FINISH
PER SCHEDULE
BACKER ROD AND
ACOUSTICAL SEALANT,
BOTH SIDES
SET RUNNERS ON
SEALANT, TYP
NTS
SEE FLOOR PLAN FOR REQUIRED
SMOKE PARTITION LOCATIONS
ACOUSTICAL INSULATION
STRUCTURAL DECK
GI
4" MTL
STUDS
GI4
1-HOUR FIRE RATED
UL V497
20 GA MTL STUDS @ 16"
OC
2 LAYERS OF 5/8" TYPE "X"
GWB (CBB AT TILE FINISH)
BASE AND FLOOR FINISH
PER SCHEDULE
BACKER ROD AND
ACOUSTICAL SEALANT,
BOTH SIDES
SET RUNNERS ON
SEALANT, TYP
6" MTL
STUDS
GI6
ACOUSTICAL INSULATION
FIRESTOP SEALANT
DEFLECTION TRACK
4" MTL
STUDS
GG6
STRUCTURAL DECK
ADJUSTABEL
UPPER PANEL
ADJUSTABLE
HYDRAULIC CLOSER
ANGLE MOUNTED TO
GASKET AND ADHERED TO
FORM SEAL WITH FRAME
SOLID ALUMINUM
THRESHOLD STRIP
WITH NEOPRENE
GASKET MATERIAL
SEAL TO THE FLOOR
NOT TO SCALE
TEMPORARY ICRA BARRIER PARTITION
A502
NOT TO SCALE
TEMPORARY ICRA BARRIER ENTRANCE DOOR
A502
STRUCTURAL DECK
ADJUSTABEL
UPPER PANEL
ADJUSTABLE
HYDRAULIC CLOSER
ANGLE MOUNTED TO
GASKET AND ADHERED TO
FORM SEAL WITH FRAME
SELF LATCHING, LOCKING HANDLE
WITH KEYED OUTSIDE AND
THUMBTURN INSIDE WITH
COMBINATION PUSH BUTTON LOCK
GASKETED SWEEP TO PREVENT
DUST AND DEBRIS ESCAPE
SOLID ALUMINUM THRESHOLD
STRIP WITH NEOPRENE GASKET
SEAL TO FLOOR
NOTE:
1. SYSTEM MUST BE 1 HOUR RATED
PER NFPA 241
NOTE:
1. SYSTEM MUST BE 1 HOUR RATED
PER NFPA 241
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
DATE:
Drawing Title:
Approved Project Director
Project Title:
1 2 3 4 5 6 7 8 9
BID DOCUMENTS
512 MEANS STREET NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 400
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and
Facilities Management
Drawn
SJ MC/KB
673-21-145
10-27-2025REVISIONS:
A
B
C
D
E
F
CONSTRUCT NEW BED TOWER
CONNECTOR
13000 BRUCE B DOWNS BLVD
PARTITION TYPES AND DETAILS
AE501
FINISH LEGEND (BASIS OF DESIGN)
SYMBOL MANUFACTURER SERIES/ PATTERN MODEL NUMBER COLOR DESCRIPTION
ACOUSTICAL CEILING TILE (AT)
AT-1 ROCKFON ALASKA 10200 WHITE 24" X 24" SQUARE TEGULAR WITH CHICAGO METALLIC TEMPRA 4000 GRID
CORNER GUARDS (CG)
CG-1 INPRO
SURFACE MOUNT
CORNER GUARD TBD
STAINLESS
STEEL FULL HEIGHT SURFACE MOUNT INSTALLATION; 3 1/2" WIDTH - 16 GAUGE
RESILIENT WALL BASE (RB)
RB-1 JOHNSONITE
TRADITIONAL VINYL
WALL BASE 29 MOON ROCK 4" HEIGHT
WALL PROTECTION (WP)
WP-1
CONSTRUCTION
SPECIALTIES
ACROVYN SOLID
COLORS 314- .4" THICK OZARK 48" HIGH RWC WAINSCOT
ROOM FINISH SCHEDULE GENERAL NOTES
A. ALL FINISH AND COLOR SELECTIONS AND THEIR LOCATIONS SHALL BE VERIFIED AND APPROVED BY THE COR. ALL PRODUCTS LISTED ARE PROVIDED AS A BASIS OF DESIGN PER
VAMC TAMPA STANDARD FINISH SELECTIONS.
B. DIRECTION OF LVT PLANK FLOORING SHALL BE VERIFIED AND APPROVED BY THE COR; SEAMING DIAGRAM SHOP DRAWING TO BE PROVIDED AS REQUIRED BY THE
SPECIFICATIONS. REFER TO FLOOR PLAN FOR DIRECTION OF LVT PLANK FLOORING.
C. PROVIDE TRANSITION STRIP AT FLOORING FINISH CHANGE.
CRASH RAIL (CR)
CR-1
CONSTRUCTION
SPECIALTIES GROUP
ACROVYN CRASH RAIL SCR-64N
DRIFTEDWOOD
262-SUEDE
HANDRAIL (HR)
HR-1
CONSTRUCTION
SPECIALTIES GROUP
ACROVYN PLATFORM
HANDRAIL
DRIFTEDWOOD
262-SUEDEP-RAA
PAINT (P)
P-1 PPG EGGSHELL 102-2
SILENT
SMOKE
MAIN WALLS
P-2 PPG SEMI-GLOSS 0996-5 STEAMSHIP TRIM AND DOOR FRAMES
LUXURY VINYL TILE (LVT)
LVT-1
MANNINGTON ANCHOR-STRIDE
WINTER
FLEECE
C137 6" X 36" FIELD PATTERN
SURFACE MOUNT; TO BE INSTALLED 2" ABOVE WALL BASE
SURFACE MOUNT; TO BE INSTALLED AT 36" AFF
LVT-2
PATCRAFT SENSE LVT EASEV1 00100 9" X 36" FIELD PATTERN
P-3 PPG FLAT 1025-1
COMMERCIAL
WHITE
CEILINGS
MATCH EXISTING ADJACENT LVT. VERIFY WITH CORLVT-3
RB-2 MATCH EXISTING ADJACENT RB. VERIFY WITH COR
P-4 MATCH EXISTING ADJACENT PAINT. VERIFY WITH COR
WP-2 MATCH EXISTING ADJACENT WP. VERIFY WITH COR
AT-2 MATCH EXISTING ADJACENT ACT. VERIFY WITH COR
A
SEE SCHED
S E
E S
C H
E D
U
LE
DOOR TYPES
NTS
FRAME TYPES
NTS
S E
E S
C H
E D
U
LE
2" SEE SCHED
2"
2"SEE SCHED
S E
E S
C H
E D
U
LE
2' -9
3'
-6
9" 3"
B
RIRE RATED
GLASS
FRAME PER SCHEDULE
DOOR PER SCHEDULE
TRANSITION STRIP AS
APPROPRIATE
FLOOR FINISH PER
SCHEDULE
PARTITION PER TYPE
SEALANT, EACH SIDE
FRAME PER SCHEDULE
DOOR PER SCHEDULE
DOUBLE METAL TRACK
PARTITION PER TYPE
SEALANT, EACH SIDE
FRAME PER SCHEDULE
DOOR PER SCHEDULE
DOUBLE METAL STUD
JAMB ANCHOR
SILL DETAIL
SCALE: 3"=1'-0"
S1
JAMB DETAIL
SCALE: 3"=1'-0"
J1
HEAD DETAIL
SCALE: 3"=1'-0"
H1
ROOM FINISH SCHEDULE REMARKS:
1. PROVIDE WALL PROTECTION, HANDRAIL, CRASH RAIL AND CORNER GUARDS AS INDICATED ON FLOOR PLAN.
REFER TO DRAWING GI002 WALL PROTECTION INTERIOR ELEVATION DIAGRAM.
2. GWB BULKHEAD TO BE 8'-8" AFF, P-3 PAINT. REFER TO DETAIL 3/AE501.
3. REFER TO AE101 FOR DIRECTION OF LVT PLANK FLOORING.
4. MATCH EXISTING ADJACENT LVT. VERIFY WITH COR
ROOM FINISH SCHEDULE GENERAL NOTES:
A. ALL FINISH AND COLOR SELECTIONS AND THEIR LOCATIONS SHALL BE VERIFIED AND APPROVED BY THE COR. ALL PRODUCTS LISTED ARE PROVIDED AS A BASIS OF DESIGN PER
VAMC TAMPA STANDARD FINISH SELECTIONS.
B. DIRECTION OF LVT PLANK FLOORING SHALL BE VERIFIED AND APPROVED BY THE COR; SEAMING DIAGRAM SHOP DRAWING TO BE PROVIDED AS REQUIRED BY THE
SPECIFICATIONS. REFER TO FLOOR PLAN FOR DIRECTION OF LVT PLANK FLOORING.
C. PROVIDE TRANSITION STRIP AT FLOORING FINISH CHANGE.
DOOR AND FRAME SCHEDULE REMARKS:
1. PROVIDE PIV CARD READER FOR ACCESS CONTROL.
2. PAIR OF EQUAL LEAF DOORS.
3. D TYPE OPNG.- INTEGRATED DOOR ASSEMBLY
(SPEC 081710)
NOT TO SCALE
BASIS OF DESIGN: TO MATCH EXISTING HOSPITAL SIGNAGE STANDARD
9" INSIDE FRAME DIMENSION
9"
IN
S
ID
E F
R A
M E
D
IM
E N
S
IO
N
3" 6" 5"
8"
.060" ROOM NUMBER PANEL FIRST SURFACE PAINTED WITH
RAISED NUMBERS AND BRAILLE 3/16" ACRYLIC BACKER (CLEAR)
MAGNET TAPE BACKING FOR MOUNTING.
SIMPLY PREMIER FRAME BEVELED EDGE
STANDARD DEPTH METAL INSIDE.
.060" GLOSSY PETG FACE
FIRST SURFACE PAINTED WITH VINYL MASKED WINDOW
.118" CLEAR PETG WINDOW SPACER
.060" WINDOW BACK
BACK PAINTED WITH MAGNET TAPE FOR MOUNTING
NOT TO SCALE
BASIS OF DESIGN: TO MATCH EXISTING HOSPITAL SIGNAGE STANDARD
WALL DIRECTIONAL - SINGLE INSERT
NEW BMS- DOOR
CONTACTS (2)
NEW CARD READER
CEILING
NEW ELEC. HINGE OR EPT
NEW CLOSER (IF NOT EXIST.)
NEW ELEC. EXIT DEVICE
1. OPENINGS ARE SHOWN FROM INTERIOR SECURE
PROTECTED SIDE. DOTTED LINES INDICATE
DEVICES LOCATED ON THE OPPOSITE UNSECURE
APPROACH SIDE.
2. REFER TO VA PSRDM APPENDIX A1 VA STANDARD
SECURITY DOOR TYPES.
3. NOT ALL SYSTEMS DEVICES SHOWN OCCUR AT
EACH OPENING. REFER TO SYSTEMS DRAWINGS
FOR DEVICES REQUIRED.
D TYPE
OPENING-
(Both Active)
PAIR SWING
EXIT DEVICES
EXIST. FLOOR
FACTORY DRILL DOOR
FOR WIRING TO NEW
ELEC. EXIT DEVICE
PROVIDE DOOR, FRAME, & HARDWARE PER SPEC 08 17 10 INTEGRATED DOOR ASSEMBLIES.
SILL DETAIL
SCALE: 3"=1'-0"
S2
JAMB DETAIL
SCALE: 3"=1'-0"
J2
HEAD DETAIL
SCALE: 3"=1'-0"
H2
PARTITION PER TYPE
SEALANT, EACH SIDE
FRAME PER SCHEDULE
DOOR PER SCHEDULE
DOUBLE METAL TRACK
FRAME PER SCHEDULE
DOOR PER SCHEDULE
TRANSITION STRIP AS
APPROPRIATE
FLOOR FINISH PER
SCHEDULE
PARTITION PER TYPE
SEALANT, EACH SIDE
FRAME PER SCHEDULE
DOOR PER SCHEDULE
DOUBLE METAL STUD
JAMB ANCHOR
EXIST PARTITION
EXIST PARTITION
F.V.
FIELD VERIFY
METAL STUD TRACK
PARTITION TYPE AS SCHEDULED
STAINLESS STEEL,
5/16" FLAT TRIM FULLY RECESSED FIRE
EXTINGUISHER CABINET
BASIS OF DESIGN: LARSON 2409-R1
NOTE:
A. BASIS OF DESIGN: LARSEN 2409-R1, STAINLESS STEEL, 5/16" FLAT TRIM FULLY RECESSED FIRE EXTINGUISHER CABINET
B. SEE FLOOR PLAN ON SHEET 1/AE101 FOR FEC LOCATIONS.
C. REFER TO SHEET GI002 FOR MOUNTING HEIGHT.
PARTITION TYPE AS SCHEDULED
5/16" FLAT TRIM FULLY RECESSED FIRE
EXTINGUISHER CABINET
AT FIRE-RATED WALL, WRAP
5/8", TYPE "X" GWB AROUND
RECESSED SIDES OF F.E.C.
AT FIRE-RATED WALL, WRAP 5/8",
TYPE "X" GWB AROUND BACK OF F.E.C.
ELEVATION DETAIL PLAN DETAIL
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
DATE:
Drawing Title:
Approved Project Director
Project Title:
1 2 3 4 5 6 7 8 9
BID DOCUMENTS
512 MEANS STREET NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 400
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and
Facilities Management
Drawn
SJ MC/KB
673-21-145
10-27-2025REVISIONS:
A
B
C
D
E
F
CONSTRUCT NEW BED TOWER
CONNECTOR
13000 BRUCE B DOWNS BLVD
SCHEDULES, NOTES AND DETAILS
AE601
ROOM FINISH SCHEDULE
Number ROOM NAME FLOOR BASE
EAST
WALL
NORTH
WALL
SOUTH
WALL
WEST
WALL WAINSCOT CEILING
CLG.
HT. REMARKS
2D-252B EQUIPMENT
STORAGE
LVT-1 RB-1 P-1 P-1 P-1 P-1 -- AT-1 9'-0"
2D-252C EQUIPMENT
STORAGE
LVT-1 RB-1 P-1 P-1 P-1 P-1 -- AT-1 9'-0"
C2-44-1 CORRIDOR LVT-3 RB-2 P-4 P-4 P-4 EXIST WP-2 AT-2 9'-0" 1,4
C2-44-2 CORRIDOR LVT-1/LVT-2 RB-1 P-1 P-1 P-1 P-1 WP-1 AT-1 9'-0" 1,2,3
REVISION 1 4-8-2020
3" = 1'-0"AE601
4 DOOR DETAIL 1
DOOR AND FRAME SCHEDULE
DOOR NO. WIDTH HEIGHT
DOOR
TYPE
DOOR
MATERIAL
FRAME
TYPE
FRAME
MATERIAL
HEAD
DETAIL
JAMB
DETAIL
SILL
DETAIL
FIRE
RATING HARDWARE SET REMARKS
2D-251A 3'-6" 7'-0" A WD 1 HM H2 J2 S2 45 MIN 4F
2D-252B 3'-6" 7'-0" A WD 1 HM H1 J1 S1 45 MIN 4F
2D-252C 7'-0" 7'-0" A HM 1 HM H1 J1 S1 45 MIN 10L 2
C2-44-2 7'-0" 7'-0" A HM 1 HM H1 J1 S1 20 MIN SH-10 1,2,3
SIGNAGE SCHEDULE
SIGN TYPE ROOM NO. ROOM NAME CONTENT MOUNT
1 2D-252B EQUIPMENT STORAGE EQUIPMENT STORAGE WALL MOUNTED
1 2D-252C EQUIPMENT STORAGE EQUIPMENT STORAGE WALL MOUNTED
1 2D-251A STORAGE STORAGE WALL MOUNTED
1 C2-44-1 CORRIDOR -- WALL MOUNTED
2 C2-44-2 CORRIDOR OR SURGERY WALL MOUNTED
2 C2-44-2 CORRIDOR ICU WALL MOUNTED
GENERAL SIGNAGE NOTES:
A. PROVIDE AND INSTALL SIGNAGE IN ACCORDANCE WITH FACILITY GUIDELINES, STANDARDS AND REQUIREMENTS. SIGNAGE TYPE, CONTENT, LOCATION AND QUANTITY TO BE COORDINATED WITH VENDOR, VA STAFF, AND COR FOR ACCEPTANCE AND APPROVAL. SUBMIT A SHOP DRAWING WITH COORDINATION RESULTS FOR REVIEW. ROOM IDENTIFICATION SIGNAGE TYPE IS INCLUDED FOR BIDDING. CONFIRM SIGN TYPE WITH COR.
B. SEE DRAWING GI002 FOR SIGNAGE MOUNTING HEIGHTS.
C. REFER TO 1/AE101 FLOOR PLAN FOR SIGNAGE LOCATIONS.
AE601
1 SIGN TYPE 1
AE601
2 SIGN TYPE 2
1/2" = 1'-0"AE601
6 SECURITY DOOR TYPES
3" = 1'-0"AE601
5 DOOR DETAIL 2
1 1/2" = 1'-0"AE601
3 FIRE EXTINGUISHER CABINET DETAIL
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
DATE:
Drawing Title:
Approved Project Director
Project Title:
1 2 3 4 5 6 7 8 9
BID DOCUMENTS
512 MEANS STREET NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 400
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and
Facilities Management
Drawn
BS/DH/DK DK
673-21-145
10-27-2025REVISIONS:
A
B
C
D
E
F
CONSTRUCT NEW BED TOWER
CONNECTOR
13000 BRUCE B DOWNS BLVD
FIRE PROTECTION LEGEND, ABBREVIATIONS
AND NOTES
FP001
FIRE PROECTION ABBREVIATIONSFIRE PROTECTION PROJECT NOTES
ABOVE FINISH FLOOR
ELECTRICAL
EXISTING
FINISHED FLOOR
FINISH
FLOOR
NOT TO SCALE
TYPICAL
AFF
ELEC
EXIST
FF
FIN
FLR
NTS
TYP
A. THE CONTRACTOR SHALL BE PREPARED TO…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .