This document is a Limited Renovation Asbestos Survey Report for the James A. Haley VA Medical Center in Tampa, Florida, specifically for Building 1, Wing 2D, SICU. GLE Associates, Inc. performed the survey on January 10, 2025, to identify accessible asbestos-containing materials (ACMs) within the "EXISTING CONSTRUCTION TO BE DEMOLISHED" area, as defined in drawing AD101. The survey was conducted pursuant to National Emission Standards for Hazardous Air Pollutants (NESHAP) requirements in preparation for a renovation project.

The survey involved collecting 48 samples from 16 different homogeneous areas, including ceiling tiles, drywall, joint compound, fireproofing, floor tiles, caulk, mastic, and thermal system insulation. Samples were analyzed by Arrowhead Technologies, LLC using Polarized Light Microscopy. Notably, no asbestos-containing materials were identified in the surveyed areas. The report includes a comprehensive table detailing the sampling locations, material descriptions, and analysis results, along with appendices containing analytical results, personnel certifications, a scope of work drawing, and photographs documenting the sampling process.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5405 Cypress Center Drive, Suite 110

Tampa, Florida 33609 813-241-8350 • Fax 813-241-8737

LIMITED RENOVATION

ASBESTOS SURVEY REPORT

James A. Haley VA Medical Center

Building 1, Wing 2D, SICU 13000 Bruce B Downs Boulevard

Tampa, Florida 33612

GLE Project No.: 24000-30656

Prepared for:

Mr. Scott Jeffries Toland Mizell Molnar, LLC

512 Means Street Northwest, Suite 400 Atlanta, Georgia 30318

January 2025

Prepared by:

GLE Associates, Inc.

5405 Cypress Center Drive, Suite 110 | Tampa, Florida 33609 | 813-241-8350 | Fax: 813-241-8737 Orlando | Ft. Lauderdale | Miami | Jacksonville | Gainesville | Atlanta | Nashville

Architecture AR 0007729 • Engineer RY 5483 • Asbestos ZA 0000034 • Geology PG 1737

January 24, 2025

Mr. Scott Jeffries Toland Mizell Molnar, LLC 512 Means Street Northwest, Suite 400 Atlanta, Georgia 30318

RE: Limited Renovation Asbestos Survey Report

James A. Haley VA Medical Center Building 1, Wing 2D, SICU 13000 Bruce B Downs Boulevard Tampa, Florida 33612

GLE Project No.: 24000-30656

Dear Mr. Jeffries:

GLE Associates, Inc. (GLE) performed a limited renovation survey for asbestos-containing materials (ACM) on January 10, 2025, at the James A. Haley VA Medical Center, located in Tampa, Florida. The survey was performed by Mr. Justin Zapata with GLE. This report outlines the sampling and testing procedures, and presents the results along with our conclusions and recommendations.

GLE appreciates the opportunity to serve as your consultant on this project. If you should have any questions, or if we can be of further service, please do not hesitate to call.

Sincerely, Justin Zapata Robert B. Greene, PE, PG, CIH, LEED AP Junior Project Manager President

Florida LAC# EA 0000009 JZ/PSZ/RBG/aw

F:\Work\ASB\24000\30656 TMM - Tampa VA New Bed Tower Connector LAS\Report\24000-30656 Survey Report.docx

TABLE OF CONTENTS

1.0 INTRODUCTION 1

1.1 Introduction 1

2.0 RESULTS 1

2.1 Asbestos Survey Procedures 1

2.2 Identified Suspect Asbestos-Containing Materials 2

Table 2.2-1 — Summary of Homogeneous Sampling Areas

3.0 CONCLUSIONS AND RECOMMENDATIONS 4

4.0 LIMITATIONS AND CONDITIONS 4

APPENDICES

Appendix A – Analytical Results and Chain of Custody Appendix B – Personnel and Laboratory Certifications Appendix C – Scope of Work Drawing Appendix D – Photographs

1.0 INTRODUCTION

1.1 INTRODUCTION

The purpose of this limited renovation survey was to identify accessible asbestos-containing materials (ACMs) and their general locations within James A. Haley VA Medical Center, located at 13000 Bruce B Downs Boulevard in Tampa, Florida. The survey was limited to the “EXISTING CONSTRUCTION TO BE DEMOLISHED” area on drawing AD101, which was provided by the client, Toland Mizell Molnar, LLC. This drawing has been provided in Appendix C. The survey was conducted pursuant to National Emission Standards for Hazardous Air Pollutants (NESHAP, 40 CFR 61) requirements, associated with the scheduled renovation plans. The survey was performed on January 10, 2025, by Mr. Justin Zapata, an Environmental Protection Agency/Asbestos Hazard Emergency Response Act (EPA/AHERA) accredited inspector. The scope of this survey did not include demolition of any building components, evaluation of architectural plans, or the quantification of materials for abatement purposes, or removal cost estimating.

2.0 RESULTS

2.1 ASBESTOS SURVEY PROCEDURES

The survey was performed by visually observing accessible areas within the scope of work. An EPA/AHERA accredited inspector performed the visual observations (refer to Appendix B for personnel qualifications).

After the overall visual survey was completed, representative sampling areas were determined.

The surveyor delineated homogeneous areas of suspect materials and samples of each material were obtained, in general accordance with regulations as established by the Occupational Safety and Health Administration (OSHA) and NESHAP. The field surveyor determined sample locations based on previous experience. Both friable and non-friable materials were sampled. A friable material is one that can be crushed when dry by normal hand pressure. This survey did not include the demolition of building components to access suspect material.

After completion of the fieldwork, the samples were delivered to Arrowhead Technologies, LLC, a National Voluntary Laboratory Accreditation Program (NVLAP) accredited laboratory for analysis. (The samples were analyzed by Polarized Light Microscopy (PLM) coupled with dispersion staining, in general accordance with EPA-600/R-93/116. Utilizing this procedure, the various asbestos minerals (chrysotile, amosite, crocidolite, actinolite, tremolite, and anthophyllite) can be determined. The percentages of asbestos minerals in the samples were visually determined by the microscopist. Please note that the EPA designates all materials containing greater than one percent asbestos as an “asbestos-containing material” (ACM).

Regulated Asbestos-Containing Material (RACM) is defined as (a) Friable asbestos materials, (b) Category I non-friable ACM that has become friable, (c) Category I non-friable ACM that will be or has been subjected to sanding, grinding, cutting, or abrading, or (d) Category II non-friable

ACM that has a high probability of becoming or has become crumbled, pulverized, or reduced to powder by the forces expected to act on the material in the course of demolition or renovation operations regulated by this subpart.

Category I and Category II non-friable ACM, as defined by the EPA:

Category I non-friable ACM means asbestos-containing packings, gaskets, resilient floor covering, asphalt roofing products, and pliable sealants and mastics that are in good condition and not friable, containing more than one percent asbestos, as determined using the method specified in Appendix E, Subpart E, 40 CFR Part 763, Section 1, PLM.

Category II non-friable ACM means any material, excluding Category I non-friable ACM, containing more than 1 percent asbestos as determined using the methods specified in Appendix E, Subpart E, 40 CFR Part 763 Section 1, PLM that, when dry, cannot be crumbled, pulverized, or reduced to powder by hand pressure.

2.2 IDENTIFIED SUSPECT ASBESTOS-CONTAINING MATERIALS

A total of 48 samples of suspect building materials were collected from the facility during the survey, representing 16 different identified homogeneous areas. The results of the laboratory analyses are included in Appendix A.

A summary of the homogenous sampling areas of suspect ACM determined to be present is outlined in the following table.

ASBESTOS CONTENT

Expressed as percent

* = The facility owner has the option of point-counting by Polarized Light Microscopy (PLM) those RACM whose asbestos content is less than 10% in order to more accurately determine the asbestos content therein.

FRIABILITY F = Friable Material NF = Non-Friable Material ACM CATEGORY RACM = Regulated ACM CAT I = Category I non-friable ACM CAT II = Category II non-friable ACM

ABBREVIATIONS:

PC = Results based on Point-Count analysis TEM NOB = Transmission Electron Microscopy of Non-Friable Organically Bound Material NA = Not Applicable ND = None Detected NIS = Not in Scope C = Chrysotile A = Amosite HA = Homogeneous Area SF = Square Feet LF = Linear Feet CF = Cubic Feet

TABLE 2.2-1: SUMMARY OF HOMOGENEOUS SAMPLING AREAS

JAMES A. HALEY VA MEDICAL CENTER – TAMPA, FLORIDA

BUILDING 1, WING 2D, SICU

HA # HOMOGENEOUS MATERIAL

DESCRIPTION

HOMOGENEOUS MATERIAL

LOCATION

FRIABILITY

(F /NF) % ASBESTOS* # OF SAMPLES

COLLECTED

APPROXIMATE

QUANTITY

ACM

CATEGORY

CT-01 2’x2’ White Bevel Fissure Pinhole Ceiling Tile Throughout–Ceiling F ND 3 NIS NA

DW-01 Drywall/Joint Compound Throughout–Walls NF ND 3 NIS NA FP-01 Gray Fireproofing Throughout–Above Ceiling F ND 3 NIS NA FP-02 Blue Sprayed Gray Fireproofing Intermittent–Above Ceiling F ND 3 NIS NA

FT-01 12”x12” White, Blue Fleck Floor Tile/Yellow Mastic Throughout–Floor NF ND 3 NIS NA

FT-02 12”x12” Tan Fleck Floor Tile/Brown Mastic Intermittent–Floor NF ND 3 NIS NA

FT-03 12”x12” Pink Floor Tile/Brown Mastic Intermittent–Floor NF ND 3 NIS NA FT-04 12”x12” Teal Floor Tile/Brown Mastic Intermittent–Floor NF ND 3 NIS NA M-01 Black Caulk Glass Sliding Doors NF ND 3 NIS NA M-02 Gray Caulk Interior Windows NF ND 3 NIS NA M-03 Gray Sink Undercoat North Nurse Station Sink NF ND 3 NIS NA

MAS-01 Tan Duct Mastic N. to S. Above Rooms–Above Ceiling NF ND 3 NIS NA

TSI-01 3” OD White TSI Mastic/Fibrous Insulation Intermittent–Above Ceiling F ND 3 NIS NA

TSI-02 8” OD White TSI Mastic Elbow/Foamglass Insulation Room 2D-252G–Above Ceiling NF ND 3 NIS NA

VB-01 6” Gray Cove Base/Tan Mastic Throughout–Cove Base NF ND 3 NIS NA VB-02 6” Teal Cove Base/Tan Mastic 2D-252G–Cove Base NF ND 3 NIS NA

3.0 CONCLUSIONS AND RECOMMENDATIONS

No asbestos-containing materials were identified in the scope of this survey.

4.0 LIMITATIONS AND CONDITIONS

As a result of previous renovations, there may be hidden materials, such as floor tile, sheet vinyl flooring, insulation, etc. These materials may be found in various areas hidden under existing flooring materials or in wall cavities. Any materials found during construction activities, either not addressed in this survey report, or similar to the ACM identified in this survey report should be assumed to be ACM until sampling and analysis documents otherwise.

Because of the hidden nature of many building components (i.e. within mechanical chases), it may be impossible to determine if all of the suspect building materials have been located and subsequently tested. Destructive testing in some instances is not a viable option. We cannot, therefore, guarantee that all potential ACM has been located. For the same reasons, estimates of quantities and/or conditions are subject to readily apparent situations, and our findings reflect this condition. We do warrant, however, that the investigations and methodology reflect our best efforts based upon the prevailing standard of care in the environmental industry.

The information contained in this report was prepared based upon specific parameters and regulations in force at the time of this report. The information herein is only for the specific use of the client and GLE. GLE accepts no responsibility for the use, interpretation, or reliance by other parties on the information contained herein, unless prior written authorization has been obtained from GLE.

APPENDIX A

Analytical Results and Chain of Custody

PLM REPORT SUMMARY

3151 San Bernadino St.

Clearwater, Florida 33759

NVLAP Lab Code 200703-0813-679-0720 / mhall005@tampabay.rr.com

Client : GLE Associates Lab Set No. : 014280

Project : JAHVA Bed Tower 25-14280AT Job No. :

24000-30656Client Project No.: Report Date : 1/16/2025

Identification : Asbestos, Bulk Sample Analysis Sample Date : 1/10/2025

Test Method : Polarized Light Microscopy / Dispersion Staining (PLM/DS) Page 1 of 7App E to Sub E of 40 CFR Part 763 and EPA Method 600/R-93/116

On 1/10/2025, forty-eight (48) bulk material samples were submitted by Justin Zapata for asbestos analysis by PLM/DS.

Copies of Bulk Sample Analysis sheets are attached; additional information may be found therein. The results are summarized below:

Asbestos ContentSample Description / LocationLab Sample No.

None Detected-White Ceiling Tile2x2 White Bevel Fissure Pinhole CT CT-01-A014280-001

None Detected-White Ceiling Tile2x2 White Bevel Fissure Pinhole CT CT-01-B014280-002

None Detected-White Ceiling Tile2x2 White Bevel Fissure Pinhole CT CT-01-C014280-003

None Detected-White Joint CompoundDrywall/Joint Compound DW-01-A014280-004 None Detected-White Drywall Material

None Detected-White Joint CompoundDrywall/Joint Compound DW-01-B014280-005 None Detected-White Drywall Material

None Detected-White Joint CompoundDrywall/Joint Compound DW-01-C014280-006 None Detected-White Drywall Material

None Detected-Gray FireproofingGray Fireproofing FP-01-A014280-007

None Detected-Gray FireproofingGray Fireproofing FP-01-B014280-008

None Detected-Gray FireproofingGray Fireproofing FP-01-C014280-009

None Detected-Gray/Blue FireproofingBlue Fireproofing FP-02-A014280-010

None Detected-Gray/Blue FireproofingBlue Fireproofing FP-02-B014280-011

These samples were analyzed by layers. Specific layer or component asbestos content is indicated when relevant. The EPA considers a material to be asbestos containing only if it contains more than one percent asbestos by Calibrated Visual Area Estimation (CVAE). EPA regulations also indicate that Regulated Asbestos Containing Materials (RACM) -- materials which are friable or may become friable -- be further analyzed by point counting when the results indicate less than ten percent asbestos by CVAE. Arrowhead utilizes CVAE on a routine basis and does not include point counting unless specifically requested.

The results may not be reproduced except in full.

PLM Report Summary - Revision 4 - 08/04/2022- Issuing Authority: Monte Hall, PG mailto:mhall005@tampabay.rr

Clearwater, Florida 33759

NVLAP Lab Code 200703-0813-679-0720 / mhall005@tampabay.rr.com

Client : GLE Associates Lab Set No. : 014280

Project : JAHVA Bed Tower 25-14280AT Job No. :

24000-30656Client Project No.: Report Date : 1/16/2025

Identification : Asbestos, Bulk Sample Analysis Sample Date : 1/10/2025

Test Method : Polarized Light Microscopy / Dispersion Staining (PLM/DS) Page 2 of 7App E to Sub E of 40 CFR Part 763 and EPA Method 600/R-93/116

On 1/10/2025, forty-eight (48) bulk material samples were submitted by Justin Zapata for asbestos analysis by PLM/DS.

Copies of Bulk Sample Analysis sheets are attached; additional information may be found therein. The results are summarized below:

Asbestos ContentSample Description / LocationLab Sample No.

None Detected-Gray/Blue FireproofingBlue Fireproofing FP-02-C014280-012

None Detected-White Floor Tile12x12 White FT/Yellow Mastic FT-01-A014280-013 None Detected-Yellow Mastic

None Detected-White Floor Tile12x12 White FT/Yellow Mastic FT-01-B014280-014 None Detected-Yellow Mastic

None Detected-White Floor Tile12x12 White FT/Yellow Mastic FT-01-C014280-015 None Detected-Yellow Mastic

None Detected-Tan Floor Tile12x12 Tan FT/Brown Mastic FT-02-A014280-016 None Detected-Brown Mastic

None Detected-Tan Floor Tile12x12 Tan FT/Brown Mastic FT-02-B014280-017 None Detected-Brown Mastic

None Detected-Tan Floor Tile12x12 Tan FT/Brown Mastic FT-02-C014280-018 None Detected-Brown Mastic

None Detected-Pink Floor Tile12x12 Pink FT/Brown Mastic FT-03-A014280-019 None Detected-Brown Mastic

These samples were analyzed by layers. Specific layer or component asbestos content is indicated when relevant. The EPA considers a material to be asbestos containing only if it contains more than one percent asbestos by Calibrated Visual Area Estimation (CVAE). EPA regulations also indicate that Regulated Asbestos Containing Materials (RACM) -- materials which are friable or may become friable -- be further analyzed by point counting when the results indicate less than ten percent asbestos by CVAE. Arrowhead utilizes CVAE on a routine basis and does not include point counting unless specifically requested.

The results may not be reproduced except in full.

Clearwater, Florida 33759

NVLAP Lab Code 200703-0813-679-0720 / mhall005@tampabay.rr.com

Client : GLE Associates Lab Set No. : 014280

Project : JAHVA Bed Tower 25-14280AT Job No. :

24000-30656Client Project No.: Report Date : 1/16/2025

Identification : Asbestos, Bulk Sample Analysis Sample Date : 1/10/2025

Test Method : Polarized Light Microscopy / Dispersion Staining (PLM/DS) Page 3 of 7App E to Sub E of 40 CFR Part 763 and EPA Method 600/R-93/116

On 1/10/2025, forty-eight (48) bulk material samples were submitted by Justin Zapata for asbestos analysis by PLM/DS.

Copies of Bulk Sample Analysis sheets are attached; additional information may be found therein. The results are summarized below:

Asbestos ContentSample Description / LocationLab Sample No.

None Detected-Pink Floor Tile12x12 Pink FT/Brown Mastic FT-03-B014280-020 None Detected-Brown Mastic

None Detected-Pink Floor Tile12x12 Pink FT/Brown Mastic FT-03-C014280-021 None Detected-Brown Mastic

None Detected-Teal Floor Tile12x12 Teal FT/Brown Mastic FT-04-A014280-022 None Detected-Brown Mastic

None Detected-Teal Floor Tile12x12 Teal FT/Brown Mastic FT-04-B014280-023 None Detected-Brown Mastic

None Detected-Teal Floor Tile12x12 Teal FT/Brown Mastic FT-04-C014280-024 None Detected-Brown Mastic

None Detected-Black CaulkBlack Caulk M-01-A014280-025

None Detected-Black CaulkBlack Caulk M-01-B014280-026

None Detected-Black CaulkBlack Caulk M-01-C014280-027

None Detected-Gray CaulkGray Caulk M-02-A014280-028

None Detected-Gray CaulkGray Caulk M-02-B014280-029

These samples were analyzed by layers. Specific layer or component asbestos content is indicated when relevant. The EPA considers a material to be asbestos containing only if it contains more than one percent asbestos by Calibrated Visual Area Estimation (CVAE). EPA regulations also indicate that Regulated Asbestos Containing Materials (RACM) -- materials which are friable or may become friable -- be further analyzed by point counting when the results indicate less than ten percent asbestos by CVAE. Arrowhead utilizes CVAE on a routine basis and does not include point counting unless specifically requested.

The results may not be reproduced except in full.

Clearwater, Florida 33759

NVLAP Lab Code 200703-0813-679-0720 / mhall005@tampabay.rr.com

Client : GLE Associates Lab Set No. : 014280

Project : JAHVA Bed Tower 25-14280AT Job No. :

24000-30656Client Project No.: Report Date : 1/16/2025

Identification : Asbestos, Bulk Sample Analysis Sample Date : 1/10/2025

Test Method : Polarized Light Microscopy / Dispersion Staining (PLM/DS) Page 4 of 7App E to Sub E of 40 CFR Part 763 and EPA Method 600/R-93/116

On 1/10/2025, forty-eight (48) bulk material samples were submitted by Justin Zapata for asbestos analysis by PLM/DS.

Copies of Bulk Sample Analysis sheets are attached; additional information may be found therein. The results are summarized below:

Asbestos ContentSample Description / LocationLab Sample No.

None Detected-Gray CaulkGray Caulk M-02-C014280-030

None Detected-Gray Sink MasticGray Sink Undercoating M-03-A014280-031

None Detected-Gray Sink MasticGray Sink Undercoating M-03-B014280-032

None Detected-Gray Sink MasticGray Sink Undercoating M-03-C014280-033

None Detected-Tan MasticTan Duct Mastic MAS-01-A014280-034

None Detected-Tan MasticTan Duct Mastic MAS-01-B014280-035

None Detected-Tan MasticTan Duct Mastic MAS-01-C014280-036

None Detected-White MasticWhite TSI Mastic/Fiberglass TSI-01-A014280-037 None Detected-Yellow Glass Insulation

None Detected-White MasticWhite TSI Mastic/Fiberglass TSI-01-B014280-038 None Detected-Yellow Glass Insulation

None Detected-White MasticWhite TSI Mastic/Fiberglass TSI-01-C014280-039 None Detected-Yellow Glass Insulation

These samples were analyzed by layers. Specific layer or component asbestos content is indicated when relevant. The EPA considers a material to be asbestos containing only if it contains more than one percent asbestos by Calibrated Visual Area Estimation (CVAE). EPA regulations also indicate that Regulated Asbestos Containing Materials (RACM) -- materials which are friable or may become friable -- be further analyzed by point counting when the results indicate less than ten percent asbestos by CVAE. Arrowhead utilizes CVAE on a routine basis and does not include point counting unless specifically requested.

The results may not be reproduced except in full.

Clearwater, Florida 33759

NVLAP Lab Code 200703-0813-679-0720 / mhall005@tampabay.rr.com

Client : GLE Associates Lab Set No. : 014280

Project : JAHVA Bed Tower 25-14280AT Job No. :

24000-30656Client Project No.: Report Date : 1/16/2025

Identification : Asbestos, Bulk Sample Analysis Sample Date : 1/10/2025

Test Method : Polarized Light Microscopy / Dispersion Staining (PLM/DS) Page 5 of 7App E to Sub E of 40 CFR Part 763 and EPA Method 600/R-93/116

On 1/10/2025, forty-eight (48) bulk material samples were submitted by Justin Zapata for asbestos analysis by PLM/DS.

Copies of Bulk Sample Analysis sheets are attached; additional information may be found therein. The results are summarized below:

Asbestos ContentSample Description / LocationLab Sample No.

None Detected-White MasticWhite TSI Mastic/Foamglass TSI-02-A014280-040 None Detected-Black Foam Glass

None Detected-White MasticWhite TSI Mastic/Foamglass TSI-02-B014280-041 None Detected-Black Foam Glass

None Detected-White MasticWhite TSI Mastic/Foamglass TSI-02-C014280-042 None Detected-Black Foam Glass

None Detected-Gray Baseboard6" Gray CB/Tan Mastic VB-01-A014280-043 None Detected-Tan Mastic

None Detected-Gray Baseboard6" Gray CB/Tan Mastic VB-01-B014280-044 None Detected-Tan Mastic

None Detected-Gray Baseboard6" Gray CB/Tan Mastic VB-01-C014280-045 None Detected-Tan Mastic

None Detected-Teal Baseboard6" Teal CB/Tan Mastic VB-02-A014280-046 None Detected-Tan Mastic

None Detected-Teal Baseboard6" Teal CB/Tan Mastic VB-02-B014280-047 None Detected-Tan Mastic

These samples were analyzed by layers. Specific layer or component asbestos content is indicated when relevant. The EPA considers a material to be asbestos containing only if it contains more than one percent asbestos by Calibrated Visual Area Estimation (CVAE). EPA regulations also indicate that Regulated Asbestos Containing Materials (RACM) -- materials which are friable or may become friable -- be further analyzed by point counting when the results indicate less than ten percent asbestos by CVAE. Arrowhead utilizes CVAE on a routine basis and does not include point counting unless specifically requested.

The results may not be reproduced except in full.

Clearwater, Florida 33759

NVLAP Lab Code 200703-0813-679-0720 / mhall005@tampabay.rr.com

Client : GLE Associates Lab Set No. : 014280

Project : JAHVA Bed Tower 25-14280AT Job No. :

24000-30656Client Project No.: Report Date : 1/16/2025

Identification : Asbestos, Bulk Sample Analysis Sample Date : 1/10/2025

Test Method : Polarized Light Microscopy / Dispersion Staining (PLM/DS) Page 6 of 7App E to Sub E of 40 CFR Part 763 and EPA Method 600/R-93/116

On 1/10/2025, forty-eight (48) bulk material samples were submitted by Justin Zapata for asbestos analysis by PLM/DS.

Copies of Bulk Sample Analysis sheets are attached; additional information may be found therein. The results are summarized below:

Asbestos ContentSample Description / LocationLab Sample No.

None Detected-Teal Baseboard6" Teal CB/Tan Mastic VB-02-C014280-048 None Detected-Tan Mastic

These samples were analyzed by layers. Specific layer or component asbestos content is indicated when relevant. The EPA considers a material to be asbestos containing only if it contains more than one percent asbestos by Calibrated Visual Area Estimation (CVAE). EPA regulations also indicate that Regulated Asbestos Containing Materials (RACM) -- materials which are friable or may become friable -- be further analyzed by point counting when the results indicate less than ten percent asbestos by CVAE. Arrowhead utilizes CVAE on a routine basis and does not include point counting unless specifically requested.

The results may not be reproduced except in full.

Clearwater, Florida 33759

NVLAP Lab Code 200703-0813-679-0720 / mhall005@tampabay.rr.com

Client : GLE Associates Lab Set No. : 014280

Project : JAHVA Bed Tower 25-14280AT Job No. :

24000-30656Client Project No.: Report Date : 1/16/2025

Identification : Asbestos, Bulk Sample Analysis Sample Date : 1/10/2025

Test Method : Polarized Light Microscopy / Dispersion Staining (PLM/DS) Page 7 of 7App E to Sub E of 40 CFR Part 763 and EPA Method 600/R-93/116

SCOPE OF THIS REPORT

These samples were obtained as a part of a building survey; this report is only intended to be used as a part of the survey report issued by the surveyor. This report explains the laboratory analysis and results. The surveyor's report explains the sampling protocol used, when the samples were obtained, the location(s) of the samples, where the materials were observed in the building, quantities of materials observed, condition of the materials and the extent of his/her survey. Sample locations and material descriptions are given by the surveyor on the chain of custody but included here (possibly abbreviated)only as a convenience for the reader.

This report may not be reproduced without written permission of Arrowhead Technologies, LLC and must be reproduced in full.

STATEMENT OF LABORATORY ACCREDITATION

The samples were analyzed in general accordance with the procedures outlined in the Method for the Determinationof Asbestos in Bulk Building Materials, EPA/600/R-93/116,and the Interim Method for the Determinationof Asbestos in Bulk Insulation Samples, EPA 600/M4-82-020. The results of each bulk sample relate only to the material tested as received and the results shall not be used to claim product endorsement by NVLAP or any agency of the U.S. Government.

Floor tile and other resinously bound materials, when analyzed by the EPA method, may yield false negative results because of limitations in separating closely bound fibers and in detecting fibers of small length and diameter. When a definitive result is required, Arrowhead recommendsutilizing alternative methods of identification, including Transmission Electron Microscopy.

Specific questions concerning bulk sample results shall be directed to the Laboratory Director.

Analyst : Ryan Schwegman

Monte Hall, P.G.Laboratory Director :

Florida Registration No. 1658

Approved Signatory :

APPENDIX B

Personnel and Laboratory Certifications

Melanie S. Griffin, SecretaryRon DeSantis, Governor

STATE OF FLORIDA

DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION

ASBESTOS LICENSING UNIT

THE ASBESTOS BUSINESS ORGANIZATION HEREIN IS LICENSED UNDER THE

PROVISIONS OF CHAPTER 469, FLORIDA STATUTES

GLE ASSOCIATES INC

Do not alter this document in any form.

ROBERT BLAIR GREENE

LICENSE NUMBER: ZA0000034

EXPIRATION DATE: NOVEMBER 30, 2025

This is your license. It is unlawful for anyone other than the licensee to use this document.

5405 CYPRESS CENTER DRIVE

SUITE 110

TAMPA FL 33609

Always verify licenses online at MyFloridaLicense.com

ISSUED: 11/02/2023

https://www.myfloridalicense.com/LicenseDetail.asp?SID=&id=2c9db36082555fee1afe88b159c9ca06 https://www.myfloridalicense.com/LicenseDetail.asp?SID=&id=2c9db36082555fee1afe88b159c9ca06

Melanie S. Griffin, SecretaryRon DeSantis, Governor

STATE OF FLORIDA

DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION

ASBESTOS LICENSING UNIT

THE ASBESTOS CONSULTANT - ENGINEER HEREIN IS LICENSED UNDER THE

PROVISIONS OF CHAPTER 469, FLORIDA STATUTES

GREENE, ROBERT BLAIR

Do not alter this document in any form.

GLE ASSOCIATES INC

LICENSE NUMBER: EA0000009

EXPIRATION DATE: NOVEMBER 30, 2026

This is your license. It is unlawful for anyone other than the licensee to use this document.

5405 CYPRESS CENTER DR

SUITE 110

TAMPA FL 33609

Always verify licenses online at MyFloridaLicense.com

ISSUED: 09/24/2024

https://www.myfloridalicense.com/LicenseDetail.asp?SID=&id=10324f95ba50b55978623c96241000ac https://www.myfloridalicense.com/LicenseDetail.asp?SID=&id=10324f95ba50b55978623c96241000ac

United States Department of Commerce National Institute of Standards and Technology

Certificate of Accreditation to ISO/IEC 17025:2017

NVLAP LAB CODE: 200703-0

Arrowhead Technologies, L.L.C.

Clearwater, FL is accredited by the National Voluntary Laboratory Accreditation Program for specific services, listed on the Scope of Accreditation, for:

Asbestos Fiber Analysis

2025-01-01 through 2025-12-31

Effective Dates For the National Voluntary Laboratory Accreditation Program

This laboratory is accredited in accordance with the recognized International Standard ISO/IEC 17025:2017.

This accreditation demonstrates technical competence for a defined scope and the operation of a laboratory quality management system (refer to joint ISO-ILAC-IAF Communique on ISO/IEC 17025).

APPENDIX C

Scope of Work Drawing

DEMOLITION PLAN LEGEND

EXISTING CONSTRUCTION

TO REMAIN

EXISTING CONSTRUCTION

TO BE DEMOLISHED

LIMITS OF PROJECT AREA

UNLESS NOTED OTHERWISE

TRUE

NORTH

PLAN

NORTH

9 10 11 12 13 14 15 16 17

A

B

C

STORAGE

2D-251A

NURSE

STATION

2D-252

STORAGE

2D-251

H.A.C.

2D-252A

CORRIDOR

C2-37-1

MENS

VESTIBULE

V2-04-01

RESTROOM

2D-249

PATIENT

ROOM #14

ISOLATION

2D-252V

RT WORK

ROOM

2D-252W

PATIENT

ROOM #15

ISOLATION

2D-252U

CORRIDOR

C2-44-1

COMM

2D-252S

EQUIPMENT

STORAGE

2D-252T

CLEAN

LINEN

2D-259

ON CALL

2D-288

RESTROOM

2D-252P

PATIENT

ROOM #4

2D-252L

FREEZER

2A-205D

OFFICE

2A-205A

COMPUTER

ROOM

2A-205B

CORRIDOR

C2-49-1

GENERAL

STORAGE

2A-207

GENERAL

STORAGE

2A-206

PATIENT

ROOM #5

2D-252K

PATIENT

ROOM #6

2D-252J

PATIENT

ROOM #7

2D-252I

PATIENT

ROOM #8

2D-252H

HEAD

NURSE

2D-252G

PATIENT

ROOM #9

2D-252F

PATIENT

ROOM #10

2D-252E

PATIENT

ROOM #11

2D-252D

PATIENT

ROOM #12

2D-252C

CORRIDOR

C2-43-1

CONNECTOR

ENTRY TO NEW

BED TOWER

PATIENT

ROOM #13

2D-252B

NURSE

STATION

2D-252

D

ROOF

BELOW

OPEN TO

BELOW

OPEN TO

BELOW

A S

R E

Q 'D

AS REQ'D

REF

TYP

TYP

TYP

TYP

A S

R E

Q 'D

PROJECT AREA

KEY PLAN

NTS

DEMO PLAN GENERAL NOTES

A. REFER TO GENERAL PROJECT NOTES, ARCHITECTURAL NOTES, SYMBOLS,

LEGENDS AND ABBREVIATIONS ON SHEET GI002.

B. THE CONTRACTOR SHALL REMOVE ALL EXISTING CONSTRUCTION REQUIRED

TO INSTALL NEW WORK.

C. REFER TO AND COORDINATE WORK WITH OTHER DISCIPLINE'S DRAWINGS FOR

ADDITIONAL INFORMATION AND REQUIREMNETS.

D. DEMOLISH EXISTING FINISHES AND WALL MOUNTED ITEMS/ ACCESSORIES/

EQUIPEMNT IN PROJECT AREA AS REQUIRED TO INSTALL NEW WORK.

E. REMOVE EXISTING DAMAGED SUBSTRATE AND UNDERLAYMENT AS REQUIRED

TO INSTALL NEW WORK.

DEMOLISH EXISTING WINDOW ASSEMBLY.

DEMOLISH EXISTING SLIDING DOOR AND WINDOW ASSEMEBLY.

DEMOLISH EXISTING NURSE STATION MILLWORK.

DEMOLISH EXISTING COUNTER TOP, CASEWORK, FIXTURES AND OTHER WALL

MOUNTED EQUIPMENT/ ACCESSORIES.

REMOVE EXISTING POWER COLUMN AND MONITOR BOOM. TURN OVER TO THE

GOVERMENT AND RELOCATE TO A COR APPROVED LOCATION.

DEMOLISH EXISTING HANDRAIL AND CRASHRAILS.

DEMOLISH EXISTING DOOR AND FRAME ASSEMBLY.

LINE INDICATES LIMIT OF FLOORING FINISH TO BE DEMOLISHED AND PREPARED

TO INSTALL NEW WORK. FLOORING BEYOND THIS LINE TO REMAIN.

DEMO PLAN KEY NOTES #

VA FORM 08-6231

1 2 3 4 5 6 7 8 9

DATE:

Drawing Title:

Approved Project Director

Project Title:

1 2 3 4 5 6 7 8 9

90% SUBMITTAL

512 MEANS STREET NW

Phase Project Number

Building Number

Drawing NumberLocation

Issue Date CheckedFULLY SPRINKLERED

STAMP

STE. 400

ATLANTA, GA 30318

ARCHITECT/ENGINEER OF RECORDCONSULTANT

A

B

C

D

E

F

U.S. Department of Veterans Affairs

Office of Construction and

Facilities Management

Drawn

SJ MC/KB

673-21-145

10-23-2024REVISIONS:

A

B

C

D

E

F

CONSTRUCT NEW BED TOWER

CONNECTOR

13000 BRUCE B DOWNS BLVD

SECOND FLOOR DEMO PLAN

AD101

0' 4' 8' 16' 24'

SCALE: 1/8" = 1' - 0"

1/8" = 1'-0"AD101

1 SECOND FLOOR DEMO PLAN

APPENDIX D

Photographs

Photograph Date:

January 10, 2025

Prepared By:

Upper Photo: CT-01

Lower Photo: DW-01

Figure

Job No.

24000-30656

Tampa VA New Bed Tower

Connector LAS

Upper Photo: FP-01

Lower Photo: FP-02

Figure

Job No.

24000-30656

Upper Photo: FT-01

Lower Photo: FT-02

Figure

Job No.

24000-30656

Upper Photo: FT-03

Lower Photo: FT-04

Upper Photo: M-01

Lower Photo: M-02

Upper Photo: M-03

Lower Photo: MAS-01

Upper Photo: TSI-01

Lower Photo: TSI-02

Figure

Job No.

24000-30656

Upper Photo: VB-01

Lower Photo: VB-02

James A. Haley VA Medical Center
Building 1, Wing 2D, SICU
13000 Bruce B Downs Boulevard
Tampa, Florida 33612
GLE Project No.: 24000-30656
Prepared for:
Mr. Scott Jeffries
Toland Mizell Molnar, LLC
512 Means Street Northwest, Suite 400
Atlanta, Georgia 30318
January 2025
Prepared by:
Mr. Scott Jeffries
Toland Mizell Molnar, LLC
512 Means Street Northwest, Suite 400
Atlanta, Georgia 30318
GLE Project No.: 24000-30656
GLE Associates, Inc.
JZ/PSZ/RBG/aw
Table 2.2-1 — Summary of Homogeneous Sampling Areas
APPENDICES
Appendix A – Analytical Results and Chain of Custody
No asbestos-containing materials were identified in the scope of this survey.