Drawings_985 Passenger Elevator_2-21-22.pdf

PDF 24 MB Posted

Attached to
Passenger Elevator Modernization, Federal Garage, 985 Michigan Ave, Detroit, MI
Solicitation number
47PF0022R0056
Issued by

About this file

This notice is a solicitation for a passenger elevator modernization contract. The General Services Administration Public Buildings Service Region 5 is seeking proposals to renovate three existing passenger elevators in the Federal Garage located at 985 Michigan Avenue in Detroit, Michigan. The modernization is intended to bring the elevators into compliance with ASME A17.1 national standards as well as new International Building Code, National Fire Protection Association, and National Electrical Code requirements. The estimated value of the contract is between $1,000,000 to $5,000,000 and the period of performance for on-site work is 300 calendar days from notice to proceed. This procurement is set aside for small businesses with a NAICS code of 238290 and size standard of $16.5 million. Offerors must attend a pre-proposal conference on June 10, 2022 and register by May 31, 2022. The award will be made based on technical evaluation factors and total price.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MECHANICAL ABBREVIATION LIST

ABBREVIATION DESCRIPTION

COMPRESSED AIR

COMPRESSED AIR (SPECIFIC PSIG)

AUTOMATIC AIR VENT

AIR COOLED CONDENSER

AIR COOLED CONDENSER UNIT

ACCESS DOOR

AREA DRAIN

AIR EXTRACTOR

ABOVE FINISHED FLOOR

AIR HANDLING UNIT

ALTERNATE

AMPERE

AIR PRESSURE DROP

ARGON

AMERICAN SOCIETY OF HEATING, REFRIGERATION

AND AIR-CONDITIONING ENGINEERS

AUTOMATIC SPRINKLER RISER

AIR TRANSFER DUCT

AUXILIARY

ACID VENT

ACID VENT THROUGH ROOF

ACID WASTE

BUILDING AUTOMATION SYSTEM

BLOWER COIL UNIT

BACK DRAFT DAMPER

BELOW FINISHED FLOOR

BACKFLOW PREVENTER

BRAKE HORSEPOWER

BOTTOM OF DUCT

BOTTOM OF PIPE

BRITISH THERMAL UNIT

BRITISH THERMAL UNIT PER HOUR

BEVERAGE CONDUIT

BACKWATER VALVE

COMMON

CAPACITY

CONSTANT AIR VOLUME

CATCH BASIN

COOLING COIL

COLD DECK

CONDENSATE DRAIN

CONTRACTOR FURNISHED, CONTRACTOR INSTALLED

CUBIC FEET PER HOUR

CUBIC FEET PER MINUTE

CHILLER

CHILLED WATER

CHILLED WATER RETURN

CHILLED WATER SUPPLY

COOLING

CONDENSATE

CONDENSATE (SPECIFIC PSIG)

CLEAN OUT

CARBON DIOXIDE

CONTINUATION OR CONTINUED

CONTRACTOR

CONVECTOR

COEFFICIENT OF PERFORMANCE

CIRCULATING PUMP

CONDENSATE RETURN UNIT

CLINICAL SERVICE SINK

COOLING TOWER

CABINET UNIT HEATER

DOMESTIC COLD WATER

DOMESTIC COLD WATER - FILTERED

CONDENSER WATER RETURN

CONDENSER WATER SUPPLY

DRIP AND TRAP

DISCHARGE AIR

DISCHARGE AIR TEMPERATURE

DRY BULB

DIRECT DIGITAL CONTROL

DEGREE

DRY FIRE STAND PIPE

DRAINAGE FIXTURE UNITS

DIAMETER

DAMPER

DAY/NIGHT

DOWN

DOWNSPOUT NOZZLE

DUCT SILENCER

DRAIN TILE

DRAIN TILE CONNECTION

DOMESTIC WATER HEATER

DRAWING

EXISTING

EXHAUST GRILLE OR REGISTER

EACH

EXHAUST AIR

ENTERING AIR TEMPERATURE

EXPANSION COMPENSATOR

ELECTRIC CABINET UNIT HEATER

ENTERING DRY BULB

ENERGY EFFICIENCY RATIO

EMERGENCY EYE WASH / SHOWER

EMERGENCY EYE WASH

EXHAUST FAN

EFFICIENCY

ELECTRIC HEATING COIL

EXPANSION JOINT

ELEVATION

ELECTRICAL

ENERGY MANAGEMENT SYSTEM

ENERGY RECOVERY LOOP

ENERGY RECOVERY LOOP RETURN

ENERGY RECOVERY LOOP SUPPLY

ENERGY RECOVERY UNIT

EMERGENCY SHOWER

EXTERNAL STATIC PRESSURE

ELECTRIC UNIT HEATER

ENTERING WET BULB

ELECTRIC WATER COOLER

ENTERING WATER TEMPERATURE

EXHAUST

FIRE PROTECTION

DEGREES FAHRENHEIT

FACE AND BYPASS

FLOAT AND THERMOSTATIC

FACE AREA

FAN COIL UNIT

ABBREVIATION DESCRIPTION

MECHANICAL SYMBOL LIST

NOTE: SOME SYMBOLS AND ABBREVIATIONS

SHOWN MAY NOT APPLY TO THIS PROJECT.

PIPING SYMBOLS

MECHANICAL DRAWING INDEX

FLOOR DRAIN

FUNNEL FLOOR DRAIN

FIRE HYDRANT

FIRE HOSE CABINET

FIRE HOSE RACK

FIRE HOSE VALVE

FULL LOAD AMPS

FLOOR

FLOW METER

FLOW MEASURING STATION

FEET PER MINUTE

FIRE PUMP

FAN POWERED (AIR) TERMINAL UNIT

FLOOR SINK

FOOD SERVICE EQUIPMENT CONTRACTOR

FEET

FINNED TUBE RADIATION

FACE VELOCITY

NATURAL GAS

GAUGE

GALLON

GRAVITY RELIEF HOOD

GALLONS PER HOUR

GALLONS PER MINUTE

GREASE SANITARY WASTE

HYDROGEN

HOSE BIBB

HEATING COIL

HOT DECK

HIGH EFFICIENCY PARTICULATE ARRESTANCE

HIGH LIMIT

HAND/OFF/AUTO

HEAT PUMP

HORSEPOWER

HIGH PRESSURE DOMESTIC COLD WATER

HIGH PRESSURE DOMESTIC HOT WATER

HIGH PRESSURE DOMESTIC HOT WATER RETURN

HEAT PUMP LOOP

HEAT PUMP LOOP RETURN

HEAT PUMP LOOP SUPPLY

HOUR

HEATING

HEATING VENTILATING

HEATING, VENTILATING, AIR CONDITIONING

HOT WATER HEATING

HOT WATER HEATING RETURN

HOT WATER HEATING SUPPLY

DOMESTIC HOT WATER

DOMESTIC HOT WATER (SPECIFIC TEMP °F)

DOMESTIC HOT WATER RETURN

HEAT EXCHANGER

HERTZ

INDOOR AIR QUALITY

INSIDE DIAMETER

INVERT ELEVATION

INTAKE HOOD

INCHES

INFRARED HEATER

INDIRECT WASTE

JANITOR'S CLOSET

JOCKEY PUMP

THOUSAND AMP

KILOWATT

KILOWATT-HOUR

LEAVING AIR TEMPERATURE

LABORATORY

LAVATORY

POUNDS

LEAVING DRY BULB

LOW LIMIT

LOW PRESSURE CONDENSATE

LOW PRESSURE STEAM

LOCKED ROTOR AMPS

LEAVING WET BULB

LEAVING WATER TEMPERATURE

MIXED AIR

MIXED AIR TEMPERATURE

MAKE-UP AIR UNIT

MAXIMUM

THOUSAND BRITISH THERMAL UNITS PER HOUR

MEDICAL COMPRESSED AIR

MINIMUM CIRCUIT AMPACITY

MOTOR CONTROL CENTER

MECHANICAL

MEZZANINE

MANUFACTURER

MANHOLE

1/1000th INCH

MINIMUM

MISCELLANEOUS

MILLION BRITISH THERMAL UNITS PER HOUR

MAXIMUM OVERCURRENT PROTECTION

MOTOR STARTER

MOUNTED

MOTOR

MANUAL AIR VENT

MEDICAL VACUUM

NITROGEN

NITROUS OXIDE

NOISE CRITERIA

NORMALLY CLOSED

NORMALLY CLOSED TIMED CLOSED

NORMALLY CLOSED TIMED OPEN

NATIONAL FIRE PROTECTION AGENCY

NORMALLY OPEN TIMED CLOSED

NORMALLY OPEN TIMED OPEN

NOT IN CONTRACT

NORMALLY OPEN

NOMINAL

NON POTABLE COLD WATER

ABBREVIATION DESCRIPTION

OXYGEN

OUTSIDE AIR

OUTSIDE AIR TEMPERATURE

OUTLET BOX

OPPOSED BLADE DAMPER

ON CENTER/CENTER TO CENTER

OUTSIDE DIAMETER

OPEN ENDED DUCT

OWNER FURNISHED, CONTRACTOR INSTALLED

OWNER FURNISHED, OWNER INSTALLED

OVERLOAD

OVERFLOW RAIN CONDUCTOR

OVERFLOW ROOF DRAIN

OUTSIDE SCREW AND YOKE

OUTLET VELOCITY

OPERATOR WORKSTATION

PACKAGED AIR CONDITIONING UNIT

PARALLEL BLADE DAMPER

PUMPED CONDENSATE

PROCESS COOLING WATER

PROCESS COOLING WATER RETURN

PROCESS COOLING WATER SUPPLY

PRESSURE DROP (FEET OF WATER)

PERIMETER HEAT

PERIMETER HEAT RETURN

PERIMETER HEAT SUPPLY

PANEL

PARTS PER MILLION

PRESSURE

PRESSURE REDUCING VALVE

PUMPED SANITARY

POUNDS PER SQUARE INCH

POUNDS PER SQUARE INCH - ABSOLUTE

POUNDS PER SQUARE INCH - GAUGE

PUMPED STORM

PURIFIED WATER

PURIFIED WATER RETURN

PURIFIED WATER SUPPLY

RELOCATED

RETURN GRILLE OR REGISTER

RETURN AIR

RETURN AIR TEMPERATURE

RAIN CONDUCTOR

RADIANT CEILING PANEL

ROOF DRAIN

REQUIRED

ROOF EXHAUST FAN

RETURN FAN

RELATIVE HUMIDITY

REFRIGERANT LIQUID

RELIEF AIR

REVOLUTIONS PER MINUTE

REDUCED PRESSURE BACKFLOW

DETECTION ASSY

REDUCED PRESSURE BACKFLOW

ZONE ASSY

REFRIGERANT SUCTION

ROOFTOP UNIT

SUPPLY AIR DIFFUSER OR GRILLE

SOUND ATTENUATOR

SUPPLY AIR

SANITARY WASTE

SUPPLY AIR TEMPERATURE

SHORT CIRCUIT CURRENT RATING

SECTION

SUPPLY FAN

SHOWER

SINK

SNOW MELT RETURN

SNOW MELT SUPPLY

SPRINKLER PIPING

STATIC PRESSURE

SPECIFICATION

SPRINKLER

SQUARE FOOT/SQUARE FEET

START/STOP

SERVICE SINK

STORM

STANDARD

STACK

STEAM

STEAM (SPECIFIC PSIG)

SUMMER/WINTER

SWITCH

TRANSFER GRILLE

TEMPERATURE CONTROL

TEMPERING COIL

TEMPERATURE CONTROL PANEL

TRENCH DRAIN

TEMPERATURE

TEMPORARY

TERMINAL HEATING

TOTAL HEAT ABSORBED

TERMINAL HEATING RETURN

TOTAL HEAT REJECTED

TERMINAL HEATING SUPPLY

TEPID WATER

TOTAL STATIC PRESSURE

(AIR) TERMINAL UNIT

TURNING VANES

TEMPERED WATER

TYPICAL

UNIT HEATER

UNDERWRITER'S LABORATORY

UNLESS OTHERWISE NOTED

URINAL

UNIT VENTILATOR

VALVE

VENT

VACUUM

VARIABLE AIR VOLUME

VACUUM BREAKER

VOLUME DAMPER (MANUALLY ADJUSTABLE)

VOLUME

VARIABLE FREQUENCY CONTROLLER

VENT THROUGH ROOF

VENTURI TERMINAL UNIT

VERTICAL UNIT VENTILATOR

WASTE

WASTE AND VENT

WASTE ANESTHETIC GAS DISPOSAL

WET BULB

WATER CLOSET

WATER COLUMN

WATER GAUGE

WALL HYDRANT

WASHING MACHINE SUPPLY AND DRAIN BOX

WATER PRESSURE DROP

WEIGHT

TRANSFORMER

ZONE VALVE BOX

TEMPERATURE CONTROL - PARTIAL SYMBOLS LIST

SYMBOL DESCRIPTION

CO2 CARBON DIOXIDE SENSOR

CO

DPT

FM

CARBON MONOXIDE SENSOR

DIFFERENTIAL PRESSURE TRANSMITTER

FLOW METER

GUARD FOR STAT OR SENSOR

HUMIDISTAT OR HUMIDITY SENSOR

(AS DEFINED ON TC DRAWINGS)

SYMBOL DESCRIPTION

OCCUPANCY SENSOR

PT PRESSURE TRANSMITTER

STATIC PRESSURE SENSOR OR PROBE

VALVE - 2 WAY CONTROL VALVE

VALVE - 3 WAY CONTROL VALVE

THERMOSTAT OR TEMPERATURE SENSOR

(AS DEFINED ON TC DRAWINGS)

T

OS

SP

H

NOTE: LIST OF ADDITIONAL SYMBOLS & ABBREVIATIONS ASSOCIATED WITH

TEMPERATURE CONTROLS ARE IDENTIFIED ON TC DRAWINGS.

SYMBOL DESCRIPTION

AIR VENT - AUTOMATIC

AIR VENT - MANUAL

BACKFLOW PREVENTER

CATCH BASIN

CIRCULATING PUMP

CLEAN OUT - IN FLOOR

CLEAN OUT - FLANGE

DIRECTION OF FLOW

DIRECTION OF PITCH - DOWN

FINNED TUBE RADIATION

FIRE PROTECTION - SIAMESE CONNECTION - FREE STANDING

FIRE PROTECTION - SIAMESE CONNECTION - WALL MOUNTED

FIRE PROTECTION - SPRINKLER HEAD, CONCEALED

FIRE PROTECTION - SPRINKLER HEAD, PENDANT

FIRE PROTECTION - SPRINKLER HEAD, UPRIGHT

FIRE PROTECTION - SPRINKLER HEAD, SIDEWALL

FLOOR DRAIN

FLOOR DRAIN - ELEVATION

FLOOR DRAIN - FUNNEL

FLOOR DRAIN - FUNNEL, ELEVATION

FLOW MEASURING DEVICE (FOR TEST AND BALANCING)

FLOW SWITCH

HOSE BIBB

MANHOLE

OPEN SITE DRAIN

PIPE - ANCHOR

PIPE - CAP OR PLUG

PIPE - ELBOW DOWN

PIPE - ELBOW UP

PIPE - EXPANSION JOINT OR COMPENSATOR

PIPE - FLANGE

PIPE - HOSE AND BRAID FLEXIBLE CONNECTION

PIPE - GUIDE

PIPE - TEE DOWN

PIPE - TEE UP

PIPE - UNION

PRESSURE AND TEMPERATURE TEST PLUG

PRESSURE GAUGE AND COCK

REDUCER - CONCENTRIC

REDUCER - ECCENTRIC

ROOF/OVERFLOW DRAIN

STEAM TRAP - FLOAT AND THERMOSTATIC

STRAINER

STRAINER WITH VALVE AND BLOW-OFF

THERMOMETER

TRAP

VALVE - ANGLE

VALVE - BALL

VALVE - BALANCE (i.e. BALANCE VALVE TO 0.5 GPM)

VALVE - BUTTERFLY

VALVE - COMBINATION BALANCE & FLOW MEASURING

VALVE - CHECK

VALVE - SPRING CHECK

VALVE - GAS (MANUAL)

VALVE - GLOBE

VALVE - ISOLATION

VALVE - NEEDLE

VALVE - OS&Y

VALVE - PLUG

VALVE - PRESSURE REGULATING

VALVE - PRESSURE REDUCING

VALVE - PRESSURE RELIEF

VALVE - PRESSURE & TEMPERATURE RELIEF

VENT THROUGH ROOF

WALL HYDRANT

DUCTWORK SYMBOLS

SYMBOL DESCRIPTION

AIR TERMINAL UNIT

AIR TERMINAL UNIT WITH HEATING COIL

VENTURI AIR TERMINAL UNIT

VENTURI AIR TERMINAL UNIT WITH HEATING COIL

DAMPER - HORIZONTAL FIRE (EXISTING, NEW)

DAMPER - HORIZONTAL FIRE / SMOKE (EXISTING, NEW)

DAMPER - SMOKE (EXISTING, NEW)

DAMPER - VERTICAL FIRE (EXISTING, NEW)

DAMPER - VERTICAL FIRE / SMOKE (EXISTING, NEW)

DAMPER - BACK DRAFT

DAMPER - VOLUME (MANUALLY ADJUSTABLE)

DIFFUSER - BLANK OFF

DIFFUSER - LINEAR SLOT

DIFFUSER - SQUARE OR RECTANGULAR

DUCT CROSS SECTION - SUPPLY

DUCT CROSS SECTION - RETURN

DUCT CROSS SECTION - EXHAUST

DUCT - FLEXIBLE CONNECTION

DUCT - FLEXIBLE DUCT

DUCT TAKE-OFF - ROUND CONICAL

DUCT TAKE-OFF - RECTANGULAR WITH SHOE TAP

ELBOW - RECTANGULAR WITH TURNING VANES

ELBOW - RECTANGULAR/ ROUND SMOOTH RADIUS

ELBOW DOWN - RECTANGULAR

ELBOW DOWN - ROUND

ELBOW UP - RECTANGULAR

ELBOW UP - ROUND

FAN - AXIAL

FAN - CENTRIFUGAL (ELEVATION)

HEATING COIL

INCLINED DROP IN DIRECTION OF AIRFLOW

INCLINED RISE IN DIRECTION OF AIRFLOW

INTAKE OR RELIEF HOOD

REGISTER - RETURN OR EXHAUST

REGISTER - RETURN WITH BOOT

REGISTER - TRANSFER GRILLE

ROOF EXHAUST FAN

TRANSITION - CONCENTRIC

TRANSITION - ECCENTRIC

UNIT HEATER - HORIZONTAL THROW

UNIT HEATER - VERTICAL THROW

DOUBLE LINE DUCTWORK SYMBOLS

SYMBOL DESCRIPTION

DUCT TAKE-OFF - RECTANGULAR WITH SHOE TAP

DUCT TAKE-OFF - ROUND CONICAL

ELBOW - RECTANGULAR WITH TURNING VANES

ELBOW - RECTANGULAR SHORT RADIUS WITH

SPLITTER VANES

ELBOW - ROUND

ELBOW - RECTANGULAR SMOOTH RADIUS

ELBOW DOWN - RECTANGULAR

ELBOW DOWN - ROUND

ELBOW UP - RECTANGULAR

ELBOW UP - ROUND

HEATING COIL

INCLINED DROP IN DIRECTION OF AIRFLOW

INCLINED RISE IN DIRECTION OF AIRFLOW

TRANSITION - CONCENTRIC

TRANSITION -ECCENTRIC

D

R

AV

MV

BFP

CO

CO

FS

HB

MH

P/T

VTR

WH

TU-101

TU-101

VTU-101

VTU-101

BDD

D

R

CONSTRUCTION KEY NOTE (NUMBER) OR

DEMOLITION KEY NOTE (LETTER)

SECTION OR PLAN NUMBER

SHEET WHERE SECTION IS DRAWN

M5.1

EQUIPMENT DESIGNATION,

(i.e. EXHAUST FAN NUMBER 1)

EF

M5.1

AREA OF ENLARGEMENT

PLAN NUMBER

SHEET WHERE ENLARGED PLAN IS DRAWN

M5.1

SECTION OR ENLARGED PLAN

SCALE: 1/8" = 1' - 0"

SECTION OR PLAN NUMBER

SHEET WHERE SECTION IS CUT OR

ENLARGED PLAN IS REFERENCED

MATCHLINE

HEAVY LINE WEIGHT INDICATES NEW WORK

LIGHT LINE WEIGHT INDICATES EXISTING

EQUIPMENT OR REFERENCED INFORMATION

GRAY LINE INDICATES BACKGROUND INFORMATION

DASHED LINES INDICATE PIPING

ROUTED BELOW SLAB OR GRADE

HATCH MARKS INDICATE EQUIPMENT OR MATERIALS

TO BE DISCONNECTED AND REMOVED.

POINT OF NEW CONNECTION SYMBOL

EXISTING SYSTEM COMPONENT TO REMAIN

NEW SYSTEM COMPONENT

PIPING RISER DESIGNATION,

(i.e. HOT WATER RISER NUMBER 1)

HW-1

22x10 18x14ø

DUCT SIZE NOTATION

ALL SIZES IN INCHES

8ø

OVAL DUCT

RECTANGULAR DUCT

SHEET M1.0

SHEET M1.1

0.5

0.5 (i.e. BALANCE VALVE TO 0.5 GPM)

DAMPER - MOTORIZEDM

SHEET NO. SHEET TITLE

PIPE - RUBBER FLEXIBLE CONNECTION

FLOW METER

FM

STANDARD METHODS OF NOTATION

SUPPLY DIFFUSER WITH SCHEDULE TAG "1",

10" DIAMETER NECK SIZE

350 CFM TYPICAL FOR 4

S-1 10ø 350-4

RETURN REGISTER WITH SCHEDULE TAG "1",

22"x 22" NECK SIZE

640 CFM TYPICAL FOR 2

EXHAUST REGISTER E DESIGNATION SIMILAR.

R-1 22x22 640-2

AIR TERMINAL UNIT WITH HEATING COIL NO. 101

WITH SERVICE CLEARANCE SHOWN

TU-101

VTU-101

VENTURI AIR TERMINAL WITH HEATING COIL NO. 101

WITH SERVICE CLEARANCE SHOWN

PIPE DIAMETER NOTATION

ALL SIZES IN INCHES

PLUMBING FIXTURE UNIT IDENTIFICATION TAG

WATER CLOSET TYPE "1"

TYPICAL FOR 2

(2)WC-1

A A(___#)

AAV

ACC

ACCU

AD

AD

AE

AFF

AHU

ALT

AMP

APD

AR

ASHRAE

ASR

ATD

AUX

AV

AVTR

AW

BAS

BCU

BDD

BFF

BFP

BHP

BOD

BOP

BTU

BTUH

BVC

BWV

C

CAP

CAV

CB

CC

CD

CD

CFCI

CFH

CFM

CH

CHW

CHWR

CHWS

CLG

CNDS

CNDS (__#)

CO

CO2

CONT

CONTR

CONV

COP

CP

CRU

CSS

CT

CUH

CW

CWF

CWR

CWS

D&T

DA

DAT

DB

DDC

DEG

DFSP

DFU

DIA

DMPR

D/N

DN

DNZ

DS

DT

DTC

DWH

DWG

(E) E

EA

EA

EAT

EC

ECUH

EDB

EER

EES

EEW

EF

EFF

EHC

EJ

EL

ELEC

EMS

ERL

ERLR

ERLS

ERU

ESH

ESP

EUH

EWB

EWC

EWT

EXH

F °F F&B F&T

FA

FCU

FD

FFD

FH

FHC

FHR

FHV

FLA

FLR

FM

FMS

FPM

FP

FPTU

FS

FSEC

FT

FTR

FV

G

GA

GAL

GRH

GPH

GPM

GSAN

H

HB

HC

HD

HEPA

HL

HOA

HP

HP

HPCW

HPHW

HPHWR

HPL

HPLR

HPLS

HR

HTG

HV

HVAC

HWH

HWHR

HWHS

HW

HW(__)

HWR

HX

HZ

IAQ

ID

IE

IH

IN

IR

IW

JC

JP

KA

KW

KWH

LAT

LAB

LAV

LBS

LDB

LL

LPC

LPS

LRA

LWB

LWT

MA

MAT

MAU

MAX

MBH

MCA

MCA

MCC

MECH

MEZZ

MFR

MH

MIL

MIN

MISC

MMBH

MOP

M/S

MTD

MTR

MV

MVAC

N N2O

NC

NC

NCTC

NCTO

NFPA

NOTC

NOTO

NIC

NO

NOM

NPCW

O

OA

OAT

OB

OBD

OC

OD

OED

OFCI

OFOI

OL

ORC

ORD

OS&Y

OV

OWS

PACU

PBD

PC

PCW

PCWR

PCWS

PD

PH

PHR

PHS

PNL

PPM

PRESS

PRV

PSAN

PSI

PSIA

PSIG

PST

PW

PWR

PWS

(R) R

RA

RAT

RC

RCP

RD

REQD

REF

RF

RH

RL

RLFA

RPM

RPDA

RPZA

RS

RTU

S

SA

SA

S, SAN

SAT

SCCR

SECT

SF

SH

SK

SMR

SMS

SP

SP

SPEC

SPKLR

SQFT

S/S

SS

ST

STD

STK

STM

STM(__#)

S/W

SW

T

TC

TC

TCP

TD

TEMP

TEMP

TH

THA

THR

THR

THS

TPD

TSP

TU

TV

TW

TYP

UH

UL

UON

UR

UV

V V

VAC

VAV

VB

VD

VOL

VFC

VTR

VTU

VUV

W W&V

WAGD

WB

WC

WC

WG

WH

WMSD

WPD

WT

XFMR

ZVB

SYMBOL DESCRIPTION

ABBREVIATION DESCRIPTION

COMPRESSED AIR

COMPRESSED AIR (SPECIFIC PSIG)

AUTOMATIC AIR VENT

AIR COOLED CONDENSER

AIR COOLED CONDENSER UNIT

ACCESS DOOR

AREA DRAIN

AIR EXTRACTOR

ABOVE FINISHED FLOOR

AIR HANDLING UNIT

ALTERNATE

AMPERE

AIR PRESSURE DROP

ARGON

AMERICAN SOCIETY OF HEATING, REFRIGERATION

AND AIR-CONDITIONING ENGINEERS

AUTOMATIC SPRINKLER RISER

AIR TRANSFER DUCT

AUXILIARY

ACID VENT

ACID VENT THROUGH ROOF

ACID WASTE

BUILDING AUTOMATION SYSTEM

BLOWER COIL UNIT

BACK DRAFT DAMPER

BELOW FINISHED FLOOR

BACKFLOW PREVENTER

BRAKE HORSEPOWER

BOTTOM OF DUCT

BOTTOM OF PIPE

BRITISH THERMAL UNIT

BRITISH THERMAL UNIT PER HOUR

BEVERAGE CONDUIT

BACKWATER VALVE

COMMON

CAPACITY

CONSTANT AIR VOLUME

CATCH BASIN

COOLING COIL

COLD DECK

CONDENSATE DRAIN

CONTRACTOR FURNISHED, CONTRACTOR INSTALLED

CUBIC FEET PER HOUR

CUBIC FEET PER MINUTE

CHILLER

CHILLED WATER

CHILLED WATER RETURN

CHILLED WATER SUPPLY

COOLING

CONDENSATE

CONDENSATE (SPECIFIC PSIG)

CLEAN OUT

CARBON DIOXIDE

CONTINUATION OR CONTINUED

CONTRACTOR

CONVECTOR

COEFFICIENT OF PERFORMANCE

CIRCULATING PUMP

CONDENSATE RETURN UNIT

CLINICAL SERVICE SINK

COOLING TOWER

CABINET UNIT HEATER

DOMESTIC COLD WATER

DOMESTIC COLD WATER - FILTERED

CONDENSER WATER RETURN

CONDENSER WATER SUPPLY

DRIP AND TRAP

DISCHARGE AIR

DISCHARGE AIR TEMPERATURE

DRY BULB

DIRECT DIGITAL CONTROL

DEGREE

DRY FIRE STAND PIPE

DRAINAGE FIXTURE UNITS

DIAMETER

DAMPER

DAY/NIGHT

DOWN

DOWNSPOUT NOZZLE

DUCT SILENCER

DRAIN TILE

DRAIN TILE CONNECTION

DOMESTIC WATER HEATER

DRAWING

EXISTING

EXHAUST GRILLE OR REGISTER

EACH

EXHAUST AIR

ENTERING AIR TEMPERATURE

EXPANSION COMPENSATOR

ELECTRIC CABINET UNIT HEATER

ENTERING DRY BULB

ENERGY EFFICIENCY RATIO

EMERGENCY EYE WASH / SHOWER

EMERGENCY EYE WASH

EXHAUST FAN

EFFICIENCY

ELECTRIC HEATING COIL

EXPANSION JOINT

ELEVATION

ELECTRICAL

ENERGY MANAGEMENT SYSTEM

ENERGY RECOVERY LOOP

ENERGY RECOVERY LOOP RETURN

ENERGY RECOVERY LOOP SUPPLY

ENERGY RECOVERY UNIT

EMERGENCY SHOWER

EXTERNAL STATIC PRESSURE

ELECTRIC UNIT HEATER

ENTERING WET BULB

ELECTRIC WATER COOLER

ENTERING WATER TEMPERATURE

EXHAUST

FIRE PROTECTION

DEGREES FAHRENHEIT

FACE AND BYPASS

FLOAT AND THERMOSTATIC

FACE AREA

FAN COIL UNIT

ABBREVIATION DESCRIPTION

FLOOR DRAIN

FUNNEL FLOOR DRAIN

FIRE HYDRANT

FIRE HOSE CABINET

FIRE HOSE RACK

FIRE HOSE VALVE

FULL LOAD AMPS

FLOOR

FLOW METER

FLOW MEASURING STATION

FEET PER MINUTE

FIRE PUMP

FAN POWERED (AIR) TERMINAL UNIT

FLOOR SINK

FOOD SERVICE EQUIPMENT CONTRACTOR

FEET

FINNED TUBE RADIATION

FACE VELOCITY

NATURAL GAS

GAUGE

GALLON

GRAVITY RELIEF HOOD

GALLONS PER HOUR

GALLONS PER MINUTE

GREASE SANITARY WASTE

HYDROGEN

HOSE BIBB

HEATING COIL

HOT DECK

HIGH EFFICIENCY PARTICULATE ARRESTANCE

HIGH LIMIT

HAND/OFF/AUTO

HEAT PUMP

HORSEPOWER

HIGH PRESSURE DOMESTIC COLD WATER

HIGH PRESSURE DOMESTIC HOT WATER

HIGH PRESSURE DOMESTIC HOT WATER RETURN

HEAT PUMP LOOP

HEAT PUMP LOOP RETURN

HEAT PUMP LOOP SUPPLY

HOUR

HEATING

HEATING VENTILATING

HEATING, VENTILATING, AIR CONDITIONING

HOT WATER HEATING

HOT WATER HEATING RETURN

HOT WATER HEATING SUPPLY

DOMESTIC HOT WATER

DOMESTIC HOT WATER (SPECIFIC TEMP °F)

DOMESTIC HOT WATER RETURN

HEAT EXCHANGER

HERTZ

INDOOR AIR QUALITY

INSIDE DIAMETER

INVERT ELEVATION

INTAKE HOOD

INCHES

INFRARED HEATER

INDIRECT WASTE

JANITOR'S CLOSET

JOCKEY PUMP

THOUSAND AMP

KILOWATT

KILOWATT-HOUR

LEAVING AIR TEMPERATURE

LABORATORY

LAVATORY

POUNDS

LEAVING DRY BULB

LOW LIMIT

LOW PRESSURE CONDENSATE

LOW PRESSURE STEAM

LOCKED ROTOR AMPS

LEAVING WET BULB

LEAVING WATER TEMPERATURE

MIXED AIR

MIXED AIR TEMPERATURE

MAKE-UP AIR UNIT

MAXIMUM

THOUSAND BRITISH THERMAL UNITS PER HOUR

MEDICAL COMPRESSED AIR

MINIMUM CIRCUIT AMPACITY

MOTOR CONTROL CENTER

MECHANICAL

MEZZANINE

MANUFACTURER

MANHOLE

1/1000th INCH

MINIMUM

MISCELLANEOUS

MILLION BRITISH THERMAL UNITS PER HOUR

MAXIMUM OVERCURRENT PROTECTION

MOTOR STARTER

MOUNTED

MOTOR

MANUAL AIR VENT

MEDICAL VACUUM

NITROGEN

NITROUS OXIDE

NOISE CRITERIA

NORMALLY CLOSED

NORMALLY CLOSED TIMED CLOSED

NORMALLY CLOSED TIMED OPEN

NATIONAL FIRE PROTECTION AGENCY

NORMALLY OPEN TIMED CLOSED

NORMALLY OPEN TIMED OPEN

NOT IN CONTRACT

NORMALLY OPEN

NOMINAL

NON POTABLE COLD WATER

ABBREVIATION DESCRIPTION

OXYGEN

OUTSIDE AIR

OUTSIDE AIR TEMPERATURE

OUTLET BOX

OPPOSED BLADE DAMPER

ON CENTER/CENTER TO CENTER

OUTSIDE DIAMETER

OPEN ENDED DUCT

OWNER FURNISHED, CONTRACTOR INSTALLED

OWNER FURNISHED, OWNER INSTALLED

OVERLOAD

OVERFLOW RAIN CONDUCTOR

OVERFLOW ROOF DRAIN

OUTSIDE SCREW AND YOKE

OUTLET VELOCITY

OPERATOR WORKSTATION

PACKAGED AIR CONDITIONING UNIT

PARALLEL BLADE DAMPER

PUMPED CONDENSATE

PROCESS COOLING WATER

PROCESS COOLING WATER RETURN

PROCESS COOLING WATER SUPPLY

PRESSURE DROP (FEET OF WATER)

PERIMETER HEAT

PERIMETER HEAT RETURN

PERIMETER HEAT SUPPLY

PANEL

PARTS PER MILLION

PRESSURE

PRESSURE REDUCING VALVE

PUMPED SANITARY

POUNDS PER SQUARE INCH

POUNDS PER SQUARE INCH - ABSOLUTE

POUNDS PER SQUARE INCH - GAUGE

PUMPED STORM

PURIFIED WATER

PURIFIED WATER RETURN

PURIFIED WATER SUPPLY

RELOCATED

RETURN GRILLE OR REGISTER

RETURN AIR

RETURN AIR TEMPERATURE

RAIN CONDUCTOR

RADIANT CEILING PANEL

ROOF DRAIN

REQUIRED

ROOF EXHAUST FAN

RETURN FAN

RELATIVE HUMIDITY

REFRIGERANT LIQUID

RELIEF AIR

REVOLUTIONS PER MINUTE

REDUCED PRESSURE BACKFLOW

DETECTION ASSY

REDUCED PRESSURE BACKFLOW

ZONE ASSY

REFRIGERANT SUCTION

ROOFTOP UNIT

SUPPLY AIR DIFFUSER OR GRILLE

SOUND ATTENUATOR

SUPPLY AIR

SANITARY WASTE

SUPPLY AIR TEMPERATURE

SHORT CIRCUIT CURRENT RATING

SECTION

SUPPLY FAN

SHOWER

SINK

SNOW MELT RETURN

SNOW MELT SUPPLY

SPRINKLER PIPING

STATIC PRESSURE

SPECIFICATION

SPRINKLER

SQUARE FOOT/SQUARE FEET

START/STOP

SERVICE SINK

STORM

STANDARD

STACK

STEAM

STEAM (SPECIFIC PSIG)

SUMMER/WINTER

SWITCH

TRANSFER GRILLE

TEMPERATURE CONTROL

TEMPERING COIL

TEMPERATURE CONTROL PANEL

TRENCH DRAIN

TEMPERATURE

TEMPORARY

TERMINAL HEATING

TOTAL HEAT ABSORBED

TERMINAL HEATING RETURN

TOTAL HEAT REJECTED

TERMINAL HEATING SUPPLY

TEPID WATER

TOTAL STATIC PRESSURE

(AIR) TERMINAL UNIT

TURNING VANES

TEMPERED WATER

TYPICAL

UNIT HEATER

UNDERWRITER'S LABORATORY

UNLESS OTHERWISE NOTED

URINAL

UNIT VENTILATOR

VALVE

VENT

VACUUM

VARIABLE AIR VOLUME

VACUUM BREAKER

VOLUME DAMPER (MANUALLY ADJUSTABLE)

VOLUME

VARIABLE FREQUENCY CONTROLLER

VENT THROUGH ROOF

VENTURI TERMINAL UNIT

VERTICAL UNIT VENTILATOR

WASTE

WASTE AND VENT

WASTE ANESTHETIC GAS DISPOSAL

WET BULB

WATER CLOSET

WATER COLUMN

WATER GAUGE

WALL HYDRANT

WASHING MACHINE SUPPLY AND DRAIN BOX

WATER PRESSURE DROP

WEIGHT

TRANSFORMER

ZONE VALVE BOX

SYMBOL DESCRIPTION

CARBON DIOXIDE SENSOR

CARBON MONOXIDE SENSOR

DIFFERENTIAL PRESSURE TRANSMITTER

FLOW METER

GUARD FOR STAT OR SENSOR

HUMIDISTAT OR HUMIDITY SENSOR

(AS DEFINED ON TC DRAWINGS)

SYMBOL DESCRIPTION

OCCUPANCY SENSOR

PRESSURE TRANSMITTER

STATIC PRESSURE SENSOR OR PROBE

VALVE - 2 WAY CONTROL VALVE

VALVE - 3 WAY CONTROL VALVE

THERMOSTAT OR TEMPERATURE SENSOR

(AS DEFINED ON TC DRAWINGS)

NOTE: LIST OF ADDITIONAL SYMBOLS & ABBREVIATIONS ASSOCIATED WITH

TEMPERATURE CONTROLS ARE IDENTIFIED ON TC DRAWINGS.

SYMBOL DESCRIPTION

AIR VENT - AUTOMATIC

AIR VENT - MANUAL

BACKFLOW PREVENTER

CATCH BASIN

CIRCULATING PUMP

CLEAN OUT - IN FLOOR

CLEAN OUT - FLANGE

DIRECTION OF FLOW

DIRECTION OF PITCH - DOWN

FINNED TUBE RADIATION

FIRE PROTECTION - SIAMESE CONNECTION - FREE STANDING

FIRE PROTECTION - SIAMESE CONNECTION - WALL MOUNTED

FIRE PROTECTION - SPRINKLER HEAD, CONCEALED

FIRE PROTECTION - SPRINKLER HEAD, PENDANT

FIRE PROTECTION - SPRINKLER HEAD, UPRIGHT

FIRE PROTECTION - SPRINKLER HEAD, SIDEWALL

FLOOR DRAIN

FLOOR DRAIN - ELEVATION

FLOOR DRAIN - FUNNEL

FLOOR DRAIN - FUNNEL, ELEVATION

FLOW MEASURING DEVICE (FOR TEST AND BALANCING)

FLOW SWITCH

HOSE BIBB

MANHOLE

OPEN SITE DRAIN

PIPE - ANCHOR

PIPE - CAP OR PLUG

PIPE - ELBOW DOWN

PIPE - ELBOW UP

PIPE - EXPANSION JOINT OR COMPENSATOR

PIPE - FLANGE

PIPE - HOSE AND BRAID FLEXIBLE CONNECTION

PIPE - GUIDE

PIPE - TEE DOWN

PIPE - TEE UP

PIPE - UNION

PRESSURE AND TEMPERATURE TEST PLUG

PRESSURE GAUGE AND COCK

REDUCER - CONCENTRIC

REDUCER - ECCENTRIC

ROOF/OVERFLOW DRAIN

STEAM TRAP - FLOAT AND THERMOSTATIC

STRAINER

STRAINER WITH VALVE AND BLOW-OFF

THERMOMETER

TRAP

VALVE - ANGLE

VALVE - BALL

VALVE - BALANCE (i.e. BALANCE VALVE TO 0.5 GPM)

VALVE - BUTTERFLY

VALVE - COMBINATION BALANCE & FLOW MEASURING

VALVE - CHECK

VALVE - SPRING CHECK

VALVE - GAS (MANUAL)

VALVE - GLOBE

VALVE - ISOLATION

VALVE - NEEDLE

VALVE - OS&Y

VALVE - PLUG

VALVE - PRESSURE REGULATING

VALVE - PRESSURE REDUCING

VALVE - PRESSURE RELIEF

VALVE - PRESSURE & TEMPERATURE RELIEF

VENT THROUGH ROOF

WALL HYDRANT

SYMBOL DESCRIPTION

AIR TERMINAL UNIT

AIR TERMINAL UNIT WITH HEATING COIL

VENTURI AIR TERMINAL UNIT

VENTURI AIR TERMINAL UNIT WITH HEATING COIL

DAMPER - HORIZONTAL FIRE (EXISTING, NEW)

DAMPER - HORIZONTAL FIRE / SMOKE (EXISTING, NEW)

DAMPER - SMOKE (EXISTING, NEW)

DAMPER - VERTICAL FIRE (EXISTING, NEW)

DAMPER - VERTICAL FIRE / SMOKE (EXISTING, NEW)

DAMPER - BACK DRAFT

DAMPER - VOLUME (MANUALLY ADJUSTABLE)

DIFFUSER - BLANK OFF

DIFFUSER - LINEAR SLOT

DIFFUSER - SQUARE OR RECTANGULAR

DUCT CROSS SECTION - SUPPLY

DUCT CROSS SECTION - RETURN

DUCT CROSS SECTION - EXHAUST

DUCT - FLEXIBLE CONNECTION

DUCT - FLEXIBLE DUCT

DUCT TAKE-OFF - ROUND CONICAL

DUCT TAKE-OFF - RECTANGULAR WITH SHOE TAP

ELBOW - RECTANGULAR WITH TURNING VANES

ELBOW - RECTANGULAR/ ROUND SMOOTH RADIUS

ELBOW DOWN - RECTANGULAR

ELBOW DOWN - ROUND

ELBOW UP - RECTANGULAR

ELBOW UP - ROUND

FAN - AXIAL

FAN - CENTRIFUGAL (ELEVATION)

HEATING COIL

INCLINED DROP IN DIRECTION OF AIRFLOW

INCLINED RISE IN DIRECTION OF AIRFLOW

INTAKE OR RELIEF HOOD

REGISTER - RETURN OR EXHAUST

REGISTER - RETURN WITH BOOT

REGISTER - TRANSFER GRILLE

ROOF EXHAUST FAN

TRANSITION - CONCENTRIC

TRANSITION - ECCENTRIC

UNIT HEATER - HORIZONTAL THROW

UNIT HEATER - VERTICAL THROW

SYMBOL DESCRIPTION

DUCT TAKE-OFF - RECTANGULAR WITH SHOE TAP

DUCT TAKE-OFF - ROUND CONICAL

ELBOW - RECTANGULAR WITH TURNING VANES

ELBOW - RECTANGULAR SHORT RADIUS WITH

SPLITTER VANES

ELBOW - ROUND

ELBOW - RECTANGULAR SMOOTH RADIUS

ELBOW DOWN - RECTANGULAR

ELBOW DOWN - ROUND

ELBOW UP - RECTANGULAR

ELBOW UP - ROUND

HEATING COIL

INCLINED DROP IN DIRECTION OF AIRFLOW

INCLINED RISE IN DIRECTION OF AIRFLOW

TRANSITION - CONCENTRIC

TRANSITION -ECCENTRIC

CONSTRUCTION KEY NOTE (NUMBER) OR

DEMOLITION KEY NOTE (LETTER)

SECTION OR PLAN NUMBER

SHEET WHERE SECTION IS DRAWN

EQUIPMENT DESIGNATION,

(i.e. EXHAUST FAN NUMBER 1)

AREA OF ENLARGEMENT

PLAN NUMBER

SHEET WHERE ENLARGED PLAN IS DRAWN

SCALE: 1/8" = 1' - 0"

SECTION OR PLAN NUMBER

SHEET WHERE SECTION IS CUT OR

ENLARGED PLAN IS REFERENCED

MATCHLINE

HEAVY LINE WEIGHT INDICATES NEW WORK

LIGHT LINE WEIGHT INDICATES EXISTING

EQUIPMENT OR REFERENCED INFORMATION

GRAY LINE INDICATES BACKGROUND INFORMATION

DASHED LINES INDICATE PIPING

ROUTED BELOW SLAB OR GRADE

HATCH MARKS INDICATE EQUIPMENT OR MATERIALS

TO BE DISCONNECTED AND REMOVED.

POINT OF NEW CONNECTION SYMBOL

EXISTING SYSTEM COMPONENT TO REMAIN

NEW SYSTEM COMPONENT

PIPING RISER DESIGNATION,

(i.e. HOT WATER RISER NUMBER 1)

HW-1

22x10 18x14ø

DUCT SIZE NOTATION

ALL SIZES IN INCHES

8ø

OVAL DUCT

RECTANGULAR DUCT

0.5

0.5 (i.e. BALANCE VALVE TO 0.5 GPM)

DAMPER - MOTORIZED

SHEET NO. SHEET TITLE

PIPE - RUBBER FLEXIBLE CONNECTION

FLOW METER

SUPPLY DIFFUSER WITH SCHEDULE TAG "1",

10" DIAMETER NECK SIZE

350 CFM TYPICAL FOR 4

S-1 10ø 350-4

RETURN REGISTER WITH SCHEDULE TAG "1",

22"x 22" NECK SIZE

640 CFM TYPICAL FOR 2

EXHAUST REGISTER E DESIGNATION SIMILAR.

R-1 22x22 640-2

AIR TERMINAL UNIT WITH HEATING COIL NO. 101

WITH SERVICE CLEARANCE SHOWN

VENTURI AIR TERMINAL WITH HEATING COIL NO. 101

WITH SERVICE CLEARANCE SHOWN

PIPE DIAMETER NOTATION

ALL SIZES IN INCHES

PLUMBING FIXTURE UNIT IDENTIFICATION TAG

WATER CLOSET TYPE "1"

TYPICAL FOR 2

(2)WC-1

A A(___#)

AAV

ACC

ACCU

AD

AD

AE

AFF

AHU

ALT

AMP

APD

AR

ASHRAE

ASR

ATD

AUX

AV

AVTR

AW

BAS

BCU

BDD

BFF

BFP

BHP

BOD

BOP

BTU

BTUH

BVC

BWV

C

CAP

CAV

CB

CC

CD

CD

CFCI

CFH

CFM

CH

CHW

CHWR

CHWS

CLG

CNDS

CNDS (__#)

CO

CO2

CONT

CONTR

CONV

COP

CP

CRU

CSS

CT

CUH

CW

CWF

CWR

CWS

D&T

DA

DAT

DB

DDC

DEG

DFSP

DFU

DIA

DMPR

D/N

DN

DNZ

DS

DT

DTC

DWH

DWG

(E) E

EA

EA

EAT

EC

ECUH

EDB

EER

EES

EEW

EF

EFF

EHC

EJ

EL

ELEC

EMS

ERL

ERLR

ERLS

ERU

ESH

ESP

EUH

EWB

EWC

EWT

EXH

F °F F&B F&T

FA

FCU

FD

FFD

FH

FHC

FHR

FHV

FLA

FLR

FM

FMS

FPM

FP

FPTU

FS

FSEC

FT

FTR

FV

G

GA

GAL

GRH

GPH

GPM

GSAN

H

HB

HC

HD

HEPA

HL

HOA

HP

HP

HPCW

HPHW

HPHWR

HPL

HPLR

HPLS

HR

HTG

HV

HVAC

HWH

HWHR

HWHS

HW

HW(__)

HWR

HX

HZ

IAQ

ID

IE

IH

IN

IR

IW

JC

JP

KA

KW

KWH

LAT

LAB

LAV

LBS

LDB

LL

LPC

LPS

LRA

LWB

LWT

MA

MAT

MAU

MAX

MBH

MCA

MCA

MCC

MECH

MEZZ

MFR

MH

MIL

MIN

MISC

MMBH

MOP

M/S

MTD

MTR

MV

MVAC

N N2O

NC

NC

NCTC

NCTO

NFPA

NOTC

NOTO

NIC

NO

NOM

NPCW

O

OA

OAT

OB

OBD

OC

OD

OED

OFCI

OFOI

OL

ORC

ORD

OS&Y

OV

OWS

PACU

PBD

PC

PCW

PCWR

PCWS

PD

PH

PHR

PHS

PNL

PPM

PRESS

PRV

PSAN

PSI

PSIA

PSIG

PST

PW

PWR

PWS

(R) R

RA

RAT

RC

RCP

RD

REQD

REF

RF

RH

RL

RLFA

RPM

RPDA

RPZA

RS

RTU

S

SA

SA

S, SAN

SAT

SCCR

SECT

SF

SH

SK

SMR

SMS

SP

SP

SPEC

SPKLR

SQFT

S/S

SS

ST

STD

STK

STM

STM(__#)

S/W

SW

T

TC

TC

TCP

TD

TEMP

TEMP

TH

THA

THR

THR

THS

TPD

TSP

TU

TV

TW

TYP

UH

UL

UON

UR

UV

V V

VAC

VAV

VB

VD

VOL

VFC

VTR

VTU

VUV

W W&V

WAGD

WB

WC

WC

WG

WH

WMSD

WPD

WT

XFMR

ZVB

SYMBOL DESCRIPTION

Peter Basso Associates Inc

CONSULTING ENGINEERS

5145 Livernois, Suite 100

Troy, Michigan 48098-3276

Tel: 248-879-5666

Fax: 248-879-0007 www.PeterBassoAssociates.com

PBA Project No.: 2020-0353

0 8' 16' 1/8"=1'-0"

ST

AM

P

OR

S

EA

L

OW

NE

R

ID

EN

TIF

IC

AT

IO

N

BU

ILD

IN

G

PR

OJ

EC

T

SH

EE

T

General Services Administration Public Buildings Service

Great Lakes

BUILDING NAME

ADDRESS

CITY, STATE, ZIP

BUILDING NO.

PROJECT TITLE

GSA PROJECT NO.

SUBMISSION STAGE

SUBMISSION DATE

DRAWN BY

CHECKED BY

FLOOR NO.

DISCIPLINE

PLAN TYPE

SHEET NUMBER

AND FILENAME

KE

Y

PL

AN

GR

AP

HI

C

SC

AL

E

985 Michigan Avenue

Detroit, Michigan 48225

MI0801DF

985 Passenger Elevator

Modernization

RMI12521

BID DOCUMENTS

02/21/2022

Design and Construction, Project Delivery Division John C. Kluczynski Federal Building 230 South Dearborn St.

Chicago, IL 60604

CO

NT

RA

CT

DE

SI

GN

ER

ID

EN

TI

FIC

AT

IO

N

CONST. CONTRACT NO.

DELIVER ORDER NO.

A/E CONTRACT NO.

CO

NS

UL

TA

NT

ID

EN

TIF

IC

AT

IO

N

RE

VI

SI

ON

B

LO

CK

PROPERTY OF THE UNITED STATES GOVERNMENT - FOR OFFICIAL USE ONLY - DO NOT REMOVE THIS NOTICE - PROPERLY DESTROY DOCUMENTS WHEN NO LONGER NEEDEDSENSITIVE BUT UNCLASSIFIED

SENSITIVE BUT UNCLASSIFIED

MECHANICAL

985 Federal Building Parking Garage

816 E 4th ST.

Royal Oak, MI 48067 248.542.7866/www.ghfaa.com

A S S O C I A T E S A R C H I T E C T S

INDEX AND ABBREVIATIONS

47PF0021F0046

GP-05-P13-SVD-0030

RLT

DC

M-001

N/A

C R

E V

I T L

O C

A L

F

IL

E S

\M I0

M

E P

L

-R

M a b ro w n

.r v t

/1

/2

:1

:5 A

M

M-001 MECHANICAL STANDARDS AND DRAWING INDEX

M-100 UNDERGROUND AND LOWER LEVEL MECHANICAL PLANS

M-102 ELEVATOR MACHINE ROOM MECHANICAL PLANS

M-601 MECHANICAL DETAILS

M-701 MECHANICAL SCHEDULES

M-702 MECHANICAL SCHEDULES

M-801 TEMPERATURE CONTROL STANDARDS AND GENERAL NOTES

M-802 TEMPERATURE CONTROLS

MARK DATE DESCRIPTION

D

D

M N P

4.7

5.7

S P

2" S

P

2" S

T

S P

2" S

P 4"

D F

S P

2" D

F S

P

2" S

P

2" S

T

S P

DFSP

(E) 4"

DFSP UP

(E) 4"

DFSP UP

D F

S P

4" ST

10" ST

(E)3" ST UP

(E)CO

10" ST

2" V

2" SP

(E)2" V DN

(E)FD

(E)FIRE PROTECTION

SERVING ROOM

CORRIDOR

CLL08

ELEVATOR PIT

ROOM

CLL08-1

METER ROOM

LL12

STAIR NO. 5

S-5

(E)FD

(E)CO

TD-1

(E)CO

STORAGE ROOM

LL11

CORRIDOR

CLL07

STORAGE

LL13

GSA MDF ROOM

LL14

M N P

4.7

5.7

2" V

4" S

(E)CO

4 SAN UP

TO (E)FD

(E)2 V UP

2" V

(E)2 V

CONNECTED OFF

TOP OF 4 SAN

(E)V

UNDERGROUND

TO RISER

4" S

4 SAN UP

TO (E)FD

(E)CO

4" S

4 SAN UP

TO TD-1

Peter Basso Associates Inc

CONSULTING ENGINEERS

5145 Livernois, Suite 100

Troy, Michigan 48098-3276

Tel: 248-879-5666

Fax: 248-879-0007 www.PeterBassoAssociates.com

PBA Project No.: 2020-0353

0 8' 16' 1/8"=1'-0"

ST

AM

P

OR

S

EA

L

OW

NE

R

ID

EN

TIF

IC

AT

IO

N

BU

ILD

IN

G

PR

OJ

EC

T

SH

EE

T

General Services Administration Public Buildings Service

Great Lakes

BUILDING NAME

ADDRESS

CITY, STATE, ZIP

BUILDING NO.

PROJECT TITLE

GSA PROJECT NO.

SUBMISSION STAGE

SUBMISSION DATE

DRAWN BY

CHECKED BY

FLOOR NO.

DISCIPLINE

PLAN TYPE

SHEET NUMBER

AND FILENAME

KE

Y

PL

AN

GR

AP

HI

C

SC

AL

E

985 Michigan Avenue

Detroit, Michigan 48225

MI0801DF

985 Passenger Elevator

Modernization

RMI12521

BID DOCUMENTS

02/21/2022

Design and Construction, Project Delivery Division John C. Kluczynski Federal Building 230 South Dearborn St.

Chicago, IL 60604

CO

NT

RA

CT

DE

SI

GN

ER

ID

EN

TI

FIC

AT

IO

N

CONST. CONTRACT NO.

DELIVER ORDER NO.

A/E CONTRACT NO.

CO

NS

UL

TA

NT

ID

EN

TIF

IC

AT

IO

N

RE

VI

SI

ON

B

LO

CK

PROPERTY OF THE UNITED STATES GOVERNMENT - FOR OFFICIAL USE ONLY - DO NOT REMOVE THIS NOTICE - PROPERLY DESTROY DOCUMENTS WHEN NO LONGER NEEDEDSENSITIVE BUT UNCLASSIFIED

SENSITIVE BUT UNCLASSIFIED

MECHANICAL

985 Federal Building Parking Garage

816 E 4th ST.

Royal Oak, MI 48067 248.542.7866/www.ghfaa.com

A S S O C I A T E S A R C H I T E C T S

FLOOR PLAN

47PF0021F0046

GP-05-P13-SVD-0030

RLT

DC

M-100

LOWER

C R

E V

I T L

O C

A L

F

IL

E S

\M I0

M

E P

L

-R

M a b ro w n

.r v t

/1

/2

:1

:0 A

M

SCALE: 1/4" = 1'-0"

LOWER LEVEL PLUMBING NEW WORK PLAN

PLUMBING GENERAL NOTES:

1 THESE DRAWINGS ARE DIAGRAMMATIC, AND REPRESENT THE GENERAL INTENT AND ARRANGEMENT OF

SYSTEMS. THEY ARE NOT TO BE CONSIDERED FABRICATION/COORDINATION/SHOP DRAWINGS.

COORDINATION WITH OTHER TRADES IS REQUIRED. PROVIDE THE ADDITIONAL FITTINGS AND OFFSETS THAT WILL BE REQUIRED TO COMPLETE EACH SYSTEM AND TO AVOID INTERFERENCES WITH ALL OTHER SYSTEMS INCLUDING THE STRUCTURE, SHEET METAL, OTHER PIPING SYSTEMS, ELECTRICAL CONDUITS, BUS DUCTS, CABLE TRAY, LIGHT FIXTURES, ETC. AND/OR OTHER SPACE CONSTRAINTS.

2 INSTALL SYSTEMS SUCH THAT REQUIRED CLEARANCE AND SERVICE ACCESS SPACE IS PROVIDED AROUND

ALL MECHANICAL AND ELECTRICAL EQUIPMENT, AND AROUND ANY COMPONENTS WHICH REQUIRE

SERVICE ACCESS.

3 PIPING SHALL NOT BE INSTALLED ABOVE ELECTRICAL TRANSFORMERS, SWITCHBOARDS, PANELBOARDS

OR MOTOR CONTROL CENTERS.

4 COORDINATE AND PROVIDE ACCESS DOORS WITHIN INACCESSIBLE CEILING, SHAFT, AND CHASE AREAS FOR ALL COMPONENTS WHICH REQUIRE SERVICE ACCESS. REFER TO ARCHITECTURAL DRAWINGS FOR

CEILING TYPES.

5 PROVIDE SUPPLEMENTARY STEEL AS REQUIRED FOR THE PROPER SUPPORT OF ALL SYSTEMS.

6 REFER TO ARCHITECTURAL PLANS FOR DIMENSIONED LOCATIONS OF PLUMBING FIXTURES.

7 MINIMUM UNDERGROUND PIPE SIZE SHALL BE 3".

8 PLUMBING VENT PIPING THROUGH ROOF SHALL BE LOCATED A MINIMUM OF 10'-0" FROM ANY FRESH AIR

INTAKE LOCATION AND A MINIMUM OF 18" CLEAR FROM THE INSIDE FACE OF PARAPET.

9 PROVIDE CODE REQUIRED CLEARANCE FOR ALL CLEANOUTS INSTALLED IN SANITARY WASTE AND VENT

PIPING.

SCALE: 1/4" = 1'-0"

UNDERGROUND PLUMBING NEW WORK PLAN

D

D

M N P

4.7

5.7 x S

A x S

A

36x12 RA

UP TO RTU

(AC-PE)

28x14 RA

UP TO RTU

(AC-PE)

30x6 SA

GRILLE

(TYP. 4)

(E)15 KW ELECTRIC

UNIT HEATER (EUH-B)

ELEVATOR

MACHINE ROOM

P1201-1

1" D

F S

P

BALANCE EXISTING

DIFFUSERS TO 550

CFM (TYP. 4)

(E)TSTAT

MOUNTED ON

UNIT

NEW TSTAT

AC-PE

NEW DDC

ROOM TEMP

SENSOR

M N P

4.7

5.7

36x12 RA

UP TO RTU

(EX AC-PE)

28x14 RA

UP TO RTU

(EX AC-PE)

30x6 SA

GRILLE

(TYP. 4)

x S

A x S

A

(E)15 KW ELECTRIC

UNIT HEATER (EUH-B)

PE

(E)AC

A

1" D

F S

P(ON ROOF)

(E)TSTAT

EXISTING

AC-PE

(E)TSTAT

MOUNTED ON UNIT

A

B

ELEVATOR

MACHINE ROOM

P1201-1

C

M N P

4.7

5.7

(E)ROOF DRAIN

(E)ROOF HATCH

(E)STAIRWELL

PRESSURIZATION

HOOD AND FAN

PE

AC

ROUTE 3/4

CONDENSATE FROM

RTU TO (E) ROOF DRAIN

3/ 4"

C D

PIPE SUPPORTS

(TYP.)

Peter Basso Associates Inc

CONSULTING ENGINEERS

5145 Livernois, Suite 100

Troy, Michigan 48098-3276

Tel: 248-879-5666

Fax: 248-879-0007 www.PeterBassoAssociates.com

PBA Project No.: 2020-0353

0 8' 16' 1/8"=1'-0"

ST

AM

P

OR

S

EA

L

OW

NE

R

ID

EN

TIF

IC

AT

IO

N

BU

ILD

IN

G

PR

OJ

EC

T

SH

EE

T

General Services Administration Public Buildings Service

Great Lakes

BUILDING NAME

ADDRESS

CITY, STATE, ZIP

BUILDING NO.

PROJECT TITLE

GSA PROJECT NO.

SUBMISSION STAGE

SUBMISSION DATE

DRAWN BY

CHECKED BY

FLOOR NO.

DISCIPLINE

PLAN TYPE

SHEET NUMBER

AND FILENAME

KE

Y

PL

AN

GR

AP

HI

C

SC

AL

E

985 Michigan Avenue

Detroit, Michigan 48225

MI0801DF

985 Passenger Elevator

Modernization

RMI12521

BID DOCUMENTS

02/21/2022

Design and Construction, Project Delivery Division John C. Kluczynski Federal Building 230 South Dearborn St.

Chicago, IL 60604

CO

NT

RA

CT

DE

SI

GN

ER

ID

EN

TI

FIC

AT

IO

N

CONST. CONTRACT NO.

DELIVER ORDER NO.

A/E CONTRACT NO.

CO

NS

UL

TA

NT

ID

EN

TIF

IC

AT

IO

N

RE

VI

SI

ON

B

LO

CK

PROPERTY OF THE UNITED STATES GOVERNMENT - FOR OFFICIAL USE ONLY - DO NOT REMOVE THIS NOTICE - PROPERLY DESTROY DOCUMENTS WHEN NO LONGER NEEDEDSENSITIVE BUT UNCLASSIFIED

SENSITIVE BUT UNCLASSIFIED

MECHANICAL

985 Federal Building Parking Garage

816 E 4th ST.

Royal Oak, MI 48067 248.542.7866/www.ghfaa.com

A S S O C I A T E S A R C H I T E C T S

FLOOR PLAN

47PF0021F0046

GP-05-P13-SVD-0030

RLT

DC

M-102

ELEV MACHINE ROOM

C R

E V

I T L

O C

A L

F

IL

E S

\M I0

M

E P

L

-R

M a b ro w n

.r v t

/1

/2

:1

:1 A

M

SCALE: 1/4" = 1'-0"

ELEVATOR MACHINE ROOM MECHANICAL NEW WORK PLAN

SCALE: 1/4" = 1'-0"

ELEVATOR MACHINE ROOM MECHANICAL DEMOLITION PLAN

MECHANICAL GENERAL DEMOLITION NOTES:

1 ANY INTERRUPTION OF EXISTING SERVICES AND/OR EQUIPMENT SHALL BE PERFORMED AT A TIME

APPROVED IN ADVANCE BY THE OWNER'S REPRESENTATIVE.

2 THESE DRAWINGS ARE DIAGRAMMATIC AND INDICATE THE GENERAL EXTENT OF THE WORK. ACTUAL ROUTING AND SIZES OF EXISTING PIPING AND DUCTWORK MIGHT DIFFER TO A LIMITED EXTENT FROM WHAT IS SHOWN. MAJOR DISCREPANCIES BETWEEN THE DRAWINGS AND ACTUAL EXISTING CONDITIONS

SHALL BE REPORTED TO THE ENGINEER.

3 THE EXACT EXTENT OF DEMOLITION SHALL BE AS REQUIRED BY THE NEW WORK.

4 ALL MECHANICAL ITEMS TO BE REMOVED SHALL BE REMOVED COMPLETE, INCLUDING ALL RELATED ITEMS

SUCH AS HANGERS, SUPPORTS, CONTROLS, ETC. CAP ALL OPEN ENDED PIPES AND DUCTWORK.

SHEET METAL GENERAL NOTES:

1 THESE DRAWINGS ARE DIAGRAMMATIC, AND REPRESENT THE GENERAL INTENT AND ARRANGEMENT OF

SYSTEMS. THEY ARE NOT TO BE CONSIDERED FABRICATION/COORDINATION/SHOP DRAWINGS.

COORDINATION WITH OTHER TRADES IS REQUIRED. PROVIDE THE ADDITIONAL FITTINGS AND OFFSETS THAT WILL BE REQUIRED TO COMPLETE EACH SYSTEM AND TO AVOID INTERFERENCES WITH ALL OTHER SYSTEMS INCLUDING THE STRUCTURE, PIPING SYSTEMS, ELECTRICAL CONDUITS, BUS DUCTS, CABLE

TRAY, LIGHT FIXTURES, ETC. AND/OR OTHER SPACE CONSTRAINTS.

2 INSTALL SYSTEMS SUCH THAT REQUIRED CLEARANCE AND SERVICE ACCESS SPACE IS PROVIDED

AROUND ALL MECHANICAL AND ELECTRICAL EQUIPMENT, AND AROUND ANY COMPONENTS WHICH

REQUIRE SERVICE ACCESS.

3 PIPING AND DUCTWORK SHALL NOT BE INSTALLED ABOVE ELECTRICAL TRANSFORMERS, SWITCHBOARDS, PANELBOARDS OR MOTOR CONTROL CENTERS.

4 COORDINATE AND PROVIDE ACCESS DOORS WITHIN INACCESSIBLE CEILING, SHAFT, AND CHASE AREAS FOR ALL COMPONENTS WHICH REQUIRE SERVICE ACCESS. REFER TO ARCHITECTURAL DRAWINGS FOR

CEILING TYPES.

5 PROVIDE SUPPLEMENTARY STEEL AS REQUIRED FOR THE PROPER SUPPORT OF ALL SYSTEMS.

# CONSTRUCTION KEY NOTES:

1 CONTRACTOR SHALL REUSE EXISTING ROOFTOP CURB AND PROVIDE A CURB ADAPTER AS REQUIRED FOR EXISTING CURB TO RECEIVE NEW ROOFTOP UNIT. MODIFY AND EXTEND EXISTING SHEET METAL TO

CONNECT TO NEW UNIT.

2 MODIFY EXISTING UNIT HEATER SET POINT TO 60 DEG. F. OR MINIMUM 5 DEG BELOW AC-PE SET POINT TO

PREVENT SIMULTANEOUS HEATING AND COOLING.

# DEMOLITION KEY NOTES:

A REMOVE EXISTING ROOF TOP UNIT (EX AC-PE) FROM ROOF, DISCONNECT POWER, TEMPERATURE CONTROLS, DUCTWORK, AND ASSOCIATED COMPONENTS COMPLETE TO FACILITATE THE INSTALLATION OF

NEW ROOFTOP UNIT. EXISTING CURB SHALL REMAIN.

B CONTRACTOR TO VERIFY EXACT LOCATION IN THE FIELD.

C REMOVE EXISTING COMPRESSED AIR PIPING AND VALVE BACK TO WITHIN WALL AND CAP. PIPING IS

LOCATED NEAR THE FINISHED FLOOR.

SCALE: 1/4" = 1'-0"

MECHANICAL ROOF PLAN

General Services Administration

Public Buildings Service

Great Lakes

985 Michigan Avenue

Detroit, Michigan 48225

MI0801DF

985 Passenger Elevator

Modernization

RMI12521

BID DOCUMENTS

02/21/2022

Design and Construction, Project Delivery Division

John C. Kluczynski Federal Building

230 South Dearborn St.

Chicago, IL 60604

PROPERTY OF THE UNITED STATES GOVERNMENT - FOR OFFICIAL USE ONLY - DO NOT REMOVE THIS NOTICE - PROPERLY DESTROY DOCUMENTS WHEN NO LONGER NEEDED

SENSITIVE BUT UNCLASSIFIED

SENSITIVE BUT UNCLASSIFIED

MECHANICAL

MARK DATE DESCRIPTION

5145 Livernois, Suite 100

Fax: 248-879-0007

Troy, Michigan 48098-3276

Tel: 248-879-5666 www.PeterBassoAssociates.com

CONSULTING ENGINEERS

Peter Basso Associates Inc

PBA Project No.: 2020-0353

47PF0021F0046

GP-05-P13-SVD-0030

N/A

985 Federal Building Parking Garage

816 E 4th ST.

Royal Oak, MI 48067

248.542.7866/www.ghfaa.com

A S S O C I A T E S A R C H I T E C T S

M-601

DC

RLT

DETAILS

Peter Basso Associates Inc

CONSULTING ENGINEERS

5145 Livernois, Suite 100

Troy, Michigan 48098-3276

Tel: 248-879-5666

Fax: 248-879-0007 www.PeterBassoAssociates.com

PBA Project No.: 2020-0353

ST

AM

P

OR

S

EA

L

OW

NE

R

ID

EN

TIF

IC

AT

IO

N

BU

ILD

IN

G

PR

OJ

EC

T

SH

EE

T

General Services Administration Public Buildings Service

Great Lakes

BUILDING NAME

ADDRESS

CITY, STATE, ZIP

BUILDING NO.

PROJECT TITLE

GSA PROJECT NO.

SUBMISSION STAGE

SUBMISSION DATE

DRAWN BY

CHECKED BY

FLOOR NO.

DISCIPLINE

PLAN TYPE

SHEET NUMBER

AND FILENAME

KE

Y

PL

AN

GR

AP

HI

C

SC

AL

E

985 Michigan Avenue

Detroit, Michigan 48225

MI0801DF

985 Passenger Elevator

Modernization

RMI12521

BID DOCUMENTS

02/21/2022

Design and Construction, Project Delivery Division John C. Kluczynski Federal Building 230 South Dearborn St.

Chicago, IL 60604

CO

NT

RA

CT

DE

SI

GN

ER

ID

EN

TI

FIC

AT

IO

N

CONST. CONTRACT NO.

DELIVER ORDER NO.

A/E CONTRACT NO.

CO

NS

UL

TA

NT

ID

EN

TIF

IC

AT

IO

N

RE

VI

SI

ON

B

LO

CK

PROPERTY OF THE UNITED STATES GOVERNMENT - FOR OFFICIAL USE ONLY - DO NOT REMOVE THIS NOTICE - PROPERLY DESTROY DOCUMENTS WHEN NO LONGER NEEDEDSENSITIVE BUT UNCLASSIFIED

SENSITIVE BUT UNCLASSIFIED

MECHANICAL

985 Federal Building Parking Garage

816 E 4th ST.

Royal Oak, MI 48067 248.542.7866/www.ghfaa.com

A S S O C I A T E S A R C H I T E C T S

SCHEDULES

47PF0021F0046

GP-05-P13-SVD-0030

RLT

DC

M-701

N/A

C R

E V

I T L

O C

A L

F

IL

E S

\M I0

M

E P

L

-R

M a b ro w n

.r v t

/1

/2

:1

:2 A

M

PLUMBING PIPING & VALVE APPLICATION SCHEDULE

PIPE SIZE

(INCHES)

MATERIAL PRESSURE CONNECTIONS

GRAVITY DWV

CONNECTIONS

ISOLATION

VALVES

KEYED NOTESS

O

F T

C O

P P

E R

T Y

P E

K

H A

R D

C O

P P

E R

T Y

P E

L

H A

R D

C O

P P

E R

T Y

P E

M

C A

R B

O N

S T

E E

L

S C

H E

D

C A

R B

O N

S T

E E

L

S T

D

G A

L V

S

T E

E L

S

C H

E D

S T

A

IN

L E

S S

S T

E E

L

S C

H E

D

P E

X

P E

P

IP

E

P E

S H

E A

T H

E D

C A

R B

O N

S T

E E

L P

IP

E

C S

S T

N O

-H U

B C

IS

P

P V

C T

Y P

E D

W V

P P

D R

A

IN

A G

E P

IP

E

C O

P P

E R

T Y

P E

D W

V

D U

C T

IL

E

I R

O N

P

IP

E

S O

L D

E R

E D

B R

A Z

E D

W E

L D

E D

T H

R E

A D

E D

F L A

N G

E D

G R

O O

V E

D

IN

S

E R

T

C R

IM

P

F U

S

IO

N

P R

E S

S U

R E

-S E

A L

M E

C H

A N

IC

A

L L Y

-F O

R M

E D

T E

E

M E

C H

A N

IC

A

L J

O

IN

T

P U

S H

-O N

-J O

IN

T

S O

L V

E N

T W

E L D

E D

S O

L D

E R

E D

F U

S

IO

N

C

IS

P H

U B

L E

S S

H E

A V

Y -D

U T

Y H

U B

L E

S S

B A

L L

A G

A B

A L L

G E

N E

R A

L S

E R

V

IC

E B

U T

T E

R F

L Y

L U

B R

IC

A

T E

D P

L U

G

G A

T E

UNDERGROUND SANITARY WASTE & VENT - MIN. WORKING PRESS.: 10-FOOT HEAD OF WATER

3 TO 12 X X

3 TO 12 X X

ABOVEGROUND COLD CONDENSATE DRAIN - MIN. WORKING PRESSURE: 10 FT. HEAD OF WATER

ALL SIZES X X X

DUCT SYSTEM APPLICATION SCHEDULE

AIR SYSTEMS G

G A

L V

S

H E

E T

M E

T A

L

D O

U B

L E

-W A

L L

L

IN

E D

G

G

A L V

S

H E

E T

M E

T A

L

S O

L

ID

I N

N E

R W

A L

L

D O

U B

L E

-W A

L L

L

IN

E D

G

G

A L V

S

H E

E T

M E

T A

L

P E

R F

IN

N E

R W

A L

L

G

G

A L V

S

H E

E T

M E

T A

L W

IT

H

-I

N C

H L

IN

IN

G

G A

L V

A N

N E

A L E

D S

H E

E T

M E

T A

L

A L U

M

IN

U M

T Y

P E

S T

A

IN

L E

S S

S T

E E

L

T Y

P E

S T

A

IN

L E

S S

S T

E E

L

P V

C C

O A

T E

D G

A L

V S

H E

E T

M E

T A

L

X

P V

C C

O A

T E

D G

A L

V S

H E

E T

M E

T A

L

X

P V

C C

O A

T E

D G

A L

V S

H E

E T

M E

T A

L

X

G

A C

A R

B O

N S

T E

E L

Z E

R O

-C L E

A R

A N

C E

P R

E F

A B

R

IC

A T

E D

R A

N G

E H

O O

D E

X H

A U

S T

D U

C T

F A

B R

IC

D E

S

IG

N P

R E

S S

U R

E C

L A

S S

IN

C H

E S

W G

S E

A L

C L

A S

S

M A

X A

L L

O W

A B

L E

L E

A K

A G

E R

A T

E

P E

R C

E N

T

KEYED NOTES

SUPPLY AIR WITHOUT TERMINAL UNITS X +2 A 5

RETURN AIR WITHOUT TERMINAL UNITS X -2 A 5

GENERAL NOTES:

1. 'X' INDICATES ACCEPTABLE SELECTION. IF MORE THAN ONE SELECTION IS INDICATED FOR A PIPING SYSTEM, CONTRACTOR MAY

SELECT FROM THOSE INDICATED SELECTIONS.

HORIZONTAL PIPING AND SUPPORT APPLICATION SCHEDULE

METAL PIPE TYPE & SIZE

HANGER OR SUPPORT TYPE SHIELD TYPE

KEYED NOTESM

S

S T

Y P

E

C L E

V

IS

H A

N G

E R

M S

S T

Y P

E

S

W

IV

E L R

IN

G

B A

N D

H A

N G

E R

M S

S T

Y P

E

D

O U

B L E

R O

D P

IP

E

R O

L L

E R

M S

S T

Y P

E

S

IN

G

L E

R O

D R

O L

L E

R H

A N

G E

R

M S

S T

Y P

E

P

IP

E

R O

L L E

R

S T

A N

D

M S

S T

Y P

E

A

D J U

S T

A B

L E

P

IP

E R

O L L S

T A

N D

M S

S T

Y P

E

P

R O

T E

C T

IO

N

S A

D D

L E

M S

S T

Y P

E

I N

S U

L A

T

IO

N P

R O

T E

C T

IO

N

S H

IE

L D

T H

E R

M A

L -H

A N

G E

R S

H

IE

L D

UNINSULATED SINGLE PIPE

UP TO 2 INCH X X

GENERAL NOTES:

1. 'X' INDICATES ACCEPTABLE SELECTION. IF MORE THAN ONE SELECTION IS INDICATED FOR A PIPING SYSTEM, CONTRACTOR MAY SELECT FROM THOSE INDICATED SELECTIONS.

2. DISSIMILAR-METAL PIPING JOINTS: CONSTRUCT JOINTS USING DIELECTRIC FITTINGS COMPATIBLE WITH BOTH PIPING MATERIALS.

a. NPS 2 AND SMALLER : USE DIELECTRIC NIPPLE/WATERWAY.

b. NPS 2-1/2 AND LARGER: USE DIELECTRIC FLANGE KITS.

3. USE UNIONS OR FLANGES AT VALVE AND EQUIPMENT CONNECTIONS.

4. PLUMBING EQUIPMENT DRAINS, VENTS, SAFETY VALVE PIPING, BLOWDOWN PIPING AND THE LIKE SHALL BE SAME PIPING MATERIAL AS ASSOCIATED PIPING SYSTEM.GENERAL NOTES:

1. 'X' INDICATES ACCEPTABLE SELECTION. IF MORE THAN ONE SELECTION IS INDICATED FOR A PIPING SYSTEM, CONTRACTOR MAY

SELECT FROM THOSE INDICATED SELECTIONS.

GENERAL NOTES:

1. 'X' INDICATES APPROVED HANGER OR SUPPORT ELEMENTS. IF MORE THAN ONE HANGER OR SUPPORT ELEMENT IS INDICATED, SELECTION FROM APPROVED ELEMENTS IS CONTRACTOR'S OPTION.

2. REFER TO HANGER AND SUPPORT SECTION FOR APPROVED MANUFACTURERS.

3. HANGERS AND SUPPORTS USED FOR FIRE PROTECTION SERVICES SHALL BE UL LISTED OR FMG APPROVED.

4. HANGER ELEMENTS IN CONTACT WITH BARE COPPER PIPE SHALL BE COPPER PLATED, PLASTIC COATED, FELT LINED, OR USE

MANUFACTURED COPPER TUBE ISOLATORS.

5. REFER TO INDIVIDUAL PIPING SPECIFICATION SECTIONS FOR HANGER SPACING.

6. MULTIPLE PARALLEL COLD PIPES MAY BE TRAPEZE SUPPORTED FROM BELOW USING U-BOLTS OR STRUT CLAMPS AND THERMAL

HANGER SHIELDS. REFER TO KEYED NOTE A.

7. MULTIPLE PARALLEL COLD PIPES MAY BE TRAPEZE SUPPORTED FROM ABOVE USING STANDARD HANGER ELEMENTS INDICATED FOR

SINGLE COLD PIPES.

8. MULTIPLE PARALLEL HOT PIPES MAY BE TRAPEZE SUPPORTED FROM BELOW USING ROLLER ELEMENTS AND THERMAL HANGER

SHIELD OR INSULATION PROTECTION SADDLE. REFER TO KEYED NOTES B AND C.

9. MULTIPLE PARALLEL HOT PIPES MAY BE TRAPEZE SUPPORTED FROM ABOVE USING STANDARD ROLLER HANGERS INDICATED AND

THERMAL HANGER SHIELD OR INSULATION PROTECTION SADDLE. REFER TO KEY NOTES B AND C.

10. REFER TO INDIVIDUAL PIPING SPECIFICATION SECTIONS FOR ADDITIONAL SYSTEM SPECIFIC HANGER APPLICATIONS.

Peter Basso Associates Inc

CONSULTING ENGINEERS

5145 Livernois, Suite 100

Troy, Michigan 48098-3276

Tel: 248-879-5666

Fax: 248-879-0007 www.PeterBassoAssociates.com

PBA Project No.: 2020-0353

ST

AM

P

OR

S

EA

L

OW

NE

R

ID

EN

TIF

IC

AT

IO

N

BU

ILD

IN

G

PR

OJ

EC

T

SH

EE

T

General Services Administration Public Buildings Service

Great Lakes

BUILDING NAME

ADDRESS

CITY, STATE, ZIP

BUILDING NO.

PROJECT TITLE

GSA PROJECT NO.

SUBMISSION STAGE

SUBMISSION DATE

DRAWN BY

CHECKED BY

FLOOR NO.

DISCIPLINE

PLAN TYPE

SHEET NUMBER

AND FILENAME

KE

Y

PL

AN

GR

AP

HI

C

SC

AL

E

985 Michigan Avenue

Detroit, Michigan 48225

MI0801DF

985 Passenger Elevator

Modernization

RMI12521

BID DOCUMENTS

02/21/2022

Design and Construction, Project Delivery Division John C. Kluczynski Federal Building 230 South Dearborn St.

Chicago, IL 60604

CO

NT

RA

CT

DE

SI

GN

ER

ID

EN

TI

FIC

AT

IO

N

CONST. CONTRACT NO.

DELIVER ORDER NO.

A/E CONTRACT NO.

CO

NS

UL

TA

NT

ID

EN

TIF

IC

AT

IO

N

RE

VI

SI

ON

B

LO

CK

PROPERTY OF THE UNITED STATES GOVERNMENT - FOR OFFICIAL USE ONLY - DO NOT REMOVE THIS NOTICE - PROPERLY DESTROY DOCUMENTS WHEN NO LONGER NEEDEDSENSITIVE BUT UNCLASSIFIED

SENSITIVE BUT UNCLASSIFIED

MECHANICAL

985 Federal Building Parking Garage

816 E 4th ST.

Royal Oak, MI 48067 248.542.7866/www.ghfaa.com

A S S O C I A T E S A R C H I T E C T S

SCHEDULES

47PF0021F0046

GP-05-P13-SVD-0030

RLT

DC

M-702

N/A

C R

E V

I T L

O C

A L

F

IL

E S

\M I0

M

E P

L

-R

M a b ro w n

.r v t

/1

/2

:1

:3 A

M

UNITARY ROOFTOP AIR CONDITIONING UNIT SCHEDULE - PART A

UNIT

DESIGNATION

AREA SERVED

SUPPLY FAN COOLING SECTION - DX

INTEGRAL AIR-COOLED CONDENSING

SECTION

MODEL

NUMBER

KEYED

NOTESDES. NO. AIRFLOW CFM

MINIMUM

OUTSIDE AIR

FLOW CFM E.S.P. IN. W.G.

FAN SUCTION OR

DISCHARGE S.P. IN. W.G. AT

COOLING COIL DRAIN PAN T.S.P. IN. W.G.

FAN SPEED

RPM BHP HP

MIXED AIR UNIT LEAVING AIR NET UNIT CAPACITY

NUMBER OF

CIRCUITS REFRIG. TYPE

MAX. FACE

VEL. F.P.M.

DESIGN

AMBIENT

TEMP. °F

MIN. AMBIENT

TEMP. °F

CAPACITY

CONTROL

STAGESE.D.B. °F E.W.B. °F L.D.B. °F L.W.B. °F TOTAL MBH

SENSIBLE

MBH

AC PE ELEVATOR MACHINE ROOM 2200 220 0.50 1.14 1.64 2481 1.6 2.4 81.0 66.5 58.0 57.8 59.7 59.5 1 R-410 500 95 0 MODULATING 50JC

UNITARY ROOFTOP AIR CONDITIONING UNIT SCHEDULE - PART B

UNIT

DESIGNATION

AREA SERVED

FILTER SECTION ROOF CURB MAXIMUM UNIT DIMENSIONS MAXIMUM UNIT

OPERATING

WEIGHT LBS.

(WITH CURB

ADAPTOR)

TOTAL UNIT ELECTRICAL

MODEL

NUMBER

KEYED

NOTESDES. NO. TYPE MERV

AIR PRESS. DROP TYPE

HEIGHT

LENGTH

INCHES

HEIGHT (WITH

CURB

ADAPTOR)

INCHES

WIDTH

INCHES VOLTS PHASE MCA MOP

SCCR

KA

OPTIONS /

ACCESSORIES

INITIAL IN.

W.G. FINAL IN. W.G. STANDARD

VIBRATION

ISOLATION

SPRING CURB

AC PE ELEVATOR MACHINE ROOM THROWAWAY 11 0.50 1.00 --- --- 0 74 3/8" 65 3/8" 46 1/2" 811 460 3 15 20 5 B 50JC

PLUMBING CONNECTION SCHEDULE

UNIT IDENTIFICATION

CW INCHES HW INCHES SAN INCHES VENT INCHES

KEYED

NOTESDES. NO.

TD 1 - - 4 -

SCHEDULES GENERAL NOTES:

TYPICAL FOR ALL SCHEDULE SHEETS:

1 REFER TO ELECTRICAL STANDARD SCHEDULES, ONE LINE DIAGRAM AND PANEL

SCHEDULES FOR ADDITIONAL ELECTRICAL INFORMATION

2 PROVIDE THE FOLLOWING FACTORY-WIRED ELECTRICAL OPTIONS/ACCESSORIES

WHERE INDICATED IN SCHEDULE:

A - NON-FUSED DISCONNECT SWITCH

B - UNIT SHALL BE SINGLE POINT ELECTRICAL CONNECTION WITH FACTORY

INSTALLED DISCONNECTING MEANS AND ALL REQUIRED STARTERS AND

CONTROLS

C - SERVICE RECEPTACLE

D - FUSED DISCONNECT SWITCH

E - COMBINATION STARTER

F - UNIT SHALL HAVE (2) SINGLE POINT CONNECTIONS WITH FACTORY INSTALLED

DISCONNECTING MEANS AND ALL REQUIRED STARTERS AND CONTROLS. (1)

CONNECTION SHALL BE FOR CONDENSING SECTION AND (1) CONNECTION SHALL BE

FOR THE REMAINDER OF THE UNIT.

3 FOR MODULATION/CONTROL TYPE COLUMN, "VFC" INDICATES VARIABLE FREQUENCY

CONTROLLERS, "AUTO" INDICATES AUTOMATIC OPERATION (CONTROLLED BY

TEMPERATURE CONTROLS OR SELF CONTAINED CONTROLS), "MANUAL" INDICATES

HAND OPERATION.

4 IF VARIABLE FREQUENCY CONTROLLERS ARE INDICATED TO BE PROVIDED AND ARE

NOT INSTALLED INTEGRAL TO THE UNIT, VARIABLE FREQUENCY CONTROLLERS SHALL

BE SUPPLIED BY THE MECHANICAL CONTRACTOR (UNLESS OTHERWISE NOTED) AND

INSTALLED BY THE ELECTRICAL CONTRACTOR INCLUDING THE LINE SIDE AND LOAD

SIDE WIRING TO THE MOTOR AND INCLUDING MISCELLANEOUS STEEL REQUIRED FOR

THE SUPPORT AND MOUNTING OF THE VFC. REFER TO FLOOR PLANS FOR LOCATION.

5 WHERE EQUIPMENT IS INDICATED TO HAVE A SINGLE POINT ELECTRICAL

CONNECTION, THAT EQUIPMENT SHALL COME COMPLETE WITH FACTORY INSTALLED

STARTERS, MOTOR OVERLOAD PROTECTION, CONTACTORS, FUSING AND ALL

NECESSARY INTERNAL WIRING AND CONTROLS. PROVIDE A FACTORY MOUNTED UNIT

DISCONNECTING MEANS WHERE THE ELECTRICAL CONTRACTOR SHALL MAKE SINGLE

POINT CONNECTION. INSTALL PACKAGED EQUIPMENT SUCH THAT THE ELECTRICAL

CONNECTION AND CONTROLS ARE ACCESSIBLE AND HAVE CLEARANCES MEETING

THE NATIONAL ELECTRICAL CODE.

6 WHERE PACKAGED EQUIPMENT IS PROVIDED, NAMEPLATE MUST INDICATE MAXIMUM

OVERCURRENT PROTECTION BY HACR RATED CIRCUIT BREAKERS OR FUSES. IF

FUSE PROTECTION ONLY IS INDICATED, PROVIDE A FUSIBLE DISCONNECT AND FUSES

WITH THE UNIT.

7 WHERE EQUIPMENT IS DESIGNATED BY MANUFACTURER AND MODEL NUMBER, THIS

IS THE BASIS OF DESIGN. IF THE CONTRACTOR ELECTS TO PROVIDE EQUIPMENT BY

OTHER SPECIFIED MANUFACTURERS OR PROPOSED ALTERNATE EQUIPMENT BY THE

BASIS OF DESIGN MANUFACTURER, THE CONTRACTOR SHALL BE RESPONSIBLE FOR

ANY REVISIONS TO ELECTRICAL REQUIREMENTS, STRUCTURAL LOADING, OR

ARCHITECTURAL APPURTENANCES AND SHALL INCLUDE THE COST OF SUCH

REVISIONS IN HIS BID.

8 WHERE EQUIPMENT IS SCHEDULED TO INCLUDE A SERVICE RECEPTACLE, PROVIDE A

FACTORY MOUNTED SERVICE RECEPTACLE WITH APPROPRIATE FUSES AND

TRANSFORMERS CONNECTED ON THE LINE SIDE OF THE UNIT DISCONNECT. PROVIDE

A NAMEPLATE ON THE DISCONNECT SWITCH INDICATING THE PRESENCE OF LIVE

POWER TO THE SERVICE RECEPTACLE WHEN HE UNIT DISCONNECT IS IN THE OFF

POSITION.

9 <<< DESIGNER NOTE: STANDARD MECHANICAL SPECIFICATIONS INDICATE THAT

SERVICE RECEPTACLES ARE FACTORY WIRED. IF THIS NOTE NEEDS TO CHANGE SO

THAT SERVICE RECEPTACLES ARE POWERED BY INDIVIDUAL 120V CIRCUITS, PLEASE

COORDINATE THIS CHANGE WITH THE MECHANICAL SPECIFICATIONS SECTIONS.

>>> SIZE ALL EQUIPMENT FEEDERS BASED ON THE LISTED MOP (MAXIMUM

OVERCURRENT PROTECTION). REFER TO THE FEEDER AND BRANCH CIRCUIT SIZING

SCHEDULE ON THE ELECTRICAL STANDARD SCHEDULES SHEET.

GENERAL NOTES:

1. REFER TO SCHEDULES GENERAL NOTES.

2. MODEL NUMBERS ARE CARRIER UNLESS OTHERWISE NOTED

3. DESIGN MINIMUM OUTSIDE AIRFLOW CFM (VENTILATION) LISTED IS BASED ON THE ESTIMATED MAXIMUM OCCUPANT LOAD. REFER TO TEMPERATURE CONTROL DRAWINGS FOR OUTSIDE AIR CONTROL SEQUENCE.

4. MERV DESIGNATES THE "MINIMUM EFFICIENCY REPORTING VALUE" AS EVALUATED UNDER ASHRAE STANDARD 52.2 1999.

5. AIR HANDLING UNIT TOTAL STATIC PRESSURE IS BASED ON THE FINAL FILTER AIR PRESSURE DROP.

6. CONTRACTOR SHALL UTILIZE EXISTING ROOF CURB AND PROVIDE CURB ADAPTOR IF REQUIRED.

7. PROVIDE 100% ECONOMIZER AND BAROMETRIC RELIEF.

8. UNIT SHALL BE SINGLE ZONE VARIABLE AIR VOLUME WITH MODULATING COOLING CAPACITY CONTROL.

9. PROVIDE CONDENSATE OVERFLOW SWITCH.

10. ALTERNATES SHALL NOT EXCEED THE MAXIMUM WEIGHT OF 862 LBS INCLUDING WEIGHT OF EXISTING ROOF CURB AND CURB ADAPTOR.

GENERAL NOTES:

1. INDIVIDUAL WATER LINE BRANCHES, WASTE LINES, VENTS, AND TRAPS FOR

CONNECTION TO INDIVIDUAL FIXTURES, FIXTURE FITTINGS, AND SPECIALTIES SHALL

BE IN ACCORDANCE WITH THE FOLLOWING SCHEDULE OR AS INDICATED ON

DRAWINGS, WHICHEVER IS GREATER.

General Services Administration

Public Buildings Service

Great Lakes

985 Michigan Avenue

Detroit, Michigan 48225

MI0801DF

985 Passenger Elevator

Modernization

RMI12521

BID DOCUMENTS

02/21/2022

Design and Construction, Project Delivery Division

John C. Kluczynski Federal Building

230 South Dearborn St.

Chicago, IL 60604

PROPERTY OF THE UNITED STATES GOVERNMENT - FOR OFFICIAL USE ONLY - DO NOT REMOVE THIS NOTICE - PROPERLY DESTROY DOCUMENTS WHEN NO LONGER NEEDED

SENSITIVE BUT UNCLASSIFIED

SENSITIVE BUT UNCLASSIFIED

MECHANICAL

MARK DATE DESCRIPTION

5145 Livernois, Suite 100

Fax: 248-879-0007

Troy, Michigan 48098-3276

Tel: 248-879-5666 www.PeterBassoAssociates.com

CONSULTING ENGINEERS

Peter Basso Associates Inc

PBA Project No.: 2020-0353

47PF0021F0046

GP-05-P13-SVD-0030

N/A

985 Federal Building Parking Garage

816 E 4th ST.

Royal Oak, MI 48067

248.542.7866/www.ghfaa.com

A S S O C I A T E S A R C H I T E C T S

M-801

DC

DJT

TEMPERATURE CONTROLS

Great Lakes

985 Michigan Avenue

Detroit, Michigan 48225

MI0801DF

985 Passenger Elevator

Modernization

RMI12521

BID DOCUMENTS

02/21/2022

Design and Construction, Project Delivery Division

John C. Kluczynski Federal Building

230 South Dearborn St.

Chicago, IL 60604

PROPERTY OF THE UNITED STATES GOVERNMENT - FOR OFFICIAL USE ONLY - DO NOT REMOVE THIS NOTICE - PROPERLY DESTROY DOCUMENTS WHEN NO LONGER NEEDED

SENSITIVE BUT UNCLASSIFIED

SENSITIVE BUT UNCLASSIFIED

MECHANICAL

MARK DATE DESCRIPTION

5145 Livernois, Suite 100

Fax: 248-879-0007

Troy, Michigan 48098-3276

Tel: 248-879-5666 www.PeterBassoAssociates.com

CONSULTING ENGINEERS

Peter Basso Associates Inc

PBA Project No.: 2020-0353

47PF0021F0046

GP-05-P13-SVD-0030

N/A

985 Federal Building Parking Garage

816 E 4th ST.

Royal Oak, MI 48067

248.542.7866/www.ghfaa.com

A S S O C I A T E S A R C H I T E C T S

M-802

DC

DJT

TEMPERATURE CONTROLS

U

P L E

X R

E C

E P

T A

C L E

D U

P L E

X T

A M

P E

R R

E S

IS

T

A N

T R

E C

E P

T A

C L E

D U

P L E

X G

F C

I R

E C

E P

T A

C L E

F U

T U

R E

T E

L E

C O

M M

U N

IC

A

T

IO

N O

U T

L E

T

T E

L E

C O

M M

U N

IC

A

T

IO

N O

U T

L E

T

8" ABOVE COUNTER TO

CENTER…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .