Drawings - 565-21-102 D-Wing Roof Repair.pdf
PDF 11 MB Posted
- Attached to
- D-Wing Roof Repair
- Solicitation number
- 36C24623R0089
About this file
This file describes a federal contract opportunity for roof repair work. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 6 is soliciting bids under solicitation number 36C24623R0089 to repair the roof of its D-Wing building. The opportunity type is a solicitation. Attached to the file is a set of drawings totaling 11MB that provide details on the scope of work required. Bids are due by the date listed on the solicitation for roof repair services to be completed by the date specified in any resulting award. Relevant experience with similar roof repair projects for government agencies would be considered advantageous.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sign in 12.6.23 Pre-bid site visit.pdf | ||
| RFI 12.13.23.docx | DOCX document | |
| 36C24623R0089_1.docx | DOCX document | |
| Itemized Schedule of Values Cost Breakdown.xlsx | XLSX spreadsheet | |
| 36C24623R0089_1.docx | DOCX document | |
| Re-posted D Wing RFIs.pdf | ||
| Specifications 565-21-102 D-Wing Roof Repair.pdf | ||
| Abatement Report - 565-21-102 D Wing Roof Repair.pdf | ||
| D-Wing roof RFI Questions - Responses.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
STAMP
321 4 5 6 7 8 9 10
VAMC - Fayetteville, NC
Project Director
07-12-22 JB MM
ARCHITECTPROGRAM MANAGER
ODELL INTERNATIONAL
129 FAST LANE, SUITE 200
MOORESVILLE, NC 28117
(704) 401-2074 Program Manager POC: Richard Cantwell Jr.
Revisions: Date:
A/E:
GMK ASSOCIATES, INC.
1201 MAIN STREET, SUITE 2100
COLUMBIA, S.C. 29201
(803) 256-0000 A/E firm POC: Tom Weiland
CONSULTANT
ISSUED FOR
CONSTRUCTION
D Wing Roof Repair 565-21-102 Roofing:
WM BUILDING ENVELOPE CONSUTANTS, LLC
226 N. LIVE OAK DRIVE
MONCKS CORNER, S.C. 29461
(843) 499-2756 Roofing Consultant POC: Max Morrill
Issued for
A S S O C I A ST E , CI N .
0 - Issued for Construction 07-12-2022
A001
HVAC
STACK
VENTILATOR
MECHANICAL UNIT
UNIT ON EQUIPMENT SUPPORT CURBS
PARAPET WALL
OVERFLOW SCUPPER
OF
EXPANSION JOINTEJ
ROOF HATCH
ROOF DRAINRD
VENT THROUGH ROOFVTR
ELECTRICAL PENETRATIONE
PITCH PANPP
CURB
DRAWING LEGEND
A
LG
RV
PARAPET WALL BRIDGE
LOUVERED VENT
LIGHTENING ARRESTOR SYSTEM (LARS)
ABANDONED PENETRATION/DEMO
LIGHTENING ARRESTOR SYSTEM (LARS) GROUND
CURB W/ DUCT PENETRATION
UNIT ON WOOD SLEEPERS
RELIEF VENT
GUY WIRE SUPPORT POST
ROOF ACCESS LADDER
ROOF ACCESS DOOR
DUCT/PIPE ON SLEEPERS
SMOKE HATCH
# ROOF DEMOLITION KEY NOTE
SECURITY CAMERA
ARCHITECTURAL INDEX
SHEET
N.I.C. NOT IN CONTRACT
TAPERED INSULATION
A001
EXISTING ROOF ASSEMBLY ROOF AREAS B, C, E, H, H2, & H3
N.T.S.
CONCRETE ROOF DECK
TAPERED LIGHT WEIGHT INSULATING CONCRETE (LWIC) ROOF DECK
MECHANICALLY FASTENED BASE SHEET
GRAVEL SURFACED BUILT-UP ROOF
EXPANDED POLYSTYRENE INSULATION
A001
EXISTING ROOF ASSEMBLY ROOF AREA F
N.T.S.
METAL DECK WITH SPRAY FIREPROOFING ON UNDERSIDE
GYPSUM SUBSTRATE BOARD
POLYISOCYANURATE INSULATION
TAPERED POLYISOCYANURATE INSULATION
EPDM SINGLE PLY ROOF MEMBRANE
RIVER ROUNDED STONE BALLAST
EXISTING TAPERED LIGHT WEIGHT INSULATING CONCRETE (LWIC) ROOF DECK
MECHANICALLY FASTENED BASE SHEET
GRAVEL SURFACED BUILT-UP ROOF
EXISTING EXPANDED POLYSTYRENE INSULATION
A001
EXISTING ROOF ASSEMBLY ROOF AREA A & G
N.T.S.
LIGHT WEIGHT INSULATING CONCRETE (LWIC) ROOF DECK
MECHANICALLY FASTENED BASE SHEET
GRAVEL SURFACED BUILT-UP ROOF
EXPANDED POLYSTYRENE INSULATION
A001
EXISTING ROOF ASSEMBLY ROOF AREA D
N.T.S.
METAL ROOF DECK STRUCTURALLY SLOPED METAL ROOF DECK
ABBREVIATIONS
A ABANDONED
E ELECTRICAL
EJ EXPANSION JOINT
EPS EXPANDED POLYSTYRENE INSULATION
HVAC HEATING VENTILATION AND AIR CONDITIONING
LARS LIGHTNING ARRESTOR SYSTEM
LG LIGHTNING GROUND
LWIC LIGHT WEIGHT INSULATING CONCRETE
NIC NOT IN CONTRACT
OF OVERFLOW SCUPPER
PP PITCH PAN
RD ROOF DRAIN
RV RELIEF VENT
SIM SIMILAR
TYP TYPICAL
VTR VENT THROUGH ROOF
RD
OF
OF
A
RD
RD
A
VTR
PP
PP
PP
PP
A A
E
VTR
V
OF
RDRD
RD
RD
RD
RVRVRV
RV
RV
A
A
VTR
VTR
VTR
VTR
VTR
VTR
VTR
V
V
E
E
OFOFOFOF
OF
OF
OF
OF
LGLGLG
A
A
A
PPPP
PPPP
PP PP
LG
E HVAC
A
VTR
A
VTR VTR
VTR VTR
VTR
VTR
D
G
V
V V
RD RD RD RD RD
VTR
RD
F
RD
OF OF OF OF
OF
OF
OF
N.I.C.
A
A A
PP
PP
PP
PP PP PP
PP
RV RV
RD
RD
V
V
V
V
V
V
V
V
V
V
VTR
VTR VTR
VTR
VTR VTR
VTRA
E
E
A
B
A
LGLG
VTR
RD RD
RD
RD
RD
RD
A
A
V
V
A
A
V
V
V
RV
E
N.I.C.
OFOF
RV
RV RV
RD
RD
RD
LGPP
LG
VTR
VTR
VTR
OF
V
V
V
V
VTR
C
V
RD
LG
OF
OF
OF
OFOFOF
OF
RD
RD
RD
RD
RD
RD
RD
RD
RD
RD
RD
RD
RD
RD
RD
RD RD
RD
RDRD
RD RD
RD
RD
RD
RD
RV
RVRV
RV
RV
RV
RV
RV
RV
RV
RV
RV
RV
RV RV
RV
RV
PP
PP/LG
LGLG
PP
PP
PP
PP
PP
PP
PP
PP
PP
PP
PP
PP
PP
PP
PP
PP
PP
PP
PP
PP
PP
PP LG
LG
A
A
A
AAAA
A
A
HVAC
RV
V E
V
V
V
V
V
VTR
VTR
VTR
VTR
VTR
VTR
VTR
VTR
VTR
VTR
VTR
VTR
VTR
VTR
VTR
VTR
VTR
VTR
A
A
A
OF
OF
V
H
H2
RD
V
EJ
EJ
EJ
EJEJ
EJ
EJ
EJ
EJ
VTR
23'-1"5'-10"17'50'-4"31'-8" 84'-9"
85'
23'-3"
26'-10"
25'-4"
32'-9"
76'-11"21'-10"81'-1"
24'
51'
13'-9"
13'-4"
53'-2"
25'-4"
H3
EJ
HVAC
HVAC
12'-7"
OF
A
LG
RV
H
RV
RV
E
PP PP
A A
PP
A
VTR
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
STAMP
321 4 5 6 7 8 9 10
VAMC - Fayetteville, NC
Project Director
07-12-22 JB MM
ARCHITECTPROGRAM MANAGER
ODELL INTERNATIONAL
129 FAST LANE, SUITE 200
MOORESVILLE, NC 28117
(704) 401-2074 Program Manager POC: Richard Cantwell Jr.
Revisions: Date:
A/E:
GMK ASSOCIATES, INC.
1201 MAIN STREET, SUITE 2100
COLUMBIA, S.C. 29201
(803) 256-0000 A/E firm POC: Tom Weiland
CONSULTANT
ISSUED FOR
CONSTRUCTION
D Wing Roof Repair 565-21-102 Roofing:
WM BUILDING ENVELOPE CONSUTANTS, LLC
226 N. LIVE OAK DRIVE
MONCKS CORNER, S.C. 29461
(843) 499-2756 Roofing Consultant POC: Max Morrill
Issued for
A S S O C I A ST E , CI N .
0 - Issued for Construction 07-12-2022
AD 1
AD 1
OVERALL DEMOLITION AND PHASING ROOF PLAN
1" = 10'
ROOF DEMOLITION GENERAL NOTES:
1. REMOVE AND PROPERLY DISPOSE OF ALL GRAVEL SURFACING/BALLAST,
ROOF MEMBRANE AND ALL SHEET METAL FLASHING, TRIM AND ACCESSORIES.
2. ALL PARAPET WALL STEP BRIDGES SHALL BE REMOVED AND PROPERLY
DISPOSED OF.
3. LIGHTNING ARRESTOR SYSTEM (LARS) SHALL BE COMPLETELY REMOVED AND
PROPERLY DISPOSED OF.
4. ALL ACCESS SHALL BE FROM THE EXTERIOR OF THE BUILDING DURING
CONSTRUCTION.
5. SOLAR PANELS ON STEEL SUPPORT RAILS TO REMAIN.
6. WALL MOUNTED ROOF ACCESS LADDER SHALL REMAIN.
7. ALL ROOF HATCHES SHALL REMAIN.
8. ALL HVAC EQUIPMENT SHALL REMAIN OPERATIONAL AT ALL TIMES DURING
THE PROJECT.
9. RAISE ALL MECHANICAL EQUIPMENT AS NECESSARY TO PROVIDE A MINIMUM
8 INCHES OF BASE FLASHING HEIGHT.
OVERALL DEMOLITION &
PHASING ROOF PLAN
ROOF DEMOLITION KEY NOTES:
SOLAR PANELS ON STEEL SUPPORT RAILS TO REMAIN.
TEMPORARY REMOVAL OF SECURITY CAMERA AS NECESSARY TO REPLACE
COPING SHALL BE COORDINATED WITH THE OWNER.
REMOVE AND DISPOSE OF EXISTING LWIC DOWN TO THE EXISTING ROOF DECK
WHERE INDICATED ON THE CONTRACT DRAWINGS.
REMOVE MODIFIED BITUMEN ROOF MEMBRANE AND ROOF INSULATION INFILL AT
PREVIOUS ROOF REPAIR LOCATIONS INDICATED ON THE DEMOLITION ROOF PLAN.
PROVIDE EPS INSULATION AND LWIC IN ACCORDANCE WITH THE CONSTRUCTION
DOCUMENTS.
REMOVE AND PROPERLY DISPOSE OF ALL ABANDONED PENETRATIONS. PATCH
HOLE IN ROOF DECK WITH 14" STEEL PLATE. INFILL WITH EXPANDED POLYSTYRENE
INSULATION AND LIGHT WEIGHT INSULATING CONCRETE (LWIC) PATCH MATERIAL
TO MATCH HEIGHT AND SLOPE OF EXISTING LWIC SYSTEM.
RAISE EQUIPMENT AS NECESSARY TO REMOVE AND PROPERLY DISPOSE OF
WOOD SLEEPERS. PROVIDE PREFABRICATED EQUIPMENT SUPPORT CURBS.
TYP.
5 5
5 5
PROPOSED PHASING PLAN:
PHASE 1: ROOF AREA A
PHASE 2: ROOF AREA B & D
PHASE 3: ROOF AREA F & G
PHASE 4: ROOF AREA H, H2, & H3
PHASE 5: ROOF AREA E
PHASE 6: ROOF AREA C
OF
A
RD
OF
AR1
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
STAMP
321 4 5 6 7 8 9 10
VAMC - Fayetteville, NC
Project Director
07-12-22 JB MM
ARCHITECTPROGRAM MANAGER
ODELL INTERNATIONAL
129 FAST LANE, SUITE 200
MOORESVILLE, NC 28117
(704) 401-2074 Program Manager POC: Richard Cantwell Jr.
Revisions: Date:
A/E:
GMK ASSOCIATES, INC.
1201 MAIN STREET, SUITE 2100
COLUMBIA, S.C. 29201
(803) 256-0000 A/E firm POC: Tom Weiland
CONSULTANT
ISSUED FOR
CONSTRUCTION
D Wing Roof Repair 565-21-102 Roofing:
WM BUILDING ENVELOPE CONSUTANTS, LLC
226 N. LIVE OAK DRIVE
MONCKS CORNER, S.C. 29461
(843) 499-2756 Roofing Consultant POC: Max Morrill
Issued for
A S S O C I A ST E , CI N .
0 - Issued for Construction 07-12-2022
AD 2
AD 2
DEMOLITION ROOF PLAN (AREA A)
1/8" = 1'
DEMOLITION ROOF PLAN
(AREA A)
ROOF DEMOLITION GENERAL NOTES:
1. REMOVE AND PROPERLY DISPOSE OF ALL GRAVEL SURFACING/BALLAST,
ROOF MEMBRANE AND ALL SHEET METAL FLASHING, TRIM AND ACCESSORIES.
2. LIGHTNING ARRESTOR SYSTEM (LARS) SHALL BE COMPLETELY REMOVED AND
PROPERLY DISPOSED OF.
3. ALL ACCESS SHALL BE FROM THE EXTERIOR OF THE BUILDING DURING
CONSTRUCTION.
OF
A
A A
PP
PP
PP
PP PP PP
PP
RV RV
RD
RD
V
V
V
V
V
V
V
V
V
V
VTR
VTR VTR
VTR
VTR VTR
VTRA
E
E
A
B
A
LG
VTR
HVAC
A
BR1
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
STAMP
321 4 5 6 7 8 9 10
VAMC - Fayetteville, NC
Project Director
07-12-22 JB MM
ARCHITECTPROGRAM MANAGER
ODELL INTERNATIONAL
129 FAST LANE, SUITE 200
MOORESVILLE, NC 28117
(704) 401-2074 Program Manager POC: Richard Cantwell Jr.
Revisions: Date:
A/E:
GMK ASSOCIATES, INC.
1201 MAIN STREET, SUITE 2100
COLUMBIA, S.C. 29201
(803) 256-0000 A/E firm POC: Tom Weiland
CONSULTANT
ISSUED FOR
CONSTRUCTION
D Wing Roof Repair 565-21-102 Roofing:
WM BUILDING ENVELOPE CONSUTANTS, LLC
226 N. LIVE OAK DRIVE
MONCKS CORNER, S.C. 29461
(843) 499-2756 Roofing Consultant POC: Max Morrill
Issued for
A S S O C I A ST E , CI N .
0 - Issued for Construction 07-12-2022
AD 3
AD 3
DEMOLITION ROOF PLAN (AREA B)
1/8" = 1'
DEMOLITION ROOF PLAN
(AREA B)
TYP.
ROOF DEMOLITION GENERAL NOTES:
1. REMOVE AND PROPERLY DISPOSE OF ALL GRAVEL SURFACING/BALLAST,
ROOF MEMBRANE AND ALL SHEET METAL FLASHING, TRIM AND ACCESSORIES.
2. LIGHTNING ARRESTOR SYSTEM (LARS) SHALL BE COMPLETELY REMOVED AND
PROPERLY DISPOSED OF.
3. ALL ACCESS SHALL BE FROM THE EXTERIOR OF THE BUILDING DURING
CONSTRUCTION.
4. WALL MOUNTED ROOF ACCESS LADDER SHALL REMAIN.
5. ALL HVAC EQUIPMENT SHALL REMAIN OPERATIONAL AT ALL TIMES DURING
THE PROJECT.
6. RAISE ALL MECHANICAL EQUIPMENT AS NECESSARY TO PROVIDE A MINIMUM
8 INCHES OF BASE FLASHING HEIGHT. COORDINATE WITH MECHANICAL
DRAWINGS AND SPECIFICATIONS.
ROOF DEMOLITION KEY NOTES:
REMOVE AND DISPOSE OF EXISTING LWIC DOWN TO THE EXISTING ROOF DECK WHERE
INDICATED ON THE CONTRACT DRAWINGS.
REMOVE AND PROPERLY DISPOSE OF ALL ABANDONED PENETRATIONS. PATCH HOLE
IN ROOF DECK WITH 14" STEEL PLATE. INFILL WITH EXPANDED POLYSTYRENE
INSULATION AND LIGHT WEIGHT INSULATING CONCRETE (LWIC) PATCH MATERIAL TO
MATCH HEIGHT AND SLOPE OF EXISTING LWIC SYSTEM.
N.I.C.
RV
RV RV
RD
RD
RD
LGPP
LG
VTR
VTR
VTR
OF
V
V
V
V
VTR
C
V
RD
OF
OF
EJ
EJ
VTR
CR1
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
STAMP
321 4 5 6 7 8 9 10
VAMC - Fayetteville, NC
Project Director
07-12-22 JB MM
ARCHITECTPROGRAM MANAGER
ODELL INTERNATIONAL
129 FAST LANE, SUITE 200
MOORESVILLE, NC 28117
(704) 401-2074 Program Manager POC: Richard Cantwell Jr.
Revisions: Date:
A/E:
GMK ASSOCIATES, INC.
1201 MAIN STREET, SUITE 2100
COLUMBIA, S.C. 29201
(803) 256-0000 A/E firm POC: Tom Weiland
CONSULTANT
ISSUED FOR
CONSTRUCTION
D Wing Roof Repair 565-21-102 Roofing:
WM BUILDING ENVELOPE CONSUTANTS, LLC
226 N. LIVE OAK DRIVE
MONCKS CORNER, S.C. 29461
(843) 499-2756 Roofing Consultant POC: Max Morrill
Issued for
A S S O C I A ST E , CI N .
0 - Issued for Construction 07-12-2022
AD 4
AD 4
DEMOLITION ROOF PLAN (AREA C)
1/8" = 1'
DEMOLITION ROOF PLAN
(AREA C)
ROOF DEMOLITION GENERAL NOTES:
1. REMOVE AND PROPERLY DISPOSE OF ALL GRAVEL SURFACING/BALLAST,
ROOF MEMBRANE AND ALL SHEET METAL FLASHING, TRIM AND ACCESSORIES.
2. LIGHTNING ARRESTOR SYSTEM (LARS) SHALL BE COMPLETELY REMOVED AND
PROPERLY DISPOSED OF.
3. ALL ACCESS SHALL BE FROM THE EXTERIOR OF THE BUILDING DURING
CONSTRUCTION.
4. ALL HVAC EQUIPMENT SHALL REMAIN OPERATIONAL AT ALL TIMES DURING
THE PROJECT.
5. RAISE ALL MECHANICAL EQUIPMENT AS NECESSARY TO PROVIDE A MINIMUM
8 INCHES OF BASE FLASHING HEIGHT.
A
VTR
PP
PP
PP
PP
A A
E
VTR
V
OF
HVAC
D
RD
LG
LG
EJ
EJ
EJ
EJ
OF
A
PP PP
DR1DR2
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
STAMP
321 4 5 6 7 8 9 10
VAMC - Fayetteville, NC
Project Director
07-12-22 JB MM
ARCHITECTPROGRAM MANAGER
ODELL INTERNATIONAL
129 FAST LANE, SUITE 200
MOORESVILLE, NC 28117
(704) 401-2074 Program Manager POC: Richard Cantwell Jr.
Revisions: Date:
A/E:
GMK ASSOCIATES, INC.
1201 MAIN STREET, SUITE 2100
COLUMBIA, S.C. 29201
(803) 256-0000 A/E firm POC: Tom Weiland
CONSULTANT
ISSUED FOR
CONSTRUCTION
D Wing Roof Repair 565-21-102 Roofing:
WM BUILDING ENVELOPE CONSUTANTS, LLC
226 N. LIVE OAK DRIVE
MONCKS CORNER, S.C. 29461
(843) 499-2756 Roofing Consultant POC: Max Morrill
Issued for
A S S O C I A ST E , CI N .
0 - Issued for Construction 07-12-2022
AD 5
AD 5
DEMOLITION ROOF PLAN (AREA D)
1/8" = 1'
DEMOLITION ROOF PLAN
(AREA D)
TYP.
ROOF DEMOLITION GENERAL NOTES:
1. REMOVE AND PROPERLY DISPOSE OF ALL GRAVEL SURFACING/BALLAST,
ROOF MEMBRANE AND ALL SHEET METAL FLASHING, TRIM AND ACCESSORIES.
2. ALL PARAPET WALL STEP BRIDGES SHALL BE REMOVED AND PROPERLY
DISPOSED OF.
3. LIGHTNING ARRESTOR SYSTEM (LARS) SHALL BE COMPLETELY REMOVED AND
PROPERLY DISPOSED OF.
4. ALL ACCESS SHALL BE FROM THE EXTERIOR OF THE BUILDING DURING
CONSTRUCTION.
5. ALL ROOF HATCHES SHALL REMAIN.
6. ALL HVAC EQUIPMENT SHALL REMAIN OPERATIONAL AT ALL TIMES DURING
THE PROJECT.
7. RAISE ALL MECHANICAL EQUIPMENT AS NECESSARY TO PROVIDE A MINIMUM
8 INCHES OF BASE FLASHING HEIGHT.
ROOF DEMOLITION KEY NOTES:
REMOVE AND DISPOSE OF EXISTING LWIC DOWN TO THE EXISTING ROOF DECK
WHERE INDICATED ON THE CONTRACT DRAWINGS.
REMOVE AND PROPERLY DISPOSE OF ALL ABANDONED PENETRATIONS. PATCH
HOLE IN ROOF DECK WITH 14" STEEL OR NESTED PIECE OF STEEL DECKING.
TYP.
TYP.
TYP.
TYP.
LGLG
VTR
RD RD
RD
RD
RD
RD
A
A
V
V
A
A
V
V
V
RV
E
OFOF
EJ
EJ
ER1
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
STAMP
321 4 5 6 7 8 9 10
VAMC - Fayetteville, NC
Project Director
07-12-22 JB MM
ARCHITECTPROGRAM MANAGER
ODELL INTERNATIONAL
129 FAST LANE, SUITE 200
MOORESVILLE, NC 28117
(704) 401-2074 Program Manager POC: Richard Cantwell Jr.
Revisions: Date:
A/E:
GMK ASSOCIATES, INC.
1201 MAIN STREET, SUITE 2100
COLUMBIA, S.C. 29201
(803) 256-0000 A/E firm POC: Tom Weiland
CONSULTANT
ISSUED FOR
CONSTRUCTION
D Wing Roof Repair 565-21-102 Roofing:
WM BUILDING ENVELOPE CONSUTANTS, LLC
226 N. LIVE OAK DRIVE
MONCKS CORNER, S.C. 29461
(843) 499-2756 Roofing Consultant POC: Max Morrill
Issued for
A S S O C I A ST E , CI N .
0 - Issued for Construction 07-12-2022
AD 6
AD 6
DEMOLITION ROOF PLAN (AREA E)
1/8" = 1'
DEMOLITION ROOF PLAN
(AREA E)
ROOF DEMOLITION GENERAL NOTES:
1. REMOVE AND PROPERLY DISPOSE OF ALL GRAVEL SURFACING/BALLAST,
ROOF MEMBRANE AND ALL SHEET METAL FLASHING, TRIM AND ACCESSORIES.
2. LIGHTNING ARRESTOR SYSTEM (LARS) SHALL BE COMPLETELY REMOVED AND
PROPERLY DISPOSED OF.
3. ALL ACCESS SHALL BE FROM THE EXTERIOR OF THE BUILDING DURING
CONSTRUCTION.
4. WALL MOUNTED ROOF ACCESS LADDER SHALL REMAIN.
5. ALL HVAC EQUIPMENT SHALL REMAIN OPERATIONAL AT ALL TIMES DURING
THE PROJECT.
6. RAISE ALL MECHANICAL EQUIPMENT AS NECESSARY TO PROVIDE A MINIMUM
8 INCHES OF BASE FLASHING HEIGHT.
ROOF DEMOLITION KEY NOTES:
REMOVE AND PROPERLY DISPOSE OF ALL ABANDONED PENETRATIONS. PATCH
HOLE IN ROOF DECK WITH 14" STEEL PLATE. INFILL WITH EXPANDED POLYSTYRENE
INSULATION AND LIGHT WEIGHT INSULATING CONCRETE (LWIC) PATCH MATERIAL
TO MATCH HEIGHT AND SLOPE OF EXISTING LWIC SYSTEM.
RDRD
A
A
VTR
VTR
E
OFOFOFOF
LGLGLG
A
VTR
A
VTR VTR
VTR VTR
VTR
VTR
V
V V
RD RD RD RD RD
VTR
RD
F
OF OF OF OF
OF
OF
OF
VTR
OF
FR3
FR4
FR2
FR1
FR5
FR6
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
STAMP
321 4 5 6 7 8 9 10
VAMC - Fayetteville, NC
Project Director
07-12-22 JB MM
ARCHITECTPROGRAM MANAGER
ODELL INTERNATIONAL
129 FAST LANE, SUITE 200
MOORESVILLE, NC 28117
(704) 401-2074 Program Manager POC: Richard Cantwell Jr.
Revisions: Date:
A/E:
GMK ASSOCIATES, INC.
1201 MAIN STREET, SUITE 2100
COLUMBIA, S.C. 29201
(803) 256-0000 A/E firm POC: Tom Weiland
CONSULTANT
ISSUED FOR
CONSTRUCTION
D Wing Roof Repair 565-21-102 Roofing:
WM BUILDING ENVELOPE CONSUTANTS, LLC
226 N. LIVE OAK DRIVE
MONCKS CORNER, S.C. 29461
(843) 499-2756 Roofing Consultant POC: Max Morrill
Issued for
A S S O C I A ST E , CI N .
0 - Issued for Construction 07-12-2022
AD 7
AD 7
DEMOLITION ROOF PLAN (AREA F)
1/8" = 1'
DEMOLITION ROOF PLAN
(AREA F)
ROOF DEMOLITION GENERAL NOTES:
1. REMOVE AND PROPERLY DISPOSE OF ALL GRAVEL SURFACING/BALLAST,
ROOF MEMBRANE AND ALL SHEET METAL FLASHING, TRIM AND ACCESSORIES.
2. LIGHTNING ARRESTOR SYSTEM (LARS) SHALL BE COMPLETELY REMOVED AND
PROPERLY DISPOSED OF.
3. ALL ACCESS SHALL BE FROM THE EXTERIOR OF THE BUILDING DURING
CONSTRUCTION.
4. ALL HVAC EQUIPMENT SHALL REMAIN OPERATIONAL AT ALL TIMES DURING
THE PROJECT.
5. RAISE ALL MECHANICAL EQUIPMENT AS NECESSARY TO PROVIDE A MINIMUM
8 INCHES OF BASE FLASHING HEIGHT.
ROOF DEMOLITION KEY NOTES:
REMOVE AND DISPOSE OF EXISTING ROOF INSULATION DOWN TO THE EXISTING
ROOF DECK WHERE INDICATED ON THE CONTRACT DRAWINGS.
REMOVE AND PROPERLY DISPOSE OF ALL ABANDONED PENETRATIONS. PATCH
HOLE IN ROOF DECK WITH 14" STEEL PLATE.
A
VTR
PP
PP
PP
PP
A A
E
VTR
V
OF
RDRD
RD
RD
RD
RVRVRV
RV
RV
A
A
VTR
VTR
VTR
VTR
VTR
VTR
VTR
V
V
E
E
OFOFOFOF
OF
OF
OF
OF
LGLGLG
A
A
A
PPPP
PPPP
PP PP
LG
E HVAC
D
G
RD
VTR
RD
LG
EJ
EJ
EJ
EJEJ
HVAC
OF
A
RV
RV
PP PP
VTR
FR5
FR6
DR1DR2
GR1
RVRV
RV
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
STAMP
321 4 5 6 7 8 9 10
VAMC - Fayetteville, NC
Project Director
07-12-22 JB MM
ARCHITECTPROGRAM MANAGER
ODELL INTERNATIONAL
129 FAST LANE, SUITE 200
MOORESVILLE, NC 28117
(704) 401-2074 Program Manager POC: Richard Cantwell Jr.
Revisions: Date:
A/E:
GMK ASSOCIATES, INC.
1201 MAIN STREET, SUITE 2100
COLUMBIA, S.C. 29201
(803) 256-0000 A/E firm POC: Tom Weiland
CONSULTANT
ISSUED FOR
CONSTRUCTION
D Wing Roof Repair 565-21-102 Roofing:
WM BUILDING ENVELOPE CONSUTANTS, LLC
226 N. LIVE OAK DRIVE
MONCKS CORNER, S.C. 29461
(843) 499-2756 Roofing Consultant POC: Max Morrill
Issued for
A S S O C I A ST E , CI N .
0 - Issued for Construction 07-12-2022
AD 8
AD 8
DEMOLITION ROOF PLAN (AREA G)
1/8" = 1'
DEMOLITION ROOF PLAN
(AREA G)
ROOF DEMOLITION GENERAL NOTES:
1. REMOVE AND PROPERLY DISPOSE OF ALL GRAVEL SURFACING/BALLAST,
ROOF MEMBRANE AND ALL SHEET METAL FLASHING, TRIM AND ACCESSORIES.
2. ALL PARAPET WALL STEP BRIDGES SHALL BE REMOVED AND PROPERLY
DISPOSED OF.
3. LIGHTNING ARRESTOR SYSTEM (LARS) SHALL BE COMPLETELY REMOVED AND
PROPERLY DISPOSED OF.
4. ALL ACCESS SHALL BE FROM THE EXTERIOR OF THE BUILDING DURING
CONSTRUCTION.
5. ALL ROOF HATCHES SHALL REMAIN.
6. ALL HVAC EQUIPMENT SHALL REMAIN OPERATIONAL AT ALL TIMES DURING
THE PROJECT.
7. RAISE ALL MECHANICAL EQUIPMENT AS NECESSARY TO PROVIDE A MINIMUM
8 INCHES OF BASE FLASHING HEIGHT.
ROOF DEMOLITION KEY NOTES:
REMOVE AND DISPOSE OF EXISTING LWIC DOWN TO THE EXISTING ROOF DECK
WHERE INDICATED ON THE CONTRACT DRAWINGS.
REMOVE AND PROPERLY DISPOSE OF ALL ABANDONED PENETRATIONS. PATCH
HOLE IN ROOF DECK WITH 14" STEEL PLATE. INFILL WITH EXPANDED POLYSTYRENE
INSULATION AND LIGHT WEIGHT INSULATING CONCRETE (LWIC) PATCH MATERIAL
TO MATCH HEIGHT AND SLOPE OF EXISTING LWIC SYSTEM.
RAISE EQUIPMENT AS NECESSARY TO REMOVE AND PROPERLY DISPOSE OF
WOOD SLEEPERS. PROVIDE PREFABRICATED EQUIPMENT SUPPORT CURBS.
3 3
PP
PP
PP
PP
E
RD
RV
VTR
VTR
OF
A
PPPP
PPPP
PP PP
LG
A A
PP
PP
PP PP PP
PP
RD
VTRA
E
RDRD
V
RV
N.I.C.
RV
RV RV
RD
RD
RD
LGPP
LG
VTR
VTR
VTR
OF
V
V
V
V
VTR
C
V
RD
LG
OF
OF
OF
OFOFOF
OF
RD
RD
RD
RD
RD
RD
RD
RD
RD
RD
RD
RD
RD
RD
RD
RD RD
RD
RDRD
RD RD
RD
RD
RD
RD
RV
RVRV
RV
RV
RV
RV
RV
RV
RV
RV
RV
RV
RV RV
RV
RV
PP
PP/LG
LGLG
PP
PP
PP
PP
PP
PP
PP
PP
PP
PP
PP
PP
PP
PP
PP
PP
PP
PP
PP
PP
PP
PP LG
LG
A
A
A
AAAA
A
A
HVAC
RV
V E
V
V
V
V
V
VTR
VTR
VTR
VTR
VTR
VTR
VTR
VTR
VTR
VTR
VTR
VTR
VTR
VTR
VTR
VTR
VTR
VTR
A
A
A
OF
OF
V
H
H2
RD
V
HR1
HR2
HR3
H2R1
EJ
EJEJ
EJ
EJ
EJ
VTR
H3
EJ
HVAC
A
LG
RV
H
RV
E
PP PP
H3R1
A A
PP
VTR
BR1
DR1DR2
CR1
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
STAMP
321 4 5 6 7 8 9 10
VAMC - Fayetteville, NC
Project Director
07-12-22 JB MM
ARCHITECTPROGRAM MANAGER
ODELL INTERNATIONAL
129 FAST LANE, SUITE 200
MOORESVILLE, NC 28117
(704) 401-2074 Program Manager POC: Richard Cantwell Jr.
Revisions: Date:
A/E:
GMK ASSOCIATES, INC.
1201 MAIN STREET, SUITE 2100
COLUMBIA, S.C. 29201
(803) 256-0000 A/E firm POC: Tom Weiland
CONSULTANT
ISSUED FOR
CONSTRUCTION
D Wing Roof Repair 565-21-102 Roofing:
WM BUILDING ENVELOPE CONSUTANTS, LLC
226 N. LIVE OAK DRIVE
MONCKS CORNER, S.C. 29461
(843) 499-2756 Roofing Consultant POC: Max Morrill
Issued for
A S S O C I A ST E , CI N .
0 - Issued for Construction 07-12-2022
AD 9
AD 9
DEMOLITION ROOF PLAN (AREA H, H2 AND H3)
1/8" = 1'
DEMOLITION ROOF PLAN
(AREA H, H2 AND H3)
ROOF DEMOLITION GENERAL NOTES:
1. REMOVE AND PROPERLY DISPOSE OF ALL GRAVEL SURFACING/BALLAST,
ROOF MEMBRANE AND ALL SHEET METAL FLASHING, TRIM AND ACCESSORIES.
2. ALL PARAPET WALL STEP BRIDGES SHALL BE REMOVED AND PROPERLY
DISPOSED OF.
3. LIGHTNING ARRESTOR SYSTEM (LARS) SHALL BE COMPLETELY REMOVED AND
PROPERLY DISPOSED OF.
4. ALL ACCESS SHALL BE FROM THE EXTERIOR OF THE BUILDING DURING
CONSTRUCTION.
5. SOLAR PANELS ON STEEL SUPPORT RAILS TO REMAIN.
6. WALL MOUNTED ROOF ACCESS LADDER SHALL REMAIN.
7. ALL ROOF HATCHES SHALL REMAIN.
8. ALL HVAC EQUIPMENT SHALL REMAIN OPERATIONAL AT ALL TIMES DURING
THE PROJECT.
9. RAISE ALL MECHANICAL EQUIPMENT AS NECESSARY TO PROVIDE A MINIMUM
8 INCHES OF BASE FLASHING HEIGHT.
ROOF DEMOLITION KEY NOTES:
SOLAR PANELS ON STEEL SUPPORT RAILS TO REMAIN.
TEMPORARY REMOVAL OF SECURITY CAMERA AS NECESSARY TO REPLACE
COPING SHALL BE COORDINATED WITH THE OWNER.
REMOVE MODIFIED BITUMEN ROOF MEMBRANE AND ROOF INSULATION INFILL AT
PREVIOUS ROOF REPAIR LOCATIONS INDICATED ON THE DEMOLITION ROOF PLAN.
PROVIDE EPS INSULATION AND LWIC IN ACCORDANCE WITH THE CONSTRUCTION
DOCUMENTS.
REMOVE AND PROPERLY DISPOSE OF ALL ABANDONED PENETRATIONS. PATCH
HOLE IN ROOF DECK WITH 14" STEEL PLATE. INFILL WITH EXPANDED POLYSTYRENE
INSULATION AND LIGHT WEIGHT INSULATING CONCRETE (LWIC) PATCH MATERIAL
TO MATCH HEIGHT AND SLOPE OF EXISTING LWIC SYSTEM.
RAISE EQUIPMENT AS NECESSARY TO REMOVE AND PROPERLY DISPOSE OF
WOOD SLEEPERS. PROVIDE PREFABRICATED EQUIPMENT SUPPORT CURBS.
4 4
OF
A
RD
RD
A
VTR
PP
PP
PP
PP
A A
E
VTR
V
OF
RDRD
RD
RD
RD
RVRVRV
RV
RV
A
A
VTR
VTR
VTR
VTR
VTR
VTR
VTR
V
V
E
E
OFOFOFOF
OF
OF
OF
OF
LGLGLG
A
A
A
PPPP
PPPP
PP PP
LG
E HVAC
A
VTR
A
VTR VTR
VTR VTR
VTR
VTR
D
G
V
V V
RD RD RD RD RD
VTR
RD
F
RD
OF OF OF OF
OF
OF
OF
N.I.C.
A
A A
PP
PP
PP
PP PP PP
PP
RV RV
RD
RD
V
V
V
V
V
V
V
V
V
V
VTR
VTR VTR
VTR
VTR VTR
VTRA
E
E
A
B
A
LGLG
VTR
RD RD
RD
RD
RD
RD
A
A
V
V
A
A
V
V
V
RV
E
N.I.C.
OFOF
RV
RV RV
RD
RD
RD
LGPP
LG
VTR
VTR
VTR
OF
V
V
V
V
VTR
C
V
RD
LG
OF
OF
OF
OFOFOF
OF
RD
RD
RD
RD
RD
RD
RD
RD
RD
RD
RD
RD
RD
RD
RD
RD RD
RD
RDRD
RD RD
RD
RD
RD
RD
RV
RVRV
RV
RV
RV
RV
RV
RV
RV
RV
RV
RV
RV RV
RV
RV
PP
PP/LG
LGLG
PP
PP
PP
PP
PP
PP
PP
PP
PP
PP
PP
PP
PP
PP
PP
PP
PP
PP
PP
PP
PP
PP LG
LG
A
A
A
AAAA
A
A
HVAC
RV
V E
V
V
V
V
V
VTR
VTR
VTR
VTR
VTR
VTR
VTR
VTR
VTR
VTR
VTR
VTR
VTR
VTR
VTR
VTR
VTR
VTR
A
A
A
OF
OF
V
H
H2
RD
V
HR1
HR2
HR3
H2R1
EJ
EJ
EJ
EJEJ
EJ
EJ
EJ
EJ
VTR
23'-1"5'-10"17'50'-4"31'-8" 84'-9"
85'
23'-3"
26'-10"
25'-4"
32'-9"
76'-11"21'-10"81'-1"
24'
51'
13'-9"
13'-4"
53'-2"
25'-4"
H3
EJ
HVAC
HVAC
12'-7"
OF
A
LG
RV
H
RV
RV
E
PP PP
H3R1
A A
PP
A
VTR
BR1
ER1
FR3
FR4
FR2
FR1
FR5
FR6
DR1DR2
AR1
GR1
CR1
EXISTING OVERALL
ROOF PLAN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
STAMP
321 4 5 6 7 8 9 10
VAMC - Fayetteville, NC
Project Director
07-12-22 JB MM
ARCHITECTPROGRAM MANAGER
ODELL INTERNATIONAL
129 FAST LANE, SUITE 200
MOORESVILLE, NC 28117
(704) 401-2074 Program Manager POC: Richard Cantwell Jr.
Revisions: Date:
A/E:
GMK ASSOCIATES, INC.
1201 MAIN STREET, SUITE 2100
COLUMBIA, S.C. 29201
(803) 256-0000 A/E firm POC: Tom Weiland
CONSULTANT
ISSUED FOR
CONSTRUCTION
D Wing Roof Repair 565-21-102 Roofing:
WM BUILDING ENVELOPE CONSUTANTS, LLC
226 N. LIVE OAK DRIVE
MONCKS CORNER, S.C. 29461
(843) 499-2756 Roofing Consultant POC: Max Morrill
Issued for
A S S O C I A ST E , CI N .
0 - Issued for Construction 07-12-2022
AR 1
EXISTING OVERALL ROOF PLAN
1" = 10'
AR 1
EXISTING ROOF CORE SUMMARY
XRX CORE NUMBER AND IDENTIFIER
XFX FLASHING NUMBER AND IDENTIFIER
AR1 GRAVEL SURFACING
BUILT-UP ROOF MEMBRANE
NAILED BASE SHEET
LIGHT WEIGHT INSULATING CONCRETE (LWIC) = 2"
EXPANDED POLYSTYRENE (EPS) = 1-1/2"
CONCRETE DECK
TOTAL THICKNESS = 4"
BR1 GRAVEL SURFACING
BUILT-UP ROOF MEMBRANE
NAILED BASE SHEET
LWIC = 2"
EPS = 3-1/2"
CONCRETE DECK
TOTAL THICKNESS = 6"
CR1 GRAVEL SURFACING
BUILT-UP ROOF MEMBRANE
NAILED BASE SHEET
LWIC = 2"
EPS = 3-1/2"
CONCRETE DECK
TOTAL THICKNESS = 6"
DR1 GRAVEL SURFACING
BUILT-UP ROOF MEMBRANE
NAILED BASE SHEET
LWIC = 2"
EPS = 2-1/2"
METAL DECK
TOTAL THICKNESS = 5"
DR2 GRAVEL SURFACING
BUILT-UP ROOF MEMBRANE
NAILED BASE SHEET
LWIC = 2"
EPS = 2-1/2"
METAL DECK
TOTAL THICKNESS = 5"
ER1 GRAVEL SURFACING
BUILT-UP ROOF MEMBRANE
NAILED BASE SHEET
LWIC = 2"
EPS = 3-1/2"
CONCRETE DECK
TOTAL THICKNESS = 6"
FR1 STONE BALLAST
EPDM
POLYISOCYANURATE = 3"
GYPSUM BOARD = 1/2"
METAL DECK
TOTAL THICKNESS = 3-1/2"
FR2 STONE BALLAST
EPDM
POLYISOCYANURATE = 4-1/2"
GYPSUM BOARD = 1/2"
METAL DECK
TOTAL THICKNESS = 5"
FR3 STONE BALLAST
EPDM
POLYISOCYANURATE = 3"
GYPSUM BOARD = 1/2"
METAL DECK
TOTAL THICKNESS = 3-1/2"
FR4 STONE BALLAST
EPDM
POLYISOCYANURATE = 4-1/2"
GYPSUM BOARD = 1/2"
METAL DECK
TOTAL THICKNESS = 5"
FR5 STONE BALLAST
EPDM
POLYISOCYANURATE = 2-1/2"
GYPSUM BOARD = 1/2"
METAL DECK
TOTAL THICKNESS = 3"
FR6 STONE BALLAST
EPDM
POLYISOCYANURATE = 5"
GYPSUM BOARD = 1/2"
METAL DECK
TOTAL THICKNESS = 5-1/2"
GR1 GRAVEL SURFACING
BUILT-UP ROOF MEMBRANE
NAILED BASE SHEET
LWIC = 2"
EPS = 1-1/2"
METAL DECK
TOTAL THICKNESS = 4"
HR1 GRAVEL SURFACING
BUILT-UP ROOF MEMBRANE
NAILED BASE SHEET
LWIC = 2"
EPS = 3-1/2"
CONCRETE DECK
TOTAL THICKNESS = 6"
HR2 GRAVEL SURFACING
BUILT-UP ROOF MEMBRANE
NAILED BASE SHEET
LWIC = 2"
EPS = 5-1/2"
CONCRETE DECK
TOTAL THICKNESS = 8"
HR3 MODIFIED BITUMEN
WOOD FIBER = 3"
POLYISOCYANURATE = 6"
CONCRETE DECK
TOTAL THICKNESS = 9-1/2"
H2R1 GRAVEL SURFACING
BUILT-UP ROOF MEMBRANE
NAILED BASE SHEET
LWIC = 3"
EPS = 3-1/2"
CONCRETE DECK
TOTAL THICKNESS = 7"
H3R1 GRAVEL SURFACING
BUILT-UP ROOF MEMBRANE
CONCRETE DECK
TOTAL THICKNESS = 1/4"
OF
A
RD
OF
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
STAMP
321 4 5 6 7 8 9 10
VAMC - Fayetteville, NC
Project Director
07-12-22 JB MM
ARCHITECTPROGRAM MANAGER
ODELL INTERNATIONAL
129 FAST LANE, SUITE 200
MOORESVILLE, NC 28117
(704) 401-2074 Program Manager POC: Richard Cantwell Jr.
Revisions: Date:
A/E:
GMK ASSOCIATES, INC.
1201 MAIN STREET, SUITE 2100
COLUMBIA, S.C. 29201
(803) 256-0000 A/E firm POC: Tom Weiland
CONSULTANT
ISSUED FOR
CONSTRUCTION
D Wing Roof Repair 565-21-102 Roofing:
WM BUILDING ENVELOPE CONSUTANTS, LLC
226 N. LIVE OAK DRIVE
MONCKS CORNER, S.C. 29461
(843) 499-2756 Roofing Consultant POC: Max Morrill
Issued for
A S S O C I A ST E , CI N .
0 - Issued for Construction 07-12-2022
AR 2
AR 2
NEW ROOF PLAN (AREA A)
1/8" = 1'
NEW ROOF PLAN (AREA A)
ROOF GENERAL NOTES:
1. ROOF SYSTEM SHALL REMAIN WATERTIGHT AT ALL TIMES.
2. THIS ROOF AREA IS INTENDED TO BE THE FIRST "MOCK-UP" ROOF FOR ALL
PARTIES INVOLVED TO REVIEW PROCEDURES FOR REMOVAL AND
INSTALLATION OF THE APPROVED ROOF SYSTEM AT THIS LESS CRITICAL
AREA, PRIOR TO PROCEEDING TO ROOF AREAS OVER OPERATIONAL AREAS.
D-1.1
D-1.1
D-1.1
D-1.1
OF
PP
PP
PP
PP PP PP
PP
RV RV
RD
RD
V
V
V
V
V
V
V
V
V
V
VTR
VTR VTR
VTR
VTR VTR
VTR
E
E
B
LG
VTR
HVAC
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
STAMP
321 4 5 6 7 8 9 10
VAMC - Fayetteville, NC
Project Director
07-12-22 JB MM
ARCHITECTPROGRAM MANAGER
ODELL INTERNATIONAL
129 FAST LANE, SUITE 200
MOORESVILLE, NC 28117
(704) 401-2074 Program Manager POC: Richard Cantwell Jr.
Revisions: Date:
A/E:
GMK ASSOCIATES, INC.
1201 MAIN STREET, SUITE 2100
COLUMBIA, S.C. 29201
(803) 256-0000 A/E firm POC: Tom Weiland
CONSULTANT
ISSUED FOR
CONSTRUCTION
D Wing Roof Repair 565-21-102 Roofing:
WM BUILDING ENVELOPE CONSUTANTS, LLC
226 N. LIVE OAK DRIVE
MONCKS CORNER, S.C. 29461
(843) 499-2756 Roofing Consultant POC: Max Morrill
Issued for
A S S O C I A ST E , CI N .
0 - Issued for Construction 07-12-2022
AR 3
AR 3
NEW ROOF PLAN (AREA B)
1/8" = 1'
NEW ROOF PLAN (AREA B)
ROOF GENERAL NOTES:
1. ROOF SYSTEM SHALL REMAIN WATERTIGHT AT ALL TIMES.
2. ALL MECHANICAL EQUIPMENT SHALL REMAIN OPERATIONAL AT ALL TIMES. IF
SHUT DOWNS ARE REQUIRED TO FACILITATE ROOF REPLACEMENT, THIS
SHALL BE COORDINATED WITH THE COR.
3. ROOF SLOPE OF NEW TAPERED LIGHT WEIGHT INSULATING CONCRETE (LWIC)
SHALL BE MINIMUM 1/4 INCH PER 12 INCHES.
4. ALL RELIEF VENTS SHALL BE REPLACED WITH 6 INCH DIAMETER RELIEF
VENTS.
5. GUARD RAILS SHALL BE PROVIDED AT PERIMETER OF ROOF.
D-1.1
D-1.1
D-1.1
D-1.1
D-1.1
D-1.1
D-1.1
D-1.2
D-1.2
D-1.2
D-1.2
D-1.128
D-1.3
D-1.3
D-1.3
D-1.3
D-1.3
N.I.C.
RV
RV RV
RD
RD
RD
LGPP
LG
VTR
VTR
VTR
OF
V
V
V
V
VTR
C
V
RD
OF
OF
EJ
EJ
VTR
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
STAMP
321 4 5 6 7 8 9 10
VAMC - Fayetteville, NC
Project Director
07-12-22 JB MM
ARCHITECTPROGRAM MANAGER
ODELL INTERNATIONAL
129 FAST LANE, SUITE 200
MOORESVILLE, NC 28117
(704) 401-2074 Program Manager POC: Richard Cantwell Jr.
Revisions: Date:
A/E:
GMK ASSOCIATES, INC.
1201 MAIN STREET, SUITE 2100
COLUMBIA, S.C. 29201
(803) 256-0000 A/E firm POC: Tom Weiland
CONSULTANT
ISSUED FOR
CONSTRUCTION
D Wing Roof Repair 565-21-102 Roofing:
WM BUILDING ENVELOPE CONSUTANTS, LLC
226 N. LIVE OAK DRIVE
MONCKS CORNER, S.C. 29461
(843) 499-2756 Roofing Consultant POC: Max Morrill
Issued for
A S S O C I A ST E , CI N .
0 - Issued for Construction 07-12-2022
AR 4
AR 4
NEW ROOF PLAN (AREA C)
1/8" = 1'
NEW ROOF PLAN (AREA C)
ROOF GENERAL NOTES:
1. ROOF SYSTEM SHALL REMAIN WATERTIGHT AT ALL TIMES.
2. ALL MECHANICAL EQUIPMENT SHALL REMAIN OPERATIONAL AT ALL TIMES. IF
SHUT DOWNS ARE REQUIRED TO FACILITATE ROOF REPLACEMENT, THIS
SHALL BE COORDINATED WITH THE COR.
3. ALL RELIEF VENTS SHALL BE REPLACED WITH 6 INCH DIAMETER RELIEF
VENTS.
D-1.3
D-1.1
D-1.1
D-1.2
D-1.1
D-1.3
D-1.3
D-1.1
D-1.2
D-1.2
D-1.2
D-1.1
D-1.1
D-1.2
D-1.1
D-1.3
VTR
PP
PP
PP
PP
E
VTR
V
OF
HVAC
D
RD
LG
LG
EJ
EJ
EJ
EJ
OF
PP PP
RVRV
RV
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
STAMP
321 4 5 6 7 8 9 10
VAMC - Fayetteville, NC
Project Director
07-12-22 JB MM
ARCHITECTPROGRAM MANAGER
ODELL INTERNATIONAL
129 FAST LANE, SUITE 200
MOORESVILLE, NC 28117
(704) 401-2074 Program Manager POC: Richard Cantwell Jr.
Revisions: Date:
A/E:
GMK ASSOCIATES, INC.
1201 MAIN STREET, SUITE 2100
COLUMBIA, S.C. 29201
(803) 256-0000 A/E firm POC: Tom Weiland
CONSULTANT
ISSUED FOR
CONSTRUCTION
D Wing Roof Repair 565-21-102 Roofing:
WM BUILDING ENVELOPE CONSUTANTS, LLC
226 N. LIVE OAK DRIVE
MONCKS CORNER, S.C. 29461
(843) 499-2756 Roofing Consultant POC: Max Morrill
Issued for
A S S O C I A ST E , CI N .
0 - Issued for Construction 07-12-2022
AR 5
AR 5
NEW ROOF PLAN (AREA D)
1/8" = 1'
NEW ROOF PLAN (AREA D)
ROOF GENERAL NOTES:
1. ROOF SYSTEM SHALL REMAIN WATERTIGHT AT ALL TIMES.
2. ALL MECHANICAL EQUIPMENT SHALL REMAIN OPERATIONAL AT ALL TIMES. IF
SHUT DOWNS ARE REQUIRED TO FACILITATE ROOF REPLACEMENT, THIS
SHALL BE COORDINATED WITH THE COR.
3. 6 INCH DIAMETER RELIEF VENTS SHALL BE PROVIDED AT A RATE OF 1 VENT
PER 1000 SQUARE FEET.
4. PARAPET BRIDGES SHALL BE REPLACED WITH NEW MIRO BRIDGE CROSSOVER
STAIRS.
D-1.3
D-1.3
D-1.2
D-1.2
D-1.2
D-1.1
D-1.1
D-1.2
D-1.1
D-1.1
LGLG
RD RD
RD
RD
RD
RD
V
V
V
RV
E
OFOF
EJ
EJ
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
STAMP
321 4 5 6 7 8 9 10
VAMC - Fayetteville, NC
Project Director
07-12-22 JB MM
ARCHITECTPROGRAM MANAGER
ODELL INTERNATIONAL
129 FAST LANE, SUITE 200
MOORESVILLE, NC 28117
(704) 401-2074 Program Manager POC: Richard Cantwell Jr.
Revisions: Date:
A/E:
GMK ASSOCIATES, INC.
1201 MAIN STREET, SUITE 2100
COLUMBIA, S.C. 29201
(803) 256-0000 A/E firm POC: Tom Weiland
CONSULTANT
ISSUED FOR
CONSTRUCTION
D Wing Roof Repair 565-21-102 Roofing:
WM BUILDING ENVELOPE CONSUTANTS, LLC
226 N. LIVE OAK DRIVE
MONCKS CORNER, S.C. 29461
(843) 499-2756 Roofing Consultant POC: Max Morrill
Issued for
A S S O C I A ST E , CI N .
0 - Issued for Construction 07-12-2022
AR 6
AR 6
NEW ROOF PLAN (AREA E)
1/8" = 1'
NEW ROOF PLAN (AREA E)
ROOF GENERAL NOTES:
1. ROOF SYSTEM SHALL REMAIN WATERTIGHT AT ALL TIMES.
2. ALL MECHANICAL EQUIPMENT SHALL REMAIN OPERATIONAL AT ALL TIMES. IF
SHUT DOWNS ARE REQUIRED TO FACILITATE ROOF REPLACEMENT, THIS
SHALL BE COORDINATED WITH THE COR.
3. ALL RELIEF VENTS SHALL BE REPLACED WITH 6 INCH DIAMETER RELIEF
VENTS. RELIEF VENTS SHALL BE PROVIDED AT A RATE OF 1 PER 1000 SQUARE
FEET.
D-1.1
D-1.1
D-1.1
D-1.1
D-1.1
D-1.3
D-1.3
D-1.2
D-1.3
RDRD
VTR
E
OFOFOFOF
LGLGLG
VTR VTR VTR
VTR VTR
VTR
VTR
V
V V
RD RD RD RD RD
VTR
RD
F
OF OF OF OF
OF
OF
OF
VTR
OF
RV RV RV RV
RV RV RV
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
STAMP
321 4 5 6 7 8 9 10
VAMC - Fayetteville, NC
Project Director
07-12-22 JB MM
ARCHITECTPROGRAM MANAGER
ODELL INTERNATIONAL
129 FAST LANE, SUITE 200
MOORESVILLE, NC 28117
(704) 401-2074 Program Manager POC: Richard Cantwell Jr.
Revisions: Date:
A/E:
GMK ASSOCIATES, INC.
1201 MAIN STREET, SUITE 2100
COLUMBIA, S.C. 29201
(803) 256-0000 A/E firm POC: Tom Weiland
CONSULTANT
ISSUED FOR
CONSTRUCTION
D Wing Roof Repair 565-21-102 Roofing:
WM BUILDING ENVELOPE CONSUTANTS, LLC
226 N. LIVE OAK DRIVE
MONCKS CORNER, S.C. 29461
(843) 499-2756 Roofing Consultant POC: Max Morrill
Issued for
A S S O C I A ST E , CI N .
0 - Issued for Construction 07-12-2022
AR 7
AR 7
NEW ROOF PLAN (AREA F)
1/8" = 1'
NEW ROOF PLAN (AREA F)
ROOF GENERAL NOTES:
1. ROOF SYSTEM SHALL REMAIN WATERTIGHT AT ALL TIMES.
2. ALL MECHANICAL EQUIPMENT SHALL REMAIN OPERATIONAL AT ALL TIMES. IF
SHUT DOWNS ARE REQUIRED TO FACILITATE ROOF REPLACEMENT, THIS
SHALL BE COORDINATED WITH THE COR.
3. 6 INCH DIAMETER RELIEF VENTS SHALL BE PROVIDED AT A RATE OF 1 VENT
PER 1000 SQUARE FEET.
4. ELECTRICAL CONDUIT AND SPRAY APPLIED FIREPROOFING IS PRESENT ON
THE UNDERSIDE OF THE METAL ROOF DECK. CONTRACTOR SHALL PERFORM
AN UNDER DECK INSPECTION TO VERIFY LOCATIONS OF ELECTRICAL CONDUIT
AND ENSURE CONDUIT IS NOT PENETRATED DURING INSTALLATION OF
GYPSUM SUBSTRATE BOARD.
5. CONTRACTOR SHALL INSPECT, REMOVE AND PROPERLY DISPOSE OF ALL
DEBRIS FROM ABOVE THE DROP CEILING AFTER ROOF REPLACEMENT. ANY
FIREPROOFING THAT WAS DAMAGED OR DISBONDED DURING ROOF
REPLACEMENT SHALL BE REPLACED IN ACCORDANCE WITH UNIT PRICE
QUANTITIES. INTERIOR ACCESS SHALL BE COORDINATED WITH THE COR.
D-1.1
D-1.1
D-1.1
D-1.1
D-1.2
VTR
PP
PP
PP
PP
E
VTR
V
OF
RDRD
RD
RD
RD
RVRVRV
RV
RV
VTR
VTR
VTR
VTR
VTR
VTR
VTR
V
V
E
E
OFOFOFOF
OF
OF
OF
OF
LGLGLG
PPPP
PPPP
PP PP
LG
E HVAC
D
G
RD
VTR
RD
LG
EJ
EJ
EJ
EJEJ
HVAC
OF
RV
RV
PP PP
VTR
RVRV
RV
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
STAMP
321 4 5 6 7 8 9 10
VAMC - Fayetteville, NC
Project Director
07-12-22 JB MM
ARCHITECTPROGRAM MANAGER
ODELL INTERNATIONAL
129 FAST LANE, SUITE 200
MOORESVILLE, NC 28117
(704) 401-2074 Program Manager POC: Richard Cantwell Jr.
Revisions: Date:
A/E:
GMK ASSOCIATES, INC.
1201 MAIN STREET, SUITE 2100
COLUMBIA, S.C. 29201
(803) 256-0000 A/E firm POC: Tom Weiland
CONSULTANT
ISSUED FOR
CONSTRUCTION
D Wing Roof Repair 565-21-102 Roofing:
WM BUILDING ENVELOPE CONSUTANTS, LLC
226 N. LIVE OAK DRIVE
MONCKS CORNER, S.C. 29461
(843) 499-2756 Roofing Consultant POC: Max Morrill
Issued for
A S S O C I A ST E , CI N .
0 - Issued for Construction 07-12-2022
AR 8
AR 8
NEW ROOF PLAN (AREA G)
1/8" = 1'
NEW ROOF PLAN (AREA G)
ROOF GENERAL NOTES:
1. ROOF SYSTEM SHALL REMAIN WATERTIGHT AT ALL TIMES.
2. ALL MECHANICAL EQUIPMENT SHALL REMAIN OPERATIONAL AT ALL TIMES. IF
SHUT DOWNS ARE REQUIRED TO FACILITATE ROOF REPLACEMENT, THIS
SHALL BE COORDINATED WITH THE COR.
3. ALL RELIEF VENTS SHALL BE REPLACED WITH 6 INCH DIAMETER RELIEF
VENTS. ENSURE RELIEF VENTS ARE PROVIDED AT A RATE OF 1 VENT PER 1000
SQUARE FEET.
4. PARAPET BRIDGES SHALL BE REPLACED WITH NEW MIRO BRIDGE CROSSOVER
STAIRS.
D-1.1
D-1.1
D-1.1 5
D-1.1
D-1.1
D-1.1
D-1.1
D-1.1
D-1.2
D-1.2
D-1.2
D-1.1
D-1.1 15
D-1.2
D-1.3
D-1.1
D-1.2
D-1.2
PP
PP
PP
PP
E
RD
RV
VTR
VTR
OF
PPPP
PPPP
PP PP
LG
PP
PP
PP PP PP
PP
RD
VTR
E
RDRD
V
RV
N.I.C.
RV
RV RV
RD
RD
RD
LGPP
LG
VTR
VTR
VTR
OF
V
V
V
V
VTR
C
V
RD
LG
OF
OF
OF
OFOFOF
OF
RD
RD
RD
RD
RD
RD
RD
RD
RD
RD
RD
RD
RD
RD
RD
RD RD
RD
RDRD
RD RD
RD
RD
RD
RD
RV
RVRV
RV
RV
RV
RV
RV
RV
RV
RV
RV
RV
RV RV
RV
RV
PP
PP/LG
LGLG
PP
PP
PP
PP
PP
PP
PP
PP
PP
PP
PP
PP
PP
PP
PP
PP
PP
PP
PP
PP
PP
PP LG
LG
HVAC
RV
V E
V
V
V
V
V
VTR
VTR
VTR
VTR
VTR
VTR
VTR
VTR
VTR
VTR
VTR
VTR
VTR
VTR
VTR
VTR
VTR
VTR
OF
OF
V
H
H2
RD
V
EJ
EJEJ
EJ
EJ
EJ
VTR
H3
EJ
HVAC
LG
RV
H
RV
E
PP PP
PP
VTR
RV
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
STAMP
321 4 5 6 7 8 9 10
VAMC - Fayetteville, NC
Project Director
07-12-22 JB MM
ARCHITECTPROGRAM MANAGER
ODELL INTERNATIONAL
129 FAST LANE, SUITE 200
MOORESVILLE, NC 28117
(704) 401-2074 Program Manager POC: Richard Cantwell Jr.
Revisions: Date:
A/E:
GMK ASSOCIATES, INC.
1201 MAIN STREET, SUITE 2100
COLUMBIA, S.C. 29201
(803) 256-0000 A/E firm POC: Tom Weiland
CONSULTANT
ISSUED FOR
CONSTRUCTION
D Wing Roof Repair 565-21-102 Roofing:
WM BUILDING ENVELOPE CONSUTANTS, LLC
226 N. LIVE OAK DRIVE
MONCKS CORNER, S.C. 29461
(843) 499-2756 Roofing Consultant POC: Max Morrill
Issued for
A S S O C I A ST E , CI N .
0 - Issued for Construction 07-12-2022
AR 9
AR 9
NEW ROOF PLAN (AREA H, H2 AND H3)
1/8" = 1'
NEW ROOF PLAN
(AREA H, H2 AND H3)
ROOF GENERAL NOTES:
1. ROOF SYSTEM SHALL REMAIN WATERTIGHT AT ALL TIMES.
2. ALL MECHANICAL EQUIPMENT SHALL REMAIN OPERATIONAL AT ALL TIMES. IF
SHUT DOWNS ARE REQUIRED TO FACILITATE ROOF REPLACEMENT, THIS
SHALL BE COORDINATED WITH THE COR.
3. ALL RELIEF VENTS SHALL BE REPLACED WITH 6 INCH DIAMETER RELIEF
VENTS. ENSURE RELIEF VENTS ARE PROVIDED AT A RATE OF 1 VENT PER 1000
SQUARE FEET.
4. PROVIDE TAPERED LIGHT WEIGHT INSULATING CONCRETE (LWIC) WHERE
INDICATED ON THE DRAWINGS.
4. PARAPET BRIDGES SHALL BE REPLACED WITH NEW MIRO BRIDGE CROSSOVER
STAIRS. INSTALLATION SHALL BE IN ACCORDANCE WITH MANUFACTURER'S
REQUIREMENTS
D-1.1
D-1.1
D-1.2
D-1.1
D-1.2
D-1.2
D-1.1
D-1.2
D-1.1
D-1.1
D-1.2
D-1.2
D-1.2
D-1.229
D-1.3
D-1.3
D-1.3
D-1.3
D-1.1
D-1.1
D-1.1
D-1.1
D-1.1
D-1.2
D-1.2
D-1.1
D-1.1
D-1.1
D-1.3
D-1.1
D-1.3 23
D-1.2
D-1.2
D-1.2
D-1.1
CAST IRON DRAIN STRAINER
CAP SHEET
MODIFIED BITUMEN BASE SHEET STRIP-IN PLY
MODIFIED BITUMEN BASE SHEET FIELD PLY
EXISTING CONCRETE ROOF DECK
LWIC ROOF DRAIN SUMP
CAST IRON CLAMPING RING
ROOF DECK CLAMP
CAST IRON DRAIN BOWL
MEMBRANE, LEAD, AND STRIP-IN
PLY UNDER THE CLAMPING RING
30" SQUARE, 4 LB LEAD FLASHING SET IN
ROOF CEMENT/MASTIC. PRIME BOTH SIDES
OF SURFACE PRIOR TO STRIPPING IN
EXISTING CONCRETE ROOF DECK
EXISTING TAPERED LIGHT WEIGHT INSULATING CONCRETE (LWIC) ROOF DECK
MECHANICALLY FASTENED BASE SHEET
MODIFIED BITUMEN BASE SHEET
MODIFIED BITUMEN CAP SHEET
LIGHT WEIGHT INSULATING CONCRETE (LWIC) ROOF DECK
MECHANICALLY FASTENED BASE SHEET
MODIFIED BITUMEN BASE SHEET
MODIFIED BITUMEN CAP SHEET
SLOPEEXISTING PRECAST
EXISTING WOOD BLOCKING
SELF ADHERING
UNDERLAYMENT EXTEND 1"
PAST BOTTOM OF NAILER
COPING W/ CONTINUOUS
CLEAT SECURED 6" O.C.
1" STANDING SEAM
GASKETED FASTENERS 12" O.C.
LAP VERTICAL LEG
OF COPING MIN. 3"
FASTEN TOP OF BASE
FLASHING 8" O.C.
MODIFIED BITUMEN CAP
SHEET BASE FLASHING
MODIFIED BITUMEN BASE
SHEET BASE FLASHING
EXISTING PLYWOOD SHEATHING
8" MIN.
SLOPE
2" MIN. CLEARANCE
EXISTING ROOF CURB
VAPOR RETARDER EXTENDING ONTO CURB
MODIFIED BITUMEN BASE SHEET
EXTENDING UP CURB ONTO
MECHANICALLY FASTENED BASE SHEET
EXISTING ROOF DECK
EXISTING LWIC
CANT STRIP
MODIFIED BITUMEN BASE SHEET FIELD PLY
MODIFIED BITUMEN BASE
SHEET BASE FLASHING
MODIFIED BITUMEN CAP
SHEET FIELD PLY
MODIFIED BITUMEN CAP
SHEET BASE FLASHING
FASTENERS 8" O.C.
SHEET METAL COUNTERFLASHING
STAINLESS STEEL GASKETED
FASTENERS 12" O.C.
EXISTING ROOF TOP EQUIPMENT
COUNTERFLASHING ATTACHED USING
STAINLESS STEEL GASKETED FASTENERS
12" O.C.
CANT STRIP
SHEET METAL HOOD MECHANICALLY
FASTENED TO CURB
SEAL PENETRATIONS EXTENDING
THROUGH VERTICAL FACE OF HOOD
MODIFIED BITUMEN CAP
SHEET BASE FLASHING
MODIFIED BITUMEN CAP
SHEET FIELD MEMBRANE
MODIFIED BITUMEN BASE
SHEET BASE FLASHING
MODIFIED BITUMEN BASE
SHEET FIELD MEMBRANE
LWIC INSULATION SYSTEM
EXISTING ROOF DECK
EXISTING ROOF DECK
EXISTING LWIC
MODIFIED BITUMEN BASE
SHEET FIELD MEMBRANE
LWIC CANT
MODIFIED BITUMEN CAP
SHEET FIELD MEMBRANE
SEALANT
STAINLESS STEEL DRAWBAND
SHEET METAL UMBRELLA
POURABLE FILLER SLOPED TO DRAIN
WATER OVER SIDE OF PITCH PAN
STAINLESS STEEL FULLY SOLDERED PITCH PAN
PITCH PAN STRIPPED IN W/ ROOF MEMBRANE
TARGET (SEALANT PROVIDED AT
TERMINATION OF MEMBRANE TO PITCH PAN)
NON-SHRINK GROUT
EXTEND VAPOR RETARDER ONTO
HORIZONTAL FACE OF NAILER
MODIFIED BITUMEN CAP
SHEET STRIP-IN PLY
MODIFIED BITUMEN BASE
SHEET STRIP-IN PLY
MODIFIED BITUMEN BASE SHEET FIELD PLY
EXISTING LWIC INSULATION SYSTEM
EXISTING ROOF DECK
ALUMINUM ROOF RELIEF VENT (1
VENT PER 1000 SQUARE FEET)
MODIFIED BITUMEN CAP SHEET FIELD PLY
HOLES CORED TO BASE
SHEET/VAPOR RETARDER
MODIFIED BITUMEN BASE
SHEET STRIP-IN PLY
MODIFIED BITUMEN
BASE SHEET FIELD PLY
EXISTING LWIC INSULATION SYSTEM
EXISTING ROOF DECK
SHEET METAL
COUNTERFLASHING
SHEET METAL COVERPLATE
STAINLESS STEEL
SCUPPER LINER
SHEET METAL COVERPLATE
PRIME WALL PRIOR TO BASE FLASHING INSTALLATION
MODIFIED BITUMEN STRIP-IN PLY
LIQUID APPLIED FLASHING W/ REINFORCING FABRIC
PRIME ALL SIDES OF SCUPPER
FLANGES PRIOR TO STRIP-IN
PLY INSTALLATION
MODIFIED BITUMEN CAP SHEET BASE FLASHING
MODIFIED BITUMEN BASE SHEET STRIP-IN PLY
MODIFIED BITUMEN CAP SHEET FIELD PLY
PROVIDE MASTIC ON ALL FOUR
SIDES OF OPENING PRIOR TO
SCUPPER LINER INSTALLATION
MODIFIED BITUMEN BASE SHEET FIELD PLY
EXISTING BRICK VENNER
STACK/PIPE PENETRATION
SEALANT
STAINLESS STEEL UMBRELLA
LIQUID APPLIED FLASHING W/ REINFORCING FABRIC
MODIFIED BITUMEN CAP SHEET TARGET
MODIFIED BITUMEN BASE
SHEET FIELD MEMBRANE
EXISTING LWIC INSULATION SYSTEM
EXISTING ROOF DECK
EXISTING ROOF HATCH TO REMAIN
STAINLESS STEEL GASKETED FASTENERS 12" O.C.
SHEET METAL COUNTERFLASHING
MODIFIED BITUMEN CAP SHEET BASE FLASHING
FASTENERS 8" O.C.
MODIFIED BITUMEN BASE SHEET BASE FLASHING
MODIFIED BITUMEN CAP SHEET FIELD MEMBRANE
MODIFIED BITUMEN BASE SHEET FIELD MEMBRANE
EXISTING LWIC INSULATION SYSTEM
EXISTING ROOF DECK
MODIFIED BITUMEN BASE SHEET
VAPOR RETARDER EXTENDING UP CURB
EXISTING EXPANDED POLYSTYRENE INSULATION
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
STAMP
321 4 5 6 7 8 9 10
VAMC - Fayetteville, NC
Project Director
07-12-22 JB MM
ARCHITECTPROGRAM MANAGER
ODELL INTERNATIONAL
129 FAST LANE, SUITE 200
MOORESVILLE, NC 28117
(704) 401-2074 Program Manager POC: Richard Cantwell Jr.
Revisions: Date:
A/E:
GMK ASSOCIATES, INC.
1201 MAIN STREET, SUITE 2100
COLUMBIA, S.C. 29201
(803) 256-0000 A/E firm POC: Tom Weiland
CONSULTANT
ISSUED FOR
CONSTRUCTION
D Wing Roof Repair 565-21-102 Roofing:
WM BUILDING ENVELOPE CONSUTANTS, LLC
226 N. LIVE OAK DRIVE
MONCKS CORNER, S.C. 29461
(843) 499-2756 Roofing Consultant POC: Max Morrill
Issued for
A S S O C I A ST E , CI N .
0 - Issued for Construction 07-12-2022
DETAILS
D-1.1
ROOF ASSEMBLY
N.T.S.
D-1.1
D-1.1
ROOF ASSEMBLY
N.T.S.
D-1.1
ROOF DRAIN
N.T.S.
D-1.1
OVERFLOW SCUPPER
N.T.S.
D-1.1
MECHANICAL CURB
N.T.S.
D-1.1
HOOD
N.T.S.
D-1.1
PIPE/POST PENETRATION
N.T.S.
D-1.1
PARAPET WALL
N.T.S.
D-1.1
PITCH PAN
N.T.S.
D-1.1
RELIEF VENT
N.T.S.
D-1.1
ROOF HATCH
N.T.S.
SHEET METAL FASCIA LOCKED ONTO CLEAT
ATTACHED 6" O.C. STAGGERED
NAILERS MATCHING INSULATION
THICKNESS MODIFIED BITUMEN BASE SHEET EXTENDING OVER
ROOF EDGE PRIOR TO INSTALLATION OF CLEAT AND
FASCIA
SEALANT/MASTIC AT ROOF
MEMBRANE TERMINATION
NAILERS FILLING GAP
MODIFIED BITUMEN CAP SHEET FIELD PLY
MODIFIED BITUMEN BASE SHEET FIELD PLIES
MODIFIED BITUMEN BASE SHEET STRIP IN PLY
EDGE METAL PRIMED AND SET IN A BED OF
ROOF CEMENT/MASTIC
GRAVEL STOP LOCKED ONTO CLEAT
ATTACHED 3" O.C.
CLEAT ATTACHED 6" O.C. STAGGERED
EXISTING ROOF DECK
INSULATION SYSTEM
COUNTERFLASHING
RECEIVER ATTACHED 12" O.C.
EXISTING SUBSTRATE
WOOD CANT
EXISTING ROOF DECK
INSULATION SYSTEM
MODIFIED BITUMEN BASE SHEET FIELD PLY
MODIFIED BITUMEN CAP SHEET FIELD PLY
MODIFIED BITUMEN BASE SHEET BASE FLASHING
MODIFIED BITUMEN CAP SHEET BASE FLASHING
EXPANSION JOINT (SEE NOTES ON
EXPANSION JOINT CURB DETAIL)
MINIMUM 4" LAP WITH TWO STRIPS OF BUTYL
TAPE ON HORIZONTAL AND VERTICAL FACES
COUNTERFLASHING ATTACHED 12"
O.C. TO RECEIVER WITH WIND
CLIPS 24" O.C.
VENT THROUGH ROOF PENETRATION
MODIFIED BITUMEN CAP SHEET FIELD PLY
LIQUID APPLIED FLASHING WITH REINFORCING FABRIC
ROOF MEMBRANE PLIES
ROOF INSULATION SYSTEM
EXISTING ROOF DECK
COMPATIBLE MASTIC
6" MIN.
8" MIN.
ROOF MOUNTED
COPING
MOUNTED
INSULATION SYSTEM
EXISTING ROOF DECK
WALK PAD SET IN MASTIC TO CAP SHEET FIELD MEMBRANELIGHTENING PROTECTION AIR TERMINAL
SET IN APPROPRIATE SEALANT
COPING SYSTEM
LIGHTENING ARRESTOR AIR TERMINAL
ATTACHED TO COPING AND SET IN SEALANT
STAINLESS STEEL DRAWBAND
POURABLE FILLER SLOPED TO DRAIN WATER OVER SIDE OF
PITCH PAN
STAINLESS STEEL FULLY SOLDERED PITCH PAN
PITCH PAN STRIPPED IN WITH ROOF MEMBRANE TARGET
(SEALANT PROVIDED AT TERMINATION OF MEMBRANE TO
PITCH PAN)
MODIFIED BITUMEN CAP SHEET STRIP IN PLY
MODIFIED BITUMEN BASE SHEET STRIP IN PLY
MODIFIED BITUMEN BASE SHEET FIELD PLY
INSULATION SYSTEM
EXISTING ROOF DECK
MODIFIED BITUMEN CAP SHEET FIELD PLY
SEALANT
NON SHRINK GROUT
SHEET METAL RAIN COLLAR2" MINIMUM
CLEARANCE
WOOD NAILERS MATCHING
THE HEIGHT OF
INSULATION SYSTEM
SEALANT
SEALANT
STAINLESS STEEL DRAW BAND SECURING THE
UMBRELLA TO STACK
FLASHING INSTALLED IN A WATER
SHEDDING FASHION
STAINLESS STEEL
GASKETED FASTENERS
SHEET METAL COUNTERFLASHING
FASTENERS 8" O.C.
MODIFIED BITUMEN CAP SHEET
BASE FLASHING
MODIFIED BITUMEN BASE SHEET
BASE FLASHING
MODIFIED BITUMEN BASE SHEET FIELD PLY
WOOD NAILERS ATTACHED TO THE
ROOF DECK
INSULATION SYSTEM
EXISTING ROOF DECKWOOD CANT STRIP
MODIFIED BITUMEN CAP SHEET
FIELD PLY
SLOPE
18" - 24"
18" - 24"
EXISTING SUPPORT
APPROPRIATE FASTENERS AS INDICATED
CONTINUOUS SEALANT
SHEET METAL COUNTERFLASHING
INSERTED IN SAW CUT REGLET WITH
LEAD WEDGES HOLDING IN PLACE
COPING FLANGE TURNED UP 2
INCHES; SET IN SEALANT TO WALL
COPING SYSTEM
SET SHEET METAL COVER
PLATE IN TWO STRIPS OF BUTYL
SEALANT/TAPE ON ALL SIDES
EDGE METAL PRIMED AND SET IN A BED OF ROOF
CEMENT/MASTIC
EDGE METAL ATTACHED 3" O.C. STAGGERED TO
PERIMETER NAILERS
MODIFIED BITUMEN BASE SHEET STRIP IN PLY
MODIFIED BITUMEN CAP SHEET FIELD PLY
MODIFIED BITUMEN BASE SHEET FIELD PLY
STANDING SEAMS
STANDING SEAMS
EQUIPMENT SUPPORT CURB
MODIFIED BITUMEN BASE SHEET FIELD PLY
MODIFIED BITUMEN BASE SHEET
BASE FLASHING ATTACHED 8" O.C.
COUNTERFLASHING COUNTERFLASHING
AND COUNTERFLASHING RECEIVER
ATTACHED 12" O.C. WITH STAINLESS
STEEL GASKETED FASTENERS
MODIFIED BITUMEN CAP
SHEET BASE FLASHING
MODIFIED BITUMEN
CAP SHEET FIELD PLY
MODIFIED BITUMEN BASE
SHEET BASE FLASHING
INSULATION SYSTEM
EXISTING ROOF DECK
EXISTING DUCT PENETRATION CONTINUOUS SEALANT AT SHEET METAL UMBRELLA KICKOUT
STAINLESS STEEL DRAWBAND
STAINLESS STEEL UMBRELLA
EXISTING SHEET CURB METAL CAP
STAINLESS STEEL GASKETED FASTENERS 12" O.C.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
STAMP
321 4 5 6 7 8 9 10
VAMC - Fayetteville, NC
Project Director
07-12-22 JB MM
ARCHITECTPROGRAM MANAGER
ODELL INTERNATIONAL
129 FAST LANE, SUITE 200
MOORESVILLE, NC 28117
(704) 401-2074 Program Manager POC: Richard Cantwell Jr.
Revisions: Date:
A/E:
GMK ASSOCIATES, INC.
1201 MAIN STREET, SUITE 2100
COLUMBIA, S.C. 29201
(803) 256-0000 A/E firm POC: Tom Weiland
CONSULTANT
ISSUED FOR
CONSTRUCTION
D Wing Roof Repair 565-21-102 Roofing:
WM BUILDING ENVELOPE CONSUTANTS, LLC
226 N. LIVE OAK DRIVE
MONCKS CORNER, S.C. 29461
(843) 499-2756 Roofing Consultant POC: Max Morrill
Issued for
A S S O C I A ST E , CI N .
0 - Issued for Construction 07-12-2022
DETAILS
D-1.2
COPING TEE INTERSECTION
N.T.S.
D-1.2
D-1.2
COPING CORNER
N.T.S.
D-1.2
LIGHTENING ARRESTOR SYSTEM
N.T.S.
D-1.2
ROOF TO PARAPET WALL EXPANSION JOINT
N.T.S.
D-1.2
MULTI-PIPE PITCH PAN
N.T.S.
D-1.2
GRAVEL STOP
N.T.S.
D-1.2
HOT STACK
N.T.S.
D-1.2
VENT THROUGH ROOF
N.T.S.
D-1.2
EDGE METAL
N.T.S.
D-1.2
COPING TO WALL
N.T.S.
D-1.2
EQUIPMENT SUPPORT CURB
N.T.S.
D-1.2
DUCT PENETRATIONS CURB CAP
COUNTERFLASHING
RECEIVER ATTACHED 12" O.C.
EXISTING SUBSTRATE
WOOD CANT
EXISTING ROOF DECK
EXISTING LIGHT WEIGHT INSULATION SYSTEM
MODIFIED BITUMEN BASE SHEET FIELD PLY
MODIFIED BITUMEN CAP SHEET FIELD PLY
MODIFIED BITUMEN BASE SHEET BASE FLASHING
MODIFIED BITUMEN CAP SHEET BASE FLASHING
EXPANSION JOINT (SEE NOTES ON
EXPANSION JOINT CURB DETAIL)
MINIMUM 4" LAP WITH TWO STRIPS OF BUTYL
TAPE ON HORIZONTAL AND VERTICAL FACES
COUNTERFLASHING ATTACHED 12"
O.C. TO RECEIVER WITH WIND
CLIPS 24" O.C.
MODIFIED BITUMEN BASE SHEET IN COLD
ADHESIVE TO CONCRETE DECK
1/4 INCH G90 GALVANIZED STEEL
PLATE; 6 INCHES WIDER THAN
OPENING; SET IN CONTINUOUS
SEALANT; ATTACHED 6 INCHES ON
CENTER
OPENING IN CONCRETE DECK
EXISTING LWIC
NAILED BASE SHEET
MODIFIED BITUMEN BASE SHEET
MODIFIED BITUMEN CAP SHEET
STRIP-IN PLY
GUARD RAIL BRACKET SECURED
PER MANUFACTURER
GRAVEL STOP ATTACHED 3"
O.C. STAGGERED
TOE BOARD
CONTINUOUS CLEAT ATTACHED
6" O.C. STAGGERED
FASCIA LOCKED ONTO CLEAT
EXISTING BRICK VENEER
HORIZONTAL RAILS
EXISTING CONCRETE ROOF DECK
SELF ADHERED
UNDERLAYMENT OVER
TOP OF BASE FLASHING
DOOR THRESHOLD
SHEET METAL COUNTERFLASHING UNDER DOOR THRESHOLD
COUNTERFLASHING RECEIVER EXTENDING
UNDER DOOR THRESHOLD FLASHING
COUNTERFLASHING COUNTERFLASHING ATTACHED
12" O.C. WITH STAINLESS STEEL GASKETED
FASTENERS
2" WIDE WIND CLIPS 24" O.C.
MODIFIED BITUMEN CAP SHEET BASE FLASHING
MODIFIED BITUMEN BASE SHEET BASE FLASHING
MODIFIED BITUMEN BASE SHEET FIELD PLY
MODIFIED BITUMEN CAP SHEET FIELD PLY
EXISTING SUBSTRATE
LWIC SYSTEM
EXISTING ROOF DECK
COUNTERFLASHING UNDER THRESHOLD
BACK AND END DAMS
4" TOEBOARD
12" TREAD W/ 9-1/2" RISE (TYP)
NON-PENETRATING SUPPORT PADS
HAND RAILS
HAND RAILS
NON-PENETRATING SUPPORT PADS
EXISTING SUBSTRATE
WOOD CANT
EXISTING ROOF DECK
EXISTING LIGHT WEIGHT INSULATION SYSTEM
MODIFIED BITUMEN BASE SHEET FIELD PLY
MODIFIED BITUMEN CAP SHEET FIELD PLY
MODIFIED BITUMEN BASE SHEET BASE FLASHING
MODIFIED BITUMEN CAP SHEET BASE FLASHING
EXPANSION JOINT (SEE NOTES ON
EXPANSION JOINT CURB DETAIL)
MINIMUM 4" LAP WITH TWO STRIPS OF BUTYL
TAPE ON HORIZONTAL AND VERTICAL FACES
EXISTING WINDOW SYSTEM
GASKETED FASTENERS 12" O.C.
CONTINUOU…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .