Drawings - 561-19-105 Bldg. 18 Upgrade RRTP - 19-055.pdf
PDF 20 MB Posted
- Solicitation number
- 36C24221B0012
About this file
This notice describes a federal contract opportunity for building upgrades. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 2 will be soliciting bids for Solicitation Number 36C24221B0012 to upgrade Building 18 at the VA New Jersey Healthcare Systems East Orange campus. The project involves mechanical, electrical, plumbing, and structural work as depicted in the drawings and specifications, including improving the building entrance and nurse station, upgrading HVAC, drainage, lighting and electrical systems, improving finishes, upgrading an outdoor courtyard, and addressing other deficiencies. The estimated cost range for the project is $2,000,000 to $5,000,000. The solicitation will be released on or around December 22, 2020, with response submittals due as specified in the solicitation. This is a 100% Service-Disabled Veteran Owned Small Business set-aside requiring registration on sam.gov and vip.vetbiz.gov. The project completion deadline is 270 calendar days.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Government Responses to RFIs for 561-19-105 Upgrade Building 18.pdf | ||
| ii. I-001_Addendum-1_20210305.pdf | ||
| iii. I-101_Addendum-1_20210305.pdf | ||
| i. 20210302_Addendum-01_19-055.docx | DOCX document | |
| 36C24221B0012 0003.docx | DOCX document | |
| iv. MH101_Addendum-1_20210308.pdf | ||
| Amendment 36C24221B0012 0001 Cover Page.pdf | ||
| 36C24221B0012 0002.docx | DOCX document | |
| Upgrade Building 18 Site Visit Sign Sheet 02-24-21.pdf | ||
| Specifications - 561-19-105 Bldg. 18 Upgrade RRTP - 19-055.pdf | ||
| 36C24221B0012_1.docx | DOCX document |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BLDG. 1
Engineers Architects
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
PROJECT SITE MAP PROJECT LOCATION MAP
RED Engineering & Design, Inc.
126 Salem Towne Ct.
Apex, NC 27502 919-833-3486
STRUCTURAL ENGINEERING:
/6
/2
:5
:4
A
M
G-001
COVER
1 4
MITCHELLE R. LABADY
CK/GS/RJ
Upgrade Building 18 Inpatient & Outpatient RRTP
VA NEW JERSEY HEALTHCARE SYSTEM
385 TREMONT AVENUE
EAST ORANGE, NJ 07018 OCTOBER 1, 2020
BID DOCUMENTS
561-19-10519-055
Upgrade Building 18 Inpatient &
Outpatient RRTP
VA NEW JERSEY HEALTHCARE SYSTEM
385 TREMONT AVENUE
EAST ORANGE, NJ 07018
VA PROJECT #: 561-19-105
CK
DRAWING LIST
GENERAL
G-001 COVER 1 4
G-100 GENERAL INFORMATION 2 4
G-201 ICRA NOTES AND DETAILS 3 4
GL101 FIRST FLOOR LIFE SAFETY 4 4
CIVIL
C-101 GENERAL NOTES, SYMBOLS, AND ABBREVIATIONS 1 6
C-102 WEST COURTYARD PLAN 2 6
C-103 ENTRY IMPROVEMENTS PLAN 3 6
C-104 SITE DETAILS 4 6
C-105 SITE DETAILS 5 6
C-106 PLANTING DETAILS 6 6
STRUCTURAL
S-101 PLANS & WALL SECTIONS 1 3
S-201 DETAILS 2 3
S-301 DETAILS 3 3
ARCHITECTURAL
A-001 ARCHITECTURAL SYMBOLS, ABBREVIATIONS, NOTES, AND PARTITION TYPES 1 14
AD101 FIRST FLOOR DEMOLITION PLAN 2 14
AD110 FIRST FLOOR REFLECTED CEILING DEMOLITION PLAN 3 14
A-101 FIRST FLOOR PLAN 4 14
A-102 ROOF PLAN 5 14
A-110 FIRST FLOOR REFLECTED CEILING PLAN 6 14
A-201 EXTERIOR ELEVATIONS 7 14
A-301 SECTIONS AND DETAILS 8 14
A-302 SECTIONS AND DETAILS 9 14
A-401 INTERIOR ELEVATIONS AND ENLARGED PLANS 10 14
A-402 INTERIOR ELEVATIONS AND ENLARGED PLANS 11 14
A-501 INTERIOR DETAILS 12 14
A-502 CASEWORK DETAILS 13 14
A-601 DOOR AND WINDOW SCHEDULE, ELEVATIONS AND DETAILS 14 14
INTERIORS
I-001 PRODUCT SCHEDULES, SYMBOLS AND ABBREVIATIONS 1 3
I-101 FIRST FLOOR FINISH PLAN 2 3
I-201 FIRST FLOOR SIGNAGE PLAN 3 3
FIRE PROTECTION
FX001 FIRE PROTECTION GENERAL INFORMATION 1 2
FX101 FIRST FLOOR FIRE PROTECTION PLAN 2 2
PLUMBING
P-001 PLUMBING GENERAL INFORMATION 1 5
PD101 FIRST FLOOR PLUMBING DEMOLITION PLAN 2 5
PP101 FIRST FLOOR WASTE AND DOMESTIC WATER PLAN 3 5
P-401 ENLARGED PLUMBING PLANS 4 5
P-501 PLUMBING DETAILS 5 5
MECHANICAL
M-001 MECHANICAL GENERAL INFORMATION 1 5
MD101 FIRST FLOOR MECHANICAL DEMOLITION PLAN 2 5
MH101 FIRST FLOOR HVAC PLAN 3 5
MP101 FIRST FLOOR MECHANICAL PIPING PLAN 4 5
M-501 MECHANICAL SCHEDULES AND DETAILS 5 5
ELECTRICAL
E-001 ELECTRICAL GENERAL NOTES, SYMBOL LEGENDS, AND ABBREVIATIONS 1 8
ED101 FIRST FLOOR ELECTRICAL DEMOLITION PLAN 2 8
EP101 FIRST FLOOR POWER PLAN 3 8
EL101 FIRST FLOOR LIGHTING PLAN 4 8
E-401 ELECTRICAL ENLARGEMENTS 5 8
E-402 ELECTRICAL ENLARGEMENTS 6 8
E-501 ELECTRICAL DETAILS 7 8
E-502 ELECTRICAL DETAILS 8 8
DocuSign Envelope ID: 7C5134E5-D4A9-428A-B4A6-7E8CF47B7EF2
1/26/2021
WALL SECTION
SYMBOL
INTERIOR ELEVATION
SYMBOL
COLUMN GRID
ELEVATION SYMBOL
REVISION NOTE
ENLARGED DETAIL CALLOUT
ROOM DESIGNATION
SYMBOL
BREAK LINE
ROOF SLOPE
DIRECTION SYMBOL
TYPICAL GRAPHIC SCALE
DETAIL #
PAGE #
DETAIL #
PAGE #
TRUE NORTH ARROW
PROJECT NORTH ARROW
A8.1
EXTERIOR ELEVATION
SYMBOL
DETAIL #
PAGE #
A8.1
A8.1
A8.1
BUILDING SECTION
SYMBOL
DETAIL #
PAGE #
A8.1
A8.1
DETAIL SECTION
SYMBOL
DETAIL #
PAGE #
A8.1
WALL GRID
(REPRESENTS
FACE OF EXISTING
WALL)
XX.X
XX.X
ELEVATION
0'-0"
ROOM
NAME
101A
NORTH
PLAN
NORTH
TRUE
0 4 8 16
THE FOLLOWING SYSTEMS ARE A DESIGN/BUILD RESPONSIBILITY OF THE CONTRACTOR
OR PRODUCT MANUFACTURER AND WILL REQUIRE THE DEFERRED SUBMITTAL OF
DESIGN WORK TO THE CITY OF EAST ORANGE FOR PLAN REVIEW AND PERMITTING:
1. FIRE SPRINKLER SYSTEMS
2. FIRE ALARM SYSTEMS
1-1/2"
DIAMETER
GRAB BAR
TOILET
TISSUE
DISPENSER
SANITARY
NAPKIN
DISPOSAL
TOILET
FIXTURE
TOILET
FIXTURE
TOILET
TISSUE
DISPENSER
1-1/2"
DIAMETER
GRAB BAR
EXPOSED
PLUMBING AT
BARRIER
FREE
LAVATORIES
SHALL BE
INSULATED.
LEVER OPERATING
CONTROLLED
SOAP DISPENSER
NOTE: SINKS IN COUNTERS TO BE
MOUNTED WITH RIM NO MORE
THAN 2'-10" HIGH AND WITH AT
LEAST 2'-3" KNEE CLEARANCE.
CLEAR
ACCESSIBLE TOILET TYPICAL ACCESSIBLE
CLEARANCE AT LAVATORY
TYPICAL ACCESSIBLE
LAVATORY AND MIRROR
1'-3" 1'-3"
M
IN
M A
X
M
A X
M
A X6
A
.F .F
1'-6"
5'-0" CLEAR
3'-0" 6"
3'-0"
" 3
1'-0" 3'-6"
2'-4"
5'-0" CLEAR
MIN
8"
MAX
6"
M
IN9
M
IN
M
IN
M A
X
17" MIN
TYPICAL TOILET NON-ACCESSIBLE
TOILET
TISSUE
DISPENSER
2'-9"
TOILET
FIXTURE
1'-6"
O F
R
IM
T
O P
CLOCK
NURSE
CALL
DOME
LIGHT
CLOCK OUTLET
TOWEL BAR
ACCESSIBLE
ROBE/COAT HOOK
ROBE/COAT
HOOK
TELEVISION
OUTLET
WALL MOUNTED TVCLOCK & NURSE CALL DEVICES
TOILET ACCESSORIES
6"
F O
R S
T A
N D
IN
G
O
.C
TELEVISIO
N OUTLET
F O
R S
E A
T E
D
O
.C
PAPER TOWEL
DISPENSER
2'-0" AT SIDEWALLS
AT COUNTER SINKS
1'-6" AT SIDEWALLS
AT LAVATORY
4'-0" MAX TO
HIGHEST OPERABLE
POINT
FIRE EXTINGUISHER
CABINET
ELECTRICAL CABINET
DUPLEX
OUTLET
SWITCH
THERMOSTAT
TELEPHONE
OR DATA
OUTLET
FIRE ALARM
PULL
INTERCOM
STATION
DUPLEX
OUTLET
COMPUTER
TERMINAL
FIRE ALARM
CHIME WITH
VISUAL
ALARM LIGHT
FIRE ALARM
PULL STATION
FIRE ALARM
ANNUNCIATOR
FIRE ALARM
WALL PROTECTION
BUMPERGUARD
HANDRAIL
OR DOOR FRAME
3" TO CORNERGUARD
CORNERGUARD
MISC. WALL DEVICES
/2
/4
T O
B O
T T
O M
O F
R
E F
L E
C T
IV
S
U R
F A
C E
F
M
IR
R
O R
GENERAL SYMBOL LEGEND
DEFERRED SUBMITTALS
STANDARD MOUNTING HEIGHTS
Engineers Architects
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
RED Engineering & Design, Inc.
126 Salem Towne Ct.
Apex, NC 27502 919-833-3486
STRUCTURAL ENGINEERING:
/6
/2
:5
:4
A
M
G-100
GENERAL INFORMATION
2 4
MITCHELLE R. LABADY
CK/GS/RJ
Upgrade Building 18 Inpatient & Outpatient RRTP
VA NEW JERSEY HEALTHCARE SYSTEM
385 TREMONT AVENUE
EAST ORANGE, NJ 07018 OCTOBER 1, 2020
BID DOCUMENTS
561-19-10519-055
CK
FIRE EXTINGUISHER ON
PORTABLE FLOOR
BRACKET (ILSM MAY
REQUIRE MORE THAN
ONE).
PROVIDE STICKY
MATS (CHANGED END
OF SHIFT OR MORE IF
NECESSARY TO
MAINTAIN
CLEANLINESS).
HEPA NEGATIVE
AIR UNIT
SUPPLY DUCTS EITHER
KEEP RUNNING OR COVER
WHEN RUNNING TO KEEP
DUST OUT
COVER ALL RETURNS
AT THE
GRATE/DIFFUSERS
F L E
X D
U C
T
SUSPENDED PLASTIC
ZIPPER WALL
CURTAIN BARRIER
POST ICRA, ILSM, FIRE
INSPECTION SHEETS
VISIBLE TO PUBLIC
PROVIDE NEGATIVE AIR
PRESSURE MONITOR IN ICRA
BARRIER NEAR ENTRY TO ALL
CONSTRUCTION AREAS
HEPA
NEGATIVE AIR
UNIT
FINISHED FLOORING TO BE KEPT
CLEAN. FLOORS NOT BEING REPLACED
MUST BE PROTECTED. COVER WITH
ROSIN PAPER / FIRE RATED PLYWOOD.
FIRE RATED PLYWOOD,
TEMPORARY. SALVAGE
PROTECT AND STORE
EXISTING WINDOW TO
BE RE-INSTALLED
AFTER CONSTRUCTION
IS COMPLETE.
V .I
.F
V .I
.F
V.I.F.
V .I .F
E X
IS
T
IN
G
W A
L L
V .I .F
E X
IS
T
IN
G
W A
L L
A P
P R
O X
A .F
.F
SUSPENDED
PLASTIC ZIPPER
WALL CURTAIN
BARRIER
POST ICRA,
ILSM, FIRE
INSPECTION
SHEETS VISIBLE
TO PUBLIC
5/8" FIRE RESISTANT GYPSUM
BOARD - BOTH SIDES
EXISTING CEILING SYSTEM
BASE - TO MATCH
EXISTING AREA
EXISTING FLOOR
UNDERSIDE OF EXISTING
DECK
C E
IL
IN
G H
E
IG
H T
V A
R
IE
S F
IE
L D
V E
R
IF
Y
/2
5"
3 5/8" 16 GAUGE METAL
STUDS @ 16" O.C. WALL TO
EXTEND TO UNDERSIDE OF
DECK
FIRE RESISTANT SEALANT,
BOTH SIDES
SMOKE RATEDB
INTERIM LIFE SAFETY MEASURES IN EFFECT FOR THE
UPGRADE BLDG. 18 INPATIENT & OUTPATIENT RRTP
• THIS EXIT IS CLOSED AND LEADS TO A
CONSTRUCTION AREA
• PLEASE USE ALTERNATE EXITS AS MARKED
1'-5"
ICRA, ILSM, FIRE WATCH AND
MISC. FORMS
PAPER
CADDY
ILSM SIGNAGE
ILSM TEMPORARY BARRIER TAG
PROJECT:
PRIME CONTRACTOR:
SUB CONTRACTOR:
EMERGENCY CONTACT NO.:
BARRIER INSTALLATION DATE:
BARRIER EXPIRATION DATE:
1. Remove barrier material carefully to minimize spreading of dirt and debris associated with construction.
2. Contain construction waste before transport in tightly covered containers.
3. Cover transport receptacles or carts. Tape covering unless solid lid.
4. Vacuum work area with HEPA filtered vacuums.
5. Wet mop area with disinfectant.
6. Remove isolation of HVAC system in areas where work was being performed.
1. Isolate HVAC system in areas where work is being done to prevent contamination of duct system.
2. Complete all critical barriers i.e. sheetrock, plywood, plastic, to seal area from non work area or implement control cube method (cart with plastic covering and sealed connection to work site with HEPA vacuum for vacuuming prior to exit) before construction begins.
3. Maintain negative air pressure within work site utilizing HEPA equipped air filtration unit.
4. Seal holes, pipes, conduits, and punctures appropriately.
5. Construct anteroom and require all personnel to pass through this room so they can be vacuumed sing a HEPA vacuum cleaner before leaving work site or they can wear cloth or paper coveralls that re removed each time they leave the work site.
6. All personnel entering work site are required to wear shoe covers. Shoe covers must be changed each time the worker exits the work area.
7. Do not remove barriers from work area until completed project is inspected by the owner's Safety Department and Infection Control Department and thoroughly cleaned by the owner's Environmental Services Department.
1. Do not remove barriers from work area until completed project is inspected by the owner's Safety Department and Infection Control Department and thoroughly cleaned by the owner's Environmental Services Department.
2. Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.
3. Vacuum work area with HEPA filtered vacuums.
4. Wet mop area with disinfectant
5. Remove isolation of HVAC system in areas where work is being performed.
1. Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.
2. Complete all critical barriers i.e. sheetrock, plywood, plastic to seal area from non work area or implement control cube method (cart with plastic covering and sealed connection to work site with HEPA vacuum for vacuuming prior to exit) before construction begins.
3. Maintain negative air pressure within work site utilizing HEPA-equipped air filtration units if indicated.
4. Contain construction waste before transport in tightly covered containers.
5. Cover transport receptacles or carts. Tape covers.
1. Provide active means to prevent airborne dust from dispersing into atmosphere.
2. Water mist work surfaces to control dust while cutting.
3. Seal unused doors with duct tape.
4. Block off and seal air vents.
5. Place dust mat at entrance and exit of work area. Replace used mats in accordance with manufacturer's recommendations.
6. Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.
1. Wipe work surfaces with disinfectant.
2. Contain construction waste before transport in tightly covered containers.
3. Wet mop and/or vacuum work area with HEPA filtered vacuum before leaving work areas.
4. Remove isolation of HVAC system in areas where work is being performed.
1. Execute work by methods to minimize raising dust from construction operations.
2. Immediately replace a ceiling tile displaced for visual inspection.
Inspection and Non-Invasive Activities
Includes, but is not limited to:
- removal of ceiling tiles for visual inspection limited to 1 tile per 50 square feet
- painting (but not sanding)
- wall covering, electrical trim work, minor plumbing, and activities which do not generate dust or require cutting of walls or access to ceilings other than for visual inspection
Small scale, short duration activities which create minimal dust
Includes, but is not limited to:
- installation of telephone and computer cabling
- access to chase spaces
- cutting of walls or ceiling where dust migration can be controlled
Work that generates a moderate to high level of dust or requires demolition or removal of any fixed building components or assemblies
Includes, but is not limited to:
- sanding of walls for painting or wall covering
- removal of floor coverings, ceiling tiles and casework
- new wall construction
- minor duct work or electrical work above ceilings
- major cabling activities
- any activity which cannot be completed within a single work shift
Major demolition and construction projects
Includes, but is not limited to:
- activities which require consecutive work shifts
- requires heavy demolition or removal of a complete cabling system
- new construction
• Cardiology
• Echocardiography
• Endoscopy
• Nuclear Medicine
• Physical Therapy
• Radiology / MRI
• Respitory Therapy
• CCU
• Emergency Room
• Labor & Delivery
• Laboratories (specimen)
• Newborn Nursery
• Outpatient Surgery
• Pediatrics
• Pharmacy
• Post Anesthesia Care Unit
• Surgical Units
• Any area caring for immunocompromised patients
• Burn Unit
• Cardiac Cath Lab
• Central Sterile Supply
• Intensive Care Units
• Medical Unit
• Negative pressure isolation rooms
• Oncology
• Operation rooms including C-section rooms
• Office Spaces
C L A
S S
I V
C L A
S S
I
II
C L A
S S
I I
C L A
S S
I
PATIENT RISK GROUPS
LOW Risk Group
MEDIUM Risk Group
HIGH Risk Group
HIGHEST Risk Group
TYPE A TYPE B TYPE C TYPE D
I II II III/IV
I II III IV
I II III/IV IV
II III/IV I/IV IV
During Construction Project: Upon Completion of Project:
TYPE D
TYPE C
TYPE B
TYPE A
Group 1 Low Risk
Group 2 Medium Risk
Group 3 High Risk
Group 4 Highest Risk
Patient Risk Group Table
Infection Control Matrix - Class of Precautions: Construction Project any Patient Risk
Construction Project Type
Note: Infection Control approval will be required when the Construction Activity and Risk Level indicated that Class III or Class IV Control procedures are necessary.
It's the Contractor's Responsibility to provide the following Infection Control Precautions depending upon the Area Class Designation
Type of Construction Project activity (Type A-D)
INFECTION CONTROL RISK ASSESSMENT MATRIX OF PRECAUTIONS FOR
CONSTRUCTION AND RENOVATION
Engineers Architects
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
RED Engineering & Design, Inc.
126 Salem Towne Ct.
Apex, NC 27502 919-833-3486
STRUCTURAL ENGINEERING:
/6
/2
:5
:4
A
M
G-201
ICRA NOTES AND DETAILS
3 4
MITCHELLE R. LABADY
CK/GS/RJ
Upgrade Building 18 Inpatient & Outpatient RRTP
VA NEW JERSEY HEALTHCARE SYSTEM
385 TREMONT AVENUE
EAST ORANGE, NJ 07018 OCTOBER 1, 2020
BID DOCUMENTS
561-19-10519-055
CK
GENERAL
1. ALL APPLICABLE PERMITS AND COR APPROVALS
SHALL BE COMPLETED PRIOR TO BEGINNING ANY
WORK. PERMITS INCLUDE: ICRA, ILSM, ABOVE
CEILING FIRE/SMOKE WALL, UTILITY, FIRE ALARM
SYSTEM, MEDICAL GASES, AND CONFINED SPACES.
DUST CONTROL PLAN NOTES
A. THIS PROJECT INCLUDES CONSTRUCTION ENTRY
VESTIBULE - CONSTRUCTION ANTEROOM. THEY SHALL
BE USED WHEN GOING INTO CONSTRUCTION AREA
AND LEAVING THE CONSTRUCTION AREA AND TIGHT
SEALS SHALL BE MAINTAINED AT THE FULL
PERIMETER OF WALLS AND WALL PENETRATIONS.
ANY DUST SHALL BE IMMEDIATELY CLEANED IF
TRACKED OUTSIDE OF THE CONSTRUCTION BARRIER.
UPON COMPLETION OF THE CONSTRUCTION PHASE,
DUST BARRIERS SHALL BE REMOVED CAREFULLY
AFTER VA COR'S APPROVAL TO MINIMIZE SPREADING
OF DUST AND THE CONTRACTOR SHALL HAVE
TEMPORARY DUST PROTECTION IN PLACE BEFORE
REMOVAL OF A PERMANENT BARRIER.
INTERNAL DEMOLITION AND CONSTRUCTION
ACTIVITIES DUST AND DEBRIS CONTROL
B. TRAFFIC CONTROL: DESIGNATED ENTRY AND EXIT
PROCEDURES SHALL BE DEFINED. EGRESS PATHS
SHALL BE FREE OF DEBRIS AND ONLY AUTHORIZED
PERSONNEL SHALL BE ALLOWED TO ENTER THE
CONSTRUCTION ZONE. SIGNAGE SHALL DIRECT
PEDESTRIAN TRAFFIC AWAY FROM THE
CONSTRUCTION AREA AND MATERIALS.
C. CONTRACTOR SHALL USE TWO CARTS TO TRANSFER
CONSTRUCTION MATERIAL IN AND OUT OF THE
PROJECT - CLEAN CART SHALL BE USED; THE NOT-SO-
CLEAN CART SHALL BE USED BETWEEN THE MAIN
ENTRY AND THE CONSTRUCTION STAGING PREP
AREA.
D. DEMOLITION DEBRIS: DEBRIS SHALL BE REMOVED IN
CARTS WITH TIGHTLY FITTED COVERS, USING
DESIGNATED TRAFFIC ROUTE. EFFORTS SHALL BE
MADE TO MINIMIZE USE OF ELEVATORS WITH AN
EMPHASIS ON TRANSPORT DURING THE LOWEST
PERIOD OF ACTIVITY. DEBRIS SHALL BE REMOVED
DAILY AND AT TIMES SPECIFIED BY THE COR. IF
CHUTES ARE USED TO DIRECT DEBRIS OUTSIDE, HIGH
EFFICIENCY PARTICULATE AIR (HEPA) FILTERED
NEGATIVE AIR MACHINES SHALL BE USED, AND THE
CHUTE OPENING SHALL BE SEALED WHEN NOT IN
USE. FILTERS SHALL BE BAGGED AND SEALED
BEFORE BEING TRANSPORTED OUT OF THE
CONSTRUCTION AREA. THE CONTRACTOR SHALL NOT
HAUL DEBRIS THROUGH PATIENT-CARE AREAS
WITHOUT PRIOR APPROVAL OF THE COR.
E. EXTERIOR WINDOWS: EXISTING WINDOWS SHALL BE
PROTECTED TO PREVENT DAMAGE BY ADJACENT
CONSTRUCTION WORK.
VENTILATION AND ENVIRONMENTAL CONTROLS
F. AIR SYSTEM FLOW: THE COR VERIFY AND
ACKNOWLEDGE CONTRACTOR WHETHER THE
CONSTRUCTION AREA USES FRESH/OUTSIDE OR RE-
CIRCULATED AIR; FILTERS SHALL BE ADDED OR
RETURN VENTS COVERED AS NEEDED WITH FILTER
MATERIAL OR PLASTIC. AIR MUST FLOW FROM CLEAN
TO DIRTY PLACES.
G. NEGATIVE AIR PRESSURE: THE AIR WITHIN THE
CONSTRUCTION AREA SHALL BE NEGATIVE WITH
RESPECT TO SURROUNDING AREAS AND WITH NO
DISRUPTION OF AIR SYSTEMS OF ADJACENT AREAS.
USE OF THE NEGATIVE AIR PRESSURE SYSTEM
WITHIN THE ENCLOSURE TO REMOVE DUST SHALL
PASS AIR THROUGH AN INDUSTRIAL GRADE
PORTABLE HEPA FILTER CAPABLE OF FILTRATION
RATES OF 300-800 CUBIC FEET PER MINUTE. EXHAUST
AIR DIRECTLY TO THE OUTSIDE IF APPROVED BY COR
IF EXHAUST SHALL BE TIED INTO A RE-CIRCULATED
AIR SYSTEM, PRE-FILTER AND HEPA FILTER SHALL BE
USED BEFORE EXHAUST TO PREVENT
CONTAMINATION OF THE DUCTS.
H. ADJACENT AREAS: THE STATUS OF SEALED
PENETRATIONS AND INTACT CEILING SHALL BE
VERIFIED DAILY.
I. AIR EXCHANGE RATES AND PRESSURE
RELATIONSHIPS: VAMC AND CONTRACTOR SHALL
VERIFY AND MAINTAIN PROPER RATES IN CRITICAL
AREAS NEAR CONSTRUCTION ACTIVITY AND ENSURE
AIR IS NOT BEING RE-CIRCULATED WITHOUT
FILTRATION FROM THE CONSTRUCTION AREA
ELSEWHERE. PROVIDE AIR PRESSURE TESTING
THROUGHOUT THE PROJECT IN THE FREQUENCY AS
IDENTIFIED BY THE COR.
CONTAMINATION OF PATIENT ROOMS, SUPPLIES,
EQUIPMENT AND RELATED AREAS
J. WORKSITE CLOTHING: CONTRACTOR PERSONNEL
CLOTHING SHALL BE FREE OF LOOSE SOIL AND
DEBRIS BEFORE LEAVING THE CONSTRUCTION AREA.
IF PROTECTIVE APPAREL IS NOT WORN (E.G.,
COVERALLS, FOOTGEAR AND HEADGEAR) A HEPA-
FILTERED VACUUM SHALL BE USED TO REMOVE DUST
FROM CLOTHING BEFORE LEAVING THE BARRICADE.
THE CONTRACTOR SHALL CONSTRUCT AN ANTEROOM
FOR CHANGING CLOTHING AND STORING EQUIPMENT
(DESIGNATED AREA. ALL EQUIPMENT, TOOLS, TOOL
CARTS, AND MATERIALS TRANSPORTED THROUGH
OCCUPIED AREAS SHALL BE MADE FREE FROM DUST
AND MOISTURE BY VACUUMING AND WET WIPING
BEFORE THEIR REMOVAL FROM THE CONSTRUCTION
ZONE OR WORK AREA.
K. POST CONSTRUCTION: DO NOT REMOVE BARRIERS
AND KEEP ALL HVAC ISOLATION UNTIL CONTRACTOR
HAS CLEANED CONSTRUCTION SITE, VA EMS STAFF
HAS DONE A TERMINAL CLEANING, AND VA
INFECTIOUS DISEASE CONTROL HAS INSPECTED AND
APPROVED THE CLEANING.
GENERAL
L. PROVIDE TEMPORARY SMOKE RESISTANT ICRA
BARRIERS CONSISTING OF 3-5/8" METAL STUD
FRAMING WITH 5/8" GYPSUM BOARD ON BOTH SIDES.
BARRIERS SHALL BE INSPECTED BY VA ICRA STAFF
PRIOR TO START OF CONSTRUCTION IN SPACE.
MAINTAIN NEGATIVE PRESSURE VENTILATION IN THE
CONSTRUCTION SPACE.
M. TEMPORARY DOORS IN ICRA BARRIERS SHALL BE
SELF-CLOSING AND HAVE STOREROOM LOCK
FUNCTION.
N. TEMPORARY DOORS IN ICRA BARRIERS SHALL HAVE
LOCAL ALARMS THAT ACTIVATE WHEN OPENNED.
O. PROVIDE TWO STICKY MATS AT EACH CONSTRUCTION
ACCESS POINT.
P. VA REQUIRES THAT ALL APPLICABLE PERMITS BE
COMPLETED AND APPROVED PRIOR TO BEGINNING
ANY WORK ON STATION.
PERMITS INCLUDE:
ICRA, PCRA, ILSM, ABOVE CEILING, FIRE/SMOKE
WALL, UTILITY, FIRE SPRINKLER, FIRE ALARM SYSTEM,
MEDICAL GASES, CONFINED SPACE AND HOT WORK.
Scale: 1/2" = 1'-0"
TYPICAL ICRA CONSTRUCTION PLAN LAYOUT
Scale: 1/2" = 1'-0"
TYPICAL ICRA CONSTRUCTION SECTION
Scale: 1/2" = 1'-0"
TYPICAL ICRA ENTRY ELEVATION
Scale: 3/4" = 1'-0"
ICRA BARRIER WALL CONSTRUCTION DETAILS
Scale: 6" = 1'-0"
ILSM SIGNAGE
Scale: 12" = 1'-0"
ILSM BARRIER TAG DETAIL
DN
S
S
S
S
S SS
S S
S S
S SS
SS SSSSSSSSSSSSS
S S
S S
S S
S S
SS SSSSSSSSSSSSS
S SS S S S S S S S S S S S S
S S
S
S S
S
S S
S S
S
S SS S S S S S S S S S
SS SSSSSSSSSSSSSSSS
S S
S S
S S
S S
SS SSSSSSSSSSSS S
S SS S S S S S S S S S S S S
S S
S
S S
S
S SS S S S S S S S S S S S S
S S
S S
S SS
S S
EATD: 179'-9"
EATD: 99'-8"
CAPACITYCLR
EXIT
69" 345
CAPACITYCLR
EXIT
69" 345
CAPACITYCLR
EXIT
69" 345
CAPACITYCLR
EXIT
33" 165
CAPACITYCLR
EXIT
69" 345
CAPACITYCLR
EXIT
69" 345
EXTERIOR COURTYARD
CPTD: 64'-4"
18-103
CARE STATION
18-104
MEDS
18-105
EXAM
18-106
LOUNGE
18-112
DAY ROOM
18-113
2 BEDROOM
18-114
2-BEDROOM
18-115
2-BEDROOM
18-116
2-BEDROOM
18-117
2-BEDROOM18-118
MALE TOILET
18-119
TELE/ELEC
18-120
CLO
18-121
CLO
18-122
DIRTY UTILITY
18-122A
STORAGE
18-107
1-BEDROOM
18-108
1-BEDROOM
18-109
1-BEDROOM
18-110
1-BEDROOM
18-111
1-BEDROOM
18-102
CORRIDOR
18-125
BEDROOM
18-101
CORRIDOR
18-126
BEDROOM
18-127
BEDROOM
18-128
BEDROOM
18-129
BEDROOM
18-130
BEDROOM
18-131
CORRIDOR
18-132
DAYROOM
18-133
BEDROOM
18-134
BEDROOM
18-135
BEDROOM
18-136
BEDROOM
18-137
WOMEN'S TLT
18-138
MEN'S TLT
18-132A
LINEN
18-C1
COURTYARD
18-138A
CORRIDOR
18-139
LINEN
18-140
CLO
18-141
ELEC
18-142
CORRIDOR
18-143
MECH
18-144
MEN'S TLT
18-145
OFFICE
18-146
OFFICE
18-147
OFFICE
18-148
OFFICE
18-149
OFFICE
18-150
OFFICE
18-151
OFFICE
18-152
OFFICE
18-153
GROUP ROOM
18-154
RECEPT
18-155
OFFICE
18-156
CORRIDOR
18-157
MEN'S TLT
18-162
OFFICE
18-163
OFFICE
18-164
OFFICE
18-165
OFFICE
18-166
OFFICE
18-167
OFFICE
18-168
OFFICE
18-155A
OFFICE
18-155B
OFFICE
18-155C
OFFICE
18-154B
BREAKROOM
18-154A
VEST
18-150A
UTIL CLT
18-158A
CLO
18-132B
WOMEN'S TLT
SMOKE COMPARTMENT
HEALTHCARE OCCUPANCY ( SLEEPING AREA)
FULLY SPRINKLERED: 8,032 S.F.
SMOKE COMPARTMENT
HEALTHCARE OCCUPANCY (AMBULATORY CARE)
FULLY SPRINKLERED: 7,852 S.F.
EATD: 161'-9"
EATD: 116'-0"
REQUIR
ED E
GRESS SEPARATIO
N: 7
7'-5
OVERALL D
IAGONAL O
F B
UILDIN
G: 2 32'-2
HAZARDOUS AREA (STORAGE)
82 SF
CA
CA
CA
18-158
OFFICE
18-159
OFFICE
18-160
OFFICE
18-161
OFFICE
FEC
FECFEC
FEC
FEC
CA
CA
CA
CA
CA
CA
HO
EATD: EXIT ACCESS TRAVEL
DISTANCE (300'-0" MAX.)
CPTD: COMMON PATH OF TRAVEL
DISTANCE (100'-0" MAX.)
EGRESS IDENTIFICATION
AREA OF REFUGE
HAZARDOUS LOCATION
FIRE EXTINGUISHER BRACKET
FIRE EXTINGUISHER CABINET
EMERGENCY RESPONSE REFERENCE
CONTROLLED ACCESS - ALWAYS
UNLOCKED IN DIRECTION OF EGRESS
DELAYED EGRESS W/ ALARM
MAGNETIC HOLD OPEN
CA
DE
FEB
FEC
CAPACITYCLR
EXTERIOR
EXIT
XX" ###
EXIT
IDENTIFICATION
EGRESS CLEAR
WIDTH
EGRESS CAPACITY
HO
A. SEE SHEETS G-100 & A-001 FOR SYMBOLS AND
ABBREVIATIONS.
B. SEE STRUCTURAL DRAWINGS FOR FRAMING
INFORMATION & FRAMING DIMENSIONS. ALL
DIMENSIONS ARE FOR REFERENCE ONLY- VERIFY
ALL FRAMING WITH STRUCTURAL DRAWINGS.
C. REFER TO PLUMBING DRAWINGS FOR
INFORMATION CONCERNING PLUMBING FIXTURES
AND PIPING SYSTEM(S).
D. REFER TO MECHANICAL DRAWINGS FOR
INFORMATION CONCERNING HVAC SYSTEM(S).
E. REFER TO ELECTRICAL DRAWINGS FOR
INFORMATION CONCERNING POWER, LIGHTING
AND COMMUNICATION SYSTEM(S).
F. REFER TO ELECTRICAL DRAWING FOR FIRE ALARM
NOTIFICATION AND EMERGENCY EGRESS
LIGHTING LOCATIONS.
G. REFER TO PARTITION TYPES FOR FURTHER FIRE
SEPARATION REQUIREMENTS.
H. CONTRACTOR TO PROVIDE ALL ADDITIONAL
FRAMING NECESSARY FOR ALL OPENINGS AND
SUPPLEMENTAL FRAMING ABOVE PARTITIONS.
I. ALL FIRE RATED ASSEMBLIES SHALL BE INSTALLED
IN STRICT ACCORDANCE WITH TESTED
ASSEMBLIES INDICATED.
J. EXTEND EXTEND FIRE RATED PARTITIONS,
BARRIERS, AND OTHER SEPARATIONS TO BOTTOM
OF ROOF/FLOOR DECK ABOVE (OR AS DIRECTED
BY UL ASSEMBLY) AND TO EXTERIOR WALL. SEAL
JOINT BETWEEN EDGES OF PARTITION WITH FIRE
RATED SEALANT AND/OR INTUMESCENT
ASSEMBLY.
K. ALL PENETRATIONS OF FIRE-RATED ASSEMBLIES
SHALL BE FIRE-SEALED IN ACCORDANCE WITH
APPROVED MANUFACTURER'S DETAIL FOR
LOCATION, TYPE OF CONSTRUCTION,
PENETRATING ITEM AND RATING REQUIRED.
L. ALL DUCTWORK, DIFFUSERS AND GRILLES
PENETRATING FIRE-RATED WALLS, CEILINGS AND
FLOORS SHALL HAVE THE APPROPRIATE TYPE OF
FIRE/SMOKE DAMPER IN ACCORDANCE WITH THE
TYPE OF CONSTRUCTION BEING PENETRATED AND
THE FIRE/SMOKE RATING REQUIRED.
M. ALL LIGHT FIXTURES AND ELECTRICAL DEVICES
PENETRATING FIRE-RATED ASSEMBLIES SHALL BE
UL-LISTED FOR INSTALLATION IN THE ASSEMBLY
OR SHALL BE INSTALLED SUCH THAT THE FIRE-
RATING IS NOT COMPROMISED.
N. SMOKE RESISTANT CONSTRUCTION SHALL MEET
THE REQUIREMENTS OF ALL APPLICABLE CODES.
AREA SHALL BE SEPARATED FROM THE
REMAINDER OF THE BUILDING BE CONSTRUCTION
CAPABLE OF RESISTING THE PASSAGE OF SMOKE.
THE PARTITIONS SHALL EXTEND FROM THE FLOOR
TO THE UNDERSIDE OF THE FLOOR OR ROOF
ASSEMBLY ABOVE. DOORS SHALL BE SELF OR
AUTOMATIC CLOSING. DOORS SHALL NOT HAVE
AIR TRANSFER OPENINGS AND SHALL NOT BE
UNDERCUT IN EXCESS OF CLEARANCE PERMITTED
WITH ACCORDANCE TO NFPA 80.
O. STORAGE OF ANY FLAMMABLE OR COMBUSTIBLE
LIQUIDS IS UNDERSTOOD TO NOT BE WITHIN THE
BUILDING. STORAGE OF ANY MATERIAL IS TO BE
IN COMPLIANCE WITH ALL APPLICABLE CODES AND
AUTHORITIES HAVING JURISDICTION
P. THIS PROJECT ADDS (1) NEW FIRE EXTINGUISHER.
ALL OTHER FIRE EXTINGUISHERS ARE EXISTING TO
REMAIN.
Q. PROVIDE IDENTIFICATION OF ALL FIRE RATED
AND/OR SMOKE PARTITIONS AT NOT MORE THAN
10'-0" ON CENTER ABOVE CEILINGS WITH 3" HIGH
STENCILED BLOCK LETTERING AS FOLLOWS: "1
HOUR FIRE", "I HOUR FIRE/SMOKE", "2 HOUR FIRE",
"2 HOUR FIRE/SMOKE,", "2 HOUR SHAFT", ETC.
CONFIRM LABEL TEXT WIT COR.
R. ITEMS WITH A SURFACE AREA GREATER THAN 16
SQUARE INCHES SHALL NOT BE RECESSED IN A
RATED AND/OR RATED SMOKE WALL
S. CONTRACTOR SHALL SEAL ALL SLAB
PENETRATIONS WITHIN THE AREA OF
CONSTRUCTION TO COMPLY WITH THE REQUIRED
FIRE RATING
EGRESS WIDTH
(NFPA 101 Table 7.3.3.1)
COMMON PATH OF TRAVEL
(NFPA 101 18.2.5.3)
EXIT ACCESS TRAVEL
(NFPA 101 18.4.4.4.2)
DEAD-END CORRIDOR
(NFPA 101 18.2.5.2)
EXIT DOORS = 33"/(0.20) = 165 PPL
EXIT DOORS = 73"/(0.20) = 365 PPL
100'-0" MAXIMUM
64'-4" ACTUAL
200'-0" MAXIMUM
161'-9" ACTUAL
30'-0" MAXIMUM
OCCUPANT LOAD
(NFPA 101 Table 7.3.1.2)
SMOKE COMPARTMENT 18-A
(AMBULATORY CARE):
7,852 GSF/150 = 53 PPL
SMOKE COMPARTMENT 18-B:
(SLEEPING AREA):
7,922 GSF/120 = 66 PPL
TOTAL OCCUPANCY = 119 PEOPLE
GROSS BUILDING AREA
(OUTSIDE FACE WALLS)
16,237 SF
GROSS MEASURED AREA
(INTERIOR FACE WALLS)
15,774 SF
REQUIRED # OF EXITS
(NFPA 101 18.2.5.5)
2 EXITS REQUIRED FOR EACH
SMOKE COMPARTMENT
REQUIRED DISTANCE
BETWEEN EXITS
77'-5" MINIMUM
214'-7" ACTUAL
FLOOR
AGGREGATE FLOOR AREAS (per TABLE 503):
EXISTING NEW TOTAL
GROUND 273 SF
AREA ALLOWED (IBC Table 506.2) = 44,000 SF FOR 1-STORY
16,237 SF
EGRESS INFORMATION
ALLOWABLE STORIES (NFPA 101 Table 18.1.6.1) = 1
ACTUAL STORIES = 1
AREA AND HEIGHT REQUIREMENTS:
15,964 SF
PROPOSED USE:
OWNED BY: FEDERAL
LOCAL GOVERNMENT
CITY/COUNTY
STATE
CODE ENFORCEMENT JURISDICTION: VA
APPLICABLE CODES:
GENERAL CODE INFORMATION:
NEW CONSTRUCTION
RENOVATION (EXISTING BUILDING)
CONSTRUCTION TYPE:
MIXED CONSTRUCTION
SPRINKLERED
MEZZANINE
MIXED OCCUPANCY
PRIMARY OCCUPANCY:
SECONDARY OCCUPANCY:
PROJECT NAME:
PROJECT ADDRESS:
OWNER OR AGENT:
385 TREMONT AVENUE
EAST ORANGE, NJ 07018
VA NEW JERSEY
HEALTHCARE SYSTEM
THIS PROJECT MUST COMPLY WITH ALL CODES
AND DESIGN STANDARDS REFERENCED IN VA
DOCUMENT PG 18-3 -DESIGN AND CONSTRUCTION
PROCEDURES.
THE 2018 NFPA 101 LIFE SAFETY CODE ADDRESSES
LIFE SAFETY AND FIRE PROTECTION FEATURES
FOR THE PROJECT. THE INTERNATIONAL BUILDING
CODE SHALL APPLY FOR SUBJECT MATTER NOT
ADDRESSED IN NFPA 101.
A PARTIAL LIST OF APPLICABLE CODES IS BELOW:
HEALTHCARE
II-B
HEALTHCARE
N/A
2018 NFPA 101 LIFE SAFETY CODE
2018 INTERNATIONAL BUILDING CODE
2018 INTERNATIONAL ENERGY CONSERVATION CODE
2018 INTERNATIONAL MECHANICAL CODE
2019 INTERNATIONAL FIRE CODE
2020 NATIONAL ELECTRIC CODE
2018 INTERNATIONAL PLUMBING CODE
2010 AMERICAN WITH DISABILITIES ACT (ADA)
Upgrade Building 18 Inpatient & Outpatient RRTP
CODE INFORMATION
0 4 8 16
NORTH
PLAN
Scale: 1/8" = 1'-0"
FIRST FLOOR LIFE SAFETY PLAN
LIFE SAFETY LEGEND
Engineers Architects
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE PARTITION
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
S S S S
RED Engineering & Design, Inc.
126 Salem Towne Ct.
Apex, NC 27502 919-833-3486
STRUCTURAL ENGINEERING:
/6
/2
:5
:5
A
M
GL101
FIRST FLOOR LIFE SAFETY
4 4
MITCHELLE R. LABADY
CK/GS/RJ
Upgrade Building 18 Inpatient & Outpatient RRTP
VA NEW JERSEY HEALTHCARE SYSTEM
385 TREMONT AVENUE
EAST ORANGE, NJ 07018 OCTOBER 1, 2020
BID DOCUMENTS
561-19-10519-055
CK
KEY NOTES:
01 SPACE IS LESS THAN 50 OCCUPANTS PER 2018
IBC TABLE 1004.5 AND IS PERMITTED TO HAVE A
SINGLE MEANS OF EGRESS PER IBC TABLE
1006.2.1
02 PROVIDE SIGNAGE STATING "NO EXIT".
03 PROVIDE SIGNAGE STATING: "MAXIMUM
OCCUPANCY 49 PERSONS".
GENERAL NOTES:
1. ALL MATERIALS AND METHODS OF CONSTRUCTION SHALL BE IN
COMPLIANCE WITH THE VA STANDARDS, AND OTHER APPLICABLE LOCAL,
STATE AND FEDERAL GUIDELINES. ALL UTILITY CONSTRUCTION SHALL
COMPLY WITH VA STANDARDS AND SPECIFICATIONS.
2. EXISTING SURVEY INFORMATION INCLUDING TOPOGRAPHIC INFORMATION
FOR THE BUILDING ENTRY AREA WAS PROVIDED BY VA. THE CONTRACTOR
SHALL BE RESPONSIBLE FOR FIELD VERIFYING EXISTING CONDITIONS PRIOR
TO COMMENCEMENT OF ANY WORK. THE CONTRACTOR SHALL IMMEDIATELY
NOTIFY THE OWNER'S REPRESENTATIVE OF ANY DISCREPANCIES OR
CONFLICTS. THE EXISTING SURVEY INFORMATION FOR THE COURTYARD
WAS PROVIDED BY CONTROL POINT ASSOCIATES, INC DATED 05-13-2020.
3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONTACTING,
COORDINATING AND PAYMENT FOR ALL NECESSARY LOCATING SERVICES
INCLUDING INDEPENDENT LOCATING SERVICES. THE CONTRACTOR SHALL
PROVIDE NOTICE OF EXCAVATION TO NOTIFICATION CENTER AND FACILITY
OWNERS NO LESS THAN 3 BUSINESS DAYS AND NO MORE THAN 12 WORKING
DAYS PRIOR TO BEGINNING DEMOLITION, EXCAVATION OR ANY OTHER FORM
OF CONSTRUCTION. THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE
OWNER'S REPRESENTATIVE OF ANY DISCREPANCIES OR CONFLICTS. NO
EXCAVATION OR DEMOLITION SHALL BE STARTED WITHOUT ALL UTILITIES
BEING LOCATED.
4. ALL SUB-SURFACE UTILITIES IDENTIFIED ON THE CONSTRUCTION
DOCUMENTS ARE SHOWN IN THEIR APPROXIMATE LOCATION BASED ON
SURVEY INFORMATION GATHERED FROM FIELD INSPECTION AND/OR ANY
OTHER APPLICABLE RECORD DRAWINGS WHICH MAY BE AVAILABLE. THE
CONTRACTOR SHALL IMMEDIATELY NOTIFY THE OWNER'S REPRESENTATIVE
OF ANY DISCREPANCIES OR CONFLICTS.
5. EXISTING IMPROVEMENTS DAMAGED OR DESTROYED BY THE CONTRACTOR
DURING CONSTRUCTION SHALL BE RESTORED OR REPLACED TO ORIGINAL
CONDITION AND TO THE SATISFACTION OF THE VA AT THE CONTRACTOR'S
EXPENSE.
6. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING AND
COORDINATING PERMITS, INSPECTIONS, CERTIFICATIONS AND OTHER
REQUIREMENTS WHICH MUST BE MET UNDER THIS CONTRACT.
7. THE CONTRACTOR SHALL MAINTAIN “AS-BUILT” DRAWINGS TO RECORD THE
ACTUAL LOCATION OF ALL PIPING PRIOR TO CONCEALMENT, VALVE AND
MANHOLE CHANGES, AND HARDSCAPE OR LANDSCAPE CHANGES.
DRAWINGS SHALL BE PROVIDED TO THE OWNER'S REPRESENTATIVE AT
REGULAR INTERVALS, OR AS REQUESTED THROUGHOUT THE PROJECT FOR
RECORD KEEPING.
8. IF DEPARTURES FROM THE PROJECT DRAWINGS OR SPECIFICATIONS ARE
DEEMED NECESSARY BY THE CONTRACTOR, DETAILS OF SUCH DEPARTURES
AND REASONS THERE OF SHALL BE SUBMITTED TO THE OWNER'S
REPRESENTATIVE FOR REVIEW. NO DEPARTURES FROM THE CONTRACT
DOCUMENTS SHALL BE MADE WITHOUT THE EXPRESS WRITTEN PERMISSION
OF THE OWNER'S REPRESENTATIVE.
9. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE RELOCATION OF ANY
EXISTING UTILITY LINES REQUIRED TO COMPLETE ANY PORTION OF
CONSTRUCTION. THE CONTRACTOR SHALL ALSO BE RESPONSIBLE FOR THE
COORDINATION AND COSTS OF THE RELOCATION AND ASSOCIATED WORK.
10. THE CONTRACTOR SHALL BE RESPONSIBLE FOR KEEPING THE PREMISES
FREE FROM ACCUMULATIONS OF WASTE MATERIALS AND RUBBISH CAUSED
BY THE CONTRACTOR. ALL DEBRIS SHALL BE REMOVED FROM THE PROJECT
SITE ON A DAILY BASIS.
11. THE ENGINEER AND/OR VA DISCLAIM ANY ROLE IN THE CONSTRUCTION
MEANS AND/OR METHODS ASSOCIATED WITH THE PROJECT AS SET FORTH IN
THESE PLANS.
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of
Construction and Facilities
Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120
Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
Engineers Architects
MITCHELLE R. LABADY
EVM
UPGRADE BUILDING 18
INPATIENT & OUTPATIENT
RRTP
VA NEW JERSEY HEALTHCARE
SYSTEM 385 TREMONT AVENUE, EAST
ORANGE, NJ 07018 October 1, 2020
BID DOCUMENTS
561-19-105
19-055
SES
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
COURTYARD
COURTYARD
ENTRY
N
TRUEPLAN
AS NOTEDSCALE:
C-101
GENERAL NOTES, SYMBOLS,
AND ABBREVIATIONS
1 6
SITE NOTES:
1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE INSTALLATION AND
MAINTENANCE OF THE CONSTRUCTION LAYDOWN AREA, PERIMETER
FENCE, AND ASSOCIATED GATES. THE CONTRACTOR SHALL ALSO BE
RESPONSIBLE FOR THE REMOVAL OF THE CONSTRUCTION LAYDOWN
AREA PERIMETER FENCE AND ASSOCIATED GATES AT THE COMPLETION
OF THE PROJECT.
2. THE CONTRACTOR SHALL REFERENCE THE DESIGN PLANS FOR
DIMENSIONS, JOINT LOCATIONS, AND INLAY SPECIFICATIONS NEAR
BUILDINGS AND IN COURTYARDS. CONTRACTOR SHALL PROVIDE JOINTS
IN WALKWAYS AND HARDSCAPE PER DETAILS OR AS INDICATED ON
LANDSCAPE/HARDSCAPE PLAN SHEETS.
3. ALL CONSTRUCTION TRAFFIC ENTRIES SHALL BE COORDINATED WITH
THE COR PRIOR TO CONSTRUCTION.
4.REFER TO ARCHITECTURAL PLANS FOR BUILDING INFORMATION.
5. ALL DIMENSIONS ARE IN DECIMAL FEET TO OUTSIDE FACE OF
BUILDINGS, TO CENTERLINES, AND/OR FACE OF CURB UNLESS
OTHERWISE NOTED.
6. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND COORDINATES
AND REPORT ANY DISCREPANCIES TO THE OWNER'S REPRESENTATIVE
PRIOR TO ANY CONSTRUCTION.
7. ALL WRITTEN DIMENSIONS SHALL PREVAIL. DO NOT SCALE FROM
DRAWINGS.
8. ALL UTILITIES WITH SURFACE ACCESS SHALL BE LOCATED WITHIN THE
PAVING PATTERN AND SHALL BE COORDINATED WITH LANDSCAPE
ARCHITECT PRIOR TO CONSTRUCTION. REFER TO LAYOUT DRAWINGS.
9. ALL ANGLES ARE 90 DEGREES UNLESS OTHERWISE NOTED.
10. ALIGN ALL JOINTS, CORNERS, AND EDGES AS SHOWN
11. CONTRACTOR SHALL REFER TO AND COORDINATE WITH
ARCHITECTURAL, STRUCTURAL, AND MEP DRAWINGS AT ALL TIMES
PRIOR TO AND DURING CONSTRUCTION.
12. WHERE NEW SIDEWALK ADJOINS EXISTING WALK, PROVIDE EXPANSION
JOINT BY DRILLING INTO THE FACE OF THE EXISTING WALK FOR
PLACEMENT OF DOWELS. TIE NEW SIDEWALKS INTO NEAREST EXISTING
PAVEMENT JOINT; MATCH WIDTH OF EXISTING WALKWAY.
13. MAXIMUM RUNNING SLOPE FOR WALKING SURFACES CANNOT BE
GREATER THAN 1:20 AND CROSS SLOPES CANNOT BE GREATER THAN
1:48. HANDICAP SPACES SURFACE SLOPES SHALL NOT EXCEED 1:48 IN
ALL DIRECTIONS.
PAVING PATTERNS NOTES:
1. END ALL UNIT PAVING PATTERNS WITH A FULL OR HALF SIZE
PAVER UNLESS OTHERWISE NOTED. USE OVERSIZE PAVERS
WHERE PATTERN ENDS ON A UNIT SMALLER THAN HALF SIZE.
2. LAYOUT OF UNIT PAVING PATTERNS AND CONCRETE JOINTS
AS INDICATED ON THIS PLAN. REFERENCE LAYOUT PLANS
FOR FURTHER PAVING LAYOUT INFORMATION.
3. PAVERS ABUTTING TRUNCATED DOMES SHALL BE A
CONTRASTING COLOR.
4. ALIGN ALL TRUNCATED DOME PAVER JOINTS WITH ABUTTING
PAVER JOINTS.
5. PROVIDE CONTINUOUS EXPANSION JOINTS BETWEEN BACK
OF CURB AND ADJOINING PAVEMENT.
6. PROVIDE CONTINUOUS EXPANSION JOINT BETWEEN ALL
VERTICAL SURFACES AND ADJOINING PAVEMENT.
7. ALL DIMENSIONS MEASURED TO CENTERLINE OF JOINTS.
8. ALL WRITTEN DIMENSIONS SHALL PREVAIL. DO NOT SCALE
FROM DRAWINGS.
9. ALL ANGLES 90 DEGREES UNLESS OTHERWISE NOTED.
10. ALIGN ALL JOINTS, CORNERS AND EDGES AS SHOWN.
11. FINAL LAYOUTS TO BE APPROVED BY THE CONTRACTING
OFFICER'S REPRESENTATIVE.
DEMOLITION NOTES:
1. AS INDICATED ON PLANS.
2. REMOVE CONCRETE (WHERE REQUIRED) TO THE FIRST
COLD JOINT OR SAW CUT TO OBTAIN A CLEAN EDGE.
3. VERIFY ALL UTILITIES PRIOR TO BEGINNING DEMOLITION
OPERATIONS.
4. CLEAN SOILS SHALL BE UTILIZED FOR BACKFILL.
COMPACTION OF THESE SOILS SHALL BE PERFORMED IN
ACCORDANCE WITH THE CONSTRUCTION DOCUMENTS.
5. ALL ITEMS DESIGNATED TO BE REMOVED SHALL BE
REMOVED COMPLETELY, INCLUDING ALL SUBGRADE
MATERIALS DIRECTLY ASSOCIATED WITH ITEMS TO BE
REMOVED.
6. ALL ITEMS DESIGNATED TO BE REMOVED SHALL BE
DISPOSED OF LEGALLY OFF-SITE UNLESS OTHERWISE
NOTED ON THIS PLAN.
7. EROSION CONTROL DEVICES SHALL BE IN PLACE PRIOR TO
BEGINNING DEMOLITION.
8. ITEMS DESIGNATED TO BE SALVAGED AND/OR RE-USED
SHALL BE REMOVED BY THE CONTRACTOR AND PROVIDED
TO THE VA. COORDINATE STORAGE LOCATION WITH
CONTRACTING OFFICERS REPRESENTATIVE (COR).
9. REPAIR ALL DAMAGES TO THE EXISTING DRIVEWAY,
PARKING LOT, SIDEWALK AND CURB AND GUTTER AS A
RESULT OF CONSTRUCTION ACTIVITY AND TRAFFIC.
MAINTAIN A PRE-CONSTRUCTION VIDEO OR PHOTO
DOCUMENTATION TO SHOW NO DAMAGES OCCURRED.
10. ALL MATERIALS, FURNISHINGS, UTILITIES, AND PAVEMENT
THAT ARE NOT SCHEDULED TO BE DEMOLISHED AND ARE
DAMAGED BY THE CONTRACTOR AS A RESULT OF THE
DEMOLITION OR CONSTRUCTION OPERATIONS SHALL BE
REPAIRED BY THE CONTRACTOR AT NO ADDITIONAL COST
TO THE GOVERNMENT.
11. PROVIDE PEDESTRIAN INGRESS / EGRESS TO ALL EXISTING
BUILDINGS, PARKING LOTS, AND PATHS OF PEDESTRIAN
TRAVEL THROUGHOUT THE CONSTRUCTION PERIOD.
LANDSCAPING NOTES:
1. VERIFY ALL QUANTITIES AND REPORT ANY DISCREPANCIES OR INACCURACIES IN THE PLANS TO THE
CONTRACTOR OFFICER'S REPRESENTATIVE PRIOR TO PLANTING.
2. LANDSCAPE WORK SHALL INCLUDE THE FURNISHING, INSTALLATION, AND WARRANTY OF ALL
PLANTING MATERIALS WITHIN THE PROJECT AREA.
3. THE LANDSCAPE CONTRACTOR SHALL ASCERTAIN THE LOCATION OF ALL EXISTING AND NEW
UNDERGROUND UTILITIES PRIOR TO EXCAVATION FOR PLANTING. DAMAGES TO UTILITIES CAUSED BY
THE LANDSCAPE OPERATION SHALL BE CORRECTED BY THE LANDSCAPE CONTRACTOR AT NO COST
TO THE OWNER.
4. LANDSCAPING SHALL REMAIN CLEAR FROM ANY FIRE HYDRANTS ON THE SITE.
5. ALL PLANT BED AREAS ARE TO RECEIVE A MINIMUM OF 6" OF APPROVED TOPSOIL.
6. SOIL SHOULD BE TESTED AND AMENDED WITH LIME AND FERTILIZER FOR HARDWOOD TREES
ACCORDING TO NJDA PROCEDURES. SCARIFY PLANT PIT WALLS. CONSULT LANDSCAPE ARCHITECT
FOR ALTERNATE COMPLIANCE.
7. SHREDDED HARDWOOD MULCH 3" DEEP EXCEPT AT CROWN OF PLANT UNLESS OTHERWISE NOTED.
FLARE AT CROWN SHOULD BE REVEALED. BACKFILL CONSISTS OF THOROUGHLY BROKEN UP NATIVE
SOIL. TOTAL VOLUME OF BACKFILL SHOULD BE AMENDED WITH UP TO ONE THIRD PINE BARK MULCH.
PIECES SHOULD BE NO LARGER THAN WHAT PASSES THROUGH A ONE INCH SCREEN. IF ADDITIONAL
SOIL IS REQUIRED FOR BACKFILL DUE TO DETRIMENTAL SUBSOIL DRAINAGE CONDITIONS, USE SOIL
SIMILAR TO EXISTING NATIVE SOIL. ADDITIONAL SOIL TO BE APPROVED BY LANDSCAPE ARCHITECT.
MAXIMUM SAUCER HEIGHT IS 6 INCHES.
8. TOP OF ROOTBALL TO BE RAISED 2-3 INCHES ABOVE EXISTING GRADE.
9. FOR B&B PLANTS, NATURAL FIBER BURLAP SHOULD BE TURNED DOWN BY 1/3 TOTAL HEIGHT OF ROOT
BALL. PLASTIC FIBER BURLAP AND WIRE BASKETS SHOULD BE REMOVED TO 2/3'S OF TOTAL HEIGHT
OF ROOT BALL.
10. CONTRACTOR IS RESPONSIBLE FOR KEEPING THE TREE UPRIGHT AND PLUMB THROUGHOUT THE
WARRANTY PERIOD. IF STABILIZATION IS NECESSARY SEE STAKING IN TREE DETAIL, ORANGE
FLAGGING TAPE SHOULD BE ATTACHED TO SUPPORT WIRE. STAKING SHOULD BE REMOVED BY
CONTRACTOR AT END OF ONE YEAR WARRANTY PERIOD OR AS DIRECTED BY GROUNDS
MANAGEMENT.
11. USE STANDARD "GATOR" BAGS (OR EQUAL) FOR WATERING TREES IN AREAS NOT UNDER IRRIGATION.
INCORPORATE TERRA-SORB (OR EQUAL) AS PER MANUFACTURERS RECOMMENDATIONS, FOR AREAS
NOT UNDER IRRIGATION.
SITE LEGEND
EXISTING BUILDING
PROPOSED CONCRETE SIDEWALK
PROPOSED BRICK SIDEWALK
PROPOSED GRAVEL
CURB & GUTTER
PROPOSED SIGN
PROPOSED WALL
PROPOSED LIGHT
PROPOSED BENCH
PROPOSED BOLLARD
METAL EDGING
LIMITS OF DISTURBANCE
DEMOLITION LEGEND
REMOVE PAVERS
REMOVE BRICK PAVERS
REMOVE CONCRETE
REMOVE VEGETATION
LIMITS OF DISTURBANCE
REMOVE TREE
DocuSign Envelope ID: 7C5134E5-D4A9-428A-B4A6-7E8CF47B7EF2
1/26/2021
AutoCAD SHX Text
33.20'
3.00'
17.80'
9.42'
14.11'
31.07'
CENTER
POINT OF
LABYRINTH
R
CONCRETE
SIDEWALK
(SEE DETAIL
1/C-104)
ALIGN JOINT
WITH CORNER
OF BUILDING (TYP.)
EQ. EQ. EQ. EQ.
J N
T
Q
S P
A C
I N
G
UNIT PAVER, REUSE
EXISTING PAVERS
(SEE DETAIL 4/C-104)
BRICK UNIT PAVING,
REUSE EXISTING
PAVERS (SEE DETAIL
4/C-104)
CHALKBOARD
MOUNTED ON BUILDING,
SEE ARCHITECTURAL PLANS
LABYRINTH,
SEE DETAIL
5/C-104
4.27' 4.00'
8" RCP - 23LF
MODIFY EXISTING GRATE
OUTLET TO ACCOMMODATE
NEW STORM PIPE OUTLET
5.67'
RELOCATED
BOLLARD (TYP.)
ALIGN WALK
WITH EXISTING GATE
IN VINYL FENCE.
EXISTING
CONCRETE WALK.
NEW CONCRETE WALK
EXTENDS THROUGH THE
VINYL FENCE AT GATE.
REMOVE FOUNTAIN AND
ALL ASSOCIATED INFRASTRUCTURE
REMOVE EXISTING MANHOLE
X
REMOVE EXISTING
STORM PIPE
ENSURE THAT ALL PAVING SLOPES
TOWARDS DRAIN. 2% MIN. SLOPE
+ 211.65'
+ 211.24'
+ 211.65'
ADJUST GRATE ELEVATION :
GRT=211.32'
+ 211.65
ADJUST GRATE ELEVATION :
GRT=211.22'
+ 211.24'
+ 211.40'
2 %
2 %
CENTER OF
LABYRINTH:
211.47'
+ 211.65'
+ 211.55'
+ 211.65'
2 %
2 %
+ 211.35'
+ 211.55' + 211.55'
+ 211.60'
PLANTING AREA TO
SLOPE TO DRAIN
QTY COMMON SCIENTIFIC CONT. SPACING REMARKS
SHRUBS
35 YEW TAXUS X MEDIA 'DENSIFORMIS' 5 GAL AS SHOWN
43 ENCORE AZALEA
RHODODENDRON 'ROBLES'
PP22762
3 GAL AS SHOWN
18 INKBERRY ILEX GLABRA "SHAMROCK" 3 GAL AS SHOWN
GRASSES
235 SF GRASSLAND SEDGE CAREX DIVULSA 4" POTS 12" O.C.
385 SF TURF GRASS
SPECIES TO MATCH CURRENT ON
CAMPUS
SODDED -
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of
Construction and Facilities
Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120
Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
Engineers Architects
MITCHELLE R. LABADY
EVM
UPGRADE BUILDING 18
INPATIENT & OUTPATIENT
RRTP
VA NEW JERSEY HEALTHCARE
SYSTEM 385 TREMONT AVENUE, EAST
ORANGE, NJ 07018 October 1, 2020
BID DOCUMENTS
561-19-105
19-055
SES
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
COURTYARD
COURTYARD
ENTRY
N
TRUEPLAN
AS NOTEDSCALE:
EXISTING CONDITIONS AND DEMOLITION PLAN
C-102 SCALE: 1/8"=1'-0"
LAYOUT AND PAVING PATTERN PLAN
C-102 SCALE: 1/8"=1'-0"
GRADING PLAN
C-102 SCALE: 1/8"=1'-0"
PLANTING SCHEDULE
C-102 SCALE: 1/8"=1'-0"
C-102
WEST COURTYARD PLAN
2 6
PLANTING PLAN
C-102 SCALE: 1/8"=1'-0"
NOTES:
1) REMOVE ALL PAVERS AND STOCKPILE FOR REUSE.
2) REMOVE ALL BOLLARD LIGHTS IN COURTYARD AND STOCKPILE FOR REUSE.
DEMOLITION LEGEND
REMOVE PAVERS
REMOVE BRICK PAVERS
REMOVE CONCRETE
REMOVE VEGETATION
LIMITS OF DISTURBANCE
REMOVE TREE
SITE LEGEND
EXISTING BUILDING
PROPOSED CONCRETE SIDEWALK
PROPOSED BRICK SIDEWALK
PROPOSED GRAVEL
CURB & GUTTER
PROPOSED SIGN
PROPOSED WALL
PROPOSED LIGHT
PROPOSED BENCH
PROPOSED BOLLARD
METAL EDGING
LIMITS OF DISTURBANCE
DocuSign Envelope ID: 7C5134E5-D4A9-428A-B4A6-7E8CF47B7EF2
1/26/2021
AutoCAD SHX Text 212.63
AutoCAD SHX Text 212.32
AutoCAD SHX Text 211.58
AutoCAD SHX Text 211.66
AutoCAD SHX Text 211.72
AutoCAD SHX Text 210.96
AutoCAD SHX Text 211.47
AutoCAD SHX Text 211.63
AutoCAD SHX Text
MH
AutoCAD SHX Text RIM=211.21 a.INV=209.6 b.INV=207.8 c.INV.=207.2
AutoCAD SHX Text GRT=211.13 a.INV=210.9 b.INV=209.8
AutoCAD SHX Text
GRT=211.32 INV=210.0
AutoCAD SHX Text GRT=211.42 a.INV=210.1 b.INV=(CAPPED)
AutoCAD SHX Text
DS 211.70
AutoCAD SHX Text
GRT=211.27 INV=210.0
AutoCAD SHX Text GRT=211.25 a.INV=210.0 b.INV=(CAPPED)
AutoCAD SHX Text GRT=211.24 a.INV=210.1 b.INV=(CAPPED)
AutoCAD SHX Text
GRT=211.20 INV=209.9
AutoCAD SHX Text
MH
AutoCAD SHX Text RIM=211.22 a.INV=204.7 b.INV=200.1
AutoCAD SHX Text
CONC. WALK
AutoCAD SHX Text
1 STORY BRICK BUILDING
AutoCAD SHX Text
1 STORY BRICK BUILDING
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
PAVERS
AutoCAD SHX Text
PAVERS
AutoCAD SHX Text
VINYL FENCE
AutoCAD SHX Text
VINYL FENCE
AutoCAD SHX Text
VINYL FENCE
AutoCAD SHX Text
6" PVC
AutoCAD SHX Text
6" PVC
AutoCAD SHX Text
6" RCP
AutoCAD SHX Text
2" PVC
AutoCAD SHX Text
6" PVC
AutoCAD SHX Text
6" PVC
AutoCAD SHX Text
6" PVC
AutoCAD SHX Text
24" RCP
AutoCAD SHX Text
24" RCP
AutoCAD SHX Text a
AutoCAD SHX Text b
AutoCAD SHX Text b
AutoCAD SHX Text b
AutoCAD SHX Text a
AutoCAD SHX Text c
AutoCAD SHX Text b
AutoCAD SHX Text a
AutoCAD SHX Text b
AutoCAD SHX Text a
AutoCAD SHX Text b
AutoCAD SHX Text a
AutoCAD SHX Text b
AutoCAD SHX Text b
AutoCAD SHX Text b
AutoCAD SHX Text 211.66
AutoCAD SHX Text 211.72
AutoCAD SHX Text 210.96
AutoCAD SHX Text 211.47
AutoCAD SHX Text 211.63
AutoCAD SHX Text
MH
AutoCAD SHX Text
MH
AutoCAD SHX Text RIM=211.21 a.INV=209.6 b.INV=207.8 c.INV.=207.2
AutoCAD SHX Text GRT=211.13 a.INV=210.9 b.INV=209.8
AutoCAD SHX Text
GRT=211.32 INV=210.0
AutoCAD SHX Text GRT=211.42 a.INV=210.1 b.INV=(CAPPED)
AutoCAD SHX Text
DS 211.70
AutoCAD SHX Text
GRT=211.27 INV=210.0
AutoCAD SHX Text GRT=211.25 a.INV=210.0 b.INV=(CAPPED)
AutoCAD SHX Text GRT=211.24 a.INV=210.1 b.INV=(CAPPED)
AutoCAD SHX Text
GRT=211.20 INV=209.9
AutoCAD SHX Text RIM=211.42 a.INV=209.6 b.INV=207.2
AutoCAD SHX Text
MH
AutoCAD SHX Text RIM=211.22 a.INV=204.7 b.INV=200.1
AutoCAD SHX Text
CONC. WALK
AutoCAD SHX Text
1 STORY BRICK BUILDING
AutoCAD SHX Text
1 STORY BRICK BUILDING
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
PAVERS
AutoCAD SHX Text
PAVERS
AutoCAD SHX Text
VINYL FENCE
AutoCAD SHX Text
VINYL FENCE
AutoCAD SHX Text
VINYL FENCE
AutoCAD SHX Text
6" PVC
AutoCAD SHX Text
6" PVC
AutoCAD SHX Text
6" RCP
AutoCAD SHX Text
2" PVC
AutoCAD SHX Text
6" PVC
AutoCAD SHX Text
6" PVC
AutoCAD SHX Text
6" PVC
AutoCAD SHX Text
6" PVC
AutoCAD SHX Text
8" RCP
AutoCAD SHX Text
24" RCP
AutoCAD SHX Text
24" RCP
AutoCAD SHX Text a
AutoCAD SHX Text b
AutoCAD SHX Text b
AutoCAD SHX Text b
AutoCAD SHX Text a
AutoCAD SHX Text c
AutoCAD SHX Text b
AutoCAD SHX Text a
AutoCAD SHX Text b
AutoCAD SHX Text a
AutoCAD SHX Text b
AutoCAD SHX Text a
AutoCAD SHX Text b
AutoCAD SHX Text a
AutoCAD SHX Text b
AutoCAD SHX Text a
AutoCAD SHX Text b
AutoCAD SHX Text b
AutoCAD SHX Text 211.66
AutoCAD SHX Text 211.72
AutoCAD SHX Text 210.96
AutoCAD SHX Text 211.47
AutoCAD SHX Text 211.63
AutoCAD SHX Text
MH
AutoCAD SHX Text RIM=211.21 a.INV=209.6 b.INV=207.8 c.INV.=207.2
AutoCAD SHX Text GRT=211.13 a.INV=210.9 b.INV=209.8
AutoCAD SHX Text
GRT=211.32 INV=210.0
AutoCAD SHX Text GRT=211.42 a.INV=210.1 b.INV=(CAPPED)
AutoCAD SHX Text
DS 211.70
AutoCAD SHX Text
GRT=211.27 INV=210.0
AutoCAD SHX Text GRT=211.25 a.INV=210.0 b.INV=(CAPPED)
AutoCAD SHX Text GRT=211.24 a.INV=210.1 b.INV=(CAPPED)
AutoCAD SHX Text
GRT=211.20 INV=209.9
AutoCAD SHX Text
MH
AutoCAD SHX Text RIM=211.22 a.INV=204.7 b.INV=200.1
AutoCAD SHX Text
CONC. WALK
AutoCAD SHX Text
1 STORY BRICK BUILDING
AutoCAD SHX Text
1 STORY BRICK BUILDING
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
PAVERS
AutoCAD SHX Text
PAVERS
AutoCAD SHX Text
VINYL FENCE
AutoCAD SHX Text
VINYL FENCE
AutoCAD SHX Text
VINYL FENCE
AutoCAD SHX Text
6" PVC
AutoCAD SHX Text
6" PVC
AutoCAD SHX Text
6" RCP
AutoCAD SHX Text
2" PVC
AutoCAD SHX Text
6" PVC
AutoCAD SHX Text
6" PVC
AutoCAD SHX Text
6" PVC
AutoCAD SHX Text
24" RCP
AutoCAD SHX Text
24" RCP
AutoCAD SHX Text a
AutoCAD SHX Text b
AutoCAD SHX Text b
AutoCAD SHX Text b
AutoCAD SHX Text a
AutoCAD SHX Text c
AutoCAD SHX Text b
AutoCAD SHX Text a
AutoCAD SHX Text b
AutoCAD SHX Text a
AutoCAD SHX Text b
AutoCAD SHX Text a
AutoCAD SHX Text b
AutoCAD SHX Text b
AutoCAD SHX Text b
AutoCAD SHX Text
MH
AutoCAD SHX Text
MH
AutoCAD SHX Text
CONC. WALK
AutoCAD SHX Text
1 STORY BRICK BUILDING
AutoCAD SHX Text
1 STORY BRICK BUILDING
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
PAVERS
AutoCAD SHX Text
PAVERS
AutoCAD SHX Text
VINYL FENCE
AutoCAD SHX Text
VINYL FENCE
AutoCAD SHX Text
VINYL FENCE
REMOVE STAIRS, HANDRAIL, AND SIDEWALK.
REMOVE ALL SUB BASE TO EXISTING SOIL (TYP.)
SAW CUT AND
REMOVE EXISTING
SIDEWALK (TYP.)
CLEAR AND GRUB
EXISTING VEGETATION
(TYP.)
X
REMOVE EXISTING
TREE (TYP.)
REMOVE EXISTING HANDRAIL
DN
DN
CR
7.00'
7.00'
8.00'
8.48'
7.00'
9.57'
E
X
I
S
T
I
N
G
A
D
M
A
I
N
NOTE: EXISTING CONDITIONS INFORMATION FOR ENTRY AREA
WAS PROVIDED BY THE VA. CONTRACTOR TO VERIFY
ALL INFORMATION PRIOR TO CONSTRUCTION.
BUILDING 18
QTY COMMON SCIENTIFIC CONT. SPACING REMARKS
TREES
7 NATCHEZ CRAPE MYRTLE LAGERSTROEMIA X 'NATCHEZ' 25 GAL. AS SHOWN
MULTI-STEM, MATCHED HEIGHT
8-10'
GRASSES
142 BIG BLUE LILYTURF LIRIOPE MUSCARI 4" POT 10" O.C.
111 LLANO INDIAN GRASS SORGHASTRUM NUTANS 'LLANO' 1 GAL. 24" O.C.
2.00'
CR
8.00'
7.00'7.00'7.00'7.00'7.00'7.00'
6.59'
2.00'
7.00'
WALL WITH SIGN,
SEE DETAIL 8/C-104
BENCH
(TYP.)
METAL EDGING,
SEE DETAIL 6/C-104
(TYP.)
DECORATIVE
STONE PAVING (TYP.),
SEE DETAIL 7/C-104
EXTEND EXISTING
HANDRAIL TO EDGE OF
GRAVEL, HANDRAIL TO
MATCH EXISTING
METAL HANDRAIL BOTH SIDES,
MATCH EXISTING HANDRAIL
CONCRETE
PAVING (TYP.)
SEE DETAIL
1/C-104
NOTE: BENCHES SHALL BE THE GENERATION 50 BENCH WITH ANGLE END ARMS
MANUFACTURED BY LANDSCAPE FORMS
JOINT SHALL ALIGN WITH
EXISTING CONCRETE
SIDEWALK EDGE
C-105
C-105
CENTER BENCH ON
CONCRETE PAD
42.00'
EXTEND HANDRAIL
TO BUILDING FACE
JOINT SHALL ALIGN WITH
EXISTING CONCRETE
SIDEWALK EDGE
BUILDING 18
CR
T
Y P
T
Y P
T
Y P
7.00'
(TYP.)
3.50' 3.50'
CENTER TREE IN
LANDSCAPE BED
ALIGN TREES ON BOTH
SIDES OF SIDEWALK
BUILDING 18
CR
7 RISERS @ 6"
7 TREADS @ 12"
MAINTAIN UNIFORM
SLOPE ACROSS ENTIRE
LANDSCAPE AREA
UNIFORM GRADE ALONG
SLOPE, 3:1 MAX SLOPE
TIE PROPOSED SLOPE
INTO EXISTING GRADE
ALONG LIMITS OF
DISTURBANCE
3:1
MAX
ENSURE POSITIVE
DRAINAGE AWAY FROM
BUILDING TOWARDS
EXISTING STREET
DRAINAGE
2 %
MAX
2 %
MIN
NOTE: EXISTING CONDITIONS INFORMATION FOR ENTRY AREA
WAS PROVIDED BY THE VA. CONTRACTOR TO VERIFY
ALL GRADES PRIOR TO CONSTRUCTION
BUILDING 18
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of
Construction and Facilities
Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120
Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
Engineers Architects
MITCHELLE R. LABADY
EVM
UPGRADE BUILDING 18
INPATIENT & OUTPATIENT
RRTP
VA NEW JERSEY HEALTHCARE
SYSTEM 385 TREMONT AVENUE, EAST
ORANGE, NJ 07018 October 1, 2020
BID DOCUMENTS
561-19-105
19-055
SES
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
COURTYARD
COURTYARD
ENTRY
N
TRUEPLAN
AS NOTEDSCALE:
EXISTING CONDITIONS AND DEMOLITION PLAN
C-103 SCALE: 1/8"=1'-0"
LAYOUT AND PAVING PATTERN PLAN
C-103 SCALE: 1/8"=1'-0"
PLANTING PLAN
C-103 SCALE: 1/8"=1'-0"
PLANTING SCHEDULE
C-103 SCALE: 1/8"=1'-0"
C-103
ENTRY IMPROVEMENTS PLAN
3 6
GRADING PLAN
C-103 SCALE: 1/8"=1'-0"
DEMOLITION LEGEND
REMOVE PAVERS
REMOVE BRICK PAVERS
REMOVE CONCRETE
REMOVE VEGETATION
LIMITS OF DISTURBANCE
REMOVE TREE
DocuSign Envelope ID: 7C5134E5-D4A9-428A-B4A6-7E8CF47B7EF2
1/26/2021
B
COMPACTED AGGREGATE BASE COURSE
COMPACTED SUBGRADE
3,000 PSI AIR-ENTRAINED CONCRETE SLAB
LIGHT BROOM FINISH
PAVING JOINTS (TYP.)
A
B
4"
5"
LIGHT
DUTY
(SEE DETAIL 2 / C-104)
PREMOLDED ASPHALT IMPREGNATED
FIBER, FULL DEPTH. (RECESSED
" W @ 4" AND 8" CONCRETE
" WIDE SAW CUT CONTROL
J…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .