iii. I-101_Addendum-1_20210305.pdf
PDF 2 MB Posted
- Solicitation number
- 36C24221B0012
About this file
This solicitation package includes plans and specifications for the Upgrade of Building 18 at the VA New Jersey Healthcare Systems East Orange Campus project. Key details include:
-
The project involves mechanical, electrical, plumbing and structural upgrades to Building 18, which provides residential rehabilitation treatment. Work includes improving the building entrance, nurse station, HVAC, drainage, lighting, electrical systems, and finishes throughout, as well as upgrading the northeast courtyard.
-
The response due date is December 22, 2020 when the full solicitation will be posted to www.fbo.gov. The project completion deadline is 270 calendar days. Pricing will be solicited through this competitive procurement.
-
This is a 100% SDVOSB set-aside requiring registration at SAM.gov and VIP.vetbiz.gov verification as a service-disabled veteran-owned small business. The cost estimate range is $2-5 million. Bonding will be required. The contracting agency is the VA Veterans Health Administration VISN 2.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
02 02
02 02
18-103
CARE STATION
18-104
MEDS
18-105
EXAM
18-106
LOUNGE
18-112
DAY ROOM
18-113
2 BEDROOM
18-114
2-BEDROOM
18-115
2-BEDROOM
18-116
2-BEDROOM
18-117
2-BEDROOM18-118
MALE TOILET
18-119
TELE/ELEC
18-120
CLO
18-121
CLO
18-122
DIRTY UTILITY
18-122A
STORAGE
18-107
1-BEDROOM
18-108
1-BEDROOM
18-109
1-BEDROOM
18-110
1-BEDROOM
18-111
1-BEDROOM
18-102
CORRIDOR
18-125
BEDROOM
18-101
CORRIDOR
18-126
BEDROOM
18-127
BEDROOM
18-128
BEDROOM
18-129
BEDROOM
18-130
BEDROOM
18-131
CORRIDOR
18-132
DAYROOM
18-133
BEDROOM
18-134
BEDROOM
18-135
BEDROOM
18-136
BEDROOM
18-137
WOMEN'S TLT
18-138
MEN'S TLT
18-132A
LINEN
18-C1
COURTYARD
18-138A
CORRIDOR
18-139
LINEN
18-140
CLO
18-141
ELEC
18-142
CORRIDOR
18-143
MECH
18-144
MEN'S TLT
18-145
OFFICE
18-146
OFFICE
18-147
OFFICE
18-148
OFFICE
18-149
OFFICE
18-150
OFFICE
18-151
OFFICE
18-152
OFFICE
18-153
GROUP ROOM
18-154
RECEPT
18-155
OFFICE
18-156
CORRIDOR
18-157
MEN'S TLT
18-162
OFFICE
18-163
OFFICE
18-164
OFFICE
18-165
OFFICE
18-166
OFFICE
18-167
OFFICE
18-168
OFFICE
18-155A
OFFICE
18-155B
OFFICE
18-155C
OFFICE
18-154B
BREAKROOM
18-154A
VEST
18-150A
UTIL CLT
18-158A
CLO
18-132B
WOMEN'S TLT
18-158
OFFICE
18-159
OFFICE
18-160
OFFICE
18-161
OFFICE
P-3
P -3
P -4
P -4
P -4
P -4
P -4
P -4
P -4
P -4
P -4
P -3
P -3
P-4
P -4
P -4
P -4
P -4
P -4
P -4
P -4
P -4
P -4
P -4
P -3
I-101
I-101
CG CG
CG
CG
CG
CGCG
CG
I-101
P-2
P-2
P -2
CG
CORNER GUARD
BUMPER/ HAND RAIL/ WALL GUARD
WALL GUARD
CHAIR RAIL/CRASH RAIL
LVT-1
LVT-1
LVT-2
LVT-2
P L A
N K
D
IR
E C
T
IO
N
LVT-1
LVT-1
LVT-2LVT-2
LVT-1
LVT-1
NEW LVT-1
EXISTING LVT
EXISTING LVT
NEW LVT-2
EXISTING
FLOOR FINISHES
LVT-1
LVT-2
P L A
N K
D
IR
E
C T
IO
N
P L A
N K
D
IR
E
C T
IO
N
LVT-1
LVT-2
A L
IG
N
A L
IG
N
1'-0"
A. ALL CORNER GUARDS TO BE FROM TOP OF BASE
TO CEILING (EDIT PER HEIGHT PER PROJECT).
B. PROVIDE BLOCKING IN WALLS FOR ALL
CRASH/HANDRAILS AND BUMPER RAILS.
C. TYPICAL WALL PROTECTION HEIGHT IS XX IN XX
ROOMS AND CORRIDORS ARE 3'-0" H.
D. SEE TYPICAL DETAIL SECTIONS ON SHEET I-1XX.
E. HOLD BACK HANDRAIL/BUMPER RAIL TO BE HELD
BACK FROM CORNER GUARDS AND DOORFRAMES
2"
F. HANDRAIL NOT TO BE BEHIND DOORS WITH
CLOSURES AND START HANDRAIL 6" AWAY FROM
START OF DOOR WHEN OPEN
G. STANDARD WALL PROTECTION (SHEET) TO BE .040"
THICKNESS FOR DRYWALL APPLICATIONS AND .060"
THICKNESS FOR BRICK/CMU.
H. SEE SPECIFICATION 09 06 00 SCHEDULE OF
FINISHES FOR MATERIALS AND FINISHES
LVT-2
LVT-2
LVT-1
WRAP BORDER AT END OF CORRIDOR,
TYPICAL ALL CORRIDORS
0 4 8 16
NORTH
PLAN
Scale: 1/8" = 1'-0"
FIRST FLOOR FINISH PLAN
Engineers Architects
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
RED Engineering & Design, Inc.
126 Salem Towne Ct.
Apex, NC 27502 919-833-3486
TRUE NORTH
STRUCTURAL ENGINEERING:
/5
/2
:0
:5
P M
I-101
FIRST FLOOR FINISH PLAN
2 3
MITCHELLE R. LABADY
CK/GS/RJ
Upgrade Building 18 Inpatient & Outpatient RRTP
VA NEW JERSEY HEALTHCARE SYSTEM
385 TREMONT AVENUE
EAST ORANGE, NJ 07018 OCTOBER 1, 2020
BID DOCUMENTS
561-19-10519-055
CK
WALL PROTECTION LEGEND
01 INSTALL DECORATIVE WALL PANEL, DWP-1,
TYPICAL. TERMINATE AT INSIDE CORNER, CEILING,
TOP OF BASE, AND BEHIND CORNER GUARD.
REFER TO ELEVATION 13/A-401
02 CHAIR RAIL. SEE DETAIL ON A-501, TYP.
N
ADDITION
KEY PLAN
SCALE: NO SCALE
COURTYARD COURTYARD
RENOVATIONS
Scale: 1/4" = 1'-0"
ENLARGED FINISH PLAN AT CARE STATION & CORRIDOR
FLOOR FINISH LEGEND
0 2 4 8
NORTH
PLAN
Scale: 1/4" = 1'-0"
ENLARGED FINISH PLAN AT RECEPTION 0 2 4 8
NORTH
PLAN
Scale: 1/4" = 1'-0"
ENLARGED FINISH PLAN AT END OF CORRIDOR 0 2 4 8
NORTH
PLAN
1 ADDENDUM #1 03/05/2021
DocuSign Envelope ID: 9432FF47-B655-4312-AEC1-0E4715644BA3
3/8/2021
| Sheets |
| I-101 - FIRST FLOOR FINISH PLAN |
| 2021-03-08T07:23:39-0800 | |
| Digitally verifiable PDF exported from www.docusign.com |
File details come from the government source that posted it. Updated .