This document provides details for a federal contract opportunity to upgrade Building 18 of the Residential Rehabilitation Treatment Program at the VA New Jersey Healthcare System campus in East Orange. The project involves mechanical, electrical, plumbing and structural work as defined in the project drawings and specifications. Key aspects of the opportunity include a 100% Service-Disabled Veteran Owned Small Business set-aside, a cost estimate range of $2-5 million, a 270-day period of performance, and a planned solicitation release date of December 22, 2020 requiring hard copy submissions. The selected contractor will improve building entrances, HVAC systems, lighting, finishes and drainage, as well as upgrade the northeast courtyard. Responses are due as specified in the solicitation to be issued through the Federal Business Opportunities website.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SIGNAGE TYPES AND LEGEND

11X17 INSERT

SLEEVE

11X17 INSERT

SLEEVE

DIVIDER BETWEEN

SLEEVES

E

A. REFERENCE SPECIFICATION 09 06 00 SCHEDULE OF

FINISHES FOR FINISH MATERIAL DEFINITIONS.

B. REFERENCE REFLECTED CEILING PLAN FOR

ADDITIONAL CEILING INFO.

C. ALL NEW INTERIOR FINISHES, INCLUDING FLOOR,

WALL, AND CEILING MATERIALS, SHALL BE IN

ACCORDANCE WITH FLAME SPREAD AND SMOKE

DEVELOPMENT REQUIREMENTS FOUND IN THE

CURRENT EDITION OF THE INTERNATIONAL

BUILDING CODE.

D. THE CONTRACTOR SHALL BE RESPONSIBLE TO

VERIFY THAT ALL NEW INTERIOR WALL AND CEILING

FINISHES WILL BE CLASS B MINIMUM, WITH A FLAME

SPREAD RATING OF 75 MAXIMUM AND A SMOKE

DEVELOPED INDEX OF 450 MAXIMUM PER IBC

SECTION 803

E. PREPARE ALL FLOOR AND WALL CONSTRUCTION,

NEW AND/OR EXISTING, TO RECEIVE NEW FINISHES

IN ACCORDANCE WITH MANUFACTURER’S

RECOMMENDED INSTALLATION METHODS AND

MATERIALS FOR ALL FINISHES.

F. PRIOR TO INSTALLATION OF NEW FINISHES,

CONTRACTOR SHALL INSPECT ALL SUBSTRATES. IF

A SUBSTRATE IS DEEMED UNACCEPTABLE, THE

CONTRACTOR SHALL TAKE THE NECESSARY STEPS

TO RECTIFY THE SITUATION OR CONTACT THE

ARCHITECT WITH THE CONCERN. PROCEEDING

WITH THE INSTALLATION OF FINISHES WILL BE

INDICATION THAT THE INSTALLER / FINISHER

ACCEPTS CONDITION OF SUBSTRATE.

G. USE MANUFACTURER'S RECOMMENDED

INSTALLATION METHODS AND MATERIALS FOR ALL

FINISHES.

H. ALL NECESSARY TILE FLOORING UNDERLAYMENT

TO BE PROVIDED AND INSTALLED BY FLOORING

CONTRACTOR

I. ALL FLOORING TRANSITIONS SHALL COMPLY WITH

ADA GUIDELINES. FLOORING CONTRACTOR TO

SUBMIT A DIAGRAM SHOWING FLOORING

TRANSITION LOCATIONS FOR DESIGNERS

APPROVAL PRIOR TO INSTALLATION.

J. ALL TRANSITION/REDUCER STRIPS AND OTHER

THRESHOLDS TO BE LOCATED AT CENTERLINE OF

DOOR WHEN IN CLOSED POSITION

K. ALIGN FLOORING TRANSITIONS WITH FINISH BASE

EXCEPT AT DOORS, U.N.O.

L. FLOOR FINISHES ARE TO EXTEND UNDER NEW

BUILT-IN CABINETS.

M. FINISH LEVEL OF GYP. BD. WALLS AND SOFFITS TO

BE LEVEL 4, U.N.O.

N. ALL PAINTED WALLS TO BE PAINTED P-2, UNLESS

NOTED OTHERWISE.

O. ALL GYP. BOARD CEILINGS TO BE PAINTED P-4,

U.N.O.

P. ALL PAINTED SURFACES SHALL RECEIVE A MINIMUM

OF (1) ONE BASE COAT AND (2) TWO FINISH COATS

Q. PAINTED SHEEN LEVEL TO BE SATIN/EGG-SHELL

FOR ALL WALLS, U.N.O. SHEEN FOR ALL WET AREA

WALLS, METAL DOORS AND METAL FRAMES TO BE

SEMI-GLOSS.

R. PAINT ALL EXPOSED METAL SURFACES, SUCH AS

GRILLES, FIRE EXTINGUISHER CABINETS, ETC. WITH

PAINT TO MATCH ADJACENT SURFACE.

S. ALL HOLLOW METAL DOORS AND FRAMES TO BE

PAINTED P-1.

T. INSTALL SEALANT AT JUNCTURE OF INTERIOR

FACES OF DOOR FRAMES, VIEW WINDOW FRAMES,

EXTERIOR WINDOW FRAMES, CABINET WORK,

CASEWORK, RECESSED TOILET ACCESSORIES,

SURFACE MOUNTED TOILET ACCESSORIES, ETC.,

WITH ADJACENT MATERIALS EVEN THOUGH JOINT

MAY NOT BE VISIBLE.

U. VERIFY ALL SIGNAGE TEXT WITH COR PRIOR TO

FABRICATION.

Type X 9"w X 9"h Solid Acrylic Red Background with White Letters

/2

FINISH ABBREVIATIONS

AB ALUMINUM WALL BASE

ACT ACOUSTICAL CEILING TILE

ADJ ADJACENT

AFF ABOVE FINISHED FLOOR

AL ALUMINUM

AP ACOUSTIC WALL PANEL

BBT BIOBASED TILE

CG CORNER GUARD

CJ CONTROL JOINT

CMU CONCRETE MASONRY UNIT

CON CONCRETE FLOORING

CR CARD READER

CPT CARPET

CS CULTURED STONE

CT CERAMIC TILE

DG DOOR FRAME GUARD

EG END WALL GUARD

EM ENTRY MAT SYSTEM

EPX EPOXY FLOORING

EX EXISTING

EXJ EXPANSION JOINT

EXP EXPOSED

F FABRIC

FRP FIBERGLASS REINFORCED PANELS

GLS DECORATIVE GLASS

G GROUT

GYP GYPSUM WALL BOARD

HR HAND RAIL

LAM PLASTIC LAMINATE

LF LINEAR FEET (FOOT)

LIN LINOLEUM SHEET / TILE

LVT LUXURY VINYL TILE

MB MOLDED WALL BASE

MTL METAL

MISC MISCELLANEOUS

NA NOT APPLICABLE

NS NATURAL STONE

PNT PAINT

PFIN PREFINISHED

QTZ QUARTZ COUNTERTOP

RB RESILIENT WALL BASE

RPS RESIN PANEL SYSTEM

RM ROCK MULCH

RVT RESILIENT VINYL TILE

SF SQUARE FEET (FOOT)

SS SOLID SURFACE

SST STAINLESS STEEL

SSV SPECIALTY SHEET VINYL

ST STAIN

SV SHEET VINYL

SVT SPECIALTY VINYL TILE

T TILE FLOORING/ WALL / WALL

BASE (CERAMIC, PORCELAIN,

GLASS)

TP TOLIET PARTITION

TR DECORATIVE WOOD TRIM /

CROWN / BASE MOLDING

TS TRANSITION STRIP

TYP TYPICAL

TZ TERAZZO FLOORING

UFIN UNFINISHED

UNO UNLESS NOTED OTHERWISE

VCT VINYL COMPOSITION TILE

VET VINYL ENCHANCED TILE

VIF VERIFY IN FIELD

VWC VINYL WALL COVERING

WD WOOD FLOORING

WDP WOOD PANELING / WAINSCOT

WP WALL PROTECTION

WR WHITEROCK

Engineers Architects

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

RED Engineering & Design, Inc.

126 Salem Towne Ct.

Apex, NC 27502 919-833-3486

STRUCTURAL ENGINEERING:

/5

/2

:0

:4

P M

I-001

PRODUCT SCHEDULES, SYMBOLS AND

ABBREVIATIONS

1 3

MITCHELLE R. LABADY

CK/GS/RJ

Upgrade Building 18 Inpatient & Outpatient RRTP

VA NEW JERSEY HEALTHCARE SYSTEM

385 TREMONT AVENUE

EAST ORANGE, NJ 07018 OCTOBER 1, 2020

BID DOCUMENTS

561-19-10519-055

CK

ROOM FINISH SCHEDULE

ROOM NO. NAME FLOOR BASE WALLS

CEILING

REMARKSFIN HEIGHT

FIRST FLOOR

18-101 CORRIDOR LVT-1, LVT-2 RB-1 P-2 EXISTING 8' - 0"

18-102 CORRIDOR LVT-1, LVT-2 RB-1 P-2 EXISTING 8' - 0"

18-103 CARE

STATION

LVT-1 RB-1 P-2 ACT-1 8' - 0"

18-104 MEDS RT-1 RB-1 P-2 ACT-1 8' - 0"

18-105 EXAM LVT-1 RB-1 P-2 ACT-1 8' - 0"

18-106 LOUNGE LVT-1 RB-1 P-2 P-4 8' - 0"

18-107 1-BEDROOM LVT-1 RB-1 P-2 P-4 8' - 0"

18-108 1-BEDROOM LVT-1 RB-1 P-2 P-4 8' - 0"

18-109 1-BEDROOM LVT-1 RB-1 P-2 P-4 8' - 0"

18-110 1-BEDROOM LVT-1 RB-1 P-2 P-4 8' - 0"

18-111 1-BEDROOM LVT-1 RB-1 P-2 P-4 8' - 0"

18-112 DAY ROOM LVT-1 RB-1 P-2 EXISTING 8' - 0"

18-113 2 BEDROOM LVT-1 RB-1 P-2 P-4 8' - 0"

18-114 2-BEDROOM LVT-1 RB-1 P-2 P-4 8' - 0"

18-115 2-BEDROOM LVT-1 RB-1 P-2 P-4 8' - 0"

18-116 2-BEDROOM LVT-1 RB-1 P-2 P-4 8' - 0"

18-117 2-BEDROOM LVT-1 RB-1 P-2 P-4 8' - 0"

18-118 MALE TOILET EXISTING EXISTING EXISTING EXISTING 8' - 0"

18-119 TELE/ELEC EXISTING EXISTING EXISTING EXISTING 8' - 0"

18-120 CLO EXISTING EXISTING EXISTING EXISTING 8' - 0"

18-121 CLO EXISTING EXISTING EXISTING EXISTING 8' - 0"

18-122 DIRTY UTILITY LVT-1 RB-1 P-2 P-4 8' - 0"

18-122A STORAGE LVT-1 RB-1 P-2 P-4 8' - 0"

18-125 BEDROOM LVT-1 RB-1 P-2 P-4 8' - 0"

18-126 BEDROOM LVT-1 RB-1 P-2 P-4 8' - 0"

18-127 BEDROOM LVT-1 RB-1 P-2 P-4 8' - 0"

18-128 BEDROOM LVT-1 RB-1 P-2 P-4 8' - 0"

18-129 BEDROOM LVT-1 RB-1 P-2 P-4 8' - 0"

18-130 BEDROOM LVT-1 RB-1 P-2 P-4 8' - 0"

18-131 CORRIDOR LVT-1, LVT-2 RB-1 P-2 EXISTING 8' - 0"

18-132 DAYROOM LVT-1 RB-1 P-2 ACT-1 7' - 8"

18-132A LINEN LVT-1 RB-1 P-2 P-4 8' - 0"

18-132B WOMEN'S TLT CT-1 CT-1 CT-1 P-4 8' - 0"

18-133 BEDROOM LVT-1 RB-1 P-2 P-4 8' - 0"

18-134 BEDROOM LVT-1 RB-1 P-2 P-4 8' - 0"

18-135 BEDROOM LVT-1 RB-1 P-2 P-4 8' - 0"

18-136 BEDROOM LVT-1 RB-1 P-2 P-4 8' - 0"

18-137 WOMEN'S TLT CT-1 CT-1 CT-1 P-4 8' - 0"

18-138 MEN'S TLT EXISTING EXISTING EXISTING EXISTING 8' - 0"

18-138A CORRIDOR EXISTING EXISTING EXISTING EXISTING 8' - 0"

18-139 LINEN LVT-1 RB-1 P-2 P-4 8' - 0"

18-140 CLO EXISTING EXISTING EXISTING EXISTING 8' - 0"

18-141 ELEC EXISTING EXISTING EXISTING EXISTING 8' - 0"

18-142 CORRIDOR EXISTING EXISTING EXISTING EXISTING 8' - 0"

18-143 MECH EXISTING EXISTING EXISTING EXISTING 8' - 0"

18-144 MEN'S TLT EXISTING EXISTING EXISTING EXISTING 8' - 0"

18-145 OFFICE LVT-1 RB-1 P-2 P-4 8' - 0"

18-146 OFFICE LVT-1 RB-1 P-2 P-4 8' - 0"

18-147 OFFICE LVT-1 RB-1 P-2 P-4 8' - 0"

18-148 OFFICE LVT-1 RB-1 P-2 P-4 8' - 0"

18-149 OFFICE LVT-1 RB-1 P-2 P-4 8' - 0"

18-150 OFFICE LVT-1 RB-1 P-2 P-4 8' - 0"

18-150A UTIL CLT LVT-1 RB-1 P-2 ACT-1 8' - 0"

18-151 OFFICE LVT-1 RB-1 P-2 P-4 8' - 0"

18-152 OFFICE LVT-1 RB-1 P-2 P-4 8' - 0"

18-153 GROUP ROOM LVT-1 RB-1 P-2 P-4 8' - 0"

18-154 RECEPT LVT-1 RB-1 P-2 ACT-1 8' - 0"

18-154A VEST LVT-1 RB-1 P-2 ACT-1 8' - 0"

18-154B BREAKROOM LVT-1 RB-1 P-2 EXISTING 8' - 0"

18-155 OFFICE LVT-1 RB-1 P-2 P-4 8' - 0"

18-155A OFFICE LVT-1 RB-1 P-2 P-4 8' - 0"

18-155B OFFICE LVT-1 RB-1 P-2 P-4 8' - 0"

18-155C OFFICE LVT-1 RB-1 P-2 P-4 8' - 0"

18-156 CORRIDOR EXISTING EXISTING EXISTING EXISTING 8' - 0"

18-157 MEN'S TLT EXISTING EXISTING EXISTING EXISTING 8' - 0"

18-158 OFFICE LVT-1 RB-1 P-2 P-4 8' - 0"

18-158A CLO EXISTING EXISTING EXISTING EXISTING 8' - 0"

18-159 OFFICE LVT-1 RB-1 P-2 P-4 8' - 0"

18-160 OFFICE LVT-1 RB-1 P-2 P-4 8' - 0"

18-161 OFFICE LVT-1 RB-1 P-2 P-4 8' - 0"

18-162 OFFICE LVT-1 RB-1 P-2 P-4 8' - 0"

18-163 OFFICE LVT-1 RB-1 P-2 P-4 8' - 0"

18-164 OFFICE LVT-1 RB-1 P-2 P-4 8' - 0"

18-165 OFFICE LVT-1 RB-1 P-2 P-4 8' - 0"

18-166 OFFICE LVT-1 RB-1 P-2 P-4 8' - 0"

18-167 OFFICE LVT-1 RB-1 P-2 P-4 8' - 0"

18-168 OFFICE LVT-1 RB-1 P-2 P-4 8' - 0"

1 ADDENDUM #1 03/05/2021

DocuSign Envelope ID: 9432FF47-B655-4312-AEC1-0E4715644BA3

3/8/2021

Sheets
I-001 - PRODUCT SCHEDULES, SYMBOLS AND ABBREVIATIONS