This document appears to be a set of drawings and specifications for a roof replacement project at the Ann Arbor VA Medical Center. The key details are:
The project involves replacing the roofing systems on multiple buildings and floors, including the 8th and 9th floor roofs of the 1W unit and the 10th floor penthouse roof. The base bid calls for removing the existing roofing down to the concrete deck and installing new EPDM roofing and insulation to meet minimum R-33 requirements. There are also bid alternates, including an option to keep the existing insulation and add additional layers. The drawings provide detailed plans, elevations, and roof sections/details outlining the scope of work. The project is being solicited under VA Solicitation Number 36C25024B0033, titled "Z1DA--Descoped Replace Roofing B1W 506-21-202." The bid documents are dated December 1, 2023.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| CONTRACT 36C25024C0116 PROJECT 506-21-202 AWARDED.pdf | ||
| 36C25024B0033 0004 - 506-21-202.pdf | ||
| Pre Bid Site Visit Attendance Log - 506-21-202.pdf | ||
| 36C25024B0033 0003 - 506-21-202.pdf | ||
| 36C25024B0033 0002 - 506-21-202.pdf | ||
| Pre-Bid Site Visit Agenda signed - 506-21-202.pdf | ||
| ATTENDANCE LOG - Pre-Bid Site Visit - 506-21-202.pdf | ||
| 36C25024B0033 0001 - 506-21-202.pdf | ||
| RFIs Answered - 506-21-202.pdf | ||
| Wage Determination MI20240100 Apr 5 2024 - 506-21-202.pdf | ||
| RFI Form - 506-21-202.doc | DOC document | |
| Specifications Mar 27 - 506-21-202.pdf | ||
| EMR Certification Form - 506-21-202.pdf | ||
| Drawing 01W-AS140 - 506-21-202.pdf | ||
| Wage Determination MI20240100 Jan 19 2024 - 506-21-202.pdf | ||
| 36C25024B0033_4.docx | DOCX document |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BID ALTERNATES
REFER TO SECTION 01 00 00 - GENERAL REQUIREMENTS FOR MORE INFORMATION
BID ALTERNATIVE NO. 1 - DEMOLITION /REMOVAL OF EXISTNG ROOF MEMBRANE,
COVER BOARD AND INSULATION DOWN TO CONCRETE ROOF DECK, INSTALL 6
INCHES OF POLYISO ROOF INSULATION TO MEET MINIMUM R-33 VA SCOPE
REQUIREMENT, WITH BALANCE OF WORK TO MATCH BASE BID SCOPE.
BID DEDUCTION NO. 2 - SCOPE OF 8TH FLOOR ROOF (N)
BID DEDUCTION NO. 3 - SCOPE OF 10TH FLOOR PENTHOUSE ROOF
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
DWG. ___ OF 08
7GAE PROJECT NO.: 220109
Sprinkler:
600 E. Michigan Avenue, Suite B Kalamazoo, MI 49007 P: 269.927.0144 www.7GenAE.com
1635 Prince Street Alexandria, VA 22314 P: 202.617.8485 www.alliance.us.com
COVER SHEET ROOF REPLACEMENT
ANN ARBOR VAMC
220109
1W
PROJECT DIRECTOR
DECEMBER 1, 2023 JD GN
100% BID
DOCUMENTS
G001
ANN ARBOR, MICHIGAN
NORTH
LOCATION MAPPROJECT TEAM DRAWING SHEET INDEX
ARCHITECTURE:
OWNER:
DESCRIPTIONSHEET ISSUE DATE
PHONE: 269.927.0144
269.593.5933FAX:
ALLIANCE│7GAE JV
KALAMAZOO, MI 49007
600 E. MICHIGAN AVENUE - SUITE B
WEB: WWW.7GENAE.COM
OFFICE OF CONSTRUCTION &
FACILITES MANAGEMENT
DEPARTMENT OF VETERANS AFFAIRS
ANN ARBOR, MI, 48105
2215 FULLER ROAD
PROJECT NO. 506-21-202 ROOF REPLACEMENT, B1W
VA ANN ARBOR HEALTHCARE SYSTEM
DEPARTMENT OF VETERANS AFFAIRS
ANN ARBOR, MICHIGAN
G001 COVER SHEET DECEMBER 1, 2023
GS100 SITE CAMPUS MAP DECEMBER 1, 2023
01W-AS140 COMPOSITE ROOF PLAN DECEMBER 1, 2023
01W-AS141 ROOF PLAN - UNIT A DECEMBER 1, 2023
01W-AS142 ROOF PLAN - UNIT B DECEMBER 1, 2023
01W-AS200 EXTERIOR ELEVATIONS DECEMBER 1, 2023
01W-AS201 EXTERIOR ELEVATIONS DECEMBER 1, 2023
01W-AS340 ROOF SECTIONS AND DETAILS DECEMBER 1, 2023
PROJECT LOCATION
100% BID DOCUMENTS
DIRECTOR
ASSOCIATE DIRECTOR
PROJECT #506-21-202 SIGNATURE DATE
CHIEF OF STAFF
CHIEF, FMS
CHIEF, ENGINEERING SECTION
CHIEF, ENVIRONMENTAL MANAGEMENT SECTION
INFECTION CONTROL OFFICER
PATIENT SAFETY MANAGER
GEMS COORDINATOR
CHIEF, POLICE SERVICE
CHIEF, FIRE SERVICE
UNION SAFETY REPRESENTATIVE
CONTRACTING OFFICER
COR
SAFETY SPECIALIST
ASSOCIATE DIRECTOR FOR PATIENT CARE SERVICES
Revisions: Date:
100% BID DOCUMENTS 12/01/23
JAMES F.
DERKS
ARCHITECT
NO.
36980
T500
WALK
CONC.
FREEDOM BUILDING (1E)
LIBERTY BUILDING (1W)
SITE CAMPUS MAP LEGEND
BUILDING ROOF IN SCOPE OF WORK
PROPOSED PROJECT LAYDOWN AREAS (TO BE
CONFIRMED BY CONTRACTOR W/ COR)
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
DWG. ___ OF 08
7GAE PROJECT NO.: 220109
Sprinkler:
600 E. Michigan Avenue, Suite B Kalamazoo, MI 49007 P: 269.927.0144 www.7GenAE.com
1635 Prince Street Alexandria, VA 22314 P: 202.617.8485 www.alliance.us.com
A
B
SITE CAMPUS MAP ROOF REPLACEMENT
ANN ARBOR VAMC
220109
PROJECT DIRECTOR
DECEMBER 1, 2023 JD GN
100% BID
DOCUMENTS
GS100
NORTH
SCALE: 1" = 60'-0"
SITE PLAN
Revisions: Date:
100% BID DOCUMENTS 12/01/23
JAMES F.
DERKS
ARCHITECT
9TH FLOOR
ROOF
2,942 SF
BID DEDUCTION NO.3
(10TH FLOOR)
PENTHOUSE ROOF
1,822 SF
BID DEDUCTION NO.2
8TH FLOOR ROOF
1,637 SF
8TH FLOOR
ROOF
2,016 SF
8TH FLOOR
ROOF
2,047 SF
45' - 9"
55' - 11"
/2
/2
15' - 0" 47' - 1"
38' - 3"
/2
/2
9TH FLOOR (N):
-ASPHALT PRIMED CONCRETE DECK
- FULLY ADHERED
-1.0" ISO
-1.5" ISO
-TAPERED ISO
-0.60 mil EPDM
8TH FLOOR ROOF (SSE):
-ASPHALT PRIMED CONCRETE DECK
- FULLY ADHERED
-1.5" ISO
-2.0" ISO
-TAPERED ISO
-0.60 mil EPDM
38' - 3"
ROOF PLAN LEGEND
BASE BID ROOFS - WHITE EPDM
BID DEDUCTIONS - WHITE EPDM
ROOF REPLACEMENT SQUARE FOOTAGE:
9TH FLOOR ROOF (N) 2,942 S.F.
8TH FLOOR ROOF (SSW) 2,047 S.F.
8TH FLOOR ROOF (SSE) 2,016 S.F.
TOTAL SQUARE FOOTAGE: 7,005 S.F.
BID ALTERNATE SQUARE FOOTAGE:
10TH FLOOR PENTHOUSE ROOF 1,822 S.F.
8TH FLOOR ROOF (N) 1,637 S.F.
ROOF CORE SAMPLE
-DATA SHOWN IS EXISTING
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
DWG. ___ OF 08
7GAE PROJECT NO.: 220109
Sprinkler:
600 E. Michigan Avenue, Suite B Kalamazoo, MI 49007 P: 269.927.0144 www.7GenAE.com
1635 Prince Street Alexandria, VA 22314 P: 202.617.8485 www.alliance.us.com
A
B
COMPOSITE ROOF PLAN ROOF REPLACEMENT
ANN ARBOR VAMC
220109
1W
PROJECT DIRECTOR
DECEMBER 1, 2023 JD GN
100% BID
DOCUMENTS
01W-AS140
NORTH
SCALE: 1/16" = 1'-0"
COMPOSITE ROOF PLAN
NOTE: DIMENSIONS SHOWN ARE APPROXIMATE.
CONTRACTOR IS RESPONSIBLE FOR VERIFICATION
OF QUANTITIES USED IN THEIR BIDS.
Revisions: Date:
100% BID DOCUMENTS 12/01/23
JAMES F.
DERKS
ARCHITECT
1 1
9TH FLOOR
ROOF
2,942 SF
01W-AS340
01W-AS340
01W-AS340
01W-AS340
01W-AS340
A1
01W-AS340
1 1
01W-AS340
01W-AS340
01W-AS340
01W-AS340
01W-AS340
EXISTING
RAISED CURB
BID DEDUCTION NO.2
8TH FLOOR ROOF
1,637 SF
1 1
01W-AS340
01W-AS340
01W-AS340
01W-AS340
01W-AS340
01W-AS340
ROOF PLAN KEYNOTES
NEW (LOW SLOPE) EPDM ROOFING AND INSULATION ON EXISTING DECK. PONDING
NOT ALLOWED @ ANY LOCATION. ALTERNATE 1: ADDITIONAL INSULATION AND EPDM
OVER EXISTING INSULATION.
DESIGN/INSTALL NEW LIGHTNING PROTECTION SYSTEM AND INCLUDE ALL
APPURTENANCES FOR A COMPLETE AND FUNCTIONAL SYSTEM. BOND MPE EQUIPMENT
NEAR LP DOWNLEADS. CONTRACTOR IS RESPONSIBLE FOR PROVIDING CONTINUITY
TESTING AS REQUIRED FOR CERTIFICATION OF THE SYSTEM (SEE DESIGN/BUILD
PERFORMANCE SPECIFICATION - 26 41 00 FACILITY LIGHTNING PROTECTION).
CLEAN AND PROVIDE PROTECTION OVER AFFECTED AREA OF EXISTING FLAT ROOF
DURING CONSTRUCTION PERIOD.
CONTRACTOR TO HAVE EXISTING FLAT ROOF CLOSELY INSPECTED BY A 3RD PARTY
CERTIFIED ROOFING INSPECTOR FAMILIAR WITH THE EXISTING ROOF SYSTEM
MANUFACTURER. INSPECT THE ROOF DECK AFTER ROOF AND INSULATION SYSTEM
DEMO AND PRIOR TO INSTALLING NEW MEMBRANE SYSTEM. AS ROOFTOP UNITS AND
LIGHTNING PROTECTION EQUIPMENT ARE RESET AND REINSTALLED, INSPECT TO VERIFY
NO DAMAGE OCCURED DURING THOSE INSTALLATIONS. MAKE ANY REPAIRS TO
EXISTING ROOF FOUND DURING FINAL INSPECTION AT NO ADDITIONAL COST TO THE
GOVERNMENT. CONTRACTOR SHALL NOTIFY COR 7 DAYS PRIOR TO INSPECTIONS AS
THE COR MUST BE PRESENT.
FURNISH AND INSTALL NEW ROOFING WALKWAY PADS IN AREAS SHOWN. PADS SHALL
NOT BE ADHERED TO THE ROOF. COLOR TO BE BLACK. SEE SPECIFICATION FOR FURTHER
INFORMATION.
CONTRACTOR SHALL RELOCATE ANY EXISTING EQUIPMENT DURING ROOF
REPLACEMENT ACTIVITIES. RELOCATION PLAN SHALL BE APPROVED BY COR PRIOR TO
WORK.
EXISTING WALL ATTACHED ROOF LADDER TO REMAIN.
EXISTING ROOFTOP EQUIPMENT TO REMAIN. EXTEND CURB HEIGHTS AS NEEDED TO
MAINTAIN 8" CLEAR ABOVE ADJACENT ROOF PLANES. PATCH AND REPAIR ANY
ADJACENT SURFACES AS NEEDED.
NOTE: ALL KEY NOTES FOR THE PROJECT ARE LISTED BUT DO NOT NECESSARILY APPLY TO
EVERY PLAN OR ELEVATION. REFER TO DRAWINGS FOR APPLICABILITY.
ROOF PLAN LEGEND
EXISTING ROOF DRAIN
NEW MEMBRANE ROOFING
EXISTING EXHAUST FAN (E.F.) OR RELIEF VENT (R.V.) IN ROOF AREA
RUBBER WALKWAY TRAFFIC PAD
GENERAL NOTES - ROOF PLAN
1. PRIOR TO COMMENCING EACH NEW PHASE OF WORK CONTRACTORS ARE TO
VERIFY EXISTING FIELD CONDITIONS AND DIMENSIONS. INSPECT EXISTING WORK
AREAS AND OBSERVE FOR ANY DAMAGE OR POTENTIAL ADVERSE EFFECT OF NEW
WORK ON STRUCTURAL INTEGRITY OF THE BUILDING. IMMEDIATELY NOTIFY THE COR
OF ALL DISCREPANCIES OR CONCERNS A MINIMUM OF (10) TEN WORKING DAYS IN
ADVANCE OF THE WORK.
2. CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, EQUIPMENT, TESTING & ALL
APPURTENANCES TO COMPLETE THE PROJECT AND DELIVER A COMPLETE,
FUNCTIONAL ROOF SYSTEM.
3. PROVIDE MINIMUM ¼” PER FOOT SLOPE AT ALL LOW-SLOPE ROOF AREAS. SLOPE TO
DRAINS WITH A MINIMUM OF 3” INSULATION THICKNESS OF INSULATION AT THE
LOWEST SUMP POINT, INCLUDING SCUPPERS.
4. REPLACE FLASHING AROUND ALL ROOF PENETRATIONS INCLUDING BUT NOT LIMITED
TO, STAND PIPES, PLUMBING VENTS, HVAC INTAKE/EXHAUST FANS, ETC.
5. ALL CONSTRUCTION AREAS ARE TO BE PROPERLY IDENTIFIED, CLEANED AND
MAINTAINED BY THE CONTRACTOR ON A DAILY BASIS. NO CONSTRUCTION DEBRIS IS
TO REMAIN ON SITE AT PROJECT COMPLETION.
6. CONTRACTOR TO VERIFY CONSTRUCTION WASTE DUMPSTER LOCATIONS WITH THE
COR PRIOR TO BEGINNING ANY DEMOLITION AT EACH BUILDING.
7. ALL CONTRACTORS ARE TO PROTECT EXISTING EQUIPMENT, FINISHES AND BUILDING
COMPONENTS FROM CONSTRUCTION ACTIVITIES.
8. CONTRACTORS SHALL BE RESPONSIBLE FOR ANY/ALL DAMAGE CAUSED DURING
CONSTRUCTION OPERATIONS INCLUDING BUT NOT LIMITED TO SIDEWALK, CURBS,
BUILDINGS, IRRIGATION, PRIVATE PROPERTY, LAWN RESTORATION, ETC. THE
CONTRACTOR SHALL NOTIFY THE COR IMMEDIATELY IF ANY DAMAGE OCCURS AS A
RESULT OF WORK ACTIVITIES.
9. CONTRACTOR IS TO TAKE PRECAUTIONARY MEASURES TO PROTECT ALL TURF, TREES
AND PLANTS THAT ARE IN THE VICINITY OF CONSTRUCTION AREAS AND BE
RESPONSIBLE TO REPAIR/REPLACE ANY DAMAGED VEGETATION AND/OR PERFORM
ANY LAWN RESTORATION AS A RESULT.
10. CONTRACTOR SHALL NOT BLOCK AREAS OF INGRESS/EGRESS FOR VEHICLE TRAFFIC
OR PATIENT/STAFF ACCESS DURING CONSTRUCTION ACTIVITIES. IF THIS CANNOT BE
AVOIDED, WRITTEN PERMISSION MUST BE OBTAINED FROM THE COR PRIOR. PROVIDE
TRAFFIC CONES OR BARRICADES AND/OR PROVIDE A PERSON AT THE SUBJECT AREA
TO ALERT PEDESTRIANS DURING THE WORK.
11. CONTRACTOR SHALL INSPECT ALL ROOF DECKS AND PARAPETS WHILE EXPOSED
AFTER DEMOLITION OF ROOFING MATERIALS. ALL DAMAGED ROOF DECK AND
PARAPET MATERIAL SHALL BE REMOVED AND REPLACED WITH NEW MATCHING
ROOF DECK TO MATCH EXISTING. SCOPE NOT TO EXCEED 15% OR 5,300 SF OF
OVERALL EXISTING MATERIAL.
12. UPON PROJECT COMPLETION, CONTRACTOR SHALL CONFIRM PROPER FUNCTION
OF ROOF DRAINAGE SYSTEMS, CLEAR ANY CLOGS & REPLACE MISSING OR
DAMAGED STRAINER BASKETS WITH NEW TO MATCH EXISTING QUALITY/FUNCTION
AND WITH THE ABILITY TO SECURE/REMOVE FOR ROUTINE MAINTENANCE.
13. CONTRACTOR IS RESPONSIBLE FOR HOSTING SUBMITTAL EXCHANGE IN ONLINE
SUBMITTAL TRACKING PLATFORM.
PHOTO REFERENCE - SEE SHEET 01W-AS341
EXISTING WALKWAY TRAFFIC PAD TO BE OMITTED
DEMOLITION KEYNOTES
REMOVE EXISTING (LOW-SLOPE) BUILT-UP, ROLLED OR EPDM ROOFING AND
INSULATION LAYERS DOWN TO THE DECK – COMPLETE TEAR-OFF INCLUDING ALL
FASTENERS. PREP FOR NEW ROOF SYSTEM AS INDICATED. ALTERNATE 1: EXISTING
INSULATION TO REMAIN.
REMOVE EXISTING METAL FASCIA/COPING AND REPLACE WITH NEW AS
SHOWN/SPECIFIED.
EXISTING INTERNAL ROOF DRAIN TO REMAIN, MODIFY/ADJUST HEIGHT AND ADD
COLLAR EXTENSION AS NEEDED TO ACCOMMODATE NEW ROOF INSULATION
THICKNESS.
REMOVE EXISTING LIGHTNING PROTECTION COMPONENTS FOR ROOF REPLACEMENT
WORK. EXISTING AIR TERMINALS CAN BE REUSED AS LONG AS THEIR PHYSICAL
CONDITION IS INTACT. EXISTING DOWNLEADS AND GROUNDING ARE MOSTLY INTACT
AND CAN BE REUSED WITH MINOR REPAIRS, REATTACHMENT AND RE-ROUTE AS
REQUIRED TO MEET PERFORMANCE SPEC REQUIREMENTS FOR A COMPLETE AND
FUNCTIONAL SYSTEM.
REMOVE EXISTING ROOFTOP EQUIPMENT.
EXISTING VENTS, DRAINS, EQUIPMENT OR OTHER ROOFTOP PENETRATIONS TO REMAIN,
U.N.O. REMOVE ANY PIPE BOOTS, FLASHING, AND SEALANTS AROUND PENETRATIONS.
RAISE TO RECEIVE NEW ROOFING AND INSULATION SYSTEM. EXISTING ROOF DRAIN
PIPING TO REMAIN FOR RECONNECTION. REMOVE AND REPLACE EXISTING DRAIN
BODY, SUMP AND ASSOCIATED FASTENERS. COMPLETELY REMOVE ANY DEBRIS FROM
EXISTING ROOF DRAIN PIPE TO ALLOW FOR PROPER DRAINAGE.
PREVIOUS EXISTING ROOF VENT (OR OTHER) LOCATION. PATCH/INFILL WITH NEW ROOF
DECK MATERIAL AND SHIM AS REQUIRED TO BE FLUSH WITH ADJACENT EXISTING.
ENSURE PATCHES ARE ADEQUATELY SUPPORTED TO MEET CODE MIN. LIVE AND DEAD
LOAD DESIGN CRITERIA. ALL WORK TO BE COMPLETED FROM ABOVE. FILL ANY GAPS IN
THE INSULATION BARRIER WITH LIKE MATERIALS MATCHING QUALITY AND
PERFORMANCE. AT OPENINGS LARGER THAN 6 INCH DIAMETER, RETAIN EXISTING CURB
STRUCTURE, FRAME ACROSS OPENING WITH P.T. 2X6 AT 16" O.C. WITH 3/4" MARINE
GRADE PLYWOOD DECK. INSTALL INSULATION, COVERBOARD AND EPDM OVER NEW
ASSEMBLY.
CAPPED PIPES. REMOVE AND CAP BELOW ROOF-LINE. ALL WORK TO BE COMPLETED
FROM ABOVE.
NOTE: ALL KEY NOTES FOR THE PROJECT ARE LISTED BUT DO NOT NECESSARILY APPLY TO
EVERY PLAN OR ELEVATION. REFER TO DRAWINGS FOR APPLICABILITY.
SEE SPECIFICATIONS FOR GENERAL DEMOLITION AND PATCHING REQUIREMENTS.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
DWG. ___ OF 08
7GAE PROJECT NO.: 220109
Sprinkler:
600 E. Michigan Avenue, Suite B Kalamazoo, MI 49007 P: 269.927.0144 www.7GenAE.com
1635 Prince Street Alexandria, VA 22314 P: 202.617.8485 www.alliance.us.com
A
B
ROOF PLAN - UNIT A ROOF REPLACEMENT
ANN ARBOR VAMC
220109
1W
PROJECT DIRECTOR
DECEMBER 1, 2023 JD GN
100% BID
DOCUMENTS
01W-AS141
NORTH
SCALE: 1/8" = 1'-0"
UNIT A ROOF PLAN
Revisions: Date:
100% BID DOCUMENTS 12/01/23
JAMES F.
DERKS
ARCHITECT
ROOF PLAN KEYNOTES
NEW (LOW SLOPE) EPDM ROOFING AND INSULATION ON EXISTING DECK. PONDING
NOT ALLOWED @ ANY LOCATION. ALTERNATE 1: ADDITIONAL INSULATION AND EPDM
OVER EXISTING INSULATION.
DESIGN/INSTALL NEW LIGHTNING PROTECTION SYSTEM AND INCLUDE ALL
APPURTENANCES FOR A COMPLETE AND FUNCTIONAL SYSTEM. BOND MPE EQUIPMENT
NEAR LP DOWNLEADS. CONTRACTOR IS RESPONSIBLE FOR PROVIDING CONTINUITY
TESTING AS REQUIRED FOR CERTIFICATION OF THE SYSTEM (SEE DESIGN/BUILD
PERFORMANCE SPECIFICATION - 26 41 00 FACILITY LIGHTNING PROTECTION).
CLEAN AND PROVIDE PROTECTION OVER AFFECTED AREA OF EXISTING FLAT ROOF
DURING CONSTRUCTION PERIOD.
CONTRACTOR TO HAVE EXISTING FLAT ROOF CLOSELY INSPECTED BY A 3RD PARTY
CERTIFIED ROOFING INSPECTOR FAMILIAR WITH THE EXISTING ROOF SYSTEM
MANUFACTURER. INSPECT THE ROOF DECK AFTER ROOF AND INSULATION SYSTEM
DEMO AND PRIOR TO INSTALLING NEW MEMBRANE SYSTEM. AS ROOFTOP UNITS AND
LIGHTNING PROTECTION EQUIPMENT ARE RESET AND REINSTALLED, INSPECT TO VERIFY
NO DAMAGE OCCURED DURING THOSE INSTALLATIONS. MAKE ANY REPAIRS TO
EXISTING ROOF FOUND DURING FINAL INSPECTION AT NO ADDITIONAL COST TO THE
GOVERNMENT. CONTRACTOR SHALL NOTIFY COR 7 DAYS PRIOR TO INSPECTIONS AS
THE COR MUST BE PRESENT.
FURNISH AND INSTALL NEW ROOFING WALKWAY PADS IN AREAS SHOWN. PADS SHALL
NOT BE ADHERED TO THE ROOF. COLOR TO BE BLACK. SEE SPECIFICATION FOR FURTHER
INFORMATION.
CONTRACTOR SHALL RELOCATE ANY EXISTING EQUIPMENT DURING ROOF
REPLACEMENT ACTIVITIES. RELOCATION PLAN SHALL BE APPROVED BY COR PRIOR TO
WORK.
EXISTING WALL ATTACHED ROOF LADDER TO REMAIN.
EXISTING ROOFTOP EQUIPMENT TO REMAIN. EXTEND CURB HEIGHTS AS NEEDED TO
MAINTAIN 8" CLEAR ABOVE ADJACENT ROOF PLANES. PATCH AND REPAIR ANY
ADJACENT SURFACES AS NEEDED.
NOTE: ALL KEY NOTES FOR THE PROJECT ARE LISTED BUT DO NOT NECESSARILY APPLY TO
EVERY PLAN OR ELEVATION. REFER TO DRAWINGS FOR APPLICABILITY.
ROOF PLAN LEGEND
EXISTING ROOF DRAIN
NEW MEMBRANE ROOFING
EXISTING EXHAUST FAN (E.F.) OR RELIEF VENT (R.V.) IN ROOF AREA
RUBBER WALKWAY TRAFFIC PAD
GENERAL NOTES - ROOF PLAN
1. PRIOR TO COMMENCING EACH NEW PHASE OF WORK CONTRACTORS ARE TO
VERIFY EXISTING FIELD CONDITIONS AND DIMENSIONS. INSPECT EXISTING WORK
AREAS AND OBSERVE FOR ANY DAMAGE OR POTENTIAL ADVERSE EFFECT OF NEW
WORK ON STRUCTURAL INTEGRITY OF THE BUILDING. IMMEDIATELY NOTIFY THE COR
OF ALL DISCREPANCIES OR CONCERNS A MINIMUM OF (10) TEN WORKING DAYS IN
ADVANCE OF THE WORK.
2. CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, EQUIPMENT, TESTING & ALL
APPURTENANCES TO COMPLETE THE PROJECT AND DELIVER A COMPLETE,
FUNCTIONAL ROOF SYSTEM.
3. PROVIDE MINIMUM ¼” PER FOOT SLOPE AT ALL LOW-SLOPE ROOF AREAS. SLOPE TO
DRAINS WITH A MINIMUM OF 3” INSULATION THICKNESS OF INSULATION AT THE
LOWEST SUMP POINT, INCLUDING SCUPPERS.
4. REPLACE FLASHING AROUND ALL ROOF PENETRATIONS INCLUDING BUT NOT LIMITED
TO, STAND PIPES, PLUMBING VENTS, HVAC INTAKE/EXHAUST FANS, ETC.
5. ALL CONSTRUCTION AREAS ARE TO BE PROPERLY IDENTIFIED, CLEANED AND
MAINTAINED BY THE CONTRACTOR ON A DAILY BASIS. NO CONSTRUCTION DEBRIS IS
TO REMAIN ON SITE AT PROJECT COMPLETION.
6. CONTRACTOR TO VERIFY CONSTRUCTION WASTE DUMPSTER LOCATIONS WITH THE
COR PRIOR TO BEGINNING ANY DEMOLITION AT EACH BUILDING.
7. ALL CONTRACTORS ARE TO PROTECT EXISTING EQUIPMENT, FINISHES AND BUILDING
COMPONENTS FROM CONSTRUCTION ACTIVITIES.
8. CONTRACTORS SHALL BE RESPONSIBLE FOR ANY/ALL DAMAGE CAUSED DURING
CONSTRUCTION OPERATIONS INCLUDING BUT NOT LIMITED TO SIDEWALK, CURBS,
BUILDINGS, IRRIGATION, PRIVATE PROPERTY, LAWN RESTORATION, ETC. THE
CONTRACTOR SHALL NOTIFY THE COR IMMEDIATELY IF ANY DAMAGE OCCURS AS A
RESULT OF WORK ACTIVITIES.
9. CONTRACTOR IS TO TAKE PRECAUTIONARY MEASURES TO PROTECT ALL TURF, TREES
AND PLANTS THAT ARE IN THE VICINITY OF CONSTRUCTION AREAS AND BE
RESPONSIBLE TO REPAIR/REPLACE ANY DAMAGED VEGETATION AND/OR PERFORM
ANY LAWN RESTORATION AS A RESULT.
10. CONTRACTOR SHALL NOT BLOCK AREAS OF INGRESS/EGRESS FOR VEHICLE TRAFFIC
OR PATIENT/STAFF ACCESS DURING CONSTRUCTION ACTIVITIES. IF THIS CANNOT BE
AVOIDED, WRITTEN PERMISSION MUST BE OBTAINED FROM THE COR PRIOR. PROVIDE
TRAFFIC CONES OR BARRICADES AND/OR PROVIDE A PERSON AT THE SUBJECT AREA
TO ALERT PEDESTRIANS DURING THE WORK.
11. CONTRACTOR SHALL INSPECT ALL ROOF DECKS AND PARAPETS WHILE EXPOSED
AFTER DEMOLITION OF ROOFING MATERIALS. ALL DAMAGED ROOF DECK AND
PARAPET MATERIAL SHALL BE REMOVED AND REPLACED WITH NEW MATCHING
ROOF DECK TO MATCH EXISTING. SCOPE NOT TO EXCEED 15% OR 5,300 SF OF
OVERALL EXISTING MATERIAL.
12. UPON PROJECT COMPLETION, CONTRACTOR SHALL CONFIRM PROPER FUNCTION
OF ROOF DRAINAGE SYSTEMS, CLEAR ANY CLOGS & REPLACE MISSING OR
DAMAGED STRAINER BASKETS WITH NEW TO MATCH EXISTING QUALITY/FUNCTION
AND WITH THE ABILITY TO SECURE/REMOVE FOR ROUTINE MAINTENANCE.
13. CONTRACTOR IS RESPONSIBLE FOR HOSTING SUBMITTAL EXCHANGE IN ONLINE
SUBMITTAL TRACKING PLATFORM.
PHOTO REFERENCE - SEE SHEET 01W-AS341
EXISTING WALKWAY TRAFFIC PAD TO BE OMITTED
1 1
8TH FLOOR
ROOF
2,047 SF
01W-AS340
01W-AS340
01W-AS340
8TH FLOOR
ROOF
2,016 SF
6 6
AIR COOLED CHILLER
SERVES FAN COIL UNITS
ON 8th FLOOR BELOW.
6 6
01W-AS340
01W-AS340
01W-AS340
01W-AS340
01W-AS340
01W-AS340
01W-AS340
01W-AS340
01W-AS340
01W-AS340
01W-AS340
01W-AS340
1 1
BID DEDUCTION NO.3
(10TH FLOOR)
PENTHOUSE ROOF
1,822 SF
2 CONCRETE CAPPED
BRICK STACK
DEMOLITION KEYNOTES
REMOVE EXISTING (LOW-SLOPE) BUILT-UP, ROLLED OR EPDM ROOFING AND
INSULATION LAYERS DOWN TO THE DECK – COMPLETE TEAR-OFF INCLUDING ALL
FASTENERS. PREP FOR NEW ROOF SYSTEM AS INDICATED. ALTERNATE 1: EXISTING
INSULATION TO REMAIN.
REMOVE EXISTING METAL FASCIA/COPING AND REPLACE WITH NEW AS
SHOWN/SPECIFIED.
EXISTING INTERNAL ROOF DRAIN TO REMAIN, MODIFY/ADJUST HEIGHT AND ADD
COLLAR EXTENSION AS NEEDED TO ACCOMMODATE NEW ROOF INSULATION
THICKNESS.
REMOVE EXISTING LIGHTNING PROTECTION COMPONENTS FOR ROOF REPLACEMENT
WORK. EXISTING AIR TERMINALS CAN BE REUSED AS LONG AS THEIR PHYSICAL
CONDITION IS INTACT. EXISTING DOWNLEADS AND GROUNDING ARE MOSTLY INTACT
AND CAN BE REUSED WITH MINOR REPAIRS, REATTACHMENT AND RE-ROUTE AS
REQUIRED TO MEET PERFORMANCE SPEC REQUIREMENTS FOR A COMPLETE AND
FUNCTIONAL SYSTEM.
REMOVE EXISTING ROOFTOP EQUIPMENT.
EXISTING VENTS, DRAINS, EQUIPMENT OR OTHER ROOFTOP PENETRATIONS TO REMAIN,
U.N.O. REMOVE ANY PIPE BOOTS, FLASHING, AND SEALANTS AROUND PENETRATIONS.
RAISE TO RECEIVE NEW ROOFING AND INSULATION SYSTEM. EXISTING ROOF DRAIN
PIPING TO REMAIN FOR RECONNECTION. REMOVE AND REPLACE EXISTING DRAIN
BODY, SUMP AND ASSOCIATED FASTENERS. COMPLETELY REMOVE ANY DEBRIS FROM
EXISTING ROOF DRAIN PIPE TO ALLOW FOR PROPER DRAINAGE.
PREVIOUS EXISTING ROOF VENT (OR OTHER) LOCATION. PATCH/INFILL WITH NEW ROOF
DECK MATERIAL AND SHIM AS REQUIRED TO BE FLUSH WITH ADJACENT EXISTING.
ENSURE PATCHES ARE ADEQUATELY SUPPORTED TO MEET CODE MIN. LIVE AND DEAD
LOAD DESIGN CRITERIA. ALL WORK TO BE COMPLETED FROM ABOVE. FILL ANY GAPS IN
THE INSULATION BARRIER WITH LIKE MATERIALS MATCHING QUALITY AND
PERFORMANCE. AT OPENINGS LARGER THAN 6 INCH DIAMETER, RETAIN EXISTING CURB
STRUCTURE, FRAME ACROSS OPENING WITH P.T. 2X6 AT 16" O.C. WITH 3/4" MARINE
GRADE PLYWOOD DECK. INSTALL INSULATION, COVERBOARD AND EPDM OVER NEW
ASSEMBLY.
CAPPED PIPES. REMOVE AND CAP BELOW ROOF-LINE. ALL WORK TO BE COMPLETED
FROM ABOVE.
NOTE: ALL KEY NOTES FOR THE PROJECT ARE LISTED BUT DO NOT NECESSARILY APPLY TO
EVERY PLAN OR ELEVATION. REFER TO DRAWINGS FOR APPLICABILITY.
SEE SPECIFICATIONS FOR GENERAL DEMOLITION AND PATCHING REQUIREMENTS.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
DWG. ___ OF 08
7GAE PROJECT NO.: 220109
Sprinkler:
600 E. Michigan Avenue, Suite B Kalamazoo, MI 49007 P: 269.927.0144 www.7GenAE.com
1635 Prince Street Alexandria, VA 22314 P: 202.617.8485 www.alliance.us.com
A
B
ROOF PLAN - UNIT B ROOF REPLACEMENT
ANN ARBOR VAMC
220109
1W
PROJECT DIRECTOR
DECEMBER 1, 2023 JD GN
100% BID
DOCUMENTS
01W-AS142
NORTH
SCALE: 1/8" = 1'-0"
ROOF PLAN - UNIT B
Revisions: Date:
100% BID DOCUMENTS 12/01/23
JAMES F.
DERKS
ARCHITECT
1W - 2ND FLOOR
839' - 2"
1W - 1ST FLOOR
827' - 3"
1W - BSMT
816' - 3"
1W - 3RD FLOOR
850' - 2"
1W - 4TH FLOOR
861' - 2"
1W - 5TH FLOOR
873' - 9 1/4"
1W - SUBBSMT
810' - 3"
1W - 6TH FLOOR
885' - 8 1/4"
1W - 7TH FLOOR
896' - 8 1/4"
1W - 8TH FLOOR
908' - 7 1/4"
1W - 9TH FLOOR
920' - 0 3/4"
1W - PENTHOUSE
931' - 0 3/4"
1W - MACHINE
ROOM SLAB
945' - 6"
1W - ROOF SLAB
956' - 8 3/4"
UNIT A - NORTH
8TH FLOOR ROOF
UNIT A - NORTH
9TH FLOOR ROOF
UNIT B - 10TH FLOOR
PENTHOUSE ROOF
1W - 2ND FLOOR
839' - 2"
1W - 1ST FLOOR
827' - 3"
1W - BSMT
816' - 3"
1W - 3RD FLOOR
850' - 2"
1W - 4TH FLOOR
861' - 2"
1W - 5TH FLOOR
873' - 9 1/4"
1W - SUBBSMT
810' - 3"
1W - 6TH FLOOR
885' - 8 1/4"
1W - 7TH FLOOR
896' - 8 1/4"
1W - 8TH FLOOR
908' - 7 1/4"
1W - 9TH FLOOR
920' - 0 3/4"
1W - PENTHOUSE
931' - 0 3/4"
1W - MACHINE
ROOM SLAB
945' - 6"
1W - ROOF SLAB
956' - 8 3/4"
UNIT B - SOUTH 8TH
FLOOR ROOF
UNIT E - SOUTH ELECTRICAL ROOF
UNIT B - SOUTH 8TH FLOOR ROOF
UNIT B - 10TH FLOOR
PENTHOUSE ROOF
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
DWG. ___ OF 08
7GAE PROJECT NO.: 220109
Sprinkler:
600 E. Michigan Avenue, Suite B Kalamazoo, MI 49007 P: 269.927.0144 www.7GenAE.com
1635 Prince Street Alexandria, VA 22314 P: 202.617.8485 www.alliance.us.com
EXTERIOR ELEVATIONS ROOF REPLACEMENT
ANN ARBOR VAMC
220109
1W
PROJECT DIRECTOR
DECEMBER 1, 2023 JD GN
100% BID
DOCUMENTS
01W-AS200
SCALE: 1/16" = 1'-0"01W-AS200
NORTH ELEVATION02
SCALE: 1/16" = 1'-0"01W-AS200
SOUTH ELEVATION01
Revisions: Date:
100% BID DOCUMENTS 12/01/23
JAMES F.
DERKS
ARCHITECT
1W - 2ND FLOOR
839' - 2"
1W - 1ST FLOOR
827' - 3"
1W - BSMT
816' - 3"
1W - 3RD FLOOR
850' - 2"
1W - 4TH FLOOR
861' - 2"
1W - 5TH FLOOR
873' - 9 1/4"
1W - SUBBSMT
810' - 3"
1W - 6TH FLOOR
885' - 8 1/4"
1W - 7TH FLOOR
896' - 8 1/4"
1W - 8TH FLOOR
908' - 7 1/4"
1W - 9TH FLOOR
920' - 0 3/4"
1W - PENTHOUSE
931' - 0 3/4"
1W - MACHINE
ROOM SLAB
945' - 6"
1W - ROOF SLAB
956' - 8 3/4" UNIT B - 10TH FLOOR
PENTHOUSE ROOF
UNIT A - 9TH
FLOOR ROOF
UNIT A - 8TH
FLOOR ROOF
UNIT B - SOUTH
8TH FLOOR ROOF
1W - 2ND FLOOR
839' - 2"
1W - 1ST FLOOR
827' - 3"
1W - BSMT
816' - 3"
1W - 3RD FLOOR
850' - 2"
1W - 4TH FLOOR
861' - 2"
1W - 5TH FLOOR
873' - 9 1/4"
1W - SUBBSMT
810' - 3"
1W - 6TH FLOOR
885' - 8 1/4"
1W - 7TH FLOOR
896' - 8 1/4"
1W - 8TH FLOOR
908' - 7 1/4"
1W - 9TH FLOOR
920' - 0 3/4"
1W - PENTHOUSE
931' - 0 3/4"
1W - MACHINE
ROOM SLAB
945' - 6"
1W - ROOF SLAB
956' - 8 3/4"
UNIT A - NORTH 8TH
FLOOR ROOF
UNIT A - NORTH 9TH
FLOOR ROOF
UNIT B - SOUTH 8TH
FLOOR ROOF
UNIT B - 10TH FLOOR
PENTHOUSE ROOF
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
DWG. ___ OF 08
7GAE PROJECT NO.: 220109
Sprinkler:
600 E. Michigan Avenue, Suite B Kalamazoo, MI 49007 P: 269.927.0144 www.7GenAE.com
1635 Prince Street Alexandria, VA 22314 P: 202.617.8485 www.alliance.us.com
EXTERIOR ELEVATIONS ROOF REPLACEMENT
ANN ARBOR VAMC
220109
PROJECT DIRECTOR
DECEMBER 1, 2023 Checker Author
100% BID
DOCUMENTS
01W-AS201
SCALE: 1/16" = 1'-0"01W-AS201
EAST ELEVATION02
SCALE: 1/16" = 1'-0"01W-AS201
WEST ELEVATION01
Revisions: Date:
100% BID DOCUMENTS 12/01/23
JAMES F.
DERKS
ARCHITECT
NEW EPDM MEMBRANE
ROOFING
EXISTING CONCRETE DECK TO
REMAIN
NEW PRE-MFR. RUBBER VENT
FLASHING BOOT
TYPICAL EXISTING PENETRATION
NEW DRAW BAND
NEW SEALANT
NEW RIGID INSULATION OVER
EXISTING(R-33 MIN. TOTAL)
NEW 1/2" COVER BOARD
SINGLE-PLY
MEMBRANE OVER
1/2" COVERBOARD
BONDING ADHESIVE
INSULATION
(SEE NOTES)
SUBSTRATE
NOTES
1. APPLICATION:
-REMOVE EXISTING FLASHING DOWN TO THE METAL BOWL.
-REPAIR OR REPLACE BROKEN DRAIN COMPONENTS.
-DRILL AND TAP BROKEN DRAINS , BOLTS, AND
REPLACE IF NECESSARY.
2. PROVIDE ALL NEW STRAINER BASKETS AND LEAF GRATES.
3. TAPERED INSULATION SLOPE: 1/4" PER FOOT.
SUMP AREA FIELD SEAM REQUIREMENTS:
A. IF SEAM EDGE IS WITHIN 9" OF DRAIN
COMPRESSION RING, ROOFING MEMBRANE PATCH REQUIRED.
B. IF FIELD EDGE IS WITHIN 9" TO 18" OF DRAIN COMPRESSION RING, INSTALL A LAYER OF
5" QUICKSEAM FLASHING CENTERED OVER SEAM EDGE.
5" QUICK SEAM FLASHING SHALL EXTEND 3" MIN.
BEYOND EDGE OF SUMP.
REMOVE/REPLACE
STRAINER BASKET
NEW COMPRESSION
RING TO FIT EXISTING
DRAIN BODY
ADD EXTENSION AS NEEDED TO
COORDINATE WITH ADDITIONAL
INSULATION THICKNESS
DECK
NOTE:
WHEN ATTACHING THE PARAPET FLASHING TO THE SUBSTRATE, THE
APPROPRIATE FASTENER MUST BE USED. THE FASTENER FOR THE WALL FLASHING
MAY BE DIFFERENT THAN THE FASTENER USED ON THE HORIZONTAL ROOF
DECKING.
SINGLE-PLY EPDM FLASHING
(SELF-ADHERING) TURNED UP
PARAPET FACE.
PERIMETER FASTENERS PER
ROOFING MFCTR.
RECOMMENDATIONS FOR
ADHERED SYSTEM
ROOFING
MEMBRANE
SEALANT
TERMINATION BAR (FASTEN 6-INCHES
ON CENTER USING ROOFING SYSTEM
MFR'S RECOMMENDED FASTENERS)
2 PIECE REGLET &
COUNTER FLASHING
RIVET INTO PLACE
(24-INCHES ON
CENTER, MAX.)
NEW MORTAR AT REGLET INSERT IN COMPLIANCE
WITH ASTM INTERNATIONAL C144-11 AGGREGATE
FOR MASONRY MORTAR, C270-14A MORTAR OF
UNIT MASONRY AND C1329/C1329M-15 MORTAR
CEMENT.
CAST STONE CAP
TO REMAIN
PA
R
A
PE
T C
A P
A T
4T H
TH
F
LO
O
R S
NOTE:
AT NORTH SIDES OF UNIT C 4TH AND 5TH FLOOR ROOFS, MEMBRANE
FLASHING AND TERMINATION WILL OCCUR ON TOP OF EXISTING CAST
STONE ORIGINAL PARAPET CAP IN LIEU OF MEMBRANE.
1/2" COVERBOARD
EPDM MEMBRANE
AND COVER STRIPS
BASE BID IS R-49 INSULATION ON EXISTING
DECK. DEDUCT ALTERNATE IS TWO (2) LAYERS
OF 3 INCH INSULATION FOR R-33 MIN.
DECK
GALVANIZED NAILS 6-
INCHES ON CENTER
EXISTING RECTANGULAR PENETRATION
SINGLE-PLY EPDM FLASHING (SELF-
ADHERING) WRAP UP AND OVER
CURB
DECK
8" M
IN
NEW P.T. 2X BLOCKING W/ 1/2" EXT.
GRADE PLYWOOD AS REQUIRED FOR
MINIMUM HEIGHT
PERIMETER FASTENERS PER ROOFING
MFR'S. RECOMMENDATIONS FOR
ADHERED SYSTEM
1/2" COVERBOARD
BASE BID IS R-49 INSULATION ON
EXISTING DECK. DEDUCT ALTERNATE
IS TWO (2) LAYERS OF 3 INCH
INSULATION FOR R-33 MIN.
EXISTING STRUCTURE
TO REMAIN
ROOFING MEMBRANE CORNER
FLASHING
EXISTING MASONRY
WALL AND CAST STONE
CAP TO REMAIN
TAPERED RIGID ROOF INSULATION
TO EXISTING SCUPPER
AIR TERMINAL CONDUCTOR.
PROVIDE ADDITIONAL LAYER OF
ROOFING MEMBRANE AT
CONNECTIONS AND GROUND WIRE
ANCHORS, TYP.
CONTINUOUS SEALANT
EXISTING SCUPPER TO
REMAIN
ROOFING MEMBRANE - UP PARAPET
EXISTING CONCRETE ROOF
DECK
PARAPET FLASHING AND COUNTER-
FLASHING (SEE DETAIL 04).
EPDM OVER 1/2" COVERBOARD
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
DWG. ___ OF 08
7GAE PROJECT NO.: 220109
Sprinkler:
600 E. Michigan Avenue, Suite B Kalamazoo, MI 49007 P: 269.927.0144 www.7GenAE.com
1635 Prince Street Alexandria, VA 22314 P: 202.617.8485 www.alliance.us.com
ROOF SECTIONS AND DETAILS ROOF REPLACEMENT
ANN ARBOR VAMC
220109
1W
PROJECT DIRECTOR
DECEMBER 1, 2023 JD GN
100% BID
DOCUMENTS
01W-AS340
SCALE: 1 1/2" = 1'-0"01W-AS340
TYP. LOW SLOPE ROOF PENETRATION DETAIL01
SCALE: N.T.S.01W-AS340
TYP. ROOF DRAIN DETAIL02
SCALE: N.T.S.01W-AS340
TYP. PARAPET WALL FLASHING AND
COUNTERFLASHING DETAIL04
SCALE: N.T.S.01W-AS340
TYP. EXISTING RECTANGULAR PENETRATION DETAIL05
SCALE: 1 1/2" = 1'-0"01W-AS340
SCUPPER DETAIL03
REFERENCE PHOTO - A1
Revisions: Date:
100% BID DOCUMENTS 12/01/23
JAMES F.
DERKS
ARCHITECT
| Sheets |
| G001 - COVER SHEET |
| GS100 - SITE CAMPUS MAP |
| 01W-AS140 - COMPOSITE ROOF PLAN |
| 01W-AS141 - ROOF PLAN - UNIT A |
| 01W-AS142 - ROOF PLAN - UNIT B |
| 01W-AS200 - EXTERIOR ELEVATIONS |
| 01W-AS201 - EXTERIOR ELEVATIONS |
| 01W-AS340 - ROOF SECTIONS AND DETAILS |