This is a solicitation for a mechanical construction project located at the Fort Harrison VA Medical Center in Montana. The scope of work involves replacing approximately 244 control valves and actuators for fin tube radiators, and installing four gas flow meters to monitor boiler plant usage. Contractors must provide all labor, materials, tools and services to complete the project, which includes coordination with the existing building automation system. Work will take place after hours and on weekends to minimize disruption. The period of performance is 90 days from notice to proceed. The contractor must comply with all applicable safety requirements and VA protocols for infection control and COVID-19.

View the file

Other files

File Type Posted
S05- Questions and Answers.docx DOCX document
S04- Site Visit Attendance sheet.pdf PDF
S04- Site Visit Meeting Doc.docx DOCX document
36C25922Q0121 0001.docx DOCX document
S02- 36C25922Q0121_solicitation.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

14/14 UP

14/16 UP

8"~

12"~

12"~

VAV

VAV

8/4

16/12

/1

8x8

10x10

10x10

8x8

10x10

8x8

8x8

6x8

14x14

8x8

14x14

8"

6"

10"~

8"~

6"

6"

8"~

18/16 SA UP

/1

12"~

14/10

10x10

PFHX-7

BWR

B W

S

141-HWP-1

141-HWP-2

HWS

HWR

H W

S

H W

R

6"~

H W

R

H W

S

FTR

FTR

FTR

FTR

FTR

FTRFTR

FTR

FTR

FTR

FTR

FTRFTR

FTR

FTR

FTR

FTR

FTR

FTR

FTR FTR FTR FTR FTR FTR

FTR

WOWO

12x12

12x12

WO

WO

10x10

WO

8"~

12x12

8"

12x12

WO

WO

WO

WO

8x8

8"~

6"~

WO WO

WO WO

6"

AP

AP

AP

8/4 UP

WO

FTR

FCU

WO

14x14

8x8

WO

FTR

14/10

8"~

8/4

10/10 10/6

8"~

10"~

6"~

8"~

20/14 RA UP

10"~

6"~

WO

H H

X -1

WO

HWR

3"

4"

4"

3"

4"

141-VAV-77

8"~

VAV

6"~

8"~

8"~

200 CFM

200 CFM

190 CFM

141-VAV-78

10"~

RG-3

141-VAV-3

141-VAV-79

6"

6"

/1

141-VAV-80

200 CFM

315 CFM 300 CFM

210 CFM

230 CFM

230 CFM

180 CFM

120 CFM

110 CFM

50 CFM

50 CFM

55 CFM

315 CFM

270 CFM

240 CFM

8"~8"

10"~

8"~

/1

/1

8/

141-VAV-82

6"~

6"~ 8"~

7"~8/8

/1

7"~10"~

6"

7"

/8

7"

6"~

210 CFM

55 CFM

100 CFM

250 CFM

1-1/4"

3/4"

1-1/4"

TO

141-VAV-81

1/2"

3/4"

3/4"

VAV

3/4"

1-1/4"

1"

1"

1"

3/4"

3/4"

3/4"

3/4" 3/4"

HWS

141-VAV-83

141-VAV-81

160 CFM

200 CFM

130 CFM

RG-4

HWR

TO

141-VAV-6

H W

S H

W R

H W

S H

W R

HWS

HWR

HWS

HWRHWR

HWS

HWS

HWR

HWS

HWR

H W

S H

W R

H W

S H

W R

TO

141-VAV-80

TO

VAV-5

TO

141-VAV-77

TO

141-VAV-78

TO

VAV-1

12/18

RA UP

16/14

SA UP

1330 CFM

205 CFM

1980 CFM

1140 CFM

141-FTR-2141-CV-96

3/4"

8"~

8"~

141-ET-1

50 CFM

160 CFM

/1

141-VAV-6

WO

141-EF-3

PROVIDE 8/8 HOODED WALL

CAP WITH BIRDSCREEN

8/8

8x8

SEE S201 FOR DUCT

PENETRATION DETAIL

VAV

8"

1 2 3 4 5 6 7

D

C

B

A

1 2 3 4 5 6 7

D

C

B

A

E

E

Engineers Architects

INSTALL NEW PIPING BEFORE REMOVING OLD. SEE MD101 FOR MORE

INFORMATION.

INSTALL NEW MAIN SHUTOFF VALVES.

RELOCATED GATE VALVE AND BALANCING VALVE. SEE MD101 FOR MORE

INFORMATION.

INSULATE EXISTING DUCT SECTION.

PROVIDE NEW LOCAL CONTROLLER FOR EXISTING VAV BOX.

CONNECT TO EXISTING COIL.

CONNECT NEW THERMOSTAT TO EXISTING PERIMETER HEAT CONTROL VALVE.

SUPPLEMENTAL TEMPERATURE SENSOR FOR AVERAGING. NO LOCAL SET POINT

ADJUSTMENT. COORDINATE MOUNTING WITH ALL WALL MOUNTED OBJECTS.

RELOCATED VAV BOX. PROVIDE NEW LOCAL CONTROLLER AND HOT WATER COIL.

NEW THERMOSTAT LOCATION, COORDINATE MOUNTING WITH ALL WALL MOUNTED

OBJECTS.

PROVIDE RETURN AIR BOOT PER DETAIL 4/M502. ALIGN GRILLE LOCATION WITH

EXISTING CEILING GRID.

PROVIDE NEW HOT WATER COIL FOR EXISTING VAV BOX.

UTILIZE EXISTING FLEX DUCT.

CONNECT NEW THERMOSTAT TO EXISTING FAN COIL UNIT. SEE CONTROL

SEQUENCE ON M503.

BLANK OFF AND SEAL EXISTING OPENING FROM FROM REMOVED DUCTWORK.

CLEAN AND RE-GASKET EXISTING PLATE AND FRAME HEAT EXCHANGER.

THERMOSTAT IS FOR ROOM TEMPERATURE MONITORING ONLY. SEE CONTROL

SEQUENCE ON M504.

UTILIZE EXISTING PENETRATION THROUGH EARTHQUAKE WALL.

ROUTE PIPING IN BETWEEN CONCRETE JOISTS AT THIS LOCATION.

OFFSET PIPING/DUCTWORK BELOW BEAM.

ROUTE PIPING OVER EXISTING DOMESTIC WATER MAINS.

3/4" HWS/R DOWN TO 141-FTR-2 WITH NEW 2-WAY CONTROL VALVE. SEE DETAIL

10/M501 FOR PIPING CONNECTIONS.

RELOCATED DIFFUSER. ALIGN LOCATION WITH EXISTING CEILING GRID.

NEW FLOOR MOUNTED EXPANSION TANK. PROVIDE 4" THICK HOUSEKEEPING PAD.

PROVIDE NEW HEATING HOT WATER SYSTEM CONTROLLER IN EXISTING CABINET

AND CONNECT TO NEW AUTOMATION SERVER ON THE FIRST FLOOR. REUSE

EXISTING SYSTEM SENSORS/PROBES. REPLACE DEVICES THAT ARE

INCOMPATIBLE WITH THE NEW CONTROLLER.

RELOCATED RETURN GRILLE. ALIGN LOCATION WITH EXISTING CEILING GRID.

AREA

SHOWN

R E

F

LI

N E

M H

R E

F

LI

N E

M H

1. COORDINATE WORKING HOURS ALLOWED WITH VA COR AS INSTRUCTED IN

GENERAL REQUIREMENTS.

2. BALANCE ALL SYSTEMS TO THE AIRFLOW SHOWN AT EACH DIFFUSER, GRILLE

AND RETURN INLET AFTER THE REZONING WORK HAS BEEN COMPLETED. ADD

BALANCING DAMPERS TO THE EXISTING EXHAUST SYSTEM AS NECESSARY TO

REACH INDICATED AIRFLOW.

3. UPON COMPLETION OF DUCTWORK MODIFICATIONS, CLEAN THE ENTIRE

SUPPLY AND RETURN SYSTEMS.

4. FLUSH AND CLEAN EXISTING VAV HOT WATER COILS BEFORE CONNECTING

RUNOUT PIPING.

5. HWS/R RUNOUTS TO VAV BOXES IS TO BE 1/2" UNLESS NOTED OTHERWISE.

6. ALL EXISTING WIRELESS JCI CONTROLLERS, NETWORKING DEVICES AND

AUTOMATION ENGINES ARE TO BE REMOVED FROM THIS BUILDING. NEW WIRED

CONTROLLERS AND NETWORKING DEVICES THAT ARE 100% COMPATIBLE WITH

THE EXISTING SCHNEIDER ELECTRIC DEVICES AND NETWORK SHALL BE

INSTALLED. SEE DETAIL 2/M503 FOR A COMPLETED PROJECT BUILDING

CONTROLS ARCHITECTURE.

7. VAV BOX LOCAL CONTROLLER IS TO COMMUNICATE AND CONTROL EXISTING

PERIMETER HEAT AND NEW REHEAT CONTROL VALVES PER THE SEQUENCE

SHOWN ON M503.

8. PROVIDE A NEW THERMOSTAT IN THE SAME LOCATION AS THE REMOVED.

PATCH AND REPAIR THE WALL IN ROOMS WITH NO NEW THERMOSTAT

SPECIFIED.

9. HOT WATER CONTROL VALVES FOR FIN TUBE RADIATORS SHOWN ON THIS

FLOOR ARE FOR RADIATORS ON BOTH THIS FLOOR AND THE FIRST FLOOR.

10. SEE THE SINGLE DUCT VAV BOX SCHEDULE FOR CORRESPONDING HOT WATER

CONTROL VALVE MARK.

11. PROVIDE REMOVABLE JACKETS ON ALL NEW VALVES INCLUDING CONTROL

VALVES. JACKETS FOR VALVES LESS THAN 1" ARE TO BE A PART OF DEDUCT

ALTERNATE 2.

12. ALL FIN TUBE RADIATORS (FTR) SHOWN ARE EXISTING. CORRESPONDING

CONTROL VALVES ARE SHOWN FOR CONTROLS PURPOSES UNLESS NOTED

OTHERWISE.

13. UTILIZE EXISTING PENETRATIONS THROUGH EARTHQUAKE WALLS FOR NEW

DUCTWORK AND PIPING WHEREVER POSSIBLE.

14. SLEEVE AND FIRESTOP ALL NEW WALL PENETRATIONS THROUGH SMOKE

PARTITIONS.

15. REFER TO M-001 FOR ADDITIONAL INFORMATION.

16. ALL EXISTING PERIMETER HEAT CONTROL VALVE ACTUATORS ARE TO BE

REMOVED AND REPLACED. THIS WORK IS TO BE A PART OF DEDUCT

ALTERNATE 1.

17. ALL DUCTWORK REVISIONS IN THE BASEMENT INCLUDING THE ADDITION OF

BRANCH PIPING FOR HW REHEAT AT THE VAV BOXES SHALL BE A PART OF

DEDUCT ALTERNATE 4. HW MAINS SHALL STILL BE ROUTED IN THE CORRIDORS

AND EXISTING BOXES ARE TO BE CONVERTED TO NEW CONTROLS.

18. CONTRACTOR SHALL REPLACE ANY VALVE IN MECHANICAL ROOM B-2 THAT IS

UTILIZED DURING THE PROJECT AND NOT FUNCTIONING PROPERLY.

Fin Tube Radiator = FTR

FTR = 29

TOTAL = 244

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

18/14 UP

8/6 UP

9"~

10"~

VAV

VAV

16/14 UP

12/18 UP

/1

8/6

6"~

14/10 10/10

14/10

14/1214/14

16/14

14x14

8x8 8x8

8x8

10x10 10x10

10x10 12x12

10x10

8x8

10x10

14x14

8"

6"~

8"

14"~

8"

16/18

6/

6"

FTRFTR

FTR

FTR

FTR

FTR FTR

FTR

FTR

FTR

FTR

FTR

FTR

FTR

FTRFTRFTRFTR

FTR

WOWO

10x10

8"

WO

WO

FTR FTR

WO

WO

WOWO

6"

WO

FTR

8/

WO

WO

8"~

FTR

6"~

10"~

9"~

8"

8"~

6"

8"

4"

4"

4"

HWR

HWS

141-VAV-84

141-VAV-9

/8

10/12

/1

141-VAV-85

8/

8"~

8/

141-VAV-11

141-VAV-12

130 CFM

135 CFM

175 CFM

55 CFM

8"~

10"~

8"~

8"

275 CFM

275 CFM380 CFM

245 CFM

245 CFM

8"

10"~

8"

12"~

8"

230 CFM

265 CFM

250 CFM

210 CFM

155 CFM

HWR

3/4"

270 CFM

3/4"

H W

R H

W S

H W

R H

W S

TO

VAV-8

TO

141-VAV-9240 CFM

TO

VAV-10

TO

141-VAV-12

TO

141-VAV-85

1300 CFM

65 CFM

1940 CFM

100 CFM

100 CFM

HWS

HWR

HWS

HWR

3/4"

1/2"

H W

S

10"~

1 2 3 4 5 6 7

D

C

B

A

1 2 3 4 5 6 7

D

C

B

A

E

E

Engineers Architects

4" HWS/R UP, CORE DRILL THE FLOOR AND SEAL PENETRATIONS WITH FIRE

CAULK.

ROUTE HWS/R PIPING HIGH TO CROSS CORRIDOR.

ROUTE HWS/R PIPING ABOVE EXISTING DOMESTIC WATER PIPING.

INSULATE EXISTING DUCT SECTION.

PROVIDE NEW LOCAL CONTROLLER FOR EXISTING VAV BOX.

CONNECT TO EXISTING COIL.

CONNECT NEW THERMOSTAT TO EXISTING PERIMETER HEAT CONTROL VALVE.

PROVIDE NEW HOT WATER COIL FOR EXISTING VAV BOX.

POSITION BOX SO CONTROLS PANEL AND HOT WATER CONTROL VALVE IS

ACCESSIBLE VIA NEW SOFFIT.

BLANK OFF AND SEAL EXISTING OPENING FROM FROM REMOVED DUCTWORK.

UTILIZE EXISTING PENETRATION THROUGH EARTHQUAKE WALL.

SUPPLEMENTAL TEMPERATURE SENSOR FOR AVERAGING. NO LOCAL SET POINT

ADJUSTMENT. COORDINATE MOUNTING WITH ALL WALL MOUNTED OBJECTS.

NEW THERMOSTAT LOCATION, COORDINATE MOUNTING WITH ALL WALL MOUNTED

OBJECTS.

ROUTE PIPING IN BETWEEN CONCRETE JOISTS AT THIS LOCATION.

UTILIZE EXISTING VAV-14 FROM THE FIRST FLOOR. PROVIDE NEW LOCAL

CONTROLLER AND HOT WATER COIL.

UTILIZE EXISTING VAV-15 FROM THE FIRST FLOOR. PROVIDE NEW LOCAL

CONTROLLER AND HOT WATER COIL.

TRANSITION DOWN TO 8"~ TO UTILIZE EXISTING PENETRATION THROUGH

EARTHQUAKE WALL.

AREA

SHOWN

R E

F

LI

N E

M H

R E

F

LI

N E

M H

1. COORDINATE WORKING HOURS ALLOWED WITH VA COR AS INSTRUCTED IN

GENERAL REQUIREMENTS.

2. BALANCE ALL SYSTEMS TO THE AIRFLOW SHOWN AT EACH DIFFUSER, GRILLE

AND RETURN INLET AFTER THE REZONING WORK HAS BEEN COMPLETED. ADD

BALANCING DAMPERS TO THE EXISTING EXHAUST SYSTEM AS NECESSARY TO

REACH INDICATED AIRFLOW.

3. UPON COMPLETION OF DUCTWORK MODIFICATIONS, CLEAN THE ENTIRE

SUPPLY AND RETURN SYSTEMS.

4. FLUSH AND CLEAN EXISTING VAV HOT WATER COILS BEFORE CONNECTING

RUNOUT PIPING.

5. HWS/R RUNOUTS TO VAV BOXES IS TO BE 1/2" UNLESS NOTED OTHERWISE.

6. ALL EXISTING WIRELESS JCI CONTROLLERS, NETWORKING DEVICES AND

AUTOMATION ENGINES ARE TO BE REMOVED FROM THIS BUILDING. NEW WIRED

CONTROLLERS AND NETWORKING DEVICES THAT ARE 100% COMPATIBLE WITH

THE EXISTING SCHNEIDER ELECTRIC DEVICES AND NETWORK SHALL BE

INSTALLED. SEE DETAIL 2/M503 FOR A COMPLETED PROJECT BUILDING

CONTROLS ARCHITECTURE.

7. VAV BOX LOCAL CONTROLLER IS TO COMMUNICATE AND CONTROL EXISTING

PERIMETER HEAT AND NEW REHEAT CONTROL VALVES PER THE SEQUENCE

SHOWN ON M503.

8. PROVIDE A NEW THERMOSTAT IN THE SAME LOCATION AS THE REMOVED.

PATCH AND REPAIR THE WALL IN ROOMS WITH NO NEW THERMOSTAT

SPECIFIED.

9. HOT WATER CONTROL VALVES FOR FIN TUBE RADIATORS SHOWN ON THIS

FLOOR ARE FOR RADIATORS ON BOTH THIS FLOOR AND THE FIRST FLOOR.

10. SEE THE SINGLE DUCT VAV BOX SCHEDULE FOR CORRESPONDING HOT WATER

CONTROL VALVE MARK.

11. PROVIDE REMOVABLE JACKETS ON ALL NEW VALVES INCLUDING CONTROL

VALVES. JACKETS FOR VALVES LESS THAN 1" ARE TO BE A PART OF DEDUCT

ALTERNATE 2.

12. ALL FIN TUBE RADIATORS (FTR) SHOWN ARE EXISTING. CORRESPONDING

CONTROL VALVES ARE SHOWN FOR CONTROLS PURPOSES UNLESS NOTED

OTHERWISE.

13. UTILIZE EXISTING PENETRATIONS THROUGH EARTHQUAKE WALLS FOR NEW

DUCTWORK AND PIPING WHEREVER POSSIBLE.

14. SLEEVE AND FIRESTOP ALL NEW WALL PENETRATIONS THROUGH SMOKE

PARTITIONS.

15. REFER TO M-001 FOR ADDITIONAL INFORMATION.

16. ALL EXISTING PERIMETER HEAT CONTROL VALVE ACTUATORS ARE TO BE

REMOVED AND REPLACED. THIS WORK IS TO BE A PART OF DEDUCT

ALTERNATE 1.

17. ALL DUCTWORK REVISIONS IN THE BASEMENT INCLUDING THE ADDITION OF

BRANCH PIPING FOR HW REHEAT AT THE VAV BOXES SHALL BE A PART OF

DEDUCT ALTERNATE 4. HW MAINS SHALL STILL BE ROUTED IN THE CORRIDORS

AND EXISTING BOXES ARE TO BE CONVERTED TO NEW CONTROLS.

FTR = 23

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

20/14 DN

18/20 UP

14/16 DN

14/26 UP

14/14 DN

12/9 UP

5/4 DN

20/18 UP

16/14 DN

8"~

VAV

12"~

9"

22/12

16/12

16/10

16/12 14/10

/1

/1

8x8

8x8

8x8

8x8

10x10

10x10 10x10 12x12

12x12

10x10

8x8

8x8

10x1010x10

10x10

12/10

8x8

12x12

8x8

12x10

12x10

12x10

8"

8"

6"

8"

6"

6"

6"

10"~

6"

10"~

8"~

8"~

8/8

8"

8"~

8"~

10"~

"~ 12

"~ 8"

8"

26/18 UP

18/16 DN

36/14 UP

24/12

9"

12"~ 16"~

8x8

8"~

8x8

8"~

/1

8"

8"

FTR FTRFTR

FTR

FTR

FTR

FTR

FTR

FTR

FTR

FTR

FTR

FTRFTRFTRFTR

FTR

FTR

FTR

FTR

FTR

FTR

FTRFTR

FTR

FTR

FTR

FTR

FTR

FTR

FTR FTR FTR FTR

FTR

FTR

FTR

FTR

8"~

8"~

10"~10"~

6"~

8"

8"~

FTR

FTR

12/8

R

8x8 10"~

BWR

BWSBWS

BWR

B W

R B

W S

B W

R B

W S

FTR

WO

WO

WO

WOWO

220 CFM

250 CFM

120 CFM

120 CFM

175 CFM

165 CFM

150 CFM

120 CFM

8"~

7"~

141-CV-90

10"~

10"~

6"~

8"

6"~

8"

6"~

141-VAV-14

141-VAV-67

141-VAV-68

141-VAV-66

TO

VAV-13

1190 CFM

6"~

250 CFM

265 CFM

200 CFM

10/108"~

141-VAV-69

8"

8"

10"~

8"~

141-VAV-15

55 CFM

6"~

141-VAV-70

10"~

8"~

305 CFM

300 CFM

275 CFM

50 CFM

70 CFM

65 CFM

140 CFM

155 CFM

210 CFM

TO

141-VAV-70

8"~

6"

8"

141-VAV-71

160 CFM

200 CFM

200 CFM

165 CFM 95 CFM

141-VAV-19

305 CFM 305 CFM

305 CFM

1560 CFM

2110 CFM

VAV

VAV

18/16 UP

18/12 DN

6"

TO

141-VAV-68

1-1/4"

1-1/4"

3/4"

3/4"

1-1/4"

1-1/4"

1-1/4" 1"

1"1"

3/4"

3/4"

1"

3/4"3/4"

HWS

HWR

H W

R H

W S

HWS

HWR

HWS

HWR

HWS

HWR

HWS

HWR

HWS

HWS

H W

R H

W S

H W

R H

W S

H W

R H

W S

HWS

HWR

3/4"

8"~ 8"~ 10/10

8"

141-VAV-76

12"~

141-VAV-18

7"~10"~

TO

141-VAV-18

8"~

H W

R H

W S

250 CFM

1 2 3 4 5 6 7

D

C

B

A

1 2 3 4 5 6 7

D

C

B

A

E

E

Engineers Architects

AREA

SHOWN

R E

F

LI

N E

M H

R E

F

LI

N E

M H

INSULATE EXISTING DUCT SECTION.

PROVIDE NEW LOCAL CONTROLLER FOR EXISTING VAV BOX.

BLANK OFF AND SEAL EXISTING OPENING FROM FROM REMOVED DUCTWORK.

RELOCATED DIFFUSER. ALIGN LOCATION WITH EXISTING CEILING GRID.

CONNECT TO EXISTING COIL.

CAP EXISTING DUCT.

CONNECT NEW THERMOSTAT TO EXISTING PERIMETER HEAT CONTROL VALVE.

SUPPLEMENTAL TEMPERATURE SENSOR FOR AVERAGING. NO LOCAL SET POINT

ADJUSTMENT. COORDINATE MOUNTING WITH ALL WALL MOUNTED OBJECTS.

PROVIDE NEW 2-WAY CONTROL VALVE.

PROVIDE NEW HOT WATER COIL FOR EXISTING VAV BOX.

UTILIZE EXISTING PENETRATION THROUGH EARTHQUAKE WALL.

UTILIZE EXISTING FLEX DUCT.

LOCATION OF NEW AUTOMATION SERVER. CONNECT ALL LOCAL CONTROLLERS

ON THE FIRST FLOOR AND BASEMENT AND INTEGRATE TO THE STRUXUREWARE

ECC IN BUILDING 154.

ROUTE PIPING TIGHT TO STRUCTURE AT THIS LOCATION.

THERMOSTAT IS FOR ROOM TEMPERATURE MONITORING ONLY. SEE CONTROL

SEQUENCE ON M504.

ROUTE PIPING IN BETWEEN CONCRETE JOISTS AT THIS LOCATION.

1. COORDINATE WORKING HOURS ALLOWED WITH VA COR AS INSTRUCTED IN

GENERAL REQUIREMENTS.

2. BALANCE ALL SYSTEMS TO THE AIRFLOW SHOWN AT EACH DIFFUSER, GRILLE

AND RETURN INLET AFTER THE REZONING WORK HAS BEEN COMPLETED. ADD

BALANCING DAMPERS TO THE EXISTING EXHAUST SYSTEM AS NECESSARY TO

REACH INDICATED AIRFLOW.

3. UPON COMPLETION OF DUCTWORK MODIFICATIONS, CLEAN THE ENTIRE

SUPPLY AND RETURN SYSTEMS.

4. FLUSH AND CLEAN EXISTING VAV HOT WATER COILS BEFORE CONNECTING

RUNOUT PIPING.

5. HWS/R RUNOUTS TO VAV BOXES IS TO BE 1/2" UNLESS NOTED OTHERWISE.

6. ALL EXISTING WIRELESS JCI CONTROLLERS, NETWORKING DEVICES AND

AUTOMATION ENGINES ARE TO BE REMOVED FROM THIS BUILDING. NEW WIRED

CONTROLLERS AND NETWORKING DEVICES THAT ARE 100% COMPATIBLE WITH

THE EXISTING SCHNEIDER ELECTRIC DEVICES AND NETWORK SHALL BE

INSTALLED. SEE DETAIL 2/M503 FOR A COMPLETED PROJECT BUILDING

CONTROLS ARCHITECTURE.

7. VAV BOX LOCAL CONTROLLER IS TO COMMUNICATE AND CONTROL EXISTING

PERIMETER HEAT AND NEW REHEAT CONTROL VALVES PER THE SEQUENCE

SHOWN ON M503.

8. PROVIDE A NEW THERMOSTAT IN THE SAME LOCATION AS THE REMOVED.

PATCH AND REPAIR THE WALL IN ROOMS WITH NO NEW THERMOSTAT

SPECIFIED.

9. HOT WATER CONTROL VALVES FOR FIN TUBE RADIATORS SHOWN ON THIS

FLOOR ARE LOCATED ABOVE CEILING IN THE FLOOR BELOW.

10. SEE THE SINGLE DUCT VAV BOX SCHEDULE FOR CORRESPONDING HOT WATER

CONTROL VALVE MARK.

11. PROVIDE REMOVABLE JACKETS ON ALL NEW VALVES INCLUDING CONTROL

VALVES. JACKETS FOR VALVES LESS THAN 1" ARE TO BE A PART OF DEDUCT

ALTERNATE 2.

12. ALL FIN TUBE RADIATORS (FTR) SHOWN ARE EXISTING. CORRESPONDING

CONTROL VALVES ARE SHOWN FOR CONTROLS PURPOSES UNLESS NOTED

OTHERWISE.

13. UTILIZE EXISTING PENETRATIONS THROUGH EARTHQUAKE WALLS FOR NEW

DUCTWORK AND PIPING WHEREVER POSSIBLE.

14. SLEEVE AND FIRESTOP ALL NEW WALL PENETRATIONS THROUGH SMOKE

PARTITIONS.

15. REFER TO M-001 FOR ADDITIONAL INFORMATION.

16. ALL EXISTING PERIMETER HEAT CONTROL VALVE ACTUATORS ARE TO BE

REMOVED AND REPLACED. THIS WORK IS TO BE A PART OF DEDUCT

ALTERNATE 1.

FTR = 41

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

10/8 UP

6/5 DN

20/18 UP

16/14 DN

18/20 UP

18/12 DN

VAV

8"

18/12 18/12

12"~

10x10 10x10

10x10

/1

8x8 10x10

10x10

8x8

10x10

10x10

12x12

/1

12x12

8"~

8"

8"~

8"

"~8"

36/14 UP

18/18 DN

18/14 DN

12/10

14/10

36/14

/1

FTR FTR

FTR FTR

FTR

FTR

FTR

FTR

FTR

FTR

FTR

FTR

FTR

FTRFTR

FTR

FTR

FTR

FTR

FTR

FTRFTRFTRFTRFTR

8"~

18/14

18/18

12"~

6/5

FTR

R

/8

15/6 15/8

8"~

14/10

8"~

8"~

6"~

6"

FTR

WO

220 CFM

170 CFM

50 CFM

8/

220 CFM

270 CFM

260 CFM

141-VAV-72

141-VAV-20

/1

8"~

8"~

10"~ 7"~

8"

260 CFM

141-VAV-73

6"~8"~

6"

8"~

10"~

141-VAV-74

141-VAV-21

220 CFM

210 CFM

TO

141-VAV-21

TO

141-VAV-74

180 CFM

TO

141-VAV-72

50 CFM

300 CFM

300 CFM

300 CFM

6"

RG-2

250 CFM

145 CFM

145 CFM

VAV

VAV

7"~

7"

8/

7"

7"

8"~

141-VAV-75

SD-2

1340 CFM

1860 CFM

12"~

10x10

32/14 UP

12"~

TO

141-VAV-73

3/4"

3/4"

1-1/2"

1-1/4"

1-1/4" 1-1/4"

3/4"

3/4"

HWS

HWR

H W

S H

W R

H W

S H

W R

H W

S

HWR

HWS

HWR

HWS

HWR

HWS

HWR

4"~ EA

10x10

10"~

50 CFM

100 CFM

1 2 3 4 5 6 7

D

C

B

A

1 2 3 4 5 6 7

D

C

B

A

E

E

Engineers Architects

4" HWS/R RISER. CORE DRILL THE FLOOR AND SEAL PENETRATIONS WITH FIRE

CAULK. PROVIDE 1-1/2" TAKEOFFS WITH SHUTOFF VALVES.

INSULATE EXISTING DUCT SECTION.

PROVIDE NEW LOCAL CONTROLLER FOR EXISTING VAV BOX.

RELOCATED VAV BOX. PROVIDE NEW LOCAL CONTROLLER.

RELOCATED DIFFUSER. ALIGN LOCATION WITH EXISTING CEILING GRID.

CONNECT NEW THERMOSTAT TO EXISTING PERIMETER HEAT CONTROL VALVE.

CAP EXISTING DUCT.

UTILIZE EXISTING PENETRATION THROUGH EARTHQUAKE WALL.

CONNECT TO EXISTING COIL.

RELOCATED VAV BOX. PROVIDE NEW LOCAL CONTROLLER AND HOT WATER COIL.

NEW THERMOSTAT LOCATION, COORDINATE MOUNTING WITH ALL WALL MOUNTED

OBJECTS.

BLANK OFF AND SEAL EXISTING OPENING FROM FROM REMOVED DUCTWORK.

PROVIDE RETURN AIR BOOT PER DETAIL 4/M502. ALIGN GRILLE LOCATION WITH

EXISTING CEILING GRID.

ROUTE PIPING TIGHT TO STRUCTURE AT THIS LOCATION.

PROVIDE NEW 10/8 OPENING IN EXISTING EARTHQUAKE WALL.

PROVIDE NEW 16/10 OPENING IN EXISTING PARTITION. COORDINATE LOCATION

WITH ALL CONDUITS AND CABLING USING WALL FOR SUPPORT.

RELOCATED RETURN GRILLE. ALIGN LOCATION WITH EXISTING CEILING GRID.

UTILIZE EXISTING VAV-20. PROVIDE NEW LOCAL CONTROLLER AND HOT WATER

COIL.

AREA

SHOWN

R E

F

LI

N E

M H

R E

F

LI

N E

M H

1. COORDINATE WORKING HOURS ALLOWED WITH VA COR AS INSTRUCTED IN

GENERAL REQUIREMENTS.

2. BALANCE ALL SYSTEMS TO THE AIRFLOW SHOWN AT EACH DIFFUSER, GRILLE

AND RETURN INLET AFTER THE REZONING WORK HAS BEEN COMPLETED. ADD

BALANCING DAMPERS TO THE EXISTING EXHAUST SYSTEM AS NECESSARY TO

REACH INDICATED AIRFLOW.

3. UPON COMPLETION OF DUCTWORK MODIFICATIONS, CLEAN THE ENTIRE

SUPPLY AND RETURN SYSTEMS.

4. FLUSH AND CLEAN EXISTING VAV HOT WATER COILS BEFORE CONNECTING

RUNOUT PIPING.

5. HWS/R RUNOUTS TO VAV BOXES IS TO BE 1/2" UNLESS NOTED OTHERWISE.

6. ALL EXISTING WIRELESS JCI CONTROLLERS, NETWORKING DEVICES AND

AUTOMATION ENGINES ARE TO BE REMOVED FROM THIS BUILDING. NEW WIRED

CONTROLLERS AND NETWORKING DEVICES THAT ARE 100% COMPATIBLE WITH

THE EXISTING SCHNEIDER ELECTRIC DEVICES AND NETWORK SHALL BE

INSTALLED. SEE DETAIL 2/M503 FOR A COMPLETED PROJECT BUILDING

CONTROLS ARCHITECTURE.

7. VAV BOX LOCAL CONTROLLER IS TO COMMUNICATE AND CONTROL EXISTING

PERIMETER HEAT AND NEW REHEAT CONTROL VALVES PER THE SEQUENCE

SHOWN ON M503.

8. PROVIDE A NEW THERMOSTAT IN THE SAME LOCATION AS THE REMOVED.

PATCH AND REPAIR THE WALL IN ROOMS WITH NO NEW THERMOSTAT

SPECIFIED.

9. HOT WATER CONTROL VALVES FOR FIN TUBE RADIATORS SHOWN ON THIS

FLOOR ARE LOCATED ABOVE CEILING IN THE FLOOR BELOW.

10. SEE THE SINGLE DUCT VAV BOX SCHEDULE FOR CORRESPONDING HOT WATER

CONTROL VALVE MARK.

11. PROVIDE REMOVABLE JACKETS ON ALL NEW VALVES INCLUDING CONTROL

VALVES. JACKETS FOR VALVES LESS THAN 1" ARE TO BE A PART OF DEDUCT

ALTERNATE 2.

12. ALL FIN TUBE RADIATORS (FTR) SHOWN ARE EXISTING. CORRESPONDING

CONTROL VALVES ARE SHOWN FOR CONTROLS PURPOSES UNLESS NOTED

OTHERWISE.

13. UTILIZE EXISTING PENETRATIONS THROUGH EARTHQUAKE WALLS FOR NEW

DUCTWORK AND PIPING WHEREVER POSSIBLE.

14. SLEEVE AND FIRESTOP ALL NEW WALL PENETRATIONS THROUGH SMOKE

PARTITIONS.

15. REFER TO M-001 FOR ADDITIONAL INFORMATION.

16. ALL EXISTING PERIMETER HEAT CONTROL VALVE ACTUATORS ARE TO BE

REMOVED AND REPLACED. THIS WORK IS TO BE A PART OF DEDUCT

ALTERNATE 1.

FTR = 27

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

10/16 UP

54/14

24/20 UP

20/18 DN

26/18 UP

18/16 DN

10"~

9"

9"~

VAV

VAV

14/10 18/14

14/12

14/10

/1

14x14

8x8

8x8

8x8

8x8

8x8

8x8

8x8

8x8

10x10

8x8

8x8

8x8

8x8

10x10

8x8 8x8

10x10

12x12

10x10

12x12

8x8

8x8

8"

8"

6"

8"

8"

8"

8"

8" ~ 8"

6"

8"~

8"~

8"~

8"~

6"~ 8"~

14/26 DN

10"~

8"

8"

8"

8"

8"

8"~ 8/8

8"~

8"~

8"~

8"~

8"~

8"~

8"~

10"~

10"~

12"~

8"~

54/14 UP

WO

12/10

8X8 8X8

18/30 UP

18/20 DN

16/36 UP

8"~

6"

8"

12/6

9"~

/7

9/5

/5

38/18 UP

36/14 DN

26/18 DN

28/12

26/18

10x10

12/9 DN

9/12

10"~

8"~

8x8

/1

24/14

6"

8"~

5"~

8"~

8"~

10"~

6"~

FTR

FTR

FTR

FTR

FTR

FTR

FTR

FTRFTR

FTR

FTR

FTR

FTR

FTR

FTR

FTR

FTR

FTR

FTR

FTR FTR FTR

FTR

FTR FTR FTR

FTR FTR FTR

FTR

FTR

FTR

FTR

FTR

FTR

FTR

FTR

FTR

FTR

FTR

FTR

FTR

FTR

FTR

FTR

141-VAV-56

/8

8"

/8

141-VAV-26

8"~12"~

8"~

140 CFM

190 CFM

200 CFM

240 CFM240 CFM

165 CFM

165 CFM

165 CFM

141-VAV-57

8"~

8"~

6"

165 CFM

180 CFM

235 CFM

7"~

141-VAV-29

16"~

8"~

10"~

10"~

141-VAV-58

141-VAV-59

10"~

7"

8"~

8"~

140 CFM

195 CFM

185 CFM

200 CFM

150 CFM

280 CFM 280 CFM

50 CFM

170 CFM

145 CFM

180 CFM

R

/1

141-VAV-60

141-VAV-61

7"~

141-VAV-31

R

8"~

10"~ 14"~

18/8

/8

/6

10/8

/8

8"~

290 CFM

210 CFM

150 CFM

195 CFM

150 CFM

195 CFM

260 CFM

170 CFM

135 CFM

CFM

RG-1

2300 CFM 55 CFM

270 CFM

3/4"

3/4"

1" 1"

1"

1"

1"

3/4"

1"

3/4"

1-1/4"

1-1/4"

HWS

HWR

HWS

HWR

HWS

HWR

HWS

HWR

H W

S H

W R

H W

S H

W R

H W

S H

W R

H W

S H

W R

TO

141-VAV-58

TO

VAV-28

TO

141-VAV-29

TO

141-VAV-60 TO

141-VAV-30

141-CV-42

8"~

HWS

HWR

H W

S H

W R

1360 CFM

3/4"

VAV

8"

8"~

8"~

210 CFM

8"~

SD-3

10/8

250 CFM

100 CFM

50 CFM

50 CFM

25 CFM

8"~

VAV

50 CFM

1 2 3 4 5 6 7

D

C

B

A

1 2 3 4 5 6 7

D

C

B

A

E

E

Engineers Architects

AREA

SHOWN

R E

F

LI

N E

M H

R E

F

LI

N E

M H

INSULATE EXISTING DUCT SECTION.

CAP EXISTING DUCT.

PROVIDE NEW LOCAL CONTROLLER FOR EXISTING VAV BOX.

BLANK OFF AND SEAL EXISTING OPENING FROM FROM REMOVED DUCTWORK.

RELOCATED DIFFUSER. ALIGN LOCATION WITH EXISTING CEILING GRID.

ROUTE PIPING TIGHT TO STRUCTURE AT THIS LOCATION.

CONNECT TO EXISTING COIL.

NO EXISTING THERMOSTAT WAS IN THIS ROOM. COORDINATE NEW THERMOSTAT

MOUNTING WITH ALL WALL MOUNTED OBJECTS.

CONNECT NEW THERMOSTAT TO EXISTING PERIMETER HEAT CONTROL VALVE.

SUPPLEMENTAL TEMPERATURE SENSOR FOR AVERAGING. NO LOCAL SET POINT

ADJUSTMENT. COORDINATE MOUNTING WITH ALL WALL MOUNTED OBJECTS.

PROVIDE NEW 3-WAY CONTROL VALVE.

UTILIZE EXISTING PENETRATION THROUGH EARTHQUAKE WALL.

PROVIDE RETURN AIR BOOT PER DETAIL 4/M502. ALIGN GRILLE LOCATION WITH

EXISTING CEILING GRID.

ROUTE PIPING IN BETWEEN CONCRETE JOISTS AT THIS LOCATION.

ROUTE HWS/R PIPING BELOW EXISTING DUCTWORK.

RUN A CAT6A CABLE FROM THE EXISTING ECC IN BUILDING 150 TO THE

COMPUTER WORKSTATION IN THIS ROOM. APPROXIMATE DISTANCE IS 460 FEET.

ROUTING IS TO BE THROUGH INTERIOR HALLWAYS ONLY UTILIZING EXISTING

CABLE TRAY WHERE POSSIBLE. SEE 8/MH504 FOR MORE INFORMATION.

1. COORDINATE WORKING HOURS ALLOWED WITH VA COR AS INSTRUCTED IN

GENERAL REQUIREMENTS.

2. BALANCE ALL SYSTEMS TO THE AIRFLOW SHOWN AT EACH DIFFUSER, GRILLE

AND RETURN INLET AFTER THE REZONING WORK HAS BEEN COMPLETED. ADD

BALANCING DAMPERS TO THE EXISTING EXHAUST SYSTEM AS NECESSARY TO

REACH INDICATED AIRFLOW.

3. UPON COMPLETION OF DUCTWORK MODIFICATIONS, CLEAN THE ENTIRE

SUPPLY AND RETURN SYSTEMS.

4. FLUSH AND CLEAN EXISTING VAV HOT WATER COILS BEFORE CONNECTING

RUNOUT PIPING.

5. HWS/R RUNOUTS TO VAV BOXES IS TO BE 1/2" UNLESS NOTED OTHERWISE.

6. ALL EXISTING WIRELESS JCI CONTROLLERS, NETWORKING DEVICES AND

AUTOMATION ENGINES ARE TO BE REMOVED FROM THIS BUILDING. NEW WIRED

CONTROLLERS AND NETWORKING DEVICES THAT ARE 100% COMPATIBLE WITH

THE EXISTING SCHNEIDER ELECTRIC DEVICES AND NETWORK SHALL BE

INSTALLED. SEE DETAIL 2/M503 FOR A COMPLETED PROJECT BUILDING

CONTROLS ARCHITECTURE.

7. VAV BOX LOCAL CONTROLLER IS TO COMMUNICATE AND CONTROL EXISTING

PERIMETER HEAT AND NEW REHEAT CONTROL VALVES PER THE SEQUENCE

SHOWN ON M503.

8. PROVIDE A NEW THERMOSTAT IN THE SAME LOCATION AS THE REMOVED.

PATCH AND REPAIR THE WALL IN ROOMS WITH NO NEW THERMOSTAT

SPECIFIED.

9. HOT WATER CONTROL VALVES FOR FIN TUBE RADIATORS SHOWN ON THIS

FLOOR ARE LOCATED ABOVE CEILING IN THE FLOOR BELOW.

10. SEE THE SINGLE DUCT VAV BOX SCHEDULE FOR CORRESPONDING HOT WATER

CONTROL VALVE MARK.

11. PROVIDE REMOVABLE JACKETS ON ALL NEW VALVES INCLUDING CONTROL

VALVES. JACKETS FOR VALVES LESS THAN 1" ARE TO BE A PART OF DEDUCT

ALTERNATE 2.

12. ALL FIN TUBE RADIATORS (FTR) SHOWN ARE EXISTING. CORRESPONDING

CONTROL VALVES ARE SHOWN FOR CONTROLS PURPOSES UNLESS NOTED

OTHERWISE.

13. UTILIZE EXISTING PENETRATIONS THROUGH EARTHQUAKE WALLS FOR NEW

DUCTWORK AND PIPING WHEREVER POSSIBLE.

14. SLEEVE AND FIRESTOP ALL NEW WALL PENETRATIONS THROUGH SMOKE

PARTITIONS.

15. REFER TO M-001 FOR ADDITIONAL INFORMATION.

16. ALL EXISTING PERIMETER HEAT CONTROL VALVE ACTUATORS ARE TO BE

REMOVED AND REPLACED. THIS WORK IS TO BE A PART OF DEDUCT

ALTERNATE 1.

FTR = 45

EXISTING VALVE AND VALVE ACTUATOR LOCATED

AT THE FTR INSIDE THE WEST STAIRWELL.

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

Line

44/16 UP

34/14 DN

38/18 UP

24/18 DN

12/9 UP 10/8 DN

24/20 UP

20/18 DN

18/26 UP

18/20 DN

10"~

9"

10"~

22/10

VAV

VAV

VAV

14"~

16/10

14/10

/1

16/12

14x14

8x8

8x8 10x10

8x8

8x8

12x12

14x14

/1

14x14

14x14

14/10

6" ~ 6"

8"~

8"

8"

8"

6"

8"~

8"

8"

10"~

8"~

8"~

WO

FCU

FCU

10"~

9"~

FTR FTR FTR FTR

FTR

FTR

FTR

FTR

FTR

FTR

FTR

FTR

FTR

FTR

FTR

FTR

FTR

FTR

FTR

FTR

FTR

FTRFTR

FTR

FTR

FTR

FTR

FTR

/1

14"~

16/14

12"~10"~

10/1010"~

10/10

255 CFM 255 CFM

141-VAV-62

141-VAV-63

230 CFM 230 CFM

141-VAV-33

10"~

275 CFM

145 CFM

145 CFM

45 CFM

8"~

7"

10"~

8"~

141-VAV-64

8/10

305 CFM

175 CFM

150 CFM

150 CFM

10"~

6"~

8"~

/1

SD-1

7"~

10"~

141-VAV-65

250 CFM

250 CFM

210 CFM

210 CFM

210 CFM

1430 CFM

2450 CFM

100 CFM

1-1/4"

3/4"

1-1/4" 1-1/4"

3/4"

1-1/2"

3/4"

3/4"

H W

S H

W R

H W

S H

W R

HWS

HWR

HW

S

HW

R

HWS

HWR

HWS

HWR

TO

VAV-35

TO

VAV-36

VAV

141-CV-91

6"~

8"

250 CFM

SD-6

270 CFM

H W

S H

W R

SD-7

210 CFM

8"~

3/4"

12/10

1 2 3 4 5 6 7

D

C

B

A

1 2 3 4 5 6 7

D

C

B

A

E

E

Engineers Architects

AREA

SHOWN

R E

F

LI

N E

M H

R E

F

LI

N E

M H

4" HWS/R RISER. CORE DRILL THE FLOOR AND SEAL PENETRATIONS WITH FIRE

CAULK. PROVIDE 1-1/2" TAKEOFFS WITH SHUTOFF VALVES.

INSULATE EXISTING DUCT SECTION.

RELOCATED DIFFUSER. ALIGN LOCATION WITH EXISTING CEILING GRID.

PROVIDE NEW LOCAL CONTROLLER FOR EXISTING VAV BOX.

RELOCATED VAV BOX. PROVIDE NEW LOCAL CONTROLLER AND HOT WATER COIL.

ROUTE PIPING IN BETWEEN CONCRETE JOISTS AT THIS LOCATION.

CONNECT TO EXISTING COIL.

LOCATION OF NEW AUTOMATION SERVER. CONNECT ALL LOCAL CONTROLLERS

ON THE SECOND AND THIRD FLOOR AND INTEGRATE TO THE STRUXUREWARE

ECC IN BUILDING 154.

CONNECT NEW THERMOSTAT TO EXISTING PERIMETER HEAT CONTROL VALVE.

NO EXISTING THERMOSTAT WAS IN THIS ROOM. COORDINATE NEW THERMOSTAT

MOUNTING WITH ALL WALL MOUNTED OBJECTS.

3/4" HWS/R UP TO 141-FTR-1 WITH NEW 2-WAY CONTROL VALVE. CORE DRILL THE

FLOOR AND SEAL PENETRATIONS. SEE DETAIL 10/M501 FOR PIPING

CONNECTIONS.

UTILIZE EXISTING PENETRATION THROUGH EARTHQUAKE WALL.

CAP EXISTING DUCT.

RELOCATED RETURN GRILLE. ALIGN LOCATION WITH EXISTING CEILING GRID AND

TRIM LAY-IN PANEL TO FIT.

PROVIDE NEW HOT WATER COIL FOR EXISTING VAV BOX.

1. COORDINATE WORKING HOURS ALLOWED WITH VA COR AS INSTRUCTED IN

GENERAL REQUIREMENTS.

2. BALANCE ALL SYSTEMS TO THE AIRFLOW SHOWN AT EACH DIFFUSER, GRILLE

AND RETURN INLET AFTER THE REZONING WORK HAS BEEN COMPLETED. ADD

BALANCING DAMPERS TO THE EXISTING EXHAUST SYSTEM AS NECESSARY TO

REACH INDICATED AIRFLOW.

3. UPON COMPLETION OF DUCTWORK MODIFICATIONS, CLEAN THE ENTIRE

SUPPLY AND RETURN SYSTEMS.

4. FLUSH AND CLEAN EXISTING VAV HOT WATER COILS BEFORE CONNECTING

RUNOUT PIPING.

5. HWS/R RUNOUTS TO VAV BOXES IS TO BE 1/2" UNLESS NOTED OTHERWISE.

6. ALL EXISTING WIRELESS JCI CONTROLLERS, NETWORKING DEVICES AND

AUTOMATION ENGINES ARE TO BE REMOVED FROM THIS BUILDING. NEW WIRED

CONTROLLERS AND NETWORKING DEVICES THAT ARE 100% COMPATIBLE WITH

THE EXISTING SCHNEIDER ELECTRIC DEVICES AND NETWORK SHALL BE

INSTALLED. SEE DETAIL 2/M503 FOR A COMPLETED PROJECT BUILDING

CONTROLS ARCHITECTURE.

7. VAV BOX LOCAL CONTROLLER IS TO COMMUNICATE AND CONTROL EXISTING

PERIMETER HEAT AND NEW REHEAT CONTROL VALVES PER THE SEQUENCE

SHOWN ON M503.

8. PROVIDE A NEW THERMOSTAT IN THE SAME LOCATION AS THE REMOVED.

PATCH AND REPAIR THE WALL IN ROOMS WITH NO NEW THERMOSTAT

SPECIFIED.

9. HOT WATER CONTROL VALVES FOR FIN TUBE RADIATORS SHOWN ON THIS

FLOOR ARE LOCATED ABOVE CEILING IN THE FLOOR BELOW.

10. SEE THE SINGLE DUCT VAV BOX SCHEDULE FOR CORRESPONDING HOT WATER

CONTROL VALVE MARK.

11. PROVIDE REMOVABLE JACKETS ON ALL NEW VALVES INCLUDING CONTROL

VALVES. JACKETS FOR VALVES LESS THAN 1" ARE TO BE A PART OF DEDUCT

ALTERNATE 2.

12. ALL FIN TUBE RADIATORS (FTR) SHOWN ARE EXISTING. CORRESPONDING

CONTROL VALVES ARE SHOWN FOR CONTROLS PURPOSES UNLESS NOTED

OTHERWISE.

13. UTILIZE EXISTING PENETRATIONS THROUGH EARTHQUAKE WALLS FOR NEW

DUCTWORK AND PIPING WHEREVER POSSIBLE.

14. SLEEVE AND FIRESTOP ALL NEW WALL PENETRATIONS THROUGH SMOKE

PARTITIONS.

15. REFER TO M-001 FOR ADDITIONAL INFORMATION.

16. ALL EXISTING PERIMETER HEAT CONTROL VALVE ACTUATORS ARE TO BE

REMOVED AND REPLACED. THIS WORK IS TO BE A PART OF DEDUCT

ALTERNATE 1.

FTR = 29

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

46/18

60/16 UP

50/18 UP

54/14 DN

38/18 DN

10/16 UP

10/16 DN

24/20 DN

26/18 DN

12"~

42/12

16"~

VAV

VAV

24/1612"~

VAV

VAV

VAV

14/12

18/12

/1

/1

14/12

/1

/1

12x12

16/10

16x16

12x12 12x12

8x8 8x8

8x8 8x8

12x12

12x12

10x10 10x10

8x8

10x10

/1

16x16

12x12

16x16

8"~

8"

8"~

8"

8"

8"

8"

6"~

8"~

8"~

10"~

10"~

20"~ UP 24"~ UP

8"

6"~

12"~

10"~

"~12

12"~

8"

8"

8/

8"

18/26 UP16/24 UP

16/10

24/16 28/16

WO

14"~

16/10

18/36 UP

18/30 DN

16/42 UP

16/36 DN

24/12 16

FCU

6"~

8"~

FTR

FTR FTR FTR

FTR

FTR

FTR

FTR

FTR

FTR

FTR

FTR

FTRFTRFTRFTRFTRFTR

FTR

FTR

FTR

FTR

FTR FTR FTR FTR FTR FTR

FTR

FTR FTR FTR

141-VAV-49

/1

8"

355 CFM

205 CFM 210 CFM

/1

141-VAV-51

6"~

270 CFM

270 CFM

190 CFM

295 CFM

360 CFM

360 CFM

6"~

141-VAV-42

8"~

8"~

141-VAV-52

8"

240 CFM

240 CFM

165 CFM

141-VAV-41

8"

265 CFM

255 CFM

50 CFM

10"~

8"

141-VAV-39

141-VAV-50

14/12

230 CFM

245 CFM

50 CFM

425 CFM425 CFM

370 CFM

370 CFM

360 CFM

10"~

365 CFM

CFM

3590 CFM3/4"

3/4"

3/4"

1" 1" 1"

1-1/4"

1-1/4"

1/2"

1-1/4"

3/4"

1-1/4"

HWS

HWR

HWS

HWR

HWS

HWR

H W

S H

W R H W

S H

W R

HWS

HWR

HWS

HWR

TO

141-VAV-53

8x8

8"

1 2 3 4 5 6 7

D

C

B

A

1 2 3 4 5 6 7

D

C

B

A

E

E

Engineers Architects

INSULATE EXISTING DUCT SECTION.

CAP EXISTING DUCT.

PROVIDE NEW LOCAL CONTROLLER FOR EXISTING VAV BOX.

CONNECT TO EXISTING COIL.

CONNECT NEW THERMOSTAT TO EXISTING PERIMETER HEAT CONTROL VALVE.

PROVIDE NEW HOT WATER COIL FOR EXISTING VAV BOX.

THERMOSTAT IS FOR ROOM TEMPERATURE MONITORING ONLY. SEE CONTROL

SEQUENCE ON M504.

RELOCATED DIFFUSER. ALIGN LOCATION WITH EXISTING CEILING GRID.

RELOCATED RETURN GRILLE. ALIGN LOCATION WITH EXISTING CEILING GRID.

AREA

SHOWN

R E

F

LI

N E

M H

R E

F

LI

N E

M H

1. COORDINATE WORKING HOURS ALLOWED WITH VA COR AS INSTRUCTED IN

GENERAL REQUIREMENTS.

2. BALANCE ALL SYSTEMS TO THE AIRFLOW SHOWN AT EACH DIFFUSER, GRILLE

AND RETURN INLET AFTER THE REZONING WORK HAS BEEN COMPLETED. ADD

BALANCING DAMPERS TO THE EXISTING EXHAUST SYSTEM AS NECESSARY TO

REACH INDICATED AIRFLOW.

3. UPON COMPLETION OF DUCTWORK MODIFICATIONS, CLEAN THE ENTIRE

SUPPLY AND RETURN SYSTEMS.

4. FLUSH AND CLEAN EXISTING VAV HOT WATER COILS BEFORE CONNECTING

RUNOUT PIPING.

5. HWS/R RUNOUTS TO VAV BOXES IS TO BE 1/2" UNLESS NOTED OTHERWISE.

6. ALL EXISTING WIRELESS JCI CONTROLLERS, NETWORKING DEVICES AND

AUTOMATION ENGINES ARE TO BE REMOVED FROM THIS BUILDING. NEW WIRED

CONTROLLERS AND NETWORKING DEVICES THAT ARE 100% COMPATIBLE WITH

THE EXISTING SCHNEIDER ELECTRIC DEVICES AND NETWORK SHALL BE

INSTALLED. SEE DETAIL 2/M503 FOR A COMPLETED PROJECT BUILDING

CONTROLS ARCHITECTURE.

7. VAV BOX LOCAL CONTROLLER IS TO COMMUNICATE AND CONTROL EXISTING

PERIMETER HEAT AND NEW REHEAT CONTROL VALVES PER THE SEQUENCE

SHOWN ON M503.

8. PROVIDE A NEW THERMOSTAT IN THE SAME LOCATION AS THE REMOVED.

PATCH AND REPAIR THE WALL IN ROOMS WITH NO NEW THERMOSTAT

SPECIFIED.

9. HOT WATER CONTROL VALVES FOR FIN TUBE RADIATORS SHOWN ON THIS

FLOOR ARE LOCATED ABOVE CEILING IN THE FLOOR BELOW.

10. SEE THE SINGLE DUCT VAV BOX SCHEDULE FOR CORRESPONDING HOT WATER

CONTROL VALVE MARK.

11. PROVIDE REMOVABLE JACKETS ON ALL NEW VALVES INCLUDING CONTROL

VALVES. JACKETS FOR VALVES LESS THAN 1" ARE TO BE A PART OF DEDUCT

ALTERNATE 2.

12. ALL FIN TUBE RADIATORS (FTR) SHOWN ARE EXISTING. CORRESPONDING

CONTROL VALVES ARE SHOWN FOR CONTROLS PURPOSES UNLESS NOTED

OTHERWISE.

13. UTILIZE EXISTING PENETRATIONS THROUGH EARTHQUAKE WALLS FOR NEW

DUCTWORK AND PIPING WHEREVER POSSIBLE.

14. SLEEVE AND FIRESTOP ALL NEW WALL PENETRATIONS THROUGH SMOKE

PARTITIONS.

15. REFER TO M-001 FOR ADDITIONAL INFORMATION.

16. ALL EXISTING PERIMETER HEAT CONTROL VALVE ACTUATORS ARE TO BE

REMOVED AND REPLACED. THIS WORK IS TO BE A PART OF DEDUCT

ALTERNATE 1.

FTR = 32

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

48/18 UP

38/18 DN

54/16 UP

44/16 DN

14/12 UP

12/9 DN

26/18 DN

26/18 DN

10"~

8"

VAV

VAV

VAV

14"~

32/12

14"~ 9"~

9/

10x10

/1

16x16

10x10

10x10

12x12

10x10

8"~

10"~

8"

8"

8"~

14/10

14x14

22"~ DN24"~ DN

12/12

10"~

12"~

18/24 UP

18/28 UP

24/22

WO16/14

20/22

9"~

12/6 15/66/4

8"~

FTR

FTR FTR FTR FTR FTR FTR

FTR

FTR

FTR

FTR

FTRFTRFTR

FTRFTR

FTR

1-1/2"

12/12

12/10

12/10 8"~

8"~

10"~

141-VAV-53

195 CFM

320 CFM 320 CFM

10"~

6"~

141-VAV-54

290 CFM

270 CFM

240 CFM

255 CFM

250 CFM

295 CFM

2750 CFM

141-FTR-1

141-VAV-55

6"~ 10"~

1/2"

3/4"

3/4"

1-1/4"

3/4"

1-1/4"

1-1/4"

1-1/2"

H W

S H

W R

HWS

HWR

HWS

HWR

HWS

HWR

TO

141-VAV-55

TO

VAV-48

141-VAV-47

250 CFM

8"

8"~

SD-4

SD-5

200 CFM

200 CFM

50 CFM

10/10

/1

1 2 3 4 5 6 7

D

C

B

A

1 2 3 4 5 6 7

D

C

B

A

E

E

Engineers Architects

AREA

SHOWN

R E

F

LI

N E

M H

R E

F

LI

N E

M H

4" HWS/R RISER. CORE DRILL THE FLOOR AND SEAL PENETRATIONS WITH FIRE

CAULK. PROVIDE 1-1/2" TAKEOFFS WITH SHUTOFF VALVES.

INSULATE EXISTING DUCT SECTION.

PROVIDE NEW LOCAL CONTROLLER FOR EXISTING VAV BOX.

CONNECT TO EXISTING COIL.

NO EXISTING THERMOSTAT WAS IN THIS ROOM. COORDINATE NEW THERMOSTAT

MOUNTING WITH ALL WALL MOUNTED OBJECTS.

CONNECT NEW THERMOSTAT TO EXISTING PERIMETER HEAT CONTROL VALVE.

1. COORDINATE WORKING HOURS ALLOWED WITH VA COR AS INSTRUCTED IN

GENERAL REQUIREMENTS.

2. BALANCE ALL SYSTEMS TO THE AIRFLOW SHOWN AT EACH DIFFUSER, GRILLE

AND RETURN INLET AFTER THE REZONING WORK HAS BEEN COMPLETED. ADD

BALANCING DAMPERS TO THE EXISTING EXHAUST SYSTEM AS NECESSARY TO

REACH INDICATED AIRFLOW.

3. UPON COMPLETION OF DUCTWORK MODIFICATIONS, CLEAN THE ENTIRE

SUPPLY AND RETURN SYSTEMS.

4. FLUSH AND CLEAN EXISTING VAV HOT WATER COILS BEFORE CONNECTING

RUNOUT PIPING.

5. HWS/R RUNOUTS TO VAV BOXES IS TO BE 1/2" UNLESS NOTED OTHERWISE.

6. ALL EXISTING WIRELESS JCI CONTROLLERS, NETWORKING DEVICES AND

AUTOMATION ENGINES ARE TO BE REMOVED FROM THIS BUILDING. NEW WIRED

CONTROLLERS AND NETWORKING DEVICES THAT ARE 100% COMPATIBLE WITH

THE EXISTING SCHNEIDER ELECTRIC DEVICES AND NETWORK SHALL BE

INSTALLED. SEE DETAIL 2/M503 FOR A COMPLETED PROJECT BUILDING

CONTROLS ARCHITECTURE.

7. VAV BOX LOCAL CONTROLLER IS TO COMMUNICATE AND CONTROL EXISTING

PERIMETER HEAT AND NEW REHEAT CONTROL VALVES PER THE SEQUENCE

SHOWN ON M503.

8. PROVIDE A NEW THERMOSTAT IN THE SAME LOCATION AS THE REMOVED.

PATCH AND REPAIR THE WALL IN ROOMS WITH NO NEW THERMOSTAT

SPECIFIED.

9. HOT WATER CONTROL VALVES FOR FIN TUBE RADIATORS SHOWN ON THIS

FLOOR ARE LOCATED ABOVE CEILING IN THE FLOOR BELOW.

10. SEE THE SINGLE DUCT VAV BOX SCHEDULE FOR CORRESPONDING HOT WATER

CONTROL VALVE MARK.

11. PROVIDE REMOVABLE JACKETS ON ALL NEW VALVES INCLUDING CONTROL

VALVES. JACKETS FOR VALVES LESS THAN 1" ARE TO BE A PART OF DEDUCT

ALTERNATE 2.

12. ALL FIN TUBE RADIATORS (FTR) SHOWN ARE EXISTING. CORRESPONDING

CONTROL VALVES ARE SHOWN FOR CONTROLS PURPOSES UNLESS NOTED

OTHERWISE.

13. UTILIZE EXISTING PENETRATIONS THROUGH EARTHQUAKE WALLS FOR NEW

DUCTWORK AND PIPING WHEREVER POSSIBLE.

14. SLEEVE AND FIRESTOP ALL NEW WALL PENETRATIONS THROUGH SMOKE

PARTITIONS.

15. REFER TO M-001 FOR ADDITIONAL INFORMATION.

16. ALL EXISTING PERIMETER HEAT CONTROL VALVE ACTUATORS ARE TO BE

REMOVED AND REPLACED. THIS WORK IS TO BE A PART OF DEDUCT

ALTERNATE 1.

FTR = 18

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

VHAFHMBilodJ Highlight

20180201 Structural
17-E134-S101
17-E134-S102
17-E134-S103
17-E134-S201
20180201 Mechanical
20180201 Electrical