Drawings_436-22-105 BUILDING 141 VALVES UPGRADE.pdf
PDF 5 MB Posted
- Solicitation number
- 36C25922Q0121
About this file
This is a solicitation for a mechanical construction project located at the Fort Harrison VA Medical Center in Montana. The scope of work involves replacing approximately 244 control valves and actuators for fin tube radiators, and installing four gas flow meters to monitor boiler plant usage. Contractors must provide all labor, materials, tools and services to complete the project, which includes coordination with the existing building automation system. Work will take place after hours and on weekends to minimize disruption. The period of performance is 90 days from notice to proceed. The contractor must comply with all applicable safety requirements and VA protocols for infection control and COVID-19.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| S05- Questions and Answers.docx | DOCX document | |
| S04- Site Visit Attendance sheet.pdf | ||
| S04- Site Visit Meeting Doc.docx | DOCX document | |
| 36C25922Q0121 0001.docx | DOCX document | |
| S02- 36C25922Q0121_solicitation.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
14/14 UP
14/16 UP
8"~
12"~
12"~
VAV
VAV
8/4
16/12
/1
8x8
10x10
10x10
8x8
10x10
8x8
8x8
6x8
14x14
8x8
14x14
8"
6"
10"~
8"~
6"
6"
8"~
18/16 SA UP
/1
12"~
14/10
10x10
PFHX-7
BWR
B W
S
141-HWP-1
141-HWP-2
HWS
HWR
H W
S
H W
R
6"~
H W
R
H W
S
FTR
FTR
FTR
FTR
FTR
FTRFTR
FTR
FTR
FTR
FTR
FTRFTR
FTR
FTR
FTR
FTR
FTR
FTR
FTR FTR FTR FTR FTR FTR
FTR
WOWO
12x12
12x12
WO
WO
10x10
WO
8"~
12x12
8"
12x12
WO
WO
WO
WO
8x8
8"~
6"~
WO WO
WO WO
6"
AP
AP
AP
8/4 UP
WO
FTR
FCU
WO
14x14
8x8
WO
FTR
14/10
8"~
8/4
10/10 10/6
8"~
10"~
6"~
8"~
20/14 RA UP
10"~
6"~
WO
H H
X -1
WO
HWR
3"
4"
4"
3"
4"
141-VAV-77
8"~
VAV
6"~
8"~
8"~
200 CFM
200 CFM
190 CFM
141-VAV-78
10"~
RG-3
141-VAV-3
141-VAV-79
6"
6"
/1
141-VAV-80
200 CFM
315 CFM 300 CFM
210 CFM
230 CFM
230 CFM
180 CFM
120 CFM
110 CFM
50 CFM
50 CFM
55 CFM
315 CFM
270 CFM
240 CFM
8"~8"
10"~
8"~
/1
/1
8/
141-VAV-82
6"~
6"~ 8"~
7"~8/8
/1
7"~10"~
6"
7"
/8
7"
6"~
210 CFM
55 CFM
100 CFM
250 CFM
1-1/4"
3/4"
1-1/4"
TO
141-VAV-81
1/2"
3/4"
3/4"
VAV
3/4"
1-1/4"
1"
1"
1"
3/4"
3/4"
3/4"
3/4" 3/4"
HWS
141-VAV-83
141-VAV-81
160 CFM
200 CFM
130 CFM
RG-4
HWR
TO
141-VAV-6
H W
S H
W R
H W
S H
W R
HWS
HWR
HWS
HWRHWR
HWS
HWS
HWR
HWS
HWR
H W
S H
W R
H W
S H
W R
TO
141-VAV-80
TO
VAV-5
TO
141-VAV-77
TO
141-VAV-78
TO
VAV-1
12/18
RA UP
16/14
SA UP
1330 CFM
205 CFM
1980 CFM
1140 CFM
141-FTR-2141-CV-96
3/4"
8"~
8"~
141-ET-1
50 CFM
160 CFM
/1
141-VAV-6
WO
141-EF-3
PROVIDE 8/8 HOODED WALL
CAP WITH BIRDSCREEN
8/8
8x8
SEE S201 FOR DUCT
PENETRATION DETAIL
VAV
8"
1 2 3 4 5 6 7
D
C
B
A
1 2 3 4 5 6 7
D
C
B
A
E
E
Engineers Architects
INSTALL NEW PIPING BEFORE REMOVING OLD. SEE MD101 FOR MORE
INFORMATION.
INSTALL NEW MAIN SHUTOFF VALVES.
RELOCATED GATE VALVE AND BALANCING VALVE. SEE MD101 FOR MORE
INFORMATION.
INSULATE EXISTING DUCT SECTION.
PROVIDE NEW LOCAL CONTROLLER FOR EXISTING VAV BOX.
CONNECT TO EXISTING COIL.
CONNECT NEW THERMOSTAT TO EXISTING PERIMETER HEAT CONTROL VALVE.
SUPPLEMENTAL TEMPERATURE SENSOR FOR AVERAGING. NO LOCAL SET POINT
ADJUSTMENT. COORDINATE MOUNTING WITH ALL WALL MOUNTED OBJECTS.
RELOCATED VAV BOX. PROVIDE NEW LOCAL CONTROLLER AND HOT WATER COIL.
NEW THERMOSTAT LOCATION, COORDINATE MOUNTING WITH ALL WALL MOUNTED
OBJECTS.
PROVIDE RETURN AIR BOOT PER DETAIL 4/M502. ALIGN GRILLE LOCATION WITH
EXISTING CEILING GRID.
PROVIDE NEW HOT WATER COIL FOR EXISTING VAV BOX.
UTILIZE EXISTING FLEX DUCT.
CONNECT NEW THERMOSTAT TO EXISTING FAN COIL UNIT. SEE CONTROL
SEQUENCE ON M503.
BLANK OFF AND SEAL EXISTING OPENING FROM FROM REMOVED DUCTWORK.
CLEAN AND RE-GASKET EXISTING PLATE AND FRAME HEAT EXCHANGER.
THERMOSTAT IS FOR ROOM TEMPERATURE MONITORING ONLY. SEE CONTROL
SEQUENCE ON M504.
UTILIZE EXISTING PENETRATION THROUGH EARTHQUAKE WALL.
ROUTE PIPING IN BETWEEN CONCRETE JOISTS AT THIS LOCATION.
OFFSET PIPING/DUCTWORK BELOW BEAM.
ROUTE PIPING OVER EXISTING DOMESTIC WATER MAINS.
3/4" HWS/R DOWN TO 141-FTR-2 WITH NEW 2-WAY CONTROL VALVE. SEE DETAIL
10/M501 FOR PIPING CONNECTIONS.
RELOCATED DIFFUSER. ALIGN LOCATION WITH EXISTING CEILING GRID.
NEW FLOOR MOUNTED EXPANSION TANK. PROVIDE 4" THICK HOUSEKEEPING PAD.
PROVIDE NEW HEATING HOT WATER SYSTEM CONTROLLER IN EXISTING CABINET
AND CONNECT TO NEW AUTOMATION SERVER ON THE FIRST FLOOR. REUSE
EXISTING SYSTEM SENSORS/PROBES. REPLACE DEVICES THAT ARE
INCOMPATIBLE WITH THE NEW CONTROLLER.
RELOCATED RETURN GRILLE. ALIGN LOCATION WITH EXISTING CEILING GRID.
AREA
SHOWN
R E
F
LI
N E
M H
R E
F
LI
N E
M H
1. COORDINATE WORKING HOURS ALLOWED WITH VA COR AS INSTRUCTED IN
GENERAL REQUIREMENTS.
2. BALANCE ALL SYSTEMS TO THE AIRFLOW SHOWN AT EACH DIFFUSER, GRILLE
AND RETURN INLET AFTER THE REZONING WORK HAS BEEN COMPLETED. ADD
BALANCING DAMPERS TO THE EXISTING EXHAUST SYSTEM AS NECESSARY TO
REACH INDICATED AIRFLOW.
3. UPON COMPLETION OF DUCTWORK MODIFICATIONS, CLEAN THE ENTIRE
SUPPLY AND RETURN SYSTEMS.
4. FLUSH AND CLEAN EXISTING VAV HOT WATER COILS BEFORE CONNECTING
RUNOUT PIPING.
5. HWS/R RUNOUTS TO VAV BOXES IS TO BE 1/2" UNLESS NOTED OTHERWISE.
6. ALL EXISTING WIRELESS JCI CONTROLLERS, NETWORKING DEVICES AND
AUTOMATION ENGINES ARE TO BE REMOVED FROM THIS BUILDING. NEW WIRED
CONTROLLERS AND NETWORKING DEVICES THAT ARE 100% COMPATIBLE WITH
THE EXISTING SCHNEIDER ELECTRIC DEVICES AND NETWORK SHALL BE
INSTALLED. SEE DETAIL 2/M503 FOR A COMPLETED PROJECT BUILDING
CONTROLS ARCHITECTURE.
7. VAV BOX LOCAL CONTROLLER IS TO COMMUNICATE AND CONTROL EXISTING
PERIMETER HEAT AND NEW REHEAT CONTROL VALVES PER THE SEQUENCE
SHOWN ON M503.
8. PROVIDE A NEW THERMOSTAT IN THE SAME LOCATION AS THE REMOVED.
PATCH AND REPAIR THE WALL IN ROOMS WITH NO NEW THERMOSTAT
SPECIFIED.
9. HOT WATER CONTROL VALVES FOR FIN TUBE RADIATORS SHOWN ON THIS
FLOOR ARE FOR RADIATORS ON BOTH THIS FLOOR AND THE FIRST FLOOR.
10. SEE THE SINGLE DUCT VAV BOX SCHEDULE FOR CORRESPONDING HOT WATER
CONTROL VALVE MARK.
11. PROVIDE REMOVABLE JACKETS ON ALL NEW VALVES INCLUDING CONTROL
VALVES. JACKETS FOR VALVES LESS THAN 1" ARE TO BE A PART OF DEDUCT
ALTERNATE 2.
12. ALL FIN TUBE RADIATORS (FTR) SHOWN ARE EXISTING. CORRESPONDING
CONTROL VALVES ARE SHOWN FOR CONTROLS PURPOSES UNLESS NOTED
OTHERWISE.
13. UTILIZE EXISTING PENETRATIONS THROUGH EARTHQUAKE WALLS FOR NEW
DUCTWORK AND PIPING WHEREVER POSSIBLE.
14. SLEEVE AND FIRESTOP ALL NEW WALL PENETRATIONS THROUGH SMOKE
PARTITIONS.
15. REFER TO M-001 FOR ADDITIONAL INFORMATION.
16. ALL EXISTING PERIMETER HEAT CONTROL VALVE ACTUATORS ARE TO BE
REMOVED AND REPLACED. THIS WORK IS TO BE A PART OF DEDUCT
ALTERNATE 1.
17. ALL DUCTWORK REVISIONS IN THE BASEMENT INCLUDING THE ADDITION OF
BRANCH PIPING FOR HW REHEAT AT THE VAV BOXES SHALL BE A PART OF
DEDUCT ALTERNATE 4. HW MAINS SHALL STILL BE ROUTED IN THE CORRIDORS
AND EXISTING BOXES ARE TO BE CONVERTED TO NEW CONTROLS.
18. CONTRACTOR SHALL REPLACE ANY VALVE IN MECHANICAL ROOM B-2 THAT IS
UTILIZED DURING THE PROJECT AND NOT FUNCTIONING PROPERLY.
Fin Tube Radiator = FTR
FTR = 29
TOTAL = 244
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
18/14 UP
8/6 UP
9"~
10"~
VAV
VAV
16/14 UP
12/18 UP
/1
8/6
6"~
14/10 10/10
14/10
14/1214/14
16/14
14x14
8x8 8x8
8x8
10x10 10x10
10x10 12x12
10x10
8x8
10x10
14x14
8"
6"~
8"
14"~
8"
16/18
6/
6"
FTRFTR
FTR
FTR
FTR
FTR FTR
FTR
FTR
FTR
FTR
FTR
FTR
FTR
FTRFTRFTRFTR
FTR
WOWO
10x10
8"
WO
WO
FTR FTR
WO
WO
WOWO
6"
WO
FTR
8/
WO
WO
8"~
FTR
6"~
10"~
9"~
8"
8"~
6"
8"
4"
4"
4"
HWR
HWS
141-VAV-84
141-VAV-9
/8
10/12
/1
141-VAV-85
8/
8"~
8/
141-VAV-11
141-VAV-12
130 CFM
135 CFM
175 CFM
55 CFM
8"~
10"~
8"~
8"
275 CFM
275 CFM380 CFM
245 CFM
245 CFM
8"
10"~
8"
12"~
8"
230 CFM
265 CFM
250 CFM
210 CFM
155 CFM
HWR
3/4"
270 CFM
3/4"
H W
R H
W S
H W
R H
W S
TO
VAV-8
TO
141-VAV-9240 CFM
TO
VAV-10
TO
141-VAV-12
TO
141-VAV-85
1300 CFM
65 CFM
1940 CFM
100 CFM
100 CFM
HWS
HWR
HWS
HWR
3/4"
1/2"
H W
S
10"~
1 2 3 4 5 6 7
D
C
B
A
1 2 3 4 5 6 7
D
C
B
A
E
E
Engineers Architects
4" HWS/R UP, CORE DRILL THE FLOOR AND SEAL PENETRATIONS WITH FIRE
CAULK.
ROUTE HWS/R PIPING HIGH TO CROSS CORRIDOR.
ROUTE HWS/R PIPING ABOVE EXISTING DOMESTIC WATER PIPING.
INSULATE EXISTING DUCT SECTION.
PROVIDE NEW LOCAL CONTROLLER FOR EXISTING VAV BOX.
CONNECT TO EXISTING COIL.
CONNECT NEW THERMOSTAT TO EXISTING PERIMETER HEAT CONTROL VALVE.
PROVIDE NEW HOT WATER COIL FOR EXISTING VAV BOX.
POSITION BOX SO CONTROLS PANEL AND HOT WATER CONTROL VALVE IS
ACCESSIBLE VIA NEW SOFFIT.
BLANK OFF AND SEAL EXISTING OPENING FROM FROM REMOVED DUCTWORK.
UTILIZE EXISTING PENETRATION THROUGH EARTHQUAKE WALL.
SUPPLEMENTAL TEMPERATURE SENSOR FOR AVERAGING. NO LOCAL SET POINT
ADJUSTMENT. COORDINATE MOUNTING WITH ALL WALL MOUNTED OBJECTS.
NEW THERMOSTAT LOCATION, COORDINATE MOUNTING WITH ALL WALL MOUNTED
OBJECTS.
ROUTE PIPING IN BETWEEN CONCRETE JOISTS AT THIS LOCATION.
UTILIZE EXISTING VAV-14 FROM THE FIRST FLOOR. PROVIDE NEW LOCAL
CONTROLLER AND HOT WATER COIL.
UTILIZE EXISTING VAV-15 FROM THE FIRST FLOOR. PROVIDE NEW LOCAL
CONTROLLER AND HOT WATER COIL.
TRANSITION DOWN TO 8"~ TO UTILIZE EXISTING PENETRATION THROUGH
EARTHQUAKE WALL.
AREA
SHOWN
R E
F
LI
N E
M H
R E
F
LI
N E
M H
1. COORDINATE WORKING HOURS ALLOWED WITH VA COR AS INSTRUCTED IN
GENERAL REQUIREMENTS.
2. BALANCE ALL SYSTEMS TO THE AIRFLOW SHOWN AT EACH DIFFUSER, GRILLE
AND RETURN INLET AFTER THE REZONING WORK HAS BEEN COMPLETED. ADD
BALANCING DAMPERS TO THE EXISTING EXHAUST SYSTEM AS NECESSARY TO
REACH INDICATED AIRFLOW.
3. UPON COMPLETION OF DUCTWORK MODIFICATIONS, CLEAN THE ENTIRE
SUPPLY AND RETURN SYSTEMS.
4. FLUSH AND CLEAN EXISTING VAV HOT WATER COILS BEFORE CONNECTING
RUNOUT PIPING.
5. HWS/R RUNOUTS TO VAV BOXES IS TO BE 1/2" UNLESS NOTED OTHERWISE.
6. ALL EXISTING WIRELESS JCI CONTROLLERS, NETWORKING DEVICES AND
AUTOMATION ENGINES ARE TO BE REMOVED FROM THIS BUILDING. NEW WIRED
CONTROLLERS AND NETWORKING DEVICES THAT ARE 100% COMPATIBLE WITH
THE EXISTING SCHNEIDER ELECTRIC DEVICES AND NETWORK SHALL BE
INSTALLED. SEE DETAIL 2/M503 FOR A COMPLETED PROJECT BUILDING
CONTROLS ARCHITECTURE.
7. VAV BOX LOCAL CONTROLLER IS TO COMMUNICATE AND CONTROL EXISTING
PERIMETER HEAT AND NEW REHEAT CONTROL VALVES PER THE SEQUENCE
SHOWN ON M503.
8. PROVIDE A NEW THERMOSTAT IN THE SAME LOCATION AS THE REMOVED.
PATCH AND REPAIR THE WALL IN ROOMS WITH NO NEW THERMOSTAT
SPECIFIED.
9. HOT WATER CONTROL VALVES FOR FIN TUBE RADIATORS SHOWN ON THIS
FLOOR ARE FOR RADIATORS ON BOTH THIS FLOOR AND THE FIRST FLOOR.
10. SEE THE SINGLE DUCT VAV BOX SCHEDULE FOR CORRESPONDING HOT WATER
CONTROL VALVE MARK.
11. PROVIDE REMOVABLE JACKETS ON ALL NEW VALVES INCLUDING CONTROL
VALVES. JACKETS FOR VALVES LESS THAN 1" ARE TO BE A PART OF DEDUCT
ALTERNATE 2.
12. ALL FIN TUBE RADIATORS (FTR) SHOWN ARE EXISTING. CORRESPONDING
CONTROL VALVES ARE SHOWN FOR CONTROLS PURPOSES UNLESS NOTED
OTHERWISE.
13. UTILIZE EXISTING PENETRATIONS THROUGH EARTHQUAKE WALLS FOR NEW
DUCTWORK AND PIPING WHEREVER POSSIBLE.
14. SLEEVE AND FIRESTOP ALL NEW WALL PENETRATIONS THROUGH SMOKE
PARTITIONS.
15. REFER TO M-001 FOR ADDITIONAL INFORMATION.
16. ALL EXISTING PERIMETER HEAT CONTROL VALVE ACTUATORS ARE TO BE
REMOVED AND REPLACED. THIS WORK IS TO BE A PART OF DEDUCT
ALTERNATE 1.
17. ALL DUCTWORK REVISIONS IN THE BASEMENT INCLUDING THE ADDITION OF
BRANCH PIPING FOR HW REHEAT AT THE VAV BOXES SHALL BE A PART OF
DEDUCT ALTERNATE 4. HW MAINS SHALL STILL BE ROUTED IN THE CORRIDORS
AND EXISTING BOXES ARE TO BE CONVERTED TO NEW CONTROLS.
FTR = 23
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
20/14 DN
18/20 UP
14/16 DN
14/26 UP
14/14 DN
12/9 UP
5/4 DN
20/18 UP
16/14 DN
8"~
VAV
12"~
9"
22/12
16/12
16/10
16/12 14/10
/1
/1
8x8
8x8
8x8
8x8
10x10
10x10 10x10 12x12
12x12
10x10
8x8
8x8
10x1010x10
10x10
12/10
8x8
12x12
8x8
12x10
12x10
12x10
8"
8"
6"
8"
6"
6"
6"
10"~
6"
10"~
8"~
8"~
8/8
8"
8"~
8"~
10"~
"~ 12
"~ 8"
8"
26/18 UP
18/16 DN
36/14 UP
24/12
9"
12"~ 16"~
8x8
8"~
8x8
8"~
/1
8"
8"
FTR FTRFTR
FTR
FTR
FTR
FTR
FTR
FTR
FTR
FTR
FTR
FTRFTRFTRFTR
FTR
FTR
FTR
FTR
FTR
FTR
FTRFTR
FTR
FTR
FTR
FTR
FTR
FTR
FTR FTR FTR FTR
FTR
FTR
FTR
FTR
8"~
8"~
10"~10"~
6"~
8"
8"~
FTR
FTR
12/8
R
8x8 10"~
BWR
BWSBWS
BWR
B W
R B
W S
B W
R B
W S
FTR
WO
WO
WO
WOWO
220 CFM
250 CFM
120 CFM
120 CFM
175 CFM
165 CFM
150 CFM
120 CFM
8"~
7"~
141-CV-90
10"~
10"~
6"~
8"
6"~
8"
6"~
141-VAV-14
141-VAV-67
141-VAV-68
141-VAV-66
TO
VAV-13
1190 CFM
6"~
250 CFM
265 CFM
200 CFM
10/108"~
141-VAV-69
8"
8"
10"~
8"~
141-VAV-15
55 CFM
6"~
141-VAV-70
10"~
8"~
305 CFM
300 CFM
275 CFM
50 CFM
70 CFM
65 CFM
140 CFM
155 CFM
210 CFM
TO
141-VAV-70
8"~
6"
8"
141-VAV-71
160 CFM
200 CFM
200 CFM
165 CFM 95 CFM
141-VAV-19
305 CFM 305 CFM
305 CFM
1560 CFM
2110 CFM
VAV
VAV
18/16 UP
18/12 DN
6"
TO
141-VAV-68
1-1/4"
1-1/4"
3/4"
3/4"
1-1/4"
1-1/4"
1-1/4" 1"
1"1"
3/4"
3/4"
1"
3/4"3/4"
HWS
HWR
H W
R H
W S
HWS
HWR
HWS
HWR
HWS
HWR
HWS
HWR
HWS
HWS
H W
R H
W S
H W
R H
W S
H W
R H
W S
HWS
HWR
3/4"
8"~ 8"~ 10/10
8"
141-VAV-76
12"~
141-VAV-18
7"~10"~
TO
141-VAV-18
8"~
H W
R H
W S
250 CFM
1 2 3 4 5 6 7
D
C
B
A
1 2 3 4 5 6 7
D
C
B
A
E
E
Engineers Architects
AREA
SHOWN
R E
F
LI
N E
M H
R E
F
LI
N E
M H
INSULATE EXISTING DUCT SECTION.
PROVIDE NEW LOCAL CONTROLLER FOR EXISTING VAV BOX.
BLANK OFF AND SEAL EXISTING OPENING FROM FROM REMOVED DUCTWORK.
RELOCATED DIFFUSER. ALIGN LOCATION WITH EXISTING CEILING GRID.
CONNECT TO EXISTING COIL.
CAP EXISTING DUCT.
CONNECT NEW THERMOSTAT TO EXISTING PERIMETER HEAT CONTROL VALVE.
SUPPLEMENTAL TEMPERATURE SENSOR FOR AVERAGING. NO LOCAL SET POINT
ADJUSTMENT. COORDINATE MOUNTING WITH ALL WALL MOUNTED OBJECTS.
PROVIDE NEW 2-WAY CONTROL VALVE.
PROVIDE NEW HOT WATER COIL FOR EXISTING VAV BOX.
UTILIZE EXISTING PENETRATION THROUGH EARTHQUAKE WALL.
UTILIZE EXISTING FLEX DUCT.
LOCATION OF NEW AUTOMATION SERVER. CONNECT ALL LOCAL CONTROLLERS
ON THE FIRST FLOOR AND BASEMENT AND INTEGRATE TO THE STRUXUREWARE
ECC IN BUILDING 154.
ROUTE PIPING TIGHT TO STRUCTURE AT THIS LOCATION.
THERMOSTAT IS FOR ROOM TEMPERATURE MONITORING ONLY. SEE CONTROL
SEQUENCE ON M504.
ROUTE PIPING IN BETWEEN CONCRETE JOISTS AT THIS LOCATION.
1. COORDINATE WORKING HOURS ALLOWED WITH VA COR AS INSTRUCTED IN
GENERAL REQUIREMENTS.
2. BALANCE ALL SYSTEMS TO THE AIRFLOW SHOWN AT EACH DIFFUSER, GRILLE
AND RETURN INLET AFTER THE REZONING WORK HAS BEEN COMPLETED. ADD
BALANCING DAMPERS TO THE EXISTING EXHAUST SYSTEM AS NECESSARY TO
REACH INDICATED AIRFLOW.
3. UPON COMPLETION OF DUCTWORK MODIFICATIONS, CLEAN THE ENTIRE
SUPPLY AND RETURN SYSTEMS.
4. FLUSH AND CLEAN EXISTING VAV HOT WATER COILS BEFORE CONNECTING
RUNOUT PIPING.
5. HWS/R RUNOUTS TO VAV BOXES IS TO BE 1/2" UNLESS NOTED OTHERWISE.
6. ALL EXISTING WIRELESS JCI CONTROLLERS, NETWORKING DEVICES AND
AUTOMATION ENGINES ARE TO BE REMOVED FROM THIS BUILDING. NEW WIRED
CONTROLLERS AND NETWORKING DEVICES THAT ARE 100% COMPATIBLE WITH
THE EXISTING SCHNEIDER ELECTRIC DEVICES AND NETWORK SHALL BE
INSTALLED. SEE DETAIL 2/M503 FOR A COMPLETED PROJECT BUILDING
CONTROLS ARCHITECTURE.
7. VAV BOX LOCAL CONTROLLER IS TO COMMUNICATE AND CONTROL EXISTING
PERIMETER HEAT AND NEW REHEAT CONTROL VALVES PER THE SEQUENCE
SHOWN ON M503.
8. PROVIDE A NEW THERMOSTAT IN THE SAME LOCATION AS THE REMOVED.
PATCH AND REPAIR THE WALL IN ROOMS WITH NO NEW THERMOSTAT
SPECIFIED.
9. HOT WATER CONTROL VALVES FOR FIN TUBE RADIATORS SHOWN ON THIS
FLOOR ARE LOCATED ABOVE CEILING IN THE FLOOR BELOW.
10. SEE THE SINGLE DUCT VAV BOX SCHEDULE FOR CORRESPONDING HOT WATER
CONTROL VALVE MARK.
11. PROVIDE REMOVABLE JACKETS ON ALL NEW VALVES INCLUDING CONTROL
VALVES. JACKETS FOR VALVES LESS THAN 1" ARE TO BE A PART OF DEDUCT
ALTERNATE 2.
12. ALL FIN TUBE RADIATORS (FTR) SHOWN ARE EXISTING. CORRESPONDING
CONTROL VALVES ARE SHOWN FOR CONTROLS PURPOSES UNLESS NOTED
OTHERWISE.
13. UTILIZE EXISTING PENETRATIONS THROUGH EARTHQUAKE WALLS FOR NEW
DUCTWORK AND PIPING WHEREVER POSSIBLE.
14. SLEEVE AND FIRESTOP ALL NEW WALL PENETRATIONS THROUGH SMOKE
PARTITIONS.
15. REFER TO M-001 FOR ADDITIONAL INFORMATION.
16. ALL EXISTING PERIMETER HEAT CONTROL VALVE ACTUATORS ARE TO BE
REMOVED AND REPLACED. THIS WORK IS TO BE A PART OF DEDUCT
ALTERNATE 1.
FTR = 41
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
10/8 UP
6/5 DN
20/18 UP
16/14 DN
18/20 UP
18/12 DN
VAV
8"
18/12 18/12
12"~
10x10 10x10
10x10
/1
8x8 10x10
10x10
8x8
10x10
10x10
12x12
/1
12x12
8"~
8"
8"~
8"
"~8"
36/14 UP
18/18 DN
18/14 DN
12/10
14/10
36/14
/1
FTR FTR
FTR FTR
FTR
FTR
FTR
FTR
FTR
FTR
FTR
FTR
FTR
FTRFTR
FTR
FTR
FTR
FTR
FTR
FTRFTRFTRFTRFTR
8"~
18/14
18/18
12"~
6/5
FTR
R
/8
15/6 15/8
8"~
14/10
8"~
8"~
6"~
6"
FTR
WO
220 CFM
170 CFM
50 CFM
8/
220 CFM
270 CFM
260 CFM
141-VAV-72
141-VAV-20
/1
8"~
8"~
10"~ 7"~
8"
260 CFM
141-VAV-73
6"~8"~
6"
8"~
10"~
141-VAV-74
141-VAV-21
220 CFM
210 CFM
TO
141-VAV-21
TO
141-VAV-74
180 CFM
TO
141-VAV-72
50 CFM
300 CFM
300 CFM
300 CFM
6"
RG-2
250 CFM
145 CFM
145 CFM
VAV
VAV
7"~
7"
8/
7"
7"
8"~
141-VAV-75
SD-2
1340 CFM
1860 CFM
12"~
10x10
32/14 UP
12"~
TO
141-VAV-73
3/4"
3/4"
1-1/2"
1-1/4"
1-1/4" 1-1/4"
3/4"
3/4"
HWS
HWR
H W
S H
W R
H W
S H
W R
H W
S
HWR
HWS
HWR
HWS
HWR
HWS
HWR
4"~ EA
10x10
10"~
50 CFM
100 CFM
1 2 3 4 5 6 7
D
C
B
A
1 2 3 4 5 6 7
D
C
B
A
E
E
Engineers Architects
4" HWS/R RISER. CORE DRILL THE FLOOR AND SEAL PENETRATIONS WITH FIRE
CAULK. PROVIDE 1-1/2" TAKEOFFS WITH SHUTOFF VALVES.
INSULATE EXISTING DUCT SECTION.
PROVIDE NEW LOCAL CONTROLLER FOR EXISTING VAV BOX.
RELOCATED VAV BOX. PROVIDE NEW LOCAL CONTROLLER.
RELOCATED DIFFUSER. ALIGN LOCATION WITH EXISTING CEILING GRID.
CONNECT NEW THERMOSTAT TO EXISTING PERIMETER HEAT CONTROL VALVE.
CAP EXISTING DUCT.
UTILIZE EXISTING PENETRATION THROUGH EARTHQUAKE WALL.
CONNECT TO EXISTING COIL.
RELOCATED VAV BOX. PROVIDE NEW LOCAL CONTROLLER AND HOT WATER COIL.
NEW THERMOSTAT LOCATION, COORDINATE MOUNTING WITH ALL WALL MOUNTED
OBJECTS.
BLANK OFF AND SEAL EXISTING OPENING FROM FROM REMOVED DUCTWORK.
PROVIDE RETURN AIR BOOT PER DETAIL 4/M502. ALIGN GRILLE LOCATION WITH
EXISTING CEILING GRID.
ROUTE PIPING TIGHT TO STRUCTURE AT THIS LOCATION.
PROVIDE NEW 10/8 OPENING IN EXISTING EARTHQUAKE WALL.
PROVIDE NEW 16/10 OPENING IN EXISTING PARTITION. COORDINATE LOCATION
WITH ALL CONDUITS AND CABLING USING WALL FOR SUPPORT.
RELOCATED RETURN GRILLE. ALIGN LOCATION WITH EXISTING CEILING GRID.
UTILIZE EXISTING VAV-20. PROVIDE NEW LOCAL CONTROLLER AND HOT WATER
COIL.
AREA
SHOWN
R E
F
LI
N E
M H
R E
F
LI
N E
M H
1. COORDINATE WORKING HOURS ALLOWED WITH VA COR AS INSTRUCTED IN
GENERAL REQUIREMENTS.
2. BALANCE ALL SYSTEMS TO THE AIRFLOW SHOWN AT EACH DIFFUSER, GRILLE
AND RETURN INLET AFTER THE REZONING WORK HAS BEEN COMPLETED. ADD
BALANCING DAMPERS TO THE EXISTING EXHAUST SYSTEM AS NECESSARY TO
REACH INDICATED AIRFLOW.
3. UPON COMPLETION OF DUCTWORK MODIFICATIONS, CLEAN THE ENTIRE
SUPPLY AND RETURN SYSTEMS.
4. FLUSH AND CLEAN EXISTING VAV HOT WATER COILS BEFORE CONNECTING
RUNOUT PIPING.
5. HWS/R RUNOUTS TO VAV BOXES IS TO BE 1/2" UNLESS NOTED OTHERWISE.
6. ALL EXISTING WIRELESS JCI CONTROLLERS, NETWORKING DEVICES AND
AUTOMATION ENGINES ARE TO BE REMOVED FROM THIS BUILDING. NEW WIRED
CONTROLLERS AND NETWORKING DEVICES THAT ARE 100% COMPATIBLE WITH
THE EXISTING SCHNEIDER ELECTRIC DEVICES AND NETWORK SHALL BE
INSTALLED. SEE DETAIL 2/M503 FOR A COMPLETED PROJECT BUILDING
CONTROLS ARCHITECTURE.
7. VAV BOX LOCAL CONTROLLER IS TO COMMUNICATE AND CONTROL EXISTING
PERIMETER HEAT AND NEW REHEAT CONTROL VALVES PER THE SEQUENCE
SHOWN ON M503.
8. PROVIDE A NEW THERMOSTAT IN THE SAME LOCATION AS THE REMOVED.
PATCH AND REPAIR THE WALL IN ROOMS WITH NO NEW THERMOSTAT
SPECIFIED.
9. HOT WATER CONTROL VALVES FOR FIN TUBE RADIATORS SHOWN ON THIS
FLOOR ARE LOCATED ABOVE CEILING IN THE FLOOR BELOW.
10. SEE THE SINGLE DUCT VAV BOX SCHEDULE FOR CORRESPONDING HOT WATER
CONTROL VALVE MARK.
11. PROVIDE REMOVABLE JACKETS ON ALL NEW VALVES INCLUDING CONTROL
VALVES. JACKETS FOR VALVES LESS THAN 1" ARE TO BE A PART OF DEDUCT
ALTERNATE 2.
12. ALL FIN TUBE RADIATORS (FTR) SHOWN ARE EXISTING. CORRESPONDING
CONTROL VALVES ARE SHOWN FOR CONTROLS PURPOSES UNLESS NOTED
OTHERWISE.
13. UTILIZE EXISTING PENETRATIONS THROUGH EARTHQUAKE WALLS FOR NEW
DUCTWORK AND PIPING WHEREVER POSSIBLE.
14. SLEEVE AND FIRESTOP ALL NEW WALL PENETRATIONS THROUGH SMOKE
PARTITIONS.
15. REFER TO M-001 FOR ADDITIONAL INFORMATION.
16. ALL EXISTING PERIMETER HEAT CONTROL VALVE ACTUATORS ARE TO BE
REMOVED AND REPLACED. THIS WORK IS TO BE A PART OF DEDUCT
ALTERNATE 1.
FTR = 27
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
10/16 UP
54/14
24/20 UP
20/18 DN
26/18 UP
18/16 DN
10"~
9"
9"~
VAV
VAV
14/10 18/14
14/12
14/10
/1
14x14
8x8
8x8
8x8
8x8
8x8
8x8
8x8
8x8
10x10
8x8
8x8
8x8
8x8
10x10
8x8 8x8
10x10
12x12
10x10
12x12
8x8
8x8
8"
8"
6"
8"
8"
8"
8"
8" ~ 8"
6"
8"~
8"~
8"~
8"~
6"~ 8"~
14/26 DN
10"~
8"
8"
8"
8"
8"
8"~ 8/8
8"~
8"~
8"~
8"~
8"~
8"~
8"~
10"~
10"~
12"~
8"~
54/14 UP
WO
12/10
8X8 8X8
18/30 UP
18/20 DN
16/36 UP
8"~
6"
8"
12/6
9"~
/7
9/5
/5
38/18 UP
36/14 DN
26/18 DN
28/12
26/18
10x10
12/9 DN
9/12
10"~
8"~
8x8
/1
24/14
6"
8"~
5"~
8"~
8"~
10"~
6"~
FTR
FTR
FTR
FTR
FTR
FTR
FTR
FTRFTR
FTR
FTR
FTR
FTR
FTR
FTR
FTR
FTR
FTR
FTR
FTR FTR FTR
FTR
FTR FTR FTR
FTR FTR FTR
FTR
FTR
FTR
FTR
FTR
FTR
FTR
FTR
FTR
FTR
FTR
FTR
FTR
FTR
FTR
FTR
141-VAV-56
/8
8"
/8
141-VAV-26
8"~12"~
8"~
140 CFM
190 CFM
200 CFM
240 CFM240 CFM
165 CFM
165 CFM
165 CFM
141-VAV-57
8"~
8"~
6"
165 CFM
180 CFM
235 CFM
7"~
141-VAV-29
16"~
8"~
10"~
10"~
141-VAV-58
141-VAV-59
10"~
7"
8"~
8"~
140 CFM
195 CFM
185 CFM
200 CFM
150 CFM
280 CFM 280 CFM
50 CFM
170 CFM
145 CFM
180 CFM
R
/1
141-VAV-60
141-VAV-61
7"~
141-VAV-31
R
8"~
10"~ 14"~
18/8
/8
/6
10/8
/8
8"~
290 CFM
210 CFM
150 CFM
195 CFM
150 CFM
195 CFM
260 CFM
170 CFM
135 CFM
CFM
RG-1
2300 CFM 55 CFM
270 CFM
3/4"
3/4"
1" 1"
1"
1"
1"
3/4"
1"
3/4"
1-1/4"
1-1/4"
HWS
HWR
HWS
HWR
HWS
HWR
HWS
HWR
H W
S H
W R
H W
S H
W R
H W
S H
W R
H W
S H
W R
TO
141-VAV-58
TO
VAV-28
TO
141-VAV-29
TO
141-VAV-60 TO
141-VAV-30
141-CV-42
8"~
HWS
HWR
H W
S H
W R
1360 CFM
3/4"
VAV
8"
8"~
8"~
210 CFM
8"~
SD-3
10/8
250 CFM
100 CFM
50 CFM
50 CFM
25 CFM
8"~
VAV
50 CFM
1 2 3 4 5 6 7
D
C
B
A
1 2 3 4 5 6 7
D
C
B
A
E
E
Engineers Architects
AREA
SHOWN
R E
F
LI
N E
M H
R E
F
LI
N E
M H
INSULATE EXISTING DUCT SECTION.
CAP EXISTING DUCT.
PROVIDE NEW LOCAL CONTROLLER FOR EXISTING VAV BOX.
BLANK OFF AND SEAL EXISTING OPENING FROM FROM REMOVED DUCTWORK.
RELOCATED DIFFUSER. ALIGN LOCATION WITH EXISTING CEILING GRID.
ROUTE PIPING TIGHT TO STRUCTURE AT THIS LOCATION.
CONNECT TO EXISTING COIL.
NO EXISTING THERMOSTAT WAS IN THIS ROOM. COORDINATE NEW THERMOSTAT
MOUNTING WITH ALL WALL MOUNTED OBJECTS.
CONNECT NEW THERMOSTAT TO EXISTING PERIMETER HEAT CONTROL VALVE.
SUPPLEMENTAL TEMPERATURE SENSOR FOR AVERAGING. NO LOCAL SET POINT
ADJUSTMENT. COORDINATE MOUNTING WITH ALL WALL MOUNTED OBJECTS.
PROVIDE NEW 3-WAY CONTROL VALVE.
UTILIZE EXISTING PENETRATION THROUGH EARTHQUAKE WALL.
PROVIDE RETURN AIR BOOT PER DETAIL 4/M502. ALIGN GRILLE LOCATION WITH
EXISTING CEILING GRID.
ROUTE PIPING IN BETWEEN CONCRETE JOISTS AT THIS LOCATION.
ROUTE HWS/R PIPING BELOW EXISTING DUCTWORK.
RUN A CAT6A CABLE FROM THE EXISTING ECC IN BUILDING 150 TO THE
COMPUTER WORKSTATION IN THIS ROOM. APPROXIMATE DISTANCE IS 460 FEET.
ROUTING IS TO BE THROUGH INTERIOR HALLWAYS ONLY UTILIZING EXISTING
CABLE TRAY WHERE POSSIBLE. SEE 8/MH504 FOR MORE INFORMATION.
1. COORDINATE WORKING HOURS ALLOWED WITH VA COR AS INSTRUCTED IN
GENERAL REQUIREMENTS.
2. BALANCE ALL SYSTEMS TO THE AIRFLOW SHOWN AT EACH DIFFUSER, GRILLE
AND RETURN INLET AFTER THE REZONING WORK HAS BEEN COMPLETED. ADD
BALANCING DAMPERS TO THE EXISTING EXHAUST SYSTEM AS NECESSARY TO
REACH INDICATED AIRFLOW.
3. UPON COMPLETION OF DUCTWORK MODIFICATIONS, CLEAN THE ENTIRE
SUPPLY AND RETURN SYSTEMS.
4. FLUSH AND CLEAN EXISTING VAV HOT WATER COILS BEFORE CONNECTING
RUNOUT PIPING.
5. HWS/R RUNOUTS TO VAV BOXES IS TO BE 1/2" UNLESS NOTED OTHERWISE.
6. ALL EXISTING WIRELESS JCI CONTROLLERS, NETWORKING DEVICES AND
AUTOMATION ENGINES ARE TO BE REMOVED FROM THIS BUILDING. NEW WIRED
CONTROLLERS AND NETWORKING DEVICES THAT ARE 100% COMPATIBLE WITH
THE EXISTING SCHNEIDER ELECTRIC DEVICES AND NETWORK SHALL BE
INSTALLED. SEE DETAIL 2/M503 FOR A COMPLETED PROJECT BUILDING
CONTROLS ARCHITECTURE.
7. VAV BOX LOCAL CONTROLLER IS TO COMMUNICATE AND CONTROL EXISTING
PERIMETER HEAT AND NEW REHEAT CONTROL VALVES PER THE SEQUENCE
SHOWN ON M503.
8. PROVIDE A NEW THERMOSTAT IN THE SAME LOCATION AS THE REMOVED.
PATCH AND REPAIR THE WALL IN ROOMS WITH NO NEW THERMOSTAT
SPECIFIED.
9. HOT WATER CONTROL VALVES FOR FIN TUBE RADIATORS SHOWN ON THIS
FLOOR ARE LOCATED ABOVE CEILING IN THE FLOOR BELOW.
10. SEE THE SINGLE DUCT VAV BOX SCHEDULE FOR CORRESPONDING HOT WATER
CONTROL VALVE MARK.
11. PROVIDE REMOVABLE JACKETS ON ALL NEW VALVES INCLUDING CONTROL
VALVES. JACKETS FOR VALVES LESS THAN 1" ARE TO BE A PART OF DEDUCT
ALTERNATE 2.
12. ALL FIN TUBE RADIATORS (FTR) SHOWN ARE EXISTING. CORRESPONDING
CONTROL VALVES ARE SHOWN FOR CONTROLS PURPOSES UNLESS NOTED
OTHERWISE.
13. UTILIZE EXISTING PENETRATIONS THROUGH EARTHQUAKE WALLS FOR NEW
DUCTWORK AND PIPING WHEREVER POSSIBLE.
14. SLEEVE AND FIRESTOP ALL NEW WALL PENETRATIONS THROUGH SMOKE
PARTITIONS.
15. REFER TO M-001 FOR ADDITIONAL INFORMATION.
16. ALL EXISTING PERIMETER HEAT CONTROL VALVE ACTUATORS ARE TO BE
REMOVED AND REPLACED. THIS WORK IS TO BE A PART OF DEDUCT
ALTERNATE 1.
FTR = 45
EXISTING VALVE AND VALVE ACTUATOR LOCATED
AT THE FTR INSIDE THE WEST STAIRWELL.
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
Line
44/16 UP
34/14 DN
38/18 UP
24/18 DN
12/9 UP 10/8 DN
24/20 UP
20/18 DN
18/26 UP
18/20 DN
10"~
9"
10"~
22/10
VAV
VAV
VAV
14"~
16/10
14/10
/1
16/12
14x14
8x8
8x8 10x10
8x8
8x8
12x12
14x14
/1
14x14
14x14
14/10
6" ~ 6"
8"~
8"
8"
8"
6"
8"~
8"
8"
10"~
8"~
8"~
WO
FCU
FCU
10"~
9"~
FTR FTR FTR FTR
FTR
FTR
FTR
FTR
FTR
FTR
FTR
FTR
FTR
FTR
FTR
FTR
FTR
FTR
FTR
FTR
FTR
FTRFTR
FTR
FTR
FTR
FTR
FTR
/1
14"~
16/14
12"~10"~
10/1010"~
10/10
255 CFM 255 CFM
141-VAV-62
141-VAV-63
230 CFM 230 CFM
141-VAV-33
10"~
275 CFM
145 CFM
145 CFM
45 CFM
8"~
7"
10"~
8"~
141-VAV-64
8/10
305 CFM
175 CFM
150 CFM
150 CFM
10"~
6"~
8"~
/1
SD-1
7"~
10"~
141-VAV-65
250 CFM
250 CFM
210 CFM
210 CFM
210 CFM
1430 CFM
2450 CFM
100 CFM
1-1/4"
3/4"
1-1/4" 1-1/4"
3/4"
1-1/2"
3/4"
3/4"
H W
S H
W R
H W
S H
W R
HWS
HWR
HW
S
HW
R
HWS
HWR
HWS
HWR
TO
VAV-35
TO
VAV-36
VAV
141-CV-91
6"~
8"
250 CFM
SD-6
270 CFM
H W
S H
W R
SD-7
210 CFM
8"~
3/4"
12/10
1 2 3 4 5 6 7
D
C
B
A
1 2 3 4 5 6 7
D
C
B
A
E
E
Engineers Architects
AREA
SHOWN
R E
F
LI
N E
M H
R E
F
LI
N E
M H
4" HWS/R RISER. CORE DRILL THE FLOOR AND SEAL PENETRATIONS WITH FIRE
CAULK. PROVIDE 1-1/2" TAKEOFFS WITH SHUTOFF VALVES.
INSULATE EXISTING DUCT SECTION.
RELOCATED DIFFUSER. ALIGN LOCATION WITH EXISTING CEILING GRID.
PROVIDE NEW LOCAL CONTROLLER FOR EXISTING VAV BOX.
RELOCATED VAV BOX. PROVIDE NEW LOCAL CONTROLLER AND HOT WATER COIL.
ROUTE PIPING IN BETWEEN CONCRETE JOISTS AT THIS LOCATION.
CONNECT TO EXISTING COIL.
LOCATION OF NEW AUTOMATION SERVER. CONNECT ALL LOCAL CONTROLLERS
ON THE SECOND AND THIRD FLOOR AND INTEGRATE TO THE STRUXUREWARE
ECC IN BUILDING 154.
CONNECT NEW THERMOSTAT TO EXISTING PERIMETER HEAT CONTROL VALVE.
NO EXISTING THERMOSTAT WAS IN THIS ROOM. COORDINATE NEW THERMOSTAT
MOUNTING WITH ALL WALL MOUNTED OBJECTS.
3/4" HWS/R UP TO 141-FTR-1 WITH NEW 2-WAY CONTROL VALVE. CORE DRILL THE
FLOOR AND SEAL PENETRATIONS. SEE DETAIL 10/M501 FOR PIPING
CONNECTIONS.
UTILIZE EXISTING PENETRATION THROUGH EARTHQUAKE WALL.
CAP EXISTING DUCT.
RELOCATED RETURN GRILLE. ALIGN LOCATION WITH EXISTING CEILING GRID AND
TRIM LAY-IN PANEL TO FIT.
PROVIDE NEW HOT WATER COIL FOR EXISTING VAV BOX.
1. COORDINATE WORKING HOURS ALLOWED WITH VA COR AS INSTRUCTED IN
GENERAL REQUIREMENTS.
2. BALANCE ALL SYSTEMS TO THE AIRFLOW SHOWN AT EACH DIFFUSER, GRILLE
AND RETURN INLET AFTER THE REZONING WORK HAS BEEN COMPLETED. ADD
BALANCING DAMPERS TO THE EXISTING EXHAUST SYSTEM AS NECESSARY TO
REACH INDICATED AIRFLOW.
3. UPON COMPLETION OF DUCTWORK MODIFICATIONS, CLEAN THE ENTIRE
SUPPLY AND RETURN SYSTEMS.
4. FLUSH AND CLEAN EXISTING VAV HOT WATER COILS BEFORE CONNECTING
RUNOUT PIPING.
5. HWS/R RUNOUTS TO VAV BOXES IS TO BE 1/2" UNLESS NOTED OTHERWISE.
6. ALL EXISTING WIRELESS JCI CONTROLLERS, NETWORKING DEVICES AND
AUTOMATION ENGINES ARE TO BE REMOVED FROM THIS BUILDING. NEW WIRED
CONTROLLERS AND NETWORKING DEVICES THAT ARE 100% COMPATIBLE WITH
THE EXISTING SCHNEIDER ELECTRIC DEVICES AND NETWORK SHALL BE
INSTALLED. SEE DETAIL 2/M503 FOR A COMPLETED PROJECT BUILDING
CONTROLS ARCHITECTURE.
7. VAV BOX LOCAL CONTROLLER IS TO COMMUNICATE AND CONTROL EXISTING
PERIMETER HEAT AND NEW REHEAT CONTROL VALVES PER THE SEQUENCE
SHOWN ON M503.
8. PROVIDE A NEW THERMOSTAT IN THE SAME LOCATION AS THE REMOVED.
PATCH AND REPAIR THE WALL IN ROOMS WITH NO NEW THERMOSTAT
SPECIFIED.
9. HOT WATER CONTROL VALVES FOR FIN TUBE RADIATORS SHOWN ON THIS
FLOOR ARE LOCATED ABOVE CEILING IN THE FLOOR BELOW.
10. SEE THE SINGLE DUCT VAV BOX SCHEDULE FOR CORRESPONDING HOT WATER
CONTROL VALVE MARK.
11. PROVIDE REMOVABLE JACKETS ON ALL NEW VALVES INCLUDING CONTROL
VALVES. JACKETS FOR VALVES LESS THAN 1" ARE TO BE A PART OF DEDUCT
ALTERNATE 2.
12. ALL FIN TUBE RADIATORS (FTR) SHOWN ARE EXISTING. CORRESPONDING
CONTROL VALVES ARE SHOWN FOR CONTROLS PURPOSES UNLESS NOTED
OTHERWISE.
13. UTILIZE EXISTING PENETRATIONS THROUGH EARTHQUAKE WALLS FOR NEW
DUCTWORK AND PIPING WHEREVER POSSIBLE.
14. SLEEVE AND FIRESTOP ALL NEW WALL PENETRATIONS THROUGH SMOKE
PARTITIONS.
15. REFER TO M-001 FOR ADDITIONAL INFORMATION.
16. ALL EXISTING PERIMETER HEAT CONTROL VALVE ACTUATORS ARE TO BE
REMOVED AND REPLACED. THIS WORK IS TO BE A PART OF DEDUCT
ALTERNATE 1.
FTR = 29
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
46/18
60/16 UP
50/18 UP
54/14 DN
38/18 DN
10/16 UP
10/16 DN
24/20 DN
26/18 DN
12"~
42/12
16"~
VAV
VAV
24/1612"~
VAV
VAV
VAV
14/12
18/12
/1
/1
14/12
/1
/1
12x12
16/10
16x16
12x12 12x12
8x8 8x8
8x8 8x8
12x12
12x12
10x10 10x10
8x8
10x10
/1
16x16
12x12
16x16
8"~
8"
8"~
8"
8"
8"
8"
6"~
8"~
8"~
10"~
10"~
20"~ UP 24"~ UP
8"
6"~
12"~
10"~
"~12
12"~
8"
8"
8/
8"
18/26 UP16/24 UP
16/10
24/16 28/16
WO
14"~
16/10
18/36 UP
18/30 DN
16/42 UP
16/36 DN
24/12 16
FCU
6"~
8"~
FTR
FTR FTR FTR
FTR
FTR
FTR
FTR
FTR
FTR
FTR
FTR
FTRFTRFTRFTRFTRFTR
FTR
FTR
FTR
FTR
FTR FTR FTR FTR FTR FTR
FTR
FTR FTR FTR
141-VAV-49
/1
8"
355 CFM
205 CFM 210 CFM
/1
141-VAV-51
6"~
270 CFM
270 CFM
190 CFM
295 CFM
360 CFM
360 CFM
6"~
141-VAV-42
8"~
8"~
141-VAV-52
8"
240 CFM
240 CFM
165 CFM
141-VAV-41
8"
265 CFM
255 CFM
50 CFM
10"~
8"
141-VAV-39
141-VAV-50
14/12
230 CFM
245 CFM
50 CFM
425 CFM425 CFM
370 CFM
370 CFM
360 CFM
10"~
365 CFM
CFM
3590 CFM3/4"
3/4"
3/4"
1" 1" 1"
1-1/4"
1-1/4"
1/2"
1-1/4"
3/4"
1-1/4"
HWS
HWR
HWS
HWR
HWS
HWR
H W
S H
W R H W
S H
W R
HWS
HWR
HWS
HWR
TO
141-VAV-53
8x8
8"
1 2 3 4 5 6 7
D
C
B
A
1 2 3 4 5 6 7
D
C
B
A
E
E
Engineers Architects
INSULATE EXISTING DUCT SECTION.
CAP EXISTING DUCT.
PROVIDE NEW LOCAL CONTROLLER FOR EXISTING VAV BOX.
CONNECT TO EXISTING COIL.
CONNECT NEW THERMOSTAT TO EXISTING PERIMETER HEAT CONTROL VALVE.
PROVIDE NEW HOT WATER COIL FOR EXISTING VAV BOX.
THERMOSTAT IS FOR ROOM TEMPERATURE MONITORING ONLY. SEE CONTROL
SEQUENCE ON M504.
RELOCATED DIFFUSER. ALIGN LOCATION WITH EXISTING CEILING GRID.
RELOCATED RETURN GRILLE. ALIGN LOCATION WITH EXISTING CEILING GRID.
AREA
SHOWN
R E
F
LI
N E
M H
R E
F
LI
N E
M H
1. COORDINATE WORKING HOURS ALLOWED WITH VA COR AS INSTRUCTED IN
GENERAL REQUIREMENTS.
2. BALANCE ALL SYSTEMS TO THE AIRFLOW SHOWN AT EACH DIFFUSER, GRILLE
AND RETURN INLET AFTER THE REZONING WORK HAS BEEN COMPLETED. ADD
BALANCING DAMPERS TO THE EXISTING EXHAUST SYSTEM AS NECESSARY TO
REACH INDICATED AIRFLOW.
3. UPON COMPLETION OF DUCTWORK MODIFICATIONS, CLEAN THE ENTIRE
SUPPLY AND RETURN SYSTEMS.
4. FLUSH AND CLEAN EXISTING VAV HOT WATER COILS BEFORE CONNECTING
RUNOUT PIPING.
5. HWS/R RUNOUTS TO VAV BOXES IS TO BE 1/2" UNLESS NOTED OTHERWISE.
6. ALL EXISTING WIRELESS JCI CONTROLLERS, NETWORKING DEVICES AND
AUTOMATION ENGINES ARE TO BE REMOVED FROM THIS BUILDING. NEW WIRED
CONTROLLERS AND NETWORKING DEVICES THAT ARE 100% COMPATIBLE WITH
THE EXISTING SCHNEIDER ELECTRIC DEVICES AND NETWORK SHALL BE
INSTALLED. SEE DETAIL 2/M503 FOR A COMPLETED PROJECT BUILDING
CONTROLS ARCHITECTURE.
7. VAV BOX LOCAL CONTROLLER IS TO COMMUNICATE AND CONTROL EXISTING
PERIMETER HEAT AND NEW REHEAT CONTROL VALVES PER THE SEQUENCE
SHOWN ON M503.
8. PROVIDE A NEW THERMOSTAT IN THE SAME LOCATION AS THE REMOVED.
PATCH AND REPAIR THE WALL IN ROOMS WITH NO NEW THERMOSTAT
SPECIFIED.
9. HOT WATER CONTROL VALVES FOR FIN TUBE RADIATORS SHOWN ON THIS
FLOOR ARE LOCATED ABOVE CEILING IN THE FLOOR BELOW.
10. SEE THE SINGLE DUCT VAV BOX SCHEDULE FOR CORRESPONDING HOT WATER
CONTROL VALVE MARK.
11. PROVIDE REMOVABLE JACKETS ON ALL NEW VALVES INCLUDING CONTROL
VALVES. JACKETS FOR VALVES LESS THAN 1" ARE TO BE A PART OF DEDUCT
ALTERNATE 2.
12. ALL FIN TUBE RADIATORS (FTR) SHOWN ARE EXISTING. CORRESPONDING
CONTROL VALVES ARE SHOWN FOR CONTROLS PURPOSES UNLESS NOTED
OTHERWISE.
13. UTILIZE EXISTING PENETRATIONS THROUGH EARTHQUAKE WALLS FOR NEW
DUCTWORK AND PIPING WHEREVER POSSIBLE.
14. SLEEVE AND FIRESTOP ALL NEW WALL PENETRATIONS THROUGH SMOKE
PARTITIONS.
15. REFER TO M-001 FOR ADDITIONAL INFORMATION.
16. ALL EXISTING PERIMETER HEAT CONTROL VALVE ACTUATORS ARE TO BE
REMOVED AND REPLACED. THIS WORK IS TO BE A PART OF DEDUCT
ALTERNATE 1.
FTR = 32
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
48/18 UP
38/18 DN
54/16 UP
44/16 DN
14/12 UP
12/9 DN
26/18 DN
26/18 DN
10"~
8"
VAV
VAV
VAV
14"~
32/12
14"~ 9"~
9/
10x10
/1
16x16
10x10
10x10
12x12
10x10
8"~
10"~
8"
8"
8"~
14/10
14x14
22"~ DN24"~ DN
12/12
10"~
12"~
18/24 UP
18/28 UP
24/22
WO16/14
20/22
9"~
12/6 15/66/4
8"~
FTR
FTR FTR FTR FTR FTR FTR
FTR
FTR
FTR
FTR
FTRFTRFTR
FTRFTR
FTR
1-1/2"
12/12
12/10
12/10 8"~
8"~
10"~
141-VAV-53
195 CFM
320 CFM 320 CFM
10"~
6"~
141-VAV-54
290 CFM
270 CFM
240 CFM
255 CFM
250 CFM
295 CFM
2750 CFM
141-FTR-1
141-VAV-55
6"~ 10"~
1/2"
3/4"
3/4"
1-1/4"
3/4"
1-1/4"
1-1/4"
1-1/2"
H W
S H
W R
HWS
HWR
HWS
HWR
HWS
HWR
TO
141-VAV-55
TO
VAV-48
141-VAV-47
250 CFM
8"
8"~
SD-4
SD-5
200 CFM
200 CFM
50 CFM
10/10
/1
1 2 3 4 5 6 7
D
C
B
A
1 2 3 4 5 6 7
D
C
B
A
E
E
Engineers Architects
AREA
SHOWN
R E
F
LI
N E
M H
R E
F
LI
N E
M H
4" HWS/R RISER. CORE DRILL THE FLOOR AND SEAL PENETRATIONS WITH FIRE
CAULK. PROVIDE 1-1/2" TAKEOFFS WITH SHUTOFF VALVES.
INSULATE EXISTING DUCT SECTION.
PROVIDE NEW LOCAL CONTROLLER FOR EXISTING VAV BOX.
CONNECT TO EXISTING COIL.
NO EXISTING THERMOSTAT WAS IN THIS ROOM. COORDINATE NEW THERMOSTAT
MOUNTING WITH ALL WALL MOUNTED OBJECTS.
CONNECT NEW THERMOSTAT TO EXISTING PERIMETER HEAT CONTROL VALVE.
1. COORDINATE WORKING HOURS ALLOWED WITH VA COR AS INSTRUCTED IN
GENERAL REQUIREMENTS.
2. BALANCE ALL SYSTEMS TO THE AIRFLOW SHOWN AT EACH DIFFUSER, GRILLE
AND RETURN INLET AFTER THE REZONING WORK HAS BEEN COMPLETED. ADD
BALANCING DAMPERS TO THE EXISTING EXHAUST SYSTEM AS NECESSARY TO
REACH INDICATED AIRFLOW.
3. UPON COMPLETION OF DUCTWORK MODIFICATIONS, CLEAN THE ENTIRE
SUPPLY AND RETURN SYSTEMS.
4. FLUSH AND CLEAN EXISTING VAV HOT WATER COILS BEFORE CONNECTING
RUNOUT PIPING.
5. HWS/R RUNOUTS TO VAV BOXES IS TO BE 1/2" UNLESS NOTED OTHERWISE.
6. ALL EXISTING WIRELESS JCI CONTROLLERS, NETWORKING DEVICES AND
AUTOMATION ENGINES ARE TO BE REMOVED FROM THIS BUILDING. NEW WIRED
CONTROLLERS AND NETWORKING DEVICES THAT ARE 100% COMPATIBLE WITH
THE EXISTING SCHNEIDER ELECTRIC DEVICES AND NETWORK SHALL BE
INSTALLED. SEE DETAIL 2/M503 FOR A COMPLETED PROJECT BUILDING
CONTROLS ARCHITECTURE.
7. VAV BOX LOCAL CONTROLLER IS TO COMMUNICATE AND CONTROL EXISTING
PERIMETER HEAT AND NEW REHEAT CONTROL VALVES PER THE SEQUENCE
SHOWN ON M503.
8. PROVIDE A NEW THERMOSTAT IN THE SAME LOCATION AS THE REMOVED.
PATCH AND REPAIR THE WALL IN ROOMS WITH NO NEW THERMOSTAT
SPECIFIED.
9. HOT WATER CONTROL VALVES FOR FIN TUBE RADIATORS SHOWN ON THIS
FLOOR ARE LOCATED ABOVE CEILING IN THE FLOOR BELOW.
10. SEE THE SINGLE DUCT VAV BOX SCHEDULE FOR CORRESPONDING HOT WATER
CONTROL VALVE MARK.
11. PROVIDE REMOVABLE JACKETS ON ALL NEW VALVES INCLUDING CONTROL
VALVES. JACKETS FOR VALVES LESS THAN 1" ARE TO BE A PART OF DEDUCT
ALTERNATE 2.
12. ALL FIN TUBE RADIATORS (FTR) SHOWN ARE EXISTING. CORRESPONDING
CONTROL VALVES ARE SHOWN FOR CONTROLS PURPOSES UNLESS NOTED
OTHERWISE.
13. UTILIZE EXISTING PENETRATIONS THROUGH EARTHQUAKE WALLS FOR NEW
DUCTWORK AND PIPING WHEREVER POSSIBLE.
14. SLEEVE AND FIRESTOP ALL NEW WALL PENETRATIONS THROUGH SMOKE
PARTITIONS.
15. REFER TO M-001 FOR ADDITIONAL INFORMATION.
16. ALL EXISTING PERIMETER HEAT CONTROL VALVE ACTUATORS ARE TO BE
REMOVED AND REPLACED. THIS WORK IS TO BE A PART OF DEDUCT
ALTERNATE 1.
FTR = 18
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
VHAFHMBilodJ Highlight
| 20180201 Structural |
| 17-E134-S101 |
| 17-E134-S102 |
| 17-E134-S103 |
| 17-E134-S201 |
| 20180201 Mechanical |
| 20180201 Electrical |
File details come from the government source that posted it. Updated .