DRAWINGS

11 MB Posted

Attached to
WEST TOWN SCHOOL HVAC AND PLUMBING UPGRADES
Solicitation number
22-FAC-017
Issued by
Douglas County, Georgia

About this file

This file contains architectural and engineering drawings for the West Town Elementary School HVAC and Plumbing Upgrades project located at 1113 University Street, Albany, Georgia. The project includes comprehensive replacement of heating, ventilation, air conditioning systems, and plumbing fixtures across three buildings (3000, 3010, and 3020) at the school campus. The scope encompasses demolition of existing mechanical equipment including wall-hung heat pumps, rooftop units, fan coil units, exhaust fans, and associated ductwork, followed by installation of new equipment including Carrier rooftop packaged units, Bard wall-hung heat pumps, Greenheck exhaust fans, ductless fan coil units, air handling units, ceiling heaters, and packaged terminal heat pumps. The project is organized into four construction phases designed to maintain occupancy of the school during renovation. Plumbing work includes replacement of water closets, urinals, lavatories, sinks, water coolers, and associated fixtures throughout the buildings. Electrical work involves disconnecting and reconnecting power circuits to all mechanical equipment, with existing panels retained for reuse. The drawings include mechanical demolition plans, new work plans, equipment schedules detailing capacities and specifications, piping and ductwork details, and general notes addressing contractor responsibilities including refrigerant recovery from existing R-22 systems.

The project involves extensive coordination requirements including field verification of existing conditions, temporary wall installation to separate work areas from occupied student spaces, coordination with utility companies for temporary power service to modular classroom units, protection of existing data, fire alarm, intercom, and security systems, and careful sequencing to avoid conflicts with structural members and other building systems. The contractor must provide modular classroom units to house displaced students during each construction phase, with no more than eight classrooms relocated per phase. Temporary domestic cold water piping connections are required for the modular units. Equipment removal includes recovery of R-22 refrigerant with cylinders returned to the owner for processing, and salvage of existing bipolar ionization units for reinstallation in new equipment. The project specifications reference standard SMACNA construction details for ductwork, ASHRAE 62.1 indoor air quality procedures for outdoor air requirements, and manufacturer installation instructions for all equipment. Cost details, bid dates, contract award dates, and project timeline information are not included in this drawing set.

Text of this file

D A

D E

BLECKLEY LAURENS

CHATHAM

EFFINGHAM

IRWIN

BERRIEN

LOWNDESGRADY

SE

MI

NO

LE

DECATUR

EARLY

MILLER

BAKER

THOMAS

BROOKS

COLQUITT

MITCHELL

COOK

TIFT

SCHLEY

TERRELL

DOUGHERTY

WEBSTER

RANDOLPH

QUITMAN

CLAY

CALHOUN

CHATTAHOOCHEE

STEWART

MARION

WILCOX

CRISP

WORTH

LEE

TURNER

DOOLY

MACON

SUMTER

HOUSTON

PULASKI

McINTOSH

PIERCE

CHARLTON

LA

NIE

R

CLINCH

ECHOLS

ATKINSON

WARE

CAMDEN

BRANTLEY

GLYNN

TOOMBS

APPLING

COFFEE

BEN HILL

TELFAIR

DAVIS

JEFF

WHEELER

DODGE

TREUTLEN

M

ON

TG

OM

ER

Y

LONG

WAYNE

LIBERTY

BULLOCH

EVANS

CANDLER

TATTNALL

BRYAN

DAWSON FRANKLIN

CLARKE

OCONEE

PUTNAM

BALDWIN

TWIGGS

HENRY

FA

YE

TT

E

PIKE

UPSON

SPALDING

M

ER

IW

ET

HER

HARRIS

MUSCOGEE

TALBOT

COWETA

HEARD

TROUP

PEACH

CRAWFORD

TAYLOR

BIBB

MONROE

LAMAR

BUTTS

JASPER

JONES

CHEROKEE

FULTON

PAULDING

HARALSON

CARROLL

DOUGLAS

BARTOWFLOYD

POLK

COBB

NEWTON

DEKALB

CL

AY

TO

N

ROCKD

AL

E

WALTON

MORGAN

GWINNETT

FORSYTH

JACKSON

HALL BANKS

BARROW

M cD

U F

FI

E

JEFFERSON

EMANUEL

WASHINGTON

WILKINSON

JOHNSON

HANCOCK

WARREN

GLASCOCK

JENKINS

SCREVEN

RICHMOND

BURKE

COLUMBIA

OGLETHORPE

WILKES

TALIAFERROGREENE

LINCOLN

ELBERT

HART

MADISON

RABUN

STEPHENS

FANNIN

PICKENS

GILMER

WHITF

IELD

GORDON

C H

AT

TO

O G

A

WALKER M

U

R R

AY

CATOOSA

UNION

LUMPKIN

WHITE

HABERSHAM

TOWNS

BACON

DOUGHERTY

PROJECT NUMBER:

DATE:

DRAWN BY:

CHECKED BY:

TITLE:

SUBJECT TO GENERAL

COPYRIGHT LAWS ©

REVISIONS

INDEX OF DRAWINGS GEORGIA/COUNTY MAP PROJECT LOCATION

GA DOE ID #: 5062

T100

TITLE SHEET

2021200

W E

S T

T O

W N

E L

E M

E N

T A

R Y

S C

H O

O L

H

V A

C

P L

U M

B

IN

G U

P G

R A

D E

S

05/20/2022

HHP

JA3

U

N

IV

E R

S

IT

Y S

T

A L

B A

N Y

G

A

WEST TOWN ELEMENTARY SCHOOL - HVAC &

PLUMBING UPGRADES

1113 UNIVERSITY ST, ALBANY, GA 31707

T100 TITLE SHEET

C100 SITE PLAN

A100 CONSTRUCTION PHASING PLAN

A200 ARCHITECTURAL CEILING PLAN - OVERALL

MD100 MECHANICAL DEMO PLAN - OVERALL

MD101 MECHANICAL DEMO PLAN - BUILDING 3000

MD102 MECHANICAL DEMO PLAN - BUILDING 3010 & 3020

M100 MECHANICAL NEW WORK PLAN - OVERALL

M101 MECHANICAL NEW WORK PLAN - BUILDING 3000

M102 MECHANICAL NEW WORK PLAN - BUILDING 3010 & 3020

M501 MECHANICAL DETAILS

M502 MECHANICAL DETAILS

M503 MECHANICAL DETAILS

M601 MECHANICAL SCHEDULES

M602 MECHANICAL SCHEDULES, LEGEND & GENERAL NOTES

P101 PLUMBING FLOOR PLAN - BUILDING 3000

P102 PLUMBING FLOOR PLANS - BUILDING 3010 & 3020

E001 ELECTRICAL OVERALL PLAN

ED101 ELECTRICAL DEMOLITION PLAN - BUILDING 3000

ED102 ELECTRICAL DEMOLITION PLAN - BUILDING 3010 & 3020

E201 ELECTRICAL NEW WORK POWER PLAN - BUILDING 3000

E202 ELECTRICAL NEW WORK POWER PLAN - BUILDING 3010 & 3020

E801 ELECTRICAL SCHEDULES AND LEGEND

No. Description Date

GA DOE ID#: 5062

U N

IV

E

R S

IT

Y

S T

U N

IV

E

R S

IT

Y

S T

TEMPORARY PORTABLE CLASSROOM

TEMPORARY PORTABLE CLASSROOM

GENERAL NOTE: LOCATIONS OF CLASSROOM TRAILERS IS

APPROXIMATE. CONTRACTOR SHALL FIELD VERIFY LOCATIONS OF

EXISTING STORM DRAINS, FENCING, SIDEWALKS, PLAYGROUNDS,

DRIVES, ETC. AND CAREFULLY COORDINATE PLACEMENT OF

CLASSROOMS TO AVOID CONFLICT AND MAINTAIN REQUIRED

CLEARANCES.

EXISTING PLAYGROUND

EXISTING PLAYGROUND

EXISTING PLAYGROUND

2" DCW 2" DCW

D C

W

1 1/2" DCW

1 1/2" DCW

1 1/2" DCW

1 1/2" DCW

1 1/2" DCW

CONTRACTOR SHALL COORDINATE WITH OWNER FOR

TEMPORARY CONNECTION OF 2" DOMESTIC COLD WATER

PIPING TO EXISTING IN THIS APPROXIMATE LOCATION.

EXISTING COVERED W

ALKW

AY

EXISTING COVERED WALKWAY

EXISTING PAVED PARKING LOT

E X

IS

T

IN

G

C O

V E

R E

D

W A

L K

W A

Y

EXISTING COVERED

WALKWAY

EXISTING CONCRETE PAD

EXISTING TREE

EXISTING TREE

D C

W

D C

W

PROJECT NUMBER:

DATE:

DRAWN BY:

CHECKED BY:

TITLE:

SUBJECT TO GENERAL

COPYRIGHT LAWS ©

REVISIONS

A

B

C

GA DOE ID #: 5062

C101

SITE PLAN

2021200

W E

S T

T O

W N

E L

E M

E N

T A

R Y

S C

H O

O L

H

V A

C

P L

U M

B

IN

G U

P G

R A

D E

S

04/22/2022

HHP

JA3

U

N

IV

E R

S

IT

Y S

T

A L

B A

N Y

G

A

1/16" = 1'-0"1 SITE PLAN

PHASE 2

PHASE 1

PHASE 3

PHASE 4

PHASE 1

PHASE 1

PHASE 2

1(TYP.)

MUSIC

PRODUCTION

A.V. STOR.

MEDIA

OFFICE

WORK RM.

MEETING

ART

ART STOR.

KILN

K-1 CLASSROOM

K-1 CLASSROOMK-1 CLASSROOM

K-1 CLASSROOM

P.E. STOR.

STOR.

BOYS

GIRLS

JAN.

TLT.

TLT.

TEACHER TLT.

TLT.

TLT.

IDF

Room

DRY STOR.

OFFICE

KITCHEN

DISHWASH

CAFETERIA

COPIER & SUPPLY

DRESSING

OFFICE

PRINCIPAL

OFFICE

WORK ROOM

VAULT

MECH.

TLT.

K-1 CLASSROOM

BOOK STOR. PARENT CENTER BOOK STOR.

3RD CLASSROOMK COMPUTER LAB

1ST CLASSROOM 3RD CLASSROOM

3RD CLASSROOM

1ST CLASSROOM

1ST CLASSROOM

4TH CLASSROOM

COUNSELOR

COUNSELOR

ASSIST. PRINCIPAL

WAITING

1ST CLASSROOM

1ST CLASSROOM

2ND CLASSROOM

2ND CLASSROOM

2ND CLASSROOM

2ND CLASSROOM 5TH CLASSROOM 5TH CLASSROOM

5TH CLASSROOM

5TH CLASSROOM2ND CLASSROOM

READING

SPEECH SPECIAL ED.

RESOURCE SPECIAL

ED. SPECIAL ED.

4TH COMPUTER LAB

4TH CLASSROOM

4TH CLASSROOM

WORK RM.

TESTING

STOR.WORK RM.JAN. STOR.

GIRLS TLT GIRLS TLT.

BOYS TLT.

BOYS TLT.

JAN.

ELEC. LOBBY

STAGE

P.E. OFFICE

BOYS TLT.

GIRLS TLT.

STOR. EXTENDED DAY

UTILITY CLOSET

FOYER

GYM

TLT.Room

PROJECT NUMBER:

DATE:

DRAWN BY:

CHECKED BY:

TITLE:

SUBJECT TO GENERAL

COPYRIGHT LAWS ©

REVISIONS

GA DOE ID #: 5062

A100

CONSTRUCTION PHASING

PLAN

2021200

W E

S T

T O

W N

E L

E M

E N

T A

R Y

S C

H O

O L

H

V A

C

P L

U M

B

IN

G U

P G

R A

D E

S

04/22/2022

HHP

JA3

U

N

IV

E R

S

IT

Y S

T

A L

B A

N Y

G

A

1/16" = 1'-0"1 CONSTRUCTION PHASING PLAN

1 . ADJUST TEMPORARY WALLS AS REQUIRED TO MAINTAIN SEPARATION FROM

WORK AREAS AND OCCUPIED STUDENT AREAS. ACCESS TO EXIT DOORS SHALL

BE MAINTAINED AT ALL TIMES.

2 . PROVIDE TEMPORARY WALL (MIN 6' TALL) TO SEPARATE WORK AREAS FROM

OCCUPIED AREAS BASED ON PHASING. PROVIDE DOORS AS REQUIRED FOR

ACCESS TO WORK AREA. PROVIDE PROTECTION FOR EXISTING FLOORING,

WALLS, ETC. TO PREVENT DAMAGE TO EXISTING ITEMS DURING INSTALLATION /

REMOVAL OF TEMPORARY WALL.

3 . ADJUST TEMPORARY WALLS AS REQUIRED TO ALLOW ACCESS TO RESTROOMS

WHILE MAINTAINING SEPARATION OF WORK AREAS FROM OCCUPIED STUDENT

AREAS.

NOTES: (THIS SHEET ONLY)

GENERAL NOTE: THERE WILL BE 4 MODULAR CLASSROOM BUILDINGS WITH (2) CLASSROOMS PER MODULAR UNIT ON THIS SITE PROVIDED BY THE CONTRACTOR. NO MORE THAN 8 CLASSROOMS MAY BE MOVED TO MODULAR UNITS FOR

EACH PHASE. PHASES SHOWN HEREIN ARE SUGGESTED PHASES AND MAY BE CHANGED DUE TO CONSTRUCTION TIMELINES, CONSTRUCTION SCHEDULES, EQUIPMENT LEAD TIMES, UNFORESEEN CIRCUMSTANCES ENCOUNTERED

DURING THE CONSTRUCTION PROCESS OR FURTHER COORDINATION WITH OWNER. VERIFY ALL PHASING, TEMPORARY

WALL/PARTITION INSTALLATION AND/OR SCHEDULING PRIOR TO COMMENCEMENT OF WORK.

No. Description Date

GENERAL NOTE: PRIOR TO CONSTRUCTION, CONTRACTOR SHALL COORDINATE WITH OWNER TO REMOVE ALL PERSONAL ITEMS FROM SPACES AFFECTED BY DEMOLITION. CONTRACTOR SHALL PROTECT EXISTING CASEWORK, FURNITURE, FLOORING, WALLS, CEILINGS, ETC. NOT ABLE TO BE REMOVED. AT THE END OF CONSTRUCTION, CONTRACTOR SHALL REMOVE ALL PROTECTIVE COVERS AND WIPE DOWN AND CLEAN ALL SURFACES AFFECTED BY

DUST, DIRT, CONSTRUCTION DEBRIS, ETC.

GENERAL NOTE: REMOVAL OF CEILINGS REQUIRED FOR REMOVAL OF

EXISTING EXHAUST FANS LOCATED ABOVE RESTROOMS NOT SHOWN.

SEE MECHANICAL DRAWINGS FOR LOCATIONS OF ITEMS LOCATED

ABOVE CEILINGS THAT MAY REQUIRE REMOVAL OF CEILING TILES.

DEMO EXISTING CEILING TILE &

GRID AS REQUIRED AND REPLACE

WITH NEW CEILING TILE & GRID

DEMO EXISTING CEILING TILE &

REPLACE WITH NEW CEILING TILE

CEILING HATCH LEGEND

(NO HATCH) EXISTING CEILING TILE

& GRID TO REMAIN

PROJECT NUMBER:

DATE:

DRAWN BY:

CHECKED BY:

TITLE:

SUBJECT TO GENERAL

COPYRIGHT LAWS ©

REVISIONS

A

B

C

GA DOE ID #: 5062

A200

ARCHITECTURAL CEILING

PLAN - OVERALL

2021200

W E

S T

T O

W N

E L

E M

E N

T A

R Y

S C

H O

O L

H

V A

C

P L

U M

B

IN

G U

P G

R A

D E

S

05/20/2022

HHP

JA3

U

N

IV

E R

S

IT

Y S

T

A L

B A

N Y

G

A

3/32" = 1'-0"1 ARCHITECTURAL CEILING PLAN - OVERALL

MD101

MD102

MD102

TOILETS

ADDED?

PROJECT NUMBER:

DATE:

DRAWN BY:

CHECKED BY:

TITLE:

SUBJECT TO GENERAL

COPYRIGHT LAWS ©

REVISIONS

A

B

C

GA DOE ID #: 5062

MD100

MECHANICAL DEMO PLAN -

OVERALL

2021200

W E

S T

T O

W N

E L

E M

E N

T A

R Y

S C

H O

O L

H

V A

C

P L

U M

B

IN

G U

P G

R A

D E

S

05/20/2022

HHP

JA3

U

N

IV

E R

S

IT

Y S

T

A L

B A

N Y

G

A

3/32" = 1'-0"1 MECHANICAL DEMO PLAN - OVERALL

1 1

6 6

15 4 4

4 4

3 3 3 3 3 3 3 3 3

33333333

3RD CLASSROOM

4TH CLASSROOM 4TH CLASSROOM 4TH CLASSROOM 4TH COMPUTER LAB 5TH CLASSROOM 5TH CLASSROOM

5TH CLASSROOM5TH CLASSROOM

2ND CLASSROOM 2ND CLASSROOM

2ND CLASSROOM2ND CLASSROOM2ND CLASSROOM1ST CLASSROOM1ST CLASSROOM1ST CLASSROOM1ST CLASSROOM

K-1 CLASSROOM

KITCHENDISHWASH

DRY STOR.

OFFICE

CAFETERIA

STAGE

COPIER & SUPPLY

DRESSING

OFFICE

WORK ROOM

PRINCIPAL

VAULT

OFFICE

LOBBY

ASSIST. PRINCIPAL

WAITING

COUNSELOR

COUNSELOR

3RD CLASSROOM

K COMPUTER LAB 1ST CLASSROOM

3RD CLASSROOM

BOYS TLT.

GIRLS TLT

WORK RM.

JAN. STOR.

SPEECH SPECIAL ED.

RESOURCE SPECIAL

ED.

SPECIAL ED.

READING

STOR.

BOYS TLT.

GIRLS TLT.

WORK RM. TESTING

9 9

MECH.

Room

PROJECT NUMBER:

DATE:

DRAWN BY:

CHECKED BY:

TITLE:

SUBJECT TO GENERAL

COPYRIGHT LAWS ©

REVISIONS

A

B

C

GA DOE ID #: 5062

MD101

MECHANICAL DEMO PLAN -

BUILDING 3000

2021200

W E

S T

T O

W N

E L

E M

E N

T A

R Y

S C

H O

O L

H

V A

C

P L

U M

B

IN

G U

P G

R A

D E

S

05/20/2022

HHP

JA3

U

N

IV

E R

S

IT

Y S

T

A L

B A

N Y

G

A

1/8" = 1'-0"1 MECHANICAL DEMO PLAN - BUILDING 3000

NOTES: (THIS SHEET ONLY)

10 . REMOVE EXISTING RANGE HOOD EXHAUST FAN ON ROOF.

11 . EXISTING KITCHEN RANGE HOOD TOO REMAIN.

12 . REMOVE EXISTING UNIT HEATER.

13 . REMOVE EXISTING DUCT HEATER. SEE ELECTRICAL DRAWINGS FOR CIRCUIT DEMO.

14 . REMOVE EXISTING PACKAGED TERMINAL HEAT PUMP. SALVAGE BIPOLAR IONIZATION UNIT IF APPLICABLE.

15 . REMOVE EXISTING ROOFTOP AIR CONDITIONER CAP EXISTING ROOF CURB. SEE ROOF CURB CAP DETAIL. SALVAGE BIPOLAR

IONIZATION UNIT AND TURN OVER TO OWNER.

16 . REMOVE EXISTING EXISTNG DUCTWORK. GRILLES TO REMAIN FOR RESUSE.

17 . EXISTING DISHWASHE EXHAUST FAN TO REMAIN.

18 . REMOVE EXISTING DUCTWORK AND GRILLES BACK TO SCOPE OF WORK SYMBOL. PATCH AND SEAL OPENING IN DUCT AIR TIGHT.

REINSULATE AS NEEDED.

19 . REMOVE EXISTING ROOF VENTILATOR TO REMAIN. CAP EXISTING ROOF CURB. SEE ROOF CURB CAP DETAIL.

20 . REMOVE EXISTING CEILING MOUNTED EXHAUST FAN AND ASSOCIATED DUCTWORK, SUPPORTS, AND ELECTRICAL CIRCUIT.

1 . REMOVING EXISTING CEILING HEATER.

2 . REMOVE EXISTING CEILING MOUNTED EXHAUST FAN AND ASSOCIATED DUCTWORK UP TO SCOPE OF WORK SYMBOL.

3 . REMOVE EXISTING WALL HUNG HEAT PUMP AND ASSOCIATED DISCONNECT. SALVAGE EXISTING GPS BIPOLAR IONIZATION UNIT

FOR INSTALLATION IN NEW WALL HUNG HEAT PUMP SAME LOCATION.

4 . REMOVE EXISTING ROOFTOP PACKAGE UNIT. SALVAGE EXISTING GPS BIPOLAR IONIZATION UNIT FOR REINSTALLATION IN NEW PACKAGED HEAT PUMP SAME LOCATION. SEE NEW WORK DRAWINGS FROM REPLACEMENT OF UNIT.

5 . REMOVE EXISTING HEAT PUMP ON ROOF FROM THIS APPROXIMATE LOCATION. REMOVE ANY ASSOCIATED REFRIGERANT PIPES (ON ROOF AND INSIDE BUILDING). EQUIPMENT SUPPORT RAILS TO REMAIN FOR REUSE. ROOF PIPE BOX SHALL DEMOED AND ROOF

OPENING WILL BE USED FOR A NEW PIPE BOX. SEE NEW WORK DRAWINGS FOR PIPE BOX

6 . REMOVE EXISTING ROOF MOUNTED CENTRIFUGAL EXHAUST FAN.

7 . EXISTING ROOF VENTILATOR TO REMAIN.

8 . REMOVE EXISTING RANGE HOOD SUPPLY FAN ON ROOF.

9 . REMOVE EXISTING AIR HANDLING UNIT FROM THIS APPROXIMATE LOCATION. REMOVE EXISTING SUPPLY AND RETURN DUCT FROM AIR HANDLING UNIT UP TO THE SCOPE OF WORK SYMBOL. SALVAGE EXISTING GPS BIPOLAR IONIZATION UNIT FOR INSTALLATION IN NEW VRF FAN COIL UNIT. SEE NEW WORK DRAWING FOR NEW AIR HANDLING UNIT AND DUCTWORK.

No. Description Date

GENERAL NOTE: THIS PROJECT INVOLVES THE REMOVAL AND REPLACEMENT OF

WALL HUNG HEAT PUMPS (WHHP), ROOFTOP HEAT PUMPS (RTU), & FAN COIL

UNITS AND HEAT PUMPS (FCU AND HP). MECHANICAL CONTRACTOR SHALL BE

RESPONSIBLE FOR RECOVERING ALL R-22 REFRIGERANT FROM ALL EXISTING

WHHP, RTU, FCU/HP SYSTEMS REMOVED DURING DEMOLITION PHASE(S).

CONTRACTOR SHALL PROVIDE ALL LABOR AND TOOLS/RECOVERY EQUIPMENT

REQUIRED TO RECOVER R-22 REFRIGERANT. REFRIGERANT RECOVERY

CYLINDERS SHALL BE PROVIDED BY CONTRACTOR. ONCE RECOVERED CYLINDERS

HAVE BEEN FILLED, CYLINDERS SHALL BE RETURNED TO OWNER FOR

PROCESSING.

TT TT

P.E. OFFICE

GYM

FOYER

BOYS TLT.

GIRLS TLT.

STOR.

UTILITY CLOSET

EXTENDED DAY

1 1

3 3 3 3

3 3 3 3 3

PRODUCTION

A.V. STOR.

MUSIC

MEDIA

OFFICE

WORK RM.

MEETING

ART

ART STOR. KILN

K-1 CLASSROOMK-1 CLASSROOMK-1 CLASSROOMK-1 CLASSROOM

STOR.

P.E. STOR.

BOYS

JAN.

GIRLS

TLT.

TEACHER TLT.

TLT. TLT.

TLT.

IDF

PROJECT NUMBER:

DATE:

DRAWN BY:

CHECKED BY:

TITLE:

SUBJECT TO GENERAL

COPYRIGHT LAWS ©

REVISIONS

A

B

C

GA DOE ID #: 5062

MD102

MECHANICAL DEMO PLAN -

BUILDING 3010 & 3020

2021200

W E

S T

T O

W N

E L

E M

E N

T A

R Y

S C

H O

O L

H

V A

C

P L

U M

B

IN

G U

P G

R A

D E

S

05/20/2022

HHP

JA3

U

N

IV

E R

S

IT

Y S

T

A L

B A

N Y

G

A

1/8" = 1'-0"2 MECHANICAL DEMO PLAN - BUILDING 3020

NOTES: (THIS SHEET ONLY)

1 . REMOVING EXISTING CEILING HEATER. SEE NEW WORK FOR REPLACEMENT.

2 . REMOVE EXISTING CEILING MOUNTED EXHAUST FAN AND ASSOCIATED DUCTWORK UP TO SCOPE OF

WORK SYMBOL.

3 . REMOVE EXISTING WALL HUNG HEAT PUMP AND ASSOCIATED DISCONNECT. SALVAGE EXISTING GPS BIPOLAR IONIZATION UNIT FOR INSTALLATION IN NEW WALL HUNG HEAT PUMP SAME LOCATION.

4 . REMOVE EXISTING WALL HEATER. SEE NEW WORK FOR REPLACEMENT.

5 . EXISTING KILN EXHAUST DUCT AND WALL CAP TO REMAIN.

6 . EXISTING LOUVER TO REMAIN.

7 . EXISTING LOUVER AND EXHAUST FAN TO REMAIN.

8 . REMOVE EXISTING PACKAGED TERMINAL HEAT PUMP. SALVAGE BIPOLAR IONIZATION UNIT IF

APPLICABLE.

9 . REMOVE EXISTING PAD MOUNTED PACKAGED HEAT PUMP, ASSOCIATED DUCTWORK, AND DUCT COVER UP TO LOCATION SHOWN. SALVAGE EXISTING GPS BIPOLAR IONIZATION UNIT FOR REINSTALLATION IN

NEW PACKAGED HEAT PUMP SAME LOCATION.

1/8" = 1'-0"1 MECHANICAL DEMO PLAN - BUILDING 3010

No. Description Date

GENERAL NOTE: THIS PROJECT INVOLVES THE REMOVAL AND REPLACEMENT OF

WALL HUNG HEAT PUMPS (WHHP), ROOFTOP HEAT PUMPS (RTU), & FAN COIL

UNITS AND HEAT PUMPS (FCU AND HP). MECHANICAL CONTRACTOR SHALL BE

RESPONSIBLE FOR RECOVERING ALL R-22 REFRIGERANT FROM ALL EXISTING

WHHP, RTU, FCU/HP SYSTEMS REMOVED DURING DEMOLITION PHASE(S).

CONTRACTOR SHALL PROVIDE ALL LABOR AND TOOLS/RECOVERY EQUIPMENT

REQUIRED TO RECOVER R-22 REFRIGERANT. REFRIGERANT RECOVERY

CYLINDERS SHALL BE PROVIDED BY CONTRACTOR. ONCE RECOVERED CYLINDERS

HAVE BEEN FILLED, CYLINDERS SHALL BE RETURNED TO OWNER FOR

PROCESSING.

M101

M102

M102

3RD CLASSROOM

4TH CLASSROOM

4TH CLASSROOM

4TH CLASSROOM

4TH COMPUTER LAB

5TH CLASSROOM

5TH CLASSROOM5TH CLASSROOM2ND CLASSROOM2ND CLASSROOM

2ND CLASSROOM

2ND CLASSROOM

1ST CLASSROOM

1ST CLASSROOM

1ST CLASSROOM

1ST CLASSROOM

K-1 CLASSROOM

K COMPUTER LAB 3RD CLASSROOM

3RD CLASSROOM1ST CLASSROOM

BOYS TLT. BOYS TLT.

GIRLS TLT.GIRLS TLT

SPEECH SPECIAL ED.

RESOURCE SPECIAL

ED.

SPECIAL ED.

5TH CLASSROOM2ND CLASSROOM

READING

TESTING

WORK RM.

STOR.

JAN. STOR.

PARENT CENTER

BOOK STOR.

BOOK STOR.

CAFETERIA STAGE

KITCHEN

DRY STOR.

OFFICE

DISHWASH

WORK ROOM

COPIER & SUPPLY

VAULT

PRINCIPAL

OFFICE

OFFICE

LOBBY

ASSIST. PRINCIPAL

WAITING

COUNSELOR COUNSELOR

ART

ART STOR. KILN

MEETING

WORK RM.

OFFICE

MEDIAMUSIC

PRODUCTION

A.V. STOR.

P.E. STOR.

STOR.

BOYS

GIRLS

JAN.

K-1 CLASSROOM K-1 CLASSROOM K-1 CLASSROOM K-1 CLASSROOMTLT.

IDF

TLT.

TLT.

TLT.

TEACHER TLT.

MECH.

TLT.

ELEC.

JAN.

P.E. OFFICE FOYER

BOYS TLT.

GIRLS TLT.

STOR.

UTILITY CLOSET

EXTENDED DAY

GYM

EF-24

EF-25

EF-26

EF-14

EF-15

PROJECT NUMBER:

DATE:

DRAWN BY:

CHECKED BY:

TITLE:

SUBJECT TO GENERAL

COPYRIGHT LAWS ©

REVISIONS

A

B

C

GA DOE ID #: 5062

M100

MECHANICAL NEW WORK

PLAN - OVERALL

2021200

W E

S T

T O

W N

E L

E M

E N

T A

R Y

S C

H O

O L

H

V A

C

P L

U M

B

IN

G U

P G

R A

D E

S

05/20/2022

HHP

JA3

U

N

IV

E R

S

IT

Y S

T

A L

B A

N Y

G

A

3/32" = 1'-0"1 MECHANICAL NEW WORK PLAN - OVERALL

3RD CLASSROOM 4TH CLASSROOM 4TH CLASSROOM 4TH CLASSROOM

4TH COMPUTER LAB 5TH CLASSROOM

5TH CLASSROOM

5TH CLASSROOM5TH CLASSROOM

2ND CLASSROOM 2ND CLASSROOM

2ND CLASSROOM2ND CLASSROOM2ND CLASSROOM1ST CLASSROOM1ST CLASSROOM1ST CLASSROOM1ST CLASSROOM

K-1 CLASSROOM

KITCHEN

DISHWASH

DRY STOR.

OFFICE

CAFETERIA

STAGE

COPIER & SUPPLY

DRESSING

OFFICE

WORK ROOM

PRINCIPAL

VAULT

OFFICE

LOBBY

ASSIST. PRINCIPAL

WAITING

COUNSELOR

COUNSELOR

3RD CLASSROOM

K COMPUTER LAB

1ST CLASSROOM

3RD CLASSROOM

BOYS TLT. GIRLS TLT

WORK RM.

JAN. STOR.

SPEECH SPECIAL ED.

RESOURCE SPECIAL

ED.

SPECIAL ED.

READING

STOR.

213.8 SF

BOYS TLT. GIRLS TLT.

WORK RM. TESTING

Room

MECH.

TLT.

TLT.

ELEC.

JAN.

WHHP-1 WHHP-2 WHHP-3 WHHP-4 WHHP-5 WHHP-6 WHHP-7 WHHP-8 WHHP-9

WHHP-10

WHHP-11

WHHP-12WHHP-13WHHP-14

WHHP-15

WHHP-16WHHP-17WHHP-18WHHP-19

EF-6

EF-8

EF-7

EF-9

RTU-4

RTU-6 RTU-7

RTU-8

RTU-9

RTU-10

RTU-11

RTU-12

RTU-13

RTU-1 RTU-2

EF-1

EF-2

EF-4 EF-5

EF-11EF-12

EF-14

EF-15

EF-16

EF-17

ECH-2

ECH-2

ECH-3

ECH-1

EF-18

EF-19

8 8

3 3 3 3 3

33333333

EF-10

OAU-1

OAU-2

PARENT CENTER

BOOK STOR.

BOOK STOR.

KEF-1

KSF-1 KSF-2

HP-1

HP-2

AHU-2

AHU-1

A2

A2

A2

A2

A2

A2

A2

A2

A2

A2

A2

A2

A2

A2

A2

A2

A2

14 14

DFCU-1

A1

A1

6"ø

6"ø

12"ø20"x12" 10"ø18"x12"

8"ø

8"ø

8"ø8"ø8"ø8"ø8"ø8"ø8"ø

DOU-1

750 750

12"ø 12"ø 10"ø10"ø

CC CC

CC CC

MM MM

MM

MM

MM

MM

T

PTHP-1

PTHP-3

A1

DFCU-2

500500

150300

DCU-2

EA - 300 CFM

EA - 300 CFM EA - 450 CFM

EA - 450 CFM

225225

TT TT TT TT

TTTTTTTT

MM

MM

ECH-8 ECH-9

ECH-10ECH-11

200 200

RTU-3

TT TT TT TT TT TT TT

TT

TT

TTTTTTTTTTTTTTTT

50 50

A2

12 12 12 12 12 12 12 12

121212121212121212

CC

CC

CC

T

16"x12"

"x

TT

TT

R

R

1" D

1" D

TT

18 18 18 18 18 18 18

18 18 18 18 18 18 18 18

TT 18

TT 18

R

3/4" D

A2

A2

A1

A1

6"ø

A1

A1

A1

6"ø

TT

TT

TT

18 TT

18 TT 18 TT

D

28(TYP)

28(TYP)

D

3/4" D

6"ø

3/4" D

3/4" D

3/4" D

3/4" D

3/4" D

PROJECT NUMBER:

DATE:

DRAWN BY:

CHECKED BY:

TITLE:

SUBJECT TO GENERAL

COPYRIGHT LAWS ©

REVISIONS

A

B

C

GA DOE ID #: 5062

M101

MECHANICAL NEW WORK

PLAN - BUILDING 3000

2021200

W E

S T

T O

W N

E L

E M

E N

T A

R Y

S C

H O

O L

H

V A

C

P L

U M

B

IN

G U

P G

R A

D E

S

05/20/2022

HHP

JA3

U

N

IV

E R

S

IT

Y S

T

A L

B A

N Y

G

A

1/8" = 1'-0"1 MECHANICAL NEW WORK PLAN - BUILDING 3000

NOTES: (THIS SHEET ONLY)

20 . FACTORY WALL MOUNTED DUCTLESS UNIT THERMOSTAT. MOUNT B.E. 4' 6" A.F.F..

21 . PIPE BOX LOCATED IN SAME PLACE AS EXISTING PIPE BOX. SEE PIPE BOX DETAIL. USE ROOF CURB ADAPTER AS NEEDED. SEE ROOF CURB ADAPTER DETAIL.

22 . CONDENSATE PIPE TO DISCHARGE INTO EXISTING CONDENSATE DRAINE LINE. BEFORE CONNECTING TO EXISTING PIPE, CONTRACTOR SHALL ENSURE EXISTING LINE IS

FREE OF DEBRIS OR ANY BLOCKAGE.

23 . REPAIR EXISTING DUCT COVERING TO FIT UP TO NEW UNIT. MATCH EXISTING DUCT COVER.

24 . ROOF MOUNTED DUCTLESS CONDENSING UNIT. SEE DUCTLESS UNIT ATOP EQUIPMENT SUPPORT RAIL DETAIL.

25 . WALL MOUNTED DUCTLESS FAN COIL UNIT. MOUNT B.E. OF UNIT 6' 8" A.F.F.

26 . DUCTLESS CEILING CASSETTE. SUSPENDED FROM DROP RODS (MIN 3/8") CONNECTED TO OVERHEAD STRUCTURE WITH SUPPLEMENTAL 2"X2"X1/4" ANGLE IRON.

27 . ROUTE CONDENSATE FROM WALL UNIT UP THROUGH PIPE BOX AND DISCHARGE ON ROOF.

28 . CONDENSATE PIPE SUPPORT ON ROOF. SEE CONDENSATE PIPE SUPPORT ON ROOF DETAILS.

29 . PROVIDE FULL SIZE, SLOPED (1/4" PER FOOT), TRAPPED, SCHEDULE 40 PVC PIPING TO DISCHARGE AS SHOWN ON DRAWINGS . DRAIN PIPING SHALL BE PROVIDED FROM EACH OAU AND ROUTED TO THE NEAREST GUTTER AS SHOWN. INSURE THAT DRAIN PIPING DOES NOT BLOCK OAU ACCESS PANELS. DO NOT ROUTE DRAIN PIPING IN FRONT OF ACCESS PANELS. SEE CONDENSATE DRAIN TRAP DETAIL AND CONDENSATE ROOF SUPPORT DETAIL(S).

30 . DISCHARGE CONDENSATE ON ROOF AFTER P-TRAP.

1 . NEW CEILING HEATER IN EXISTING GRID.

2 . NEW CEILING MOUNTED EXHAUST FAN CONNECTED TO EXITING DUCTWORK WITH FLEXIBLE DUCT OF SIZE INDICATED.

3 . NEW WALL HUNG HEAT PUMP MOUNTED IN SAME LOCATION AS REMOVED WHHP. PROVIDE TRANSITIONS AS REQUIRED TO CONNECT NEW WHHP TO EXISTING DUCTWORK

IN CHASE.

4 . ROOFTOP AIR CONDITIONING UNIT MOUNTED ATOP ROOF CURB ADAPTER

6 . CENTRIFUGAL ROOF MOUNTED EXHAUST FAN MOUNTED ON EXISTING CURB. PROVIDE CURB ADAPTER AS NEEDED.

7 . KITCHEN HOOD EXHAUST FAN. MOUNTED ON ROOF CURB ADAPTER.

8 . KITCHEN HOOD SUPPLY FAN. MOUNTED ON ROOF CURB ADAPTER.

9 . EXISTING KITCHEN HOOD.

10 . HORIZONTAL AIR HANDLER SUSPENDED FROM CEILING IN SAME LOCATION AS OLD AIR HANDLE.

11 . NEW HEAT PUMP MOUNTED ON EXISITNG ROOF SUPPORTS IN THIS APPROXIMATE LOCATION.

12 . ATTACH NEW DUCT TO EXISTING DUCTWORK AT THIS APPROXIMATE LOCATION. PROVIDE AS NECESSARY TRANSITIONS AND OFFSETS TO MAKE CONNECTION.

13 . 100% OUTSIDE AIR UNIT MOUNTED ATOP ROOF CURB. SEE ROOF CURB DETAIL - NEW CURB ON EXISTING ROOF.

14 . CONNECTION SIZE SUPPLY DUCT TRANSITIONS IN ELBOW FOR CONNECTION TO EXISTING 24" X 24" SUPPLY DUCTWORK AT APPROXIMATE LOCATION SHOWN. FIELD VERIFY EXISTING DUCTWORK DIMENSIONS. PROVIDE FITTINGS AND OFFSETS AS REQURIED TO MAKE CONNECTION.

15 . NEW RETURN DUCT CONNECTS TO EXISTING RETURN PLENUM AT THIS APPROXIMATE LOCATION.

16 . PACKAGED TERMINAL HEAT PUMP MOUNTED IN PLACE OF OLD.

17 . EXISTING TO REMAIN.

18 . WALL MOUNTED DDC SPACE TEMPERATURE/HUMIDITY SENSOR. MOUNT B.E. OF SENSOR 4' 6" A.F.F..

19 . DDC TEMERATURE SENSOR TO MONITOR IDF SPACE TEMPERATURE. MOUNT B.E. 4' 6" A.F.F..

No. Description Date

GENERAL NOTE: PROVIDE LINTEL AT ALL NEW DUCT PENETRATIONS

THRU EXISTING WALLS. SEE LINTEL DETAIL AT EXISTING WALL.

PRODUCTION

A.V. STOR.

MUSIC

MEDIA

OFFICE

WORK RM.

MEETING

ART

ART STOR. KILN

K-1 CLASSROOMK-1 CLASSROOMK-1 CLASSROOMK-1 CLASSROOM

STOR.

P.E. STOR.

237.07 SF

BOYS

JAN.

GIRLS TLT.

TEACHER TLT.

TLT.

TLT.

TLT.

IDF

WHHP-20WHHP-22WHHP-23

WHHP-24 WHHP-25 WHHP-26 WHHP-27 WHHP-28

WHHP-29

EF-21

EF-23

EF-22

EF-26

EF-25

EF-24EF-27

EF-28

EF-13

550 550

550 500

300 400400

400400

3 3 3 3

3 3 3 3

3ECH-5

ECH-4

ECH-6

ECH-7

OAU-3

A2

A2

A2

A2

A2

A2

A2

A2

WHHP-21

50 50

CC

CCCC

CC

MM

MM

MM MM

MM

DFCU-3

DCU-3

TT

6 6 6 6

8"ø

8"ø

8"ø 8"ø

8"ø

8"ø

16"ø

14"ø 12"ø

8"ø 8"ø

TT

133/4" D

R

16TT TT TT TT

TT

TTTTTT

TT

TT

16 16 16

161616

MVD

1" D

14"x16"

"ø

14"ø

A2

6"ø A2

6"ø

F.D. F.D.

F.D.

P.E. OFFICE

GYM

FOYER

BOYS TLT.

GIRLS TLT.

STOR. UTILITY CLOSET

EXTENDED DAY

EWH-2

EWH-1

EF-20

EF-3

PTHP-2

MM

MM

RTU-15RTU-14

ECH-12

NOTES: (THIS SHEET ONLY)

PROJECT NUMBER:

DATE:

DRAWN BY:

CHECKED BY:

TITLE:

SUBJECT TO GENERAL

COPYRIGHT LAWS ©

REVISIONS

A

B

C

GA DOE ID #: 5062

M102

MECHANICAL NEW WORK

PLAN - BUILDING 3010 & 3020

2021200

W E

S T

T O

W N

E L

E M

E N

T A

R Y

S C

H O

O L

H

V A

C

P L

U M

B

IN

G U

P G

R A

D E

S

05/20/2022

HHP

JA3

U

N

IV

E R

S

IT

Y S

T

A L

B A

N Y

G

A

1/8" = 1'-0"1 MECHANICAL NEW WORK PLAN - BUILDING 3010

1/8" = 1'-0"2 MECHANICAL NEW WORK PLAN - BUILDING 3020

1 . NEW CEILING HEATER IN EXISTING GRID.

2 . NEW CEILING MOUNTED EXHAUST FAN CONNECTED TO EXITING DUCTWORK WITH FLEXIBLE DUCT OF SIZE INDICATED.

3 . NEW WALL HUNG HEAT PUMP MOUNTED IN SAME LOCATION AS REMOVED WHHP. PROVIDE TRANSITIONS AS REQUIRED TO CONNECT NEW WHHP TO EXISTING DUCTWORK IN CHASE.

4 . 100% OUTDSIDE AIR UNIT MOUNTED ON CONCRETE EQUIPMENT PAD. SEE CONCRETE EQUIPMENT PAD DETAIL. SEE PAD MOUNTED EXTERIOR METAL DUCT HOOD DETAIL.

5 . OA DUCT RISES IN STORAGE ROOM TO ATTIC. ROUTE OA DUCT ABOVE CORRIDOR FIRE RATED ASSEMBLY

6 . ATTACH NEW DUCT TO EXISTING DUCTWORK AT THIS APPROXIMATE LOCATION. PROVIDE ASS NECESSARY TRANSITIONS AND OFFSETS TO MAKE CONNECTION.

7 . PACKAGED TERMINAL HEAT PUMP MOUNTED IN PLACE OF OLD.

8 . ELECTRIC WALL HEATER REPLACEMENT. FEILD VERIFY EXACT LOCATION OF EXISTING.

9 . CONNECT NEW DUCTWORK TO EXISTING DUCTWORK. PROVIDE TRANSITIONS/OFFSETS AS REQUIRED TO MAKE NEW CONNECTION TO EXISTING DUCTWORK. SEE

10 . GROUND MOUNTED HORIZONTAL DISCHARGE PACKAGED HEAT PUMP MOUNTED ON CONCRETE EQUIPMENT PAD. SEE CONCRETE EQUIPMENT PAD DETAIL. SEE PAD MOUNTED GYM RTU EXTERIOR METAL DUCT HOOD DETAIL. PROVIDE TRANSITIONS/OFFSETS AS NEED TO MAKE DUCT CONNECTION.

11 . ROUTE CONDENSATE PIPING UNDERNEATH RETURN DUCT AND THROUGH EXTERNAL COVER. INSTALL THE CONDENSATE TRAP OUTSIDE OF THE COVERING. DO NOT INSTALL TRAP BETWEEN SUPPLE

AND RETURN DUCT. DISCHARGE ON PAD.

12 . NEW DUCTLESS CONDENSING UNIT MOUNTED ON WALL BRACKET. MOUNT UNIT AS HIGH AS POSSIBLE ON WALL. MAINTAIN MANUFACTURERS CLEARANCES.

13 . WALL MOUNTED DUCTLESS FAN COIL UNIT. MOUNT B.E. OF UNIT 6' 8" A.F.F.

14 . DDC TEMERATURE SENSOR TO MONITOR IDF SPACE TEMPERATURE. MOUNT B.E. 4' 6" A.F.F..

15 . FACTORY WALL MOUNTED DUCTLESS UNIT THERMOSTAT. MOUNT B.E. 4' 6" A.F.F..

16 . WALL MOUNTED DDC SPACE TEMPERATURE/HUMIDITY SENSOR. MOUNT B.E. OF SENSOR 4' 6" A.F.F..

17 . 100% OUTDSIDE AIR UNIT CONDENSATE TO DISCHARGE OFF THE EDGE OF PAD.

18 . TAP EXISTING DUCT FOR HALLWAY SUPPLY DUCT.

19 . INSTALL 6' TALL CHAINLINK FENCE AROUND EQUIPMENT YARD IN ACCORDANCE TO SPECIFICATIONS. INSTALL 3'GATE IN FENCE FOR SERVICE ACCESS.

No. Description Date

GENERAL NOTE: PROVIDE LINTEL AT ALL NEW DUCT PENETRATIONS

THRU EXISTING WALLS. SEE LINTEL DETAIL AT EXISTING WALL.

MAIN ROUND TRUNK DUCT

2 3/16" DUCT WRAP INSULATION FOR

SUPPLY AND RETURN DUCT

OPENING IN SIDE OF RECTANGULAR SHEET METAL

DUCT SHALL BE CUT WITH DRILL-CUTTER OR TIN

SNIPS. DIAMETER OF OPENING SHALL MATCH INNER

DIAMETER OF FOAM GASKET OR DIAMETER

RECOMMENDED BY TAKEOFF MANUFACTURER

DUCT

DUCT MASTICSHEET METAL SCREWS ON 6" CENTERS

FOAM GASKET

EXTERIOR VAPOR BARRIER (ONLY) SECURED

TO FITTING WITH NYLON "ZIP STRIP" BAND

SECURE INNER DUCT TO FITTING WITH NYLON

ZIP STRIP BAND IN ADDITION TO NYLON

STRIPBAND. SEAL INNER CORE TO DUCT.

FLEXIBLE DUCTWORK

90° SADDLE TAKEOFF COLLAR DAMPER AND THERMA-SEAL

GASKET FLANGE AND DAMPER HANDLE STANDOFF, SIMILAR TO

CROWN PRODUCT MODEL #314-DSO

FOR SUPPLY/RETURN DUCTS, INSULATE ENTIRE FITTING (EXCEPT OPERATOR

HANDLE) WITH 2 3/16" DUCT WRAP. SEAL WITH VAPOR PROOF MASTIC AND CLOTH

FABRIC OVERLAPPING ESCUTCHEON AND DUCT WRAP FSK JACKET TO PREVENT

PASSAGE OF SMOKE.

20 GAUGE GALVANIZED SHEET METAL COVER

SEAL AND CAULK ALL JOINTS WATERTIGHT

A S

R E

Q U

IR

E

D

AS REQUIRED

SHEET METAL COVER ATOP ANGLE IRON

CONTINUOUS INSULATION

LAG SCREWS TO CURB ON MAXIMUM 16" CENTERS

EXISTING ROOF CURB TO REMAIN FOR REUSE

EXISTING ROOF AND DECK

PLAN VIEW

ELEVATION VIEW

CONTRACTOR SHALL FIELD VERIFY

EXACT CURB DIMENSIONS PRIOR

TO FABRICATING CURB CAP.

3" X 3" X ¼" ANGLE IRON FULLY WELDED

(PROVIDE CENTER ANGLE AT MIDSPAN

FOR ALL CURBS LARGER THAN 8 SQ. FT.)

NOTE: ALL ITEMS IN THIS DETAIL ARE NEW UNLESS NOTED OTHERWISE.

CURB CAP IS TO BE CONSTRUCTED OF 3" X 3" X ¼" ANGLE IRON

MEMBERS, MITERED OR BUTTED AS SHOWN AND WELDED TOGETHER.

COVER ENTIRE FRAME WITH 20 GA. GALVANIZED SHEET METAL. SEAL

AND CAULK ALL SEAMS WATERTIGHT. LINE ENTIRE UNDERSIDE WITH 1 ½"

RIGID FIBERGLASS INSULATION. SECURE TO EXISTING CURB WITH

GALVANIZED LAG SCREWS ON 16" CENTERS.

PROVIDE 1" WIDE CLOSED CELL

ELASTOMERIC (ARMAFLEX) TAPE

AROUND FULL PERIMETER OF

CURB TO SEAL COVER TO CURB.

PROVIDE BACKERBOARD IN ANY GAPS

AND SEAL AIR TIGHT WITH SILICONE

CAULK AROUND FULL PERIMETER

AT POINT WHERE ANGLE IRON OVERLAPS

CURB.

CEILING, BY ARCHITECTURAL

SQUARE TO ROUND TRANSITION (WHERE ELBOW CONNECTS TO SQUARE

NECK DIFFUSERS). PROVIDE ROUND TO ROUND TRANSITION WHERE GRILLE

NECK SIZE DIFFERS FROM CONNECTING DUCT SIZE (EITHER LARGER OR

SMALLER). INSULATE ON SUPPLY DUCTS.

3 GORE ADJUSTABLE ELBOW. INSULATE

ON SUPPLY DUCTS.

NYLON ZIP STRIP ON OUTER VAPOR BARRIER.

ENSURE INSULATION IS PULLED DOWN WITH

VAPOR BARRIER SO NO DUCTWORK IS

UNINSULATED.

NOTE: DETAIL IS TYPICAL FOR ALL FLEX DUCT RUNOUTS TO DIFFUSERS

STAINLESS STEEL DRAWBAND

ON INNER DUCT

FLEX DUCT

INSULATION BLANKET ON TOP

OF SUPPLY DIFFUSERS

CEILING DIFFUSER

J

POWER WIRING AND CONDUIT BY ELECTRICAL

PROVIDE "KNOCK OUT" AND GROMMET

FOR POWER CABLE

ROOF CURB. SEE ROOF CURB DETAIL.

POWER CABLE BY ELECTRICAL

REMOVABLE ACCESS COVER FOR MOTOR

COMPARTMENT

INTERNAL FACTORY INSTALLED NEMA-1 DISCONNECT

SWITCH UNLESS SCHEDULED OTHERWISE

SEE SCHEDULE FOR DRIVE TYPE. (PROVIDE

ADJUSTABLE SHEAVE FOR ALL BELT DRIVE)

FACTORY WIRED FROM MOTOR TO

DISCONNECT SWITCH.

EXHAUST FAN

FACTORY FURNISHED DAMPER TRAY TO SUPPORT

BACK DRAFT DAMPER AND PROVIDE DUCT

ATTACHMENT.

FULL PERIMETER ANGLE IRON FRAMING BENEATH

CURB BY STRUCTURAL.

SECURE DUCT TO ROOF STRUCTURE WITH SHEET

METAL ON 4 SIDES. DUCT SHALL NOT BE

SUPPORTED BY DAMPER TRAY.

EXHAUST DUCT UP FROM BELOW

EXHAUST DUCT SHALL TRANSITION AS REQUIRED AT

UNDERSIDE OF ROOF DECK TO MATCH FANS DAMPER/

CURB SIZE.

MINIMUM 1 1/4" CLEARANCE FOR CONDUIT

FACTORY INSTALLED, MINIMUM 1/2"

DIA. CONDUIT CHASE

J

POWER WIRING AND CONDUIT BY ELECTRICAL

PROVIDE "KNOCK OUT" AND GROMMET

FOR POWER CABLE

ROOF CURB. SEE ROOF CURB DETAIL.

POWER CABLE BY ELECTRICAL

REMOVABLE ACCESS COVER FOR MOTOR

COMPARTMENT

INTERNAL FACTORY INSTALLED NEMA-1 DISCONNECT

SWITCH UNLESS SCHEDULED OTHERWISE

SEE SCHEDULE FOR DRIVE TYPE.

FACTORY WIRED FROM MOTOR TO

DISCONNECT SWITCH.

UPBLAST EXHAUST FAN

FACTORY FURNISHED DAMPER TRAY TO SUPPORT

BACK DRAFT DAMPER AND PROVIDE DUCT

ATTACHMENT.

FULL PERIMETER ANGLE IRON FRAMING BENEATH

CURB BY STRUCTURAL.

SECURE DUCT TO ROOF STRUCTURE WITH SHEET

METAL ON 4 SIDES. DUCT SHALL NOT BE

SUPPORTED BY DAMPER TRAY.

EXHAUST DUCT UP FROM BELOW

EXHAUST DUCT SHALL TRANSITION AS REQUIRED AT

UNDERSIDE OF ROOF DECK TO MATCH FANS DAMPER/

CURB SIZE.

MINIMUM 1 1/4" CLEARANCE FOR CONDUIT

FACTORY INSTALLED, MINIMUM 1/2"

DIA. CONDUIT CHASE GALVANIZED BIRD SCREEN

SECURE CURB CAP TO CURB WITH ANCHORS ON

MAXIMUM 12" CENTERS (MINIMUM 2 ANCHORS

EACH SIDE)

GRADE

WELDED WIRE MESH

AT MID DEPTH OF SLAB

6" X 6" 10/10 WWF

3000 PSI CONCRETE

1" CHAMFER

SEE SPECIFICATIONS FOR

PAD HEIGHT ABOVE

ADJACENT GRADE

2" MINIMUM

EXTERIOR CONCRETE PAD

FLOOR

1" CHAMFER

ANCHOR (TYPICAL OF 4)

INTERIOR CONCRETE PAD

WELDED WIRE MESH

AT MID DEPTH OF SLAB

6" X 6" 10/10 WWF

SEE SPECIFICATIONS FOR

PAD HEIGHT ABOVE

ADJACENT GRADE

2"

3000 PSI CONCRETE

1½"

3"

UNION

AC UNIT

DRAIN CONNECTION

DRAIN PIPE SHALL BE AT LEAST

THE SAME DIAMETER AS THE NIPPLE

ON THE DRAIN PAN CONNECTION

OPEN END NIPPLE

SEE DRAWINGS FOR

PIPE REQUIRED MATERIAL

SLOPE AS REQUIRED

IN SPECIFICATIONS

PIPE NIPPLE

6"

FRONT VIEW

4"

SIDE VIEW

V A

R

IE

S

CONDENSATE PIPE,

VERIFY SIZE (TYP)

UV - STABILIZED, EDPM ADJUSTABLE RUBBER PIPE

SUPPORT, VERIFY PIPE DIAMETER BEING SUPPORTED.

SPACED ON MAXIMUM 8 FT. CENTERS AND 24" OF

FITTINGS (ERICO CADDY PYRAMID RPSE - TYPICAL)

INSTALL CONDENSATE PIPE AT THE LOWEST

POSSIBLE ELEVATION TO REDUCE TOP

HEAVY PIPE AND TO REDUCE TIPPING OVER

BUT TO MAINTAIN SPECIFIED SLOPE.

GENERAL: THIS CONDENSATE SUPPORT SHALL BE USED WITH DRAIN ELEVATIONS ABOVE ROOF OF 7" OR LESS. CONDENSATE ELEVATIONS ABOVE 8" SHALL USE ERICO CADDY PYRAMID ST ADJUSTABLE

STRUT SUPPORT OR EQUAL BY MIRO.

OPENING IN SIDE OF RECTANGULAR

SHEET METAL DUCT SHALL BE CUT

WITH DRILL CUTTER (NOT TIN SNIPS).

DIAMETER OF OPENING SHALL MATCH

INNER DIAMTER OF FOAM GASKET.

DUCT

DUCT MASTIC

FOAM GASKET

SHEET METAL SCREWS

ON 4" CENTERSDUCT

2" DUCT WRAP INSULATION FOR SUPPLY DUCT

EXTERIOR VAPOR BARRIER (ONLY) SECURED TO

FITTING WITH NYLON "ZIP-STRIP" BAND

FLEXIBLE DUCTWORK

BELLMOUTH OR 45° FITTING WITH DAMPER

FOR SUPPLY DUCTS, INSULATE ENTIRE FITTING (EXCEPT OPERATOR HANDLE)

WITH 2" DUCTWRAP SEALED WITH VAPOR PROOF MASTIC AND CLOTH FABRIC

OVERLAPPING ESCUTCHEON AND DUCT WRAP FSK JACKET TO PREVENT PASSAGE

OF SMOKE.

PROVIDE OPTIONAL EXTENDED NECK SHAFT

FOR INSULATED DUCTS TO CLEAR INSULATION THICKNESS

SECURE INNER DUCT TO FITTING WITH 1/2" STAINLESS STEEL

DRAW BAND. CONTRACTOR SHALL NOT UTILIZE NYLON "ZIP-

STRIP" BAND TO SECURE INNER DUCT TO FITTING.

AIR

NOTE: SINGLE BI-POLAR IONIZATION UNIT SHOWN. INSTALLATION SIMILAR WHEN

MULTIPLE UNITS ARE INSTALLED IN ONE HVAC UNIT, EXCEPT 24V WIRING FROM

HVAC UNIT'S TERMINAL SIDE SHALL FEED CONTRACTOR FURNISHED TERMINAL

STRIP, WHICH SHALL THEN FEED POWER TO MULTIPLE UNITS. CONTRACTOR

FURNISHED TERMINAL STRIP SHALL BE ELECTRICALLY ISOLATED FROM THE HVAC

UNIT CASING AND ALL OTHER METAL COMPONENTS.

SECURE WITH SCREWS IN LOCATION THAT

WILL NOT DAMAGE HVAC EQUIPMENT OR

ASSOCIATED REFRIGERANT PIPE, WIRING

OR OTHER COMPONENTS

NEEDLEPOINT ELECTRODES. ENSURE UNIT IS

ORIENTED AND INSTALLED SO THAT AIR FLOW

PASSES BETWEEN ELECTRODES (INSTALL

PERPENDICULAR TO AIRFLOW). MAINTAIN

MANUFACTURER'S DISTANCE FROM NEEDLES

TO METAL SURFACE TO PREVENT ARCING.

FACTORY

FURNISHED

24VAC WIRING

BI-POLAR UNIT. SEE SCHEDULE FOR QUANTITY.

SEE ENLARGED DRAWING BELOW.

LED CONFIRMING IONIZATION OPERATION

B.A.S. CONTACTS TO ALLOW OWNER TO MONITOR STATUS.

MONITORING IS NOT INCLUDED IN THIS PROJECT.

BI-POLAR IONIZATION UNIT MOUNTED INSIDE UNIT DOWNSTREAM OF

FILTER IN SUPPLY AIRSTREAM IN LOCATION APPROVED BY HVAC

EQUIPMENT MANUFACTURER AND BI-POLAR MANUFACTURER

(FAN)

(24V POWER)

G

R

Y

W

C

O

CONNECT TO FAN AND 24V POWER TERMINALS ON 24 VAC

TERMINAL STRIP IN HVAC EQUIPMENT. ADDITIONAL GENERIC

TERMINALS ARE SHOWN FOR SYMBOLIC PURPOSES AND

ACTUAL TERMINALS WILL VARY BASED ON TYPE OF

EQUIPMENT.

PROVIDE ADDITIONAL WIRING (AS REQUIRED) IF FACTORY FURNISHED

WIRING WILL NOT REACH 24VAC TERMINAL STRIP. PROVIDE WIRE NUTS

AND ELECTRICAL TAPE AT JOINT. MATCH WIRE GAUGE OF

MANUFACTURER'S WIRING.

PROJECT NUMBER:

DATE:

DRAWN BY:

CHECKED BY:

TITLE:

SUBJECT TO GENERAL

COPYRIGHT LAWS ©

REVISIONS

GA DOE ID #: 5062

M501

MECHANICAL DETAILS

2021200

W E

S T

T O

W N

E L

E M

E N

T A

R Y

S C

H O

O L

H

V A

C

P L

U M

B

IN

G U

P G

R A

D E

S

05/20/2022

HHP

JA3

U

N

IV

E R

S

IT

Y S

T

A L

B A

N Y

G

A

NOT TO SCALE

90° SADDLE TAP TAKEOFF FITTING DETAIL

NOT TO SCALE

CAP AT EXISTING CURB

NOT TO SCALE

CEILING GRILLE DUCT CONNECTION DETAIL

NOT TO SCALE

CENTRIFUGAL DOWN BLAST EXHAUST FAN DETAIL

NOT TO SCALE

CENTRIFUGAL UPBLAST EXHAUST FAN DETAIL (CHECK)

NOT TO SCALE

CONCRETE EQUIPMENT PAD DETAIL

NOT TO SCALE

CONDENSATE DRAIN TRAP DETAIL

NOT TO SCALE

CONDENSATE PIPE SUPPORT ON ROOF DETAIL

NOT TO SCALE

BELLMOUTH AND 45° TAKEOFF FITTING DETAIL

No. Description Date

NOT TO SCALE

COMPACT BI-POLAR IONIZATION UNIT DETAIL

PROVIDE INSULATED HOUSING WHERE SCHEDULED

DUCT

AIRFLOW

PARALLEL BLADE BACKDRAFT DAMPER

SQUARE ACCESS PANEL FOR DAMPER ACTUATOR ACCESS

ACCESS PANEL (BOTH SIDES)

MOUNTING BRACKETS (TYP)

HANGING VIBRATION ISOLATORS. SEE SPECS FOR TYPE.

THREADED ROD

SUPPLEMENTAL ANGLE IRON FRAMING

DOUBLE NUTS

DOUBLE NUTS

DUCT

MOTOR. SEE SPECS FOR TYPE.

NOTE: BELT DRIVE FAN SIMILAR, EXCEPT MOTOR

OUTISDE OF FAN CASING, AND WITH INSULATED

MOTOR COVER WHERE SPECIFIED.

DUCT MOUNTING COLLAR (TYP INLET AND OUTLET). PROVIDE

1/2" X 1/2" WELDED WIRE GALVANIZED INLET GUARD FOR

NON-DUCTED INLET APPLICATIONS AS SCHEDULED.

MAINTAIN MINIMUM 2.5 TIMES WHERE DIAMETER STRAIGHT

DUCT LENGTH AT INLET AND OUTLET OF FAN BEFORE

ELBOW, TRANSITION, DAMPER, ETC.

PROVIDE MOTORIZED DAMPER WITH INTERNAL ACTUATOR WHERE

SCHEDULED. DAMPER VOLTAGE SHALL MATCH FAN VOLTAGE.

FLEXIBLE DUCT

CONNECTION (TYP)

GALVANIZED MOTOR COVER

WHERE SCHEDULED

BACKWARD

INCLINED WHEEL

MAINTAIN MINIMUM 2.5 TIMES

WHEEL DIAMETER STRAIGHT

DUCT LENGTH AT INLET AND

OUTLET OF FAN BEFORE ELBOW,

TRANSITION, DAMPER, ETC.

FACTORY INSTALLED NEMA-1

DISCONNECT SWITCH

FACTORY WIRED FROM MOTOR

TO DISCONNECT SWITCH

WELD SIDE ANGLE CLIP TO PAN (TYP OF 4)

TO CORNERS. SUSPEND WITH 3/8"

THREADED ROD. DO NOT BLOCK ACCESS

TO CONTROLLER.

PAN SHALL BE MIN. 18 GAUGE

GALVANIZED STEEL

2"

3/4" NIPPLE WELDED

TO PAN

PIPE 3/4" PAN DRAIN TO LOCATION

SHOWN ON DRAWINGS. SLOPE

PAN TO THIS SIDE.

FABRICATE DRAIN PAN MINIMUM

12" LONGER AND WIDER THAN

MAIN/SUB CONTROLLER

FABRICATE DRAIN PAN MINIMUM

12" LONGER AND WIDER THAN

MAIN/SUB CONTROLLER

18 GAUGE GALVANIZED SHEET METAL COVER FACTORY

FABRICATED BY EQUIPMENT SUPPORT MANUFACTURER

SEE SPECIFICATIONS FOR ADDITIONAL INFORMATION.AS REQUIRED

RAISED CHANNEL SUPPORT FOR

MOUNTING OF HEAT PUMPS (TYP).

CHANNELS TO BE FACTORY

FABRICATED INTO COVER.

COORDINATE SPACING OF SUPPORT CHANNELS

WITH DIMENSIONS OF HEAT PUMPS BEING

INSTALLED ATOP PLATFORM. SEE PLANS

FOR UNIT LAYOUT.

ROOF CURB. SEE ROOF CURB DETAIL.COORDINATE LENGTH OF PLATFORM

REQUIRED WITH UNIT LAYOUT INDICATED

ON PLANS

ISOMETRIC VIEW

HEAT PUMP UNIT. SEE PLANS FOR SIZING AND LAYOUT.

SECURE HEAT PUMP

TO SUPPORT CHANNEL.

LAG SCREWS TO CURB ON

MAXIMUM 16" CENTERS.

ROOF CURB. SEE

ROOF CURB DETAIL.

PROVIDE FACTORY FURNISHED

INTERNAL SUPPORT CHANNELS

AS REQUIRED TO SUPPORT

WEIGHT OF HEAT PUMP UNITS.

ROOF DECK SHALL BE

CONTINUOUS UNDER CURB.

6" (MIN.)

FRONT VIEW

PRESSURE TREATED WOOD NAILER

SHEET METAL SCREW IN SIDE OF

COUNTER FLASHING (TYP)

18 GAUGE GALVANIZED STEEL

COUNTER FLASHING

SHEET METAL SCREW (TYP)

18 GAUGE STEEL BASE SECTION

FIELD INSTALLED INSULATION

INTEGRAL 18 GAUGE

GALVANIZED

STEEL BASE PLATE

FIELD INSTALLED CANT

ROOF DECK CONTINUOUS

BENEATH SUPPORT RAIL

SEE ARCHITECTURAL DRAWINGS FOR SPECIFIC

DETAILS CONCERNING ROOF CONSTRUCTION,

FLASHING, ANCHORS, BLOCKING,

ROOF DECK TYPE, ETC.

C U

R B

H E

IG

H

T

S T

Y

LE

A

S T

Y

LE

B

S T

Y

LE

C

2" MAX.

1" 1"

FOLDING BLADE STATIC RATED FIRE DAMPER

IN TYPE 'B' FRAME (EXCEPT TYPE 'A' SHALL BE

USED AT SIDEWALL REGISTERS AND NON-DUCTED

TRANSFER OPENING). DYNAMIC RATED DAMPERS

SHALL BE USED WHERE SPECIFICALLY SHOWN

ON DRAWINGS

ATTACH FIRE DAMPER TO SLEEVE IN

ACCORDANCE WITH MANUFACTUER'S

UL INSTALLATION INSTRUCTIONS

FACTORY FURNISHED ROUND OR OVAL

TRANSITION WITH BLADE STACK OUT

OF AIR STREAM

ROUND AND OVAL FIRE DAMPER

INSTALLATION SIMILAR

DUCT (WHERE APPLICABLE)

SLEEVE LENGTH SHALL BE DETERMINED BY CONTRACTOR TO

BE WITHIN MINIMUM AND MAXIMUM DISTANCE FROM

WALL/FLOOR AS REQUIRED BY MANUFACTUER

NOTE: INSTALLATION SHALL CONFORM TO THE FIRE

DAMPERS MANUFACTURER'S "UL" INSTALLATION

INSTRUCTIONS

WALL OR FLOOR. CONTRACTOR SHALL VERIFY

THICKNESS RATING, AND MATERIAL OF

CONSTRUCTION FROM ARCHITECTURAL DRAWINGS,

AND USE THIS INFORMATION TO SELECT FIRE

DAMPER AND FIRE DAMPER ACCESSORIES.

PROVIDE MINIMUM OVERLAP ALL AROUND AS REQUIRED BY

MANUFACTURER'S UL INSTALLATION INSTRUCTIONS

CLEARANCE (TYPICAL) AS REQUIRED BY MANUFACTURER'S

UL INSTALLATION INSTRUCTIONS

165° FUSIBLE LINK

DUCT TO SLEEVE CONNECTION SHALL BE AN APPROVED

TYPE AS LISTED IN THE MANUFACTURER'S UL INSTALLATION

INSTRUCTIONS. PROVIDE DUCT SEALANT APPROVED BY

FIRE DAMPER MANUFACTURER.

PROVIDE ACCESS PANEL FOR RECTANGULAR DUCTS. FOR ROUND DUCTS,

DOOR SIZE SHALL BE AS NOTED IN SPECIFICATIONS. FOR FLOOR

PENETRATIONS ACCESS PANEL SHALL BE ABOVE FLOOR.

FACTORY PROVIDED SLEEVE. SLEEVE LENGTH AND GAUGE SHALL

BE DETERMINED BY CONTRACTOR IN ACCORDANCE WITH

MANUFACTURER'S UL INSTALLATION INSTRUCTIONS.

FACTORY PROVIDED RETAINING ANGLES. ANGLE SIZE AND GAUGE

SHALL BE DETERMINED BY CONTRACTOR IN ACCORDANCE WITH

MANUFACTURER'S UL INSTALLATION INSTRUCTIONS.

GROUT

1" ABOVE FLOOR; FLUSH FOR WALLS

SCHEDULE 10 (MINIMUM)

STEEL PIPE

CONDUIT OR PIPING

PIPING INSULATION AS SPECIFIED.

PIPE INSULATION SHALL BE CONTINUOUS

THRU PENETRATION.

SEAL BETWEEN SLEEVE AND PIPING WITH FIRE RESISTANT

SEALANT OF SUFFICIENT THICKNESS TO MAINTAIN WALL'S

OR FLOOR FIRE RATING (1" MINIMUM THICKNESS). IF WALL

IS NOT FIRE RATED, PROVIDE CAULKING IN LIEU OF FIRE

RESISTANT SEALANT. SEALANT IS ONLY REQUIRED ON

ONE SIDE OF WALL, UNLESS REQUIRED BY MANUFACTURER

ON BOTH SIDES.

FIBERGLASS BATTS PACKED BETWEEN SLEEVE

AND PIPE (OR PIPE INSULATION ON INSULATED PIPE)

WALL OR FLOOR. CONTRACTOR SHALL VERIFY

CONSTRUCTION TYPE (MASONRY, CONCRETE,

BRICK AND CMU, ETC.) AND THICKNESS.

INSIDE

UNINSULATED REFRIGERANT LIQUID PIPE

REFRIGERANT PIPE DROPS

IN WALL AS REQUIRED

INSULATED REFRIGERANT

SUCTION PIPE

20 GAUGE GALVANIZED

STEEL SHEET METAL SLEEVE

TERMINATE SLEEVE

FLUSH WITH WALL

OUTSIDE

PIPE PENETRATES WALL

NEAR GRADE LEVEL

EXTERIOR PAINTABLE SILICON CAULK.

PAINT TO MATCH EXTERIOR. EXTERIOR WALL. SEE ARCHITECTURAL PLANS

FOR CONSTRUCTION

FIRE RESISTANT FOAM OF APPROPRIATE

THICKNESS TO MAINTAIN WALL'S FIRE RATING

(1" MINIMUM THICKNESS)

DIA. -",

(SEE PLANS)

3"

DIM. + ?"

DIM. + ?"

3"

PAINT INTERIOR OF BOX MATTE BLACK.1

2 MINIMUM 26 GAUGE GALV. SHEET METAL.

4 ADAPTER MAY BE FABRICATED BY CONTRACTOR OR PROVIDED BY CROWN

PRODUCTS MODEL #666 ADAPTER OR EQUAL.

PROVIDE 1/2" DUCT LINER ON RETURN DUCT

APPLICATIONS AND NO LINER ON EXHAUST APPLICATION.

NOTES: (THIS DETAIL ONLY)

CAULK AROUND FULL PERIMETER OF ANGLE

EACH SIDE OF WALL.

3" X 3", 22 GAUGE SHEET METAL ANGLE

AROUND PERIMETER OF DUCT EACH SIDE

OF WALL. ANCHOR TO WALL WITH

EXPANSION ANCHOR.

DUCT WRAP INSULATION WITH FSK JACKET.

INSULATION IS CONTINUOUS THROUGH WALL

OPENING.

ELEVATION SECTION

NOTE: DETAIL IS SIMILAR FOR

UNINSULATED DUCTS. SEE

SPECIFICATION FOR REQUIRED

INSULATION THICKNESS.

SEAL WITH VAPOR PROOF MASTIC AND CLOTH FABRIC

OVERLAPPING ANGLE AND DUCT WRAP FSK JACKET TO

PREVENT PASSAGE OF SMOKE.

CAULK AROUND FULL PERIMETER OF ANGLE

EACH SIDE OF WALL.

3" X 3", 22 GAUGE SHEET METAL ANGLE AROUND

PERIMETER OF DUCT EACH SIDE OF WALL.

ANCHOR TO WALL WITH EXPANSION ANCHOR.

DUCT WRAP INSULATION WITH FSK

JACKET.INSULATION IS CONTINUOUS

THROUGH WALL OPENING.

SEAL WITH VAPOR PROOF MASTIC AND CLOTH

FABRIC OVERLAPPING ANGLE AND DUCT WRAP

FSK JACKET TO PREVENT PASSAGE OF SMOKE.

PROJECT NUMBER:

DATE:

DRAWN BY:

CHECKED BY:

TITLE:

SUBJECT TO GENERAL

COPYRIGHT LAWS ©

REVISIONS

GA DOE ID #: 5062

M502

MECHANICAL DETAILS

2021200

W E

S T

T O

W N

E L

E M

E N

T A

R Y

S C

H O

O L

H

V A

C

P L

U M

B

IN

G U

P G

R A

D E

S

05/20/2022

HHP

JA3

U

N

IV

E R

S

IT

Y S

T

A L

B A

N Y

G

A

NOT TO SCALE

CENTRIFUGAL INLINE FAN DETAIL

NOT TO SCALE

CONDENSATE AUXILIARY DRAIN PAN DETAIL

NOT TO SCALE

EQUIPMENT SUPPORT PLATFORM DETAIL (HP)

NOT TO SCALE

EQUIPMENT SUPPORT RAIL DETAIL

NOT TO SCALE

FIRE DAMPER DETAIL

NOT TO SCALE

PIPE SLEEVE DETAIL

NOT TO SCALE

PIPE SLEEVE DETAIL - REFRIGERANT PIPE THRU EXTERIOR WALL

NOT TO SCALE

RECTANGULAR TO ROUND FLAT ADAPTER

NOT TO SCALE

DUCT PENETRATION THRU WALL DETAIL

INSIDEOUTSIDE

GRADE

EXTERIOR 22 GAUGE HOOD SHALL BE PAINT GRIP SHEET

METAL. ALL JOINTS AND SEAMS SHALL BE STANDARD

SMACNA CONSTRUCTION, AND SEALED NEATLY AND

WATERTIGHT. PAINT EXTERIOR DUCTWORK WITH 2 COATS

OF ENAMEL PAINT. VERIFY COLOR WITH ENGINEER.

HVAC

UNIT CAULK FULL WIDTH.

SEAL WEATHERTIGHT.

TURN CONNECTING DUCT UPWARD WITH 2"

FLANGE ON RTAC CONNECTION. CAULK FULL

PERIMETER OF DUCT.

1 LAYER OF EXTERIOR 2" THICK ARMACELL CLOSED

CELL ELASTOMERIC INSULATION OVER SUPPLY AND

RETURN DUCTWORK. FIBERGLASS INTERNAL DUCT

LINER OR EXTERNAL DUCT WRAP/BOARD IS NOT

ALLOWED ON THE DUCT. FINISH INSULATION WITH 2

COATS OF ARMACELL ARMAFLEX FINISH AND

EMBOSSED ALUMINUM COVER.

SEE PLANS FOR DUCT CONTINUATION.

NOTE: THE DUCT ROUTING SHOWN BETWEEN THE HVAC UNIT AND THE EXTERIOR WALL IS

SYMBOLIC IN THIS DETAIL AND DOES NOT INTEND TO INDICATE ALL ELBOWS, TRANSITIONS,

OFFSETS, ETC. SEE FLOOR PLANS FOR ACTUAL ROUTING.

CONCRETE EQUIPMENT PAD. SEE

CONCRETE EQUIPMENT PAD DETAIL.

22 GAUGE 3 SIDED METAL DUCT HOOD BETWEEN HVAC UNIT AND

EXTERIOR WALL. EXTEND BOTH SIDES OF SHEET METAL COVER TO

CONCRETE PAD. FLANGE DUCT 2" AT CONCRETE PAD AND PROVIDE

WEATHERTIGHT SEALS AT CONNECTION POINTS.

22 GAUGE METAL COUNTER FLASHING FULL

WIDTH OF DUCT ANCHORED TO EXTERIOR

WALL AND OVERLAPPING FLANGE OF COVER

NOTE: BASIS OF DESIGN CONDENSATE DRAIN IS LOCATED BETWEEN SUPPLY AND RETURN

DUCT CONNECTIONS. ROUTE CONDENSATE TO EXTERIOR OF HOOD AND PROVIDE P-TRAP

AT EXTERIOR OF HOOD IN AN ACCESSIBLE LOCATION. SEE CONDENSATE DRAIN TRAP

DETAIL.

2" MIN. UPWARD TURNED FLANGE. CAULK

FULL WIDTH OF FLANGE.

DUCT

SEE PLANS FOR DUCT CONTINUATION.

DUCT

FIELD VERIFY EXISTING DUCT

OPENING DIMENSIONS.

INSIDEOUTSIDE

GRADE

EXTERIOR 22 GAUGE HOOD SHALL BE PAINT GRIP

SHEET METAL. ALL JOINTS AND SEAMS SHALL BE

STANDARD SMACNA CONSTRUCTION, AND SEALED

NEATLY AND WATERTIGHT. PAINT EXTERIOR

DUCTWORK WITH 2 COATS OF ENAMEL PAINT.

VERIFY COLOR WITH ENGINEER.

22 GAUGE METAL COUNTER FLASHING FULL

WIDTH OF DUCT ANCHORED TO RTAC AND

OVERLAPPING FLANGE OF COVER

HVAC

UNIT

CAULK FULL WIDTH

CAULK FULL WIDTH OF FLANGE

TURN CONNECTING DUCT UPWARD WITH 2"

FLANGE ON RTAC CONNECTION. CAULK FULL

PERIMETER OF DUCT.

1 LAYER OF EXTERIOR 2" THICK ARMACELL CLOSED

CELL ELASTOMERIC INSULATION. FIBERGLASS

INTERNAL DUCT LINER OR EXTERNAL DUCT

WRAP/BOARD IS NOT ALLOWED ON THE DUCT. FINISH

INSULATION WITH 2 COATS OF ARMACELL ARMAFLEX

FINISH AND EMBOSSED ALUMINUM COVER.

SEE PLANS FOR DUCT CONTINUATION.

NOTE: THE DUCT ROUTING SHOWN BETWEEN THE HVAC UNIT AND THE EXTERIOR WALL IS

SYMBOLIC IN THIS DETAIL AND DOES NOT INTEND TO INDICATE ALL ELBOWS, TRANSITIONS,

OFFSETS, ETC. SEE FLOOR PLANS FOR ACTUAL ROUTING.

CONCRETE EQUIPMENT PAD. SEE

CONCRETE EQUIPMENT PAD DETAIL.

22 GAUGE 3 SIDED METAL DUCT HOOD BETWEEN HVAC UNIT

AND EXTERIOR WALL. EXTEND BOTH SIDES OF SHEET METAL

COVER TO CONCRETE PAD. FLANGE DUCT 2" AT CONCRETE

PAD AND PROVIDE WEATHERTIGHT SEALS AT CONNECTION

POINTS. SLOPE HOOD TO PREVENT WATER POOLING ON

TOP OF HOOD.

22 GAUGE METAL COUNTER FLASHING FULL

WIDTH OF DUCT ANCHORED TO EXTERIOR

WALL AND OVERLAPPING FLANGE OF COVER

NOTE: DO NOT ENCLOSE CONDENSATE DRAIN CONNECTION IN SHEET METAL HOOD. SEE

DRAWINGS FOR CONDENSATE ROUTING.

2" MIN. UPWARD TURNED FLANGE. CAULK

FULL WIDTH OF FLANGE.

LIGHT

RETURN

DUCT

22 GAUGE PAINT GALV GRIP GALVANIZED FLASHING. PAINT

FLASHING TO MATCH WHAC COLOR. FLASHING SHALL EXTEND

UP 4". CAULK AND SEAL WATERTIGHT AT FLASHING OVERLAP

FLASHING OVER WHAC'S INTEGRAL VERTICAL FLASHING.

WALL HUNG HEAT PUMP (WHHP)

INTEGRAL SLOPED TOP

EXISTING EXTERIOR WALL. FIELD

VERIFY EXACT CONSTRUCTION.

INTEGRAL DISCONNECT SWITCH

INTEGRAL VINYL DRAIN TUBING BY EQUIPMENT

MANUFACTURER. PVC TUBING SHALL BE

INSERTED INTO VINYL TUBING

STAINLESS STEEL HOSE CLAMP

3/4" PAINTED SCHEDULE 80 PVC DRAIN PIPE

PIPE CLAMP SECURED TO WALL

ON MAX 18" CENTERS

HEAVY DUTY STEEL RETURN GRILLE.

CONDENSATE LINE DOWN WALL AT GRADE.

AT GRADE, ELBOW PIPE AWAY FROM

BUILDING.

ROUTE DUCT HARD AGAINST

WALL AS POSSIBLE.

PROVIDE 1" LINER FROM UNIT CONNECTION

THRU BOTH ELBOWS TO LOCATION SHOWN.

REMAINDER OF SUPPLY DUCT SHALL BE

EXTERNALLY INSULATED WITH 2 3/16" DUCT

WRAP.

EXACT MOUNTING HEIGHT OF WHAC UNIT ABOVE GRADE / FINISHED

FLOOR VARIES BASED ON EXISTING CONDITIONS. WHERE POSSIBLE,

MAINTAIN MINIMUM 12" FROM BOTTOM OF WHAC TO GRADE.

SEE

INSERT

ROUTE DUCT HARD AGAINST

WALL AS POSSIBLE.

NEW ARCHITECTURAL CHASE TO CONCEAL

DUCT. SEE ARCH DRAWINGS FOR DETAILS.

WALL CURB TO ALLOW INSTALLATION OF NEW

WHHP IN SAME LOCATION AS EXISTING WHHP.

CAULK FULL LENGTH, BOTH SIDES AND TOP OF

UNIT. COLOR SHALL MATCH EXTERIOR WALL.

1" DUCT LINER INSIDE ALL RETURN DUCT.

PROVIDE CLOSED CELL EPDM ADHESIVE BACKED WEATHER

STRIPPING AROUND FULL PERIMETER OF UNIT PRIOR TO

MOUNTING AGAINST WALL TO SERVE AS INSECT AND

INFILTRATION BARRIER.

FILTER ACCESS PANEL

INTERNALLY MOUNTED BI-POLAR

IONIZATION UNIT

8" A.F.F. TO B.E. GRILLE

SOUND TRAP ELBOW

BRICK AND BLOCK WALL

FILTER IN INTEGRAL FILTER RACK

3" X 3" X 1/4" STRUCTURAL ANGLE. PAINT EXPOSED ANGLE

WITH TWO COATS OF PANT TO MATCH BUILDING COLOR

SUPPLY DUCTWORK

EXISTING INSULATION ON

CHICKEN WIRE SUPPORT

SYSTEM.

CEILINGTRANSITION IN RISE FROM

UNIT CONNECTION SIZE TO

SIZE SHOWN ON PLAN

ELECTRIC HEAT

SPACE ABOVE CEILING IS EXTREMELY LIMITED.

OFFSET DUCTWORK HORIZONTALLY AS

REQUIRED TO AVOID CONFLICT WITH LIGHT

FIXTURES. ENSURE DUCT INSULATION IS NOT

COMPRESSED MORE THAN 25%.

NOTE: DETAIL IS SIMILAR FOR UNINSULATED DUCTS.

CAULK AROUND FULL PERIMETER OF ESCUTCHEON

EACH SIDE OF WALL.

3" WIDE (MINIMUM) GAUGE SHEET METAL ESCUTCHEON

AROUND PERIMETER OF DUCT EACH SIDE OF WALL.

ANCHOR TO WALL WITH EXPANSION ANCHOR.

DUCT

DUCT WRAP INSULATION WITH FSK JACKET.

INSULATION IS CONTINUOUS THROUGH WALL OPENING.SEAL WITH VAPOR PROOF MASTIC AND

CLOTH FABRIC OVERLAPPING

ESCUTCHEON AND DUCT

WRAP FSK JACKET TO PREVENT

PASSAGE OF SMOKE.

NOTE: THIS DETAIL IS APPLICABLE TO CONCEALED ROUND, FLAT OVAL,

AND SPIRAL DUCTWORK. THIS DETAIL IS NOT APPLICABLE TO THE

INSTALLATION OF EXPOSED NON-RECTANGULAR DUCTWORK. SEE

SPECIFICATIONS FOR REQUIRED INSULATION THICKNESS

ELEVATION

SECTION

MASONRY WALL SHOWN. INSTALLATION REQUIREMENTS

ARE THE SAME FOR GYP BOARD WALLS.

SEAL WITH FSK TAPE OVERLAPPING ESCUTCHEON AND DUCT

WRAP FSK JACKET TO PREVENT PASSAGE OF SMOKE.

DUCT WRAP INSULATION WITH FSK JACKET.

INSULATION IS CONTINUOUS THROUGH WALL

OPENING.

3" WIDE (MINIMUM) 22 GAUGE SHEET METAL

ESCUTCHEON AROUND PERIMETER OF DUCT EACH

SIDE OF WALL. ANCHOR TO WALL WITH EXPANSION

ANCHOR .ENSURE ESCUTCHEON WIDTH IS

SUFFICIENT TO CONCEAL EDGES OF WALL OPENING.

CAULK AROUND FULL PERIMETER OF ESCUTCHEON

EACH SIDE OF WALL.

PROCEDURE:

1. SAW CUT BED JOINT IN BRICK TO INSTALL ANGLE.

2. INSTALL ANGLE - BEAR 8" AT JAMB.

3. SAW CUT BED JOINT IN CMU TO INSTALL ANGLE.

4. GROUT JAMBS SOLID.

5. INSTALL ANGLE - BEAR 8" AT JAMB.

6. REMOVE MASONRY AS REQUIRED.

EXISTING BRICK

¼" THICK X 11" WIDE

STEEL PLATE SPANNING

FULL WIDTH OF OPENING.

4 x 4 x 3/8 ANGLE IRON

EXISTING CMU

4 x 4 x 3/8 ANGLE IRON

3/16

NOTE: EXISTING BRICK AND BLOCK WALL

CONSTRUCTION SHOWN. SIMILAR FOR OTHER WALL

CONSTRUCTIONS.

EXISTING ROOF

RE-WORK ROOFING FOR INSTALLATION

OF NEW ROOF CURB IN ACCORDANCE WITH

ROOF MANUFACTURER'S BOND REQUIREMENTS.

C U

R B

H E

IG

H

T

EQUIPMENT

GASKET SEALER

PRESSURE

TREATED

WOOD NAILER

RIGID INSULATION

METAL ROOF CURB

LAG BOLT

PRESSURE TREATED BLOCKING

AS REQUIRED TO MATCH INSULATION

THICKNESS.

DUCT

ANCHOR TO DECK

ROOF DECK TO EXTEND

BENEATH ENTIRE ROOF CURB,

COORDINATE DUCT OPENING

LOCATION WITH MECH. UNIT

FULL PERIMETER STRUCTURAL STEEL FRAMING

UNDER ROOF CURB.

EXISTING METAL DECK

5/16" X 1/2" (MINIMUM) HEX HEAD

SCREWS ON 18" CENTERS. PROVIDE

MINIMUM 2 SCREWS PER SIDE.

PROJECT NUMBER:

DATE:

DRAWN BY:

CHECKED BY:

TITLE:

SUBJECT TO GENERAL

COPYRIGHT LAWS ©

REVISIONS

GA DOE ID #: 5062

M503

MECHANICAL DETAILS

2021200

W E

S T

T O

W N

E L

E M

E N

T A

R Y

S C

H O

O L

H

V A

C

P L

U M

B

IN

G U

P G

R A

D E

S

05/20/2022

HHP

JA3

U

N

IV

E R

S

IT

Y S

T

A L

B A

N Y

G

A

NOT TO SCALE

PAD MOUNTED GYM RTU EXTERIOR METAL DUCT HOOD DETAIL

NOT TO SCALE

PAD MOUNTED EXTERIOR METAL DUCT HOOD DETAIL

NOT TO SCALE

WALL HUNG AIR CONDITIONER - DUCTED SUPPLY DETAIL

NOT TO SCALE

NON-RECTANGULAR DUCT PENETRATION THRU WALL DETAIL

No. Description Date

NOT TO SCALE

LINTEL DETAIL AT EXISTING WALL

NOT TO SCALE

ROOF CURB DETAIL - NEW CURB ON EXISTING ROOF

PROJECT NUMBER:

DATE:

DRAWN BY:

CHECKED BY:

TITLE:

SUBJECT TO GENERAL

COPYRIGHT LAWS ©

REVISIONS

GA DOE ID #: 5062

M601

MECHANICAL SCHEDULES

2021200

W E

S T

T O

W N

E L

E M

E N

T A

R Y

S C

H O

O L

H

V A

C

P L

U M

B

IN

G U

P G

R A

D E

S

05/20/2022

HHP

JA3

U

N

IV

E R

S

IT

Y S

T

A L

B A

N Y

G

A

EXHAUST FANS

TAG GREENHECK MODEL NUMBER CFM APPROX. E.S.P. (IN.W.G.) FAN RPM MOTOR HP SONES NOTES

EF-1 SP-80-VG 75 0.375 935 6 - 2:3:4:5

EF-2 SP-80-VG 75 0.375 935 6 - 2:3:4:5

EF-3 SP-80-VG 75 0.375 935 80W 0.5 2:3:4:5

EF-4 G-090-VG 300 0.3 1,135 1/10 4.7 1:3:4:5:6

EF-5 G-095-VG 450 0.3 1,174 1/6 5.4 1:3:4:5:6

EF-6 SP-A390-VG 225 0.5 1,274 1/15 5.2 2:3:4:5

EF-7 SP-80-VG 75 0.375 935 6 - 2:3:4:5

EF-8 SP-80-VG 75 0.375 935 6 - 2:3:4:5

EF-9 SP-80-VG 75 0.375 935 6 - 2:3:4:5

EF-10 SP-A390-VG 110 0.5 1,274 1/15 5.2 2:3:4:5

EF-11 G-095-VG 450 0.3 1,174 1/6 5.4 1:3:4:5:6

EF-12 G-090-VG 300 0.3 1,135 1/10 4.7 1:3:4:5:6

EF-13 CSP-A510-VG 375 0.5 1,217 92W 1.1 2:3:4:5

EF-14 SP-A390-VG 225 0.5 1,274 1/15 5.2 2:3:4:5

EF-15 SP-80-VG 65 0.5 935 - 0.5 2:3:4:5

EF-16 SP-80-VG 75 0.375 935 6 - 2:3:4:5

EF-17 SP-80-VG 75 0.375 935 6 - 2:3:4:5

EF-18 SP-80-VG 75 0.375 935 6 - 2:3:4:5

EF-19 CSP-A510-VG 500 0.5 500 156W 1.4 2:3:4:5

EF-20 SP-80-VG 75 0.375 935 80W 0.5 2:3:4:5

EF-21 SP-A390-VG 150 0.5 1,222 29W 4.0 2:3:4:5

EF-22 SP-80-VG 75 0.375 768 80W 1.0 2:3:4:5

EF-23 SP-80-VG 75 0.375 768 80W 1.0 2:3:4:5

EF-24 SP-80-VG 75 0.375 768 80W 1.0 2:3:4:5

EF-25 SP-80-VG 75 0.375 768 80W 1.0 2:3:4:5

EF-26 SP-80-VG 75 0.375 768 80W 1.0 2:3:4:5

EF-27 SP-80-VG 40 0.5 935 6W 0.3 2:3:4:5

EF-28 SP-A390-VG 225 0.5 1,274 1/15 5.2 2:3:4:5

KEF-1 CUE-240-VG 6,200 0.5 809 2 17.1 4:8

KSF-1 SAF-112 2,480 0.5 779 3/4 15.2 4:7

KSF-2 SAF-112 2,480 0.5 779 3/4 15.2 4:7

DUCTLESS FAN COIL UNITS

TAG

CARRIER MODEL

NUMBER

TOTAL COOLING MBH SENSIBLE COOLING

CAPACITY (MBH)

TOTAL

SUPPLY CFM

HEATING CAPACITY MBH APPROX. E.S.P.

(IN.W.G.)

BLOWER

MOTOR WATTS

NOTES

RATED MIN. RATED MIN

DFCU-1 40MBCQ48 48 9.0 38.4 1175 50.0 10.0 - 270 1:2:3:4

DFCU-2 40MHHC12 12 4.8 9 305 - - - 20 2:3:4:5:6

DFCU-3 40MHHC12 12 4.8 9 305 - - - 20 2:3:4:5:6

DUCTLESS CONDENSING UNITS/HEAT PUMPS

TAG

CARRIER MODEL

NUMBER

TOTAL COOLING MBH HEATING CAPACITY MBH MINIMUM AMBIENT

COOLING TEMP. °F

NOTES

RATED MIN. RATED MIN.

DOU-1 38MBRQ48 48 9.0 50.0 10.0 40 1:2:3:4:5:6:7

DCU-2 38MHRBC12 12 4.8 - - 40 1:2:3:4:5:6:7:8

DCU-3 38MHRBC12 12 4.8 - - 40 1:2:3:4:5:7:8:9

ROOFTOP/PACKAGED UNITS

TAG

CARRIER

MODEL

NUMBER

TOTAL

COOLING MBH

SENSIBLE

COOLING MBH

TOTAL

SUPPLY CFM

O.A. CFM

HEATING

OUTPUT MBH

AUX. HEAT KW

APPROX.

E.S.P.

(IN.W.G.)

MINUMUM STAGES

COOLING ENTERING

CONDITIONS

MINIMUM

AMBIENT

COOLING TEMP

NOTES

COOLING HEATING E.A.T. D.B. °F E.A.T. W.B. °F

RTU-1 50GCQM04 33.8 26.9 1,200 150 24.1 8.1 0.5 2 2 77.6 64.2 40 1:2:3:4:5:6:7:8:9:10:11:12:14

RTU-2 50GCQM04 33.8 26.9 1,200 150 24.1 8.1 0.5 2 2 77.6 64.2 40 1:2:3:4:5:6:7:8:9:10:11:12:14

RTU-3 50GCQM05 45.2 35.8 1600 150 28.7 12.0 0.5 2 2 77.0 63.6 40 1:2:3:4:5:6:7:8:9:10:11:12:14

RTU-4 50GCQM05 45.2 35.8 1600 150 28.7 12.0 0.5 2 2 77.0 63.6 40 1:2:3:4:5:6:7:8:9:10:11:12:14

RTU-6 50GCQM04 33.8 26.9 1200 150 24.1 8.1 0.5 2 2 77.6 64.2 40 1:2:3:4:5:6:7:8:9:10:11:12:14

RTU-7 50GCQM36 33.8 26.9 1,200 150 24.1 8.1 0.5 2 2 77.6 64.2 40 1:2:3:4:5:6:7:8:9:10:11:12:14

RTU-8 50GCQM04 33.8 26.9 1200 150 24.1 8.1 0.5 2 2 77.6 64.2 40 1:2:3:4:5:6:7:8:9:10:11:12:14

RTU-9 50GCQM04 33.8 26.9 1200 150 24.1 8.1 0.5 2 2 77.6 64.2 40 1:2:3:4:5:6:7:8:9:10:11:12:14

RTU-10 50GCQM04 33.8 26.9 1200 150 24.1 8.1 0.5 2 2 77.6 64.2 40 1:2:3:4:5:6:7:8:9:10:11:12:14

RTU-11 50GCQM05 45.2 35.8 1600…

This is the start of the file's text. The full file is on GovTribe.

Other files

File Type Posted
Bid Invitation —
Addendum 1 —
Addendum 4 —
Award Information —
Addendum 3 —
Addendum 2 —

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file