About this file
This document is a detailed network infrastructure design and installation specification for a multi-room telecommunications infrastructure upgrade. The project involves installing new conduit pathways, cable trays, and network equipment across multiple rooms (RM 306-323), with specific requirements for network segregation and security. Key technical specifications include installing (4) 3-inch EMT conduits between cable trays in rooms 316 and 317, removing existing waveguide cabling, and implementing new grounding and bonding infrastructure in accordance with TIA-607D standards.
The design supports multiple network classifications including NIPR (Unclassified), SIPRNET, DREN, JWICS, and Army High-Side networks, with dedicated equipment and patch panels for each network type. The infrastructure includes Catalyst 3550 switches, WS-X 6408A modules, KG175 encryption devices, and requires specific cabling management such as maintaining 6-inch separation between different network type conduits and cables. The project involves both retaining existing infrastructure and adding new horizontal cable management, patch panels, and network connectivity across the specified rooms.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. Clouded drop locations require new conduit stubs.
2. All drop locations will be marked by the customer prior to construction
3. Each triangle represents (2) Cat6 channels
4. All locations will use six position faceplates, blank plugs required for all unused ports.
RM 316
RM 317
RM 318 RM 320
RM 322
RM 323
RM 306
This room is located 40' south of room 316, cable trays are available
Existing unused conduit stub retained for future use
WG
WG
WG
WG
WG
WG
WG
WG
WG
WG
WG
WG
WG
WG
WG
WG
WG
WG
W G
W G
W G
W G
W G
W G
RM 316
RM 317
RM 318
RM 320
RM 322
RM 323
WG
WG
WG
1. Install (4) 3inch EMT conduits between the cable trays located in room 316 and room 317. The pathway must be continuous as it transitions across the hallway, couplers, splices, or pull boxes are not authorize. All conduits must be bonded to the cable tray using bonding bushings. See detail.
2. Remove all cabling from existing wave guide, spray foam all penetrations and reinstall covers on both sides of wall.
TR313
TGB
21 43 65 21 43 65
21 43 65 21 43 65 21 43 65
21 43 65 21 43 65 21 43 65
21 43 65 21 43 65 21 43 65
C1
21 43 65
21 43 65 21 43 65
21 43 65 21 43 65 21 43 65
21 43 65 21 43 65 21 43 65
21 43 65 21 43 65 21 43 65
21 43 65
21 43 65 21 43 65
21 43 65 21 43 65 21 43 65
21 43 65 21 43 65 21 43 65
21 43 65 21 43 65 21 43 65
21 43 65
21 43 65 21 43 65
21 43 65 21 43 65 21 43 65
21 43 65 21 43 65 21 43 65
21 43 65 21 43 65 21 43 65
21 43 65
21 43 65 21 43 65 21 43 65
21 43 65 21 43 65 21 43 65
C2 C3 C4 C5 C6
NIPR
Equipment
Secret Infrastructure
Unclassified Infrastructure
SIPRNET
DREN
Equipment
TS SCI
Infrastructure
JWICS
Equipment
PDAS & Army High-Side Network
Equipment/ Infrastructure
C7
WS-X 6408A
S TATU S
8 POR T GIGAB IT ETHE RNE T
LIN K
LINK
LINK
LIN K
LINK LINK
LIN K LINK
85 7
SYS TEM
R PS
STA TUS
UT IL
D UPLE X
S PEED
MO DE
1X
2X
15 X
16 X
15 161 2 3 4 5 6 7 8 9 10 11 12 13 14 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32
17X
18X
31X
32X
33X
34X
47 X
48 X
33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48
Catalyst 3550
WS-X 6408A
S TATU S
8 POR T GIGAB IT ETHE RNE T
LIN K
LINK
LINK
LIN K
LINK LINK
LIN K LINK
85 7
SYS TEM
R PS
STA TUS
UT IL
D UPLE X
S PEED
MODE
1X
2X
15 X
16 X
15 161 2 3 4 5 6 7 8 9 10 11 12 13 14 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32
17X
18X
31X
32X
33X
34X
47 X
48 X
33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48
Catalyst 3550
WS-X 6408A
S TATU S
8 POR T GIGAB IT ETHE RNE T
LIN K
LINK
LINK
LIN K
LINK LINK
LIN K LINK
85 7
SYS TEM
R PS
STA TUS
UT IL
D UPLE X
S PEED
MODE
1X
2X
15 X
16 X
15 161 2 3 4 5 6 7 8 9 10 11 12 13 14 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32
17X
18X
31X
32X
33X
34X
47 X
48 X
33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48
Catalyst 3550
WS-X 6408A
S TATU S
8 POR T GIGAB IT ETHE RNE T
LIN K
LINK
LINK
LIN K
LINK LINK
LIN K LINK
85 7
SYS TEM
R PS
STA TUS
UT IL
D UPLE X
S PEED
MODE
1X
2X
15 X
16 X
15 161 2 3 4 5 6 7 8 9 10 11 12 13 14 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32
17X
18X
31X
32X
33X
34X
47 X
48 X
33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48
Catalyst 3550
WS-X 6408A
S TATU S
8 POR T GIGAB IT ETHE RNE T
LIN K
LINK
LINK
LIN K
LINK LINK
LIN K LINK
85 7
SYS TEM
R PS
STA TUS
UT IL
DU PLE X
S PEED
MO DE
1X
2X
15X
16X
15 161 2 3 4 5 6 7 8 9 10 11 12 13 14 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32
17 X
18 X
31 X
32 X
33X
34X
47 X
48 X
33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48
Catalyst 3550
WS-X 6408A
S TATU S
8 POR T G IG AB IT ETHE RNE T
LIN K
LINK
LINK
LIN K
LINK LINK
LIN K LINK
85 7
SYS TEM
R PS
STA TUS
UT IL
D UPLE X
S PEED
MO DE
1X
2X
15 X
16 X
15 161 2 3 4 5 6 7 8 9 10 11 12 13 14 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32
17X
18X
31X
32X
33X
34X
47 X
48 X
33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48
Catalyst 3550
WS-X 6408A
S TATU S
8 POR T G IG AB IT ETHE RNE T
LIN K
LINK
LINK
LIN K
LINK LINK
LIN K LINK
85 7
SYS TEM
R PS
STA TUS
UT IL
D UPLE X
S PEED
MO DE
1X
2X
15 X
16 X
15 161 2 3 4 5 6 7 8 9 10 11 12 13 14 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32
17X
18X
31X
32X
33X
34X
47 X
48 X
33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48
Catalyst 3550
KG175
KG175
KG175
KG175
KG175
21 43 65 21 43 65
21 43 65 21 43 65 21 43 65
21 43 65 21 43 65 21 43 65
21 43 65 21 43 65 21 43 65
21 43 65
6 9 11 13
A
A
B
C
D
E
F
A: GFGI NIPR Switches B: GFGI SIPR Equipment C: GFGI DREN Equipment D: GFGI JWICS Equipment E: GFGI PDAS Equipment F: GFGI Army High- Side Network Equipment G: Existing Cable Trays
1. (E) 100PR Cat3 voice riser from B48 MTR, to remain.
2. (E) Cat6 voice drops, Unused drops removed by contractor field verify with NEC TPOC.
3. (N) Horizontal cable management (10) 1U & (30) 2U required for project
4. (E) 12 single mode riser from MTR, contractor to add 12 additional strands of OS2
5. (N) 25Pr Cat3 riser from (E) Cross connect field, terminated on RJ45 patch panel
6. (E) Unclassified OM2 “Green” drops, to remain
7. (E) Cat6 UTP patch panels Unused drops removed by contractor field verify with NEC TPOC.
8. (N) Cat6 STP patch panels, quantity as needed
9. (E) Secret OM2 “red” drops, to remain
10. (N) Cat6 STP patch panels, quantity as needed
11. (E) TS SCI OM2 “Yellow” drops, to remain
12. (N) Cat6 STP patch panels, quantity as needed
13. (E) SAP OM2 “violet” drops, to remain
14. (N) Cat6 STP patch panels, quantity as needed
15. (N) Cat6 STP patch panels, quantity as needed
G
G
G
21 43 65
21 43 65 21 43 65 21 43 65
21 43 65 21 43 65 21 43 65
(E) CABLE TRAY (E) CABLE TRAY
CABLE TRAY WALL PENETRATION DETAIL(TYPICAL)
(E) WAVE GUIDE, RE-INSTALL FRONT
COVER OR PROVIDE NEW IF MISSING.
(E) CEILING GRID (E) CEILING GRID
(N) #6 Green THHN BOND BETWEEN
WAVEGUIDE AND CABLE TRAY
(N) #4 Green THHN BOND BETWEEN
ALL CABLE TRAY SECTIONS
(N) CAT6 STP
12" 12"
CABLE TRAY CROSS SECTION (TYPICAL)
UNCLASS STP AND FIBERSIPRNET STP AND FIBERSAP & JWICS STP AND FIBER
MAINTAIN 6" OF SEPERATION
6" 6"
(N) 3" conduit with bonding bushings on both ends for SAP
(N) 3" conduit with bonding bushings on both ends for SIPRNET
(N) 3" conduit with bonding bushings on both ends for JWICS
(N) 3" conduit with bonding bushings on both ends for NIPR
#4 Green THHN bond between cable trays and all conduits
(N) Conduit between room 316 and 317 cross section Minimum 6" separation between all conduits.
3" pathways
3" pathways
All pathways and cable distribution must be staggered to provide a minimum of 6" of separation
TGB
TGB
TMGB
MDP/
ESS
TR313
TR213
TR113
New grounding and bonding IAW TIA-607D
| Page-1� |
| Page-2� |
| Page-3� |
File details come from the government source that posted it. Updated .