These are architectural and engineering construction documents for a Sterile Processing Services (SPS) Equipment Site Preparation project at the Durham VA Medical Center. The project involves replacing existing medical equipment with new Getinge brand equipment, including three Sonic Cleaners, two Instrument Washers, one Cart Washer, and three Steam Sterilizers. The comprehensive set of drawings covers architectural, plumbing, mechanical, and electrical work required to prepare the 2nd floor SPS department for new equipment installation.
The project is structured with two primary bid items: Item 0001 covers removing and preparing the site for new equipment for most devices, while Item 0002 specifically addresses the removal and site preparation for three Steam Sterilizers. The construction documents specify detailed requirements for equipment replacement, utility connections, phasing, and adherence to various codes and standards, including NFPA, NEC, and VA construction guidelines. The project has a 545-day performance period and requires careful coordination to minimize disruption to the 24/7 SPS department operations, with a requirement to maintain at least two pieces of similar equipment operational throughout the project.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C24625B0024 0003.docx | DOCX document | |
| 36C24625B0024 0002.docx | DOCX document | |
| 36C24625B0024 0001.docx | DOCX document | |
| Contractor Invoice Form.pdf | ||
| 36C24625B0024_2.docx | DOCX document | |
| Specifications Rev. 05.07.25 Install SPS Site Prep 558-23-300 Durham.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
FULLY SPRINKLERED
Department of Veterans Affairs Medical Center
ABOVE GROUP, INC.
MECHANICAL ELECTRICAL PLUMBING
305 EAST DRIVE, SUITE H
MELBOURNE, FL 32904
321.345.9026 P
305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
VA Project No.
AG Project No.
A u to d e s k D o c s /V
A M
C
D u rh a m
/0
D u rh a m V
A I n s ta ll S
P S
E q u im e n t_
R
M
E P
.r v t
/7
/2
:1
:2
A M
GI001
VA COVER SHEET INSTALL SPS EQUIPMENT
Durham VA
0124042
05/07/2025 JMC AJZ
CONSTRUCTION DOCUMENTS
JOSHUA CALHOUN, P.E.
PA License #PE093054
INSTALL SPS EQUIPMENT
VAMC - DURHAM 508 FULTON STREET DURHAM, NC 27705 PROJECT #: 558-23-300
558-23-300
SHEET LIST
SHEET NUMBER SHEET NAME
GENERAL
GI001 VA COVER SHEET
GI002 GENERAL NOTES AND PHASING
ARCHITECTURAL
AG-001 2nd FLOOR - ICRA PLAN
AG-002 2ND FLOOR - ICRA ASSESSMENT NOTES
AD-101 2nd FLOOR - SELECTIVE REMOVAL PLAN
A-101 2nd FLOOR - NEW WORK PLAN
PLUMBING
P-001 PLUMBING NOTES, LEGENDS, & SYMBOLS
PD101 SECOND FLOOR PLAN - PLUMBING PIPING - DEMOLITION
PP101 SECOND FLOOR PLAN - PLUMBING PIPING - NEW WORK
P-501 PLUMBING DETAILS
P-801 PLUMBING SCHEDULES
MECHANICAL
M-001 MECHANICAL NOTES, LEGENDS, & SYMBOLS
MD101 SECOND FLOOR PLAN - MECHANICAL - DEMOLITION
MH101 SECOND FLOOR PLAN - MECHANICAL - NEW WORK
M-501 MECHANICAL DETAILS
M-801 MECHANICAL SCHEDULES
ELECTRICAL
E-001 ELECTRICAL LEGENDS & SYMBOLS
ED102 SECOND FLOOR PLAN - ELECTRICAL EQUIPMENT - DEMO
EP101 SECOND FLOOR PLAN - ELECTRICAL EQUIP - NEW WORK
E-501 ELECTRICAL DETAILS
E-601 ELECTRICAL DIAGRAMS
TOTAL SHEET COUNT : 21
PROJECT LOCATION
© Google Maps
NN
DELTA ENGINEERS,
ARCHITECTS, & SURVEYORS
ARCHITECT
8401 CONNETICUT AVE, SUITE 350
CHEVY CHASE, MD 20815
301.718.0080 P
CT CONSULTANTS
HAZMAT
44265 PLYMOUTH OAKS BLVD.
PLYMOUTH, MI 48170
734.455.8600 P
O'CONNOR CONSTRUCTION
MANAGEMENT INC, OCMI
COST ESTIMATING
2015 AYRSLEY TOWN BLVD., SUITE 202
CHARLOTTE, NC 28273
704.280.8356 P
Revisions Date
STAMP
OFFICE
D2009
WORK RM
D2006
HAC
D2008
TOILET
D2006A
CORRIDOR
LOCKER RM
D2010J
MENS
D2010K
ANTE RM
D2010G
LOCKER RM
D2010A
WOMENS
D2010B
SURGICAL SUPPLY AND CART STORAGE
C2015
ELECTRICAL CLOSET
C2023
CORRIDOR
TELEPHONE CLOSET
C2005B
OFFICE
C2005A
LINEN/TRASH CHUTE
C2007
CORRIDOR
ELEVATOR
CORRIDOR
C2010CLEAN RECEIVING AND BREAKOUT
C2000
DUMBWAITER
ANTE RM
C2004
SPD CLEAN STORAGE
C2002
EQUIP STORAGE AND TESTING
C2002D
DUMBWAITER
CART WASH
MANUAL CART WASH
C2002A
SPD CART WASH AREA
D2010
STORAGE
C2002A
ETO STERILIZER
HAC
C2002B
HAC
D2010DSCOPE STORAGE
C2002C
DUMBWAITER
SPD SOIL RECEIVING AND DECONTAMINATION
D2010E
CART/EQUIP ANTE RM
D2010C
WATER TREATMENT
D2010F
STAIR
D2014A
MECHANICAL CHASE
SPD STORAGE
C2005
OFFICE/LAB
C2009
ICRA ZONE PHASE 1
APPROX 490 SQ.FT
MAX VOLUME 4,410 CU.FT
6 AIR CHANGES: 440 CFM
PREPARATION ASSEMBLY AND STERILIZATION
D2014
PHASE PATTERN KEY EQUIPMENT
REPLACED
EQUIPMENT MODULE
LARGEST SIZE
(WxHxD IN)
AFFECTED ROOMS ROOM NUMBER
PHASING DIAGRAM TABLE
1 N/A
SURGICAL SUPPLY AND CART STORAGE
CORRIDOR
C2015 NORTH
NEAR ENTRANCE
UNOCCUPIED AREAS
N/A
2 CARTWASHER
SPD SOILED RECEIVING AND DECON
CARTWASHER CHAMBER
D2010E CARTWASH ENTRANCE
ALL
53x96x47
5A STERILIZER
PREPARATION ASSEMBLY AND STERILIZATION D2014
EQUIPMENT AREA35.5x78x64
5-B/C STERILIZERS EQUIPMENT AREA35.5x78x64
SPD SOILED RECEIVING AND DECON D2010E
PREPARATION ASSEMBLY AND STERILIZATION D2014
SPD SOILED RECEIVING AND DECON D2010E
3-A/B/C
INSTRUMENT
WASHERS
EQUIPMENT AREA44x39x73
PREPARATION ASSEMBLY AND STERILIZATION D2014
SPD SOILED RECEIVING AND DECON D2010E
SONIC
CLEANERS
EQUIPMENT AREA24x50x65 SPD SOILED RECEIVING AND DECON D2010E
NOTES
1 2
1 3
1 4
1 5
1 6
1 7
BID ITEM
BASE BID
BASE BID
BASE BID
BASE BID
BASE BID
DEDUCT
ALTERNATE 1
OFFICE
D2009
WORK RM
D2006
HAC
D2008
TOILET
D2006A
CORRIDOR
LOCKER RM
D2010J
MENS
D2010K
ANTE RM
D2010G
LOCKER RM
D2010A
WOMENS
D2010B
SURGICAL SUPPLY AND CART STORAGE
C2015
ELECTRICAL CLOSET
C2023
CORRIDOR
TELEPHONE CLOSET
C2005B
OFFICE
C2005A
LINEN/TRASH CHUTE
C2007
CORRIDOR
ELEVATOR
CORRIDOR
C2010CLEAN RECEIVING AND BREAKOUT
C2000
DUMBWAITER
ANTE RM
C2004
SPD CLEAN STORAGE
C2002
EQUIP STORAGE AND TESTING
C2002D
DUMBWAITER
CART WASHMANUAL CART WASH
C2002A
SPD CART WASH AREA
D2010
STORAGE
C2002A
ETO STERILIZER
HAC
C2002B
HAC
D2010DSCOPE STORAGE
C2002C
DUMBWAITER
SPD SOIL RECEIVING AND DECONTAMINATION
D2010E
CART/EQUIP ANTE RM
D2010C
WATER TREATMENT
D2010F
PREPARATION ASSEMBLY AND STERILIZATION
D2014
STAIR
D2014A
MECHANICAL CHASE
SPD STORAGE
C2005
OFFICE/LAB
C2009
ICRA ZONE PHASE 2
APPROX 100 SQ.FT
MAX VOLUME 900 CU.FT
6 AIR CHANGES: 90 CFM
EACH BOUNDARY
7 OFFICE
D2009
WORK RM
D2006
HAC
D2008
TOILET
D2006A
CORRIDOR
LOCKER RM
D2010J
MENS
D2010K
ANTE RM
D2010G
LOCKER RM
D2010A
WOMENS
D2010B
SURGICAL SUPPLY AND CART STORAGE
C2015
ELECTRICAL CLOSET
C2023
CORRIDOR
TELEPHONE CLOSET
C2005B
OFFICE
C2005A
LINEN/TRASH CHUTE
C2007
CORRIDOR
ELEVATOR
CORRIDOR
C2010CLEAN RECEIVING AND BREAKOUT
C2000
DUMBWAITER
ANTE RM
C2004
SPD CLEAN STORAGE
C2002
EQUIP STORAGE AND TESTING
C2002D
DUMBWAITER
CART WASH
MANUAL CART WASH
C2002A
SPD CART WASH AREA
D2010
STORAGE
C2002A
ETO STERILIZER
HAC
C2002B
HAC
D2010DSCOPE STORAGE
C2002C
DUMBWAITER
SPD SOIL RECEIVING AND DECONTAMINATION
D2010E
CART/EQUIP ANTE RM
D2010C
WATER TREATMENT
D2010F
PREPARATION ASSEMBLY AND STERILIZATION
D2014
STAIR
D2014A
MECHANICAL CHASE
SPD STORAGE
C2005
OFFICE/LAB
C2009
ICRA ZONE PHASE 3
APPROX 100 SQ.FT
MAX VOLUME 900 CU.FT
6 AIR CHANGES: 90 CFM
EACH BOUNDARY
ICRA ZONE PHASE 3
APPROX 75 SQ.FT
MAX VOLUME 675 CU.FT
6 AIR CHANGES: 70 CFM
EACH BOUNDARY
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
VA Project No.
AG Project No.
A u to d e s k D o c s /V
A M
C
D u rh a m
/0
D u rh a m V
A I n s ta ll S
P S
E q u im e n t_
R
M
E P
.r v t
/7
/2
:1
:2
A M
GI002
GENERAL NOTES AND PHASING INSTALL SPS EQUIPMENT
Durham VA
0124042
05/07/2025 JMC AJZ
CONSTRUCTION DOCUMENTS
JOSHUA CALHOUN, P.E.
PA License #PE093054
558-23-300
1. THE DEPARTMENT OF VETERANS AFFAIRS PROJECT SCOPE INCLUDES REPLACING SPECIFIC STERILE PROCESSING EQUIPMENT WITHIN
THE EXISTING STERILE PROCESSING DEPARTMENT.
2. REFERENCE DEMOLITION PLAN FOR HORIZONTAL AND VERTICAL CONTROL.
3. THE CONTRACTOR SHALL MAINTAIN A CLEAN AND ORDERLY APPEARANCE IN ALL WORK AREAS. TRASH AND WASTE MATERIALS SHALL BE STORED IN APPROVED CONTAINERS AND ROUTINELY DISPOSED OF OFF-SITE. CLEANUP SHALL BE REQUIRED AT THE END OF EACH
DAY OR AS DIRECTED BY THE VA CONTRACTING OFFICERS REPRESENTATIVE “VA COR”.
4. THE GC'S SUPERINTENDENT, WHO IS APPRISED OF THE CONDITION AND PROGRESS OF ALL AREAS OF WORK ON SITE SHALL BE PRESENT AT ALL TIMES WHEN WORK IS BEING DONE. THIS PERSON SHALL BE ABLE TO SPEAK FOR AND ACT IN THE BEHALF OF THE CONTRACTOR. THEY SHALL BE AWARE AND KNOWLEDGEABLE OF ALL THE SAFETY CONCERNS ON THE JOB SITE. THEY SHALL BE EMPOWERED TO IMMEDIATELY AND EFFECTIVELY MITIGATE THE ACTIONS OF ANY WORKMAN ON SITE.
5. CONSTRUCTION OF THE PROJECT SHALL BE IN CONFORMANCE WITH ALL APPLICABLE VA, FEDERAL AND STATE REQUIREMENTS.
6. ALL TESTS, STUDIES, ETC., REQUIRED DURING CONSTRUCTION WILL BE CARRIED OUT BY A THIRD PARTY ENGINEERING FIRM AND PAID
FOR BY THE CONTRACTOR.
7. LIMITS OF DISTURBANCE ARE APPROXIMATE. ALL AREAS DISTURBED BY THE CONTRACTOR SHALL BE RESTORED. DISTURBED TURF
AREAS SHALL BE RESTORED.
8. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND COORDINATES AND REPORT ANY DISCREPANCIES TO THE VA COR PRIOR TO
ANY CONSTRUCTION.
9. PLANS SHOW FIXTURES “SIGNS, LIGHTS, ETC.” THAT ARE TO BE REMOVED AND REINSTALLED AFTER CONSTRUCTION OF UTILITIES.
CONTRACTOR SHALL:
A. DOCUMENT CONDITION OF FIXTURES PRIOR TO REMOVAL.
B. REMOVE ALL FIXTURES USING METHODS THAT DO NOT CAUSE DAMAGE.
C. STORE THE FIXTURES IN A VA COR APPROVED LOCATION UNTIL REINSTALLMENT
D. PROTECT ALL STORED FIXTURES FROM DAMAGE
PRICING NOTES:
GENERAL NOTES:
CONSTRUCTION NOTES:
1. REFERENCE DIVISION 1 SPECIFICATIONS FOR A COMPREHENSIVE LIST OF REQUIREMENTS. CONTRACTOR SHALL PROVIDE
ALTERNATE PRICING AS FOLLOWS:
A. ITEM I, BASE BID : WORK INCLUDES GENERAL CONSTRUCTION, ALTERATIONS, AND NECESSARY REMOVAL OF EXISTING
COMPONENTS. WORK SHALL INCLUDE THE PHASED DEMOLITION OF THE EXISTING SPS EQUIPMENT, PREPARATION OF UTILITIES, AND MODIFICATIONS TO EXISTING WALLS AND WINDOWS AS REQUIRED AND SHOWN ON THE CONSTRUCTION DOCUMENTS.
CONTRACTOR IS TO PROVIDE THEIR BID IN ACCORDANCE WITH THE FOLLOWING INSTRUCTIONS:
1. CONTRACTOR SHALL INCLUDE THE EFFORT REQUIRED TO MANAGE THE COORDINATION WITH THE MEDICAL EQUIPMENT
MANUFACTURER TO DETERMINE THE PHASING, SHUTDOWN, DEMOLITION, INSTALLATION, AND COMPLETION OF EACH PHASE.
2. BASE BID: THE PHASING, DEMOLITION, AND RETROFIT WORK TO REMOVE ALL OF THE EQUIPMENT SHOWN ON THE PLANS AND
PREPARE FOR TEH EQUIPMENT MANUFACTURER TO INSTALL THE NEW EQUIPMENT.
3. ALTERNATE NO.1: BASE BID EXCEPT EXCLUDE THE WORK SHOWN FOR THE STERILIZERS, LISTED AS PHASES 5A AND 5-B/C ON
THE CONSTRUCTION DOCUMENTS
2. NEW MEDICAL / STERILE PROCESSING EQUIPMENT IS OWNER FURNISHED, ASSEMBLED AND INSTALLED BY MANUFACTURER.
CONTRACTORS SCOPE INCLUDES MODIFICATIONS TO UTILITIES AND ROOMS AS REQUIRED TO REPLACE EQUIPMENT AS SHOWN ON
THE CONSTRUCTION DOCUMENTS.
3. CONTRACTOR SHALL INCLUDE EFFORT TO MOCKUP INSTALLATION AND CONNECTIONS FOR REPLACED EQUIPMENT TO VERIFY ALL WORK PRIOR TO TAKING ANY PIECE OF EQUIPMENT OFFLINE. REWORK REQUIRED TO MODIFY UTILITIES, WALLS, OR OTHER APPURTENANCES THAT SUPPORT THE EQUIPMENT AFTER DEMOLITION HAS STARTED THAT DELAYS THE SCHEDULE OR INCREASES
THE TIME EQUIPMENT IS UNAVAILABLE TO THE USERS ARE UNACCEPTABLE.
4. CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATION WITH THE EQUIPMENT MANUFACTURER TO ESTABLISH THE PHASED INSTALLATION OF THE NEW EQUIPMENT. CONTRACTOR SHALL ALSO BE RESPONSIBLE FOR THE REMOVAL OF CONSTRUCTION BARRIERS ONCE THE EQUIPMENT MANUFACTURER HAS COMPLETED ALL NECESSARY INSTALLATION TESTS FOR EACH PIECE OF
EQUIPMENT.
* PLEASE NOTE THAT THE TERM PROJECT ENGINEER REFERS TO THE CONTRACTING OFFICER'S REPRESENTATIVE (C.O.R.).
1. ALL WORK SHALL COMPLY WITH THE LATEST NFPA 101 LIFE SAFETY CODE, INTERNATIONAL BUILDING CODE, AND OTHER CODES AS IDENTIFIED IN VHA PROGRAM GUIDE PG-18-3, TOPIC 01, CODES, STANDARDS AND EXECUTIVE ORDERS WHICH CAN BE FOUND ON
THE DEPARTMENT OF VETERAN AFFAIRS, TECHNICAL INFORMATION LIBRARY WEBSITE.
2. ALL WORK SHALL COMPLY WITH REQUIREMENTS OF THE LATEST ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARD (ABAAS) AND DEPARTMENT OF VETERANS AFFAIRS BARRIER FREE DESIGN GUIDE PG-18-13 WHICH CAN BE FOUND ON THE
DEPARTMENT OF VETERANS AFFAIRS TECHNICAL INFORMATION LIBRARY WEBSITE.
3. CONTRACTOR IS RESPONSIBLE TO VISIT THE SITE, EXAMINE AND ACCEPT EXISTING CONDITIONS PRIOR TO BIDDING. SITE VISITS
TO BE COORDINATED WITH THE CONTRACTING OFFICER'S REPRESENTATIVE.
4. CONTRACTOR IS RESPONSIBLE TO REPAIR AND/OR REFINISH, TO MATCH ADJACENT EXISTING SURFACES, ANY EXISTING MATERIALS TO REMAIN THAT ARE DAMAGED DURING THE COURSE OF DEMOLITION OR NEW WORK.
5. WHERE REMOVAL OF EXISTING WORK IS REQUIRED FOR INSTALLATION OF NEW WORK, CONTRACTOR SHALL REPAIR EXISTING CONSTRUCTION TO REMAIN OR PROVIDE NEW CONSTRUCTION TO MATCH EXISTING ADJACENT SURFACES TO REMAIN.
6. CONTRACTOR IS RESPONSIBLE TO FIELD VERIFY ALL CONDITIONS AND DIMENSIONS PRIOR TO ORDERING, FABRICATING OR
INSTALLING NEW MATERIALS.
7. CONTRACTOR IS RESPONSIBLE TO VERIFY SIZES OF ALL EQUIPMENT, ETC. TO BE INSTALLED AS PART OF THIS PROJECT, AND WHERE NECESSARY, MAKE SPECIAL PROVISIONS TO INSTALL EQUIPMENT THAT IS TOO LARGE TO FIT THROUGH FINISHED
OPENINGS.
8. CONTRACTOR SHALL PROVIDE WOOD BLOCKING AT TOILET ACCESSORIES, HAND RAILS, BUMPER RAILS, SHELVING, CASEWORK, MOUNTING BRACKETS AND OTHER WALL MOUNTED ITEMS, AS INDICATED IN THE CONTRACT DOCUMENTS AND AS RECOMMENDED
BY PRODUCT MANUFACTURERS. ALL WOOD BLOCKING SHALL BE FIRE RETARDANT TREATED.
9. ALL EXPOSED NEW WORK IS TO RECEIVE NEW FINISHES UNLESS SPECIFICALLY NOTED OTHERWISE. IF NO FINISH IS INDICATED AT A PARTICULAR SURFACE, CONTRACTOR SHALL PROVIDE FINISH(S) AS INDICATED AT SIMILAR CONDITIONS.
10. CONTRACTOR SHALL PROVIDE COMPLETE AND FULLY OPERATIONAL SYSTEMS WHICH COMPLY WITH STATED CODES AND REGULATIONS. WHERE THE OMISSION OF A PART OR ELEMENT OF A SYSTEM WOULD RESULT IN THE NON-OPERATION, OR INCORRECT OPERATION OF A SYSTEM, CONTRACTOR SHALL INCLUDE SAID PART OR ELEMENT AS PART OF THE WORK.
11. ALL PENETRATIONS THROUGH NEW AND/OR EXISTING SMOKE OR FIRE RATED WALLS SHALL BE SMOKE/FIRE STOPPED AS
REQUIRED BY THE RATING OF THE WALL.
12. FIRE PROTECTION CONTRACTOR'S SPRINKLER DESIGN WILL BE SUBJECT TO AN INDEPENDENT REVIEW BY A CERTIFIED FIRE PROTECTION ENGINEER RETAINED BY THE OWNER. THE FIRE PROTECTION CONTRACTOR IS RESPONSIBLE FOR MAKING ANY REQUIRED CHANGES TO THE DESIGN AS IDENTIFIED BY THE OWNER'S FIRE PROTECTION ENGINEER AS NECESSARY FOR
COMPLIANCE WITH SPECIFIED NFPA REQUIREMENTS.
1/16" = 1'-0"
SPS EQUIPMENT REPLACEMENT - PHASE 1 AND 2
PHASING CODED NOTES:
APPROXIMATE BOUNDARY LIMITS FOR CONSTRUCTION BOUNDARIES PER PHASE. VERIFY CONSTRUCTION BARRIER WITH CONTRACTING OFFICER REPRESENTATIVE PRIOR TO THE START OF DEMOLITION EACH PHASE. PROVIDE ANTEROOMS AS REQUIRED BY ICRA PLAN.
ACCESS PATH FOR EQUIPMENT REPLACEMENT TO BE CONSTRUCTED PRIOR TO THE DEMOLITION OF ANY MEDICAL OR STERILE PROCESSING EQUIPMENT, OR SHUTOFF OF ANY UTILITIES THAT SERVE THE STERILE PROCESSING SERVICES AREA.
VERIFY THAT CONSTRUCTION BARRIER CAN ACCOMMODATE TURNING RADIUS REQUIRED FOR LARGEST MODULE OF EQUIPMENT BEING REPLACED. ATTEMPT TO MINIMIZE ADDITIONAL SPACE REQUIRED FOR CONSTRUCTION BARRIER TO MINIMIZE IMPACT TO OCCUPIED
SPACE.
STERILIZER IN OPEN AREA IS TO BE REPLACED PRIOR TO THE WALL RECESSED UNITS. LIMIT CONSTRUCTION BARRIERS TO ALLOW STAFF ACCESS TO REMAINING EXISTING STERILIZERS.
WALL RECESSED STERILIZERS ARE TO BE REPLACED ONE AT A TIME, WITH CONSTRUCTION BARRIERS INSTALLED TO ALLOW VA STAFF TO ACCESS TO AT LEAST TWO (2) OPERATIONAL STERILIZERS AT ALL TIMES. EQUIPMENT IS TO BE REPLACED FROM THE SOILED RECEIVING ROOM AS MUCH AS PRACTICAL AND CONSTRUCTION BARRIERS ARE TO BE MINIMIZED ON PREPARATION ASSEMBLY SIDE.
INSTRUMENT WASHERS ARE TO BE REPLACED ONE AT A TIME, WITH CONSTRUCTION BARRIERS INSTALLED TO ALLOW VA STAFF TO ACCESS TO AT LEAST TWO (2) OPERATIONAL WASHERS AT ALL TIMES. EQUIPMENT IS TO BE REPLACED FROM THE SOILED RECEIVING ROOM AS MUCH AS PRACTICAL AND CONSTRUCTION BARRIERS ARE TO BE MINIMIZED ON PREPARATION ASSEMBLY SIDE. MAINTAIN A CLEAR ACCESS PATH TO INSTRUMENT WASHERS BEHIND CONSTRUCTION BARRIERS FOR FACILITY STAFF ACCESS.
PHASE SONIC CLEANER REPLACEMENT SO THAT FACILITY STAFF CAN ACCESS AT LEAST 2 OPERATIONAL UNITS AT ANY TIME.
FOR EXHAUST AIR FROM ICRA BARRIER, DISCHARGE AIR FROM NEGATIVE PRESSURE MACHINE TO BUILDING EXTERIOR. PROVIDE NEW METAL PANEL SYSTEM, AMERICLAD SYSTEM AC-3000 OR EQUAL, AND SEAL AROUND DUCTWORK PENETRATION. DO NOT FASTEN PANEL SYSTEM THAT SEALS AROUND DUCTWORK TO WINDOW FRAME THAT CREATES PERMANENT DAMAGE TO FENESTRATION SYSTEM. TERMINATE DUCTWORK AT 45° CUT TO PREVENT WATER INTRUSION THROUGH WINDOW OR INTO DUCT. REPLACE METAL PANEL WITH GLAZING MATHCING EXISTING CONDITIONS UNLESS INSTRUCTED OTHERWISE BY VA REPRESENTATIVE. SEE MH101 FOR MORE INFORMATION.
1/16" = 1'-0"2
SPS EQUIPMENT REPLACEMENT - PHASE 5 - STERILIZERS
1/16" = 1'-0"3
SPS EQUIPMENT REPLACEMENT - PHASE 3/4 - INSTRUMENT WASHERS AND SONIC CLEANERS
N 0 8' 16' 32' 48'
1/16" = 1'-0"
Revisions Date
CONSTRUCTION PHASING GENERAL NOTES:
1. PHASING DIAGRAM SHOWN REPRESENTS A SINGLE OPTION FOR THE CONSTRUCTION, OTHER OPTIONS OR SOLUTIONS MAY BE ACCEPTABLE BY THE RESPONSIBLE DESIGNERS AND VA IF PROPOSED BY THE CONTRACTOR. EACH PHASE SHALL BE INDEPENDENT OF ALL OTHERS AND NOT ASSUMED TO BE SEQUENTIAL UNLESS THE VA PROVIDES PRIOR APPROVAL. CONTRACTOR SHALL COORDINATE WITH THE VA AND EQUIPMENT MANUFACTURER RESPONSIBLE FOR THE FINAL EQUIPMENT INSTALLATION PRIOR TO THE START OF WORK
OF EACH PHASE.
2. WHERE MULTIPLE PIECES OF SIMILAR EQUIPMENT ARE BEING REPLACED, CONTRACTOR SHALL TAKE EVERY EFFORT AND PRECAUTION TO KEEP AT LEAST TWO (2) OF THE EQUIPMENT INSTANCES OPERATIONAL AND ACCESSIBLE TO VA STAFF AT ALL TIMES.
3. CONSTRUCTION PHASING SHALL BE COORDINATED WITH VA REPRESENTATIVES PRIOR TO THE START OF CONSTRUCTION. ASSUME AT MINIMUM A 2 WEEK PERIOD IS REQUIRED TO COORDINATE ALL CONSTRUCTION PHASING PRIOR TO THE START OF WORK.
4. CONTRACTOR SHALL ASSUME MULTIPLE SHUTDOWNS ARE REQUIRED, MULTIPLE CONSTRUCTION PHASES ARE REQUIRED, AND WORK IS TO BE PERFORMED ON NIGHTS AND WEEKENDS. NO ADDITIONAL FUNDS SHALL BE ALLOTTED FOR PHASING NOT PLANNED BY THE CONTRACTOR DURING THE ORIGINAL BIDDING PROCESS. AT THE CONVINIENCE OF THE VA, THE WORK MAY BE PERFORMED DURING REGULAR BUSINESS HOURS WITH EXPRESS APPROVAL BY THE FACILITY PRIOR TO THE START OF THE RESPECTIVE PHASE. IT IS NOT TO BE ASSUMED THAT ANY WORK MAY BE PERFORMED DURING REGULAR HOURS AS PART OF THE BASE SCOPE OF WORK.
A. CONTRACTOR TO ASSUME, AT MINIMUM, ONE SHUTDOWN PER PHASE GROUP INDICATED BELOW.
5. CONTRACTOR TO COORDINATE, DETERMINE ALLOWABLE SHUTDOWN PERIOD, AND RECEIVE WRITTEN APPROVAL FROM VA
REPRESENTATIVE FOR EACH PHASE AT A MINIMUM OF 24 HOURS PRIOR TO THE SHUTDOWN.
6. CONTRACTOR SHALL PROVIDE MOCKUPS OF NEW EQUIPMENT PRIOR TO THE INSTALLATION OF EACH EQUIPMENT TYPE TO VERIFY THAT ALL CONNECTIONS CAN BE MADE WITHOUT ALTERING OF BUILDING'S STRUCTURE OR MAIN UTILITIES. NO ADDITIONAL FUNDING OR CONSTRUCTION SCHEDULE WILL BE ALLOCATED FOR CONTRACTOR'S LACK OF PREPARATION FOR THE REPLACEMENT OF THE
EQUIPMENT.
7. CONTRACTOR SHALL PROVIDE TEST AND BALANCE MEASUREMENTS AND REPORT OF ALL INLETS AND OUTLETS FOR ALL ROOMS AFFECTED BY CONSTRUCTION PRIOR TO THE START OF DEMOLITION. CONTRACTOR SHALL VERIFY SPACE PRESSURIZATION AND AIRFLOWS IN EACH ROOM AFFECTED BY CONSTRUCTION BETWEEN EACH PHASE AS VENTILATION FOR CONSTRUCTION BARRIERS IS
ADJUSTED AND OR REMOVED FROM OPERATION.
E.C.R.C
TO BLDG. 23
C2000
D 2014
C2010
C2002
C2005
C2015
D 2010E
C2023
D2006A
D2006
D2007 D2005
D2002
D2003 D2001
D2004
C2002B
D2010
C2011
C2009
C2002A
C2004
C2005B
C2007
C2005A
C2002A
D2009
D2008D2010A
C2002D
D2010G
D2010J
D2010D
D 2010F
D 2010C
C2002C
D 2014A
D2010K
D2010B
TOILET
ELECTRICAL
STAIR-5
CLOSET
SPD CLEAN STORAGE
OFFICE
WORK RM
KEEPING
SPD STORAGE
CLOSET
OFFICE
OFFICE/LAB
OFFICE/LAB
LINEN /
HOUSE
STORAGE
LINEN CHUTE
STERILIZATION
ETO STERILIZER
DUMB WAITER
DUMB
WAITER
WASH
MANUAL
SPD CART
WASH AREA
SHAFT
AND DECONTAMINATION
BREAKOUT
FIRE CABINET
LINEN
ONC OFFICE
HEM /
ONC OFFICE
HEM /
ONC OFFICE
HEM /
ONC OFFICE
HEM /
ONC OFFICE
HEM /
ONC OFFICE
HEM /
CORRIDOR
CORRIDOR
ANTE RM
RECEIVING AND
TELEPHONE
TRASH CHUTE
CHUTE
STORAGE
GENERAL
CORRIDOR
CORRIDOR
CORRIDOR
HAC
CORRIDOR
RM
CART STORAGE
SURGICAL SUPPLY AND
WOMENS
EQUIP STORAGE
AND TESTING
ANTE RM
LOCKER RM
CORRIDOR
MENS
CLOSET CLOSET
KEEPING
HOUSE
CLEAN
DUMBWAITER
SPD SOILED RECEIVING
ETO #1 ETO #2 ETO #3 ETO #4
TREATMENT
WATER
ASSEMBLY AND
PREPARATION
EQUIP
CART/
ANTE RM
SCOPE
STORAGE
LOCKER
PROGRESS PRINT
NOT FOR CONSTRUCTION
PROGRESS PRINT
NOT FOR CONSTRUCTION
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
VA Project No.
AG Project No.
Email: mail@delta-eas.com www.delta-eas.com
8401 Connecticut Avenue, Suite 350 Chevy Chase, MD 20815
Tel: 301.718.0080 Fax: 301.718.9520
558-23-300
DURHAM VA
A u to d e s k D o c s
/V A
M C
D u rh a m
/2
.0
.0
-D u rh a m S
P S
-R
.r v t
/7
/2
:5
:2
P M
1/7/2025 6:51:20 PM1/7/2025 6:51:20 PM
AG-001
2nd FLOOR - ICRA PLAN INSTALL SPS EQUIPMENT 124042
01/07/2025 EJL LDM
100% CONSTRUCTION
DOCUMENTS
SCALE: 1/8" = 1'-0"AG-001
1 2nd FLOOR - ICRA PLAN
0'
SCALE: 1/8" = 1'-0"
2' 4' 16'8'
NORTH
NOTE:
1. THIS ICRA PLAN IS SHOWING A PROPOSED PHASING PLAN. COORDINATE PROJECT PHASING WITH MEP DRAWINGS.
PHASING TO BE FURTHER DEVELOPED AT THE NEXT MEETING.
2. REINSTALLATION OF ACP CEILING IN FIELD WITH MECHANICAL DRAWINGS. INSTALL AND REPLACE CEILING TILES AS
REQUIRED TO ADHERE TO ICRA REQUIREMENTS ABOVE.
3. REFER TO ICRA ASSESSMENT AND NOTES ON AG-002
Revisions Date
05/07/2025
CONSTRUCTION DOCUMENTS
PROGRESS PRINT
NOT FOR CONSTRUCTION
PROGRESS PRINT
NOT FOR CONSTRUCTION
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
VA Project No.
AG Project No.
Email: mail@delta-eas.com www.delta-eas.com
8401 Connecticut Avenue, Suite 350 Chevy Chase, MD 20815
Tel: 301.718.0080 Fax: 301.718.9520
558-23-300
DURHAM VA
A u to d e s k D o c s
/V A
M C
D u rh a m
/2
.0
.0
-D u rh a m S
P S
-R
.r v t
/7
/2
:5
:3
P M
1/7/2025 6:51:33 PM1/7/2025 6:51:33 PM
AG-002
2nd FLOOR - ICRA ASSESSMENT
NOTES
INSTALL SPS EQUIPMENT 124042
01/07/2025 EJL LDM
100% CONSTRUCTION
DOCUMENTS
Revisions Date
05/07/2025
CONSTRUCTION DOCUMENTS
C2000
D 2014
C2010
C2002
C2005
C2015
D 2010E
C2023
D2006A
D2006
D2007 D2005
D2002
D2003 D2001
D2004
C2002B
D2010
C2011
C2009
C2002A
C2004
C2005B
C2007
C2005A
C2002A
D2009
D2008D2010A
C2002D
D2010G
D2010J
D2010D
D 2010F
D 2010C
C2002C
D 2014A
D2010K
D2010B
TOILET
ELECTRICAL
STAIR-5
CLOSET
SPD CLEAN STORAGE
OFFICE
WORK RM
KEEPING
SPD STORAGE
CLOSET
OFFICE
OFFICE/LAB
OFFICE/LAB
LINEN /
HOUSE
STORAGE
LINEN CHUTE
STERILIZATION
ETO STERILIZER
DUMB WAITER
DUMB
WAITER
WASH
MANUAL
SPD CART
WASH AREA
SHAFT
AND DECONTAMINATION
BREAKOUT
FIRE CABINET
LINEN
ONC OFFICE
HEM /
ONC OFFICE
HEM /
ONC OFFICE
HEM /
ONC OFFICE
HEM /
ONC OFFICE
HEM /
ONC OFFICE
HEM /
CORRIDOR
CORRIDOR
ANTE RM
RECEIVING AND
TELEPHONE
TRASH CHUTE
CHUTE
STORAGE
GENERAL
CORRIDOR
CORRIDOR
CORRIDOR
HAC
CORRIDOR
RM
CART STORAGE
SURGICAL SUPPLY AND
WOMENS
EQUIP STORAGE
AND TESTING
ANTE RM
LOCKER RM
CORRIDOR
MENS
CLOSET CLOSET
KEEPING
HOUSE
CLEAN
DUMBWAITER
SPD SOILED RECEIVING
ETO #1 ETO #2 ETO #3 ETO #4
TREATMENT
WATER
ASSEMBLY AND
PREPARATION
EQUIP
CART/
ANTE RM
SCOPE
STORAGE
LOCKER
R2
R2
R2
R2
R2
R2
R2
R2
R1
R1
R1
R1
R1
R1
R1
R2
R1
R1
R3
PROGRESS PRINT
NOT FOR CONSTRUCTION
PROGRESS PRINT
NOT FOR CONSTRUCTION
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
VA Project No.
AG Project No.
Email: mail@delta-eas.com www.delta-eas.com
8401 Connecticut Avenue, Suite 350 Chevy Chase, MD 20815
Tel: 301.718.0080 Fax: 301.718.9520
558-23-300
DURHAM VA
A u to d e s k D o c s
/V A
M C
D u rh a m
/2
.0
.0
-D u rh a m S
P S
-R
.r v t
/7
/2
:5
:2
P M
1/7/2025 6:51:22 PM1/7/2025 6:51:22 PM
AD-101
2nd FLOOR - SELECTIVE REMOVAL
PLAN
INSTALL SPS EQUIPMENT 124042
01/07/2025 EJL LDM
100% CONSTRUCTION
DOCUMENTS
SCALE: 1/8" = 1'-0"AD-101
1 2nd FLOOR - SELECTIVE REMOVAL PLAN
GENERAL REMOVAL NOTES
A. ITEMS DESIGNATED ON PLAN BY DASHED LINE ARE EXISTING ELEMENTS TO BE
REMOVED. REFER TO OTHER TRADE DRAWINGS FOR OTHER REMOVALS, INCLUDING
MODIFICATIONS THAT MAY EXTEND BEYOND AREAS SHOWN.
B. FOR DURATION OF PROJECT, EXISTING CONSTRUCTION AND/OR EQUIPMENT TO
REMAIN FROM DAMAGE OR CONSTRUCTION ACTIVITIES. WHERE CONSTRUCTION
ACTIVITIES RESULT IN DAMAGE TO EXISTING CONSTRUCTION TO BE RETAINED,
REPLACE/REPAIR EXISTING CONSTRUCTION TO RETURN IT TO ITS ORIGINAL
CONDITION. WHERE REMOVAL OF EXISTING CONSTRUCTION, PIPING, DUCTWORK, AND
OTHER ITEMS CREATES OPENINGS IN WALLS, FLOORS OR CEILINGS, PATCH OPENINGS
IMMEDIATELY WITH SAME MATERIALS AS ADJACENT CONSTRUCTION AND/OR TO
MAINTAIN REQUIRED FIRE RATING.
C. PROVIDE FULL HEIGHT TEMPORARY CONSTRUCTION BARRIERS WHERE REQUIRED TO
PREVENT DUST POLLUTION OF SURROUNDING OCCUPIED AREAS. SEAL AIR-TIGHT.
PARTITIONS MUST BE INSTALLED IN ACCORDANCE WITH FIRE PROTECTION AND
EGRESS REQUIREMENTS. MAINTAIN MEANS OF EGRESS ACCESS TO EXITS DURING
CONSTRUCTION.
D. TAKE PROPER MEASURES TO PREVENT DUST MIGRATION TO AREAS OUTSIDE THE
CONSTRUCTION AREA BY CLOSING ALL OPENINGS IN DUCTS, WALLS, FLOORS AND
CEILINGS. PROVIDE CONTINUOUS EXHAUST TO EXTERIOR TO MAINTAIN NEGATIVE
PRESSURE IN CONSTRUCTION AREA.
E. COORDINATE WITH OWNER FOR EQUIPMENT TO BE SALVAGED AND RETURNED TO
OWNER. THE OWNER WILL RETAIN ALL SALVAGE THAT IS OF VALUE AS DESIGNATED BY
THE USER OR BUILDING ENGINEER. REMOVE FROM THE BUILDING AND DISPOSE OF IN
A LAWFUL MANNER ALL DEBRIS AND/OR ITEMS NOT RETAINED BY OWNER.
F. INSTALL ADHESIVE MATS INSIDE AND OUTSIDE EACH ACCESS DOOR TO
CONSTRUCTION AREA.
G. COORDINATE WITH OTHER TRADE DRAWINGS FOR REMOVAL WORK, AS REQUIRED.
REMOVAL KEY NOTES
R1 CONSTRUCT TEMPORARY CONSTRUCTION BARRIER AT EACH EQUIPMENT.
PERFORM REMOVAL/INSTALLATION OF ONE (1) UNIT AT A TIME. REMOVE
TEMPORARY BARRIER AT COMPLETION OF INSTALLATION.
R2 DEMO, PATCH, AND PAINT DRYWALL AROUND UTILITIES RECESSED IN COLUMN
FURRINGS FOR WALLS, AND FOR UTILITY WALL BOXES AS REQUIRED. REMOVE
EXISTING EQUIPMENT. REMOVE ONE (1) UNIT AT A TIME. REFER TO MEP
DRAWINGS FOR RELATED WORK.
R3 REMOVE EXISTING DOOR & FRAME. REMOVE PORTION OF EXISTING PARTITION TO
ACCOMMODATE NEW DOOR & FRAME
0'
SCALE: 1/8" = 1'-0"
2' 4' 16'8'
NORTH
Revisions Date
05/07/2025
CONSTRUCTION DOCUMENTS
DEDUCT ALTERNATE 1
DEDUCT ALTERNATE 1
C2000
D 2014
C2010
C2002
C2005
C2015
D 2010E
C2023
D2006A
D2006
D2007 D2005
D2002
D2003 D2001
D2004
C2002B
D2010
C2011
C2009
C2002A
C2004
C2005B
C2007
C2005A
C2002A
D2009
D2008D2010A
C2002D
D2010G
D2010J
D2010D
D 2010F
D 2010C
C2002C
D 2014A
D2010K
D2010B
TOILET
ELECTRICAL
STAIR-5
CLOSET
SPD CLEAN STORAGE
OFFICE
WORK RM
KEEPING
SPD STORAGE
CLOSET
OFFICE
OFFICE/LAB
OFFICE/LAB
LINEN /
HOUSE
STORAGE
LINEN CHUTE
STERILIZATION
ETO STERILIZER
DUMB WAITER
DUMB
WAITER
WASH
MANUAL
SPD CART
WASH AREA
SHAFT
AND DECONTAMINATION
BREAKOUT
FIRE CABINET
LINEN
ONC OFFICE
HEM /
ONC OFFICE
HEM /
ONC OFFICE
HEM /
ONC OFFICE
HEM /
ONC OFFICE
HEM /
ONC OFFICE
HEM /
CORRIDOR
CORRIDOR
ANTE RM
RECEIVING AND
TELEPHONE
TRASH CHUTE
CHUTE
STORAGE
GENERAL
CORRIDOR
CORRIDOR
CORRIDOR
HAC
CORRIDOR
RM
CART STORAGE
SURGICAL SUPPLY AND
WOMENS
EQUIP STORAGE
AND TESTING
ANTE RM
LOCKER RM
CORRIDOR
MENS
CLOSET CLOSET
KEEPING
HOUSE
CLEAN
DUMBWAITER
SPD SOILED RECEIVING
ETO #1 ETO #2 ETO #3 ETO #4
TREATMENT
WATER
ASSEMBLY AND
PREPARATION
EQUIP
CART/
ANTE RM
SCOPE
STORAGE
LOCKER
T Y
P
4" 2"
PARTITION AS
SCHEDULED
(2) 24 GA. METAL STUDS
FLOOR TO TOP OF WALL,
BRACE TO STRUCTURE
SEALANT, TYP.
HOLLOW METAL
FRAME (AS
SCHEDULED)
DOOR AS SCHEDULED
ADJACENT
WALL
(3) ANCHORS PER JAMB,
PROVIDE SPOT GROUTING
PARTITION + 1"
2"
PARTITION AS
SCHEDULED
METAL STUD LINTEL AS
REQ. FOR SPAN
METAL RUNNER
CHANNEL
SEALANT, TYP.
HOLLOW METAL
FRAME AS
SCHEDULED
DOOR AS SCHEDULED
PARTITION + 1"
DOOR TYPE LEGEND
FLUSH MOUNTED DOUBLE
DOOR W/ NARROW VISION LITE
S E
E S
C H
E D
U
LE
SCHEDULE
SEE
1/4" TEMPERED
VISION GLASS
6" 5"
6" 2'
AA
FRAME TYPE LEGEND
HOSPITAL STOP
4"
S E
E S
C H
E D
U
LE
2"
SCHEDULE
SEE 2"
PROGRESS PRINT
NOT FOR CONSTRUCTION
PROGRESS PRINT
NOT FOR CONSTRUCTION
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
VA Project No.
AG Project No.
Email: mail@delta-eas.com www.delta-eas.com
8401 Connecticut Avenue, Suite 350 Chevy Chase, MD 20815
Tel: 301.718.0080 Fax: 301.718.9520
558-23-300
DURHAM VA
A u to d e s k D o c s
/V A
M C
D u rh a m
/2
.0
.0
-D u rh a m S
P S
-R
.r v t
/7
/2
:5
:2
P M
1/7/2025 6:51:27 PM1/7/2025 6:51:27 PM
A-101
2nd FLOOR - NEW WORK PLAN INSTALL SPS EQUIPMENT 124042
01/07/2025 EJL LDM
100% CONSTRUCTION
DOCUMENTS
SCALE: 1/8" = 1'-0"A-101
1 2nd FLOOR - NEW WORK PLAN
GENERAL ARCHITECTURAL NOTES
A. VERIFY ALL DIMENSIONS AND EXISTING CONDITIONS. NOTIFY THE ARCHITECT OF
DISCREPANCIES PRIOR TO COMMENCING WORK. EXISTING CONDITIONS THAT WOULD
EFFECT THE EXECUTION OF THE WORK MUST BE BROUGHT TO THE ATTENTION OF THE
ARCHITECT PRIOR TO COMMENCING THE WORK.
B. DIMENSIONS GIVEN ON PLANS ARE FROM FINISHED FACE TO FINISHED FACE UNLESS
OTHERWISE NOTED. DIMENSIONS ARE NOT ADJUSTABLE WITHOUT THE APPROVAL OF
THE ARCHITECT UNLESS OTHERWISE NOTED.
C. PROVIDE BLOCKING IN WALLS AS REQUIRED TO SUPPORT WALL MOUNTED ITEMS.
LOCATE EQUIPMENT AND COORDINATE BLOCKING LOCATIONS IN FIELD.
D. PROVIDE PROTECTION OF EXISTING FINISHES AND/OR MATERIALS. RESTORE TO
ORIGINAL CONDITIONS AREAS OR FINISHES DAMAGED BY THE WORK, AT THE EXPENSE
OF THE CONTRACTOR. REMOVE MEANS OF PROTECTION AT THE END OF THE
PROJECT.
E. ALL SCRATCHES, DENTS, CRACKS, HOLES, OPENINGS, IRREGULARITIES AND/OR
DEFECTS IN BOTH EXISTING AND NEW CONSTRUCTION SURFACES ARE TO BE
PATCHED TO PROVIDE A UNIFORM AND SMOOTH FINISHED SURFACE. CLEAN AND SAND
SMOOTH SURFACES BEFORE APPLYING FINISH MATERIALS.
F. REMOVE ALL EXCESS BUILD-UP OF EXISTING AND/OR NEW WALL AND PAINT
MATERIALS FROM ALL NEW AND EXISTING WALL SURFACES. CLEAN AND FINISH SAND
SMOOTH TO PROVIDE A UNIFORM AND SMOOTH WALL SURFACE READY FOR THE
APPLICATION OF FINISH MATERIALS.
G. DIMENSIONS LOCATING DOORS OR INTERIOR WINDOWS ARE TO OUTSIDE EDGE OF
FRAME UNLESS NOTED OTHERWISE. REFER TO DOOR & WINDOW SHEETS FOR FRAME
TYPE, SIZE AND DETAILS.
H. REFER TO CIVIL, STRUCTURAL, FIRE PROTECTION, PLUMBING, MECHANICAL, AND
ELECTRICAL DRAWINGS FOR ADDITIONAL INFORMATION.
RENOVATION KEY NOTES
1 INSTALL EQUIPMENT ONE (1) UNIT AT A TIME. REFER TO MEP DRAWINGS. REMOVE
TEMPORARY CONSTRUCTION BARRIER AT COMPLETION. PATCH EXISTING TO
MATCH.
2 INSTALL NEW DOOR FRAME & DOOR.
SCALE: 1 1/2" = 1'-0"A-101
2 HM JAMB DETAIL
SCALE: 1 1/2" = 1'-0"A-101
3 HM HEAD DETAIL
DOOR SCHEDULE
DOOR
NUMBER
FIRE
RATING
DOOR FRAME
GLASS
DETAILS
HARDWARE
GROUP
COMMENTSOPENING SIZE
THICKNESS
DOOR
TYPE
DOOR MATERIAL DOOR FINISH
FRAME
TYPE
FRAME MATERIAL FRAME FINISH HEAD JAMB THRESHOLD
HEIGHT WIDTH
1 - 7' - 0" 6' - 0" 1 3/4" AA HM PNT-1 1 HM PNT-1 (2) 5x24 3/A101 2/A101 - HW-1
ROOM FINISH SCHEDULE
ROOM
NUMBER
ROOM NAME
FLOOR
BASE
WALLS CEILING
COMMENTS
MATERIAL FINISH
NORTH SOUTH EAST WEST
MATERIAL FINISH
MATERIAL FINISH MATERIAL FINISH MATERIAL FINISH MATERIAL FINISH
C2002D EQUIPMENT STORAGE & TESTING - * RB-1** * * ETR PNT-1** - * - * - * *=FINISH ETR; **=PATCH TO MATCH EXISTING
C2002 SPD CLEAN STORAGE - * RB-1** ETR PNT-1** - * - * - * - * *=FINISH ETR; **=PATCH TO MATCH EXISTING
D2014 PREP ASSEMBLY & STERILIZATION - * * - **MATCH - * - **MATCH - * - * *=FINISH ETR; **=PATCH TO MATCH EXISTING
D2010E SPD SOILED RECEIVING & DECON - * * - **MATCH - * - * - **MATCH - * *=FINISH ETR; **=PATCH TO MATCH EXISTING
D2010 SPD CART WASH AREA - * * - * ETR **MATCH - * - * - * *=FINISH ETR; **=PATCH TO MATCH EXISTING
C2002A MANUAL CART WASH - * * - * - * - * - * - * * = FINISH ETR
0'
SCALE: 1/8" = 1'-0"
2' 4' 16'8'
NORTH
Revisions Date
05/07/2025
CONSTRUCTION DOCUMENTS
DEDUCT ALTERNATE 1
1. DRAWINGS ARE DIAGRAMMATIC AND INDICATE GENERAL ARRANGEMENT OF SYSTEMS. PROVIDE COMPONENTS INDICATED IN DETAILS AND/OR RISER DIAGRAMS WHETHER OR NOT INDICATED ON PLANS AND VICE VERSA. WHERE A DISCREPANCY OR CONFLICT IS FOUND BETWEEN ONE DRAWING
AND ANOTHER, OR BETWEEN A DRAWING AND APPLICABLE SPECIFICATIONS, NOTIFY THE
ARCHITECT/ENGINEER IMMEDIATELY IN WRITTEN FORM. IN GENERAL, THE MOST STRINGENT
REQUIREMENT SHALL GOVERN UNLESS THE DISCREPANCY CONFLICTS WITH APPLICABLE CODES OR
OWNER'S DESIGN STANDARDS, WHEREIN THE CODE OR OWNER'S DESIGN STANDARDS SHALL
GOVERN.
2. LOCATE VALVES IN ACCESSIBLE AREAS WHERE NECESSARY. (12"X12" MIN.)
3. PROVIDE PIPE MARKER FOR ALL PIPING ABOVE THE CEILING SPACES IN ACCORDANCE WITH DIVISION
22 SPECIFICATION SECTION. "IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT".
4. LABEL VALVES ABOVE CEILINGS AND IN CONCEALED SPACES AT CEILING TILE WITH METAL CEILING TACKS INDICATING VALVE # AND TYPE OF WATER. (i.e.; BLUE= COLD WATER, LETTERING CW
VLV1-001).
5. PROVIDE AND INSTALL WATER WATER HAMMER ARRESTORS IN ACCORDANCE WITH PDI-WH201 IN ALL HW AND CW SUPPLY PIPING WITH QUICK CLOSING VALVES AS REQUIRED. AIR CHAMBERS ARE NOT
ACCEPTABLE SUBSTITUTIONS.
6. PROVIDE THERMAL INSULATION FOR HOT WATER AND HOT WATER RETURN PIPING IN ACCORDANCE
WITH THE INTERNATIONAL ENERGY EFFICIENCY CODE (IECC) AND PER SPECIFICATIONS.
7. THE MANUFACTURERS OF EQUIPMENT SHOWN ARE THE BASIS OF DESIGN. SEE SPECIFICATION FOR
OTHER ACCEPTABLE MANUFACTURER'S.
8. FIRE CAULK AND SLEEVE PENETRATIONS THROUGH FIRE RATED ASSEMBLIES. REFER TO LIFE SAFETY PLANS FOR RATED ASSEMBLY LOCATIONS. REFER TO ARCHITECTURAL SHEETS FOR DETAILS AND UL
ASSEMBLY NUMBERS.
9. REFER TO ARCHITECTURAL SHEETS FOR FIXTURE MOUNTING.
10. COORDINATE CEILING PIPING AND ELEVATIONS IN SHOP DRAWINGS WITH ALL OTHER TRADES (I.E.
HVAC, FIRE PROTECTION, ELECTRICAL, TELECOMM, STRUCTURAL, ETC.) PRIOR TO ANY INSTALLATION
TO ENSURE PROPER CLEARANCES AND PENETRATIONS.
11. VALVES AND FITTINGS SHALL BE THE SAME SIZE AS THE PIPING WHERE THEY ARE LOCATED UNLESS
NOTED OTHERWISE.
12. PROVIDE ALL NECESSARY SUPPORTING DEVICES FOR FIXTURES PER MANUFACTURER INSTALLATION
INSTRUCTIONS.
13. ROUGH-IN WASTE AND WATER SUPPLIES FOR FIXTURES AND PERFORM FINAL CONNECTIONS PER
MANUFACTURER RECOMMENDATIONS.
14. THE CONTRACTOR SHALL BASE THEIR PROPOSAL UPON THE EQUIPMENT AS SCHEDULED USING THE
MANUFACTURERS AND MODEL NUMBERS AS SCHEDULED ON THE DRAWINGS. IF THE CONTRACTOR
WISHES TO USE EQUIPMENT NOT SCHEDULED, THEY MAY SUBMIT TO ENGINEER FOR REVIEW AND
COMPLIANCE WITH CONTRACT DOCUMENTS.
15. COMPLY WITH THE AMERICANS WITH DISABILITIES ACT (ADA) ACCESSIBILITY GUIDELINES FOR
BUILDINGS AND FACILITIES.
16. ALL AUTOMATIC CONTROL, PROTECTIVE OR SIGNAL DEVICES REQUIRED FOR THE OPERATION SPECIFIED, SHALL BE PROVIDED WITH ANY CONTROL WIRING AND INSTALLED PER MANUFACTURERS
REQUIREMENTS.
17. PROVIDE AN AIR GAP, WHEN REQUIRED BY CODE, SERVING INDIVIDUAL FIXTURES, DEVICES, APPLIANCES AND APPARATUS.
18. SHOP DRAWING SUBMITTALS SHALL BE FULLY COORDINATED PRIOR TO SUBMITTAL.
PLUMBING ABBREVIATIONSPLUMBING SYMBOL LEGEND
SYMBOL DESCRIPTION
NOTE: SOME SYMBOLS SHOWN ON THIS LEGEND MAY NOT PERTAIN TO THIS PROJECT
COMPRESSED AIR PIPINGCA
HOT WATER PIPINGHW
HOT WATER RETURN PIPINGHWR
SANITARY DRAINAGE PIPING (UNDERGROUND)SAN U/G
SANITARY DRAINAGE PIPING (ABOVE SLAB)SAN
V VENT PIPING
GATE VALVE
PRESSURE GAUGE
CHECK VALVE
BALL VALVE
CIRCULATING PUMP
PIPE END CAP
PIPE TURNING DOWN
PIPE TURNING UP
PIPE TURNING DOWN (TEE)
CLEANOUTS
CW COLD WATER PIPING
CD CONDENSATE PIPING
CIRCUIT SETTER VALVE
OR
PDI-"A" WATER HAMMER ARRESTER & SIZE
THERMOSTATIC MIXING VALVE
HB-1 OR WHY-1 HOSE BIBB / WALL HYDRANT
FLOW ARROW
P-TRAP
ROLL DOWN
PIPING TEE
PRESSURE REGULATING VALVE
BUTTERFLY VALVE
A
B
SIM
A
SECTION SYMBOL:
A = IDENTIFYING LETTER
B = SHEET WHERE SECTION IS SHOWN
SIM =
(ONLY NOTED IF IT APPLIES)
PLUMBING RISER DESIGNATION:
A = RISER IDENTIFYING SYSTEM TYPE
1 =
REVISION CLOUD AND
REVISION NUMBER
SHEET NOTE CALLOUT
A TITLE SYMBOL ON SHEET WHERE SHOWN
A = IDENTIFYING NUMBER/LETTER
RISER IDENTIFYING SYSTEM NUMBER
SIMILAR
ABBR. DESCRIPTION ABBR. DESCRIPTION
PLUMBING GENERAL NOTES
WATER HAMMER ARRESTOR
SYMBOL
1/2"
PIPE SIZE PDI STANDARD FIXTURE UNIT CAP.
3/4"
1"
1-1/4"
A
B
C
D
1 TO 11
12 TO 32
33 TO 60
61 TO 113
DEMOLISH TO POINT INDICATED
CONNECT TO EXISTING
DEMOLISHED PIPING
EXISTING PIPING
NEW PIPING
AS ABOVE SLAB
ADA AMERICANS WITH DISABILITIES ACT
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
ANSI AMERICAN NATIONAL STANDARDS INSTITUTE
AP ACCESS PANEL
ASTM AMERICAN STANDARDS TESTING MATERIALS
AWWA AMERICAN WATER WORKS ASSOCIATION
BFP BACKFLOW PREVENTER
BF BELOW FLOOR
BG BELOW GRADE
BLDG BUILDING
BOP BOTTOM OF PIPE
BS BELOW SLAB
CA COMPRESSED AIR
CD CONDENSATE
CO CLEANOUT
CONN CONNECTION
CONT CONTINUOUS
CP CIRCULATING PUMP
CW COLD WATER
DA DENTAL AIR
DF DRINKING FOUNTAIN
DFU DRAINAGE FIXTURE UNITS
DIA DIAMETER
DN DOWN
DV DENTAL VACUUM
DW DOMESTIC WATER
DWF DRAIN, WASTE, AND VENT
DWG DRAWING
ECO EXTERIOR CLEANOUT
ELEV ELEVATION
EQUIP EQUIPMENT
EWC ELECTRIC WATER COOLER
EWH ELECTRIC WATER HEATER
EX EXISTING
ºF DEGREES FAHRENHEIT
FCO FLOOR CLEANOUT
FD FLOOR DRAIN
FIN FINISH
FL FLOOR
FM FORCE MAIN
FPS FEET PER SECOND
FS FLOOR SINK
FT FEET
FU FIXTURE UNITS
G NATURAL GAS
GAL GALLON(S)
GPM GALLONS PER MINUTE
GR GREASE WASTE
HB HOSE BIBB
HP HORSEPOWER
HR HOUR
HW HOT WATER
HWR HOT WATER RETURN
HZ HERTZ
IE INVERT ELEVATION
ID INTERNAL DIAMETER
IN INCHES
INV INVERT
IPS INTERNATIONAL PIPE STANDARD
IRR IRRIGATION WATER
KW KILOWATT
LA LABORATORY AIR
LAV LAVATORY
LF LINEAR FEET
LV LABORATORY VACUUM
MA MEDICAL AIR
MAP MEDICAL ALARM PANEL
MAX MAXIMUM
MIN MINIMUM
MNTG MOUNTING
MS MOP SINK
MV MEDICAL VACUUM
N NITROGEN
N2O NITROUS OXIDE
NA NOT APPLICABLE
NC NORMALLY CLOSED
NIC NOT IN CONTRACT
NO NORMALLY OPEN
NSF NATIONAL SANITATION FOUNDATION
NTS NOT TO SCALE
O2 OXYGEN
OD OUTSIDE DIAMETER
ORWL OVERFLOW RAIN WATER LEADER
PD PUMP DISCHARGE
PDI PLUMBING DRAINAGE INSTITUTE
PH PHASE
PPP PRECISION PLUMBING PRODUCTS
PSI POUNDS PER SQUARE INCH
RD ROOF DRAIN
RO REVERSE OSMOSIS WATER
RPM REVOLUTIONS PER MINUTE
RWL RAIN WATER LEADER
RX REMOVE EXISTING
S SANITARY
SAN SANITARY
SH SHOWER
SK SINK
SL SODA LINE
SPEC SPECIFICATION
SQ SQUARE
SS STAINLESS STEEL
STD STANDARD
ST STORM
STO SECONDARY STORM
TD TRENCH DRAIN
TDH TOTAL DYNAMIC HEAD
TEMP TEMPERATURE
TET THERMAL EXPANSION TANK
TMV THERMOSTATIC MIXING VALVE
TP TRAP PRIMER
TYP TYPICAL
UL UNDERWRITER'S LABORATORY
U/G UNDERGROUND
UNO UNLESS NOTED OTHERWISE
UR URINAL
V VENT
VTR VENT THROUGH ROOF
VIV VALVE IN VERTICAL
VLV VALVE
VOL VOLUME
W WATTS
W/ WITH
WAGD WASTE ANESTHETIC GAS DISPOSAL
WC WATER CLOSET
WCO WALL CLEANOUT
WHA WATER HAMMER ARRESTOR
WHY WALL HYDRANT
WFU WATER SUPPLY FIXTURE UNITS
ZVB MEDICAL ZONE VALVE BOX
APPLICABLE CODES
1. VA PLUMBING DESIGN MANUAL 2024 EDITION
2. INTERNATIONAL BUILDING CODE: CONFORM IN STRICT COMPLIANCE TO THE INTERNATIONAL BUILDING
CODE AND THE AMENDMENTS WHICH ARE ENFORCED BY THE LOCAL AUTHORITY HAVING
JURISDICTION.
A. INTERNATIONAL BUILDING CODE (IBC) 2024 EDITION
B. INTERNATIONAL PLUMBING CODE (IPC) 2024 EDITION
C. INTERNATIONAL ENERGY CONSERVATION CODE (IECC) 2024 EDITION
3. NATIONAL FIRE PROTECTION ASSOCIATION (NFPA), INCLUDING (BUT NOT LIMITED TO):
A. STANDARD FOR FIRE PREVENTION DURING WELDING, CUTTING, AND OTHER HOT WORK (NFPA 51B)
2024 EDITION
B. COMPRESSED GASES AND CRYOGENIC FLUIDS CODE, NFPA 55 2023 EDITION
C. NATIONAL ELECTRICAL CODE (NFPA 70 - NEC) 2023 EDITION
D. HEALTH CARE FACILITIES CODE (NFPA 99) 2024 EDITION
E. LIFE SAFETY CODE (NFPA 101) 2024 EDITION
4. OCCUPATIONAL SAFETY AND HEALTH ACT (OSHA)
5. AMERICANS WITH DISABILITIES ACT (ADA)
6. AMERICAN SOCIETY OF TESTING AND MATERIALS (ASTM)
7. APPLICABLE REGULATORY REQUIREMENTS AND ADVISORY PRACTICES OF APPROPRIATE AUTHORITIES HAVING JURISDICTION (AHJs)
8. APPLICABLE STANDARDS, REGULATIONS, AND PRACTICES OF THE OWNER
SYMBOL DESCRIPTION
CONTROL VALVE
BUTTERFLY VALVE
CALIBRATING BALANCING VALVE
BALL VALVE
STRAINER
UNION
THERMOMETER
PSI REG.
FLOW SWITCH
CHECK VALVE
THREE-WAY CONTROL VALVE
FLEX CONNECTION
RELIEF VALVE
VALVE ON RISER
TEST PLUG
GLOBE VALVE
PSI REG.
FLOW SWITCH
PRESSURE SWITCH
AUTOMATIC AIR VENT
XX-X SPECIALTY EQUIPMENT CALLOUT
REVERSE OSMOSIS WATER PIPINGRO
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
VA Project No.
AG Project No.
A u to d e s k D o c s /V
A M
C
D u rh a m
/0
D u rh a m V
A I n s ta ll S
P S
E q u im e n t_
R
M
E P
.r v t
/7
/2
:1
:2
A M
P-001
PLUMBING NOTES, LEGENDS, &
SYMBOLS
INSTALL SPS EQUIPMENT
Durham VA
0124042
05/07/2025 JMC AJZ
CONSTRUCTION DOCUMENTS
JOSHUA CALHOUN, P.E.
PA License #PE093054
558-23-300
SHEET LIST
SHEET NUMBER SHEET NAME
P-001 PLUMBING NOTES, LEGENDS, & SYMBOLS
PD101 SECOND FLOOR PLAN - PLUMBING PIPING - DEMOLITION
PP101 SECOND FLOOR PLAN - PLUMBING PIPING - NEW WORK
P-501 PLUMBING DETAILS
P-801 PLUMBING SCHEDULES
OFFICE
D2009
WORK RM
D2006
HAC
D2008
TOILET
D2006A
CORRIDOR
LOCKER RM
D2010J
MENS
D2010K
ANTE RM
D2010G
LOCKER RM
D2010A
WOMENS
D2010B
SURGICAL SUPPLY AND CART
STORAGE
C2015
ELECTRICAL CLOSET
C2023
CORRIDOR
TELEPHONE CLOSET
C2005B
OFFICE
C2005A
LINEN/TRASH CHUTE
C2007
CORRIDOR
ELEVATOR
CORRIDOR
C2010CLEAN RECEIVING AND BREAKOUT
C2000
DUMBWAITER
ANTE RM
C2004
SPD CLEAN STORAGE
C2002
EQUIP STORAGE AND TESTING
C2002D
DUMBWAITER
CART WASH
MANUAL CART WASH
C2002A
SPD CART WASH AREA
D2010
STORAGE
C2002A
ETO STERILIZER
HAC
C2002B
HAC
D2010DSCOPE STORAGE
C2002C
DUMBWAITER
SPD SOIL RECEIVING AND
DECONTAMINATION
D2010E
CART/EQUIP ANTE RM
D2010C
WATER TREATMENT
D2010F
PREPARATION ASSEMBLY AND
STERILIZATION
D2014
STAIR
D2014A
MECHANICAL CHASE
SPD STORAGE
C2005
OFFICE/LAB
C2009
RX STEAM STERILIZER 1
RX STEAM STERILIZER 1
RX INSTRUMENT WASHERS 2
RX CART WASHER3
RX ULTRASONIC CLEANERS4
RX ULTRASONIC CLEANERS5
EX 1/2" CA
EX AIR COMPRESSOR LOCATION
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
VA Project No.
AG Project No.
A u to d e s k D o c s /V
A M
C
D u rh a m
/0
D u rh a m V
A I n s ta ll S
P S
E q u im e n t_
R
M
E P
.r v t
/7
/2
:1
:2
A M
PD101
SECOND FLOOR PLAN - PLUMBING
PIPING - DEMOLITION
INSTALL SPS EQUIPMENT
Durham VA
0124042
05/07/2025 JMC AJZ
CONSTRUCTION DOCUMENTS
JOSHUA CALHOUN, P.E.
PA License #PE093054
558-23-300
CODED NOTES:
DRAWING NOTES:
1. PROJECT SHALL BE PHASED TO ALLOW FOR SPS TO REMAIN OPERATIONAL DURING CONSTRUCTION.
ONE TYPE OF EACH PIECE OF EQUIPMENT SHALL REMAIN ACTIVE AT ALL TIMES. COORDINATE
PHASING OF WORK WITH GENERAL CONTRACTOR AND VA COR. WORK SHALL ONLY BE COMPLETED
INSIDE OF ICRA BARRIER. IF ADDITIONAL WORK NEEDS TO BE COMPLETED OUTSIDE OF ICRA
BARRIER, IMMEDIATELY NOTIFY VA COR.
2. COORDINATE ALL SHUTDOWNS WITH VA COR A MINIMUM OF 15 WORKING DAYS PRIOR TO
CONSTRUCTION. SPS IS TO REMAIN OPERATIONAL AT ALL TIMES. WORK MAY NEED TO BE
COMPLETED DURING OFF HOURS OR WEEKENDS TO MINIMIZE IMPACT TO SPS.
3. PLUMBING CONTRACTOR IS TO DISCONNECT DIVISION 22 UTILITIES FROM EACH PIECE OF
EQUIPMENT TO BE REMOVED IN SCOPE OF THE PROJECT. CONTRACTOR SHALL CLOSE ALL
REQUIRED VALVES AND TEMPORARILY CAP PIPING. ALL SYSTEMS SHALL REMAIN ACTIVE TO ALL
OTHER PIECES OF EQUIPMENT. NOTIFY GENERAL CONTRACTOR WHEN DISCONNECTION OF
EQUIPMENT FROM DIVISION 22 SERVICES IS COMPLETE. GENERAL CONTRACTOR TO REMOVE
EQUIPMENT.
4. CONTRACTOR IS RESPONSIBLE FOR COORDINATING ROUGH IN LOCATIONS WITH EQUIPMENT
MANUFACTURER, CREATING MOCK-UP, AND VERIFYINH FIELD CONDITIONS FOR REMODEL PRIOR TO
DISCONNECTING EQUIPMENT BEING REPLACED.
RX 1" CW AND 1/2" CA PIPING BACK TO EXISTING VALVE. RX FLEXIBLE HOSE. PLACE BALL
VALVE IN THE CLOSED POSITION AND TEMPORARILY CAP CW AND CA PIPING. RX 2" DRAIN
PIPING FROM EQUIPMENT TO FLOOR DRAIN. DEMO FLOOR DRAIN BODY TO BE REPLACED
IN RENOVATION PHASE.
RX 1" CW PIPING BACK TO EXISTING VALVE. RX FLEXIBLE HOSE. PLACE BALL VALVE IN
THE CLOSED POSITION AND TEMPORARILY CAP CW PIPING. RX 2" DRAIN PIPING FROM
EQUIPMENT TO FLOOR DRAIN.
RX 1 1/4" CW, 1 1/4" HW, 1 1/4" RO, AND 1/2" CA PIPING BACK TO EXISTING VALVE. RX
FLEXIBLE HOSE. PLACE BALL VALVE IN THE CLOSED POSITION AND TEMPORARILY CAP
ALL PIPING. RX 3" DRAIN PIPING FROM EQUIPMENT TO FLOOR DRAIN. DISCONNECT DRAIN
PAN PUMP AND STORE PUMP FOR USE WITH NEW WORK.
RX 3/4" CW, 3/4" HW, AND 1/2" RO PIPING BACK TO EXISTING VALVE. RX FLEXIBLE HOSE.
PLACE BALL VALVE IN THE CLOSED POSITION AND TEMPORARILY CAP ALL PIPING. RX 2"
DRAIN PIPING FROM EQUIPMENT TO WALL BOX.
RX 1/2" CW, 1/2" HW, AND 1/2" RO PIPING BACK TO EXISTING VALVE. RX FLEXIBLE HOSE.
PLACE BALL VALVE IN THE CLOSED POSITION AND TEMPORARILY CAP ALL PIPING. RX 3"
DRAIN PIPING FROM EQUIPMENT TO WALL BOX.
RX 1/2" CA AS REQUIRED TO INSTALL NEW COMPRESSED AIR CONNECTIONS FOR
ULTRASONIC CLEANERS. REFER TO PP101 FOR NEW WORK. FIELD VERIFY NEAREST
SHUTOFF VALVE. COORDINATE SHUTDOWN OF AIR COMPRESSOR WITH VA COR IF
REQUIRED. COORDINATE WORK TO MINIMIZE DOWNTIME, INCLUDING HAVING NEW
PIPING PRE-ASSEMBLED TO MAKE DOWNTIME OF AIR COMPRESSOR AS SHORT AS
NECESSARY.
N 0 4' 8' 16' 24'
1/8" = 1'-0"
1/8" = 1'-0"1
SECOND FLOOR PLAN - PLUMBING PIPING - DEMOLITION
P-501
DETAIL:DESCRIPTION:
P-501
P-501
P-501
P-501
PP101
Revisions Date
WORK RM
D2006
HAC
D2008
TOILET
D2006A
CORRIDOR
LOCKER RM
D2010J
MENS
D2010K
ANTE RM
D2010G
LOCKER RM
D2010A
WOMENS
D2010B
SURGICAL SUPPLY AND CART
STORAGE
C2015
ELECTRICAL CLOSET
C2023
CORRIDOR
TELEPHONE CLOSET
C2005B
OFFICE
C2005A
LINEN/TRASH CHUTE
C2007
CORRIDOR
ELEVATOR
CORRIDOR
C2010CLEAN RECEIVING AND BREAKOUT
C2000
DUMBWAITER
ANTE RM
C2004
SPD CLEAN STORAGE
C2002
EQUIP STORAGE AND TESTING
C2002D
DUMBWAITER
CART WASH
MANUAL CART WASH
C2002A
SPD CART WASH AREA
D2010
STORAGE
C2002A
ETO STERILIZER
HAC
C2002B
HAC
D2010DSCOPE STORAGE
C2002C
DUMBWAITER
SPD SOIL RECEIVING AND
DECONTAMINATION
D2010E
CART/EQUIP ANTE RM
D2010C
WATER TREATMENT
D2010F
PREPARATION ASSEMBLY AND
STERILIZATION
D2014
STAIR
D2014A
MECHANICAL CHASE
SPD STORAGE
C2005
OFFICE/LAB
C2009
SS-1
SS-21
SS-1
IW-1
IW-1
IW-1
CW-1
UC-14
UC-25
EX 1/2" CA
1/2" CA
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
VA Project No.
AG Project No.
A u to d e s k D o c s /V
A M
C
D u rh a m
/0
D u rh a m V
A I n s ta ll S
P S
E q u im e n t_
R
M
E P
.r v t
/7
/2
:1
:2
A M
PP101
SECOND FLOOR PLAN - PLUMBING
PIPING - NEW WORK
INSTALL SPS EQUIPMENT
Durham VA
0124042
05/07/2025 JMC AJZ
CONSTRUCTION DOCUMENTS
JOSHUA CALHOUN, P.E.
PA License #PE093054
558-23-300
CODED NOTES:
DRAWING NOTES:
1. COORDINATE ALL FINAL EQUIPMENT SIZES WITH FINAL EQUIPMENT SELECTIONS.
2. PROJECT SHALL BE PHASED TO ALLOW FOR SPS TO REMAIN OPERATIONAL DURING CONSTRUCTION.
ONE TYPE OF EACH PIECE OF EQUIPMENT SHALL REMAIN ACTIVE AT ALL TIMES. COORDINATE
PHASING OF WORK WITH GENERAL CONTRACTOR AND VA COR. WORK SHALL ONLY BE COMPLETED
INSIDE OF ICRA BARRIER. IF ADDITIONAL WORK NEEDS TO BE COMPLETED OUTSIDE OF ICRA
BARRIER, IMMEDIATELY NOTIFY VA COR.
3. COORDINATE ALL SHUTDOWNS WITH VA COR A MINIMUM OF 15 WORKING DAYS PRIOR TO
CONSTRUCTION. SPS IS TO REMAIN OPERATIONAL AT ALL TIMES. WORK MAY NEED TO BE
COMPLETED DURING OFF HOURS OR WEEKENDS TO MINIMIZE IMPACT TO SPS.
REMOVE TEMPORARY CAP ON PIPING. ROUTE 1" CW, 3/4' RO, AND 1/2" CA PIPING FROM
EXISTING VALVE TO NEW CONNECTION POINT. PLACE BALL VALVE IN THE OPEN
POSITION. ROUTE 2" DRAIN PIPING FROM EQUIPMENT TO FLOOR DRAIN. PROVIDE NEW
FLOOR DRAIN BODY TO MATCH EXISTING. PROVIDE DRAIN TEMPERING VALVE ON DRAIN
PIPING. FINAL CONNECTIONS BY EQUIPMENT CONTRACTOR. REFER TO DETAIL.
REMOVE TEMPORARY CAP ON PIPING. ROUTE 1" CW PIPING FROM EXISTING VALVE TO
NEW CONNECTION POINT. PLACE BALL VALVE IN THE OPEN POSITION. ROUTE 2" DRAIN
PIPING FROM EQUIPMENT TO FLOOR DRAIN. FINAL CONNECTIONS BY EQUIPMENT
CONTRACTOR. REFER TO DETAIL.
REMOVE TEMPORARY CAP ON PIPING. ROUTE 1 1/4" CW, 1 1/4" HW, 1 1/4" RO, AND 1/2" CA
PIPING FROM EXISTING VALVE TO NEW CONNECTION POINT. PLACE BALL VALVE IN THE
OPEN POSITION. ROUTE 3" DRAIN PIPING FROM EQUIPMENT TO FLOOR DRAIN. REINSTALL
EXISTING DRAIN PAN PUMP AND ROUTE PIPING TO FLOOR DRAIN. FINAL CONNECTIONS
BY EQUIPMENT CONTRACTOR. REFER TO DETAIL.
REMOVE TEMPORARY CAP ON PIPING. ROUTE 3/4" CW, 3/4" HW, AND 1/2" RO PIPING FROM
EXISTING VALVE TO NEW CONNECTION POINT. ROUTE 1/2" CA ABOVE CEILING FROM
ADJACENT SINK AS SHOWN TO NEW CONNECTION POINT. PLACE BALL VALVE IN THE
OPEN POSITION. ROUTE 2" DRAIN PIPING FROM EQUIPMENT TO WALL BOX. FINAL
CONNECTIONS BY EQUIPMENT CONTRACTOR. REFER TO DETAIL.
REMOVE TEMPORARY CAP ON PIPING. ROUTE 1/2" CW, 1/2" HW, AND 1/2" RO PIPING FROM
EXISTING VALVE TO NEW CONNECTION POINT. PLACE BALL VALVE IN THE OPEN
POSITION. ROUTE 2" DRAIN PIPING FROM EQUIPMENT TO WALL BOX. FINAL
CONNECTIONS BY EQUIPMENT CONTRACTOR. REFER TO DETAIL.
N 0 4' 8' 16' 24'
1/8" = 1'-0"
1/8" = 1'-0"
SECOND FLOOR PLAN - PLUMBING PIPING - NEW WORK
P-501
DETAIL:DESCRIPTION:
P-501
P-501
P-501
P-501
Revisions Date
2" MINIMUM AIR
GAP (SEE NOTE)
CAST IRON
FLOOR DRAIN
DRAIN LINE
TO "P" TRAP
FINISHED FLOOR
REMOVABLE GRATE SUPPORT PIPING
EVERY 4'-0"
INDIRECT WASTE
LINE
NOTE:
THE AIR GAP BETWEEN THE INDIRECT WASTE PIPE AND THE FLOOD LEVEL RIM OF THE
WASTE RECEPTOR SHALL BE A MINIMUM OF TWICE THE EFFECTIVE OPENING OF THE
INDIRECT WASTE PIPE.
ADJUSTABLE STAND (U.L. LISTED OR
F.M. APPROVED)
ANCHOR TO FLOOR
PIPE
CW
HW
RO
CA
CA
RO
CART AND UTENSIL WASHER
TO BE INSTALLED BY OTHERS
SANITARY EXISTING TO REMAIN
DEMO EXISTING INDIRECT
DRAIN AND DRAIN PUMP
PIPING FROM EXISTING CART
WASHER
FLOOR SINK EXISTING TO
REMAIN
FLOOR
DEMO EXISTING
FLEXIBLE HOSES AND
PIPING BACK TO
ISOLATION VALVES
NEAREST MAINS.
DEMO ANY PRESENT
PIPING ACCESSORIES
EXISTING PLUMBING
BRANCHES
DEMO SHOCK
ABSORBER
GENERAL NOTES:
1. REFER TO SHEET P-801 FOR EQUIPMENT ROUGH-IN CONNECTION SIZES PER EQUIPMENT TYPE.
2. CONTRACTOR IS RESPONSIBLE FOR COORDINATING ROUGH IN LOCATIONS WITH EQUIPMENT
MANUFACTURER, CREATING MOCK-UP, AND VERIFYING FIELD CONDITIONS FOR REMODEL PRIOR
TO DISCONNECTING EQUIPMENT BEING REPLACED.
WALL
CONVEYOR
EXISTING WASHER / DISINFECTOR
CONVEYOR
FLOOR
SANITARY EXISTING TO REMAIN
DEMO SHOCK
ABSORBER
DEMO EXISTING
FLEXIBLE HOSES AND
PIPING BACK TO
ISOLATION VALVES
NEAREST MAINS.
DEMO ANY PRESENT
PIPING ACCESSORIES
GENERAL NOTES:
1. REFER TO SHEET P-801 FOR EQUIPMENT ROUGH-IN CONNECTION SIZES PER EQUIPMENT TYPE.
2. CONTRACTOR IS RESPONSIBLE FOR COORDINATING ROUGH IN LOCATIONS WITH EQUIPMENT
MANUFACTURER, CREATING MOCK-UP, AND VERIFYING FIELD CONDITIONS FOR REMODEL PRIOR
TO DISCONNECTING EQUIPMENT BEING REPLACED.
CW
HW
RO
RO
EXISTING PLUMBING
BRANCHES
DEMO EXISTING DRAIN
COOLER AND DRAIN PIPE
DEMO EXISTING FLOOR DRAIN
BODY
DEMO SHOCK
ABSORBER
FLOOR
SANITARY EXISTING TO REMAIN
DEMO EXISTING DRAIN
COOLER AND DRAIN PIPE
DEMO EXISTING FLOOR DRAIN
BODY
STERILIZER TO BE
REMOVED BY OTHERS
DEMO EXISTING
FLEXIBLE HOSES AND
PIPING BACK TO
ISOLATION VALVES
NEAREST…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .