About this file

These are architectural and engineering construction documents for a Sterile Processing Services (SPS) Equipment Site Preparation project at the Durham VA Medical Center. The project involves replacing existing medical equipment with new Getinge brand equipment, including three Sonic Cleaners, two Instrument Washers, one Cart Washer, and three Steam Sterilizers. The comprehensive set of drawings covers architectural, plumbing, mechanical, and electrical work required to prepare the 2nd floor SPS department for new equipment installation.

The project is structured with two primary bid items: Item 0001 covers removing and preparing the site for new equipment for most devices, while Item 0002 specifically addresses the removal and site preparation for three Steam Sterilizers. The construction documents specify detailed requirements for equipment replacement, utility connections, phasing, and adherence to various codes and standards, including NFPA, NEC, and VA construction guidelines. The project has a 545-day performance period and requires careful coordination to minimize disruption to the 24/7 SPS department operations, with a requirement to maintain at least two pieces of similar equipment operational throughout the project.

View the file

Other files for this federal contract opportunity

Other files attached to Y1DB--Install Sterile Processing Services Equipment Site Prep, newest first.
File Type Posted
36C24625B0024 0003.docx DOCX document
36C24625B0024 0002.docx DOCX document
36C24625B0024 0001.docx DOCX document
Contractor Invoice Form.pdf PDF
36C24625B0024_2.docx DOCX document
Specifications Rev. 05.07.25 Install SPS Site Prep 558-23-300 Durham.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120

FULLY SPRINKLERED

Department of Veterans Affairs Medical Center

ABOVE GROUP, INC.

MECHANICAL ELECTRICAL PLUMBING

305 EAST DRIVE, SUITE H

MELBOURNE, FL 32904

321.345.9026 P

305 East Dr., Suite H, Melbourne, Florida 32904

PH: 321.345.9026

VA Project No.

AG Project No.

A u to d e s k D o c s /V

A M

C

D u rh a m

/0

D u rh a m V

A I n s ta ll S

P S

E q u im e n t_

R

M

E P

.r v t

/7

/2

:1

:2

A M

GI001

VA COVER SHEET INSTALL SPS EQUIPMENT

Durham VA

0124042

05/07/2025 JMC AJZ

CONSTRUCTION DOCUMENTS

JOSHUA CALHOUN, P.E.

PA License #PE093054

INSTALL SPS EQUIPMENT

VAMC - DURHAM 508 FULTON STREET DURHAM, NC 27705 PROJECT #: 558-23-300

558-23-300

SHEET LIST

SHEET NUMBER SHEET NAME

GENERAL

GI001 VA COVER SHEET

GI002 GENERAL NOTES AND PHASING

ARCHITECTURAL

AG-001 2nd FLOOR - ICRA PLAN

AG-002 2ND FLOOR - ICRA ASSESSMENT NOTES

AD-101 2nd FLOOR - SELECTIVE REMOVAL PLAN

A-101 2nd FLOOR - NEW WORK PLAN

PLUMBING

P-001 PLUMBING NOTES, LEGENDS, & SYMBOLS

PD101 SECOND FLOOR PLAN - PLUMBING PIPING - DEMOLITION

PP101 SECOND FLOOR PLAN - PLUMBING PIPING - NEW WORK

P-501 PLUMBING DETAILS

P-801 PLUMBING SCHEDULES

MECHANICAL

M-001 MECHANICAL NOTES, LEGENDS, & SYMBOLS

MD101 SECOND FLOOR PLAN - MECHANICAL - DEMOLITION

MH101 SECOND FLOOR PLAN - MECHANICAL - NEW WORK

M-501 MECHANICAL DETAILS

M-801 MECHANICAL SCHEDULES

ELECTRICAL

E-001 ELECTRICAL LEGENDS & SYMBOLS

ED102 SECOND FLOOR PLAN - ELECTRICAL EQUIPMENT - DEMO

EP101 SECOND FLOOR PLAN - ELECTRICAL EQUIP - NEW WORK

E-501 ELECTRICAL DETAILS

E-601 ELECTRICAL DIAGRAMS

TOTAL SHEET COUNT : 21

PROJECT LOCATION

© Google Maps

NN

DELTA ENGINEERS,

ARCHITECTS, & SURVEYORS

ARCHITECT

8401 CONNETICUT AVE, SUITE 350

CHEVY CHASE, MD 20815

301.718.0080 P

CT CONSULTANTS

HAZMAT

44265 PLYMOUTH OAKS BLVD.

PLYMOUTH, MI 48170

734.455.8600 P

O'CONNOR CONSTRUCTION

MANAGEMENT INC, OCMI

COST ESTIMATING

2015 AYRSLEY TOWN BLVD., SUITE 202

CHARLOTTE, NC 28273

704.280.8356 P

Revisions Date

STAMP

OFFICE

D2009

WORK RM

D2006

HAC

D2008

TOILET

D2006A

CORRIDOR

LOCKER RM

D2010J

MENS

D2010K

ANTE RM

D2010G

LOCKER RM

D2010A

WOMENS

D2010B

SURGICAL SUPPLY AND CART STORAGE

C2015

ELECTRICAL CLOSET

C2023

CORRIDOR

TELEPHONE CLOSET

C2005B

OFFICE

C2005A

LINEN/TRASH CHUTE

C2007

CORRIDOR

ELEVATOR

CORRIDOR

C2010CLEAN RECEIVING AND BREAKOUT

C2000

DUMBWAITER

ANTE RM

C2004

SPD CLEAN STORAGE

C2002

EQUIP STORAGE AND TESTING

C2002D

DUMBWAITER

CART WASH

MANUAL CART WASH

C2002A

SPD CART WASH AREA

D2010

STORAGE

C2002A

ETO STERILIZER

HAC

C2002B

HAC

D2010DSCOPE STORAGE

C2002C

DUMBWAITER

SPD SOIL RECEIVING AND DECONTAMINATION

D2010E

CART/EQUIP ANTE RM

D2010C

WATER TREATMENT

D2010F

STAIR

D2014A

MECHANICAL CHASE

SPD STORAGE

C2005

OFFICE/LAB

C2009

ICRA ZONE PHASE 1

APPROX 490 SQ.FT

MAX VOLUME 4,410 CU.FT

6 AIR CHANGES: 440 CFM

PREPARATION ASSEMBLY AND STERILIZATION

D2014

PHASE PATTERN KEY EQUIPMENT

REPLACED

EQUIPMENT MODULE

LARGEST SIZE

(WxHxD IN)

AFFECTED ROOMS ROOM NUMBER

PHASING DIAGRAM TABLE

1 N/A

SURGICAL SUPPLY AND CART STORAGE

CORRIDOR

C2015 NORTH

NEAR ENTRANCE

UNOCCUPIED AREAS

N/A

2 CARTWASHER

SPD SOILED RECEIVING AND DECON

CARTWASHER CHAMBER

D2010E CARTWASH ENTRANCE

ALL

53x96x47

5A STERILIZER

PREPARATION ASSEMBLY AND STERILIZATION D2014

EQUIPMENT AREA35.5x78x64

5-B/C STERILIZERS EQUIPMENT AREA35.5x78x64

SPD SOILED RECEIVING AND DECON D2010E

PREPARATION ASSEMBLY AND STERILIZATION D2014

SPD SOILED RECEIVING AND DECON D2010E

3-A/B/C

INSTRUMENT

WASHERS

EQUIPMENT AREA44x39x73

PREPARATION ASSEMBLY AND STERILIZATION D2014

SPD SOILED RECEIVING AND DECON D2010E

SONIC

CLEANERS

EQUIPMENT AREA24x50x65 SPD SOILED RECEIVING AND DECON D2010E

NOTES

1 2

1 3

1 4

1 5

1 6

1 7

BID ITEM

BASE BID

BASE BID

BASE BID

BASE BID

BASE BID

DEDUCT

ALTERNATE 1

OFFICE

D2009

WORK RM

D2006

HAC

D2008

TOILET

D2006A

CORRIDOR

LOCKER RM

D2010J

MENS

D2010K

ANTE RM

D2010G

LOCKER RM

D2010A

WOMENS

D2010B

SURGICAL SUPPLY AND CART STORAGE

C2015

ELECTRICAL CLOSET

C2023

CORRIDOR

TELEPHONE CLOSET

C2005B

OFFICE

C2005A

LINEN/TRASH CHUTE

C2007

CORRIDOR

ELEVATOR

CORRIDOR

C2010CLEAN RECEIVING AND BREAKOUT

C2000

DUMBWAITER

ANTE RM

C2004

SPD CLEAN STORAGE

C2002

EQUIP STORAGE AND TESTING

C2002D

DUMBWAITER

CART WASHMANUAL CART WASH

C2002A

SPD CART WASH AREA

D2010

STORAGE

C2002A

ETO STERILIZER

HAC

C2002B

HAC

D2010DSCOPE STORAGE

C2002C

DUMBWAITER

SPD SOIL RECEIVING AND DECONTAMINATION

D2010E

CART/EQUIP ANTE RM

D2010C

WATER TREATMENT

D2010F

PREPARATION ASSEMBLY AND STERILIZATION

D2014

STAIR

D2014A

MECHANICAL CHASE

SPD STORAGE

C2005

OFFICE/LAB

C2009

ICRA ZONE PHASE 2

APPROX 100 SQ.FT

MAX VOLUME 900 CU.FT

6 AIR CHANGES: 90 CFM

EACH BOUNDARY

7 OFFICE

D2009

WORK RM

D2006

HAC

D2008

TOILET

D2006A

CORRIDOR

LOCKER RM

D2010J

MENS

D2010K

ANTE RM

D2010G

LOCKER RM

D2010A

WOMENS

D2010B

SURGICAL SUPPLY AND CART STORAGE

C2015

ELECTRICAL CLOSET

C2023

CORRIDOR

TELEPHONE CLOSET

C2005B

OFFICE

C2005A

LINEN/TRASH CHUTE

C2007

CORRIDOR

ELEVATOR

CORRIDOR

C2010CLEAN RECEIVING AND BREAKOUT

C2000

DUMBWAITER

ANTE RM

C2004

SPD CLEAN STORAGE

C2002

EQUIP STORAGE AND TESTING

C2002D

DUMBWAITER

CART WASH

MANUAL CART WASH

C2002A

SPD CART WASH AREA

D2010

STORAGE

C2002A

ETO STERILIZER

HAC

C2002B

HAC

D2010DSCOPE STORAGE

C2002C

DUMBWAITER

SPD SOIL RECEIVING AND DECONTAMINATION

D2010E

CART/EQUIP ANTE RM

D2010C

WATER TREATMENT

D2010F

PREPARATION ASSEMBLY AND STERILIZATION

D2014

STAIR

D2014A

MECHANICAL CHASE

SPD STORAGE

C2005

OFFICE/LAB

C2009

ICRA ZONE PHASE 3

APPROX 100 SQ.FT

MAX VOLUME 900 CU.FT

6 AIR CHANGES: 90 CFM

EACH BOUNDARY

ICRA ZONE PHASE 3

APPROX 75 SQ.FT

MAX VOLUME 675 CU.FT

6 AIR CHANGES: 70 CFM

EACH BOUNDARY

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120

FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904

PH: 321.345.9026

VA Project No.

AG Project No.

A u to d e s k D o c s /V

A M

C

D u rh a m

/0

D u rh a m V

A I n s ta ll S

P S

E q u im e n t_

R

M

E P

.r v t

/7

/2

:1

:2

A M

GI002

GENERAL NOTES AND PHASING INSTALL SPS EQUIPMENT

Durham VA

0124042

05/07/2025 JMC AJZ

CONSTRUCTION DOCUMENTS

JOSHUA CALHOUN, P.E.

PA License #PE093054

558-23-300

1. THE DEPARTMENT OF VETERANS AFFAIRS PROJECT SCOPE INCLUDES REPLACING SPECIFIC STERILE PROCESSING EQUIPMENT WITHIN

THE EXISTING STERILE PROCESSING DEPARTMENT.

2. REFERENCE DEMOLITION PLAN FOR HORIZONTAL AND VERTICAL CONTROL.

3. THE CONTRACTOR SHALL MAINTAIN A CLEAN AND ORDERLY APPEARANCE IN ALL WORK AREAS. TRASH AND WASTE MATERIALS SHALL BE STORED IN APPROVED CONTAINERS AND ROUTINELY DISPOSED OF OFF-SITE. CLEANUP SHALL BE REQUIRED AT THE END OF EACH

DAY OR AS DIRECTED BY THE VA CONTRACTING OFFICERS REPRESENTATIVE “VA COR”.

4. THE GC'S SUPERINTENDENT, WHO IS APPRISED OF THE CONDITION AND PROGRESS OF ALL AREAS OF WORK ON SITE SHALL BE PRESENT AT ALL TIMES WHEN WORK IS BEING DONE. THIS PERSON SHALL BE ABLE TO SPEAK FOR AND ACT IN THE BEHALF OF THE CONTRACTOR. THEY SHALL BE AWARE AND KNOWLEDGEABLE OF ALL THE SAFETY CONCERNS ON THE JOB SITE. THEY SHALL BE EMPOWERED TO IMMEDIATELY AND EFFECTIVELY MITIGATE THE ACTIONS OF ANY WORKMAN ON SITE.

5. CONSTRUCTION OF THE PROJECT SHALL BE IN CONFORMANCE WITH ALL APPLICABLE VA, FEDERAL AND STATE REQUIREMENTS.

6. ALL TESTS, STUDIES, ETC., REQUIRED DURING CONSTRUCTION WILL BE CARRIED OUT BY A THIRD PARTY ENGINEERING FIRM AND PAID

FOR BY THE CONTRACTOR.

7. LIMITS OF DISTURBANCE ARE APPROXIMATE. ALL AREAS DISTURBED BY THE CONTRACTOR SHALL BE RESTORED. DISTURBED TURF

AREAS SHALL BE RESTORED.

8. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND COORDINATES AND REPORT ANY DISCREPANCIES TO THE VA COR PRIOR TO

ANY CONSTRUCTION.

9. PLANS SHOW FIXTURES “SIGNS, LIGHTS, ETC.” THAT ARE TO BE REMOVED AND REINSTALLED AFTER CONSTRUCTION OF UTILITIES.

CONTRACTOR SHALL:

A. DOCUMENT CONDITION OF FIXTURES PRIOR TO REMOVAL.

B. REMOVE ALL FIXTURES USING METHODS THAT DO NOT CAUSE DAMAGE.

C. STORE THE FIXTURES IN A VA COR APPROVED LOCATION UNTIL REINSTALLMENT

D. PROTECT ALL STORED FIXTURES FROM DAMAGE

PRICING NOTES:

GENERAL NOTES:

CONSTRUCTION NOTES:

1. REFERENCE DIVISION 1 SPECIFICATIONS FOR A COMPREHENSIVE LIST OF REQUIREMENTS. CONTRACTOR SHALL PROVIDE

ALTERNATE PRICING AS FOLLOWS:

A. ITEM I, BASE BID : WORK INCLUDES GENERAL CONSTRUCTION, ALTERATIONS, AND NECESSARY REMOVAL OF EXISTING

COMPONENTS. WORK SHALL INCLUDE THE PHASED DEMOLITION OF THE EXISTING SPS EQUIPMENT, PREPARATION OF UTILITIES, AND MODIFICATIONS TO EXISTING WALLS AND WINDOWS AS REQUIRED AND SHOWN ON THE CONSTRUCTION DOCUMENTS.

CONTRACTOR IS TO PROVIDE THEIR BID IN ACCORDANCE WITH THE FOLLOWING INSTRUCTIONS:

1. CONTRACTOR SHALL INCLUDE THE EFFORT REQUIRED TO MANAGE THE COORDINATION WITH THE MEDICAL EQUIPMENT

MANUFACTURER TO DETERMINE THE PHASING, SHUTDOWN, DEMOLITION, INSTALLATION, AND COMPLETION OF EACH PHASE.

2. BASE BID: THE PHASING, DEMOLITION, AND RETROFIT WORK TO REMOVE ALL OF THE EQUIPMENT SHOWN ON THE PLANS AND

PREPARE FOR TEH EQUIPMENT MANUFACTURER TO INSTALL THE NEW EQUIPMENT.

3. ALTERNATE NO.1: BASE BID EXCEPT EXCLUDE THE WORK SHOWN FOR THE STERILIZERS, LISTED AS PHASES 5A AND 5-B/C ON

THE CONSTRUCTION DOCUMENTS

2. NEW MEDICAL / STERILE PROCESSING EQUIPMENT IS OWNER FURNISHED, ASSEMBLED AND INSTALLED BY MANUFACTURER.

CONTRACTORS SCOPE INCLUDES MODIFICATIONS TO UTILITIES AND ROOMS AS REQUIRED TO REPLACE EQUIPMENT AS SHOWN ON

THE CONSTRUCTION DOCUMENTS.

3. CONTRACTOR SHALL INCLUDE EFFORT TO MOCKUP INSTALLATION AND CONNECTIONS FOR REPLACED EQUIPMENT TO VERIFY ALL WORK PRIOR TO TAKING ANY PIECE OF EQUIPMENT OFFLINE. REWORK REQUIRED TO MODIFY UTILITIES, WALLS, OR OTHER APPURTENANCES THAT SUPPORT THE EQUIPMENT AFTER DEMOLITION HAS STARTED THAT DELAYS THE SCHEDULE OR INCREASES

THE TIME EQUIPMENT IS UNAVAILABLE TO THE USERS ARE UNACCEPTABLE.

4. CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATION WITH THE EQUIPMENT MANUFACTURER TO ESTABLISH THE PHASED INSTALLATION OF THE NEW EQUIPMENT. CONTRACTOR SHALL ALSO BE RESPONSIBLE FOR THE REMOVAL OF CONSTRUCTION BARRIERS ONCE THE EQUIPMENT MANUFACTURER HAS COMPLETED ALL NECESSARY INSTALLATION TESTS FOR EACH PIECE OF

EQUIPMENT.

* PLEASE NOTE THAT THE TERM PROJECT ENGINEER REFERS TO THE CONTRACTING OFFICER'S REPRESENTATIVE (C.O.R.).

1. ALL WORK SHALL COMPLY WITH THE LATEST NFPA 101 LIFE SAFETY CODE, INTERNATIONAL BUILDING CODE, AND OTHER CODES AS IDENTIFIED IN VHA PROGRAM GUIDE PG-18-3, TOPIC 01, CODES, STANDARDS AND EXECUTIVE ORDERS WHICH CAN BE FOUND ON

THE DEPARTMENT OF VETERAN AFFAIRS, TECHNICAL INFORMATION LIBRARY WEBSITE.

2. ALL WORK SHALL COMPLY WITH REQUIREMENTS OF THE LATEST ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARD (ABAAS) AND DEPARTMENT OF VETERANS AFFAIRS BARRIER FREE DESIGN GUIDE PG-18-13 WHICH CAN BE FOUND ON THE

DEPARTMENT OF VETERANS AFFAIRS TECHNICAL INFORMATION LIBRARY WEBSITE.

3. CONTRACTOR IS RESPONSIBLE TO VISIT THE SITE, EXAMINE AND ACCEPT EXISTING CONDITIONS PRIOR TO BIDDING. SITE VISITS

TO BE COORDINATED WITH THE CONTRACTING OFFICER'S REPRESENTATIVE.

4. CONTRACTOR IS RESPONSIBLE TO REPAIR AND/OR REFINISH, TO MATCH ADJACENT EXISTING SURFACES, ANY EXISTING MATERIALS TO REMAIN THAT ARE DAMAGED DURING THE COURSE OF DEMOLITION OR NEW WORK.

5. WHERE REMOVAL OF EXISTING WORK IS REQUIRED FOR INSTALLATION OF NEW WORK, CONTRACTOR SHALL REPAIR EXISTING CONSTRUCTION TO REMAIN OR PROVIDE NEW CONSTRUCTION TO MATCH EXISTING ADJACENT SURFACES TO REMAIN.

6. CONTRACTOR IS RESPONSIBLE TO FIELD VERIFY ALL CONDITIONS AND DIMENSIONS PRIOR TO ORDERING, FABRICATING OR

INSTALLING NEW MATERIALS.

7. CONTRACTOR IS RESPONSIBLE TO VERIFY SIZES OF ALL EQUIPMENT, ETC. TO BE INSTALLED AS PART OF THIS PROJECT, AND WHERE NECESSARY, MAKE SPECIAL PROVISIONS TO INSTALL EQUIPMENT THAT IS TOO LARGE TO FIT THROUGH FINISHED

OPENINGS.

8. CONTRACTOR SHALL PROVIDE WOOD BLOCKING AT TOILET ACCESSORIES, HAND RAILS, BUMPER RAILS, SHELVING, CASEWORK, MOUNTING BRACKETS AND OTHER WALL MOUNTED ITEMS, AS INDICATED IN THE CONTRACT DOCUMENTS AND AS RECOMMENDED

BY PRODUCT MANUFACTURERS. ALL WOOD BLOCKING SHALL BE FIRE RETARDANT TREATED.

9. ALL EXPOSED NEW WORK IS TO RECEIVE NEW FINISHES UNLESS SPECIFICALLY NOTED OTHERWISE. IF NO FINISH IS INDICATED AT A PARTICULAR SURFACE, CONTRACTOR SHALL PROVIDE FINISH(S) AS INDICATED AT SIMILAR CONDITIONS.

10. CONTRACTOR SHALL PROVIDE COMPLETE AND FULLY OPERATIONAL SYSTEMS WHICH COMPLY WITH STATED CODES AND REGULATIONS. WHERE THE OMISSION OF A PART OR ELEMENT OF A SYSTEM WOULD RESULT IN THE NON-OPERATION, OR INCORRECT OPERATION OF A SYSTEM, CONTRACTOR SHALL INCLUDE SAID PART OR ELEMENT AS PART OF THE WORK.

11. ALL PENETRATIONS THROUGH NEW AND/OR EXISTING SMOKE OR FIRE RATED WALLS SHALL BE SMOKE/FIRE STOPPED AS

REQUIRED BY THE RATING OF THE WALL.

12. FIRE PROTECTION CONTRACTOR'S SPRINKLER DESIGN WILL BE SUBJECT TO AN INDEPENDENT REVIEW BY A CERTIFIED FIRE PROTECTION ENGINEER RETAINED BY THE OWNER. THE FIRE PROTECTION CONTRACTOR IS RESPONSIBLE FOR MAKING ANY REQUIRED CHANGES TO THE DESIGN AS IDENTIFIED BY THE OWNER'S FIRE PROTECTION ENGINEER AS NECESSARY FOR

COMPLIANCE WITH SPECIFIED NFPA REQUIREMENTS.

1/16" = 1'-0"

SPS EQUIPMENT REPLACEMENT - PHASE 1 AND 2

PHASING CODED NOTES:

APPROXIMATE BOUNDARY LIMITS FOR CONSTRUCTION BOUNDARIES PER PHASE. VERIFY CONSTRUCTION BARRIER WITH CONTRACTING OFFICER REPRESENTATIVE PRIOR TO THE START OF DEMOLITION EACH PHASE. PROVIDE ANTEROOMS AS REQUIRED BY ICRA PLAN.

ACCESS PATH FOR EQUIPMENT REPLACEMENT TO BE CONSTRUCTED PRIOR TO THE DEMOLITION OF ANY MEDICAL OR STERILE PROCESSING EQUIPMENT, OR SHUTOFF OF ANY UTILITIES THAT SERVE THE STERILE PROCESSING SERVICES AREA.

VERIFY THAT CONSTRUCTION BARRIER CAN ACCOMMODATE TURNING RADIUS REQUIRED FOR LARGEST MODULE OF EQUIPMENT BEING REPLACED. ATTEMPT TO MINIMIZE ADDITIONAL SPACE REQUIRED FOR CONSTRUCTION BARRIER TO MINIMIZE IMPACT TO OCCUPIED

SPACE.

STERILIZER IN OPEN AREA IS TO BE REPLACED PRIOR TO THE WALL RECESSED UNITS. LIMIT CONSTRUCTION BARRIERS TO ALLOW STAFF ACCESS TO REMAINING EXISTING STERILIZERS.

WALL RECESSED STERILIZERS ARE TO BE REPLACED ONE AT A TIME, WITH CONSTRUCTION BARRIERS INSTALLED TO ALLOW VA STAFF TO ACCESS TO AT LEAST TWO (2) OPERATIONAL STERILIZERS AT ALL TIMES. EQUIPMENT IS TO BE REPLACED FROM THE SOILED RECEIVING ROOM AS MUCH AS PRACTICAL AND CONSTRUCTION BARRIERS ARE TO BE MINIMIZED ON PREPARATION ASSEMBLY SIDE.

INSTRUMENT WASHERS ARE TO BE REPLACED ONE AT A TIME, WITH CONSTRUCTION BARRIERS INSTALLED TO ALLOW VA STAFF TO ACCESS TO AT LEAST TWO (2) OPERATIONAL WASHERS AT ALL TIMES. EQUIPMENT IS TO BE REPLACED FROM THE SOILED RECEIVING ROOM AS MUCH AS PRACTICAL AND CONSTRUCTION BARRIERS ARE TO BE MINIMIZED ON PREPARATION ASSEMBLY SIDE. MAINTAIN A CLEAR ACCESS PATH TO INSTRUMENT WASHERS BEHIND CONSTRUCTION BARRIERS FOR FACILITY STAFF ACCESS.

PHASE SONIC CLEANER REPLACEMENT SO THAT FACILITY STAFF CAN ACCESS AT LEAST 2 OPERATIONAL UNITS AT ANY TIME.

FOR EXHAUST AIR FROM ICRA BARRIER, DISCHARGE AIR FROM NEGATIVE PRESSURE MACHINE TO BUILDING EXTERIOR. PROVIDE NEW METAL PANEL SYSTEM, AMERICLAD SYSTEM AC-3000 OR EQUAL, AND SEAL AROUND DUCTWORK PENETRATION. DO NOT FASTEN PANEL SYSTEM THAT SEALS AROUND DUCTWORK TO WINDOW FRAME THAT CREATES PERMANENT DAMAGE TO FENESTRATION SYSTEM. TERMINATE DUCTWORK AT 45° CUT TO PREVENT WATER INTRUSION THROUGH WINDOW OR INTO DUCT. REPLACE METAL PANEL WITH GLAZING MATHCING EXISTING CONDITIONS UNLESS INSTRUCTED OTHERWISE BY VA REPRESENTATIVE. SEE MH101 FOR MORE INFORMATION.

1/16" = 1'-0"2

SPS EQUIPMENT REPLACEMENT - PHASE 5 - STERILIZERS

1/16" = 1'-0"3

SPS EQUIPMENT REPLACEMENT - PHASE 3/4 - INSTRUMENT WASHERS AND SONIC CLEANERS

N 0 8' 16' 32' 48'

1/16" = 1'-0"

Revisions Date

CONSTRUCTION PHASING GENERAL NOTES:

1. PHASING DIAGRAM SHOWN REPRESENTS A SINGLE OPTION FOR THE CONSTRUCTION, OTHER OPTIONS OR SOLUTIONS MAY BE ACCEPTABLE BY THE RESPONSIBLE DESIGNERS AND VA IF PROPOSED BY THE CONTRACTOR. EACH PHASE SHALL BE INDEPENDENT OF ALL OTHERS AND NOT ASSUMED TO BE SEQUENTIAL UNLESS THE VA PROVIDES PRIOR APPROVAL. CONTRACTOR SHALL COORDINATE WITH THE VA AND EQUIPMENT MANUFACTURER RESPONSIBLE FOR THE FINAL EQUIPMENT INSTALLATION PRIOR TO THE START OF WORK

OF EACH PHASE.

2. WHERE MULTIPLE PIECES OF SIMILAR EQUIPMENT ARE BEING REPLACED, CONTRACTOR SHALL TAKE EVERY EFFORT AND PRECAUTION TO KEEP AT LEAST TWO (2) OF THE EQUIPMENT INSTANCES OPERATIONAL AND ACCESSIBLE TO VA STAFF AT ALL TIMES.

3. CONSTRUCTION PHASING SHALL BE COORDINATED WITH VA REPRESENTATIVES PRIOR TO THE START OF CONSTRUCTION. ASSUME AT MINIMUM A 2 WEEK PERIOD IS REQUIRED TO COORDINATE ALL CONSTRUCTION PHASING PRIOR TO THE START OF WORK.

4. CONTRACTOR SHALL ASSUME MULTIPLE SHUTDOWNS ARE REQUIRED, MULTIPLE CONSTRUCTION PHASES ARE REQUIRED, AND WORK IS TO BE PERFORMED ON NIGHTS AND WEEKENDS. NO ADDITIONAL FUNDS SHALL BE ALLOTTED FOR PHASING NOT PLANNED BY THE CONTRACTOR DURING THE ORIGINAL BIDDING PROCESS. AT THE CONVINIENCE OF THE VA, THE WORK MAY BE PERFORMED DURING REGULAR BUSINESS HOURS WITH EXPRESS APPROVAL BY THE FACILITY PRIOR TO THE START OF THE RESPECTIVE PHASE. IT IS NOT TO BE ASSUMED THAT ANY WORK MAY BE PERFORMED DURING REGULAR HOURS AS PART OF THE BASE SCOPE OF WORK.

A. CONTRACTOR TO ASSUME, AT MINIMUM, ONE SHUTDOWN PER PHASE GROUP INDICATED BELOW.

5. CONTRACTOR TO COORDINATE, DETERMINE ALLOWABLE SHUTDOWN PERIOD, AND RECEIVE WRITTEN APPROVAL FROM VA

REPRESENTATIVE FOR EACH PHASE AT A MINIMUM OF 24 HOURS PRIOR TO THE SHUTDOWN.

6. CONTRACTOR SHALL PROVIDE MOCKUPS OF NEW EQUIPMENT PRIOR TO THE INSTALLATION OF EACH EQUIPMENT TYPE TO VERIFY THAT ALL CONNECTIONS CAN BE MADE WITHOUT ALTERING OF BUILDING'S STRUCTURE OR MAIN UTILITIES. NO ADDITIONAL FUNDING OR CONSTRUCTION SCHEDULE WILL BE ALLOCATED FOR CONTRACTOR'S LACK OF PREPARATION FOR THE REPLACEMENT OF THE

EQUIPMENT.

7. CONTRACTOR SHALL PROVIDE TEST AND BALANCE MEASUREMENTS AND REPORT OF ALL INLETS AND OUTLETS FOR ALL ROOMS AFFECTED BY CONSTRUCTION PRIOR TO THE START OF DEMOLITION. CONTRACTOR SHALL VERIFY SPACE PRESSURIZATION AND AIRFLOWS IN EACH ROOM AFFECTED BY CONSTRUCTION BETWEEN EACH PHASE AS VENTILATION FOR CONSTRUCTION BARRIERS IS

ADJUSTED AND OR REMOVED FROM OPERATION.

E.C.R.C

TO BLDG. 23

C2000

D 2014

C2010

C2002

C2005

C2015

D 2010E

C2023

D2006A

D2006

D2007 D2005

D2002

D2003 D2001

D2004

C2002B

D2010

C2011

C2009

C2002A

C2004

C2005B

C2007

C2005A

C2002A

D2009

D2008D2010A

C2002D

D2010G

D2010J

D2010D

D 2010F

D 2010C

C2002C

D 2014A

D2010K

D2010B

TOILET

ELECTRICAL

STAIR-5

CLOSET

SPD CLEAN STORAGE

OFFICE

WORK RM

KEEPING

SPD STORAGE

CLOSET

OFFICE

OFFICE/LAB

OFFICE/LAB

LINEN /

HOUSE

STORAGE

LINEN CHUTE

STERILIZATION

ETO STERILIZER

DUMB WAITER

DUMB

WAITER

WASH

MANUAL

SPD CART

WASH AREA

SHAFT

AND DECONTAMINATION

BREAKOUT

FIRE CABINET

LINEN

ONC OFFICE

HEM /

ONC OFFICE

HEM /

ONC OFFICE

HEM /

ONC OFFICE

HEM /

ONC OFFICE

HEM /

ONC OFFICE

HEM /

CORRIDOR

CORRIDOR

ANTE RM

RECEIVING AND

TELEPHONE

TRASH CHUTE

CHUTE

STORAGE

GENERAL

CORRIDOR

CORRIDOR

CORRIDOR

HAC

CORRIDOR

RM

CART STORAGE

SURGICAL SUPPLY AND

WOMENS

EQUIP STORAGE

AND TESTING

ANTE RM

LOCKER RM

CORRIDOR

MENS

CLOSET CLOSET

KEEPING

HOUSE

CLEAN

DUMBWAITER

SPD SOILED RECEIVING

ETO #1 ETO #2 ETO #3 ETO #4

TREATMENT

WATER

ASSEMBLY AND

PREPARATION

EQUIP

CART/

ANTE RM

SCOPE

STORAGE

LOCKER

PROGRESS PRINT

NOT FOR CONSTRUCTION

PROGRESS PRINT

NOT FOR CONSTRUCTION

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120

FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904

PH: 321.345.9026

VA Project No.

AG Project No.

Email: mail@delta-eas.com www.delta-eas.com

8401 Connecticut Avenue, Suite 350 Chevy Chase, MD 20815

Tel: 301.718.0080 Fax: 301.718.9520

558-23-300

DURHAM VA

A u to d e s k D o c s

/V A

M C

D u rh a m

/2

.0

.0

-D u rh a m S

P S

-R

.r v t

/7

/2

:5

:2

P M

1/7/2025 6:51:20 PM1/7/2025 6:51:20 PM

AG-001

2nd FLOOR - ICRA PLAN INSTALL SPS EQUIPMENT 124042

01/07/2025 EJL LDM

100% CONSTRUCTION

DOCUMENTS

SCALE: 1/8" = 1'-0"AG-001

1 2nd FLOOR - ICRA PLAN

0'

SCALE: 1/8" = 1'-0"

2' 4' 16'8'

NORTH

NOTE:

1. THIS ICRA PLAN IS SHOWING A PROPOSED PHASING PLAN. COORDINATE PROJECT PHASING WITH MEP DRAWINGS.

PHASING TO BE FURTHER DEVELOPED AT THE NEXT MEETING.

2. REINSTALLATION OF ACP CEILING IN FIELD WITH MECHANICAL DRAWINGS. INSTALL AND REPLACE CEILING TILES AS

REQUIRED TO ADHERE TO ICRA REQUIREMENTS ABOVE.

3. REFER TO ICRA ASSESSMENT AND NOTES ON AG-002

Revisions Date

05/07/2025

CONSTRUCTION DOCUMENTS

PROGRESS PRINT

NOT FOR CONSTRUCTION

PROGRESS PRINT

NOT FOR CONSTRUCTION

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120

FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904

PH: 321.345.9026

VA Project No.

AG Project No.

Email: mail@delta-eas.com www.delta-eas.com

8401 Connecticut Avenue, Suite 350 Chevy Chase, MD 20815

Tel: 301.718.0080 Fax: 301.718.9520

558-23-300

DURHAM VA

A u to d e s k D o c s

/V A

M C

D u rh a m

/2

.0

.0

-D u rh a m S

P S

-R

.r v t

/7

/2

:5

:3

P M

1/7/2025 6:51:33 PM1/7/2025 6:51:33 PM

AG-002

2nd FLOOR - ICRA ASSESSMENT

NOTES

INSTALL SPS EQUIPMENT 124042

01/07/2025 EJL LDM

100% CONSTRUCTION

DOCUMENTS

Revisions Date

05/07/2025

CONSTRUCTION DOCUMENTS

C2000

D 2014

C2010

C2002

C2005

C2015

D 2010E

C2023

D2006A

D2006

D2007 D2005

D2002

D2003 D2001

D2004

C2002B

D2010

C2011

C2009

C2002A

C2004

C2005B

C2007

C2005A

C2002A

D2009

D2008D2010A

C2002D

D2010G

D2010J

D2010D

D 2010F

D 2010C

C2002C

D 2014A

D2010K

D2010B

TOILET

ELECTRICAL

STAIR-5

CLOSET

SPD CLEAN STORAGE

OFFICE

WORK RM

KEEPING

SPD STORAGE

CLOSET

OFFICE

OFFICE/LAB

OFFICE/LAB

LINEN /

HOUSE

STORAGE

LINEN CHUTE

STERILIZATION

ETO STERILIZER

DUMB WAITER

DUMB

WAITER

WASH

MANUAL

SPD CART

WASH AREA

SHAFT

AND DECONTAMINATION

BREAKOUT

FIRE CABINET

LINEN

ONC OFFICE

HEM /

ONC OFFICE

HEM /

ONC OFFICE

HEM /

ONC OFFICE

HEM /

ONC OFFICE

HEM /

ONC OFFICE

HEM /

CORRIDOR

CORRIDOR

ANTE RM

RECEIVING AND

TELEPHONE

TRASH CHUTE

CHUTE

STORAGE

GENERAL

CORRIDOR

CORRIDOR

CORRIDOR

HAC

CORRIDOR

RM

CART STORAGE

SURGICAL SUPPLY AND

WOMENS

EQUIP STORAGE

AND TESTING

ANTE RM

LOCKER RM

CORRIDOR

MENS

CLOSET CLOSET

KEEPING

HOUSE

CLEAN

DUMBWAITER

SPD SOILED RECEIVING

ETO #1 ETO #2 ETO #3 ETO #4

TREATMENT

WATER

ASSEMBLY AND

PREPARATION

EQUIP

CART/

ANTE RM

SCOPE

STORAGE

LOCKER

R2

R2

R2

R2

R2

R2

R2

R2

R1

R1

R1

R1

R1

R1

R1

R2

R1

R1

R3

PROGRESS PRINT

NOT FOR CONSTRUCTION

PROGRESS PRINT

NOT FOR CONSTRUCTION

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120

FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904

PH: 321.345.9026

VA Project No.

AG Project No.

Email: mail@delta-eas.com www.delta-eas.com

8401 Connecticut Avenue, Suite 350 Chevy Chase, MD 20815

Tel: 301.718.0080 Fax: 301.718.9520

558-23-300

DURHAM VA

A u to d e s k D o c s

/V A

M C

D u rh a m

/2

.0

.0

-D u rh a m S

P S

-R

.r v t

/7

/2

:5

:2

P M

1/7/2025 6:51:22 PM1/7/2025 6:51:22 PM

AD-101

2nd FLOOR - SELECTIVE REMOVAL

PLAN

INSTALL SPS EQUIPMENT 124042

01/07/2025 EJL LDM

100% CONSTRUCTION

DOCUMENTS

SCALE: 1/8" = 1'-0"AD-101

1 2nd FLOOR - SELECTIVE REMOVAL PLAN

GENERAL REMOVAL NOTES

A. ITEMS DESIGNATED ON PLAN BY DASHED LINE ARE EXISTING ELEMENTS TO BE

REMOVED. REFER TO OTHER TRADE DRAWINGS FOR OTHER REMOVALS, INCLUDING

MODIFICATIONS THAT MAY EXTEND BEYOND AREAS SHOWN.

B. FOR DURATION OF PROJECT, EXISTING CONSTRUCTION AND/OR EQUIPMENT TO

REMAIN FROM DAMAGE OR CONSTRUCTION ACTIVITIES. WHERE CONSTRUCTION

ACTIVITIES RESULT IN DAMAGE TO EXISTING CONSTRUCTION TO BE RETAINED,

REPLACE/REPAIR EXISTING CONSTRUCTION TO RETURN IT TO ITS ORIGINAL

CONDITION. WHERE REMOVAL OF EXISTING CONSTRUCTION, PIPING, DUCTWORK, AND

OTHER ITEMS CREATES OPENINGS IN WALLS, FLOORS OR CEILINGS, PATCH OPENINGS

IMMEDIATELY WITH SAME MATERIALS AS ADJACENT CONSTRUCTION AND/OR TO

MAINTAIN REQUIRED FIRE RATING.

C. PROVIDE FULL HEIGHT TEMPORARY CONSTRUCTION BARRIERS WHERE REQUIRED TO

PREVENT DUST POLLUTION OF SURROUNDING OCCUPIED AREAS. SEAL AIR-TIGHT.

PARTITIONS MUST BE INSTALLED IN ACCORDANCE WITH FIRE PROTECTION AND

EGRESS REQUIREMENTS. MAINTAIN MEANS OF EGRESS ACCESS TO EXITS DURING

CONSTRUCTION.

D. TAKE PROPER MEASURES TO PREVENT DUST MIGRATION TO AREAS OUTSIDE THE

CONSTRUCTION AREA BY CLOSING ALL OPENINGS IN DUCTS, WALLS, FLOORS AND

CEILINGS. PROVIDE CONTINUOUS EXHAUST TO EXTERIOR TO MAINTAIN NEGATIVE

PRESSURE IN CONSTRUCTION AREA.

E. COORDINATE WITH OWNER FOR EQUIPMENT TO BE SALVAGED AND RETURNED TO

OWNER. THE OWNER WILL RETAIN ALL SALVAGE THAT IS OF VALUE AS DESIGNATED BY

THE USER OR BUILDING ENGINEER. REMOVE FROM THE BUILDING AND DISPOSE OF IN

A LAWFUL MANNER ALL DEBRIS AND/OR ITEMS NOT RETAINED BY OWNER.

F. INSTALL ADHESIVE MATS INSIDE AND OUTSIDE EACH ACCESS DOOR TO

CONSTRUCTION AREA.

G. COORDINATE WITH OTHER TRADE DRAWINGS FOR REMOVAL WORK, AS REQUIRED.

REMOVAL KEY NOTES

R1 CONSTRUCT TEMPORARY CONSTRUCTION BARRIER AT EACH EQUIPMENT.

PERFORM REMOVAL/INSTALLATION OF ONE (1) UNIT AT A TIME. REMOVE

TEMPORARY BARRIER AT COMPLETION OF INSTALLATION.

R2 DEMO, PATCH, AND PAINT DRYWALL AROUND UTILITIES RECESSED IN COLUMN

FURRINGS FOR WALLS, AND FOR UTILITY WALL BOXES AS REQUIRED. REMOVE

EXISTING EQUIPMENT. REMOVE ONE (1) UNIT AT A TIME. REFER TO MEP

DRAWINGS FOR RELATED WORK.

R3 REMOVE EXISTING DOOR & FRAME. REMOVE PORTION OF EXISTING PARTITION TO

ACCOMMODATE NEW DOOR & FRAME

0'

SCALE: 1/8" = 1'-0"

2' 4' 16'8'

NORTH

Revisions Date

05/07/2025

CONSTRUCTION DOCUMENTS

DEDUCT ALTERNATE 1

DEDUCT ALTERNATE 1

C2000

D 2014

C2010

C2002

C2005

C2015

D 2010E

C2023

D2006A

D2006

D2007 D2005

D2002

D2003 D2001

D2004

C2002B

D2010

C2011

C2009

C2002A

C2004

C2005B

C2007

C2005A

C2002A

D2009

D2008D2010A

C2002D

D2010G

D2010J

D2010D

D 2010F

D 2010C

C2002C

D 2014A

D2010K

D2010B

TOILET

ELECTRICAL

STAIR-5

CLOSET

SPD CLEAN STORAGE

OFFICE

WORK RM

KEEPING

SPD STORAGE

CLOSET

OFFICE

OFFICE/LAB

OFFICE/LAB

LINEN /

HOUSE

STORAGE

LINEN CHUTE

STERILIZATION

ETO STERILIZER

DUMB WAITER

DUMB

WAITER

WASH

MANUAL

SPD CART

WASH AREA

SHAFT

AND DECONTAMINATION

BREAKOUT

FIRE CABINET

LINEN

ONC OFFICE

HEM /

ONC OFFICE

HEM /

ONC OFFICE

HEM /

ONC OFFICE

HEM /

ONC OFFICE

HEM /

ONC OFFICE

HEM /

CORRIDOR

CORRIDOR

ANTE RM

RECEIVING AND

TELEPHONE

TRASH CHUTE

CHUTE

STORAGE

GENERAL

CORRIDOR

CORRIDOR

CORRIDOR

HAC

CORRIDOR

RM

CART STORAGE

SURGICAL SUPPLY AND

WOMENS

EQUIP STORAGE

AND TESTING

ANTE RM

LOCKER RM

CORRIDOR

MENS

CLOSET CLOSET

KEEPING

HOUSE

CLEAN

DUMBWAITER

SPD SOILED RECEIVING

ETO #1 ETO #2 ETO #3 ETO #4

TREATMENT

WATER

ASSEMBLY AND

PREPARATION

EQUIP

CART/

ANTE RM

SCOPE

STORAGE

LOCKER

T Y

P

4" 2"

PARTITION AS

SCHEDULED

(2) 24 GA. METAL STUDS

FLOOR TO TOP OF WALL,

BRACE TO STRUCTURE

SEALANT, TYP.

HOLLOW METAL

FRAME (AS

SCHEDULED)

DOOR AS SCHEDULED

ADJACENT

WALL

(3) ANCHORS PER JAMB,

PROVIDE SPOT GROUTING

PARTITION + 1"

2"

PARTITION AS

SCHEDULED

METAL STUD LINTEL AS

REQ. FOR SPAN

METAL RUNNER

CHANNEL

SEALANT, TYP.

HOLLOW METAL

FRAME AS

SCHEDULED

DOOR AS SCHEDULED

PARTITION + 1"

DOOR TYPE LEGEND

FLUSH MOUNTED DOUBLE

DOOR W/ NARROW VISION LITE

S E

E S

C H

E D

U

LE

SCHEDULE

SEE

1/4" TEMPERED

VISION GLASS

6" 5"

6" 2'

AA

FRAME TYPE LEGEND

HOSPITAL STOP

4"

S E

E S

C H

E D

U

LE

2"

SCHEDULE

SEE 2"

PROGRESS PRINT

NOT FOR CONSTRUCTION

PROGRESS PRINT

NOT FOR CONSTRUCTION

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120

FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904

PH: 321.345.9026

VA Project No.

AG Project No.

Email: mail@delta-eas.com www.delta-eas.com

8401 Connecticut Avenue, Suite 350 Chevy Chase, MD 20815

Tel: 301.718.0080 Fax: 301.718.9520

558-23-300

DURHAM VA

A u to d e s k D o c s

/V A

M C

D u rh a m

/2

.0

.0

-D u rh a m S

P S

-R

.r v t

/7

/2

:5

:2

P M

1/7/2025 6:51:27 PM1/7/2025 6:51:27 PM

A-101

2nd FLOOR - NEW WORK PLAN INSTALL SPS EQUIPMENT 124042

01/07/2025 EJL LDM

100% CONSTRUCTION

DOCUMENTS

SCALE: 1/8" = 1'-0"A-101

1 2nd FLOOR - NEW WORK PLAN

GENERAL ARCHITECTURAL NOTES

A. VERIFY ALL DIMENSIONS AND EXISTING CONDITIONS. NOTIFY THE ARCHITECT OF

DISCREPANCIES PRIOR TO COMMENCING WORK. EXISTING CONDITIONS THAT WOULD

EFFECT THE EXECUTION OF THE WORK MUST BE BROUGHT TO THE ATTENTION OF THE

ARCHITECT PRIOR TO COMMENCING THE WORK.

B. DIMENSIONS GIVEN ON PLANS ARE FROM FINISHED FACE TO FINISHED FACE UNLESS

OTHERWISE NOTED. DIMENSIONS ARE NOT ADJUSTABLE WITHOUT THE APPROVAL OF

THE ARCHITECT UNLESS OTHERWISE NOTED.

C. PROVIDE BLOCKING IN WALLS AS REQUIRED TO SUPPORT WALL MOUNTED ITEMS.

LOCATE EQUIPMENT AND COORDINATE BLOCKING LOCATIONS IN FIELD.

D. PROVIDE PROTECTION OF EXISTING FINISHES AND/OR MATERIALS. RESTORE TO

ORIGINAL CONDITIONS AREAS OR FINISHES DAMAGED BY THE WORK, AT THE EXPENSE

OF THE CONTRACTOR. REMOVE MEANS OF PROTECTION AT THE END OF THE

PROJECT.

E. ALL SCRATCHES, DENTS, CRACKS, HOLES, OPENINGS, IRREGULARITIES AND/OR

DEFECTS IN BOTH EXISTING AND NEW CONSTRUCTION SURFACES ARE TO BE

PATCHED TO PROVIDE A UNIFORM AND SMOOTH FINISHED SURFACE. CLEAN AND SAND

SMOOTH SURFACES BEFORE APPLYING FINISH MATERIALS.

F. REMOVE ALL EXCESS BUILD-UP OF EXISTING AND/OR NEW WALL AND PAINT

MATERIALS FROM ALL NEW AND EXISTING WALL SURFACES. CLEAN AND FINISH SAND

SMOOTH TO PROVIDE A UNIFORM AND SMOOTH WALL SURFACE READY FOR THE

APPLICATION OF FINISH MATERIALS.

G. DIMENSIONS LOCATING DOORS OR INTERIOR WINDOWS ARE TO OUTSIDE EDGE OF

FRAME UNLESS NOTED OTHERWISE. REFER TO DOOR & WINDOW SHEETS FOR FRAME

TYPE, SIZE AND DETAILS.

H. REFER TO CIVIL, STRUCTURAL, FIRE PROTECTION, PLUMBING, MECHANICAL, AND

ELECTRICAL DRAWINGS FOR ADDITIONAL INFORMATION.

RENOVATION KEY NOTES

1 INSTALL EQUIPMENT ONE (1) UNIT AT A TIME. REFER TO MEP DRAWINGS. REMOVE

TEMPORARY CONSTRUCTION BARRIER AT COMPLETION. PATCH EXISTING TO

MATCH.

2 INSTALL NEW DOOR FRAME & DOOR.

SCALE: 1 1/2" = 1'-0"A-101

2 HM JAMB DETAIL

SCALE: 1 1/2" = 1'-0"A-101

3 HM HEAD DETAIL

DOOR SCHEDULE

DOOR

NUMBER

FIRE

RATING

DOOR FRAME

GLASS

DETAILS

HARDWARE

GROUP

COMMENTSOPENING SIZE

THICKNESS

DOOR

TYPE

DOOR MATERIAL DOOR FINISH

FRAME

TYPE

FRAME MATERIAL FRAME FINISH HEAD JAMB THRESHOLD

HEIGHT WIDTH

1 - 7' - 0" 6' - 0" 1 3/4" AA HM PNT-1 1 HM PNT-1 (2) 5x24 3/A101 2/A101 - HW-1

ROOM FINISH SCHEDULE

ROOM

NUMBER

ROOM NAME

FLOOR

BASE

WALLS CEILING

COMMENTS

MATERIAL FINISH

NORTH SOUTH EAST WEST

MATERIAL FINISH

MATERIAL FINISH MATERIAL FINISH MATERIAL FINISH MATERIAL FINISH

C2002D EQUIPMENT STORAGE & TESTING - * RB-1** * * ETR PNT-1** - * - * - * *=FINISH ETR; **=PATCH TO MATCH EXISTING

C2002 SPD CLEAN STORAGE - * RB-1** ETR PNT-1** - * - * - * - * *=FINISH ETR; **=PATCH TO MATCH EXISTING

D2014 PREP ASSEMBLY & STERILIZATION - * * - **MATCH - * - **MATCH - * - * *=FINISH ETR; **=PATCH TO MATCH EXISTING

D2010E SPD SOILED RECEIVING & DECON - * * - **MATCH - * - * - **MATCH - * *=FINISH ETR; **=PATCH TO MATCH EXISTING

D2010 SPD CART WASH AREA - * * - * ETR **MATCH - * - * - * *=FINISH ETR; **=PATCH TO MATCH EXISTING

C2002A MANUAL CART WASH - * * - * - * - * - * - * * = FINISH ETR

0'

SCALE: 1/8" = 1'-0"

2' 4' 16'8'

NORTH

Revisions Date

05/07/2025

CONSTRUCTION DOCUMENTS

DEDUCT ALTERNATE 1

1. DRAWINGS ARE DIAGRAMMATIC AND INDICATE GENERAL ARRANGEMENT OF SYSTEMS. PROVIDE COMPONENTS INDICATED IN DETAILS AND/OR RISER DIAGRAMS WHETHER OR NOT INDICATED ON PLANS AND VICE VERSA. WHERE A DISCREPANCY OR CONFLICT IS FOUND BETWEEN ONE DRAWING

AND ANOTHER, OR BETWEEN A DRAWING AND APPLICABLE SPECIFICATIONS, NOTIFY THE

ARCHITECT/ENGINEER IMMEDIATELY IN WRITTEN FORM. IN GENERAL, THE MOST STRINGENT

REQUIREMENT SHALL GOVERN UNLESS THE DISCREPANCY CONFLICTS WITH APPLICABLE CODES OR

OWNER'S DESIGN STANDARDS, WHEREIN THE CODE OR OWNER'S DESIGN STANDARDS SHALL

GOVERN.

2. LOCATE VALVES IN ACCESSIBLE AREAS WHERE NECESSARY. (12"X12" MIN.)

3. PROVIDE PIPE MARKER FOR ALL PIPING ABOVE THE CEILING SPACES IN ACCORDANCE WITH DIVISION

22 SPECIFICATION SECTION. "IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT".

4. LABEL VALVES ABOVE CEILINGS AND IN CONCEALED SPACES AT CEILING TILE WITH METAL CEILING TACKS INDICATING VALVE # AND TYPE OF WATER. (i.e.; BLUE= COLD WATER, LETTERING CW

VLV1-001).

5. PROVIDE AND INSTALL WATER WATER HAMMER ARRESTORS IN ACCORDANCE WITH PDI-WH201 IN ALL HW AND CW SUPPLY PIPING WITH QUICK CLOSING VALVES AS REQUIRED. AIR CHAMBERS ARE NOT

ACCEPTABLE SUBSTITUTIONS.

6. PROVIDE THERMAL INSULATION FOR HOT WATER AND HOT WATER RETURN PIPING IN ACCORDANCE

WITH THE INTERNATIONAL ENERGY EFFICIENCY CODE (IECC) AND PER SPECIFICATIONS.

7. THE MANUFACTURERS OF EQUIPMENT SHOWN ARE THE BASIS OF DESIGN. SEE SPECIFICATION FOR

OTHER ACCEPTABLE MANUFACTURER'S.

8. FIRE CAULK AND SLEEVE PENETRATIONS THROUGH FIRE RATED ASSEMBLIES. REFER TO LIFE SAFETY PLANS FOR RATED ASSEMBLY LOCATIONS. REFER TO ARCHITECTURAL SHEETS FOR DETAILS AND UL

ASSEMBLY NUMBERS.

9. REFER TO ARCHITECTURAL SHEETS FOR FIXTURE MOUNTING.

10. COORDINATE CEILING PIPING AND ELEVATIONS IN SHOP DRAWINGS WITH ALL OTHER TRADES (I.E.

HVAC, FIRE PROTECTION, ELECTRICAL, TELECOMM, STRUCTURAL, ETC.) PRIOR TO ANY INSTALLATION

TO ENSURE PROPER CLEARANCES AND PENETRATIONS.

11. VALVES AND FITTINGS SHALL BE THE SAME SIZE AS THE PIPING WHERE THEY ARE LOCATED UNLESS

NOTED OTHERWISE.

12. PROVIDE ALL NECESSARY SUPPORTING DEVICES FOR FIXTURES PER MANUFACTURER INSTALLATION

INSTRUCTIONS.

13. ROUGH-IN WASTE AND WATER SUPPLIES FOR FIXTURES AND PERFORM FINAL CONNECTIONS PER

MANUFACTURER RECOMMENDATIONS.

14. THE CONTRACTOR SHALL BASE THEIR PROPOSAL UPON THE EQUIPMENT AS SCHEDULED USING THE

MANUFACTURERS AND MODEL NUMBERS AS SCHEDULED ON THE DRAWINGS. IF THE CONTRACTOR

WISHES TO USE EQUIPMENT NOT SCHEDULED, THEY MAY SUBMIT TO ENGINEER FOR REVIEW AND

COMPLIANCE WITH CONTRACT DOCUMENTS.

15. COMPLY WITH THE AMERICANS WITH DISABILITIES ACT (ADA) ACCESSIBILITY GUIDELINES FOR

BUILDINGS AND FACILITIES.

16. ALL AUTOMATIC CONTROL, PROTECTIVE OR SIGNAL DEVICES REQUIRED FOR THE OPERATION SPECIFIED, SHALL BE PROVIDED WITH ANY CONTROL WIRING AND INSTALLED PER MANUFACTURERS

REQUIREMENTS.

17. PROVIDE AN AIR GAP, WHEN REQUIRED BY CODE, SERVING INDIVIDUAL FIXTURES, DEVICES, APPLIANCES AND APPARATUS.

18. SHOP DRAWING SUBMITTALS SHALL BE FULLY COORDINATED PRIOR TO SUBMITTAL.

PLUMBING ABBREVIATIONSPLUMBING SYMBOL LEGEND

SYMBOL DESCRIPTION

NOTE: SOME SYMBOLS SHOWN ON THIS LEGEND MAY NOT PERTAIN TO THIS PROJECT

COMPRESSED AIR PIPINGCA

HOT WATER PIPINGHW

HOT WATER RETURN PIPINGHWR

SANITARY DRAINAGE PIPING (UNDERGROUND)SAN U/G

SANITARY DRAINAGE PIPING (ABOVE SLAB)SAN

V VENT PIPING

GATE VALVE

PRESSURE GAUGE

CHECK VALVE

BALL VALVE

CIRCULATING PUMP

PIPE END CAP

PIPE TURNING DOWN

PIPE TURNING UP

PIPE TURNING DOWN (TEE)

CLEANOUTS

CW COLD WATER PIPING

CD CONDENSATE PIPING

CIRCUIT SETTER VALVE

OR

PDI-"A" WATER HAMMER ARRESTER & SIZE

THERMOSTATIC MIXING VALVE

HB-1 OR WHY-1 HOSE BIBB / WALL HYDRANT

FLOW ARROW

P-TRAP

ROLL DOWN

PIPING TEE

PRESSURE REGULATING VALVE

BUTTERFLY VALVE

A

B

SIM

A

SECTION SYMBOL:

A = IDENTIFYING LETTER

B = SHEET WHERE SECTION IS SHOWN

SIM =

(ONLY NOTED IF IT APPLIES)

PLUMBING RISER DESIGNATION:

A = RISER IDENTIFYING SYSTEM TYPE

1 =

REVISION CLOUD AND

REVISION NUMBER

SHEET NOTE CALLOUT

A TITLE SYMBOL ON SHEET WHERE SHOWN

A = IDENTIFYING NUMBER/LETTER

RISER IDENTIFYING SYSTEM NUMBER

SIMILAR

ABBR. DESCRIPTION ABBR. DESCRIPTION

PLUMBING GENERAL NOTES

WATER HAMMER ARRESTOR

SYMBOL

1/2"

PIPE SIZE PDI STANDARD FIXTURE UNIT CAP.

3/4"

1"

1-1/4"

A

B

C

D

1 TO 11

12 TO 32

33 TO 60

61 TO 113

DEMOLISH TO POINT INDICATED

CONNECT TO EXISTING

DEMOLISHED PIPING

EXISTING PIPING

NEW PIPING

AS ABOVE SLAB

ADA AMERICANS WITH DISABILITIES ACT

AFF ABOVE FINISHED FLOOR

AFG ABOVE FINISHED GRADE

ANSI AMERICAN NATIONAL STANDARDS INSTITUTE

AP ACCESS PANEL

ASTM AMERICAN STANDARDS TESTING MATERIALS

AWWA AMERICAN WATER WORKS ASSOCIATION

BFP BACKFLOW PREVENTER

BF BELOW FLOOR

BG BELOW GRADE

BLDG BUILDING

BOP BOTTOM OF PIPE

BS BELOW SLAB

CA COMPRESSED AIR

CD CONDENSATE

CO CLEANOUT

CONN CONNECTION

CONT CONTINUOUS

CP CIRCULATING PUMP

CW COLD WATER

DA DENTAL AIR

DF DRINKING FOUNTAIN

DFU DRAINAGE FIXTURE UNITS

DIA DIAMETER

DN DOWN

DV DENTAL VACUUM

DW DOMESTIC WATER

DWF DRAIN, WASTE, AND VENT

DWG DRAWING

ECO EXTERIOR CLEANOUT

ELEV ELEVATION

EQUIP EQUIPMENT

EWC ELECTRIC WATER COOLER

EWH ELECTRIC WATER HEATER

EX EXISTING

ºF DEGREES FAHRENHEIT

FCO FLOOR CLEANOUT

FD FLOOR DRAIN

FIN FINISH

FL FLOOR

FM FORCE MAIN

FPS FEET PER SECOND

FS FLOOR SINK

FT FEET

FU FIXTURE UNITS

G NATURAL GAS

GAL GALLON(S)

GPM GALLONS PER MINUTE

GR GREASE WASTE

HB HOSE BIBB

HP HORSEPOWER

HR HOUR

HW HOT WATER

HWR HOT WATER RETURN

HZ HERTZ

IE INVERT ELEVATION

ID INTERNAL DIAMETER

IN INCHES

INV INVERT

IPS INTERNATIONAL PIPE STANDARD

IRR IRRIGATION WATER

KW KILOWATT

LA LABORATORY AIR

LAV LAVATORY

LF LINEAR FEET

LV LABORATORY VACUUM

MA MEDICAL AIR

MAP MEDICAL ALARM PANEL

MAX MAXIMUM

MIN MINIMUM

MNTG MOUNTING

MS MOP SINK

MV MEDICAL VACUUM

N NITROGEN

N2O NITROUS OXIDE

NA NOT APPLICABLE

NC NORMALLY CLOSED

NIC NOT IN CONTRACT

NO NORMALLY OPEN

NSF NATIONAL SANITATION FOUNDATION

NTS NOT TO SCALE

O2 OXYGEN

OD OUTSIDE DIAMETER

ORWL OVERFLOW RAIN WATER LEADER

PD PUMP DISCHARGE

PDI PLUMBING DRAINAGE INSTITUTE

PH PHASE

PPP PRECISION PLUMBING PRODUCTS

PSI POUNDS PER SQUARE INCH

RD ROOF DRAIN

RO REVERSE OSMOSIS WATER

RPM REVOLUTIONS PER MINUTE

RWL RAIN WATER LEADER

RX REMOVE EXISTING

S SANITARY

SAN SANITARY

SH SHOWER

SK SINK

SL SODA LINE

SPEC SPECIFICATION

SQ SQUARE

SS STAINLESS STEEL

STD STANDARD

ST STORM

STO SECONDARY STORM

TD TRENCH DRAIN

TDH TOTAL DYNAMIC HEAD

TEMP TEMPERATURE

TET THERMAL EXPANSION TANK

TMV THERMOSTATIC MIXING VALVE

TP TRAP PRIMER

TYP TYPICAL

UL UNDERWRITER'S LABORATORY

U/G UNDERGROUND

UNO UNLESS NOTED OTHERWISE

UR URINAL

V VENT

VTR VENT THROUGH ROOF

VIV VALVE IN VERTICAL

VLV VALVE

VOL VOLUME

W WATTS

W/ WITH

WAGD WASTE ANESTHETIC GAS DISPOSAL

WC WATER CLOSET

WCO WALL CLEANOUT

WHA WATER HAMMER ARRESTOR

WHY WALL HYDRANT

WFU WATER SUPPLY FIXTURE UNITS

ZVB MEDICAL ZONE VALVE BOX

APPLICABLE CODES

1. VA PLUMBING DESIGN MANUAL 2024 EDITION

2. INTERNATIONAL BUILDING CODE: CONFORM IN STRICT COMPLIANCE TO THE INTERNATIONAL BUILDING

CODE AND THE AMENDMENTS WHICH ARE ENFORCED BY THE LOCAL AUTHORITY HAVING

JURISDICTION.

A. INTERNATIONAL BUILDING CODE (IBC) 2024 EDITION

B. INTERNATIONAL PLUMBING CODE (IPC) 2024 EDITION

C. INTERNATIONAL ENERGY CONSERVATION CODE (IECC) 2024 EDITION

3. NATIONAL FIRE PROTECTION ASSOCIATION (NFPA), INCLUDING (BUT NOT LIMITED TO):

A. STANDARD FOR FIRE PREVENTION DURING WELDING, CUTTING, AND OTHER HOT WORK (NFPA 51B)

2024 EDITION

B. COMPRESSED GASES AND CRYOGENIC FLUIDS CODE, NFPA 55 2023 EDITION

C. NATIONAL ELECTRICAL CODE (NFPA 70 - NEC) 2023 EDITION

D. HEALTH CARE FACILITIES CODE (NFPA 99) 2024 EDITION

E. LIFE SAFETY CODE (NFPA 101) 2024 EDITION

4. OCCUPATIONAL SAFETY AND HEALTH ACT (OSHA)

5. AMERICANS WITH DISABILITIES ACT (ADA)

6. AMERICAN SOCIETY OF TESTING AND MATERIALS (ASTM)

7. APPLICABLE REGULATORY REQUIREMENTS AND ADVISORY PRACTICES OF APPROPRIATE AUTHORITIES HAVING JURISDICTION (AHJs)

8. APPLICABLE STANDARDS, REGULATIONS, AND PRACTICES OF THE OWNER

SYMBOL DESCRIPTION

CONTROL VALVE

BUTTERFLY VALVE

CALIBRATING BALANCING VALVE

BALL VALVE

STRAINER

UNION

THERMOMETER

PSI REG.

FLOW SWITCH

CHECK VALVE

THREE-WAY CONTROL VALVE

FLEX CONNECTION

RELIEF VALVE

VALVE ON RISER

TEST PLUG

GLOBE VALVE

PSI REG.

FLOW SWITCH

PRESSURE SWITCH

AUTOMATIC AIR VENT

XX-X SPECIALTY EQUIPMENT CALLOUT

REVERSE OSMOSIS WATER PIPINGRO

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120

FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904

PH: 321.345.9026

VA Project No.

AG Project No.

A u to d e s k D o c s /V

A M

C

D u rh a m

/0

D u rh a m V

A I n s ta ll S

P S

E q u im e n t_

R

M

E P

.r v t

/7

/2

:1

:2

A M

P-001

PLUMBING NOTES, LEGENDS, &

SYMBOLS

INSTALL SPS EQUIPMENT

Durham VA

0124042

05/07/2025 JMC AJZ

CONSTRUCTION DOCUMENTS

JOSHUA CALHOUN, P.E.

PA License #PE093054

558-23-300

SHEET LIST

SHEET NUMBER SHEET NAME

P-001 PLUMBING NOTES, LEGENDS, & SYMBOLS

PD101 SECOND FLOOR PLAN - PLUMBING PIPING - DEMOLITION

PP101 SECOND FLOOR PLAN - PLUMBING PIPING - NEW WORK

P-501 PLUMBING DETAILS

P-801 PLUMBING SCHEDULES

OFFICE

D2009

WORK RM

D2006

HAC

D2008

TOILET

D2006A

CORRIDOR

LOCKER RM

D2010J

MENS

D2010K

ANTE RM

D2010G

LOCKER RM

D2010A

WOMENS

D2010B

SURGICAL SUPPLY AND CART

STORAGE

C2015

ELECTRICAL CLOSET

C2023

CORRIDOR

TELEPHONE CLOSET

C2005B

OFFICE

C2005A

LINEN/TRASH CHUTE

C2007

CORRIDOR

ELEVATOR

CORRIDOR

C2010CLEAN RECEIVING AND BREAKOUT

C2000

DUMBWAITER

ANTE RM

C2004

SPD CLEAN STORAGE

C2002

EQUIP STORAGE AND TESTING

C2002D

DUMBWAITER

CART WASH

MANUAL CART WASH

C2002A

SPD CART WASH AREA

D2010

STORAGE

C2002A

ETO STERILIZER

HAC

C2002B

HAC

D2010DSCOPE STORAGE

C2002C

DUMBWAITER

SPD SOIL RECEIVING AND

DECONTAMINATION

D2010E

CART/EQUIP ANTE RM

D2010C

WATER TREATMENT

D2010F

PREPARATION ASSEMBLY AND

STERILIZATION

D2014

STAIR

D2014A

MECHANICAL CHASE

SPD STORAGE

C2005

OFFICE/LAB

C2009

RX STEAM STERILIZER 1

RX STEAM STERILIZER 1

RX INSTRUMENT WASHERS 2

RX CART WASHER3

RX ULTRASONIC CLEANERS4

RX ULTRASONIC CLEANERS5

EX 1/2" CA

EX AIR COMPRESSOR LOCATION

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120

FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904

PH: 321.345.9026

VA Project No.

AG Project No.

A u to d e s k D o c s /V

A M

C

D u rh a m

/0

D u rh a m V

A I n s ta ll S

P S

E q u im e n t_

R

M

E P

.r v t

/7

/2

:1

:2

A M

PD101

SECOND FLOOR PLAN - PLUMBING

PIPING - DEMOLITION

INSTALL SPS EQUIPMENT

Durham VA

0124042

05/07/2025 JMC AJZ

CONSTRUCTION DOCUMENTS

JOSHUA CALHOUN, P.E.

PA License #PE093054

558-23-300

CODED NOTES:

DRAWING NOTES:

1. PROJECT SHALL BE PHASED TO ALLOW FOR SPS TO REMAIN OPERATIONAL DURING CONSTRUCTION.

ONE TYPE OF EACH PIECE OF EQUIPMENT SHALL REMAIN ACTIVE AT ALL TIMES. COORDINATE

PHASING OF WORK WITH GENERAL CONTRACTOR AND VA COR. WORK SHALL ONLY BE COMPLETED

INSIDE OF ICRA BARRIER. IF ADDITIONAL WORK NEEDS TO BE COMPLETED OUTSIDE OF ICRA

BARRIER, IMMEDIATELY NOTIFY VA COR.

2. COORDINATE ALL SHUTDOWNS WITH VA COR A MINIMUM OF 15 WORKING DAYS PRIOR TO

CONSTRUCTION. SPS IS TO REMAIN OPERATIONAL AT ALL TIMES. WORK MAY NEED TO BE

COMPLETED DURING OFF HOURS OR WEEKENDS TO MINIMIZE IMPACT TO SPS.

3. PLUMBING CONTRACTOR IS TO DISCONNECT DIVISION 22 UTILITIES FROM EACH PIECE OF

EQUIPMENT TO BE REMOVED IN SCOPE OF THE PROJECT. CONTRACTOR SHALL CLOSE ALL

REQUIRED VALVES AND TEMPORARILY CAP PIPING. ALL SYSTEMS SHALL REMAIN ACTIVE TO ALL

OTHER PIECES OF EQUIPMENT. NOTIFY GENERAL CONTRACTOR WHEN DISCONNECTION OF

EQUIPMENT FROM DIVISION 22 SERVICES IS COMPLETE. GENERAL CONTRACTOR TO REMOVE

EQUIPMENT.

4. CONTRACTOR IS RESPONSIBLE FOR COORDINATING ROUGH IN LOCATIONS WITH EQUIPMENT

MANUFACTURER, CREATING MOCK-UP, AND VERIFYINH FIELD CONDITIONS FOR REMODEL PRIOR TO

DISCONNECTING EQUIPMENT BEING REPLACED.

RX 1" CW AND 1/2" CA PIPING BACK TO EXISTING VALVE. RX FLEXIBLE HOSE. PLACE BALL

VALVE IN THE CLOSED POSITION AND TEMPORARILY CAP CW AND CA PIPING. RX 2" DRAIN

PIPING FROM EQUIPMENT TO FLOOR DRAIN. DEMO FLOOR DRAIN BODY TO BE REPLACED

IN RENOVATION PHASE.

RX 1" CW PIPING BACK TO EXISTING VALVE. RX FLEXIBLE HOSE. PLACE BALL VALVE IN

THE CLOSED POSITION AND TEMPORARILY CAP CW PIPING. RX 2" DRAIN PIPING FROM

EQUIPMENT TO FLOOR DRAIN.

RX 1 1/4" CW, 1 1/4" HW, 1 1/4" RO, AND 1/2" CA PIPING BACK TO EXISTING VALVE. RX

FLEXIBLE HOSE. PLACE BALL VALVE IN THE CLOSED POSITION AND TEMPORARILY CAP

ALL PIPING. RX 3" DRAIN PIPING FROM EQUIPMENT TO FLOOR DRAIN. DISCONNECT DRAIN

PAN PUMP AND STORE PUMP FOR USE WITH NEW WORK.

RX 3/4" CW, 3/4" HW, AND 1/2" RO PIPING BACK TO EXISTING VALVE. RX FLEXIBLE HOSE.

PLACE BALL VALVE IN THE CLOSED POSITION AND TEMPORARILY CAP ALL PIPING. RX 2"

DRAIN PIPING FROM EQUIPMENT TO WALL BOX.

RX 1/2" CW, 1/2" HW, AND 1/2" RO PIPING BACK TO EXISTING VALVE. RX FLEXIBLE HOSE.

PLACE BALL VALVE IN THE CLOSED POSITION AND TEMPORARILY CAP ALL PIPING. RX 3"

DRAIN PIPING FROM EQUIPMENT TO WALL BOX.

RX 1/2" CA AS REQUIRED TO INSTALL NEW COMPRESSED AIR CONNECTIONS FOR

ULTRASONIC CLEANERS. REFER TO PP101 FOR NEW WORK. FIELD VERIFY NEAREST

SHUTOFF VALVE. COORDINATE SHUTDOWN OF AIR COMPRESSOR WITH VA COR IF

REQUIRED. COORDINATE WORK TO MINIMIZE DOWNTIME, INCLUDING HAVING NEW

PIPING PRE-ASSEMBLED TO MAKE DOWNTIME OF AIR COMPRESSOR AS SHORT AS

NECESSARY.

N 0 4' 8' 16' 24'

1/8" = 1'-0"

1/8" = 1'-0"1

SECOND FLOOR PLAN - PLUMBING PIPING - DEMOLITION

P-501

DETAIL:DESCRIPTION:

P-501

P-501

P-501

P-501

PP101

Revisions Date

WORK RM

D2006

HAC

D2008

TOILET

D2006A

CORRIDOR

LOCKER RM

D2010J

MENS

D2010K

ANTE RM

D2010G

LOCKER RM

D2010A

WOMENS

D2010B

SURGICAL SUPPLY AND CART

STORAGE

C2015

ELECTRICAL CLOSET

C2023

CORRIDOR

TELEPHONE CLOSET

C2005B

OFFICE

C2005A

LINEN/TRASH CHUTE

C2007

CORRIDOR

ELEVATOR

CORRIDOR

C2010CLEAN RECEIVING AND BREAKOUT

C2000

DUMBWAITER

ANTE RM

C2004

SPD CLEAN STORAGE

C2002

EQUIP STORAGE AND TESTING

C2002D

DUMBWAITER

CART WASH

MANUAL CART WASH

C2002A

SPD CART WASH AREA

D2010

STORAGE

C2002A

ETO STERILIZER

HAC

C2002B

HAC

D2010DSCOPE STORAGE

C2002C

DUMBWAITER

SPD SOIL RECEIVING AND

DECONTAMINATION

D2010E

CART/EQUIP ANTE RM

D2010C

WATER TREATMENT

D2010F

PREPARATION ASSEMBLY AND

STERILIZATION

D2014

STAIR

D2014A

MECHANICAL CHASE

SPD STORAGE

C2005

OFFICE/LAB

C2009

SS-1

SS-21

SS-1

IW-1

IW-1

IW-1

CW-1

UC-14

UC-25

EX 1/2" CA

1/2" CA

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120

FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904

PH: 321.345.9026

VA Project No.

AG Project No.

A u to d e s k D o c s /V

A M

C

D u rh a m

/0

D u rh a m V

A I n s ta ll S

P S

E q u im e n t_

R

M

E P

.r v t

/7

/2

:1

:2

A M

PP101

SECOND FLOOR PLAN - PLUMBING

PIPING - NEW WORK

INSTALL SPS EQUIPMENT

Durham VA

0124042

05/07/2025 JMC AJZ

CONSTRUCTION DOCUMENTS

JOSHUA CALHOUN, P.E.

PA License #PE093054

558-23-300

CODED NOTES:

DRAWING NOTES:

1. COORDINATE ALL FINAL EQUIPMENT SIZES WITH FINAL EQUIPMENT SELECTIONS.

2. PROJECT SHALL BE PHASED TO ALLOW FOR SPS TO REMAIN OPERATIONAL DURING CONSTRUCTION.

ONE TYPE OF EACH PIECE OF EQUIPMENT SHALL REMAIN ACTIVE AT ALL TIMES. COORDINATE

PHASING OF WORK WITH GENERAL CONTRACTOR AND VA COR. WORK SHALL ONLY BE COMPLETED

INSIDE OF ICRA BARRIER. IF ADDITIONAL WORK NEEDS TO BE COMPLETED OUTSIDE OF ICRA

BARRIER, IMMEDIATELY NOTIFY VA COR.

3. COORDINATE ALL SHUTDOWNS WITH VA COR A MINIMUM OF 15 WORKING DAYS PRIOR TO

CONSTRUCTION. SPS IS TO REMAIN OPERATIONAL AT ALL TIMES. WORK MAY NEED TO BE

COMPLETED DURING OFF HOURS OR WEEKENDS TO MINIMIZE IMPACT TO SPS.

REMOVE TEMPORARY CAP ON PIPING. ROUTE 1" CW, 3/4' RO, AND 1/2" CA PIPING FROM

EXISTING VALVE TO NEW CONNECTION POINT. PLACE BALL VALVE IN THE OPEN

POSITION. ROUTE 2" DRAIN PIPING FROM EQUIPMENT TO FLOOR DRAIN. PROVIDE NEW

FLOOR DRAIN BODY TO MATCH EXISTING. PROVIDE DRAIN TEMPERING VALVE ON DRAIN

PIPING. FINAL CONNECTIONS BY EQUIPMENT CONTRACTOR. REFER TO DETAIL.

REMOVE TEMPORARY CAP ON PIPING. ROUTE 1" CW PIPING FROM EXISTING VALVE TO

NEW CONNECTION POINT. PLACE BALL VALVE IN THE OPEN POSITION. ROUTE 2" DRAIN

PIPING FROM EQUIPMENT TO FLOOR DRAIN. FINAL CONNECTIONS BY EQUIPMENT

CONTRACTOR. REFER TO DETAIL.

REMOVE TEMPORARY CAP ON PIPING. ROUTE 1 1/4" CW, 1 1/4" HW, 1 1/4" RO, AND 1/2" CA

PIPING FROM EXISTING VALVE TO NEW CONNECTION POINT. PLACE BALL VALVE IN THE

OPEN POSITION. ROUTE 3" DRAIN PIPING FROM EQUIPMENT TO FLOOR DRAIN. REINSTALL

EXISTING DRAIN PAN PUMP AND ROUTE PIPING TO FLOOR DRAIN. FINAL CONNECTIONS

BY EQUIPMENT CONTRACTOR. REFER TO DETAIL.

REMOVE TEMPORARY CAP ON PIPING. ROUTE 3/4" CW, 3/4" HW, AND 1/2" RO PIPING FROM

EXISTING VALVE TO NEW CONNECTION POINT. ROUTE 1/2" CA ABOVE CEILING FROM

ADJACENT SINK AS SHOWN TO NEW CONNECTION POINT. PLACE BALL VALVE IN THE

OPEN POSITION. ROUTE 2" DRAIN PIPING FROM EQUIPMENT TO WALL BOX. FINAL

CONNECTIONS BY EQUIPMENT CONTRACTOR. REFER TO DETAIL.

REMOVE TEMPORARY CAP ON PIPING. ROUTE 1/2" CW, 1/2" HW, AND 1/2" RO PIPING FROM

EXISTING VALVE TO NEW CONNECTION POINT. PLACE BALL VALVE IN THE OPEN

POSITION. ROUTE 2" DRAIN PIPING FROM EQUIPMENT TO WALL BOX. FINAL

CONNECTIONS BY EQUIPMENT CONTRACTOR. REFER TO DETAIL.

N 0 4' 8' 16' 24'

1/8" = 1'-0"

1/8" = 1'-0"

SECOND FLOOR PLAN - PLUMBING PIPING - NEW WORK

P-501

DETAIL:DESCRIPTION:

P-501

P-501

P-501

P-501

Revisions Date

2" MINIMUM AIR

GAP (SEE NOTE)

CAST IRON

FLOOR DRAIN

DRAIN LINE

TO "P" TRAP

FINISHED FLOOR

REMOVABLE GRATE SUPPORT PIPING

EVERY 4'-0"

INDIRECT WASTE

LINE

NOTE:

THE AIR GAP BETWEEN THE INDIRECT WASTE PIPE AND THE FLOOD LEVEL RIM OF THE

WASTE RECEPTOR SHALL BE A MINIMUM OF TWICE THE EFFECTIVE OPENING OF THE

INDIRECT WASTE PIPE.

ADJUSTABLE STAND (U.L. LISTED OR

F.M. APPROVED)

ANCHOR TO FLOOR

PIPE

CW

HW

RO

CA

CA

RO

CART AND UTENSIL WASHER

TO BE INSTALLED BY OTHERS

SANITARY EXISTING TO REMAIN

DEMO EXISTING INDIRECT

DRAIN AND DRAIN PUMP

PIPING FROM EXISTING CART

WASHER

FLOOR SINK EXISTING TO

REMAIN

FLOOR

DEMO EXISTING

FLEXIBLE HOSES AND

PIPING BACK TO

ISOLATION VALVES

NEAREST MAINS.

DEMO ANY PRESENT

PIPING ACCESSORIES

EXISTING PLUMBING

BRANCHES

DEMO SHOCK

ABSORBER

GENERAL NOTES:

1. REFER TO SHEET P-801 FOR EQUIPMENT ROUGH-IN CONNECTION SIZES PER EQUIPMENT TYPE.

2. CONTRACTOR IS RESPONSIBLE FOR COORDINATING ROUGH IN LOCATIONS WITH EQUIPMENT

MANUFACTURER, CREATING MOCK-UP, AND VERIFYING FIELD CONDITIONS FOR REMODEL PRIOR

TO DISCONNECTING EQUIPMENT BEING REPLACED.

WALL

CONVEYOR

EXISTING WASHER / DISINFECTOR

CONVEYOR

FLOOR

SANITARY EXISTING TO REMAIN

DEMO SHOCK

ABSORBER

DEMO EXISTING

FLEXIBLE HOSES AND

PIPING BACK TO

ISOLATION VALVES

NEAREST MAINS.

DEMO ANY PRESENT

PIPING ACCESSORIES

GENERAL NOTES:

1. REFER TO SHEET P-801 FOR EQUIPMENT ROUGH-IN CONNECTION SIZES PER EQUIPMENT TYPE.

2. CONTRACTOR IS RESPONSIBLE FOR COORDINATING ROUGH IN LOCATIONS WITH EQUIPMENT

MANUFACTURER, CREATING MOCK-UP, AND VERIFYING FIELD CONDITIONS FOR REMODEL PRIOR

TO DISCONNECTING EQUIPMENT BEING REPLACED.

CW

HW

RO

RO

EXISTING PLUMBING

BRANCHES

DEMO EXISTING DRAIN

COOLER AND DRAIN PIPE

DEMO EXISTING FLOOR DRAIN

BODY

DEMO SHOCK

ABSORBER

FLOOR

SANITARY EXISTING TO REMAIN

DEMO EXISTING DRAIN

COOLER AND DRAIN PIPE

DEMO EXISTING FLOOR DRAIN

BODY

STERILIZER TO BE

REMOVED BY OTHERS

DEMO EXISTING

FLEXIBLE HOSES AND

PIPING BACK TO

ISOLATION VALVES

NEAREST…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .