Drawing Renovate Bathrooms 626A4-17-101 Set Added Addendums.pdf
PDF 20 MB Posted
- Solicitation number
- 36C24922B0003
About this file
This file summary outlines renovation requirements for bathrooms at a Veterans Affairs facility. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 9 is soliciting bids for project number 626A4-17-101 to renovate bathrooms. The construction magnitude is estimated between $500,000 and $1,000,000. Interested parties should respond to solicitation number 36C24922B0003 by the specified deadline to be considered for the award, which is expected to be issued for this project requiring bathroom renovations at a Veterans Affairs medical center.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
626A4-17-101 Renovate Bathrooms
Eliminate the following work from the project:
1. All work in Building 1
2. All Work in Building 5
3. All work associated with room G-02 in Building 9
Addendum - Replace all push plates for all automatic door openers applicable to this project with touchless type.
Basis of design - BEA 4-3/4 inch square Model #10MS21HS1
2. Facility Standard - T & S Brass B-1141-2VL15CR4 with Chigago Faucets thermostatic mixing valve 131-CFMABRCF -
A R CH W A Y
C C - 5 /7
C O RR I DO R 4 /5
C O NN E C TI NG
C C -5 /6
5"
P-420
P-115
P-201
P-420 P-420 P-420
P-201
P-115
P-115
P-115
P-115
P-115
P-420 P-524
SAN
5"5"
4" 4"
2"
4"
FD-C
FD-C
2" 2"
2" BELOW SLAB
4"
WCO
WCO
WCOWCO
P-609
P-420
P-115
P-201
P-420 P-420 P-420
P-201
P-115
P-115
P-115
P-115
P-115
P-420 P-524
3/4" 1"
FD-C
FD-C
1/2"
3/4"
1/2"
P-609
WATER
LINES ARE
ABOVE
CEILING
WATER
LINES ARE
ABOVE
CEILING
WATER
LINES ARE
ABOVE
CEILING
WATER
LINES ARE
ABOVE
CEILING
Revisions: Date
Drawing Title:
Approved: Project Director
Project Title
Location
Date Checked Drawn
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg. of
F
E
D
C
B
A
F
E
D
C
B
A
VA FORM 08-6231
AS SHOWN
16-337
RENOVATE BATHROOMS -
ALVIN C. YORK VA MEDICAL
CENTER MURFREESBORO, TN
626A4-17-101
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
G G
AS INDICATED
DECEMBER 18, 2017
VAMC MURFREESBORO CAMPUS
3400 LEBANON RD,
MURFREESBORO, TN 37129
JEFF SEABORN
www.acg-pa.com
919-858-7420
Raleigh, NC
Indianapolis, IN
Pittsburgh, PA
Virginia Beach, VA
Atlanta, GA
Fort Collins, CO
SHEET KEY NOTES
SMHSPG
P-102
BUILDING 5
ENLARGED PLUMBING DEMOLITION
AND NEW WORK PLANS
KEY PLAN
SCALE: N.T.S.
AREA OF
WORK
1. DEMOLISH PLUMBING FIXTURE, CAP SANITARY LINE, AND DEMOLISH WATER
LINE TO LOCATION INDICATED AND CAP.
2. PROVIDE FAUCET. ROUTE SANITARY AND DOMESTIC WATER TO FIXTURE.
3. PROVIDE WATER CLOSET. ROUTE SANITARY AND DOMESTIC WATER TO
FIXTURE.
4. PROVIDE URINAL. ROUTE SANITARY AND DOMESTIC WATER TO FIXTURE.
5. PROVIDE DOUBLE COMPARTMENT KITCHEN SINK. ROUTE SANITARY AND
DOMESTIC WATER TO FIXTURE.
6. PROVIDE NEW FLOOR DRAIN PIPED TO EXISTING SANITARY AS INDICATED.
PROVIDE PRESSURE TRAP PRIMER ABOVE CEILING WITH ISOLATION VALVE.
PROVIDE LABEL ON CEILING TO IDENTIFY THE LOCATION FOR MAINTENANCE.
SHEET NOTES
1. SLEEVE ALL PENETRATIONS, FIRESTOP OR SEAL AS REQUIRED.
2. UNLESS NOTED OTHERWISE, THE SIZE OF FIXTURE RUNOUTS IS TO BE WHAT
IS LISTED IN THE PLUMBING FIXTURE SCHEDULE.
3. DOMESTIC WATER AND SANITARY PIPES ARE BELOW SLAB OR IN WALL AND
VENT PIPES ARE ABOVE CEILING UNLESS NOTED OTHERWISE.
4. SEAL NEW AND EXISTING PIPE PENETRATIONS THROUGH FLOOR WATER
TIGHT.
ASBESTOS NOTE
1. OBTAIN ACM REPORT FROM COR BEFORE PERFORMING WORK. NOTIFY COR
WHEN ACM IS ENCOUNTERED THEN REMOVE ACCORDING TO METHODS
INDICATED IN THE SPECIFICATIONS.
WALL LEGEND
3 ADDENDUM NO. 3 TRAP PRIMERS 11/27/2019
P-115
P-420
P-420
P-115
1"
1"
WATER
LINES ARE
UNDER
SLAB
CO
1/2" DCW & DHW
WATER
LINES ARE
UNDER
SLAB
WATER LINES ARE UNDER SLAB
3/4" DHW
2" DCW
WASTE LINES
ARE UNDER SLAB
EXISTING VENT
P-115 P-201
P-420
P-115 P-201
P-201
P-420
1"
FD-C
1"
1"
1/2" DCW & DHW
WATER
LINES ARE
UNDER
SLAB
WATER
LINES ARE
UNDER
SLAB
WASTE
LINES ARE
UNDER
SLAB
U P
D N
U P
D N
P-115 P-201
P-420
P-115 P-201
P-201
P-420
4" SAN
2" V
FD-C
2" V
2" SAN
2" SAN
2" V
WCO
WASTE LINES
ARE UNDER SLAB
4" SAN
EXISTING VENT
P-115
P-420
P-420
P-115
2" V
4"
4"
2"
WASTE
LINES ARE
UNDER
SLAB
Revisions: Date
Drawing Title:
Approved: Project Director
Project Title
Location
Date Checked Drawn
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg. of
F
E
D
C
B
A
F
E
D
C
B
A
VA FORM 08-6231
AS SHOWN
16-337
RENOVATE BATHROOMS -
ALVIN C. YORK VA MEDICAL
CENTER MURFREESBORO, TN
626A4-17-101
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
G G
AS INDICATED
DECEMBER 18, 2017
VAMC MURFREESBORO CAMPUS
3400 LEBANON RD,
MURFREESBORO, TN 37129
JEFF SEABORN
www.acg-pa.com
919-858-7420
Raleigh, NC
Indianapolis, IN
Pittsburgh, PA
Virginia Beach, VA
Atlanta, GA
Fort Collins, CO
SMHSPG
P-103
BUILDING 7
ENLARGED PLUMBING DEMOLITION AND
NEW WORK PLANS
KEY PLAN
SCALE: N.T.S.
AREA OF
WORK
SHEET KEY NOTESSHEET KEY NOTES
1. DEMOLISH PLUMBING FIXTURE, CAP SANITARY LINE, AND DEMOLISH WATER
LINE TO LOCATION INDICATED AND CAP.
2. PROVIDE FAUCET. ROUTE SANITARY AND DOMESTIC WATER TO FIXTURE.
3. PROVIDE WATER CLOSET AND HEAVY DUTY CARRIER. ROUTE SANITARY AND
DOMESTIC WATER TO FIXTURE.
4. PROVIDE URINAL. ROUTE SANITARY AND DOMESTIC WATER TO FIXTURE.
5. PROVIDE WATER CLOSET. ROUTE SANITARY AND DOMESTIC WATER TO
FIXTURE.
6. ROUTE NEW 1" DCW LINE FROM MAIN IN PIPE BASEMENT.
7. PROVIDE NEW FLOOR DRAIN PIPED TO EXISTING SANITARY AS INDICATED.
PROVIDE PRESSURE TRAP PRIMER ABOVE CEILING WITH ISOLATION VALVE.
PROVIDE LABEL ON CEILING TO IDENTIFY THE LOCATION FOR MAINTENANCE.
8. DEMOLISH ABANDONED PIPE TO MAIN IN CRAWL SPACE.
9. EXISTING WATER LINES TO REMAIN.
SHEET NOTES
1. SLEEVE ALL PENETRATIONS, FIRESTOP OR SEAL AS REQUIRED.
2. UNLESS NOTED OTHERWISE, THE SIZE OF FIXTURE RUNOUTS IS TO BE WHAT
IS LISTED IN THE PLUMBING FIXTURE SCHEDULE.
3. DOMESTIC WATER AND SANITARY PIPES ARE BELOW SLAB OR IN WALL AND
VENT PIPES ARE ABOVE CEILING UNLESS NOTED OTHERWISE.
4. SEAL NEW AND EXISTING PIPE PENETRATIONS THROUGH FLOOR WATER
TIGHT.
ASBESTOS NOTE
1. OBTAIN ACM REPORT FROM COR BEFORE PERFORMING WORK. NOTIFY COR
WHEN ACM IS ENCOUNTERED THEN REMOVE ACCORDING TO METHODS
INDICATED IN THE SPECIFICATIONS.
WALL LEGEND
2 HOUR FIREWALL
P-114
P-420
P-114
SAN
SAN
2"
6"
5"
4"
P-201
P-115
P-420
FD-C
4"
2"
SAN
SAN
2"
6"
5"
4"
C O NN E C TI NG
C O RR I DO R -8 /9
C O NN E C TI NG
C O RR I DO R -7 /8
P-201
P-115
P-420
SAN
6"
6" 5"
4" SAN
CO
FD-C
4" SAN
2" V
2" V
WCO
Revisions: Date
Drawing Title:
Approved: Project Director
Project Title
Location
Date Checked Drawn
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg. of
F
E
D
C
B
A
F
E
D
C
B
A
VA FORM 08-6231
AS SHOWN
16-337
RENOVATE BATHROOMS -
ALVIN C. YORK VA MEDICAL
CENTER MURFREESBORO, TN
626A4-17-101
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
G G
AS INDICATED
DECEMBER 18, 2017
VAMC MURFREESBORO CAMPUS
3400 LEBANON RD,
MURFREESBORO, TN 37129
JEFF SEABORN
www.acg-pa.com
919-858-7420
Raleigh, NC
Indianapolis, IN
Pittsburgh, PA
Virginia Beach, VA
Atlanta, GA
Fort Collins, CO
SMHSPG
P-104
BUILDING 8
ENLARGED PLUMBING DEMOLITION AND
NEW WORK PLANS
KEY PLAN
SCALE: N.T.S.
AREA OF
WORK
SHEET KEY NOTESSHEET KEY NOTES
1. DEMOLISH PLUMBING FIXTURE, CAP SANITARY LINE, AND DEMOLISH WATER
LINE TO LOCATION INDICATED AND CAP.
2. PROVIDE FAUCET. ROUTE SANITARY AND DOMESTIC WATER TO FIXTURE.
3. PROVIDE WATER CLOSET AND HEAVY DUTY CARRIER. ROUTE SANITARY AND
DOMESTIC WATER TO FIXTURE.
4. PROVIDE URINAL. ROUTE SANITARY AND DOMESTIC WATER TO FIXTURE.
5. PROVIDE NEW FLOOR DRAIN PIPED TO EXISTING SANITARY AS INDICATED.
PROVIDE PRESSURE TRAP PRIMER ABOVE CEILING WITH ISOLATION VALVE.
PROVIDE LABEL ON CEILING TO IDENTIFY THE LOCATION FOR MAINTENANCE.
SHEET NOTES
1. SLEEVE ALL PENETRATIONS, FIRESTOP OR SEAL AS REQUIRED.
2. UNLESS NOTED OTHERWISE, THE SIZE OF FIXTURE RUNOUTS IS TO BE WHAT
IS LISTED IN THE PLUMBING FIXTURE SCHEDULE.
3. DOMESTIC WATER AND SANITARY PIPES ARE BELOW SLAB OR IN WALL AND
VENT PIPES ARE ABOVE CEILING UNLESS NOTED OTHERWISE.
4. SEAL NEW AND EXISTING PIPE PENETRATIONS THROUGH FLOOR WATER
TIGHT.
ALTERNATE NOTES*
2 OMIT BUILDING 8 WOMEN G12 RENOVATION
ASBESTOS NOTE
1. OBTAIN ACM REPORT FROM COR BEFORE PERFORMING WORK. NOTIFY COR
WHEN ACM IS ENCOUNTERED THEN REMOVE ACCORDING TO METHODS
INDICATED IN THE SPECIFICATIONS.
WALL LEGEND
2 ADDENDUM NO. 2 SCOPE CHANGES 01/21/2019
4"
2"
P-420 P-420
P-114
P-114 P-114
P-115
P-420
P-201
FD-C
WCO
P-115 P-420
C O RR I DO R - 8/9
C O NN E C TI NG
C O NN E C TI NG
C O RR I DO R 2 /9
P-115
P-420
P-201
SAN
4" SAN
FD-C
CO
2" V
WCO
Revisions: Date
Drawing Title:
Approved: Project Director
Project Title
Location
Date Checked Drawn
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg. of
F
E
D
C
B
A
F
E
D
C
B
A
VA FORM 08-6231
AS SHOWN
16-337
RENOVATE BATHROOMS -
ALVIN C. YORK VA MEDICAL
CENTER MURFREESBORO, TN
626A4-17-101
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
G G
AS INDICATED
DECEMBER 18, 2017
VAMC MURFREESBORO CAMPUS
3400 LEBANON RD,
MURFREESBORO, TN 37129
JEFF SEABORN
www.acg-pa.com
919-858-7420
Raleigh, NC
Indianapolis, IN
Pittsburgh, PA
Virginia Beach, VA
Atlanta, GA
Fort Collins, CO
SMHSPG
P-105
BUILDING 9
ENLARGED PLUMBING DEMOLITION AND
NEW WORK PLANS
SHEET KEY NOTESSHEET KEY NOTES
1. DEMOLISH PLUMBING FIXTURE, CAP SANITARY LINE, AND DEMOLISH WATER
LINE TO LOCATION INDICATED AND CAP.
2. PROVIDE FAUCET. ROUTE SANITARY AND DOMESTIC WATER TO FIXTURE.
3. PROVIDE WATER CLOSET. ROUTE SANITARY AND DOMESTIC WATER TO
FIXTURE.
4. PROVIDE URINAL. ROUTE SANITARY AND DOMESTIC WATER TO FIXTURE.
5. PROVIDE NEW FLOOR DRAIN PIPED TO EXISTING SANITARY AS INDICATED.
PROVIDE PRESSURE TRAP PRIMER ABOVE CEILING WITH ISOLATION VALVE.
PROVIDE LABEL ON CEILING TO IDENTIFY THE LOCATION FOR MAINTENANCE
6. PIPE CHASE CONTAINS KNOWN ACM.
SHEET NOTES
AREA OF
WORK
1. SLEEVE ALL PENETRATIONS, FIRESTOP OR SEAL AS REQUIRED.
2. UNLESS NOTED OTHERWISE, THE SIZE OF FIXTURE RUNOUTS IS TO BE WHAT
IS LISTED IN THE PLUMBING FIXTURE SCHEDULE.
3. DOMESTIC WATER AND SANITARY PIPES ARE BELOW SLAB OR IN WALL AND
VENT PIPES ARE ABOVE CEILING UNLESS NOTED OTHERWISE.
4. SEAL NEW AND EXISTING PIPE PENETRATIONS THROUGH FLOOR WATER
TIGHT.
ALTERNATE NOTES*
3 OMIT BUILDING 9 WOMEN G17 RENOVATION*
KEY PLAN
SCALE: N.T.S.
ASBESTOS NOTE
1. OBTAIN ACM REPORT FROM COR BEFORE PERFORMING WORK. NOTIFY COR
WHEN ACM IS ENCOUNTERED THEN REMOVE ACCORDING TO METHODS
INDICATED IN THE SPECIFICATIONS.
WALL LEGEND
2 ADDENDUM NO. 2 SCOPE CHANGES 01/21/2019
File details come from the government source that posted it. Updated .