Renovate Bathrooms 626A4-17-101 Drawing set added addendums_Part3.pdf

PDF 9 MB Posted

Attached to
Z2DA--36C249-21-AP-4235 - 626A4-17-101 - Renovate Bathrooms
Solicitation number
36C24922B0003
Issued by

About this file

This document package includes construction drawings and specifications for the renovation of bathrooms at the Alvin C. York VA Medical Center in Murfreesboro, Tennessee. The drawings show demolition and new work plans for plumbing, including fixtures to be removed and replaced, pipe routing, and notes. Specifications call for replacing all automatic door push plates with touchless models, and specifying faucets, water closets, and other fixtures. The related federal contract opportunity is solicitation number 36C24922B0003 for project 626A4-17-101 to renovate the bathrooms. The magnitude of construction is estimated between $500,000 and $1,000,000. The soliciting agency is the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 9.

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Addendum - Replace all push plates for all automatic door openers applicable to this project with touchless type.

Basis of design - BEA 4-3/4 inch square Model #10MS21HS1

2. Facility Standard - T & S Brass B-1141-2VL15CR4 with Chigago Faucets thermostatic mixing valve 131-CFMABRCF -

ARCHWAYCC- 5/7

CORRIDOR 4/5

CONNECTING

CC-5/6

G29A

LOCKER

FEMALE

G29C

LOCKER

MALE

5"

G29D

TOILET

G29B

TOILET

G29A

LOUNGE

EMPLOYEE

G29B

WOMEN

G29A

LOUNGE

EMPLOYEE

G29C

MEN

P-420

P-115

P-201

P-420 P-420 P-420

P-201

P-115

P-115

P-115

P-115

P-115

P-420

P-524

SAN

5"

5"

4"

4"

2"

4"

G29B

ROOM

LACTATION

FD-C

FD-C

2"

2"

2" BELOW SLAB

4"

WCO

WCO

WCO

WCO

P-609

G29B

WOMEN

G29A

LOUNGE

EMPLOYEE

G29C

MEN

P-420

P-115

P-201

P-420 P-420 P-420

P-201

P-115

P-115

P-115

P-115

P-115

P-420

P-524

G29B

ROOM

LACTATION

3/4"

1"

FD-C

FD-C

1/2"

3/4"

1/2"

P-609

WATER

LINES ARE

ABOVE

CEILING

G29A

LOCKER

FEMALE

G29C

LOCKER

MALE

G29D

TOILET

G29B

TOILET

G29A

LOUNGE

EMPLOYEE

WATER

LINES ARE

ABOVE

CEILING

WATER

LINES ARE

ABOVE

CEILING

WATER

LINES ARE

ABOVE

CEILING

Revisions: Date

Drawing Title:

Approved: Project Director

Project Title

Location

Date Checked Drawn

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg. of

F

E

D

C

B

A

F

E

D

C

B

A

VA FORM 08-6231

AS SHOWN

Office of

Construction and Facilities

Management

CONSULTANTS: PROJECT MANAGER:

Project Number Scale

16-337

RENOVATE BATHROOMS -

ALVIN C. YORK VA MEDICAL

CENTER MURFREESBORO, TN

626A4-17-101

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

G G

AS INDICATED

FULLY SPRINKLERED

BID DOCUMENTS

DECEMBER 18, 2017

VAMC MURFREESBORO CAMPUS

3400 LEBANON RD,

MURFREESBORO, TN 37129

JEFF SEABORN

www.acg-pa.com

919-858-7420

Raleigh, NC

Indianapolis, IN

Pittsburgh, PA

Virginia Beach, VA

Atlanta, GA

Fort Collins, CO

SHEET KEY NOTES

SMHSPG

P-102

BUILDING 5

ENLARGED PLUMBING DEMOLITION

AND NEW WORK PLANS

KEY PLAN

SCALE: N.T.S.

AREA OF

WORK

TOILET G29D, MALE LOCKER G29C, EMPLOYEE LOUNGE G29A, & FEMALE LOCKER G29A, TOILET G29B - DEMOLITION PLAN SANITARY

1/4" = 1'-0"

EMPLOYEE LOUNGE G29, LACTATION ROOM G29A, WOMEN G29B, & MEN G29C - NEW WORK PLAN SANITARY

1/4" = 1'-0"

1. DEMOLISH PLUMBING FIXTURE, CAP SANITARY LINE, AND DEMOLISH WATER

LINE TO LOCATION INDICATED AND CAP.

2. PROVIDE FAUCET. ROUTE SANITARY AND DOMESTIC WATER TO FIXTURE.

3. PROVIDE WATER CLOSET. ROUTE SANITARY AND DOMESTIC WATER TO

FIXTURE.

4. PROVIDE URINAL. ROUTE SANITARY AND DOMESTIC WATER TO FIXTURE.

5. PROVIDE DOUBLE COMPARTMENT KITCHEN SINK. ROUTE SANITARY AND

DOMESTIC WATER TO FIXTURE.

6. PROVIDE NEW FLOOR DRAIN PIPED TO EXISTING SANITARY AS INDICATED.

PROVIDE PRESSURE TRAP PRIMER ABOVE CEILING WITH ISOLATION VALVE.

PROVIDE LABEL ON CEILING TO IDENTIFY THE LOCATION FOR MAINTENANCE.

SHEET NOTES

1. SLEEVE ALL PENETRATIONS, FIRESTOP OR SEAL AS REQUIRED.

2. UNLESS NOTED OTHERWISE, THE SIZE OF FIXTURE RUNOUTS IS TO BE WHAT

IS LISTED IN THE PLUMBING FIXTURE SCHEDULE.

3. DOMESTIC WATER AND SANITARY PIPES ARE BELOW SLAB OR IN WALL AND

VENT PIPES ARE ABOVE CEILING UNLESS NOTED OTHERWISE.

4. SEAL NEW AND EXISTING PIPE PENETRATIONS THROUGH FLOOR WATER

TIGHT.

EMPLOYEE LOUNGE G29, LACTATION ROOM G29A, WOMEN G29B, & MEN G29C -NEW WORK PLAN DOMESTIC WATER

1/4" = 1'-0"

TOILET G29D, MALE LOCKER G29C, EMPLOYEE LOUNGE G29A, & FEMALE LOCKER G29A, TOILET G29B - DEMOLITION PLAN DOMESTIC WATER

1/4" = 1'-0"

ASBESTOS NOTE

1. OBTAIN ACM REPORT FROM COR BEFORE PERFORMING WORK. NOTIFY COR

WHEN ACM IS ENCOUNTERED THEN REMOVE ACCORDING TO METHODS

INDICATED IN THE SPECIFICATIONS.

SMOKE RESISTIVE HAZARDOUS AREA

NON RATED SMOKE PARTITION

WALL LEGEND

2 HOUR FIREWALL

3 ADDENDUM NO. 3 TRAP PRIMERS 11/27/2019

DocuSign Envelope ID: DD959F15-522A-479F-B168-E0ABA3263D07

11/27/2019

G23

RESTROOM

G22A

RESTROOM

P-115

P-420

P-420

P-115

1"

1"

WATER

LINES ARE

UNDER

SLAB

G14

MEN

CO

1/2" DCW & DHW

WATER

LINES ARE

UNDER

SLAB

WATER LINES ARE UNDER SLAB

3/4" DHW

2" DCW

WASTE LINES

ARE UNDER SLAB

EXISTING VENT

G14

MEN

P-115

P-201

P-420

P-115

P-201

P-201

P-420

1"

FD-C

1"

1"

1/2" DCW & DHW

WATER

LINES ARE

UNDER

SLAB

G23

RESTROOM

G22A

RESTROOM

WATER

LINES ARE

UNDER

SLAB

WASTE

LINES ARE

UNDER

SLAB

UP

DN

UP

CONNECTING

CORRIDOR 7/8

CORRIDOR 5/7

CONNECTING

DN

CORRIDOR 7/107

CONNECTING

G14

MEN

G23

RESTROOM

G22A

RESTROOM

P-115

P-201

P-420

P-115

P-201

P-201

P-420

P-115

P-420

P-420

P-115

2" V

4"

4"

4" SAN

2" V

1"

1"

FD-C

1"

2" V

2"

1"

2" SAN

2" SAN

2" V

CO

WCO

1/2" DCW & DHW

WATER

LINES ARE

UNDER

SLAB

WATER LINES ARE UNDER SLAB

3/4" DHW

2" DCW

1"

WASTE LINES

ARE UNDER SLAB

WASTE LINES

ARE UNDER SLAB

1/2" DCW & DHW

WATER

LINES ARE

UNDER

SLAB

4" SAN

WATER

LINES ARE

UNDER

SLAB

WASTE

LINES ARE

UNDER

SLAB

WATER

LINES ARE

UNDER

SLAB

WASTE

LINES ARE

UNDER

SLAB

EXISTING VENTEXISTING VENT

G14

MEN

P-115

P-201

P-420

P-115

P-201

P-201

P-420

4" SAN

2" V

FD-C

2" V

2" SAN

2" SAN

2" V

WCO

WASTE LINES

ARE UNDER SLAB

4" SAN

EXISTING VENT

G23

RESTROOM

G22A

RESTROOM

P-115

P-420

P-420

P-115

2" V

4"

4"

2"

WASTE

LINES ARE

UNDER

SLAB

Revisions: Date

Drawing Title:

Approved: Project Director

Project Title

Location

Date Checked Drawn

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg. of

F

E

D

C

B

A

F

E

D

C

B

A

VA FORM 08-6231

AS SHOWN

Office of

Construction and Facilities

Management

CONSULTANTS: PROJECT MANAGER:

Project Number Scale

16-337

RENOVATE BATHROOMS -

ALVIN C. YORK VA MEDICAL

CENTER MURFREESBORO, TN

626A4-17-101

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

G G

AS INDICATED

FULLY SPRINKLERED

BID DOCUMENTS

DECEMBER 18, 2017

VAMC MURFREESBORO CAMPUS

3400 LEBANON RD,

MURFREESBORO, TN 37129

JEFF SEABORN

www.acg-pa.com

919-858-7420

Raleigh, NC

Indianapolis, IN

Pittsburgh, PA

Virginia Beach, VA

Atlanta, GA

Fort Collins, CO

SMHSPG

P-103

BUILDING 7

ENLARGED PLUMBING DEMOLITION AND

NEW WORK PLANS

RESTROOM G22A & RESTROOM G23 - NEW WORK PLAN DOMESTIC WATER

1/4" = 1'-0"

MEN G14 - DEMOLITION PLAN

1/4" = 1'-0"

MEN G14 - NEW WORK PLAN DOMESTIC WATER

1/4" = 1'-0"

STAFF TOILET G22A & TOILET G23 - DEMOLITION PLAN

1/4" = 1'-0"

KEY PLAN

SCALE: N.T.S.

AREA OF

WORK

SHEET KEY NOTES

SHEET KEY NOTES

1. DEMOLISH PLUMBING FIXTURE, CAP SANITARY LINE, AND DEMOLISH WATER

LINE TO LOCATION INDICATED AND CAP.

2. PROVIDE FAUCET. ROUTE SANITARY AND DOMESTIC WATER TO FIXTURE.

3. PROVIDE WATER CLOSET AND HEAVY DUTY CARRIER. ROUTE SANITARY AND

DOMESTIC WATER TO FIXTURE.

4. PROVIDE URINAL. ROUTE SANITARY AND DOMESTIC WATER TO FIXTURE.

5. PROVIDE WATER CLOSET. ROUTE SANITARY AND DOMESTIC WATER TO

FIXTURE.

6. ROUTE NEW 1" DCW LINE FROM MAIN IN PIPE BASEMENT.

7. PROVIDE NEW FLOOR DRAIN PIPED TO EXISTING SANITARY AS INDICATED.

PROVIDE PRESSURE TRAP PRIMER ABOVE CEILING WITH ISOLATION VALVE.

PROVIDE LABEL ON CEILING TO IDENTIFY THE LOCATION FOR MAINTENANCE.

8. DEMOLISH ABANDONED PIPE TO MAIN IN CRAWL SPACE.

9. EXISTING WATER LINES TO REMAIN.

SHEET NOTES

RESTROOM G22A & RESTROOM G23 - NEW WORK PLAN SANITARY

1/4" = 1'-0"

MEN G14 - NEW WORK PLAN SANITARY

1/4" = 1'-0"

1. SLEEVE ALL PENETRATIONS, FIRESTOP OR SEAL AS REQUIRED.

2. UNLESS NOTED OTHERWISE, THE SIZE OF FIXTURE RUNOUTS IS TO BE WHAT

IS LISTED IN THE PLUMBING FIXTURE SCHEDULE.

3. DOMESTIC WATER AND SANITARY PIPES ARE BELOW SLAB OR IN WALL AND

VENT PIPES ARE ABOVE CEILING UNLESS NOTED OTHERWISE.

4. SEAL NEW AND EXISTING PIPE PENETRATIONS THROUGH FLOOR WATER

TIGHT.

ASBESTOS NOTE

1. OBTAIN ACM REPORT FROM COR BEFORE PERFORMING WORK. NOTIFY COR

WHEN ACM IS ENCOUNTERED THEN REMOVE ACCORDING TO METHODS

INDICATED IN THE SPECIFICATIONS.

WALL LEGEND

2 HOUR FIREWALL

3 ADDENDUM NO. 3 TRAP PRIMERS 11/27/2019

G12

WOMEN

P-114

P-420

P-114

SAN

SAN

2"

6"

5"

4"

UPG18

MEN

P-201

P-115

P-420

FD-C

UPG18

MEN

4"

2"

G12

WOMEN

SAN

SAN

2"

6"

5"

4"

DN DN

CONNECTING

CORRIDOR-8/9 CONNECTING

CORRIDOR-7/8

UP

DN

UP

UPG18

MEN

P-201

P-115

P-420

SAN

6"

6" 5"

4" SAN

CO

FD-C

4" SAN

2" V

2" V

WCO

Revisions: Date

Drawing Title:

Approved: Project Director

Project Title

Location

Date Checked Drawn

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg. of

F

E

D

C

B

A

F

E

D

C

B

A

VA FORM 08-6231

AS SHOWN

Office of

Construction and Facilities

Management

CONSULTANTS: PROJECT MANAGER:

Project Number Scale

16-337

RENOVATE BATHROOMS -

ALVIN C. YORK VA MEDICAL

CENTER MURFREESBORO, TN

626A4-17-101

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

G G

AS INDICATED

FULLY SPRINKLERED

BID DOCUMENTS

DECEMBER 18, 2017

VAMC MURFREESBORO CAMPUS

3400 LEBANON RD,

MURFREESBORO, TN 37129

JEFF SEABORN

www.acg-pa.com

919-858-7420

Raleigh, NC

Indianapolis, IN

Pittsburgh, PA

Virginia Beach, VA

Atlanta, GA

Fort Collins, CO

SMHSPG

P-104

BUILDING 8

ENLARGED PLUMBING DEMOLITION AND

NEW WORK PLANS

WOMEN G12 - NEW WORK PLAN DOMESTIC WATER

1/4" = 1'-0"

MEN G18 - NEW WORK PLAN DOMESTIC WATER

1/4" = 1'-0"

WOMEN G12 - DEMOLITION PLAN

1/4" = 1'-0"

MEN G18 - DEMOLITION PLAN

1/4" = 1'-0"

KEY PLAN

SCALE: N.T.S.

AREA OF

WORK

SHEET KEY NOTES

SHEET KEY NOTES

1. DEMOLISH PLUMBING FIXTURE, CAP SANITARY LINE, AND DEMOLISH WATER

LINE TO LOCATION INDICATED AND CAP.

2. PROVIDE FAUCET. ROUTE SANITARY AND DOMESTIC WATER TO FIXTURE.

3. PROVIDE WATER CLOSET AND HEAVY DUTY CARRIER. ROUTE SANITARY AND

DOMESTIC WATER TO FIXTURE.

4. PROVIDE URINAL. ROUTE SANITARY AND DOMESTIC WATER TO FIXTURE.

5. PROVIDE NEW FLOOR DRAIN PIPED TO EXISTING SANITARY AS INDICATED.

PROVIDE PRESSURE TRAP PRIMER ABOVE CEILING WITH ISOLATION VALVE.

PROVIDE LABEL ON CEILING TO IDENTIFY THE LOCATION FOR MAINTENANCE.

SHEET NOTES

MEN G18 - NEW WORK PLAN SANITARY

1/4" = 1'-0"

1. SLEEVE ALL PENETRATIONS, FIRESTOP OR SEAL AS REQUIRED.

2. UNLESS NOTED OTHERWISE, THE SIZE OF FIXTURE RUNOUTS IS TO BE WHAT

IS LISTED IN THE PLUMBING FIXTURE SCHEDULE.

3. DOMESTIC WATER AND SANITARY PIPES ARE BELOW SLAB OR IN WALL AND

VENT PIPES ARE ABOVE CEILING UNLESS NOTED OTHERWISE.

4. SEAL NEW AND EXISTING PIPE PENETRATIONS THROUGH FLOOR WATER

TIGHT.

ALTERNATE NOTES

2 OMIT BUILDING 8 WOMEN G12 RENOVATION

ASBESTOS NOTE

1. OBTAIN ACM REPORT FROM COR BEFORE PERFORMING WORK. NOTIFY COR

WHEN ACM IS ENCOUNTERED THEN REMOVE ACCORDING TO METHODS

INDICATED IN THE SPECIFICATIONS.

WALL LEGEND

2 HOUR FIREWALL

2 ADDENDUM NO. 2 SCOPE CHANGES 01/21/2019

3 ADDENDUM NO. 3 TRAP PRIMERS 11/27/2019

G02

RESTROOM

G13

MEN

4"

2"

G17

WOMEN

G17

WOMEN

P-420

P-420

P-114

P-114

P-114

G13

MEN

P-115

P-420

P-201

FD-C

WCO

G02

RESTROOM

P-115

P-420

CORRIDOR- 8/9

CONNECTING

CONNECTING

CORRIDOR 2/9

G13

MEN

P-115

P-420

P-201

SAN

4" SAN

FD-C

CO

2" V

WCO

Revisions: Date

Drawing Title:

Approved: Project Director

Project Title

Location

Date Checked Drawn

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg. of

F

E

D

C

B

A

F

E

D

C

B

A

VA FORM 08-6231

AS SHOWN

Office of

Construction and Facilities

Management

CONSULTANTS: PROJECT MANAGER:

Project Number Scale

16-337

RENOVATE BATHROOMS -

ALVIN C. YORK VA MEDICAL

CENTER MURFREESBORO, TN

626A4-17-101

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

G G

AS INDICATED

FULLY SPRINKLERED

BID DOCUMENTS

DECEMBER 18, 2017

VAMC MURFREESBORO CAMPUS

3400 LEBANON RD,

MURFREESBORO, TN 37129

JEFF SEABORN

www.acg-pa.com

919-858-7420

Raleigh, NC

Indianapolis, IN

Pittsburgh, PA

Virginia Beach, VA

Atlanta, GA

Fort Collins, CO

SMHSPG

P-105

BUILDING 9

ENLARGED PLUMBING DEMOLITION AND

NEW WORK PLANS

RESTROOM G02 - DEMOLITION PLAN

1/4" = 1'-0"

MEN G13 - DEMOLITION PLAN

1/4" = 1'-0"

WOMEN G17 - DEMOLITION PLAN

1/4" = 1'-0"

RESTROOM G02 - NEW WORK PLAN

1/4" = 1'-0"

MEN G13 - NEW WORK PLAN DOMESTIC WATER

1/4" = 1'-0"

WOMEN G17 - NEW WORK PLAN

1/4" = 1'-0"

SHEET KEY NOTES

SHEET KEY NOTES

1. DEMOLISH PLUMBING FIXTURE, CAP SANITARY LINE, AND DEMOLISH WATER

LINE TO LOCATION INDICATED AND CAP.

2. PROVIDE FAUCET. ROUTE SANITARY AND DOMESTIC WATER TO FIXTURE.

3. PROVIDE WATER CLOSET. ROUTE SANITARY AND DOMESTIC WATER TO

FIXTURE.

4. PROVIDE URINAL. ROUTE SANITARY AND DOMESTIC WATER TO FIXTURE.

5. PROVIDE NEW FLOOR DRAIN PIPED TO EXISTING SANITARY AS INDICATED.

PROVIDE PRESSURE TRAP PRIMER ABOVE CEILING WITH ISOLATION VALVE.

PROVIDE LABEL ON CEILING TO IDENTIFY THE LOCATION FOR MAINTENANCE.

6. PIPE CHASE CONTAINS KNOWN ACM.

SHEET NOTES

AREA OF

WORK

1 1 1

1. SLEEVE ALL PENETRATIONS, FIRESTOP OR SEAL AS REQUIRED.

2. UNLESS NOTED OTHERWISE, THE SIZE OF FIXTURE RUNOUTS IS TO BE WHAT

IS LISTED IN THE PLUMBING FIXTURE SCHEDULE.

3. DOMESTIC WATER AND SANITARY PIPES ARE BELOW SLAB OR IN WALL AND

VENT PIPES ARE ABOVE CEILING UNLESS NOTED OTHERWISE.

4. SEAL NEW AND EXISTING PIPE PENETRATIONS THROUGH FLOOR WATER

TIGHT.

ALTERNATE NOTES

3 OMIT BUILDING 9 WOMEN G17 RENOVATION

MEN G13 - NEW WORK PLAN SANITARY

1/4" = 1'-0"

KEY PLAN

SCALE: N.T.S.

ASBESTOS NOTE

1. OBTAIN ACM REPORT FROM COR BEFORE PERFORMING WORK. NOTIFY COR

WHEN ACM IS ENCOUNTERED THEN REMOVE ACCORDING TO METHODS

INDICATED IN THE SPECIFICATIONS.

SMOKE RESISTIVE HAZARDOUS AREA

WALL LEGEND

2 HOUR FIREWALL

2 ADDENDUM NO. 2 SCOPE CHANGES 01/21/2019

3 ADDENDUM NO. 3 TRAP PRIMERS 11/27/2019

Renovate Bathrooms 626A4-17-10ing set added addendums signed 10
Renovate Bathrooms 626A4-17-10ing set added addendums signed 11
Renovate Bathrooms 626A4-17-10ing set added addendums signed 12
Renovate Bathrooms 626A4-17-10ing set added addendums signed 13
Renovate Bathrooms 626A4-17-10ing set added addendums signed 14
Renovate Bathrooms 626A4-17-10ing set added addendums signed 15
Renovate Bathrooms 626A4-17-10ing set added addendums signed 16

File details come from the government source that posted it. Updated .