Drawing O - 508-11-402 Surgery HVAC.pdf

PDF 5 MB Posted

Attached to
HVAC Test and Balance
Solicitation number
36C24725Q0613
Issued by

About this file

These are detailed architectural and engineering design drawings for HVAC system modifications at the Atlanta VA Medical Center, specifically focused on implementing surgery energy conservation measures. The comprehensive set of technical drawings, prepared by Barry Davis Architects, P.C., includes multiple sheets covering demolition and new work plans for the chiller room, mechanical rooms, roof plans, and equipment installations on the second floor of Building 1.

The drawings outline extensive HVAC infrastructure updates, including replacement of existing chillers, air handling units, ductwork, and associated mechanical systems. Key elements include detailed floor plans for demolition and new work, roof plan mechanical equipment layouts, control diagrams, equipment schedules for air handling units and water chilling units, and specific technical details for components like air handlers, condensate drain traps, and ventilation systems. The project appears designed to improve energy efficiency and update aging HVAC infrastructure at the medical center facility.

View the file

Other files

Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

D ep ar tm en t of V et er an s

A ff ai rs

GEORG I A

E N G I N E E R

REG IST ERED

ar tm en t of V et er an s

A ff

ATLANTA VA MEDICAL CENTER

KEY PLAN

BUILDING 1

ar tm en t of V et er an s

A ff ar tm en t of V et er an s

A ff ar tm en t of V et er an s

A ff ar tm en t of V et er an s

A ff ar tm en t of V et er an s

A ff ar tm en t of V et er an s

A ff ar tm en t of V et er an s

A ff ar tm en t of V et er an s

A ff ar tm en t of V et er an s

A ff ar tm en t of V et er an s

A ff ar tm en t of V et er an s

A ff

AIR HANDLING UNIT SCHEDULE

WATER CHILLING UNIT SCHEDULE

FAN SCHEDULE

DUCT PRESSURE CLASSIFICATION FOR AHU 60 & 61

STEAM TO STEAM GENERATOR SCHEDULES

D ep ar tm en t of V et er an s

A ff ar tm en t of V et er an s

A ff

G1-01
1-MH-001
1-MD-101
1-MD-102
1-MD-103
1-MD-104
1-MH-101
1-MH-102
1-MH-103
1-MH-104
1-MH-105
1-MH-106
1-MH-301
1-MH-501
1-MH-601
1-MI-601
1-EP-101
1-EP-102
1-EP-103
1-EP-104