Drawing H - FTM HVAC Drawings.pdf
PDF 20 MB Posted
- Attached to
- HVAC Test and Balance
- Solicitation number
- 36C24725Q0613
About this file
These are HVAC (Heating, Ventilation, and Air Conditioning) technical drawings for a construction project, dated 18 September 2013, prepared by SRS Inc. and J.L. Harbert International for what appears to be a multi-story building complex. The comprehensive set of drawings includes detailed plans and control diagrams for various HVAC systems, including chilled water piping, hot water piping, air handling units, boiler systems, and environmental control mechanisms. The drawings cover multiple building floors (ground, first, second, and attic levels), providing intricate schematics for equipment placement, piping routes, mechanical system configurations, and control point specifications for different HVAC components like chillers, pumps, fans, and air conditioning units.
The technical drawings feature extensive technical details such as sequence of operations for different systems, control point lists, piping diagrams, equipment schedules, and specific installation notes. The drawings indicate a fully sprinklered facility with complex HVAC infrastructure designed to manage environmental conditions across multiple zones and floors. The documentation includes legends, abbreviation keys, and detailed technical specifications for each system, suggesting a sophisticated and comprehensive approach to building mechanical systems design. The drawings are stamped as "Record Drawings" and appear to represent the final, approved technical documentation for the HVAC installation.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Approved: Utility Management Supervisor
Approved: Safety Manager
Approved: Facilities Service Line Manager
Approved: Environment of Care Manager
Approved: Chief, Maintenance and Operations
Approved: Chief, Engineer
HVAC PIPING
NEW DUCTWORK AND FITTINGS
LEGEND ABBREVIATIONS
GENERAL NOTES:
CHILLED/HOT WATER PIPING GENERAL NOTES:
Approved: Facilities Service Line Manager
Approved: Environment of Care Manager
Approved: Chief, Maintenance and Operations
Approved: Chief, Engineer
Approved: Facilities Service Line Manager
Approved: Environment of Care Manager
Approved: Facilities Service Line Manager
Approved: Environment of Care Manager
Approved: Facilities Service Line Manager
Approved: Environment of Care Manager
Approved: Facilities Service Line Manager
Approved: Environment of Care Manager
Approved: Facilities Service Line Manager
Approved: Environment of Care Manager
Approved: Facilities Service Line Manager
Approved: Environment of Care Manager
Approved: Facilities Service Line Manager
Approved: Environment of Care Manager
Approved: Facilities Service Line Manager
Approved: Environment of Care Manager
Approved: Facilities Service Line Manager
Approved: Environment of Care Manager
Approved: Facilities Service Line Manager
Approved: Environment of Care Manager
Approved: Facilities Service Line Manager
Approved: Environment of Care Manager
Approved: Facilities Service Line Manager
Approved: Environment of Care Manager
Approved: Facilities Service Line Manager
Approved: Environment of Care Manager
Approved: Facilities Service Line Manager
Approved: Environment of Care Manager
Approved: Facilities Service Line Manager
Approved: Environment of Care Manager
Approved: Facilities Service Line Manager
Approved: Environment of Care Manager
Approved: Facilities Service Line Manager
Approved: Environment of Care Manager
Approved: Facilities Service Line Manager
Approved: Environment of Care Manager
Approved: Facilities Service Line Manager
Approved: Environment of Care Manager
Approved: Facilities Service Line Manager
Approved: Environment of Care Manager
Approved: Facilities Service Line Manager
Approved: Environment of Care Manager
Approved: Chief, Maintenance and Operations
ISOLATOR - TYPE NP, NEOPRENE PAD (TYPE C)
Approved: Facilities Service Line Manager
Approved: Environment of Care Manager
Approved: Facilities Service Line Manager
Approved: Environment of Care Manager
Approved: Facilities Service Line Manager
Approved: Environment of Care Manager
Approved: Facilities Service Line Manager
Approved: Environment of Care Manager
Approved: Chief, Maintenance and Operations
Approved: Chief, Engineer
PACKAGE AIR CONDITIONER, UNITARY
BOILERS
EXHAUST FAN SCHEDULE
STEAM HUMIDIFIER SCHEDULE
Approved: Facilities Service Line Manager
Approved: Environment of Care Manager
Approved: Chief, Maintenance and Operations
CONTROL DIAGRAM - SITE PLAN
Approved: Facilities Service Line Manager
Approved: Environment of Care Manager
Approved: Chief, Maintenance and Operations
Approved: Chief, Engineer
T
AI - ZONE TEMP
AI - ZONE SETON ADJUST
BI - ZONE OVERRIDE
RA DA
T
CT
M
100% OUTSIDE AIR HANDLING UNIT CONTROL DIAGRAM
100% OUTSIDE AIR HANDLING UNIT SEQUENCE OF OPERATION
H
100% OUTSIDE AIR HANDLING UNIT CONTROL PINTS LIST
T
VFD
CT
Approved: Facilities Service Line Manager
Approved: Environment of Care Manager
Approved: Chief, Maintenance and Operations
Approved: Chief, Engineer
T
T
CHWS
VFD
VFD
H
L
P1
P2
M
M
CT
CT
CHWS CHWS
T
ACC-1
Chiller
CHWS
CHWR
H
L
CHWR CHWR
CHWS
CHWR
T
Approved: Facilities Service Line Manager
Approved: Environment of Care Manager
Approved: Chief, Maintenance and Operations
Approved: Chief, Engineer
T
VFD
VFD
H
L
P1
P2
M
M
CT
CT
HWS
HWR
HWS
HWS HWR
T
M
CT
T
T
T
M
CT
T
T
M
CT
T
HOT WATER PIPING CONTROL DIAGRAM
HOT WATER PIPING
SEQUENCE OF OPERATION
Approved: Facilities Service Line Manager
Approved: Environment of Care Manager
Approved: Chief, Maintenance and Operations
Approved: Chief, Engineer
HARDWARE POINTS SOFTWARE POINTS
POINT NAME AI AO BI BO AV BV SCHED TREND ALARM
SHOW ON
GRAPHIC
HOT WATER DIFFERENTIAL PRESSURE X X X
HOT WATER DIFFERENTIAL PRESSURE X X X
PRIMARY HOT WATER RETURN TEMP X X X
PRIMARY HOT WATER SUPPLY TEMP X X X
B-1 HOT WATER RETURN TEMP X X X
B-1 HOT WATER SUPPLY TEMP X X X
B-2 HOT WATER RETURN TEMP X X X
B-2 HOT WATER SUPPLY TEMP X X X
B-3 HOT WATER RETURN TEMP X X X
B-3 HOT WATER SUPPLY TEMP X X X
HOT WATER PUMP 1 VFD SPEED X X X
HOT WATER PUMP 2 VFD SPEED X X X
BOILER HOT WATER SUPPLY TEMP SETON RESET X X X
B-1 BOILER ALARM STATUS X X X X
B-1 LOW WATER LEVEL X X X X
HOT WATER PUMP 1 VFD FAULT X X X
HOT WATER PUMP 2 VFD FAULT X X X
HOT WATER PUMP 1 STATUS X X X
HOT WATER PUMP 2 STATUS X X X
BHWP-1A CIRCULATION PUMP STATUS X X X
BHWP-1B CIRCULATION PUMP STATUS X X X
B-1 BOILER STATUS X X X
HOT WATER PUMP 1 START/STOP X X
HOT WATER PUMP 2 START/STOP X X
BHWP-2A CIRCULATION PUMP STATUS X X X
BHWP-2B CIRCULATION PUMP STATUS X X X
B-2 BOILER STATUS X X X
BHWP-3A CIRCULATION PUMP STATUS X X X
BHWP-3B CIRCULATION PUMP STATUS X X X
B-3 BOILER STATUS X X X
HOT WATER PUMP 1 START/STOP X X
HOT WATER PUMP 2 START/STOP X X
BHWP-1A CIRCULATION PUMP START/STOP X X X
BHWP-2A CIRCULATION PUMP START/STOP X X X
BHWP-3A CIRCULATION PUMP START/STOP X X X
B-1 BOILER ENABLE X X
B-2 BOILER ENABLE X X
B-3 BOILER ENABLE X X
OUTSIDE AIR TEMP X X
HOT WATER DIFFERENTIAL PRESSURE EAST SETON X X
HOT WATER DIFFERENTIAL PRESSURE WEST SETON X X
OUTSIDE AIR TEMP X X
HIGH HOT WATER DIFFERENTIAL PRESSURE X
LOW HOT WATER DIFFERENTIAL PRESSURE X
HOT WATER PUMP 1 FAILURE X
HOT WATER PUMP 1 RUNNING IN HAND X
HOT WATER PUMP 1 RUNTIME EXCEEDED X
HOT WATER PUMP 2 FAILURE X
HOT WATER PUMP 2 RUNNING IN HAND X
HOT WATER PUMP 2 RUNTIME EXCEEDED X
BHWP-1A CIRCULATION PUMP FAILURE X
BHWP-1A CIRCULATION PUMP RUNNING IN HAND X
BHWP-1A CIRCULATION PUMP RUNTIME EXCEEDED X
B-1 BOILER FAILURE X
B-1 BOILER RUNNING IN HAND X
B-1 BOILER RUNTIME EXCEEDED X
BHWP-2A CIRCULATION PUMP FAILURE X
BHWP-2A CIRCULATION PUMP RUNNING IN HAND X
BHWP-2A CIRCULATION PUMP RUNTIME EXCEEDED X
B-2 BOILER FAILURE X
B-2 BOILER RUNNING IN HAND X
B-2 BOILER RUNTIME EXCEEDED X
BHWP-3A CIRCULATION PUMP FAILURE X
BHWP-3A CIRCULATION PUMP RUNNING IN HAND X
BHWP-3A CIRCULATION PUMP RUNTIME EXCEEDED X
B-3 BOILER FAILURE X
B-3 BOILER RUNNING IN HAND X
B-3 BOILER RUNTIME EXCEEDED X
HIGH PRIMARY HOT WATER SUPPLY TEMP X
LOW PRIMARY HOT WATER SUPPLY TEMP X
CHILLED WATER PIPING CONTROL DIAGRAM
CHILLED WATER PIPING
SEQUENCE OF OPERATION
HOT WATER RESET SCHEDULE
Approved: Facilities Service Line Manager
Approved: Environment of Care Manager
Approved: Chief, Maintenance and Operations
Approved: Chief, Engineer
ATTIC FAN (DF) SEQUENCE OF OPERATION
ATTIC FAN (DF) CONTROL DIAGRAM
EXHAUST FAN SEQUENCE OF
OPERATION
EXHAUST FAN CONTROL DIAGRAM
COMM. , ELEC. AND ELEV. ROOMS - AC
UNIT SEQUENCE OF OPERATION
COMM. , ELEC. AND ELEV. ROOMS - AC
UNIT CONTROL DIAGRAM
BUILDING 131 ELECTRICAL METERING
SEQUENCE OF OPERATION
BUILDING 131 ELECTRICAL METERING
CONTROL DIAGRAM
| 508_11302_131_M001 |
| 508_11302_131_M100 |
| 508_11302_131_M101 |
| 508_11302_131_M110 |
| 508_11302_131_M111 |
| 508_11302_131_M112 |
| 508_11302_131_M113 |
| 508_11302_131_M114 |
| 508_11302_131_M115 |
| 508_11302_131_M300 |
| 508_11302_131_M301 |
| 508_11302_131_M302 boiler rev |
| 508_11302_131_M302 |
| 508_11302_131_M310 |
| 508_11302_131_M311 |
| 508_11302_131_M312 |
| 508_11302_131_M313 |
| 508_11302_131_M314 |
| 508_11302_131_M315 |
| 508_11302_131_M501 |
| 508_11302_131_M701 |
| 508_11302_131_M702 |
| 508_11302_131_M703 |
| 508_11302_131_M704 |
| 508_11302_131_M705 |
| 508_11302_131_M801 |
| 508_11302_131_M802 |
| 508_11302_131_M901 |
| 508_11302_131_M902 |
| 508_11302_131_M903 |
| 508_11302_131_M904 |
| 508_11302_131_M905 |
| 508_11302_131_M906 |
File details come from the government source that posted it. Updated .