Drawing No. AS101, First Floor Plan (Rev 1).pdf

PDF 1 MB Posted

Attached to
Y1AA--Infrastructure Deficiencies B408 [552-19-102] Dayton VAMC
Solicitation number
36C25025B0036Amend0008
Issued by

About this file

This document is an architectural floor plan for a VA (Veterans Affairs) building renovation project located in Dayton, Ohio. The first floor plan details a comprehensive infrastructure improvement project for Building 408, with multiple office spaces, conference rooms, lobby areas, restrooms, and support facilities. The drawing includes four alternate bid options for window and door replacements on different building elevations, allowing potential cost adjustments. The project is fully sprinklered and is at the 100% Construction Documents stage, with an issue date of 08/15/2022 and a recent revision on 04/09/2025 related to asbestos abatement work. The architectural plan includes general notes about field verification, ADA compliance, flooring requirements, and coordination with mechanical, plumbing, fire protection, and electrical systems. The design is by Guidon Design Inc. with engineering consultation from Heapy Engineering, and the Contracting Officer Representative is Phil West.

View the file

Other files

File Type Posted
552-19-102_Addendum 2 - Rev1.pdf PDF
36C25025B0036 0008.docx DOCX document
Drawing No. AS111, First Floor Reflected Ceiling Plan (Rev 1).pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AS201

AS202

AS201

AS202

CONFERENCE

103C

OFFICE

OFFICE

103D

OFFICE

103A

OFFICE

TELE PHARMACY

MENS

OFFICE LOBBY

109A

COMM.

103B

LOBBY

OFFICE

101C

ACQUISITION

CHAPLAIN

101OFFICE

101D

OFFICE

101A

KITCHEN

OFFICE

106k

OFFICE

106l

OFFICE

106h

OFFICE

106g

DSS SUITE

OFFICE

106e

STORAGE

106d

OFFICE

106a

OFFICE

106j

OFFICE

106f

COPIER

106c

OFFICE

106b

OPEN OFFICE

OFFICE

100d

OFFICE

100c

OFFICE

100h

OFFICE

100k

OFFICE

100j

OFFICE

100l

WOMENS

OFFICE

100n

OFFICE

100g

OFFICE

100m

CONFERENCE

107f

OFFICE

107g

OFFICE

107a

OFC

107c

OFC

107d

OFC

107e

OFC

107b

SUITE

COMM

101B

OFFICE

109C

AS203

AS203

CH4.A1

CH4.A1

CH4.A1

CH4.A1

1' - 11"

4'

1' - 11"

4'

2 2 2

2 2 2 2 2 2 2 2

2 2

222 2 2

2 2

C-2-5E

ARCHITECTURAL GENERAL NOTES

ARCHITECTURAL PLAN NOTES #

A

B

C

D

E

F

G

REFERENCE MECHANICAL, PLUMBING, FIRE PROTECTION AND ELECTRICAL

FOR COORDINATION ITEMS. COORDINATE AS REQUIRED INCLUDING

NECESSARY FRAMING, BLOCKING, ETC.

VERIFY EXISTING FIELD CONDITIONS PRIOR TO BEGINNING WORK, AND

REPORT DISCREPANCIES IMMEDIATELY TO ARCHITECT FOR CLARIFICATION.

PATCH EXISTING WALLS WHERE NEW WALLS MEET.

PROVIDE MINIMUM CLEARANCES AT ALL DOORS PER ADA REQUIREMENTS.

WHERE NO DIMENSION IS INDICATED, FINISH DOORS 6" FROM EDGE OF

STUD FRAMING AT CORNERS UNLESS OTHERWISE NOTED.

LEVEL AND INFILL FLOOR SLAB TO RECEIVE NEW FLOORING. REFER TO

SPECIFICATIONS AND FLOORING MANUFACTURE'S TOLERANCES FOR

ADDITIONAL INFORMATION.

WHERE FLOORING IN REMOVED FOR HAZARDOUS MATERIAL ABATEMENT

PROVIDE NEW CARPET, CPT-1 AND RESILIENT BASE, RB-1.

PROVIDE SHAFT WALL TO ENCLOSE MEP SYSTEMS

INSTALL NEW WINDOWS IN EXISTING OPENINGS. REFER TO SHEET AS602

ALTERNATE NO.1:

ELIMINATE ALL SCOPE ASSOCIATED WITH REPLACING THE WINDOWS AND

DOORS IN THE BASEMENT AND PIPE BASEMENT.

ALTERNATE NO. 2:

ELIMINATE ALL SCOPE ASSOCIATED WITH REPLACING THE WINDOWS AND

DOORS ON THE WEST ELEVATION OF THE FIRST FLOOR, AS INDICATED IN

THE DRAWINGS.

ALTERNATE NO. 3:

ELIMINATE ALL SCOPE ASSOCIATED WITH REPLACING THE WINDOWS AND

DOORS ON THE WEST ELEVATION OF THE SECOND FLOOR, AS INDICATED IN

THE DRAWINGS.

ALTERNATE NO. 4:

ELIMINATE ALL SCOPE ASSOCIATED WITH REPLACING THE WINDOWS AND

DOORS ON THE EAST ELEVATION OF THE BUILDING, AS INDICATED IN THE

DRAWINGS.

DEDUCT ALTERNATES #

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

P

.1

V

A D a y to n

I D

IQ

\T

O

C o rr e c t In fr a s tr u c ti o n

D e fe c ie n c ie s B ld g

G D

I\

D ra w in g s \2

-1 A rc h it e c tu re \1

-1 R e v it \1

.1

.0

B L

D G v

.r v t

/2

/2

:3

:5

P

M

AS102

FIRST FLOOR PLAN

GUIDON DESIGN INC.

1221 N. PENNSYLVANIA STREET, SUITE 200

INDIANAPOLIS, IN 46202

317-800-6388

ADAM OGRZEWALLA

HEAPY ENGINEERING

1400 W DOROTHY LANE

DAYTON, OH 45409

317-800-6388

MATT GRAHAM

CORRECT INFRASTRUCTURE

DEFICIENCIES, B408

DAYTON, OH 45428

552-19-102

PHIL WEST, COR

08/15/2022 AO KH

100% CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

SCALE: 1/8" = 1'-0"AS102

1 FIRST FLOOR PLAN

N

Revisions: Date:

Absestos abatement work, Not in Contract 2025/04/09 aogrzewalla Text Box 05/02/2025 aogrzewalla Cloud aogrzewalla Image

File details come from the government source that posted it. Updated .