Drawing M7 - Gate Tower Hydraulic Lines Sections and Details.pdf
PDF 627 KB Posted
- Attached to
- Sluice Gates for Willow Creek Dam, Steamboat
- Solicitation number
- IFB1 PMAA 2017000165 2
- Issued by
- Denver County, Denver City, Colorado
About this file
This is a technical drawing document related to hydraulic systems infrastructure for a gate tower facility. The drawing, designated as M7, provides detailed specifications for hydraulic line sections and their corresponding installation details. The document appears to be a component of a larger construction or renovation project involving gate tower infrastructure, though the specific agency or jurisdiction is not identified within the drawing itself. The drawing includes cross-sectional views and dimensional specifications for hydraulic piping systems, suggesting this is a design or construction specification document that would be provided to bidders or contractors undertaking work on gate tower hydraulic infrastructure.
No specific contract details including quantities, response dates, due dates, bidder meetings, award dates, contract terms, pricing information, set-asides, or funding sources are contained within this technical drawing document. The drawing serves solely as a technical specification reference that would likely be incorporated into a broader scope of work or project description for contractors bidding on gate tower construction or renovation services.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .