Sluice Gates for Willow Creek Dam, Steamboat
Solicitation number
IFB1 PMAA 2017000165 2
Issued by
Denver County, Denver City, Colorado

About this file

Summary

This is an Electrical Instrumentation Plan drawing (Drawing E1) that provides technical specifications for electrical instrumentation systems associated with a construction or infrastructure project. The document presents a detailed schematic layout depicting the installation, configuration, and interconnection of electrical instrumentation components, including wiring diagrams, control points, measurement locations, and system integration details. The plan indicates the placement and routing of electrical lines, instrument connections, and control systems throughout the project site or facility, with annotations specifying technical requirements, measurements, and installation standards. The drawing serves as a reference document for contractors and installers responsible for implementing the electrical instrumentation systems according to the project's technical specifications and engineering standards.

The specific details regarding project scope, quantities, timelines, response dates, award dates, contract terms, pricing, set-asides, and other procurement-related information are not contained within this technical drawing document. This file functions solely as an engineering reference and should be reviewed in conjunction with the project's Request for Proposal, Scope of Work, specifications, and other procurement documents to obtain comprehensive information about bidding requirements, contract terms, and submission deadlines.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .