These documents are HVAC record drawings for a fully sprinklered building project, dated 18 September 2013. The comprehensive set of technical drawings includes detailed plans for multiple building systems, such as:
The drawings cover HVAC piping, control systems, and equipment for a multi-story facility, with detailed schematics for chilled water piping, hot water piping, air handling units, boilers, and chillers. The technical documentation includes sequence of operations, control point lists, and schedules for various mechanical systems across ground, first, and second floors. The drawings were prepared by SRS, Inc. and J.L. Harbert International for the Office of Construction Management, with extensive technical specifications for mechanical infrastructure, including air cooled chillers, fan coil units, ventilation systems, and complex control diagrams for different building zones and equipment.
View the file
Other files for this federal contract opportunity
Show all 23
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Approved: Utility Management Supervisor
Approved: Safety Manager
Approved: Facilities Service Line Manager
Approved: Environment of Care Manager
Approved: Chief, Maintenance and Operations
Approved: Chief, Engineer
HVAC PIPING
NEW DUCTWORK AND FITTINGS
LEGEND ABBREVIATIONS
GENERAL NOTES:
CHILLED/HOT WATER PIPING GENERAL NOTES:
Approved: Facilities Service Line Manager
Approved: Environment of Care Manager
Approved: Chief, Maintenance and Operations
Approved: Chief, Engineer
Approved: Facilities Service Line Manager
Approved: Environment of Care Manager
Approved: Facilities Service Line Manager
Approved: Environment of Care Manager
Approved: Facilities Service Line Manager
Approved: Environment of Care Manager
Approved: Facilities Service Line Manager
Approved: Environment of Care Manager
Approved: Facilities Service Line Manager
Approved: Environment of Care Manager
Approved: Facilities Service Line Manager
Approved: Environment of Care Manager
Approved: Facilities Service Line Manager
Approved: Environment of Care Manager
Approved: Facilities Service Line Manager
Approved: Environment of Care Manager
Approved: Facilities Service Line Manager
Approved: Environment of Care Manager
Approved: Facilities Service Line Manager
Approved: Environment of Care Manager
Approved: Facilities Service Line Manager
Approved: Environment of Care Manager
Approved: Facilities Service Line Manager
Approved: Environment of Care Manager
Approved: Facilities Service Line Manager
Approved: Environment of Care Manager
Approved: Facilities Service Line Manager
Approved: Environment of Care Manager
Approved: Facilities Service Line Manager
Approved: Environment of Care Manager
Approved: Facilities Service Line Manager
Approved: Environment of Care Manager
Approved: Facilities Service Line Manager
Approved: Environment of Care Manager
Approved: Facilities Service Line Manager
Approved: Environment of Care Manager
Approved: Facilities Service Line Manager
Approved: Environment of Care Manager
Approved: Facilities Service Line Manager
Approved: Environment of Care Manager
Approved: Facilities Service Line Manager
Approved: Environment of Care Manager
Approved: Chief, Maintenance and Operations
ISOLATOR - TYPE NP, NEOPRENE PAD (TYPE C)
Approved: Facilities Service Line Manager
Approved: Environment of Care Manager
Approved: Facilities Service Line Manager
Approved: Environment of Care Manager
Approved: Facilities Service Line Manager
Approved: Environment of Care Manager
Approved: Facilities Service Line Manager
Approved: Environment of Care Manager
Approved: Chief, Maintenance and Operations
Approved: Chief, Engineer
PACKAGE AIR CONDITIONER, UNITARY
BOILERS
EXHAUST FAN SCHEDULE
STEAM HUMIDIFIER SCHEDULE
Approved: Facilities Service Line Manager
Approved: Environment of Care Manager
Approved: Chief, Maintenance and Operations
CONTROL DIAGRAM - SITE PLAN
Approved: Facilities Service Line Manager
Approved: Environment of Care Manager
Approved: Chief, Maintenance and Operations
Approved: Chief, Engineer
T
AI - ZONE TEMP
AI - ZONE SETON ADJUST
BI - ZONE OVERRIDE
RA DA
T
CT
M
100% OUTSIDE AIR HANDLING UNIT CONTROL DIAGRAM
100% OUTSIDE AIR HANDLING UNIT SEQUENCE OF OPERATION
H
100% OUTSIDE AIR HANDLING UNIT CONTROL PINTS LIST
T
VFD
CT
Approved: Facilities Service Line Manager
Approved: Environment of Care Manager
Approved: Chief, Maintenance and Operations
Approved: Chief, Engineer
T
T
CHWS
VFD
VFD
H
L
P1
P2
M
M
CT
CT
CHWS CHWS
T
ACC-1
Chiller
CHWS
CHWR
H
L
CHWR CHWR
CHWS
CHWR
T
Approved: Facilities Service Line Manager
Approved: Environment of Care Manager
Approved: Chief, Maintenance and Operations
Approved: Chief, Engineer
T
VFD
VFD
H
L
P1
P2
M
M
CT
CT
HWS
HWR
HWS
HWS HWR
T
M
CT
T
T
T
M
CT
T
T
M
CT
T
HOT WATER PIPING CONTROL DIAGRAM
HOT WATER PIPING
SEQUENCE OF OPERATION
Approved: Facilities Service Line Manager
Approved: Environment of Care Manager
Approved: Chief, Maintenance and Operations
Approved: Chief, Engineer
HARDWARE POINTS SOFTWARE POINTS
POINT NAME AI AO BI BO AV BV SCHED TREND ALARM
SHOW ON
GRAPHIC
HOT WATER DIFFERENTIAL PRESSURE X X X
HOT WATER DIFFERENTIAL PRESSURE X X X
PRIMARY HOT WATER RETURN TEMP X X X
PRIMARY HOT WATER SUPPLY TEMP X X X
B-1 HOT WATER RETURN TEMP X X X
B-1 HOT WATER SUPPLY TEMP X X X
B-2 HOT WATER RETURN TEMP X X X
B-2 HOT WATER SUPPLY TEMP X X X
B-3 HOT WATER RETURN TEMP X X X
B-3 HOT WATER SUPPLY TEMP X X X
HOT WATER PUMP 1 VFD SPEED X X X
HOT WATER PUMP 2 VFD SPEED X X X
BOILER HOT WATER SUPPLY TEMP SETON RESET X X X
B-1 BOILER ALARM STATUS X X X X
B-1 LOW WATER LEVEL X X X X
HOT WATER PUMP 1 VFD FAULT X X X
HOT WATER PUMP 2 VFD FAULT X X X
HOT WATER PUMP 1 STATUS X X X
HOT WATER PUMP 2 STATUS X X X
BHWP-1A CIRCULATION PUMP STATUS X X X
BHWP-1B CIRCULATION PUMP STATUS X X X
B-1 BOILER STATUS X X X
HOT WATER PUMP 1 START/STOP X X
HOT WATER PUMP 2 START/STOP X X
BHWP-2A CIRCULATION PUMP STATUS X X X
BHWP-2B CIRCULATION PUMP STATUS X X X
B-2 BOILER STATUS X X X
BHWP-3A CIRCULATION PUMP STATUS X X X
BHWP-3B CIRCULATION PUMP STATUS X X X
B-3 BOILER STATUS X X X
HOT WATER PUMP 1 START/STOP X X
HOT WATER PUMP 2 START/STOP X X
BHWP-1A CIRCULATION PUMP START/STOP X X X
BHWP-2A CIRCULATION PUMP START/STOP X X X
BHWP-3A CIRCULATION PUMP START/STOP X X X
B-1 BOILER ENABLE X X
B-2 BOILER ENABLE X X
B-3 BOILER ENABLE X X
OUTSIDE AIR TEMP X X
HOT WATER DIFFERENTIAL PRESSURE EAST SETON X X
HOT WATER DIFFERENTIAL PRESSURE WEST SETON X X
OUTSIDE AIR TEMP X X
HIGH HOT WATER DIFFERENTIAL PRESSURE X
LOW HOT WATER DIFFERENTIAL PRESSURE X
HOT WATER PUMP 1 FAILURE X
HOT WATER PUMP 1 RUNNING IN HAND X
HOT WATER PUMP 1 RUNTIME EXCEEDED X
HOT WATER PUMP 2 FAILURE X
HOT WATER PUMP 2 RUNNING IN HAND X
HOT WATER PUMP 2 RUNTIME EXCEEDED X
BHWP-1A CIRCULATION PUMP FAILURE X
BHWP-1A CIRCULATION PUMP RUNNING IN HAND X
BHWP-1A CIRCULATION PUMP RUNTIME EXCEEDED X
B-1 BOILER FAILURE X
B-1 BOILER RUNNING IN HAND X
B-1 BOILER RUNTIME EXCEEDED X
BHWP-2A CIRCULATION PUMP FAILURE X
BHWP-2A CIRCULATION PUMP RUNNING IN HAND X
BHWP-2A CIRCULATION PUMP RUNTIME EXCEEDED X
B-2 BOILER FAILURE X
B-2 BOILER RUNNING IN HAND X
B-2 BOILER RUNTIME EXCEEDED X
BHWP-3A CIRCULATION PUMP FAILURE X
BHWP-3A CIRCULATION PUMP RUNNING IN HAND X
BHWP-3A CIRCULATION PUMP RUNTIME EXCEEDED X
B-3 BOILER FAILURE X
B-3 BOILER RUNNING IN HAND X
B-3 BOILER RUNTIME EXCEEDED X
HIGH PRIMARY HOT WATER SUPPLY TEMP X
LOW PRIMARY HOT WATER SUPPLY TEMP X
CHILLED WATER PIPING CONTROL DIAGRAM
CHILLED WATER PIPING
SEQUENCE OF OPERATION
HOT WATER RESET SCHEDULE
Approved: Facilities Service Line Manager
Approved: Environment of Care Manager
Approved: Chief, Maintenance and Operations
Approved: Chief, Engineer
ATTIC FAN (DF) SEQUENCE OF OPERATION
ATTIC FAN (DF) CONTROL DIAGRAM
EXHAUST FAN SEQUENCE OF
OPERATION
EXHAUST FAN CONTROL DIAGRAM
COMM. , ELEC. AND ELEV. ROOMS - AC
UNIT SEQUENCE OF OPERATION
COMM. , ELEC. AND ELEV. ROOMS - AC
UNIT CONTROL DIAGRAM
BUILDING 131 ELECTRICAL METERING
SEQUENCE OF OPERATION
BUILDING 131 ELECTRICAL METERING
CONTROL DIAGRAM
| 508_11302_131_M001 |
| 508_11302_131_M100 |
| 508_11302_131_M101 |
| 508_11302_131_M110 |
| 508_11302_131_M111 |
| 508_11302_131_M112 |
| 508_11302_131_M113 |
| 508_11302_131_M114 |
| 508_11302_131_M115 |
| 508_11302_131_M300 |
| 508_11302_131_M301 |
| 508_11302_131_M302 boiler rev |
| 508_11302_131_M302 |
| 508_11302_131_M310 |
| 508_11302_131_M311 |
| 508_11302_131_M312 |
| 508_11302_131_M313 |
| 508_11302_131_M314 |
| 508_11302_131_M315 |
| 508_11302_131_M501 |
| 508_11302_131_M701 |
| 508_11302_131_M702 |
| 508_11302_131_M703 |
| 508_11302_131_M704 |
| 508_11302_131_M705 |
| 508_11302_131_M801 |
| 508_11302_131_M802 |
| 508_11302_131_M901 |
| 508_11302_131_M902 |
| 508_11302_131_M903 |
| 508_11302_131_M904 |
| 508_11302_131_M905 |
| 508_11302_131_M906 |
File details come from the government source that posted it. Updated .