About this file

This document is a set of mechanical design and demolition plans for an HVAC replacement project at the U.S. Naval Air Weapons Station in China Lake, California. The project scope involves replacing the existing HVAC unit (evaporative cooling and heating) in Building 20279's elevator mechanical room with a new packaged air-to-air heat pump, meeting UFC 3-490-26 requirements. The drawings include detailed mechanical plans, roof plans, and installation details, specifying galvanized steel double-wall ductwork with fiberglass insulation, a heat pump with 50.74 MBH cooling capacity, and specific installation requirements for duct supports, penetrations, and electrical connections. The project involves removing the existing mechanical system, installing new equipment, and ensuring proper configuration and performance according to military engineering standards.

View the file

Other files

File Type Posted
Q and A 1.pdf PDF
Solicitation Amendment - N6893626Q50200001.pdf PDF
Updated SOW.pdf PDF
Wage Determination.pdf PDF
N6893626Q5020.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N

W E

S

PROJECT LOCATION

SCALE IN MILES

20100 *

* OLANCHA

TRONA

ISABELLA

TEHACHAPI

MOJAVE

LANCASTER

LOS

ANGELES

SAN

BERNARDINO

BARSTOW

BAKERSFIELD

CHINA LAKE

RIDGECREST

INYOKERN

395 15

U.S. NAVAL

AIR WEAPONS

STATION

U. S. N.

RANDSBURG

WASH

CR CR

IS

S

U E

D F

O R

S

TA

TI

O

N R

E

VI

E W

/1

3/

E

LE

V A

TO

R

M A

C H

IN

E

R M

. A /C

R E

P

LA

C E

M E

N T

N A

V A

L A

IR

W

E A

P O

N S

C E

N

TE

R

W E

A P

O N

S D

IV

IS

IO

N

IS

S

U E

D F

O R

C O

N S

TR

U

C

TI

O N

/2

4/

SIZING CONDENSERS AND CONDENSING UNITS, ADD 5°F TO

THE OUTDOOR DB TEMPERATURE.

SUMMER

106°F DB 66°F WB

WINTER

23°F DB

SUMMER/WINTER

70°F-90°F DB 35%-60% RH

WINTER

68°F DB

OUTSIDE DESIGN CONDITIONS

ELEVATOR MR DESIGN CONDITIONS

APPLICABLE CODES

ALL WORK SHALL BE IN ACCORDANCE WITH THE LATEST REVISION/EDITION OF

THE FOLLOWING REFERENCED CODES AND STANDARDS.

NFPA 70 NATIONAL ELECTRIC CODE

NFPA 90A STANDARD FOR INSTALLATION OF AIR CONDITIONING

AND VENTILATION SYSTEM

NFPA 101 LIFE SAFETY CODE

UFC 3-110-03 ROOFING

UFC 3-301-01 STRUCTURAL ENGINEERING

UFC 3-310-04 SEISMIC DESIGN OF BUILDINGS

UFC 3-450-01 NOISE AND VIBRATION CONTROL

UFC 3-400-02 ENGINEERING WEATHER DATA

UFC 3-401-01 MECHANICAL ENGINEERING

UFC 3-410-01 HEATING, VENTILATION & AIR CONDITIONING SYSTEMS

UFC 3-420-01 PLUMBING SYSTEMS

UFC 3-501-01 ELECTRICAL ENGINEERING

UFC 3-550-01 EXTERIOR ELECTRICAL POWER DISTRIBUTION

UFC 3-560-01 ELECTRICAL SAFETY

UFC 4-010-01 DOD MINIMUM ANTI-TERRORISM STANDARDS FOR

BUILDINGS

DWG

T-1

SHEET TITLE

TITLE SHEET

DRAWING SCHEDULE

M-1 MECHANICAL PLAN

M-2 MECHANICAL DETAILS

SCOPE OF WORK SUMMERY

REPLACE THE EXISTING HVEC UNIT (EVAPORATIVE COOLING AND HYDRONIC

HEATING) WITH A NEW PACKAGED AIR TO AIR HEAT PUMP TO MEET UFC

3-490-26 REQUIREMENTS. TI

TL

E

SH

EE

T

T-1

PROJECT LOCATION

IR #11-6554

GENERAL DEMOLITION NOTES:

1. THIS DRAWING WAS COMPILED USING AVAILABLE RECORD DRAWINGS AND ARE

INTENDED TO INDICATE DEMOLITION SCOPE FOR THE EXISTING HVEC SYSTEM.

THE CONTRACTOR SHALL FIELD VERIFY ALL DUCTWORK, PIPING, EQUIPMENT

LOCATION, DIMENSIONS AND ALL FIELD CONDITIONS.

2. PRIOR TO COMMENCING WORK, THE CONTRACTOR SHALL DISCONNECT

ELECTRICAL POWER TO THE EXISTING EQUIPMENT.

3. AFTER DISCONNECTION WORK HAS BEEN COMPLETED, THE CONTRACTOR SHALL

REMOVE EXISTING MECHANICAL SYSTEM INCLUDING (1) EVAPORATIVE COOLING,

HEATING HOT WATER HEATING UNIT WITH ASSOCIATED DUCTING (INTERIOR AND

EXTERIOR), INSULATIONS, PIPING, AND ACCESSORIES FOR AIR DISTRIBUTION

SYSTEM (SUPPLY WALL REGISTER)

4. REMOVE ALL EXISTING THERMOSTATS/TEMPERATURE SENSORS. DEMOLITION TO

INCLUDE ALL WIRING, CONDUIT.

5. CONTRACTOR IS RESPONSIBLE FOR PATCHING ALL PENETRATIONS CREATED BY

REMOVAL OF EQUIPMENT, DUCTWORK, PIPING, ETC. TO MATCH EXISTING. REPAIR

ADJACENT CONSTRUCTION AND FINISHES DAMAGED DURING DEMOLITION AND

EXTENSION WORK. PATCH TO MATCH ORIGINAL CONSTRUCTION.

6. COORDINATE DEMOLITION WORK WITH OTHER TRADES.

GENERAL NOTES:

1. PROVIDE DRY BULB ECONOMIZER WITH POWER EXHAUST AND FACTORY INSTALLED

AND WIRED, FULLY MODULATING ACTUATORS WITH LOW LEAKAGE DAMPERS.

2. EFFICIENCY RATING REQUIREMENTS SHALL MEET ASHRAE 90.1.

3. PROVIDE DOUBLE WALL DUCT WITH 3" INSULATION. SIZE SHOWN IS INSIDE CLEAR

DIMENSION. TYPICAL FOR ALL EXPOSED DUCTWORK ON ROOF.

4. PROVIDE REPLACEMENT THE (E) EC-9 WITH A (N) HEAT PUMP.

5. PROVIDE FACTORY MOUNTED 120V POWERED GFCI CONVENIENCE OUTLET.

6. THE CONTRACTOR SHALL MODIFY THE (E) EC-9 UNIT MOUNTING SYSTEM TO RESIST

UPLIFT AND SLIDING FORCES FROM WIND AND OTHER LOADS, ENSURING IT MEETS THE

MANUFACTURER'S SPECIFIED LOAD CAPACITY AND PROVIDES CORROSION

PROTECTION AS OUTLINED IN THE RELEVANT UFC.

KEY NOTES:

REUSE EXISTING WALL PENETRATION.

PROVIDE MAN BAR PER DETAIL 6/M-2.

PROVIDE 7 DAYS PROGRAMMABLE THERMOSTAT WITH LOCKING COVER.

PROVIDE A 600V, 30A, 3-PHASE, HEAVY DUTY, NEMA 3, NON-FUSED, ELECTRICAL DISCONNECT.

EXTEND EXISTING CIRCUIT TO NEW DISCONNECT AND MAKE FINAL TERMINATIONS TO THE NEW

MECHANICAL EQUIPMENT.

REPLACE (E) OVERCURRENT PROTECTIVE DEVICE WITH A 15A, 3-POLE MOLDED CASE BREAKER.

COORDINATE BREAKER MAXIMUM OVERCURRENT PROTECTION (MOCP) RATING WITH THE

PROCURED EQUIPMENT MANUFACTURER. BREAKER IS LOCATED IN DISTRIBUTION EQUIPMENT

'MCC-2'.

CR CR

IS

S

U E

D F

O R

S

TA

TI

O

N R

E

VI

E W

/1

3/

E

LE

V A

TO

R

M A

C H

IN

E

R M

. A /C

R E

P

LA

C E

M E

N T

N A

V A

L A

IR

W

E A

P O

N S

C E

N

TE

R

W E

A P

O N

S D

IV

IS

IO

N

IS

S

U E

D F

O R

C O

N S

TR

U

C

TI

O N

/2

4/

MECHANICAL DEMO PLAN

SCALE: 316 " = 1'

N

M

EC

H

AN

IC

AL

P

LA

N

MECHANICAL ROOF PLAN

SCALE: 316 " = 1'

N

M-1

KEY NOTES:

DISCONNECT AND REMOVE (E) ELECTRICAL DISCONNECT. PULL BACK (E) FEEDER AND

SAFE-OFF FOR RE-USE.

IR #11-6555

CR CR

IS

S

U E

D F

O R

S

TA

TI

O

N R

E

VI

E W

/1

3/

E

LE

V A

TO

R

M A

C H

IN

E

R M

. A /C

R E

P

LA

C E

M E

N T

N A

V A

L A

IR

W

E A

P O

N S

C E

N

TE

R

W E

A P

O N

S D

IV

IS

IO

N

IS

S

U E

D F

O R

C O

N S

TR

U

C

TI

O N

/2

4/

M

EC

H

AN

IC

AL

D

ET

AI

LS

M-2

GRILLES AND REGISTERS SCHEDULE

DOUBLE DEFLECTION

SIDEWALL SUPPLY REGISTER

SYMBOL DESCRIPTION MAX

CFM

TP

(in.wg)

FACE

SIZE NC

FIXED ANGLE SIDEWALL RETURN GRILLE

STEEL CONSTRUCTION, 45° FIXED BLADE 35

1670 0.168 24"x18"

1668 -

DUCT SYSTEM

DESCRIPTION MATERIAL INSULATION

SUPPLY AIR DUCT (OUTDOOR) A 1

RETURN AIR DUCT (OUTDOOR) A 1

GALVANIZED STEEL DOUBLE WALLA

FIBERGLASS INSULATION (R-8) BETWEEN INNER AND

OUTER DUCT WALLS.1

24"x18"

IR #11-6556

T-1
M-1
M-2