Drawing.pdf
PDF 145 KB Posted
- Attached to
- VAFO - WALNUT HILL PAVILION Federal contract opportunity
- Solicitation number
- 140P4223Q0086
About this file
This drawing package provides construction plans and design assumptions for a covering structure at the Walnut Hill Privy in Virginia. Key details include specifications for 20-foot screw pile foundations, 8x8 pressure treated wood columns and beams, 2x8 pressure treated wood framing and roof rafters, and 3-inch corrugated metal roofing. The contractor will assist with pile sizing and design to support the total dead load of 20,120 pounds including a 25 psf snow load. Related federal contract opportunity 140P4223Q0086 from the Department of the Interior National Park Service Northeast Region seeks offers for construction of the Walnut Hill Pavilion in accordance with the provided drawing package.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_0001_RFI_Responses_0001.pdf | ||
| Sol_140P4223Q0086_Amd_0001.pdf | ||
| WD_PA20230083.pdf | ||
| Site_Visit_Location.pptx | PPTX presentation | |
| Pavilion_SOW.pdf | ||
| Sol_140P4223Q0086.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
20' - 0"
SCREW PILE/HELICAL PILE FOUNDATION WITH COLUMN
FLANGE;
CONTRACTOR TO DESIGN ASSIST ON PILE SIZE AND
DEPTH TO ACCOMMODATE COVERING STRUCTURAL
DEADLOAD (SEE DESIGN ASSUMPTIONS BELOW), 25PSF
SNOWLOAD AND MIN. UPLIFT
8X8 PRESSURE TREATED POST, TYP
HDU HOLD DOWNS MIRROR COLUMNS
ON COLUMN LINE A
EXISTING PRIVY RUIN TO REMAIN
PROTECT WITH PLYWOOD AND
COVERED WITH MOVERS BLANKET
DURING CONSTRUCTION OF
COVERING
BA
EQ EQ EQ
EQ
6' 0"
EQ
A101
20' - 0"
BA
WOOD SWING GATE -
OUTSWINGING. ROUGHLY 3'WX
3'H LEAVES VERIFY FINAL
DIMENSIONS IN FIELD
PROVIDE CLAPS FOR PAD LOCK
AND HANDLES ON PULL SIDE
3' TALL SAFETY GUARDRAIL
2X4 WOOD FRAMING WITH 4"
WELDED WIRE PANELS
8X8 PRESSURE TREATED
WOOD POSTS TYP
VERY COURSE GRAVEL MOUND
ABOVE GEOTEXTILE; BELOW GRADE
BEAM AND AROUND HELICAL PILE
FOUNDATION
LAY DOWN GEOTEXTILE PRIOR TO
CONSTRUCTION
30' - 0"
NO GRADE BEAM HERE; PROVIDE (2) 2X10
PT HEADER AT 8' ABOVE ENTRY WAY
BOTTOM OF POST
0' - 0"
BOTTOM OF RUIN
MASONRY
9' - 0"
BA
PRIVY RUIN BEYOND INSIDE COVERING STRUCTURE. ALL
CONSTRUCTION ACTIVITIES MUST TAKE THE PROTECTION
OF THIS STRUCTURE INTO ACCOUNT. PROTECT RUIN
TEMPORARILY WITH PLYWOOD COVERING AND MOVERS
BLANKET DURING CONSTRUCTION. RUIN ROOF IS IN
POOR CONDITION, PROTECTION MUST INCLUDE METHODS
THAT PREVENTS FURTHER COLLAPSE OF THE RUIN'S
ROOF JOISTS
2X10 PT LUMBER ATTACHED TO INSIDE AND OUT
FACE OF 8X8 COLUMNS WITH (2) 1/2" THROUGH
BOLTS AT EACH COLUMN
REFER TO 3/A101 FOR LAYOUT
8X8 PRESSURE TREATED POSTS; TOP
OF POST VARIES BASED ON THE
HEIGHT OF BOTTOM OF RAFTER
3' 6" M
IN
(2) 2X10 PRESSURE TREATED LUMBER
SANDWICH AND THROUGH BOLT AT
EACH COLUMN
0' 4" M
IN
HELICAL PILE FOUNDATION; DEPTH SHOWN IS MINIMUM
BELOW FROST LINE
CONTRACTOR TO PROVIDE DESIGN ASSISTANCE IN
ACTUAL SIZE AND DEPTH BASED ON BUILDING
DEADLOAD AND SNOWLOAD ASSUMPTIONS
2X4 PT FRAMING; 4" WELDED
WIRE FENCE PANELS
1' 8"
VA
R
IE
S
3' 0"
VA
R
IE
S
COORDINATE BOTTOM
GRADE BEAM HEIGHT
BASED ON SCREW PILE
FLANGE HEIGHT AND
SIMPSON STRONG TIE
ATTACHMENT
REQUIREMENTS
A101
LAYDOWN GEOTEXTILE AROUND
CONSTRUCTION AREA PRIOR TO
CONSTRUCTION
VERY COURSE GRAVEL MOUND BELOW
GRADE BEAM AND AROUND HELICAL PIES
PROVIDE SIMPSON STRONG TIE
HURRICANE TIE H10A OR EQUAL A EACH
RAFTER TO BEAM CONNECTION
3" DEEP CORRUGATED ROOF DECK @ 1/4" PER 1'
SLOPE; ATTACHMENT, TRIM AND DRIP EDGE PER
MANUF
2' - 1"
2' - 0"2X10 PT LUMBER ATTACHED TO
INSIDE AND OUT FACE OF 8X8
COLUMNS WITH (2) 1/2" THROUGH
BOLTS
REFER TO 3/A101 FOR LAYOUT
2X10 STIFFENERS AT
LOCATION PER 3/A101
2X8 PT ROOF RAFTERS @ 2' O.C.
2' 4"
PROVIDE SIMPSON STRONG TIE
HURRICANE TIE H10A OR EQUAL A EACH
RAFTER TO BEAM CONNECTION
(2) 1/2" DIA. THROUGH
BOLTS AT EACH COLUMN
LOCATION TYP
LOCATION OF HEADER
ABOVE IN ELEVATION
WHERE SWING GATE
OCCURS
8' 0"
1/2" DIA THROUGH BOLT
AT EACH OLUMN
2X10 STIFFENERS AT 2'O.C.
BETWEEN 2X10. TYP
A
HELICAL PILE; FLANGE ATTACHMENT TO
8X8 PT COLUMN PER MANUFACTURER
GRAVEL MOUND PER ELEVATION
(2) PREESURE TREATED 2X10
SANDWICH EACH COLUMN WITH
1/2" DIA THROUGH BOLT ATTACHMENT
BOARDS RUNNING PEREPNDICULAR
TO THIS VIEW MAY BE STACKED
ABOVE OR BELOW TO MAINTAIN FULL
BOLTING PATTERN WITH COLUMN
COORDINATE GUARDRAIL
PANEL DIMENSION TO 2X10S
BELOW TO MAINTAIN 3' TOP OF
PANEL LEVEL
CONTINUOUS 8X8 PT POST
A101
BA
8X8 PT COLUMNS TYP
2X10 RIM JOISTS SANDWICH
EACH 8X8 POST ATTACHMENT
THROUGH COLUMN WITH (2)
1/2" THROUGH BOLTS, TYP AT
ALL COLUMN LOCATIONS
2X10 FRAMING AT LOWER
PLAN PER ELEVATION
2X10 STIFFENERS AT 2' O.C. TYP
ASSEMBLED ON GROUND PRIOR
TO INSTALLATION OVER RUIN
2' - 0"
NATIONAL PARK SERVICE
Scale
Date
Drawn By
Checked By
Project Number
As indicated
5/ /2 :3 6:
A M
A101
Walnut Hill Privy
VAFO
Covering Structure for
JENNY KO
JENNY KO
5/11/2023
PMIS 308627
No. Description Date
1/4" 1'-0"1 GROUND FLOOR FRAMING PLAN
1/4" 1'-0"2 GROUND FLOOR PLAN
3/8" 1'-0"4 SOUTH ELEVATION
1" 1'-0"5 COLUMN BASE DETAIL AT CORNERS
DESIGN ASSUMPTIONS:
PRESSURE TREATED LUMBER: 40 LB PER CUBIC FEET
CORRUGATED METAL ROOF PANEL : 5 LB PER SQUARE FEET
SNOW LOAD 25 PSF
WIND UPLIFT 22 PSF
ROOF DECK WEIGHT 2400 LBS
PRESSURE TREATED 8X8 COLUMNS 2075 LBS
PRESSURE TREATED 8X8 GRADE BEAMS 1845 LBS
PRESSURE TREATED 2X8 FRAMING 600 LBS
PRESSURE TREATED 2X8 ROOF RAFTERS 1200 LBS
STRUCTURE DEADLOAD 8120 LBS
SNOW LOAD 12,000 LBS
TOTAL DEAD LOAD 20,120 LBS
EACH COLUMN / FOUNDATION BEARING 2012 LBS
SOIL BEARING CAPACITY ASSUMED 2500 PSF
1/4" 1'-0"3 COLUMN TOP FRAMING PLAN