This document announces a draft request for proposal for multiple-award indefinite delivery indefinite quantity contracts to support the installation of electric vehicle supply equipment at federal agency locations. The General Services Administration's Public Buildings Service plans to award approximately 24 small business set-aside IDIQ contracts for four geographic zones covering the United States, with a maximum value of $500 million each. Work will include design and construction services for electric infrastructure improvements, and task orders are expected to range from $50,000 to $4 million. Interested small businesses are requested to provide feedback on the draft RFP documents by January 21, 2022. The agency also seeks market research for future nationwide IDIQ contracts without set-asides, valued at $500 million with task orders from $4-40 million. Responses are requested by January 21, 2022 to determine if a small business set-aside is warranted.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

DRAFT - Supplemental SF1442 Pricing Sheet
Solicitation Number:
Instructions

1 Input the "Name of Offeror" for each Geographic Zone the offeror is requesting to be considered for (i.e., Zone A, B, C, D).

2 Input a maximum Unit Price (Column C) for every line item listed for each year 1-10, for each Geographic Zone the offeror is requesting to be considered for (i.e., Zone A, B, C, D). These Unit Prices will establish the ceiling rate for each line item within each Geographic Zone, for each of the years within the Base and Option I contract periods. Each Task Order is anticipated to be competed. Pricing submitted for each Task Order can be lower than proposed Unit Prices, but can never be higher. These rates apply throughout the entire Geographic Zone regardless of project location within the zone.

3 The included Line Items, Unit, and Estimated Quantity (Columns A, B and D) are fixed to help the Government evaluate price. Do not change information in Columns A, B, and D on the sheets.

4 The Estimated Total Price column is the Unit Price inputted by the offeror multiplied by the Estimated Quantity (Column C times Column D). This column will add up to the “Total Year __ Estimated Price”.

5 The “Total Evaluated Price for Zone ___ (Total Base Period Estimated Price for Year 1 + Year 2 + Year 3 + Year 4 + Year 5 plus Total Option 1 Period Estimted Price for Year 6 + Year 7 + Year 8 + Year 9 + Year 10)” will be used to evaluate the offeror's pricing for each of the Geographic Zones the offeror is requesting to be considered for. The Total Evaluated Price for each Geographic Zone will be evaluated separately.

6 Following IDIQ contract award, unless the Task Order Contracting Officer specifies another format, Task Order price proposals shall utilize the line items established in the IDIQ contract and not exceed the line item prices established in the IDIQ contract. For any work that is not covered by line items established in the IDIQ contract, the Task Order Contracting Officer will specify the format of the price proposal.

Zone A

DRAFT - Supplemental SF1442 Pricing Sheet
Solicitation Number:
Name of Offeror:
Zone A - Base Period - Year 1
Line ItemsUnitUnit Price*Estimated QuantityEstimated Total Price
Feasibility Study/Site Assessment Engineeringhr32$0.00
Site Superintendenthr120$0.00
Electrician - Journeyman Levelhr80$0.00
Transformer (480:208/120, per kVA with grounding)kVA225$0.00
Panelboard (480v, 3ph, M.L.O., surface mtd, fully populated) (per buss amperage)Amp800$0.00
Panelboard (208/120v, M.L.O., surface mtd, fully populated 40A/2P) (per buss amperage)Amp800$0.00
EMT Conduit and Cable (less than 2" dia)10 ft120$0.00
EMT Conduit and Cable (greater than 2" dia)10 ft5$0.00
PVC Conduit (sked 80) and Cable (unpaved earth, with trenching and reseeding) (less than 2" dia)10 ft5$0.00
PVC Conduit (sked 80) and Cable (unpaved earth, with trenching and reseeding) (greater than 2" dia)10 ft60$0.00
PVC Conduit (sked 40) and Cable (concrete encased, with trenching and restoration of asphalt) (less than 2" dia)10 ft5$0.00
PVC Conduit (sked 40) and Cable (concrete encased, with trenching and restoration of asphalt) (greater than 2" dia)10 ft60$0.00
Concrete Pad (including rebar)cu ft3$0.00
Wheel Stop (concrete, 6' long)ea24$0.00
Bollard (6" dia, std galv stl pipe, filled with concrete) (not including concrete base)ea24$0.00
Asphalt Resurfacingsq ft250$0.00
Testing and Commissioning (level 2 charger, dual port)ea12$0.00
Overhead (percentage of Year 1 line items above, 0-100)%n/a$0.00
Profit (percentage of Year 1 line items above excluding Overhead, 0-100)%n/a$0.00
Total Year 1 Estimated Price$0.00

* - Unit pricing for equipment shall include all material and labor costs for a complete install

Zone A - Base Period - Year 2
Line ItemsUnitUnit Price*Estimated QuantityEstimated Total
Feasibility Study/Site Assessment Engineeringhr32$0.00
Site Superintendenthr120$0.00
Electrician - Journeyman Levelhr80$0.00
Transformer (480:208/120, per kVA with grounding)kVA225$0.00
Panelboard (480v, 3ph, M.L.O., surface mtd, fully populated) (per buss amperage)Amp800$0.00
Panelboard (208/120v, M.L.O., surface mtd, fully populated 40A/2P) (per buss amperage)Amp800$0.00
EMT Conduit and Cable (less than 2" dia)10 ft120$0.00
EMT Conduit and Cable (greater than 2" dia)10 ft5$0.00
PVC Conduit (sked 80) and Cable (unpaved earth, with trenching and reseeding) (less than 2" dia)10 ft5$0.00
PVC Conduit (sked 80) and Cable (unpaved earth, with trenching and reseeding) (greater than 2" dia)10 ft60$0.00
PVC Conduit (sked 40) and Cable (concrete encased, with trenching and restoration of asphalt) (less than 2" dia)10 ft5$0.00
PVC Conduit (sked 40) and Cable (concrete encased, with trenching and restoration of asphalt) (greater than 2" dia)10 ft60$0.00
Concrete Pad (including rebar)cu ft3$0.00
Wheel Stop (concrete, 6' long)ea24$0.00
Bollard (6" dia, std galv stl pipe, filled with concrete) (not including concrete base)ea24$0.00
Asphalt Resurfacingsq ft250$0.00
Testing and Commissioning (level 2 charger, dual port)ea12$0.00
Overhead (percentage of Year 2 line items above, 0-100)%n/a$0.00
Profit (percentage of Year 2 line items above excluding Overhead, 0-100)%n/a$0.00
Total Year 2 Estimated Price$0.00

* - Unit pricing for equipment shall include all material and labor costs for a complete install

Zone A - Base Period - Year 3
Line ItemsUnitUnit Price*Estimated QuantityEstimated Total
Feasibility Study/Site Assessment Engineeringhr32$0.00
Site Superintendenthr120$0.00
Electrician - Journeyman Levelhr80$0.00
Transformer (480:208/120, per kVA with grounding)kVA225$0.00
Panelboard (480v, 3ph, M.L.O., surface mtd, fully populated) (per buss amperage)Amp800$0.00
Panelboard (208/120v, M.L.O., surface mtd, fully populated 40A/2P) (per buss amperage)Amp800$0.00
EMT Conduit and Cable (less than 2" dia)10 ft120$0.00
EMT Conduit and Cable (greater than 2" dia)10 ft5$0.00
PVC Conduit (sked 80) and Cable (unpaved earth, with trenching and reseeding) (less than 2" dia)10 ft5$0.00
PVC Conduit (sked 80) and Cable (unpaved earth, with trenching and reseeding) (greater than 2" dia)10 ft60$0.00
PVC Conduit (sked 40) and Cable (concrete encased, with trenching and restoration of asphalt) (less than 2" dia)10 ft5$0.00
PVC Conduit (sked 40) and Cable (concrete encased, with trenching and restoration of asphalt) (greater than 2" dia)10 ft60$0.00
Concrete Pad (including rebar)cu ft3$0.00
Wheel Stop (concrete, 6' long)ea24$0.00
Bollard (6" dia, std galv stl pipe, filled with concrete) (not including concrete base)ea24$0.00
Asphalt Resurfacingsq ft250$0.00
Testing and Commissioning (level 2 charger, dual port)ea12$0.00
Overhead (percentage of Year 3 line items above, 0-100)%n/a$0.00
Profit (percentage of Year 3 line items above excluding Overhead, 0-100)%n/a$0.00
Total Year 3 Estimated Price$0.00

* - Unit pricing for equipment shall include all material and labor costs for a complete install

Zone A - Base Period - Year 4
Line ItemsUnitUnit Price*Estimated QuantityEstimated Total
Feasibility Study/Site Assessment Engineeringhr32$0.00
Site Superintendenthr120$0.00
Electrician - Journeyman Levelhr80$0.00
Transformer (480:208/120, per kVA with grounding)kVA225$0.00
Panelboard (480v, 3ph, M.L.O., surface mtd, fully populated) (per buss amperage)Amp800$0.00
Panelboard (208/120v, M.L.O., surface mtd, fully populated 40A/2P) (per buss amperage)Amp800$0.00
EMT Conduit and Cable (less than 2" dia)10 ft120$0.00
EMT Conduit and Cable (greater than 2" dia)10 ft5$0.00
PVC Conduit (sked 80) and Cable (unpaved earth, with trenching and reseeding) (less than 2" dia)10 ft5$0.00
PVC Conduit (sked 80) and Cable (unpaved earth, with trenching and reseeding) (greater than 2" dia)10 ft60$0.00
PVC Conduit (sked 40) and Cable (concrete encased, with trenching and restoration of asphalt) (less than 2" dia)10 ft5$0.00
PVC Conduit (sked 40) and Cable (concrete encased, with trenching and restoration of asphalt) (greater than 2" dia)10 ft60$0.00
Concrete Pad (including rebar)cu ft3$0.00
Wheel Stop (concrete, 6' long)ea24$0.00
Bollard (6" dia, std galv stl pipe, filled with concrete) (not including concrete base)ea24$0.00
Asphalt Resurfacingsq ft250$0.00
Testing and Commissioning (level 2 charger, dual port)ea12$0.00
Overhead (percentage of Year 4 line items above, 0-100)%n/a$0.00
Profit (percentage of Year 4 line items above excluding Overhead, 0-100)%n/a$0.00
Total Year 4 Estimated Price$0.00

* - Unit pricing for equipment shall include all material and labor costs for a complete install

Zone A - Base Period - Year 5
Line ItemsUnitUnit Price*Estimated QuantityEstimated Total
Feasibility Study/Site Assessment Engineeringhr32$0.00
Site Superintendenthr120$0.00
Electrician - Journeyman Levelhr80$0.00
Transformer (480:208/120, per kVA with grounding)kVA225$0.00
Panelboard (480v, 3ph, M.L.O., surface mtd, fully populated) (per buss amperage)Amp800$0.00
Panelboard (208/120v, M.L.O., surface mtd, fully populated 40A/2P) (per buss amperage)Amp800$0.00
EMT Conduit and Cable (less than 2" dia)10 ft120$0.00
EMT Conduit and Cable (greater than 2" dia)10 ft5$0.00
PVC Conduit (sked 80) and Cable (unpaved earth, with trenching and reseeding) (less than 2" dia)10 ft5$0.00
PVC Conduit (sked 80) and Cable (unpaved earth, with trenching and reseeding) (greater than 2" dia)10 ft60$0.00
PVC Conduit (sked 40) and Cable (concrete encased, with trenching and restoration of asphalt) (less than 2" dia)10 ft5$0.00
PVC Conduit (sked 40) and Cable (concrete encased, with trenching and restoration of asphalt) (greater than 2" dia)10 ft60$0.00
Concrete Pad (including rebar)cu ft3$0.00
Wheel Stop (concrete, 6' long)ea24$0.00
Bollard (6" dia, std galv stl pipe, filled with concrete) (not including concrete base)ea24$0.00
Asphalt Resurfacingsq ft250$0.00
Testing and Commissioning (level 2 charger, dual port)ea12$0.00
Overhead (percentage of Year 5 line items above, 0-100)%n/a$0.00
Profit (percentage of Year 5 line items above excluding Overhead, 0-100)%n/a$0.00
Total Year 5 Estimated Price$0.00

* - Unit pricing for equipment shall include all material and labor costs for a complete install

Total Base Period Estimated Price for Zone A (Total Estimated Price for Year 1 + Year 2 + Year 3 + Year 4 + Year 5) $0.00

Zone A - Option I - Year 6
Line ItemsUnitUnit Price*Estimated QuantityEstimated Total Price
Feasibility Study/Site Assessment Engineeringhr32$0.00
Site Superintendenthr120$0.00
Electrician - Journeyman Levelhr80$0.00
Transformer (480:208/120, per kVA with grounding)kVA225$0.00
Panelboard (480v, 3ph, M.L.O., surface mtd, fully populated) (per buss amperage)Amp800$0.00
Panelboard (208/120v, M.L.O., surface mtd, fully populated 40A/2P) (per buss amperage)Amp800$0.00
EMT Conduit and Cable (less than 2" dia)10 ft120$0.00
EMT Conduit and Cable (greater than 2" dia)10 ft5$0.00
PVC Conduit (sked 80) and Cable (unpaved earth, with trenching and reseeding) (less than 2" dia)10 ft5$0.00
PVC Conduit (sked 80) and Cable (unpaved earth, with trenching and reseeding) (greater than 2" dia)10 ft60$0.00
PVC Conduit (sked 40) and Cable (concrete encased, with trenching and restoration of asphalt) (less than 2" dia)10 ft5$0.00
PVC Conduit (sked 40) and Cable (concrete encased, with trenching and restoration of asphalt) (greater than 2" dia)10 ft60$0.00
Concrete Pad (including rebar)cu ft3$0.00
Wheel Stop (concrete, 6' long)ea24$0.00
Bollard (6" dia, std galv stl pipe, filled with concrete) (not including concrete base)ea24$0.00
Asphalt Resurfacingsq ft250$0.00
Testing and Commissioning (level 2 charger, dual port)ea12$0.00
Overhead (percentage of Year 6 line items above, 0-100)%n/a$0.00
Profit (percentage of Year 6 line items above excluding Overhead, 0-100)%n/a$0.00
Total Year 6 Estimated Price$0.00

* - Unit pricing for equipment shall include all material and labor costs for a complete install

Zone A - Option I - Year 7
Line ItemsUnitUnit Price*Estimated QuantityEstimated Total
Feasibility Study/Site Assessment Engineeringhr32$0.00
Site Superintendenthr120$0.00
Electrician - Journeyman Levelhr80$0.00
Transformer (480:208/120, per kVA with grounding)kVA225$0.00
Panelboard (480v, 3ph, M.L.O., surface mtd, fully populated) (per buss amperage)Amp800$0.00
Panelboard (208/120v, M.L.O., surface mtd, fully populated 40A/2P) (per buss amperage)Amp800$0.00
EMT Conduit and Cable (less than 2" dia)10 ft120$0.00
EMT Conduit and Cable (greater than 2" dia)10 ft5$0.00
PVC Conduit (sked 80) and Cable (unpaved earth, with trenching and reseeding) (less than 2" dia)10 ft5$0.00
PVC Conduit (sked 80) and Cable (unpaved earth, with trenching and reseeding) (greater than 2" dia)10 ft60$0.00
PVC Conduit (sked 40) and Cable (concrete encased, with trenching and restoration of asphalt) (less than 2" dia)10 ft5$0.00
PVC Conduit (sked 40) and Cable (concrete encased, with trenching and restoration of asphalt) (greater than 2" dia)10 ft60$0.00
Concrete Pad (including rebar)cu ft3$0.00
Wheel Stop (concrete, 6' long)ea24$0.00
Bollard (6" dia, std galv stl pipe, filled with concrete) (not including concrete base)ea24$0.00
Asphalt Resurfacingsq ft250$0.00
Testing and Commissioning (level 2 charger, dual port)ea12$0.00
Overhead (percentage of Year 7 line items above, 0-100)%n/a$0.00
Profit (percentage of Year 7 line items above excluding Overhead, 0-100)%n/a$0.00
Total Year 7 Estimated Price$0.00

* - Unit pricing for equipment shall include all material and labor costs for a complete install

Zone A - Option I - Year 8
Line ItemsUnitUnit Price*Estimated QuantityEstimated Total
Feasibility Study/Site Assessment Engineeringhr32$0.00
Site Superintendenthr120$0.00
Electrician - Journeyman Levelhr80$0.00
Transformer (480:208/120, per kVA with grounding)kVA225$0.00
Panelboard (480v, 3ph, M.L.O., surface mtd, fully populated) (per buss amperage)Amp800$0.00
Panelboard (208/120v, M.L.O., surface mtd, fully populated 40A/2P) (per buss amperage)Amp800$0.00
EMT Conduit and Cable (less than 2" dia)10 ft120$0.00
EMT Conduit and Cable (greater than 2" dia)10 ft5$0.00
PVC Conduit (sked 80) and Cable (unpaved earth, with trenching and reseeding) (less than 2" dia)10 ft5$0.00
PVC Conduit (sked 80) and Cable (unpaved earth, with trenching and reseeding) (greater than 2" dia)10 ft60$0.00
PVC Conduit (sked 40) and Cable (concrete encased, with trenching and restoration of asphalt) (less than 2" dia)10 ft5$0.00
PVC Conduit (sked 40) and Cable (concrete encased, with trenching and restoration of asphalt) (greater than 2" dia)10 ft60$0.00
Concrete Pad (including rebar)cu ft3$0.00
Wheel Stop (concrete, 6' long)ea24$0.00
Bollard (6" dia, std galv stl pipe, filled with concrete) (not including concrete base)ea24$0.00
Asphalt Resurfacingsq ft250$0.00
Testing and Commissioning (level 2 charger, dual port)ea12$0.00
Overhead (percentage of Year 8 line items above, 0-100)%n/a$0.00
Profit (percentage of Year 8 line items above excluding Overhead, 0-100)%n/a$0.00
Total Year 8 Estimated Price$0.00

* - Unit pricing for equipment shall include all material and labor costs for a complete install

Zone A - Option I - Year 9
Line ItemsUnitUnit Price*Estimated QuantityEstimated Total
Feasibility Study/Site Assessment Engineeringhr32$0.00
Site Superintendenthr120$0.00
Electrician - Journeyman Levelhr80$0.00
Transformer (480:208/120, per kVA with grounding)kVA225$0.00
Panelboard (480v, 3ph, M.L.O., surface mtd, fully populated) (per buss amperage)Amp800$0.00
Panelboard (208/120v, M.L.O., surface mtd, fully populated 40A/2P) (per buss amperage)Amp800$0.00
EMT Conduit and Cable (less than 2" dia)10 ft120$0.00
EMT Conduit and Cable (greater than 2" dia)10 ft5$0.00
PVC Conduit (sked 80) and Cable (unpaved earth, with trenching and reseeding) (less than 2" dia)10 ft5$0.00
PVC Conduit (sked 80) and Cable (unpaved earth, with trenching and reseeding) (greater than 2" dia)10 ft60$0.00
PVC Conduit (sked 40) and Cable (concrete encased, with trenching and restoration of asphalt) (less than 2" dia)10 ft5$0.00
PVC Conduit (sked 40) and Cable (concrete encased, with trenching and restoration of asphalt) (greater than 2" dia)10 ft60$0.00
Concrete Pad (including rebar)cu ft3$0.00
Wheel Stop (concrete, 6' long)ea24$0.00
Bollard (6" dia, std galv stl pipe, filled with concrete) (not including concrete base)ea24$0.00
Asphalt Resurfacingsq ft250$0.00
Testing and Commissioning (level 2 charger, dual port)ea12$0.00
Overhead (percentage of Year 9 line items above, 0-100)%n/a$0.00
Profit (percentage of Year 9 line items above excluding Overhead, 0-100)%n/a$0.00
Total Year 9 Estimated Price$0.00

* - Unit pricing for equipment shall include all material and labor costs for a complete install

Zone A - Option I - Year 10
Line ItemsUnitUnit Price*Estimated QuantityEstimated Total
Feasibility Study/Site Assessment Engineeringhr32$0.00
Site Superintendenthr120$0.00
Electrician - Journeyman Levelhr80$0.00
Transformer (480:208/120, per kVA with grounding)kVA225$0.00
Panelboard (480v, 3ph, M.L.O., surface mtd, fully populated) (per buss amperage)Amp800$0.00
Panelboard (208/120v, M.L.O., surface mtd, fully populated 40A/2P) (per buss amperage)Amp800$0.00
EMT Conduit and Cable (less than 2" dia)10 ft120$0.00
EMT Conduit and Cable (greater than 2" dia)10 ft5$0.00
PVC Conduit (sked 80) and Cable (unpaved earth, with trenching and reseeding) (less than 2" dia)10 ft5$0.00
PVC Conduit (sked 80) and Cable (unpaved earth, with trenching and reseeding) (greater than 2" dia)10 ft60$0.00
PVC Conduit (sked 40) and Cable (concrete encased, with trenching and restoration of asphalt) (less than 2" dia)10 ft5$0.00
PVC Conduit (sked 40) and Cable (concrete encased, with trenching and restoration of asphalt) (greater than 2" dia)10 ft60$0.00
Concrete Pad (including rebar)cu ft3$0.00
Wheel Stop (concrete, 6' long)ea24$0.00
Bollard (6" dia, std galv stl pipe, filled with concrete) (not including concrete base)ea24$0.00
Asphalt Resurfacingsq ft250$0.00
Testing and Commissioning (level 2 charger, dual port)ea12$0.00
Overhead (percentage of Year 10 line items above, 0-100)%n/a$0.00
Profit (percentage of Year 10 line items above excluding Overhead, 0-100)%n/a$0.00
Total Year 10 Estimated Price$0.00

* - Unit pricing for equipment shall include all material and labor costs for a complete install

Total Option I Estimated Price for Zone A (Total Estimated Price for Year 6 + Year 7 + Year 8 + Year 9 + Year 10) $0.00

Total Evaluated Price for Zone A (Total Estimated Price for Year 1 + Year 2 + Year 3 + Year 4 + Year 5 + Year 6 + Year 7 + Year 8 + Year 9 + Year 10) $0.00

Zone B

DRAFT - Supplemental SF1442 Pricing Sheet
Solicitation Number:
Name of Offeror:
Zone B - Base Period - Year 1
Line ItemsUnitUnit Price*Estimated QuantityEstimated Total Price
Feasibility Study/Site Assessment Engineeringhr32$0.00
Site Superintendenthr120$0.00
Electrician - Journeyman Levelhr80$0.00
Transformer (480:208/120, per kVA with grounding)kVA225$0.00
Panelboard (480v, 3ph, M.L.O., surface mtd, fully populated) (per buss amperage)Amp800$0.00
Panelboard (208/120v, M.L.O., surface mtd, fully populated 40A/2P) (per buss amperage)Amp800$0.00
EMT Conduit and Cable (less than 2" dia)10 ft120$0.00
EMT Conduit and Cable (greater than 2" dia)10 ft5$0.00
PVC Conduit (sked 80) and Cable (unpaved earth, with trenching and reseeding) (less than 2" dia)10 ft5$0.00
PVC Conduit (sked 80) and Cable (unpaved earth, with trenching and reseeding) (greater than 2" dia)10 ft60$0.00
PVC Conduit (sked 40) and Cable (concrete encased, with trenching and restoration of asphalt) (less than 2" dia)10 ft5$0.00
PVC Conduit (sked 40) and Cable (concrete encased, with trenching and restoration of asphalt) (greater than 2" dia)10 ft60$0.00
Concrete Pad (including rebar)cu ft3$0.00
Wheel Stop (concrete, 6' long)ea24$0.00
Bollard (6" dia, std galv stl pipe, filled with concrete) (not including concrete base)ea24$0.00
Asphalt Resurfacingsq ft250$0.00
Testing and Commissioning (level 2 charger, dual port)ea12$0.00
Overhead (percentage of Year 1 line items above, 0-100)%n/a$0.00
Profit (percentage of Year 1 line items above excluding Overhead, 0-100)%n/a$0.00
Total Year 1 Estimated Price$0.00

* - Unit pricing for equipment shall include all material and labor costs for a complete install

Zone B - Base Period - Year 2
Line ItemsUnitUnit Price*Estimated QuantityEstimated Total
Feasibility Study/Site Assessment Engineeringhr32$0.00
Site Superintendenthr120$0.00
Electrician - Journeyman Levelhr80$0.00
Transformer (480:208/120, per kVA with grounding)kVA225$0.00
Panelboard (480v, 3ph, M.L.O., surface mtd, fully populated) (per buss amperage)Amp800$0.00
Panelboard (208/120v, M.L.O., surface mtd, fully populated 40A/2P) (per buss amperage)Amp800$0.00
EMT Conduit and Cable (less than 2" dia)10 ft120$0.00
EMT Conduit and Cable (greater than 2" dia)10 ft5$0.00
PVC Conduit (sked 80) and Cable (unpaved earth, with trenching and reseeding) (less than 2" dia)10 ft5$0.00
PVC Conduit (sked 80) and Cable (unpaved earth, with trenching and reseeding) (greater than 2" dia)10 ft60$0.00
PVC Conduit (sked 40) and Cable (concrete encased, with trenching and restoration of asphalt) (less than 2" dia)10 ft5$0.00
PVC Conduit (sked 40) and Cable (concrete encased, with trenching and restoration of asphalt) (greater than 2" dia)10 ft60$0.00
Concrete Pad (including rebar)cu ft3$0.00
Wheel Stop (concrete, 6' long)ea24$0.00
Bollard (6" dia, std galv stl pipe, filled with concrete) (not including concrete base)ea24$0.00
Asphalt Resurfacingsq ft250$0.00
Testing and Commissioning (level 2 charger, dual port)ea12$0.00
Overhead (percentage of Year 2 line items above, 0-100)%n/a$0.00
Profit (percentage of Year 2 line items above excluding Overhead, 0-100)%n/a$0.00
Total Year 2 Estimated Price$0.00

* - Unit pricing for equipment shall include all material and labor costs for a complete install

Zone B - Base Period - Year 3
Line ItemsUnitUnit Price*Estimated QuantityEstimated Total
Feasibility Study/Site Assessment Engineeringhr32$0.00
Site Superintendenthr120$0.00
Electrician - Journeyman Levelhr80$0.00
Transformer (480:208/120, per kVA with grounding)kVA225$0.00
Panelboard (480v, 3ph, M.L.O., surface mtd, fully populated) (per buss amperage)Amp800$0.00
Panelboard (208/120v, M.L.O., surface mtd, fully populated 40A/2P) (per buss amperage)Amp800$0.00
EMT Conduit and Cable (less than 2" dia)10 ft120$0.00
EMT Conduit and Cable (greater than 2" dia)10 ft5$0.00
PVC Conduit (sked 80) and Cable (unpaved earth, with trenching and reseeding) (less than 2" dia)10 ft5$0.00
PVC Conduit (sked 80) and Cable (unpaved earth, with trenching and reseeding) (greater than 2" dia)10 ft60$0.00
PVC Conduit (sked 40) and Cable (concrete encased, with trenching and restoration of asphalt) (less than 2" dia)10 ft5$0.00
PVC Conduit (sked 40) and Cable (concrete encased, with trenching and restoration of asphalt) (greater than 2" dia)10 ft60$0.00
Concrete Pad (including rebar)cu ft3$0.00
Wheel Stop (concrete, 6' long)ea24$0.00
Bollard (6" dia, std galv stl pipe, filled with concrete) (not including concrete base)ea24$0.00
Asphalt Resurfacingsq ft250$0.00
Testing and Commissioning (level 2 charger, dual port)ea12$0.00
Overhead (percentage of Year 3 line items above, 0-100)%n/a$0.00
Profit (percentage of Year 3 line items above excluding Overhead, 0-100)%n/a$0.00
Total Year 3 Estimated Price$0.00

* - Unit pricing for equipment shall include all material and labor costs for a complete install

Zone B - Base Period - Year 4
Line ItemsUnitUnit Price*Estimated QuantityEstimated Total
Feasibility Study/Site Assessment Engineeringhr32$0.00
Site Superintendenthr120$0.00
Electrician - Journeyman Levelhr80$0.00
Transformer (480:208/120, per kVA with grounding)kVA225$0.00
Panelboard (480v, 3ph, M.L.O., surface mtd, fully populated) (per buss amperage)Amp800$0.00
Panelboard (208/120v, M.L.O., surface mtd, fully populated 40A/2P) (per buss amperage)Amp800$0.00
EMT Conduit and Cable (less than 2" dia)10 ft120$0.00
EMT Conduit and Cable (greater than 2" dia)10 ft5$0.00
PVC Conduit (sked 80) and Cable (unpaved earth, with trenching and reseeding) (less than 2" dia)10 ft5$0.00
PVC Conduit (sked 80) and Cable (unpaved earth, with trenching and reseeding) (greater than 2" dia)10 ft60$0.00
PVC Conduit (sked 40) and Cable (concrete encased, with trenching and restoration of asphalt) (less than 2" dia)10 ft5$0.00
PVC Conduit (sked 40) and Cable (concrete encased, with trenching and restoration of asphalt) (greater than 2" dia)10 ft60$0.00
Concrete Pad (including rebar)cu ft3$0.00
Wheel Stop (concrete, 6' long)ea24$0.00
Bollard (6" dia, std galv stl pipe, filled with concrete) (not including concrete base)ea24$0.00
Asphalt Resurfacingsq ft250$0.00
Testing and Commissioning (level 2 charger, dual port)ea12$0.00
Overhead (percentage of Year 4 line items above, 0-100)%n/a$0.00
Profit (percentage of Year 4 line items above excluding Overhead, 0-100)%n/a$0.00
Total Year 4 Estimated Price$0.00

* - Unit pricing for equipment shall include all material and labor costs for a complete install

Zone B - Base Period - Year 5
Line ItemsUnitUnit Price*Estimated QuantityEstimated Total
Feasibility Study/Site Assessment Engineeringhr32$0.00
Site Superintendenthr120$0.00
Electrician - Journeyman Levelhr80$0.00
Transformer (480:208/120, per kVA with grounding)kVA225$0.00
Panelboard (480v, 3ph, M.L.O., surface mtd, fully populated) (per buss amperage)Amp800$0.00
Panelboard (208/120v, M.L.O., surface mtd, fully populated 40A/2P) (per buss amperage)Amp800$0.00
EMT Conduit and Cable (less than 2" dia)10 ft120$0.00
EMT Conduit and Cable (greater than 2" dia)10 ft5$0.00
PVC Conduit (sked 80) and Cable (unpaved earth, with trenching and reseeding) (less than 2" dia)10 ft5$0.00
PVC Conduit (sked 80) and Cable (unpaved earth, with trenching and reseeding) (greater than 2" dia)10 ft60$0.00
PVC Conduit (sked 40) and Cable (concrete encased, with trenching and restoration of asphalt) (less than 2" dia)10 ft5$0.00
PVC Conduit (sked 40) and Cable (concrete encased, with trenching and restoration of asphalt) (greater than 2" dia)10 ft60$0.00
Concrete Pad (including rebar)cu ft3$0.00
Wheel Stop (concrete, 6' long)ea24$0.00
Bollard (6" dia, std galv stl pipe, filled with concrete) (not including concrete base)ea24$0.00
Asphalt Resurfacingsq ft250$0.00
Testing and Commissioning (level 2 charger, dual port)ea12$0.00
Overhead (percentage of Year 5 line items above, 0-100)%n/a$0.00
Profit (percentage of Year 5 line items above excluding Overhead, 0-100)%n/a$0.00
Total Year 5 Estimated Price$0.00

* - Unit pricing for equipment shall include all material and labor costs for a complete install

Total Base Period Estimated Price for Zone B (Total Estimated Price for Year 1 + Year 2 + Year 3 + Year 4 + Year 5) $0.00

Zone B - Option I - Year 6
Line ItemsUnitUnit Price*Estimated QuantityEstimated Total Price
Feasibility Study/Site Assessment Engineeringhr32$0.00
Site Superintendenthr120$0.00
Electrician - Journeyman Levelhr80$0.00
Transformer (480:208/120, per kVA with grounding)kVA225$0.00
Panelboard (480v, 3ph, M.L.O., surface mtd, fully populated) (per buss amperage)Amp800$0.00
Panelboard (208/120v, M.L.O., surface mtd, fully populated 40A/2P) (per buss amperage)Amp800$0.00
EMT Conduit and Cable (less than 2" dia)10 ft120$0.00
EMT Conduit and Cable (greater than 2" dia)10 ft5$0.00
PVC Conduit (sked 80) and Cable (unpaved earth, with trenching and reseeding) (less than 2" dia)10 ft5$0.00
PVC Conduit (sked 80) and Cable (unpaved earth, with trenching and reseeding) (greater than 2" dia)10 ft60$0.00
PVC Conduit (sked 40) and Cable (concrete encased, with trenching and restoration of asphalt) (less than 2" dia)10 ft5$0.00
PVC Conduit (sked 40) and Cable (concrete encased, with trenching and restoration of asphalt) (greater than 2" dia)10 ft60$0.00
Concrete Pad (including rebar)cu ft3$0.00
Wheel Stop (concrete, 6' long)ea24$0.00
Bollard (6" dia, std galv stl pipe, filled with concrete) (not including concrete base)ea24$0.00
Asphalt Resurfacingsq ft250$0.00
Testing and Commissioning (level 2 charger, dual port)ea12$0.00
Overhead (percentage of Year 6 line items above, 0-100)%n/a$0.00
Profit (percentage of Year 6 line items above excluding Overhead, 0-100)%n/a$0.00
Total Year 6 Estimated Price$0.00

* - Unit pricing for equipment shall include all material and labor costs for a complete install

Zone B - Option I - Year 7
Line ItemsUnitUnit Price*Estimated QuantityEstimated Total
Feasibility Study/Site Assessment Engineeringhr32$0.00
Site Superintendenthr120$0.00
Electrician - Journeyman Levelhr80$0.00
Transformer (480:208/120, per kVA with grounding)kVA225$0.00
Panelboard (480v, 3ph, M.L.O., surface mtd, fully populated) (per buss amperage)Amp800$0.00
Panelboard (208/120v, M.L.O., surface mtd, fully populated 40A/2P) (per buss amperage)Amp800$0.00
EMT Conduit and Cable (less than 2" dia)10 ft120$0.00
EMT Conduit and Cable (greater than 2" dia)10 ft5$0.00
PVC Conduit (sked 80) and Cable (unpaved earth, with trenching and reseeding) (less than 2" dia)10 ft5$0.00
PVC Conduit (sked 80) and Cable (unpaved earth, with trenching and reseeding) (greater than 2" dia)10 ft60$0.00
PVC Conduit (sked 40) and Cable (concrete encased, with trenching and restoration of asphalt) (less than 2" dia)10 ft5$0.00
PVC Conduit (sked 40) and Cable (concrete encased, with trenching and restoration of asphalt) (greater than 2" dia)10 ft60$0.00
Concrete Pad (including rebar)cu ft3$0.00
Wheel Stop (concrete, 6' long)ea24$0.00
Bollard (6" dia, std galv stl pipe, filled with concrete) (not including concrete base)ea24$0.00
Asphalt Resurfacingsq ft250$0.00
Testing and Commissioning (level 2 charger, dual port)ea12$0.00
Overhead (percentage of Year 7 line items above, 0-100)%n/a$0.00
Profit (percentage of Year 7 line items above excluding Overhead, 0-100)%n/a$0.00
Total Year 7 Estimated Price$0.00

* - Unit pricing for equipment shall include all material and labor costs for a complete install

Zone B - Option I - Year 8
Line ItemsUnitUnit Price*Estimated QuantityEstimated Total
Feasibility Study/Site Assessment Engineeringhr32$0.00
Site Superintendenthr120$0.00
Electrician - Journeyman Levelhr80$0.00
Transformer (480:208/120, per kVA with grounding)kVA225$0.00
Panelboard (480v, 3ph, M.L.O., surface mtd, fully populated) (per buss amperage)Amp800$0.00
Panelboard (208/120v, M.L.O., surface mtd, fully populated 40A/2P) (per buss amperage)Amp800$0.00
EMT Conduit and Cable (less than 2" dia)10 ft120$0.00
EMT Conduit and Cable (greater than 2" dia)10 ft5$0.00
PVC Conduit (sked 80) and Cable (unpaved earth, with trenching and reseeding) (less than 2" dia)10 ft5$0.00
PVC Conduit (sked 80) and Cable (unpaved earth, with trenching and reseeding) (greater than 2" dia)10 ft60$0.00
PVC Conduit (sked 40) and Cable (concrete encased, with trenching and restoration of asphalt) (less than 2" dia)10 ft5$0.00
PVC Conduit (sked 40) and Cable (concrete encased, with trenching and restoration of asphalt) (greater than 2" dia)10 ft60$0.00
Concrete Pad (including rebar)cu ft3$0.00
Wheel Stop (concrete, 6' long)ea24$0.00
Bollard (6" dia, std galv stl pipe, filled with concrete) (not including concrete base)ea24$0.00
Asphalt Resurfacingsq ft250$0.00
Testing and Commissioning (level 2 charger, dual port)ea12$0.00
Overhead (percentage of Year 8 line items above, 0-100)%n/a$0.00
Profit (percentage of Year 8 line items above excluding Overhead, 0-100)%n/a$0.00
Total Year 8 Estimated Price$0.00

* - Unit pricing for equipment shall include all material and labor costs for a complete install

Zone B - Option I - Year 9
Line ItemsUnitUnit Price*Estimated QuantityEstimated Total
Feasibility Study/Site Assessment Engineeringhr32$0.00
Site Superintendenthr120$0.00
Electrician - Journeyman Levelhr80$0.00
Transformer (480:208/120, per kVA with grounding)kVA225$0.00
Panelboard (480v, 3ph, M.L.O., surface mtd, fully populated) (per buss amperage)Amp800$0.00
Panelboard (208/120v, M.L.O., surface mtd, fully populated 40A/2P) (per buss amperage)Amp800$0.00
EMT Conduit and Cable (less than 2" dia)10 ft120$0.00
EMT Conduit and Cable (greater than 2" dia)10 ft5$0.00
PVC Conduit (sked 80) and Cable (unpaved earth, with trenching and reseeding) (less than 2" dia)10 ft5$0.00
PVC Conduit (sked 80) and Cable (unpaved earth, with trenching and reseeding) (greater than 2" dia)10 ft60$0.00
PVC Conduit (sked 40) and Cable (concrete encased, with trenching and restoration of asphalt) (less than 2" dia)10 ft5$0.00
PVC Conduit (sked 40) and Cable (concrete encased, with trenching and restoration of asphalt) (greater than 2" dia)10 ft60$0.00
Concrete Pad (including rebar)cu ft3$0.00
Wheel Stop (concrete, 6' long)ea24$0.00
Bollard (6" dia, std galv stl pipe, filled with concrete) (not including concrete base)ea24$0.00
Asphalt Resurfacingsq ft250$0.00
Testing and Commissioning (level 2 charger, dual port)ea12$0.00
Overhead (percentage of Year 9 line items above, 0-100)%n/a$0.00
Profit (percentage of Year 9 line items above excluding Overhead, 0-100)%n/a$0.00
Total Year 9 Estimated Price$0.00

* - Unit pricing for equipment shall include all material and labor costs for a complete install

Zone B - Option I - Year 10
Line ItemsUnitUnit Price*Estimated QuantityEstimated Total
Feasibility Study/Site Assessment Engineeringhr32$0.00
Site Superintendenthr120$0.00
Electrician - Journeyman Levelhr80$0.00
Transformer (480:208/120, per kVA with grounding)kVA225$0.00
Panelboard (480v, 3ph, M.L.O., surface mtd, fully populated) (per buss amperage)Amp800$0.00
Panelboard (208/120v, M.L.O., surface mtd, fully populated 40A/2P) (per buss amperage)Amp800$0.00
EMT Conduit and Cable (less than 2" dia)10 ft120$0.00
EMT Conduit and Cable (greater than 2" dia)10 ft5$0.00
PVC Conduit (sked 80) and Cable (unpaved earth, with trenching and reseeding) (less than 2" dia)10 ft5$0.00
PVC Conduit (sked 80) and Cable (unpaved earth, with trenching and reseeding) (greater than 2" dia)10 ft60$0.00
PVC Conduit (sked 40) and Cable (concrete encased, with trenching and restoration of asphalt) (less than 2" dia)10 ft5$0.00
PVC Conduit (sked 40) and Cable (concrete encased, with trenching and restoration of asphalt) (greater than 2" dia)10 ft60$0.00
Concrete Pad (including rebar)cu ft3$0.00
Wheel Stop (concrete, 6' long)ea24$0.00
Bollard (6" dia, std galv stl pipe, filled with concrete) (not including concrete base)ea24$0.00
Asphalt Resurfacingsq ft250$0.00
Testing and Commissioning (level 2 charger, dual port)ea12$0.00
Overhead (percentage of Year 10 line items above, 0-100)%n/a$0.00
Profit (percentage of Year 10 line items above excluding Overhead, 0-100)%n/a$0.00
Total Year 10 Estimated Price$0.00

* - Unit pricing for equipment shall include all material and labor costs for a complete install

Total Option I Estimated Price for Zone B (Total Estimated Price for Year 6 + Year 7 + Year 8 + Year 9 + Year 10) $0.00

Total Evaluated Price for Zone B (Total Estimated Price for Year 1 + Year 2 + Year 3 + Year 4 + Year 5 + Year 6 + Year 7 + Year 8 + Year 9 + Year 10) $0.00

Zone C

DRAFT - Supplemental SF1442 Pricing Sheet
Solicitation Number:
Name of Offeror:
Zone C - Base Period - Year 1
Line ItemsUnitUnit Price*Estimated QuantityEstimated Total Price
Feasibility Study/Site Assessment Engineeringhr32$0.00
Site Superintendenthr120$0.00
Electrician - Journeyman Levelhr80$0.00
Transformer (480:208/120, per kVA with grounding)kVA225$0.00
Panelboard (480v, 3ph, M.L.O., surface mtd, fully populated) (per buss amperage)Amp800$0.00
Panelboard (208/120v, M.L.O., surface mtd, fully populated 40A/2P) (per buss amperage)Amp800$0.00
EMT Conduit and Cable (less than 2" dia)10 ft120$0.00
EMT Conduit and Cable (greater than 2" dia)10 ft5$0.00
PVC Conduit (sked 80) and Cable (unpaved earth, with trenching and reseeding) (less than 2" dia)10 ft5$0.00
PVC Conduit (sked 80) and Cable (unpaved earth, with trenching and reseeding) (greater than 2" dia)10 ft60$0.00
PVC Conduit (sked 40) and Cable (concrete encased, with trenching and restoration of asphalt) (less than 2" dia)10 ft5$0.00
PVC Conduit (sked 40) and Cable (concrete encased, with trenching and restoration of asphalt) (greater than 2" dia)10 ft60$0.00
Concrete Pad (including rebar)cu ft3$0.00
Wheel Stop (concrete, 6' long)ea24$0.00
Bollard (6" dia, std galv stl pipe, filled with concrete) (not including concrete base)ea24$0.00
Asphalt Resurfacingsq ft250$0.00
Testing and Commissioning (level 2 charger, dual port)ea12$0.00
Overhead (percentage of Year 1 line items above, 0-100)%n/a$0.00
Profit (percentage of Year 1 line items above excluding Overhead, 0-100)%n/a$0.00
Total Year 1 Estimated Price$0.00

* - Unit pricing for equipment shall include all material and labor costs for a complete install

Zone C - Base Period - Year 2
Line ItemsUnitUnit Price*Estimated QuantityEstimated Total
Feasibility Study/Site Assessment Engineeringhr32$0.00
Site Superintendenthr120$0.00
Electrician - Journeyman Levelhr80$0.00
Transformer (480:208/120, per kVA with grounding)kVA225$0.00
Panelboard (480v, 3ph, M.L.O., surface mtd, fully populated) (per buss amperage)Amp800$0.00
Panelboard (208/120v, M.L.O., surface mtd, fully populated 40A/2P) (per buss amperage)Amp800$0.00
EMT Conduit and Cable (less than 2" dia)10 ft120$0.00
EMT Conduit and Cable (greater than 2" dia)10 ft5$0.00
PVC Conduit (sked 80) and Cable (unpaved earth, with trenching and reseeding) (less than 2" dia)10 ft5$0.00
PVC Conduit (sked 80) and Cable (unpaved earth, with trenching and reseeding) (greater than 2" dia)10 ft60$0.00
PVC Conduit (sked 40) and Cable (concrete encased, with trenching and restoration of asphalt) (less than 2" dia)10 ft5$0.00
PVC Conduit (sked 40) and Cable (concrete encased, with trenching and restoration of asphalt) (greater than 2" dia)10 ft60$0.00
Concrete Pad (including rebar)cu ft3$0.00
Wheel Stop (concrete, 6' long)ea24$0.00
Bollard (6" dia, std galv stl pipe, filled with concrete) (not including concrete base)ea24$0.00
Asphalt Resurfacingsq ft250$0.00
Testing and Commissioning (level 2 charger, dual port)ea12$0.00
Overhead (percentage of Year 2 line items above, 0-100)%n/a$0.00
Profit (percentage of Year 2 line items above excluding Overhead, 0-100)%n/a$0.00
Total Year 2 Estimated Price$0.00

* - Unit pricing for equipment shall include all material and labor costs for a complete install

Zone C - Base Period - Year 3
Line ItemsUnitUnit Price*Estimated QuantityEstimated Total
Feasibility Study/Site Assessment Engineeringhr32$0.00
Site Superintendenthr120$0.00
Electrician - Journeyman Levelhr80$0.00
Transformer (480:208/120, per kVA with grounding)kVA225$0.00
Panelboard (480v, 3ph, M.L.O., surface mtd, fully populated) (per buss amperage)Amp800$0.00
Panelboard (208/120v, M.L.O., surface mtd, fully populated 40A/2P) (per buss amperage)Amp800$0.00
EMT Conduit and Cable (less than 2" dia)10 ft120$0.00
EMT Conduit and Cable (greater than 2" dia)10 ft5$0.00
PVC Conduit (sked 80) and Cable (unpaved earth, with trenching and reseeding) (less than 2" dia)10 ft5$0.00
PVC Conduit (sked 80) and Cable (unpaved earth, with trenching and reseeding) (greater than 2" dia)10 ft60$0.00
PVC Conduit (sked 40) and Cable (concrete encased, with trenching and restoration of asphalt) (less than 2" dia)10 ft5$0.00
PVC Conduit (sked 40) and Cable (concrete encased, with trenching and restoration of asphalt) (greater than 2" dia)10 ft60$0.00
Concrete Pad (including rebar)cu ft3$0.00
Wheel Stop (concrete, 6' long)ea24$0.00
Bollard (6" dia, std galv stl pipe, filled with concrete) (not including concrete base)ea24$0.00
Asphalt Resurfacingsq ft250$0.00
Testing and Commissioning (level 2 charger, dual port)ea12$0.00
Overhead (percentage of Year 3 line items above, 0-100)%n/a$0.00
Profit (percentage of Year 3 line items above excluding Overhead, 0-100)%n/a$0.00
Total Year 3 Estimated Price$0.00

* - Unit pricing for equipment shall include all material and labor costs for a complete install

Zone C - Base Period - Year 4
Line ItemsUnitUnit Price*Estimated QuantityEstimated Total
Feasibility Study/Site Assessment Engineeringhr32$0.00
Site Superintendenthr120$0.00
Electrician - Journeyman Levelhr80$0.00
Transformer (480:208/120, per kVA with grounding)kVA225$0.00
Panelboard (480v, 3ph, M.L.O., surface mtd, fully populated) (per buss amperage)Amp800$0.00
Panelboard (208/120v, M.L.O., surface mtd, fully populated 40A/2P) (per buss amperage)Amp800$0.00
EMT Conduit and Cable (less than 2" dia)10 ft120$0.00
EMT Conduit and Cable (greater than 2" dia)10 ft5$0.00
PVC Conduit (sked 80) and Cable (unpaved earth, with trenching and reseeding) (less than 2" dia)10 ft5$0.00
PVC Conduit (sked 80) and Cable (unpaved earth, with trenching and reseeding) (greater than 2" dia)10 ft60$0.00
PVC Conduit (sked 40) and Cable (concrete encased, with trenching and restoration of asphalt) (less than 2" dia)10 ft5$0.00
PVC Conduit (sked 40) and Cable (concrete encased, with trenching and restoration of asphalt) (greater than 2" dia)10 ft60$0.00
Concrete Pad (including rebar)cu ft3$0.00
Wheel Stop (concrete, 6' long)ea24$0.00
Bollard (6" dia, std galv stl pipe, filled with concrete) (not including concrete base)ea24$0.00
Asphalt Resurfacingsq ft250$0.00
Testing and Commissioning (level 2 charger, dual port)ea12$0.00
Overhead (percentage of Year 4 line items above, 0-100)%n/a$0.00
Profit (percentage of Year 4 line items above excluding Overhead, 0-100)%n/a$0.00
Total Year 4 Estimated Price$0.00

* - Unit pricing for equipment shall include all material and labor costs for a complete install

Zone C - Base Period - Year 5
Line ItemsUnitUnit Price*Estimated QuantityEstimated Total
Feasibility Study/Site Assessment Engineeringhr32$0.00
Site Superintendenthr120$0.00
Electrician - Journeyman Levelhr80$0.00
Transformer (480:208/120, per kVA with grounding)kVA225$0.00
Panelboard (480v, 3ph, M.L.O., surface mtd, fully populated) (per buss amperage)Amp800$0.00
Panelboard (208/120v, M.L.O., surface mtd, fully populated 40A/2P) (per buss amperage)Amp800$0.00
EMT Conduit and Cable (less than 2" dia)10 ft120$0.00
EMT Conduit and Cable (greater than 2" dia)10 ft5$0.00
PVC Conduit (sked 80) and Cable (unpaved earth, with trenching and reseeding) (less than 2" dia)10 ft5$0.00
PVC Conduit (sked 80) and Cable (unpaved earth, with trenching and reseeding) (greater than 2" dia)10 ft60$0.00
PVC Conduit (sked 40) and Cable (concrete encased, with trenching and restoration of asphalt) (less than 2" dia)10 ft5$0.00
PVC Conduit (sked 40) and Cable (concrete encased, with trenching and restoration of asphalt) (greater than 2" dia)10 ft60$0.00
Concrete Pad (including rebar)cu ft3$0.00
Wheel Stop (concrete, 6' long)ea24$0.00
Bollard (6" dia, std galv stl pipe, filled with concrete) (not including concrete base)ea24$0.00
Asphalt Resurfacingsq ft250$0.00
Testing and Commissioning (level 2 charger, dual port)ea12$0.00
Overhead (percentage of Year 5 line items above, 0-100)%n/a$0.00
Profit (percentage of Year 5 line items above excluding Overhead, 0-100)%n/a$0.00
Total Year 5 Estimated Price$0.00

* - Unit pricing for equipment shall include all material and labor costs for a complete install

Total Base Period Estimated Price for Zone C (Total Estimated Price for Year 1 + Year 2 + Year 3 + Year 4 + Year 5) $0.00

Zone C - Option I - Year 6
Line ItemsUnitUnit Price*Estimated QuantityEstimated Total Price
Feasibility Study/Site Assessment Engineeringhr32$0.00
Site Superintendenthr120$0.00
Electrician - Journeyman Levelhr80$0.00
Transformer (480:208/120, per kVA with grounding)kVA225$0.00
Panelboard (480v, 3ph, M.L.O., surface mtd, fully populated) (per buss amperage)Amp800$0.00
Panelboard (208/120v, M.L.O., surface mtd, fully populated 40A/2P) (per buss amperage)Amp800$0.00
EMT Conduit and Cable (less than 2" dia)10 ft120$0.00
EMT Conduit and Cable (greater than 2" dia)10 ft5$0.00
PVC Conduit (sked 80) and Cable (unpaved earth, with trenching and reseeding) (less than 2" dia)10 ft5$0.00
PVC Conduit (sked 80) and Cable (unpaved earth, with trenching and reseeding) (greater than 2" dia)10 ft60$0.00
PVC Conduit (sked 40) and Cable (concrete encased, with trenching and restoration of asphalt) (less than 2" dia)10 ft5$0.00
PVC Conduit (sked 40) and Cable (concrete encased, with trenching and restoration of asphalt) (greater than 2" dia)10 ft60$0.00
Concrete Pad (including rebar)cu ft3$0.00
Wheel Stop (concrete, 6' long)ea24$0.00
Bollard (6" dia, std galv stl pipe, filled with concrete) (not including concrete base)ea24$0.00
Asphalt Resurfacingsq ft250$0.00
Testing and Commissioning (level 2 charger, dual port)ea12$0.00
Overhead (percentage of Year 6 line items above, 0-100)%n/a$0.00
Profit (percentage of Year 6 line items above excluding Overhead, 0-100)%n/a$0.00
Total Year 6 Estimated Price$0.00

* - Unit pricing for equipment shall include all material and labor costs for a complete install

Zone C - Option I - Year 7
Line ItemsUnitUnit Price*Estimated QuantityEstimated Total
Feasibility Study/Site Assessment Engineeringhr32$0.00
Site Superintendenthr120$0.00
Electrician - Journeyman Levelhr80$0.00
Transformer (480:208/120, per kVA with grounding)kVA225$0.00
Panelboard (480v, 3ph, M.L.O., surface mtd, fully populated) (per buss amperage)Amp800$0.00
Panelboard (208/120v, M.L.O., surface mtd, fully populated 40A/2P) (per buss amperage)Amp800$0.00
EMT Conduit and Cable (less than 2" dia)10 ft120$0.00
EMT Conduit and Cable (greater than 2" dia)10 ft5$0.00
PVC Conduit (sked 80) and Cable (unpaved earth, with trenching and reseeding) (less than 2" dia)10 ft5$0.00
PVC Conduit (sked 80) and Cable (unpaved earth, with trenching and reseeding) (greater than 2" dia)10 ft60$0.00
PVC Conduit (sked 40) and Cable (concrete encased, with trenching and restoration of asphalt) (less than 2" dia)10 ft5$0.00
PVC Conduit (sked 40) and Cable (concrete encased, with trenching and restoration of asphalt) (greater than 2" dia)10 ft60$0.00
Concrete Pad (including rebar)cu ft3$0.00
Wheel Stop (concrete, 6' long)ea24$0.00
Bollard (6" dia, std galv stl pipe, filled with concrete) (not including concrete base)ea24$0.00
Asphalt Resurfacingsq ft250$0.00
Testing and Commissioning (level 2 charger, dual port)ea12$0.00
Overhead (percentage of Year 7 line items above, 0-100)%n/a$0.00
Profit (percentage of Year 7 line items above excluding Overhead, 0-100)%n/a$0.00
Total Year 7 Estimated Price$0.00

* - Unit pricing for equipment shall include all material and labor costs for a complete install

Zone C - Option I - Year 8
Line ItemsUnitUnit Price*Estimated QuantityEstimated Total
Feasibility Study/Site Assessment Engineeringhr32$0.00
Site Superintendenthr120$0.00
Electrician - Journeyman Levelhr80$0.00
Transformer (480:208/120, per kVA with grounding)kVA225$0.00
Panelboard (480v, 3ph, M.L.O., surface mtd, fully populated) (per buss amperage)Amp800$0.00
Panelboard (208/120v, M.L.O., surface mtd, fully populated 40A/2P) (per buss amperage)Amp800$0.00
EMT Conduit and Cable (less than 2" dia)10 ft120$0.00
EMT Conduit and Cable (greater than 2" dia)10 ft5$0.00
PVC Conduit (sked 80) and Cable (unpaved earth, with trenching and reseeding) (less than 2" dia)10 ft5$0.00
PVC Conduit (sked 80) and Cable (unpaved earth, with trenching and reseeding) (greater than 2" dia)10 ft60$0.00
PVC Conduit (sked 40) and Cable (concrete encased, with trenching and restoration of asphalt) (less than 2" dia)10 ft5$0.00
PVC Conduit (sked 40) and Cable (concrete encased, with trenching and restoration of asphalt) (greater than 2" dia)10 ft60$0.00
Concrete Pad (including rebar)cu ft3$0.00
Wheel Stop (concrete, 6' long)ea24$0.00
Bollard (6" dia, std galv stl pipe, filled with concrete) (not including concrete base)ea24$0.00
Asphalt Resurfacingsq ft250$0.00
Testing and Commissioning (level 2 charger, dual port)ea12$0.00
Overhead (percentage of Year 8 line items above, 0-100)%n/a$0.00
Profit (percentage of Year 8 line items above excluding Overhead, 0-100)%n/a$0.00
Total Year 8 Estimated Price$0.00

* - Unit pricing for equipment shall include all material and labor costs for a complete install

Zone C - Option I - Year 9
Line ItemsUnitUnit Price*Estimated QuantityEstimated Total