This is a Draft Specifications document for the procurement of a replacement wastewater and hazardous solids handling lift station pump for Flagg Ranch Lift Station at Grand Teton National Park. The government seeks one Myers 4VHX75M403 Hazardous Solids Handling Wastewater Pump with precise specifications to match the existing lift station configuration. The pump must feature a 7.5 HP motor with 3-phase, 200V, 60 Hz power requirements, 1750 RPM, and a full load amperage of 30 amps. Key specifications include a maximum hydraulic head of 85 feet, maximum capacity of 725 GPM, maximum liquid temperature rating of 140°F, and capability to pass full 3-inch spherical solids. The pump must include an oil-filled motor for heat dissipation and bearing lubrication, heat sensor for overtemperature protection, double tandem mechanical shaft seals with oil-filled seal chamber, cast iron body construction with 4-inch 125-pound ANSI flange discharge, and UL listing for Class I, Division 1, Group D hazardous locations.

The delivery location is Moose Warehouse, Grand Teton National Park, 103 Headquarters Loop, Moose, Wyoming 83012, with a required delivery date no later than May 1, 2026. This is a Sources Sought posting under solicitation number 140P1426Q0060, issued by the Department of the Interior National Park Service Intermountain Region. Interested contractors should contact the Contracting Officer at kiara_stewart@ios.gov with company details. The Sources Sought posting is for informational purposes only and does not constitute a formal solicitation or commitment by the government to award a contract.

View the file

Other files

File Type Posted
Sources_Sought_Info_-_GRTE_Wastewater_Pump_1.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Specifications / Scope Task: Procurement of Replacement Wastewater and Hazardous Solids Handling Lift Station Pump For Flagg Ranch Lift Station Grand Teton National Park

Table of Contents

1.0 Project Description / Summary

2.0 Objectives

3.0 Background

4.0 Specific Work / Tasks

5.0 Optional Work / Tasks

6.0 Government Furnished Equipment / Materials / Other

7.0 Special Conditions / Requirements

8.0 Place of Performance

9.0 Performance Period / Schedule Requirements

1.0 PROJECT DESCRIPTION / SUMMARY:

This project shall procure and deliver to Grand Teton National Park a specific Hazardous Solids Handling Wastewater Pump for an existing lift station. Pump specifications shall match exactly as specified herein in order to operate with existing lift station controls and communication networks along with existing power requirements and size for fit within the lift station.

2.0 OBJECTIVES:

The purpose of this project is to purchase one new lift station pump to replace one of the two existing pumps that has failed.

3.0 SPECIFIC TASKS:

a.0 Successful bidder for this project shall provide one new replacement pump meeting the following specifications, and shall deliver the new pump to Grand Teton National Park at the provided shipping location of Moose Warehouse, Grand Teton National Park 103 Headquarters Loop Moose WY, 83012, C/O Patrick Larson

1.0 Specifications: specifications shall be required to be exact brand specific in order to match the existing lift station configuration, power requirements, and controller requirements. This product is intended to be a match to the existing lift station pump and the replacement pump (existing lift station is set up as a redundant pump system with two identical pumps running in sequence)

51.0 Pump shall be as follows:

52.0 Myers 4VHX75M4‑03 Hazardous Solids Handling Wastewater Pump –

53.0 Model: Myers 4VHX75M4‑03 Hazardous Solids Handling Wastewater Pump

54.0 Motor / Power:

55.0 7.5 HP

56.0 3‑phase, 200V, 60 Hz

57.0 Full load amps: 30

58.0 Oil‑filled motor for maximum heat dissipation and constant bearing lubrication

59.0 RPM: 1750

510.0 Heat sensor for motor over‑temperature protection (auto reset)

511.0 Hydraulic Performance: Maximum head: 85 ft

512.0 Maximum capacity: 725 GPM

513.0 Maximum liquid temperature: 140°F (60°C)

514.0 Switch type: Manual

515.0 Solids Handling & Pumping Capability: Capable of passing full 3" spherical solids

516.0 Designed for hazardous solids wastewater environments

517.0 Modified constant‑velocity volute for smooth performance and long seal/bearing life

518.0 Impeller & Internal Components: Impeller: Ductile iron enclosed 2‑vane with rounded ports

519.0 Optional single‑vane impeller available

520.0 Pump‑out vanes reduce seal face pressure and keep debris away from seal

521.0 Brass wear ring to prevent rust buildup and maintain clearances

522.0 Sleeve bearing absorbs radial shock loads

523.0 Heavy 416 stainless steel shaft (corrosion resistant)

524.0 Seals & Motor Protection:

525.0 Double tandem mechanical shaft seals

526.0 Oil‑filled seal chamber for constant lubrication

527.0 Seal leak probes detect water in seal housing and trigger warning in control panel

528.0 Cable entry system with compression grommet + epoxy‑potted conductor sealing (double protection)

529.0 Construction:

530.0 Body construction: Cast iron

531.0 Discharge: 4" 125‑lb ANSI flange

532.0 Cord size: 8‑4; W

533.0 Robust construction for municipal, industrial, and lift‑station applications

534.0 Hazardous Duty Rating:

535.0 UL Listed for Class I, Division 1, Group D hazardous locations

536.0 CONTROL BOX REQUIRED (not included)

537.0 Typical Applications:

538.0 Municipal lift stations

539.0 Wastewater treatment plants

540.0 Industrial wastewater systems

2.0 SPECIAL CONDITIONS / REQUIREMENTS:

a.0 New pump shall be only as approved by the CO

3.0 PLACE OF PERFORMANCE:

a.0 Grand Teton National Park –

4.0 PERFORMANCE PERIOD / SCHEDULE REQUIREMENTS:

a.0 New pump shall be delivered to Grand Teton National Park no later than 5/1/2026 image1.png