This is a Statement of Work for the procurement, delivery, installation, and removal of dormitory furniture at Joint Base San Antonio Fort Sam Houston (JBSA FSH) Buildings 1475 and 1479. The contractor must deliver and install 786 lift beds, 357 bunkable beds, 438 wardrobes, and 357 bed stacking kits across the two Navy dormitory buildings. Building 1475 requires 345 lift beds, 155 bunkable beds, 199 wardrobes, and 155 bed stacking kits, while Building 1479 requires 441 lift beds, 202 bunkable beds, 239 wardrobes, and 202 bed stacking kits. Additionally, the contractor must remove and dispose of 499 existing captain beds (209 from Building 1475 and 290 from Building 1479) and relocate 547 lift beds and 345 wardrobes to Building 4190 for warehouse storage. All delivery must occur at 3320 CPL Johnson, JBSA Fort Sam Houston, TX 78234.
The contractor is responsible for providing all management, labor, tools, equipment, transportation, and dumpsters necessary to complete the project. Work must be performed Monday through Friday between 7:30 a.m. and 4:30 p.m., excluding federal holidays, with all furniture installation completed within a single workday to minimize disruption to occupied dormitory facilities. The contractor must confirm delivery 15 days in advance and provide 24-hour email reminders prior to truck arrival to Technical Representatives Ms. Charlene Holbrook and Mr. Ronny Vardaman. Lift and bunkable beds must meet specified dimensions (86.25" length × 38.5" width × 37" height) with ±1 inch tolerance, fabricated from welded and powder-coated steel in khaki color, and wardrobes must measure 36.5" width × 25.25" depth × 72.25" height with natural oak finish. The contractor must coordinate with occupants to ensure rooms are completed before day's end, handle all waste removal off-site daily in compliance with federal, state, and local regulations, maintain site cleanliness, and obtain access through Jadwin Gate. Commercial standard warranties commence upon project completion, with the 502nd Civil Engineer Squadron declaring satisfactory completion and the government retaining inspection authority throughout the project.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sources Sought Notice JBSA FSH Bunk Beds.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
Delivery//Installation/Removal & Disposal JBSA FORT SAM HOUSTON (FSH) NAVY FURNITURE BLDG 1475 and 1479
1. PROJECT DESCRIPTION: Procure for buildings 1475 and 1479: Lift Beds (786), Bunkable Beds (357), Wardrobes (438) and Bed Stacking Kits (357), for Joint Base San Antonio US Navy dormitories. The contractor shall ensure the furniture is properly delivered based on industry standards. Contractor shall deliver to the addressed location shown below, which is located within a secured military installation.
The Contractor shall Deliver/Install/Remove furniture in accordance with breakout below. The contractor shall install 1 (one) lift bed as a standalone bed and stack 1 (one) lift bed with 1 (one) bunkable bed to make a bunkable unit in each dorm room as required by the Government. The bunkable units shall not compromise the size of mattress required for either top or bottom bed.
Building 1475 Deliver/Install Building 1479 Deliver/Install
TOTAL
Furniture pieces Delivery Address & Acceptance
Quantity (QTY) - 345 Lift Beds
QTY - 441
Lift Beds
QTY - 786
Lift Beds 3320 CPL Johnson, JBSA Fort Sam Houston TX, 78234
QTY - 155
Bunkable Beds
QTY - 202
Bunkable Beds
QTY - 357
Bunkable Beds Same as above
QTY - 199
Wardrobes
QTY - 239
Wardrobes
QTY - 438
Wardrobes Same as above
QTY - 155
Bed Stacking Kits
QTY - 202
Bed Stacking Kits
QTY - 357
Bed Stacking Kits Same as above
| Building 1475 Remove/Dispose |
| Building 1479 Remove/Dispose |
| TOTAL |
Furniture pieces Roll-off Dumpster Location
QTY – 209
Remove and dispose old Captain Beds
QTY – 290
Remove and dispose old Captain Beds
QTY-499
Captain beds to remove and dispose Contractor shall provide/supply all necessary dumpsters. Contractor shall coordinate with Government on location placement.
Building 4190 Turn into warehouse
Building 4190 Turn into warehouse
TOTAL
Furniture pieces
Building 4190, 2100 Supply Ave JBSA -Fort Sam Houston
Quantity (QTY) - 268 Bunkable Beds
QTY - 279
Bunkable Beds
QTY - 547
Lift Beds Same as above
Quantity (QTY) - 163 Wardrobes
QTY - 182
Wardrobes
QTY - 345
Wardrobes Same as above
2. SCOPE:
2.1. Contractor shall provide all management, tools, supplies, equipment, labor and transportation necessary to perform this requirement in accordance with the statement of work.
2.1.1 Contractor shall confirm delivery with Government points of contact 15-days prior to delivery. Coordination shall be made with the below noted Technical Representatives (TRs).
2.1.2 Contractor shall ensure that the installation of any room is complete before the end of the work day. It is pertinent to ensure rooms are made available back for government use since these facilities are occupied. The intent is to minimize disruption to the personnel’s living space.
2.1.3 Contractor shall transport, deliver, unload and install all new furniture at buildings 1475 and 1479. Final delivery of items will be determined by the Government point of contact and coordinate with awardee; Contractor shall be prepared to delivery, install and remove furniture for both building.
2.1.4 Contractor shall remove 499 exiting/old captain beds that are currently in place in both buildings and transport the old captain beds to the contractor provided/supplied dumpster. The contractor is responsible for providing any roll-off dumpsters required and responsible for removing as necessary to complete this project; the Government will not provide nor supply any dumpsters or Government sites for this project. The Contractor shall not dispose of or discard recyclables, packing materials or trash in any recycling or trash containers or dumpsters located on the installation; except for the contractor owned containers or dumpsters. The Contractor shall collect all trash, debris, refuse, garbage, etc., generated in performance of entire process and remove and properly dispose items off-site daily. The contractor shall follow all Local, State, and Federal regulations for the disposal of items.
2.1.4.1. CLEAN-UP. All trash, debris, refuse, garbage and rubbish resulting from this requirement shall be disposed of by the contractor off Government property. The Government will designate a location for the contractor’s dumpster (as provided by the contractor), if necessary. Disposal will be in compliance with all applicable Federal, State, and local hauling and disposal regulations. Site clean-up shall occur daily. Contractor shall clean-up work site at the end of each working day. The contractor shall provide all labor, equipment, materials, tools, etc. to ensure proper removal and disposal of existing/old furniture and removal of debris, refuse, and garbage before and during the delivery of the dorm furniture.
2.1.5. Government will not provide any warehouse space for the contractor to store their product.
2.2. GOVNERNMENT POINTS OF CONTACT:
The Technical Representative (TR) for this project are
| Ms. Charlene Holbrook at (210)-221- 2381, email charlene.holbrook.2@us.af.mil & |
| Mr. Ronny Vardaman at (210)-221-5309, email ronny.vardaman@mail.mil |
Vendor shall provide the Technical Representatives (TR) an email notification of the truck’s arrival schedule as soon as the information is made available. A minimum of at least a 24-hour email reminder prior to truck’s scheduled arrival time shall also be sent to TR Representatives. The Contractor shall ensure proper coordination is made with the TRs prior to sending any deliveries. This coordination will be crucial to the removal and installation of all items.
3. SALIENT CHARACTERISTICS:
3.1. BUNKABLE FRAME STYLE BED.
Dimensions: +1 (one) inch on dimensions variance acceptable; a decrease in variance is not
| Length 86.25" |
| Width 38.5" |
| Height 37" |
Fabrication & Material
| Cut, formed, welded steel, Powder coated steel. Bed deck: 12 gauge. |
| End frame legs: 16 gauge. |
| End frame cross-members: 16 gauge. Connector Brackets: 3/8" thick. |
Color: Steel Color: Khaki
3.2. LIFT DECK BED, BUNKABLE END.
Dimensions: +1 (one) inch on dimensions variance acceptable; a decrease in variance is not acceptable
| Length 86.25" |
| Width 38.5" |
| Height 37" |
| Cut, formed, welded steel, Powder coated steel. Bed deck: 12 gauge. |
| Body: 18 gauge. |
| Bottom: 18 gauge. |
| End frame legs: 16 gauge. |
| End frame cross-members: 16 gauge. |
| Shall have capability to properly and appropriately stack on bunkable frame bed as needed. |
Color: Steel Color: Khaki
3.3. BUNK CLAMP KIT, AS NEEDED.
Color: Steel Color: Khaki
3.4. WARDROBES
Dimensions: +/-1 (one) inch on dimensions variance is acceptable
| Width: 36.5″, Depth: 25.25″, Height: 72.25″, Weight: 180lbs. | Wood Face door Pull. |
| With top Shelf, and closet rod. Natural Oak Finish |
4. SITE DESCRIPTION:
4.1. In buildings 1475 and 1479 there are 2 (two) sets of elevators in each building for a total 4 (four) elevators and 4 (four) stairwells in each building for a total of 8 (eight) stairwells. 1 (one) stairwell is located near the elevator and 1 (one) stairwell is located by the entrance of each building.
4.2. The building is currently occupied, and contractor must be prepared to be compliant with any COVID policies that may be in place at time of delivery, which may limit number of personnel allowed in the elevator and or facility. At no time will the contractor have exclusive rights to the elevator. Contractor shall take this into consideration at the onset. There will be no adjustments in price for this situation.
4.3. The building will remain occupied during the duration of the installation and project for this requirement. Contractor will be responsible for coordinating installation prior to delivery (not on the day of the delivery) as to ensure that any room having furniture removed and or installed shall be complete that SAME day as to minimize any disruption to the occupants living in that room. The intent for the contractor to ensure the room is complete before the end of that day.
5. HOURS OF OPERATION: Normal Hours. Performance of work shall be during normal duty hours between 7:30 am - 4:30 pm, Monday through Friday unless otherwise requested in writing and approved by the Contracting Officer.
Recognized Holidays. The contractor is not required to provide scheduled service on the following holidays:
| New Year’s Day, January 1st |
| Martin Luther King’s Birthday, 3rd Monday in January |
| President's Day, 3rd Monday in February |
| Memorial Day, Last Monday in May |
| Juneteenth, June 19th |
| Independence Day, July 4th |
| Labor Day, 1st Monday in September |
| Columbus Day, 2nd Monday in October |
| Veterans Day, November 11th |
| Thanksgiving Day, 4th Thursday in November |
| Christmas Day, December 25th |
Note: Any of the above holidays falling on a Saturday will be observed by the government on the preceding Friday. Holidays falling on a Sunday will be observed by the government on the following Monday.
6. WARRANTIES & WORKMANSHIP: The Contractor shall provide commercial standard warranties for all items, which shall commence at the point of completion of the project. The Contractor shall perform all operations of this project in a manner that will result in a professional and expeditiously completed project. The work shall be in strict accordance with the prevailing industry standards.
7. PROTECTION: The contractor shall take precautions to prevent damage to government property. The contractor shall repair or replace damaged items, resulting from contractor performance of this requirement, at no additional cost to the government.
8. ACCESSORIES AND INCIDENTALS: Contractor shall provide all incidentals necessary to comply with the terms and conditions of the requirement. Cost for these items shall be included.
9. SUBMITTALS: Provide product data on installed and delivery items products.
10. QUALITY ASSURANCE: The government shall inspect all work performed by the contractor. Work performance shall be deemed satisfactory and acceptable to the government when the 502nd CES/CEIH declares the project satisfactory and complete.
11. COMPLETION OF WORK: The contractor shall ensure that work for this project is performed in accordance with the criteria herein, and that all relevant materials, finishes, equipment, and systems shall be fully operational and ready for Government use at the completion of work for this project.
12. ENVIRONMENTAL REQUIREMENTS: The contractor shall perform all work in accordance with federal, state, and local environmental regulations.
13. All contractor vehicles must enter and depart through JBSA Fort Sam Houston via the Jadwin Gate Access Control Point which can be accessed via Interstate 35.
END OF STATEMENT OF WORK