This is a draft Statement of Work (SOW) for parking lot pavement preservation work at multiple Bureau of Land Management (BLM) locations in Fillmore, Utah. The project involves maintenance of three parking areas: the Fillmore Field Office ware yard (6,090 square yards, paved in 2002), employee parking lot (1,146 square yards, constructed in 2010), and the SEAT base parking apron at Fillmore City Airport (4,623 square yards, constructed in 2018).

The scope requires the contractor to provide all labor, materials, equipment, and supervision for: crack sealing (for cracks under 1 inch), mastic repairs (for cracks over 1 inch), application of one prime coat and two seal coats, and replacement of pavement markings. The contractor must protect storm drains and structures during work and provide traffic control. The contract is anticipated to be awarded in spring 2025 with a 30-day period of performance. Work locations are at 95 East 500 North and 1120 West 200 South in Fillmore, Utah 84631. Work must commence when temperatures are suitable for the specified treatment methods.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK WEST DESERT DISTRICT, UTAH

Fillmore Parking Lot Pavement Preservation BUREAU OF LAND MANAGEMENT

Statement of Work for

Fillmore Parking Lot Pavement Preservation

Bureau of Land Management

West Desert District

Fillmore Field Office

Millard County, Utah

December 23, 2024

DRAFT

STATEMENT OF WORK WEST DESERT DISTRICT, UTAH

Fillmore Parking Lot Pavement Preservation BUREAU OF LAND MANAGEMENT

1. INTRODUCTION

The Fillmore Field Office ware yard was originally paved in 2002 and has since received crack seal and seal coat treatments three times. The last time this parking lot was treated was in 2016 and since that time it has developed quite a few large cracks approximately 2 inches in width and a significant amount of smaller cracks. This parking lot is 6,090 square yards.

The Fillmore employee parking lot was constructed in 2010 when the new Fillmore Field Office was built. This parking lot has been treated once with crack seal and seal coat methods. This parking lot is 1,146 square yards.

The Fillmore SEAT base parking apron was constructed in 2018 and is located at the Fillmore City Airport. The BLM leases this land for the purposes of wildland fire suppression. The apron is located adjacent to the retardant farm where planes are loaded before going out to drop on fires. This parking lot is 4,623 square yards.

2.0 SCOPE

This project will consist of providing all labor, materials, equipment, and supervision to seal cracks that are 1 inch or less in width, repair cracks with mastic that are larger than 1 inch in width, seal coat all parking lots by applying one prime coat and two seal coats of asphalt emulsion and replacing all paint striping in all three locations.

3.0 TASKS

The following tasks shall be performed at locations specified below as well as in the contract drawings:

Fillmore Field Office Ware Yard Parking Lot

1. Crack seal cracks less than 1” wide

2. Crack repair cracks over 1” wide

3. Seal coat by applying one prime coat and two seal coats

4. Replace pavement markings

Fillmore Field Office Employee Parking Lot

1. Crack seal cracks less than 1” wide

2. Crack repair cracks over 1” wide

3. Seal coat by applying one prime coat and two seal coats

4. Replace pavement markings

Fillmore Field Office Visitor Parking

1. Replace pavement markings

Fillmore SEAT Base Parking Apron

1. Crack seal cracks less than 1” wide

2. Seal coat by applying one prime coat and two seal coats

STATEMENT OF WORK WEST DESERT DISTRICT, UTAH

Fillmore Parking Lot Pavement Preservation BUREAU OF LAND MANAGEMENT

3. Replace pavement markings

Contractor will be responsible for protecting all storm drains, concrete, buildings or other structures when applying asphalt surface treatments. Contractor shall also provide traffic control until each application has dried sufficiently so as to not track or peel.

4.0 PERIOD OF PERFORMANCE

It is anticipated that a contract will be awarded in the spring of 2025 with a period of performance of 30 days. Work should commence as soon as temperatures will allow for each treatment method identified.

5.0 WORK LOCATION

The work locations are at the Fillmore Field Office located at 95 East 500 North Fillmore Utah, 84631, and at the Fillmore SEAT Base located at 1120 West 200 South Fillmore, Utah 84631.