This is a draft solicitation for a contract detention facility for U.S. Immigration and Customs Enforcement (ICE) Enforcement and Removal Operations (ERO) in the Seattle, Washington Field Office. The solicitation seeks a contractor to provide detention services for up to 1,635 detainees, with a base contract period of one year and one 12-month option period. The procurement will use a two-phase evaluation approach, with offerors submitting proposals in four volumes covering technical capability, management approach, staffing, quality control, past performance, and pricing.

Key evaluation factors include technical capability (most important), past performance, and price. The government will use a tradeoff source selection process, with Factors 1 and 2 significantly more important than price. Proposals must demonstrate understanding of detention facility requirements, including facility design, staffing, transition planning, and quality control. The contract will be structured as a single award Indefinite Delivery, Indefinite Quantity (IDIQ) contract, with potential for multiple awards. Small business subcontracting goals include 39% small business, 5% small disadvantaged business, 3% HUBZone, 5% service-disabled veteran-owned, and 5% women-owned small business. The anticipated contract period is March 28, 2025 through March 27, 2027, subject to change based on source selection progress.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Department of Homeland Security (DHS) U.S. Immigration and Customs Enforcement (ICE)

Enforcement and Removal Operations (ERO) Seattle, Washington (WA) Field Office

Contract Detention Facility – ERO Seattle, WA Field Office

SECTION B:

SUPPLIES OR SERVICES AND PRICES/COSTS

B.1 GENERAL

The contractor shall provide all management, supervision, labor, and materials necessary to perform the services identified in the Performance Work Statement (PWS). This requirement will be structured as a single award Indefinite Delivery, Indefinite Quantity (IDIQ) contract. It should be noted this solicitation may allow for the award of more than one single award

IDIQ.

B.2 CONTRACT PRICING

Pricing information is not being requested currently. However, the table below reflects the anticipated CLIN structure. Please note that that the CLIN structure may be edited prior to the issuance of the final solicitation

Year 1 Pricing

CLIN

No. Description Unit Quantity Unit Price Total Price

Detention Services for 1 – 1,635 total detainees–

Firm-Fixed-Price (FFP)

*MO 10 $

Guard Hours Rate –

Labor Hour (LH)

**HR $

0004 Transportation Mileage Rate – Reimbursable ***EA $

0005 Detainee Volunteer Work Program

– Reimbursable EA $

0006 60-Day Transition Period – FFP MO 2 $

Total Pricing $ -

*MO – Monthly **HR – Hourly ***EA – Each

B.3 MINIMUM AND MAXIMUM QUANTITIES

In accordance with FAR 16.504(a)(4)(ii), the minimum and maximum quantity the government will acquire under this contract is as follows:

Minimum: To be determined based on proposed pricing. Minimum pricing limitations will be based on the total price of the transition period.

Maximum: The maximum for the IDIQ contract will be based on the proposed total value of the IDIQ for the entire ordering period, plus 40% of the total value. Note: This amount will be stated in the resulting ID IQ contract award.

*The purpose of including the additional 40% of the total value, is to account for unanticipated program growth due to possible changes in mission requirements, SCA increases, higher than expected transportation requirements, etc. This value will only impact the IDIQ Contract Maximum and is not accounted for operationally (in the CLINs) at this time.

B.4 FUNDING

Funding will be obligated at the task order level. The government anticipates issuing one task order annually for the required services.

[END OF SECTION B]

[THE REMAINDER OF THIS PAGE IS INTENTIONALLY LEFT BLANK]

SECTION C:

DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

C.1 PWS

The PWS is attached to this solicitation; see Attachment 01 – Performance Work Statement;

Attachment 05 – Anticipated Transportation Routes.

[END OF SECTION C]

SECTION D:

PACKING AND MARKING

D.1 PACKING AND MARKING

No packing or marking requirements are applicable to this requirement.

[END OF SECTION D]

SECTION E:

INSPECTION AND ACCEPTANCE

E.1 CLAUSES AND/OR PROVISIONS INCORPORATED BY REFERENCE

The following clauses are incorporated by reference:

Number Title Date 52.246-4 Inspection of Services—Fixed-Price Aug 1996 52.246-6 Inspection—Time-and-Material and Labor-Hour May 2001

52.246-6 Alt I Inspection—Time-and-Material and Labor-Hour Apr 1984

E.2 INSPECTION AND ACCEPTANCE

The government will conduct inspection and acceptance for all rendered services including deliverables.

E.3 CONTRACTOR PERFORMANCE ASSESSMENT REPORTING SYSTEM (CPARS)

In accordance with Federal Acquisition Regulation (FAR) Subpart 42.15, it is anticipated that a past performance evaluations will be entered into CPARS, the governmentwide evaluation reporting tool for all past performance reports on contracts and orders. For more information regarding CPARS, please visit http://www.cpars.gov/.

E.4 QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)

Services will be evaluated in accordance with the metrics outlined in the QASP (PWS Attachment 1).

[END OF SECTION E]

http://www.cpars.gov/

SECTION F:

DELIVERIES OR PERFORMANCE

F.1 CLAUSES AND/OR PROVISIONS INCORPORATED BY REFERENCE

The following clauses are incorporated by reference:

52.242-15 Stop-Work Order Aug 1989

F.2 PERIOD OF PERFORMANCE

This contract, when awarded, will have a base of one (1) year, with one (1) twelve-month (12) option period. However, pricing will be requested for a 5-year period of performance. As noted in Section B above, the period performance includes a 60-day transition period.

The anticipated period of performance will be 03/28/2025 through 03/27/2027. The actual period of performance may change based on the progress of the source selection. The final period of performance will be incorporated upon award.

F.3 PLACE OF PERFORMANCE

The PWS and PWS Addendum specifies place of performance requirements for a contractor-owned/contractor-operated facility. Once determined through the source selection process, actual address(es) of the place of performance will be provided upon award.

F.4 LIST OF DELIVERABLES

For a complete list of Deliverables see of the RFP Attachment 1 – PWS.

[END OF SECTION F]

SECTION G:

CONTRACT ADMINISTRATION DATA

G.1 CONTRACT ADMINISTRATION

The administration of this requirement will require maximum coordination between the government and the contractor.

G.2 CONTRACTING OFFICER’S REPRESENTATIVE (COR)

The following individual is designated as the COR for this requirement and is authorized by the Contracting Officer (CO) to perform specific contract administration functions such as inspection and acceptance of services and other functions of a technical nature:

TBD – COR contact information will be provided upon award.

Note: The CO cannot authorize the COR or any other government representative to sign documents, such as contracts, contract modifications, etc., that require the signature of the CO.

G.3 INVOICE INSTRUCTIONS

Invoicing instructions will be provided at the time of award and at the task order level.

[END OF SECTION G]

SECTION H:

SPECIAL CONTRACT REQUIREMENTS

H.1 CONTRACTOR’S INSURANCE

The contractor shall maintain insurance in an amount not less than $3,000,000 to protect the contractor from claims under workman compensation acts and from any other claims for damages for personal injury, including death which may arise from operations under this contract whether such operations by the contractor itself or by any subcontractor or anyone directly or indirectly employed by either business entity. The contractor shall maintain general liability insurance: bodily injury liability coverage written on a comprehensive form of policy of at least $500,000 per occurrence is required.

Additionally, an automobile liability insurance policy providing for bodily injury and property damage liability covering automobiles operated in the United States (U.S.) shall provide coverage of at least $200,000 per person and $500,000 per occurrence for bodily injury and $20,000 per occurrence for property coverage. Certificates of such insurance shall be subject to the approval of the CO for adequacy of protection. All insurance certificates required under this contract shall provide 30 days’ notice to the government of any contemplated cancellation. The contractor shall provide that all staff having access to non-citizen monies and valuables are bonded in an amount sufficient to ensure reimbursement to the non-citizen by the contractor in case of loss.

H.2 SPECIAL CLAUSE INFORMATION TECHNOLOGY SECURITY AWARENESS

TRAINING (JULY 2023)

(a) Applicability. This clause applies to the Contractor, its subcontractors, and Contractor employees (hereafter referred to collectively as “Contractor”). The Contractor shall insert the substance of this clause in all subcontracts.

(b) Security Training Requirements.

(1) All users of Federal information systems are required by Title 5, Code of Federal Regulations, Part 930.301, Subpart C, as amended, to be exposed to security awareness materials annually or whenever system security changes occur, or when the user’s responsibilities change.

The Department of Homeland Security (DHS) requires that Contractor employees take an annual Information Technology Security Awareness Training course before accessing sensitive information under the contract. Unless otherwise specified, the training shall be completed within thirty (30) days of contract award and be completed on an annual basis thereafter not later than October 31st of each year. Any new Contractor employees assigned to the contract shall complete the training before accessing sensitive information under the contract. The training is accessible at http://www.dhs.gov/dhs-security-and-training-requirements-contractors. The Contractor shall maintain copies of training certificates for all Contractor and subcontractor employees as a record of compliance. Unless otherwise specified, initial training certificates for each Contractor and subcontractor employee shall be provided to the Contracting Officer’s Representative (COR) not later than thirty (30) days after contract award. Subsequent training certificates to satisfy the annual training requirement shall be submitted to the COR via e-mail notification not later than October 31st of each year. The e-mail notification shall state the required training has been completed for all Contractor and subcontractor employees.

(2) The DHS Rules of Behavior apply to every DHS employee, Contractor and subcontractor that will have access to DHS systems and sensitive information. The DHS Rules of Behavior shall be signed before accessing DHS systems and sensitive information. The DHS Rules of Behavior is a document that informs users of their responsibilities when accessing DHS systems and holds users accountable for actions taken while accessing DHS systems and using DHS Information Technology resources capable of inputting, storing, processing, outputting, and/or transmitting sensitive information. The DHS Rules of Behavior is accessible at http://www.dhs.gov/dhs-security-and-training-requirements-contractors. Unless otherwise specified, the DHS Rules of Behavior shall be signed within thirty (30) days of contract award. Any new Contractor employees assigned to the contract shall also sign the DHS Rules of Behavior before accessing DHS systems and sensitive information. The Contractor shall maintain signed copies of the DHS Rules of Behavior for all Contractor and subcontractor employees as a record of compliance.

Unless otherwise specified, the Contractor shall e-mail copies of the signed DHS Rules of Behavior to the COR not later than thirty (30) days after contract award for each employee. The DHS Rules of Behavior will be reviewed annually, and the COR will provide notification when a review is required.

H.3 COMPLIANCE WITH DHS SECURITY POLICY TERMS AND CONDITIONS

All hardware, software, and services provided under this task order must be compliant with DHS 4300A DHS Sensitive System Policy and DHS 4300A Sensitive Systems Handbook.

H.4 SECURITY REVIEW TERMS AND CONDITIONS

The Government may elect to conduct periodic reviews to ensure that the security requirements contained in this contract are being implemented and enforced. The Contractor shall afford ICE, including the organization of ICE Office of the Chief Information Officer, the Office of the Inspector General, authorized Contracting Officer Technical Representative (COTR), and other government oversight organizations, access to the Contractor's facilities, installations, operations, documentation, databases and personnel used in the performance of this contract. The Contractor will contact ICE Chief Information Security Officer to coordinate and participate in the review and inspection activity of government oversight organizations external to ICE. Access shall be provided to the extent necessary for the government to carry out a program of inspection, investigation, and audit to safeguard against threats and hazards to the integrity, availability, and confidentiality of ICE data or the function of computer system operated on behalf of ICE, and to preserve evidence of computer crime.

H.5 PRIVACY EXPECTATIONS

Government contractor employees do not have a right, nor should they have an expectation, of privacy while using Government provided devices at any time, including accessing the Internet and using e-mail and voice communications. To the extent that employees wish that their private activities remain private, they should avoid using the Government provided device for limited personal use. By acceptance of the government provided device, employees imply their consent to disclosing and/or monitoring of device usage, including the contents of any files or information maintained or passed -through that device.

H.6 CONTRACTOR IT SECURITY ACCREDITATION

Within 6 months after contract, the contractor shall submit written proof of IT Security accreditation to DHS for approval by DHS CO. Accreditation will proceed according to the criteria of DHS Sensitive System Policy Publication, 4300A (most current version) or any replacement publication, which the CO will provide upon request. This accreditation will include a final security plan, risk assessment, security test and evaluation, and disaster recovery plan/continuity of operations plan. This accreditation, when accepted by the CO, shall be incorporated into the contract as a compliance document. The contractor shall comply with the approved accreditation documentation.

[END OF SECTION H]

PART II – CONTRACT CLAUSES

SECTION I:

CONTRACT CLAUSES

I.1 – CLAUSES AND/OR PROVISIONS INCORPORATED BY REFERENCE

The following clauses and/or provisions are incorporated by reference.

52.202-1 Definitions Jun 2020

52.203-2 Certificate of Independent Price Determination Apr 1985

52.203-3 Gratuities Apr 1984

52.203-12 Limitation on Payments to Influence Certain Federal Transactions Jun 2020

52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements Jan 2017

52.204-13 System for Award Management Maintenance Aug 2025

52.204-19 Incorporation by Reference of Representations and Certifications Dec 2014

52.209-10 Prohibition on Contracting with Inverted Domestic Corporations Nov 2025

52.215-8 Order of Precedence—Uniform Contract Format Oct 2025

52.216-7 Allowable Cost and Payment Oct 2025

52.216-18 Ordering Aug 2020

52.216-19 Order Limitations Oct 1995

52.216-22 Indefinite Quantity Oct 2025

52.216-31 T&M/LH Proposal Requirements—Commercial Acquisition Nov 2021

52.224-1 Privacy Act Notification Apr 1984

52.224-2 Privacy Act Apr 1984

52.226-8 Encouraging Contractor Policies to Ban Text Messaging While Driving May 2024

52.227-1 Authorization and Consent Jun 2020

52.227-2 Notice and Assistance Regarding Patent and Copyright Infringement Jun 2020

52.227-3 Patent Indemnity Apr 1984

52.227-11 Patent Rights—Ownership by the Contractor May 2014

52.227-14 Rights in Data—General May 2014

52.227-16 Additional Data Requirements Jun 1987

52.229-11 Tax on Certain Foreign Procurements – Notice and Representation Feb 2021

52.232-1 Payments Apr 1984

52.232-7 Payments under Time-and-Materials and Labor-Hour Contracts Nov 2021

52.232-8 Discounts for Prompt Payment Feb 2002

52.232-9 Limitation on Withholding of Payments Apr 1984

52.232-11 Extras Apr 1984

52.232-18 Availability of Funds Apr 1984

52.232-23 Assignment of Claims May 2014

52.232-25 Prompt Payment Jan 2017

52.232-39 Unenforceability of Unauthorized Obligations Jun 2013

52.232-40 Providing Accelerated Payments to Small Business Subcontractors Mar 2023

52.233-1 Disputes Aug 2025

52.233-1 Alt I Disputes Aug 2025

52.233-3 Protest after Award Aug 2025

52.233-4 Applicable Law for Breach of Contract Claim Oct 2004

52.237-3 Continuity of Services Jan 1991

52.242-13 Bankruptcy Jul 1995

52.243-1 Changes—Fixed Price June 2025

52.243-1 Alt I Changes—Fixed Price June 2025

52.243-3 Changes—Time-and-Materials or Labor-Hours Sep 2000

52.244-2 Subcontracts Jun 2020

52.249-2 Termination for Convenience of the Government (Fixed-Price) Apr 2012

52.249-8 Default (Fixed-Price Supply and Service) Apr 1984

3052.222-70 Strikes or Picketing Affecting Timely Completion of the Contract Work Dec 2003

I.2 CLAUSES AND/OR PROVISIONS INCORPORATED BY FULL TEXT

The following clauses and/or provisions are incorporated by full text.

52.212-4 Contract Terms and Conditions—Commercial Products and Commercial Services (Nov 2023)

(a) Inspection/Acceptance. The Contractor shall only tender for acceptance those items that conform to the requirements of this contract. The Government reserves the right to inspect or test any supplies or services that have been tendered for acceptance. The Government may require repair or replacement of nonconforming supplies or reperformance of nonconforming services at no increase in contract price. If repair/replacement or reperformance will not correct the defects or is not possible, the Government may seek an equitable price reduction or adequate consideration for acceptance of nonconforming supplies or services. The Government must exercise its post-acceptance rights-

(1) Within a reasonable time after the defect was discovered or should have been discovered; and

(2) Before any substantial change occurs in the condition of the item, unless the change is due to the defect in the item.

(b) Assignment. The Contractor or its assignee may assign its rights to receive payment due as a result of performance of this contract to a bank, trust company, or other financing institution, including any Federal lending agency in accordance with the Assignment of Claims Act (31 U.S.C. 3727). However, when a third party makes payment (e.g., use of the Governmentwide commercial purchase card), the Contractor may not assign its rights to receive payment under this contract.

(c) Changes. Changes in the terms and conditions of this contract may be made only by written agreement of the parties.

(d) Disputes. This contract is subject to 41 U.S.C. chapter 71, Contract Disputes. Failure of the parties to this contract to reach agreement on any request for equitable adjustment, claim, appeal or action arising under or relating to this contract shall be a dispute to be resolved in accordance with the clause at Federal Acquisition Regulation (FAR) 52.233-1, Disputes, which is incorporated herein by reference. The Contractor shall proceed diligently with performance of this contract, pending final resolution of any dispute arising under the contract.

(e) Definitions. The clause at FAR 52.202-1, Definitions, is incorporated herein by reference.

(f) Excusable delays. The Contractor shall be liable for default unless nonperformance is caused by an occurrence beyond the reasonable control of the Contractor and without its fault or negligence such as, acts of God or the public enemy, acts of the Government in either its sovereign or contractual capacity, fires, floods, epidemics, quarantine restrictions, strikes, unusually severe weather, and delays of common carriers. The Contractor shall notify the Contracting Officer in writing as soon as it is reasonably possible after the commencement of any excusable delay, setting forth the full particulars in connection therewith, shall remedy such occurrence with all reasonable dispatch, and shall promptly give written notice to the Contracting Officer of the cessation of such occurrence.

(g) Invoice. (1) The Contractor shall submit an original invoice and three copies (or electronic invoice, if authorized) to the address designated in the contract to receive invoices. An invoice must include-

(i) Name and address of the Contractor;

(ii) Invoice date and number;

(iii) Contract number, line-item number and, if applicable, the order number;

(iv) Description, quantity, unit of measure, unit price and extended price of the items delivered;

(v) Shipping number and date of shipment, including the bill of lading number and weight of shipment if shipped on Government bill of lading;

(vi) Terms of any discount for prompt payment offered;

(vii) Name and address of official to whom payment is to be sent;

(viii) Name, title, and phone number of person to notify in event of defective invoice; and

(ix) Taxpayer Identification Number (TIN). The Contractor shall include its TIN on the invoice only if required elsewhere in this contract.

(x) Electronic funds transfer (EFT) banking information.

(A) The Contractor shall include EFT banking information on the invoice only if required elsewhere in this contract.

(B) If EFT banking information is not required to be on the invoice, in order for the invoice to be a proper invoice, the Contractor shall have submitted correct EFT banking information in accordance with the applicable solicitation provision, contract clause (e.g., 52.232-33, Payment by Electronic Funds Transfer-System for Award Management, or 52.232-34, Payment by Electronic Funds Transfer-Other Than System for Award Management), or applicable agency procedures.

(C) EFT banking information is not required if the Government waived the requirement to pay by EFT.

(2) Invoices will be handled in accordance with the Prompt Payment Act (31 U.S.C.3903) and Office of Management and Budget (OMB) prompt payment regulations at 5 CFR Part 1315.

(h) Patent indemnity. The Contractor shall indemnify the Government and its officers, employees and agents against liability, including costs, for actual or alleged direct or contributory infringement of, or inducement to infringe, any United States or foreign patent, trademark or copyright, arising out of the performance of this contract, provided the Contractor is reasonably notified of such claims and proceedings.

(i) Payment - (1) Items accepted. Payment shall be made for items accepted by the Government that have been delivered to the delivery destinations set forth in this contract.

(2) Prompt payment. The Government will make payment in accordance with the Prompt Payment Act (31 U.S.C.3903) and prompt payment regulations at 5 CFR Part 1315.

(3) Electronic Funds Transfer (EFT). If the Government makes payment by EFT, see 52.212-5(b) for the appropriate EFT clause.

(4) Discount. In connection with any discount offered for early payment, time shall be computed from the date of the invoice. For the purpose of computing the discount earned, payment shall be considered to have been made on the date which appears on the payment check or the specified payment date if an electronic funds transfer payment is made.

(5) Overpayments. If the Contractor becomes aware of a duplicate contract financing or invoice payment or that the Government has otherwise overpaid on a contract financing or invoice payment, the Contractor shall-

(i) Remit the overpayment amount to the payment office cited in the contract along with a description of the overpayment including the-

(A) Circumstances of the overpayment (e.g., duplicate payment, erroneous payment, liquidation errors, date(s) of overpayment);

(B) Affected contract number and delivery order number, if applicable;

(C) Affected line item or subline item, if applicable; and

(D) Contractor point of contact.

(ii) Provide a copy of the remittance and supporting documentation to the Contracting Officer.

(6) Interest. (i) All amounts that become payable by the Contractor to the Government under this contract shall bear simple interest from the date due until paid unless paid within 30 days of becoming due. The interest rate shall be the interest rate established by the Secretary of the Treasury as provided in 41 U.S.C. 7109, which is applicable to the period in which the amount becomes due, as provided in (i)(6)(v) of this clause, and then at the rate applicable for each six-month period as fixed by the Secretary until the amount is paid.

(ii) The Government may issue a demand for payment to the Contractor upon finding a debt is due under the contract.

(iii) Final decisions. The Contracting Officer will issue a final decision as required by 33.211 if–

(A) The Contracting Officer and the Contractor are unable to reach agreement on the existence or amount of a debt within 30 days;

(B) The Contractor fails to liquidate a debt previously demanded by the Contracting Officer within the timeline specified in the demand for payment unless the amounts were not repaid because the Contractor has requested an installment payment agreement; or

(C) The Contractor requests a deferment of collection on a debt previously demanded by the Contracting Officer (see 32.607-2).

(iv) If a demand for payment was previously issued for the debt, the demand for payment included in the final decision shall identify the same due date as the original demand for payment.

(v) Amounts shall be due at the earliest of the following dates:

(A) The date fixed under this contract.

(B) The date of the first written demand for payment, including any demand for payment resulting from a default termination.

(vi) The interest charge shall be computed for the actual number of calendar days involved beginning on the due date and ending on-

(A) The date on which the designated office receives payment from the Contractor;

(B) The date of issuance of a Government check to the Contractor from which an amount otherwise payable has been withheld as a credit against the contract debt; or

(C) The date on which an amount withheld and applied to the contract debt would otherwise have become payable to the Contractor.

(vii) The interest charge made under this clause may be reduced under the procedures prescribed in FAR 32.608-2 in effect on the date of this contract.

(j) Risk of loss. Unless the contract specifically provides otherwise, risk of loss or damage to the supplies provided under this contract shall remain with the Contractor until, and shall pass to the Government upon:

(1) Delivery of the supplies to a carrier, if transportation is f.o.b. origin; or

(2) Delivery of the supplies to the Government at the destination specified in the contract, if transportation is f.o.b. destination.

(k) Taxes. The contract price includes all applicable Federal, State, and local taxes and duties.

(l) Termination for the Government’s convenience. The Government reserves the right to terminate this contract, or any part hereof, for its sole convenience. In the event of such termination, the Contractor shall immediately stop all work hereunder and shall immediately cause any and all of its suppliers and subcontractors to cease work. Subject to the terms of this contract, the Contractor shall be paid a percentage of the contract price reflecting the percentage of the work performed prior to the notice of termination, plus reasonable charges the Contractor can demonstrate to the satisfaction of the Government using its standard record keeping system, have resulted from the termination. The Contractor shall not be required to comply with the cost accounting standards or contract cost principles for this purpose. This paragraph does not give the Government any right to audit the Contractor’s records. The Contractor shall not be paid for any work performed or costs incurred which reasonably could have been avoided.

(m) Termination for cause. The Government may terminate this contract, or any part hereof, for cause in the event of any default by the Contractor, or if the Contractor fails to comply with any contract terms and conditions, or fails to provide the Government, upon request, with adequate assurances of future performance. In the event of termination for cause, the Government shall not be liable to the Contractor for any amount for supplies or services not accepted, and the Contractor shall be liable to the Government for any and all rights and remedies provided by law.

If it is determined that the Government improperly terminated this contract for default, such termination shall be deemed a termination for convenience.

(n) Title. Unless specified elsewhere in this contract, title to items furnished under this contract shall pass to the Government upon acceptance, regardless of when or where the Government takes physical possession.

(o) Warranty. The Contractor warrants and implies that the items delivered hereunder are merchantable and fit for use for the particular purpose described in this contract.

(p) Limitation of liability. Except as otherwise provided by an express warranty, the Contractor will not be liable to the Government for consequential damages resulting from any defect or deficiencies in accepted items.

(q) Other compliances. The Contractor shall comply with all applicable Federal, State and local laws, executive orders, rules and regulations applicable to its performance under this contract.

(r) Compliance with laws unique to Government contracts. The Contractor agrees to comply with 31 U.S.C. 1352 relating to limitations on the use of appropriated funds to influence certain Federal contracts; 18 U.S.C. 431 relating to officials not to benefit; 40 U.S.C. chapter 37, Contract Work Hours and Safety Standards; 41 U.S.C. chapter 87, Kickbacks; 49 U.S.C. 40118, Fly American; and 41 U.S.C. chapter 21 relating to procurement integrity.

(s) Order of precedence. Any inconsistencies in this solicitation or contract shall be resolved by giving precedence in the following order:

(1) The schedule of supplies/services.

(2) The Assignments, Disputes, Payments, Invoice, Other Compliances, Compliance with Laws Unique to Government Contracts, and Unauthorized Obligations paragraphs of this clause;

(3) The clause at 52.212-5.

(4) Addenda to this solicitation or contract, including any license agreements for computer software.

(5) Solicitation provisions if this is a solicitation.

(6) Other paragraphs of this clause.

(7) The Standard Form 1449.

(8) Other documents, exhibits, and attachments.

(9) The specification.

(t) [Reserved]

(u) Unauthorized Obligations. (1) Except as stated in paragraph (u)(2) of this clause, when any supply or service acquired under this contract is subject to any End User License Agreement (EULA), Terms of Service (TOS), or similar legal instrument or agreement, that includes any clause requiring the Government to indemnify the Contractor or any person or entity for damages, costs, fees, or any other loss or liability that would create an Anti-Deficiency Act violation (31 U.S.C. 1341), the following shall govern:

(i) Any such clause is unenforceable against the Government.

(ii) Neither the Government nor any Government authorized end user shall be deemed to have agreed to such clause by virtue of it appearing in the EULA, TOS, or similar legal instrument or agreement. If the EULA, TOS, or similar legal instrument or agreement is invoked through an "I agree" click box or other comparable mechanism (e.g., "click-wrap" or "browse-wrap" agreements), execution does not bind the Government or any Government authorized end user to such clause.

(iii) Any such clause is deemed to be stricken from the EULA, TOS, or similar legal instrument or agreement.

(2) Paragraph (u)(1) of this clause does not apply to indemnification by the Government that is expressly authorized by statute and specifically authorized under applicable agency regulations and procedures.

(v) Incorporation by reference. The Contractor’s representations and certifications, including those completed electronically via the System for Award Management (SAM), are incorporated by reference into the contract.

(End of clause)

Alternate I (Nov 2021). When a time-and-materials or labor-hour contract is contemplated, substitute the following paragraphs (a), (e), (i), (l), and (m) for those in the basic clause.

(a) Inspection/Acceptance. (1) The Government has the right to inspect and test all materials furnished and services performed under this contract, to the extent practicable at all places and times, including the period of performance, and in any event before acceptance. The Government may also inspect the plant or plants of the Contractor or any subcontractor engaged in contract performance. The Government will perform inspections and tests in a manner that will not unduly delay the work.

(2) If the Government performs inspection or tests on the premises of the Contractor or a subcontractor, the Contractor shall furnish and shall require subcontractors to furnish all reasonable facilities and assistance for the safe and convenient performance of these duties.

(3) Unless otherwise specified in the contract, the Government will accept or reject services and materials at the place of delivery as promptly as practicable after delivery, and they will be presumed accepted 60 days after the date of delivery, unless accepted earlier.

(4) At any time during contract performance, but not later than 6 months (or such other time as may be specified in the contract) after acceptance of the services or materials last delivered under this contract, the Government may require the Contractor to replace or correct services or materials that at time of delivery failed to meet contract requirements. Except as otherwise specified in paragraph (a)(6) of this clause, the cost of replacement or correction shall be determined under paragraph (i) of this clause, but the "hourly rate" for labor hours incurred in the replacement or correction shall be reduced to exclude that portion of the rate attributable to profit. Unless otherwise specified below, the portion of the "hourly rate" attributable to profit shall be 10 percent. The Contractor shall not tender for acceptance materials and services required to be replaced or corrected without disclosing the former requirement for replacement or correction, and, when required, shall disclose the corrective action taken. [Insert portion of labor rate attributable to profit.]

(5)(i) If the Contractor fails to proceed with reasonable promptness to perform required replacement or correction, and if the replacement or correction can be performed within the ceiling price (or the ceiling price as increased by the Government), the Government may-

(A) By contract or otherwise, perform the replacement or correction, charge to the Contractor any increased cost, or deduct such increased cost from any amounts paid or due under this contract; or

(B) Terminate this contract for cause.

(ii) Failure to agree to the amount of increased cost to be charged to the Contractor shall be a dispute under the Disputes clause of the contract.

(6) Notwithstanding paragraphs (a)(4) and (5) above, the Government may at any time require the Contractor to remedy by correction or replacement, without cost to the Government, any failure by the Contractor to comply with the requirements of this contract, if the failure is due to-

(i) Fraud, lack of good faith, or willful misconduct on the part of the Contractor's managerial personnel; or

(ii) The conduct of one or more of the Contractor’s employees selected or retained by the Contractor after any of the Contractor’s managerial personnel has reasonable grounds to believe that the employee is habitually careless or unqualified.

(7) This clause applies in the same manner and to the same extent to corrected or replacement materials or services as to materials and services originally delivered under this contract.

(8) The Contractor has no obligation or liability under this contract to correct or replace materials and services that at time of delivery do not meet contract requirements, except as provided in this clause or as may be otherwise specified in the contract.

(9) Unless otherwise specified in the contract, the Contractor's obligation to correct or replace Government-furnished property shall be governed by the clause pertaining to Government property.

(e) Definitions. (1) The clause at FAR 52.202-1, Definitions, is incorporated herein by reference.

As used in this clause-

(i) "Direct materials" means those materials that enter directly into the end product, or that are used or consumed directly in connection with the furnishing of the end product or service.

(ii) "Hourly rate" means the rate(s) prescribed in the contract for payment for labor that meets the labor category qualifications of a labor category specified in the contract that are-

(A) Performed by the contractor;

(B) Performed by the subcontractors; or

(C) Transferred between divisions, subsidiaries, or affiliates of the contractor under a common control.

(iii) "Materials" means-

(A) Direct materials, including supplies transferred between divisions, subsidiaries, or affiliates of the contractor under a common control;

(B) Subcontracts for supplies and incidental services for which there is not a labor category specified in the contract;

(C) Other direct costs (e.g., incidental services for which there is not a labor category specified in the contract, travel, computer usage charges, etc.);

(D) The following subcontracts for services which are specifically excluded from the hourly rate:

[Insert any subcontracts for services to be excluded from the hourly rates prescribed in the schedule.]; and

(E) Indirect costs specifically provided for in this clause.

(iv) "Subcontract" means any contract, as defined in FAR subpart 2.1, entered into with a subcontractor to furnish supplies or services for performance of the prime contractor a subcontract including transfers between divisions, subsidiaries, or affiliates of a contractor or subcontractor. It includes, but is not limited to, purchase orders, and changes and modifications to purchase orders.

(i) Payments. (1) Work performed. The Government will pay the Contractor as follows upon the submission of commercial invoices approved by the Contracting Officer:

(i) Hourly rate.

(A) The amounts shall be computed by multiplying the appropriate hourly rates prescribed in the contract by the number of direct labor hours performed. Fractional parts of an hour shall be payable on a prorated basis.

(B) The rates shall be paid for all labor performed on the contract that meets the labor qualifications specified in the contract. Labor hours incurred to perform tasks for which labor qualifications were specified in the contract will not be paid to the extent the work is performed by individuals that do not meet the qualifications specified in the contract, unless specifically authorized by the Contracting Officer.

(C) Invoices may be submitted once each month (or at more frequent intervals, if approved by the Contracting Officer) to the Contracting Officer or the authorized representative.

(D) When requested by the Contracting Officer or the authorized representative, the Contractor shall substantiate invoices (including any subcontractor hours reimbursed at the hourly rate in the schedule) by evidence of actual payment, individual daily job timecards, records that verify the employees meet the qualifications for the labor categories specified in the contract, or other substantiation specified in the contract.

(E) Unless the Schedule prescribes otherwise, the hourly rates in the Schedule shall not be varied by virtue of the Contractor having performed work on an overtime basis.

(1) If no overtime rates are provided in the Schedule and the Contracting Officer approves overtime work in advance, overtime rates shall be negotiated.

(2) Failure to agree upon these overtime rates shall be treated as a dispute under the Disputes clause of this contract.

(3) If the Schedule provides rates for overtime, the premium portion of those rates will be reimbursable only to the extent the overtime is approved by the Contracting Officer.

(ii) Materials.

(A) If the Contractor furnishes materials that meet the definition of a commercial product at FAR 2.101, the price to be paid for such materials shall not exceed the Contractor’s established catalog or market price, adjusted to reflect the-

(1) Quantities being acquired; and

(2) Any modifications necessary because of contract requirements.

(B) Except as provided for in paragraph (i)(1)(ii)(A) and (D)(2) of this clause, the Government will reimburse the Contractor the actual cost of materials (less any rebates, refunds, or discounts received by the contractor that are identifiable to the contract) provided the Contractor-

(1) Has made payments for materials in accordance with the terms and conditions of the agreement or invoice; or

(2) Makes these payments within 30 days of the submission of the Contractor’s payment request to the Government and such payment is in accordance with the terms and conditions of the agreement or invoice.

(C) To the extent able, the Contractor shall-

(1) Obtain materials at the most advantageous prices available with due regard to securing prompt delivery of satisfactory materials; and

(2) Give credit to the Government for cash and trade discounts, rebates, scrap, commissions, and other amounts that are identifiable to the contract.

(D) Other Costs. Unless listed below, other direct and indirect costs will not be reimbursed.

(1) Other Direct Costs. The Government will reimburse the Contractor on the basis of actual cost for the following, provided such costs comply with the requirements in paragraph (i)(1)(ii)(B) of this clause: None.

(2) Indirect Costs (Material Handling, Subcontract Administration, etc.). The Government will reimburse the Contractor for indirect costs on a pro-rata basis over the period of contract performance at the following fixed price: $0.

(2) Total cost. It is estimated that the total cost to the Government for the performance of this contract shall not exceed the ceiling price set forth in the Schedule and the Contractor agrees to use its best efforts to perform the work specified in the Schedule and all obligations under this contract within such ceiling price. If at any time the Contractor has reason to believe that the hourly rate payments and material costs that will accrue in performing this contract in the next succeeding 30 days, if added to all other payments and costs previously accrued, will exceed 85 percent of the ceiling price in the Schedule, the Contractor shall notify the Contracting Officer giving a revised estimate of the total price to the Government for performing this contract with supporting reasons and documentation. If at any time during the performance of this contract, the Contractor has reason to believe that the total price to the Government for performing this contract will be substantially greater or less than the then stated ceiling price, the Contractor shall so notify the Contracting Officer, giving a revised estimate of the total price for performing this contract, with supporting reasons and documentation. If at any time during performance of this contract, the Government has reason to believe that the work to be required in performing this contract will be substantially greater or less than the stated ceiling price, the Contracting Officer will so advise the Contractor, giving the then revised estimate of the total amount of effort to be required under the contract.

(3) Ceiling price. The Government will not be obligated to pay the Contractor any amount in excess of the ceiling price in the Schedule, and the Contractor shall not be obligated to continue performance if to do so would exceed the ceiling price set forth in the Schedule, unless and until the Contracting Officer notifies the Contractor in writing that the ceiling price has been increased and specifies in the notice a revised ceiling that shall constitute the ceiling price for performance under this contract. When and to the extent that the ceiling price set forth in the Schedule has been increased, any hours expended and material costs incurred by the Contractor in excess of the ceiling price before the increase shall be allowable to the same extent as if the hours expended and material costs had been incurred after the increase in the ceiling price.

(4) Access to records. At any time before final payment under this contract, the Contracting Officer (or authorized representative) will have access to the following (access shall be limited to the listing below unless otherwise agreed to by the Contractor and the Contracting Officer):

(i) Records that verify that the employees whose time has been included in any invoice meet the qualifications for the labor categories specified in the contract;

(ii) For labor hours (including any subcontractor hours reimbursed at the hourly rate in the schedule), when timecards are required as substantiation for payment-

(A) The original timecards (paper-based or electronic);

(B) The Contractor’s timekeeping procedures;

(C) Contractor records that show the distribution of labor between jobs or contracts; and

(D) Employees whose time has been included in any invoice for the purpose of verifying that these employees have worked the hours shown on the invoices.

(iii) For material and subcontract costs that are reimbursed on the basis of actual cost-

(A) Any invoices or subcontract agreements substantiating material costs; and

(B) Any documents supporting payment of those invoices.

(5) Overpayments/Underpayments. Each payment previously made shall be subject to reduction to the extent of amounts, on preceding invoices, that are found by the Contracting Officer not to have been properly payable and shall also be subject to reduction for overpayments or to increase for underpayments. The Contractor shall promptly pay any such reduction within 30 days unless the parties agree otherwise. The Government within 30 days will pay any such increases, unless the parties agree otherwise. The Contractor’s payment will be made by check. If the Contractor becomes aware of a duplicate invoice payment or that the Government has otherwise overpaid on an invoice payment, the Contractor shall-

(i) Remit the overpayment amount to the payment office cited in the contract along with a description of the overpayment including the-

(A) Circumstances of the overpayment (e.g., duplicate payment, erroneous payment, liquidation errors, date(s) of overpayment);

(B) Affected contract number and delivery order number, if applicable;

(C) Affected line item or subline item, if applicable; and

(D) Contractor point of contact.

(ii) Provide a copy of the remittance and supporting documentation to the Contracting Officer.

(6)(i) All amounts that become payable by the Contractor to the Government under this contract shall bear simple interest from the date due until paid unless paid within 30 days of becoming due. The interest rate shall be the interest rate established by the Secretary of the Treasury, as provided in 41 U.S.C. 7109, which is applicable to the period in which the amount becomes due, and then at the rate applicable for each six-month period as established by the Secretary until the amount is paid.

(ii) The Government may issue a demand for payment to the Contractor upon finding a debt is due under the contract.

(iii) Final Decisions. The Contracting Officer will issue a final decision as required by 33.211 if-

(A) The Contracting Officer and the Contractor are unable to reach agreement on the existence or amount of a debt in a timely manner;

(B) The Contractor fails to liquidate a debt previously demanded by the Contracting Officer within the timeline specified in the demand for payment unless the amounts were not repaid because the Contractor has requested an installment payment agreement; or

(C) The Contractor requests a deferment of collection on a debt previously demanded by the Contracting Officer (see FAR 32.607-2).

(iv) If a demand for payment was previously issued for the debt, the demand for payment included in the final decision shall identify the same due date as the original demand for payment.

(v) Amounts shall be due at the earliest of the following dates:

(A) The date fixed under this contract.

(B) The date of the first written demand for payment, including any demand for payment resulting from a default termination.

(vi) The interest charge shall be computed for the actual number of calendar days involved beginning on the due date and ending on-

(A) The date on which the designated office receives payment from the Contractor;

(B) The date of issuance of a Government check to the Contractor from which an amount otherwise payable has been withheld as a credit against the contract debt; or

(C) The date on which an amount withheld and applied to the contract debt would otherwise have become payable to the Contractor.

(vii) The interest charge made under this clause may be reduced under the procedures prescribed in FAR 32.608-2 in effect on the date of this contract.

(viii) Upon receipt and approval of the invoice designated by the Contractor as the "completion invoice" and supporting documentation, and upon compliance by the Contractor with all terms of this contract, any outstanding balances will be paid within 30 days unless the parties agree otherwise. The completion invoice, and supporting documentation, shall be submitted by the Contractor as promptly as practicable following completion of the work under this contract, but in no event later than 1 year (or such longer period as the Contracting Officer may approve in writing) from the date of completion.

(7) Release of claims. The Contractor, and each assignee under an assignment entered into under this contract and in effect at the time of final payment under this contract, shall execute and deliver, at the time of and as a condition precedent to final payment under this contract, a release discharging the Government, its officers, agents, and employees of and from all liabilities, obligations, and claims arising out of or under this contract, subject only to the following exceptions.

(i) Specified claims in stated amounts, or in estimated amounts if the amounts are not susceptible to exact statement by the Contractor.

(ii) Claims, together with reasonable incidental expenses, based upon the liabilities of the Contractor to third parties arising out of performing this contract, that are not known to the Contractor on the date of the execution of the release, and of which the Contractor gives notice in writing to the Contracting Officer not more than 6 years after the date of the release or the date of any notice to the Contractor that the Government is prepared to make final payment, whichever is earlier.

(iii) Claims for reimbursement of costs (other than expenses of the Contractor by reason of its indemnification of the Government against patent liability), including reasonable incidental expenses, incurred by the Contractor under the terms of this…