DRAFT Schedule of Material Submittals.xlsx

XLSX spreadsheet 34 KB Posted

Attached to
Building 220 Repair Roof - Fire Station
Solicitation number
FA3099-25-Q-1010
Issued by

About this file

The provided file is a Draft Schedule of Material Submittals for a roof repair project at Laughlin Air Force Base's Building 220, detailing a comprehensive list of required submittals across multiple project phases (NTP 1 - Design, NTP 2 - Pre-Construction, NTP 3 - Construction). The schedule outlines 56 specific submittal items with associated contract references, required paper and digital copies, submission dates, and approval processes, covering critical documentation such as entry access lists, design packages, safety plans, environmental compliance documents, quality control reports, and project completion materials.

The related federal contract opportunity is a Sources Sought notice for a small business set-aside project under NAICS code 238160, seeking design and construction services to replace approximately 21,000 square feet of roofing on Building 220 with a new Ethylene Propylene Diene Monomer (EPDM) roof system. The Air Force is conducting market research to determine small business interest and capabilities, with responses due by June 20, 2025. Interested firms must submit a 5-page capabilities package including business size, status (8(a), HUBZone, SDVOSB, WOSB, VOSB), teaming arrangements, past references, and SAM.gov registration, with submissions accepted electronically to specified Air Force email addresses.

View the file

Other files

File Type Posted
Division 01 Specs for Construction Projects.pdf PDF
5.1 Pre-Site Condition Pictures (25-1001).docx DOCX document
DRAFT SOW B220 Roof.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Submittals Schedule

SCHEDULE OF SUBMITTALSPROJECT
#25-1001PROJECT TITLE
Repair Roof B220, Fire StationSOLICITATION / CONTRACT NO.
(To be completed by Project Engineer)(To be completed by Contract Administrator)
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALC = Construction Project D = Design ProjectLAUGHLIN DIV 01 SPECIFICATIONSENVIRONMENTAL QUALITY CONSTRUCTION SPECIFICATIONS LAFBSTATEMENT OF WORK OR OBJECTIVESNUMBER OF PAPER COPIES REQUIRED. DIGITAL COPIES ARE REQUIRED FOR ALL SUBMITTALSREQUIRED SUBMISSION DATEDATE RECEIVED IN CONTRACTINGDATE TO CIVIL ENGINEERINGRETURN SUSPENSE DATESUBMITTAL NUMBERSDATE CONTRACTOR NOTIFIEDCONTRACTOR RESUBMITTALFINAL APPROVALREMARKS

APPR

fergusog: Enter date the Contractor was notified of submittal approval

(MM/DD/YY)

DIS

fergusog: Enter date the Contractor was notified of submittal disapproval

(MM/DD/YY)

NTP 1 - Design
1Entry Access List (EAL)D1.8.22 Weeks prior to base access
2Proof of OPSEC TrainingD2.42 Weeks prior to base access
3Summary of site investigationDNLT 49 calendar days after NTP 1
565% Design PackageD2 (drawings only)NLT 49 calendar days after NTP 1
695% Design PackageD2 (drawings only)NLT 42 calendar days after Government approves 65% design submittal
7Statement of WorkDNLT 42 calendar days after Government approves 65% design submittal
8100% Design PackageD2 (drawings only)NLT 35 calendar days after Government approves 95% design submittal
9Progress Schedule Form and Contract Progress ReportC, D6.1.1Biweekly
10Meeting MinutesD6.2.1NLT 3 Days after meeting
NTP 2 - Pre Construction
10Entry Access List (EAL)C1.8.22 Weeks prior to base access
11AF Form 103, Work Clearance RequestC2.23.3.1NLT 30 days after NTP 2
12Proof of OPSEC TrainingC, D2.42 weeks prior to base access
13Contractor Safety PlanC3.2.23.4.2.2NLT 30 days after NTP 2
14Certificate of Contractor Safety Compliance3.2.3NLT 7 days after NTP 2
15QC Manager QualificationsC, D4.2.33.1.2NLT 7 days after NTP 2
16QC PlanC, D4.2.4NLT 30 days after NTP 2
25Construction Site Plan12.1NLT 30 days after NTP 2
26Hazardous Material Approval (Safety Data Sheets)C3.2.1NLT 30 days after NTP 2 (as required)
27Hazardous Waste Training Certificate3.2.2Prior to NTP 3

(as required) 28 Hazardous Waste / Material Procedures 3.2.2 Prior to NTP 3 (as required)

29Public Water System Notification3.4.1NLT 30 days after NTP 2 (as required)
30Customer Service Inspection Certificate (TCEQ Form 20699)3.4.1Prior to NTP 3

(as required) 31 TCEQ Public water system plan review submittal form (TCEQ Form 10233) 3.4.1 Prior to NTP 3 (as required) 32 Clean Water Act TCEQ’s General Permit 3.4.2 Prior to NTP 3 (as required)

33Asbestos Hazard Abatement Plan3.5.2.1NLT 10 days prior to construction start
34Copy of notification to Department of State Health Services3.5.2.1NLT 10 days prior to construction start
35Worker/Area Protection Plan3.5.2.2Prior to NTP 3

(as required)

36FOD PlanC
37Phase PlanC , D6.1.2NLT 30 Days after NTP 2
38Traffic Control PlanC, D12.25.3, 5.5NLT 30 Days after NTP 2
39Records of Existing ConditionsC, D1.5, 7.1.14.2, 4.4, 5.5NLT 30 Days after NTP 2
40Submittals per Contractor's Design SOWD10.4.4 through 10.4.11TBD
NTP 3 - Construction
41Non-Hazardous Waste Disposal Manifest and/or Waste Shipment RecordC5.1 / 6.2NLT 45 days from the date of signature of receiving facility
42Hazardous Waste Disposal ManifestsC5.2 / 6.2As required, prior to removal from Government property
43Hazmat Usage LogC6.1End of each month during construction
44QC Daily Inspection ReportsC4.2.6Weekly
45Progress Schedule Form and Contract Progress ReportC6.1Biweekly
46Meeting MinutesC6.2.1NLT 3 Days after meeting
47Records of Existing ConditionsC7.1.1NLT 14 days after NTP 2
48Materials TestingC7.1.3As required, within 7 days of test
49Submittals per Contractor's Design SOWC10.4.4 through 10.4.11TBD
50Operation and Maintenance DataC10.4.12NLT 2 weeks after Final Inspection
51As Built Drawings/CAD FilesC10.4.132 (D size)NLT 2 weeks after Final Inspection
52Completion Inspection (QC Manager Punchlist)C13.4NLT 3 days after Pre-Final Inspection
53Draft DD Form 1354C13.3Prior to Pre-Final Inspection
54Final DD Form 1354C13.3At Final Inspection
55Other submittals per Contractor's Design SOWCTBD
56Construction Warranty Management PlanC13.2NLT 2 weeks after Final Inspection
Project Specific Submittals
N/AN/A
N/AN/A
N/AN/A
N/AN/A
N/AN/A
N/AN/A
Schedule of Submittals Template, Feb 05 (SAF/AQCP)

Task Order # FA3099-16-D-0002-0002 SOW Atch 2

&"Times New Roman,Regular"&12Page &P of &N