5.1 Pre-Site Condition Pictures (25-1001).docx
DOCX document 4 MB Posted
- Attached to
- Building 220 Repair Roof - Fire Station
- Solicitation number
- FA3099-25-Q-1010
About this file
The file "5.1 Pre-Site Condition Pictures (25-1001).docx" contains pre-site condition documentation for a roof repair project at Fire Station Building 220 at Laughlin Air Force Base. The document includes detailed images and notes about roof access locations (three identified access points) and specific areas of roof work, such as EPDM molded walkway, expansion joints, and HVAC and plumbing caps. The accompanying images (nine total) appear to document existing roof conditions, likely to support the upcoming roof replacement project.
This documentation corresponds to a pre-solicitation Sources Sought notice (Solicitation Number: FA3099-25-Q-1010) for a small business set-aside contract to replace approximately 21,000 square feet of roofing. The project involves replacing the existing Asphalt Blanket Rolled Membrane Roof System with a new Ethylene Propylene Diene Monomer (EPDM) Roof system, including all necessary materials, labor, and equipment. Interested small businesses (including 8(a), HUBZone, service-disabled veteran-owned, woman-owned, and veteran-owned) are invited to submit a 5-page capabilities package by June 20, 2025, to jesus.perez.3@us.af.mil and ian_jenne_sai.monis@us.af.mil, with the NAICS code 238160 and a $19 million size standard.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| DRAFT Schedule of Material Submittals.xlsx | XLSX spreadsheet | |
| Division 01 Specs for Construction Projects.pdf | ||
| DRAFT SOW B220 Roof.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Roof Repair, Fire Station Building 220 Existing Conditions
MXDP 25-1001
B220 Roof Existing Conditions
Roof access locations (First access, right of the mechanical room)
(Second access, leads from first to second elevation)
(Third access, left side of building, behind gate) (Three roof accesses locations)
B220 roof scope of work
EPDM molded walkway (Conceptual Drawing only)
Expansion joints Ex 1. Ex 2. Ex 3.
HVAC and plumbing caps Ex 1. Ex 2.
Ex 3.