Draft RFP N3220524R5001 MEV.docx

DOCX document 145 KB Posted

Attached to
Military Sealift Command - Lay Berth and Ship Repair Federal contract opportunity
Solicitation number
N3220524R5000
Issued by
Department of the Navy Military Sealift Command

About this file

This document is a draft solicitation for military sealift contract opportunities from the Department of the Navy Military Sealift Command (MSC). The key details are:

The solicitation is for lay berth and industrial assistance, with options for a ship repair availability, for the T-AKE (dry cargo/ammunition) and ESB (expeditionary sea base) class vessels. The required work includes providing a lay berth pier facility, supplemental skilled labor for shipboard preventive maintenance and repairs, deck/engine watch support, additional shipboard maintenance and repairs, and industrial assistance during the lay berth period. The performance period is planned in two phases - Phase 1 for lay berth and industrial assistance, and Phase 2 for a regular overhaul/dry-docking. The solicitation will be set aside for small businesses under NAICS code 336611 with a size standard of 1,300 employees. Responses to this sources sought notice are due by August 23, 2024. A question and answer session will be held on August 20, 2024.

View the file

Other files for this federal contract opportunity

Other files attached to Military Sealift Command - Lay Berth and Ship Repair, newest first.
File Type Posted
Q and A session presentation.pptx PPTX presentation
Q and A session presentation.pptx PPTX presentation
Draft RFP N3220524R5000 LNC.docx DOCX document
Draft RFP N3220524R5002 HWW.docx DOCX document
Characteristics.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N3220524R5001

Section B - Supplies or Services and Prices

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Phase 1 lay berth-USNS MEDGAR EVERS

FFP

Prepare for and accomplish lay berth pier facility, preventive maintenance and repairs, and deck and engine watch support per section C, Phase 1, paragraphs 2 through 4 as priced in Attachment J-2 and J-4.

CDRLs FOR CLINs INCLUDING OPTION CLINs, IF EXERCISED:

The data to be furnished hereunder shall be prepared and submitted IAW the CDRL, DD Form 1423, Exhibit A, attached hereto. The CDRLs form a part of the schedule of this solicitation.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

0001AA

1
Job

Lay berth

Period 1.

FOB: Destination

M2CA

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

0001AB

1
Job

Lay berth

Period 2.

M2CA

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Phase 1 lay berth additional requirement

Prepare for and accomplish additional requirements per section C, Phase 1, paragraph 5 as priced in Attachment J-4. See Section B, paragraph 1.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

0002AA

1
Job

Additional requirements

Period 1.

J998

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

0002AB

1
Job

Additional requirements

Period 2.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Phase 1 Industrial Assistance

Prepare for and accomplish Industrial Assistance per section C, Phase 1, paragraph 6 as priced in Attachment J-4. See Section B, paragraph 1.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

0003AA

1
Job
OPTION
Phase 1 Industrial Assistance

FFP

Period 1.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

0003AB

1
Job
OPTION
Phase 1 Industrial Assistance

FFP

Period 2.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

0003AC

1
Job
OPTION
Phase 1 Industrial Assistance

FFP

Period 3.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Phase 2 ROH

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

0004AA

1
Job
OPTION
Phase 2 Category "A" WIs

FFP

Prepare for and accomplish the Phase 2 per Section C, Phase 1 and Attachment J-1 as priced in Attachment J-2 and J-4.

CDRLs FOR CLINs INCLUDING OPTION CLINs, IF EXERCISED:

The data to be furnished hereunder shall be prepared and submitted IAW the CDRL, DD Form 1423, Exhibit A, attached hereto. The CDRLs form a part of the schedule of this solicitation.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

0004AB

1
Job
OPTION
Phase 2 AGR and ODC

FFP

Defined in section B, paragraph 1 and priced on Attachment J-4.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

0004AC

1
Job
OPTION
Category "B" WI 0025

FFP

WI 0025 - Physical Security at Private Contractor's Facility in FPCON Charlie - Delta

Category “B” WIs are optional WIs and not required to be accomplished as part of this contract as awarded. The ACO may require the contractor to perform the requirements of the optional Category “B” WIs by exercising the option via written notice to the contractor.

Attachment J-3, Category “B” WIs, provides a WI price breakdown. Total price provided on attachment J-4.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

0004AD

1
Job
OPTION
Category "B" WI 0030

FFP

WI 0030 - Continuation of Services

Category “B” WIs are optional WIs and not required to be accomplished as part of this contract as awarded. The ACO may require the contractor to perform the requirements of the optional Category “B” WIs by exercising the option via written notice to the contractor.

Attachment J-3, Category “B” WIs, provides a WI price breakdown. Total price provided on attachment J-4.

NET AMT

CLAUSES INCORPORATED BY FULL TEXT

Section B, Price Schedule, detailed information

1. AGR and ODC

a. This CLIN contains the FBLR (e.g., G&A, overhead, profit, supervision, consumables, and/or support functions) and the ODC profit and G&A rate. These rates are used for pricing changes negotiated during the contract. Additionally, this CLIN includes G&A and profit rates for ODC to be used for negotiating changes. These rates shall prevail even when the contract is extended/modified. The number of AGR man-hours and the ODC base amount are estimates that were generated for evaluation purposes. The actual amounts of man-hours and ODC may be used interchangeably under the contract which could result in a distribution and amount of man-hours and ODC that is either higher or lower than that stated in the CLIN. Any additional AGR or ODC required beyond the estimated amount shall be added through contract modification using the same AGR and ODC rates agreed upon at contract award. Any unused AGR or ODC will be de-obligated from the contract at the same AGR and ODC rates agreed upon at contract award. The contractor agrees that the number of man-hours included in its proposed price for such AGR shall include only direct production man-hours. For these purposes, direct production man-hours are for skilled labor at the Journeyman level expended in direct production as exemplified by the following functions:

Abrasive cleaning/blastingTank cleaning
WeldingMachinists (inside and outside)
BurningBrazing
CarpentryElectrical work
Electronic workShipfitting
LaggingPainting
BoilermakingPipefitting
Sheetmetal workEngineering
RiggingStaging/scaffolding
General laborFire Watch
Gas Free Certification

b. Direct production man-hours will not include those functions (whether charged directly or indirectly by the contractor’s accounting system) which are defined herein as support for production functions. Necessary support functions shall be considered to be included in the offeror's FBLR for direct production man-hours. Examples of support functions include:

TestingQuality Assurance
PlanningCleaning (except tank cleaning)
Material handling & warehousingSecurity
SurveyingAdministration
TransportationPurchasing staff
LoftingOther indirect support
Supervision

c. Consumable materials are goods used in the ordinary course of work performance that do not become an integral part of the repaired vessel (e.g., office supplies, paper, rags, vehicle or equipment fuel costs, cleaning chemicals, disposable tools, paint buckets, paint brushes, protective clothing). Consumable material shall be included in the contractor's FBLR and not separately priced.

d. The rates for profit and G&A shall be the same rates used by the contractor in its responses to the Request for CCO Proposals issued under this contract. The ACO will apply these rates to the ODCs for each CCO when it is negotiated and settled.

e. The ODC base does not include profit or G&A.

f. This does not include any labor, material, or equipment cost for base Category “A” or “B” WIs.

g. The Government may utilize AGR and ODC for, and not limited to, labor, material, and equipment generated from a discrepancy found between WIs and the new or discovered conditions or to conduct material condition assessments. AGR and ODC does not include work performed pursuant to DFARS 252.217-7005 - Inspection and Manner of Doing Work, 252.217-7013 - Guarantees, or other contract clauses relating to the correction of defective workmanship. The contractor agrees that additional work shall be performed concurrently with Category “A” WIs and exercised Category “B” WIs, when practicable; however, the period of performance shall be negotiable.

h. As a result of a discrepancy found between the WI and new or discovered conditions or the material condition assessment, the contractor may submit a CFR to the ACO and the PPE. As a result of this report submission, or independent of a CFR, the ACO may request a proposal from the contractor. This proposal shall be submitted within three (3) days of the receipt of the Government's request for a proposal, or within such additional time provided in writing by the ACO. The contractor's failure to submit its proposal within the three (3) day period, or such extended period of time, may be considered a failure of the parties to negotiate a fair and reasonable price for the AGR and ODC and will permit the ACO to take any of the three (3) options set forth in subparagraph “k” below. AGR proposals shall be priced using the FBLR set forth in Section B. The AGR rate will be used in evaluating the contractor's proposal and for negotiating changes. As part of the contractor’s proposal submission for AGR, the following shall be included: FBLR, proposed labor mix/categories, proposed man hours, and total proposed AGR. As part of the contractor’s proposal submission for ODC, the following shall be included:

MaterialEquipment
-Part number- Part number
-Order quantity- Order quantity
-Unit price- Unit price
-Total price- Total price

Other Direct Costs not captured above

- Travel

- Per diem (lodging, M&IE daily rates)

- Subcontractor Proposal Breakdown shall include but not be limited to, Material (Part number, Order Quantity, Unit Price, and Total Price), equipment (Part Number, Order Quantity, Unit Price, and Total Price), labor (FBLR, Proposed Labor Mix/Categories, and Proposed Manhours), and ODC (Travel and Per Diem)

The G&A and profit rates proposed shall be the same as the rates provided in Section B.

i. The contractor shall demonstrate due diligence in the evaluation, and determination resulting in the proposed utilization of other than local specialized labor resources. Only with ACO approval will a contractor, technical representative, or subcontractor be reimbursed for reasonable per diem costs (transportation, travel expenses, lodging, meals, and incidental expenses) required in connection with the associated CCO. Per diem costs are considered reasonable, allowable, and reimbursable only to the extent that they do not exceed the allowed per diem rate in effect at the time of travel as set forth in the JTR.

j. Considering FBLR and G&A and profit rates have been pre-approved in Section B, proposal evaluation may be limited to: (1) evaluating the mix of labor categories and associated man-hours and ODCs proposed to ensure that they are reasonable to meet the Government’s minimum requirements in addressing these discrepancies or repairs found; and (2) the price is fair and reasonable IAW FAR 15.404-1(b) – Price analysis for commercial and non-commercial items. If a fair and reasonable price cannot be negotiated, the ACO reserves the right to procure these ODCs utilizing alternative means described in subparagraph “k”, below.

k. Upon receipt of the contractor's price proposal for the AGR the contractor and the ACO shall negotiate the scope of the effort. If a fair and reasonable price cannot be negotiated between the contractor and the ACO, the ACO reserves the right to:

1) Have the work performed by the Government or third-party contractors;

2) Issue a unilateral modification, which must be performed, but may be the subject of DFARS 252.243-7002, Requests for Equitable Adjustment; or

3) Cancel the requirement.

l. In such case as described in subparagraphs “k.1” and “k.2” above, the contractor agrees to not in any way hinder or obstruct Government or third-party contractor work and any access issues will be discussed per DFARS 252.217-7011 - Access to Vessels.

m. The contractor is to perform additional work and invoice against AGR and ODC only for work that has been authorized by the ACO through a settled or unilateral CCO and incorporated into the contract through a contract modification.

Section C - Descriptions and Specifications

ACRONYM TABLE

ABIH
American Board of Industrial Hygiene
ABR
Agreement for Boat Repair
ABS
American Bureau of Shipping
ACO
Administrative Contracting Officer
AGR
Additional Government Requirements
AIHA
American Industrial Hygiene Association
ALT
Alternate
AMT
Amount
BLDG
Building
CCO
Contract Change Order
CD
Compact Disc
CDRL
Contract Data Requirements List
CD-ROM
Compact Disc Read-Only Memory
CFM
Contractor Furnished Material
CFP
Contractor Furnished Property
CFR
Condition Found Report
CHENG
Chief Engineer
CFR
Code of Federal Regulations
CIH
Certified Industrial Hygienist
CLIN
Contract Line Item Number

CONUS

CPARS

Contiguous United States Contractor Performance Assessment Reporting System

DBIDS
Defense Biometric Identification Systems
DFARS
Defense Federal Acquisition Regulation Supplement
DOD
Department of Defense
DOD SAFE
Department of Defense Secure Access File Exchange
DON
Department of the Navy
EMAIL
Electronic Mail
ESRS
Electronic Subcontract Report System
FAPIIS
Federal Awardee Performance and Integrity Information System
FAR
Federal Acquisition Regulation
FBLR
Fully-Burdened Labor Rate
F/CC
Fibers Per Cubic Centimeter
FPCON
Force Protection Condition
FTR
Federal Travel Regulations
G&A
General and Administrative
GFI-TD
Government Furnished Information – Technical Data
GFM
Government Furnished Material
GFP
Government Furnished Property
GPE
Governmentwide Point of Entry
IAW
In Accordance With
ID
Identification
ISO
International Organization for Standardization
JTR
Joint Travel Regulations
KO
Contracting Officer
KWh
Kilowatt Hour
LLTM
Long Lead Time Material
LPTA
Lowest Price Technically Acceptable
M&IE
Meals and Incidental Expenses
MSC
Military Sealift Command
MSCREP
Military Sealift Command Representative
MM
Millimeter
MSRA
Master Ship Repair Agreement
MTA
Mid-Term Availability
N/A
Not Applicable
NCACS
Navy Commercial Access Control System
NDA
Non-Disclosure Agreement
NO
Number
NSP
Not Separately Priced
ODC
Other Direct Costs
PAT
Proficiency in Analytical Testing

PDF

PII

Portable Document Format Personally Identifiable Information

PM
Program Manager
PPE
Principle Port Engineer
PRIME
Prime Contractor
QA
Quality Assurance
QC
Quality Control
REV
Revision
RFC
Request for Specification Clarification
RFP
Request for Proposal
ROH/DD
Regular Overhaul/Dry-Docking
SECNAV
Secretary of the Navy
SF
Standard Form
SLIN
Sub Contract Line Item Number
SUB
Subcontractor
TPSN
Time Phased Sequencing Network
TWA
Time-Weighted Average
USC
United States Code
USCG
United States Coast Guard
USNS
United States Naval Ship
VR
Voyage Repair
WAWF
Wide Area Workflow
WI
Work Item

SCOPE OF WORK

1. The contractor shall provide facilities, services, labor and materials to provide berthing, preventive maintenance industrial assistance, planning, material procurement and execution of a maintenance and repair availability as detailed herein. Due to operational and national security availability considerations, the location shall be US East, Gulf or West Coast.

Phase 1

1. Lay berth and industrial assistance. Reference section F for periods of performance.

2. Provide a lay berth pier facility (CLIN 0001 with Option SLINs) for USNS MEDGAR EVERS (T-AKE 13), meeting the requirements and providing the services as included in the WIs listed in table 1.

3. While the vessel is in lay berth, there will be a limited number of crew members living onboard, conducting daily maintenance procedures. To assist the crew, provide supplemental skilled labor to accomplish shipboard preventive maintenance and repairs Mondays through Fridays, excluding federal holidays, 0730 hours till 1600 hours (providing a 30 minute lunch break). Shipboard Automated Maintenance Management (SAMM) is an MSC tool to define, track and record maintenance actions. Weekly requirements will be provided to the contractor for accomplishment as either stand-alone tasks or in support of ship’s force actions. The Shipboard Management Team (SMT) will hold daily and weekly meetings with the contractor supervisor to review tasks, completions, issues and resolution. Provide the following skilled labor and supervision in support of this requirement:

a. Supervision: Provide a supervisor that has at least 5 years of work history as a minimum First Assistant Engineer or Chief Mate sailing under a recognized Flag State or equivalent US Navy experience. There is not a requirement that the individual have current Mariner credentials. This individual will be the main POC between the Contractor and the SMT with regard to accomplishing the preventative maintenance requirements. The Contractor shall develop and implement a Quality Assurance Plan for the supervision/oversight, work performance and reporting of this preventative maintenance team.

b. One (1) Electrician with a minimum of 3 years of shipboard electrical system experience

c. One (1) Refrigeration Technician with a minimum of 3 years of shipboard AC&R system experience

d. Two (2) Outside Machinists each with at least 3 years of shipboard equipment maintenance and repair

e. One (1) Electronics Technician with at least 3 years of shipboard non-communications related electronics systems maintenance and repair

f. Three (3) Laborers

4. To assist the crew, provide the services of a USCG licensed deck officer and a USCG licensed engineering officer of any rating to provide deck and engine watch support from 1600 hours till 0800 hours, 7 days per week while the vessel is in layberth.

5. Additional requirements (CLIN 0002 with Option SLINs). Provide shipboard emergent repairs, material condition assessments, logistic support, and unscheduled maintenance. The Government will request all tasks via a request for contract change order and negotiated per section B paragraphs 2, 3, and 4.

6. Industrial Assistance (Option CLIN 0003). There will be planned Industrial Assist periods throughout phase 1. Reference section F for periods of performance. WIs will be developed while the vessel is in lay berth and will be submitted via a request for contract change order and negotiated per Section B paragraph 1.

Phase 2 (Option CLIN 0004)

1. The contractor shall prepare for and accomplish the ROH of the USNS MEDGAR EVERS (T-AKE 13) as specified herein and IAW the WI package as provided in Table 2 and Attachment J-1 – WI Package (Specifications). Unless otherwise specified, all work shall be performed at the contractor’s shipyard.

2. In performing the WIs specified, the contractor shall be responsible for all of the following related work (in case of a discrepancy, the terms and conditions stated in the WIs take precedence over the following terms and conditions):

a. Providing the necessary management, procurement, production, testing, technical capability and resources, and quality assurance services.

b. Ensuring the timely procurement of CFM/CFP and the timely reporting, receipt, storage, installation, and accountability of GFM/GFP IAW FAR 52.245-1, DFARS 252.245-7003, and DFARS 252.245-7005.

c. Using progress measurement systems to determine the physical progress of completed work for each of the elements in the scheduling plan, including material and manpower control, engineering, production, tests and trials IAW the CDRL and the contractor's own Technical Proposal, and the WI package. The progressing system shall permit a direct comparison of the physical progress of completed work to the planned performance measurement baseline for each of the elements in the scheduling plan.

d. Using management procedures and systems to identify behind-schedule conditions and unfavorable schedule variances based on the TPSN submitted with the contractor’s proposal. The applied procedures and systems shall provide timely identification of scheduling problem areas to permit prompt management action to correct unsatisfactory conditions.

e. Developing a performance milestone schedule/critical path chart to measure scheduled performance. Deviations from the milestone schedule/critical path chart dates in WI 0013 must be submitted to and approved by the KO. A performance milestone schedule and critical path chart shall be developed and submitted IAW the WI Package. The performance milestone schedule shall include and clearly identify primary and parallel critical paths. The resource loaded performance milestone schedule shall include, at a minimum, those milestones identified in WI 0013.

f. Using approved quality control procedures as required by this contract and the WI package to ensure procured material and performed production work conforms to the required quality standards.

g. Ensuring the ship's equipment and systems remain configured to existing baselines with regard to procured material, production work, and software.

h. Applying stringent configuration control procedures to ensure that configuration baselines are maintained for procured material and production work.

i. Providing for staging and storing of material (both Government-furnished and contractor-furnished) and LLTM for use in the availabilities from the date of award.

j. Managing all subcontractors’ performance during the availability. Ensure subcontractor work is to the same quality and standards as expected from the prime contractor. Develop and maintain a subcontractor management plan. The plan shall ensure that all communication and control of subcontractors is maintained by the prime contractor.

k. Employing good judgment and sound engineering practice and principles, particularly when WIs do not describe all details of accomplishing the work. The contractor shall be expected to have, either organically or through subcontractors, access to competent engineers who have a history of working solutions in a maritime environment.

l. In preparation for Phase 2, the contractor will be requested to accomplish shipboard material condition assessments, develop recommendations for availability repair items including identification of LLTM, accomplish market research, purchase and store LLTM during the Phase 1 period. Items intended for accomplishment include the following. Specific tasks will be planned collaboratively and authorized via CCO and contract modification. New work will be collaboratively definitized between the contractor and MSC. New work to be included in Phase 2 will be negotiated and settled via a contract modification no later than 60 days prior to the start of Phase 2.

1) Load line, structural and corrosion assessments

2) Hull, deck and bulkhead gauging

3) Piping gauging and hydrostatic testing

4) Lifeboat and davit assessments

5) Switchboards, electrical panels and motor controller thermographic surveys

6) Unscheduled maintenance development shipcheck

7) Unscheduled maintenance development conference

8) LLTM identification including market research

9) LLTM purchase and storage

3. Contract work shall be performed by a contractor as defined below.

a. The contractor shall be capable of performing the full scope of the requirement stated herein within its own facilities, utilizing its own shop(s) and work force, or be capable of subcontracting for these elements beyond its managerial, technical, or physical capability or capacity. The contractor shall assume full responsibility for the integrated scheduling, cost, and quality of subcontractor performance.

b. The contractor shall be a company recognized as engaged in ship repair work and possess an organization capable of the full scope of planning, engineering, quality control, shipboard/offship production and component/system testing and trials. The contractor shall possess industry certifications, such as, MSRA, ABR, or ISO Certification, that would further emphasize the contractor's ability to perform the work. The contractor shall have established organizational elements as set forth below.

1) Administration/Management Control. Established organization geared toward ship repair at all levels of size, value, and complexity, and toward technology innovation and process improvement. Clear lines of authority. Delegation of responsibility. Mid-level managerial positions in place. Competent and experienced employees with ship repair experience. Capability to develop and integrate planning, estimating, and scheduling functions. Defined managerial responsibilities for production, quality assurance, material procurement/control, and subcontractor control.

2) Financial Control. Favorable cash flow-ratios. Availability of a line of credit or other source of financial income to support the work effort. Prompt payment of subcontractors and suppliers.

3) Production Control. A production organization. On board (or ability to obtain) trade mix/skills to perform ship repair work. Control of production efforts. Integration of other key functions with production. Use of scheduling techniques. Methods of progressing. Training available to trades employees.

4) Production Technical Support. Engineering and design support capabilities (in-house or subcontracted) with sufficient capability to diagnose and evaluate technical problems and issues and to make competent technical recommendations to MSC when necessary and appropriate. The offeror shall be fully cognizant of ABS rules and USCG regulations and how they apply and impact this specification package.

5) Material/Procurement Control. A material purchasing department with staff. Procedures for control of material (purchasing, monitoring, receipt, inspection, segregation, issuance, nonconformance, and disposal). An inventory system – ordering, tagging warehousing. CFM/GFM storage, control and protection. Existing environmentally-controlled warehouse space. Material handling equipment. Familiarity with the Navy logistics support system.

6) Subcontractor Control. Procedures for selecting, scheduling, managing, monitoring and controlling subcontractors.

7) Quality Control/Test and Trials. A quality control organization/department/staff. Quality assurance procedures/manual. Calibration and metrology system availability. Test memo writing capability. Nondestructive Testing capabilities. Welding procedures and welders’ qualifications. Ability to perform trend analysis. Quality control system shall be certified or equivalent to ISO 9001:2001 standards.

8) Safety/Security. Safety Organization/Manager or Engineer. Safety manual/procedures. Safety training. First-aid capabilities or medical services. Fire protection/procedures. Physical yard security/security procedures.

9) Hazardous Material/Waste Control. Proper procedures and facilities to meet the legal requirements for removal, storage, and disposal of hazardous waste. Segregated storage. Documentation of licensed subcontractors responsible for control of hazardous waste removal, storage, and disposal. Appropriate state/federal agency-issued hazardous waste generator number. Disposal records which indicate type of material, date, and place of disposal.

10) Facilities. Although facility requirements may vary with the work authorized for a specific ship, the contractor must be a ship repair company that possesses or has available the following facilities:

· Pier, with services in place, accessible to the CLASS size ship for berthing

· Structural Shop

· Machine Shop

· Pipe Shop

· Electrical/Electronic Shop

· Carpentry Shop

· Rigging Equipment

· Dry-dock – when required for docking of vessel in performance of the specification

c. The government reserves the right to perform a site survey(s) for verification of policies, procedures, capabilities and facilities prior to award.

4. Asbestos/Lead Paint/Hex Chromate Abatement and Removal requirements.

a. During the performance of this contract the contractor and subcontractors may be required to perform work which involves the removal or disturbance of asbestos or asbestos-containing products, lead paint, or hex-chromate contaminated paint. This requirement applies to each instance of removal or disturbance.

b. The contractor shall comply with the precautions required in 29 CFR 1910.1001, 29 CFR 1926.58 and 40 CFR Part 61 and all other applicable Federal, state, and local restrictions. The contractor shall forward a copy of all required notices, licenses and permits to the KO immediately upon issuance or receipt.

c. The latest change to the Federal, state, and local regulations in effect at the time of issuance of the contract shall govern. Compliance with these regulations is mandatory and is necessary to protect the employees of the contractor and Naval personnel from exposure to asbestos fibers in excess of the OSHA Action level airborne concentration (currently 0.1 f/cc of air).

d. During removal or disturbance, the contractor shall control airborne concentrations outside the removal boundary to less than 0.1 f/cc at all times.

e. After removal or disturbance is complete, the areas within the removal boundary shall not be released for re-occupancy until clearance air sampling demonstrates these spaces have concentrations of less than 0.1 f/cc.

f. In all respects, the performance of air sampling and analysis shall be performed IAW the OSHA Reference Method (Appendix A of 29 CFR 1910.1001), with the following additional specifications:

1) Aggressive clearance sampling shall be performed on 25 mm cassettes at 2.0 liters per minute for a minimum of four (4) hours.

2) In performing the clearance sampling, the pump shall be placed within the compartment where the removal or disturbance occurred. When this operation is conducted in a multilevel space, at least one pump shall be placed on each level.

3) Air sampling shall be performed by a person competent in sampling procedures and overseen by a CIH by the ABIH.

4) Laboratory analysis of samples shall be performed by a participant in the AIHA PAT Program rated proficient for contaminants and air.

g. Personal sampling shall be conducted using breathing zone air samples which are representative of the 8-hour TWA exposure of each individual. Samples shall be collected and analyzed using the OSHA Reference Method contained in either 29 CFR 1910.1001 (as amended) or 29 CFR 1926.58 (as amended).

h. The contractor agrees to indemnify MSC for any fines assessed by Federal, state, or local agencies, for the contractor's failure to properly follow applicable regulations.

i. The contractor shall insert this instruction in all subcontracts entered into under this contract.

5. Post-award substitution of any major subcontractor should not be effected unless the proposed substitution is submitted to the KO and official approval is obtained. The post-award substitution or insertion of a second-tier subcontractor will be treated in the same manner as the substitution of a major subcontractor and requires specific approval by the KO.

6. Substitution of key personnel.

a. The contractor agrees to assign to this contract those persons identified as key personnel who are necessary to fulfill the requirements of this contract and whose resumes were submitted with the proposal. No substitution of key personnel shall be made except IAW these instructions.

b. All proposed substitutions must be submitted, in writing, at least seven (7) days in advance of the proposed substitutions to the KO and must provide the information required by paragraph “c” below.

c. All requests for substitution must provide a detailed explanation of the circumstances necessitating the proposed substitution, a resume for the proposed substitute, and any other information as requested by the KO. All proposed substitutes must have qualifications equal to or higher than the qualifications of the person to be replaced. The KO or his authorized representative will evaluate such requests and promptly notify the contractor of the approval or disapproval thereof.

Table 1: List of Phase 1 WIs:

{insert table of WIs from PENG}

Table 2: List of Phase 2 WIs:

{insert table of WIs from PENG}

Section D - Packaging and Marking

PACKAGING AND MARKING

Material and equipment designated for turn over to the Government shall be packed, crated, and prepared for shipment by the Contractor. Package material IAW DODMANUAL 4140.01, VOLUME 9, DOD SUPPLY CHAIN MATERIEL MANAGEMENT PROCEDURES, utilizing MIL-STD 2073-1(series) or commercial packaging in accordance with the ASTM D3951(series). All crating shall be IAW the International Standards for Phytosanitary Measures (ISPM): Guidelines for Regulating Wood Packaging Material in International Trade (ISPM Publication No. 15) to include certifying that the wood packaging material bears the mark has been subjected to an approved measure.
Per MIL-STD 129R(series) markings on outside of box/crate/container shall consist of a minimum 2-inch stenciled letters with:

VESSEL’S NAME/HULL NUMBER

REQUISITION NUMBER (provided by the Government’s ILS representative) Any previous markings that contradict current material inventory shall be painted over/removed.

Section E - Inspection and Acceptance

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN
INSPECT AT
INSPECT BY
ACCEPT AT
ACCEPT BY
0001
N/A
N/A
N/A
N/A
0001AA
Destination
Government
Destination
Government
0001AB
Destination
Government
Destination
Government
0002
N/A
N/A
N/A
N/A
0002AA
Destination
Government
Destination
Government
0002AB
Destination
Government
Destination
Government
0003
N/A
N/A
N/A
N/A
0003AA
Destination
Government
Destination
Government
0003AB
Destination
Government
Destination
Government
0003AC
Destination
Government
Destination
Government
0004
N/A
N/A
N/A
N/A
0004AA
Destination
Government
Destination
Government
0004AB
Destination
Government
Destination
Government
0004AC
Destination
Government
Destination
Government
0004AD
Destination
Government
Destination
Government

CLAUSES INCORPORATED BY REFERENCE

252.217-7005
Inspection and Manner of Doing Work
JUL 2009
252.217-7006
Title
DEC 1991
252.217-7013
Guarantees
DEC 1991

Section F - Delivery and Performance

DELIVERY INFORMATION

CLIN
DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC / CAGE
0001
N/A
N/A
N/A
N/A
0001AA
POP 24-FEB-2025 TO

30-APR-2025

N/A
N/A
0001AB
POP 01-AUG-2025 TO

31-DEC-2025

N/A
N/A
0002
N/A
N/A
N/A
N/A
0002AA
POP 24-FEB-2025 TO

30-APR-2025

N/A
N/A
0002AB
POP 01-AUG-2025 TO

31-DEC-2025

N/A
N/A
0003
N/A
N/A
N/A
N/A
0003AA
POP 31-MAR-2025 TO

11-APR-2025

N/A
N/A
0003AB
POP 06-OCT-2025 TO

17-OCT-2025

N/A
N/A
0003AC
POP 08-DEC-2025 TO

19-DEC-2025

N/A
N/A
0004
N/A
N/A
N/A
N/A
0004AA
POP 01-MAY-2025 TO

31-JUL-2025

N/A
N/A
0004AB
N/A
N/A
N/A
N/A
0004AC
POP 01-MAY-2025 TO

31-JUL-2025

N/A
N/A
0004AD
POP 01-MAY-2025 TO

31-JUL-2025

N/A
N/A
52.242-15
Stop-Work Order
AUG 1989
52.242-17
Government Delay Of Work
APR 1984
52.247-55
F.O.B. Point For Delivery Of Government-Furnished Property
JUN 2003

Section G - Contract Administration data

252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)

(a) Definitions. As used in this clause—

“Department of Defense Activity Address Code (DoDAAC)” is a six position code that uniquely identifies a unit, activity, or organization.

“Document type” means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).

“Local processing office (LPO)” is the office responsible for payment certification when payment certification is done external to the entitlement system.

“Payment request” and “receiving report” are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(c) WAWF access. To access WAWF, the Contractor shall—

(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.

(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/.

(e) WAWF methods of document submission. Document submissions may be via web entry, Electronic Data Interchange, or File Transfer Protocol.

(f) WAWF payment instructions. The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:

(1) Document type. The Contractor shall submit payment requests using the following document type(s):

(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.

(ii) For fixed price line items—

(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer. NOT APPLICABLE

(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer. Invoice 2-in-1

The following information, at a minimum, must be attached into WAWF and submitted with every invoice showing certification with the Onsite Management Team prior to submission:

CLIN
Contract Price Through Mod P0000x
% Complete
Contract Completed ($)
Less Retainage ($)
Less Prev Payments ($)
Amount due this Invoice ($)
Total Invoiced to Date ($)

MSC ACO

________________________________________________________________
MSC PPEShipyard Representative

(iii) For customary progress payments based on costs incurred, submit a progress payment request.

(iv) For performance based payments, submit a performance based payment request.

(v) For commercial financing, submit a commercial financing request.

(2) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.

(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.

Routing Data Table*

Field Name in WAWF
Data to be entered in WAWF
Pay Official DoDAAC
N50082
Issue By DoDAAC
N32205
Admin DoDAAC**
N32205
Inspect By DoDAAC
N62387
Ship To Code
N62387

Ship From Code

Mark For Code

Service Approver (DoDAAC)
N62387
Service Acceptor (DoDAAC)
N62387

Accept at Other DoDAAC

LPO DoDAAC
N62387

DCAA Auditor DoDAAC

Other DoDAAC(s)

(4) Payment request. The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.

(5) Receiving report. The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F.

(g) WAWF point of contact.

(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity’s WAWF point of contact. NOT APPLICABLE

(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.

(End of clause)

MSC SPECIFIC WIDE AREA WORKFLOW (WAWF) INSTRUCTIONS (AUG 2012)

The information contained in this instruction is supplemental to DFARS 252.232-7006.

The information contained in the table in DFARS 252.232-7006 is for WAWF purposes only. Information included in DFARS 252.232-7006 and this WAWF instruction apply only to WAWF Invoicing and WAWF Receiving Reports. Contradictory information elsewhere in this contract, e.g. Ship to DoDAAC, shall be followed per the terms and conditions of the contract.

When entering the invoice into WAWF, the Contractor shall fill in the DoDAAC fields or DoDAAC extensions exactly as shown in the table in DFARS 252.232-7006. Fields that should not be filled in when entering the invoice into WAWF will be indicated with the direction, “Leave Blank.”

In some situations the WAWF system will pre-populate the “Pay DoDAAC,” “Admin By DoDAAC” and “Issue By DoDAAC.” The Contractor shall verify that those DoDAACs automatically entered by the WAWF system match the information in the table in DFARS 252.232-7006. If these DoDAACs do not match, then the Contractor shall correct the field(s).

If Receiving Reports are required, ensure that the “Inspection” and “Acceptance” defaults of “destination” for both fields are not changed in the WAWF online interface.

The CLINs on the WAWF invoice shall be entered exactly as set forth in the contract document including CLIN number (e.g. 0001), Quantity (may be adjusted for actual quantity or dollar value delivered and invoiced), and Unit Price (e.g. $1.00). The dollar amounts on each CLIN or SubCLIN on the WAWF invoice shall reflect final performance values, but in no instance can the dollar amount for each CLIN or SubCLIN exceed what is specified in the contract document. The Contractor shall bill to the lowest level, e.g., the SubCLIN level. The Quantity and Unit of Measure fields must be filled out exactly as indicated in the CLINs and SubCLINs to reduce the possibility of the invoice being delayed or rejected during processing.

Before closing out of an invoice session in WAWF, but after submitting the document or documents, the Contractor will be given the option to send additional email notifications by clicking on the “Send More Email Notifications” link that appears on the page. The Contractor shall click on this link and add the Technical Point of Contact’s (TPOC) or Contracting Officer’s Representative’s (COR) email address in the first email address block and add any other additional email addresses desired in the following blocks. This additional notification to the Government is important to ensure the acceptor/receiver is aware that the invoice documents have been submitted into the WAWF system.

(End of instructions)

Section I - Contract Clauses

52.202-1
Definitions
JUN 2020
52.203-3
Gratuities
APR 1984
52.203-5
Covenant Against Contingent Fees
MAY 2014
52.203-6
Restrictions On Subcontractor Sales To The Government
JUN 2020
52.203-7
Anti-Kickback Procedures
JUN 2020
52.203-8
Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity
MAY 2014
52.203-10
Price Or Fee Adjustment For Illegal Or Improper Activity
MAY 2014
52.203-12
Limitation On Payments To Influence Certain Federal Transactions
JUN 2020
52.203-13
Contractor Code of Business Ethics and Conduct
NOV 2021
52.203-19
Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements
JAN 2017
52.204-10
Reporting Executive Compensation and First-Tier Subcontract Awards
JUN 2020
52.204-13
System for Award Management Maintenance
OCT 2018
52.204-18
Commercial and Government Entity Code Maintenance
AUG 2020
52.204-19
Incorporation by Reference of Representations and Certifications.
DEC 2014
52.204-21
Basic Safeguarding of Covered Contractor Information Systems
NOV 2021
52.204-23
Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab Covered Entities
DEC 2023
52.204-25
Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment
NOV 2021
52.204-27
Prohibition on a ByteDance Covered Application
JUN 2023
52.204-30
Federal Acquisition Supply Chain Security Act Orders--Prohibition.
DEC 2023
52.209-6
Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, or Proposed for Debarment
NOV 2021
52.209-9
Updates of Publicly Available Information Regarding Responsibility Matters
OCT 2018
52.209-10
Prohibition on Contracting With Inverted Domestic Corporations
NOV 2015
52.210-1
Market Research
NOV 2021
52.211-5
Material Requirements
AUG 2000
52.211-15
Defense Priority And Allocation Requirements
APR 2008
52.215-2
Audit and Records--Negotiation
JUN 2020
52.215-8
Order of Precedence--Uniform Contract Format
OCT 1997
52.215-10
Price Reduction for Defective Certified Cost or Pricing Data
AUG 2011
52.215-12 (Dev)
Subcontractor Certified Cost or Pricing Data (DEVIATION 2022-O0001)
OCT 2021
52.215-14
Integrity of Unit Prices
NOV 2021
52.215-17
Waiver of Facilities Capital Cost of Money
OCT 1997
52.215-21
Requirements for Certified Cost or Pricing Data and Data Other Than Certified Cost or Pricing Data -- Modifications
NOV 2021
52.219-6
Notice Of Total Small Business Set-Aside
NOV 2020
52.219-8
Utilization of Small Business Concerns
FEB 2024
52.219-14 (Dev)
Limitations on Subcontracting (DEVIATION 2021-O0008)
FEB 2023
52.219-28
Post-Award Small Business Program Rerepresentation
FEB 2024
52.222-1
Notice To The Government Of Labor Disputes
FEB 1997
52.222-19
Child Labor -- Cooperation with Authorities and Remedies
FEB 2024
52.222-20
Contracts for Materials, Supplies, Articles, and Equipment
JUN 2020
52.222-21
Prohibition Of Segregated Facilities
APR 2015
52.222-26
Equal Opportunity
SEP 2016
52.222-35
Equal Opportunity for Veterans
JUN 2020
52.222-36
Equal Opportunity for Workers with Disabilities
JUN 2020
52.222-37
Employment Reports on Veterans
JUN 2020
52.222-40
Notification of Employee Rights Under the National Labor Relations Act
DEC 2010
52.222-50
Combating Trafficking in Persons
NOV 2021
52.222-54
Employment Eligibility Verification
MAY 2022
52.223-3
Hazardous Material Identification And Material Safety Data
FEB 2021
52.223-12
Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air Conditioners.
MAY 2024
52.223-20
Aerosols
MAY 2024
52.223-21
Foams
MAY 2024
52.225-13
Restrictions on Certain Foreign Purchases
FEB 2021
52.226-1
Utilization Of Indian Organizations And Indian-Owned Economic Enterprises
JUN 2000
52.226-7
Drug-Free Workplace
MAY 2024
52.226-8
Encouraging Contractor Policies To Ban Text Messaging While Driving
MAY 2024
52.227-1
Authorization and Consent
JUN 2020
52.227-2
Notice And Assistance Regarding Patent And Copyright Infringement
JUN 2020
52.227-3
Patent Indemnity
APR 1984
52.229-3
Federal, State And Local Taxes
FEB 2013
52.229-12
Tax on Certain Foreign Procurements
FEB 2021
52.232-1
Payments
APR 1984
52.232-8
Discounts For Prompt Payment
FEB 2002
52.232-9
Limitation On Withholding Of Payments
APR 1984
52.232-11
Extras
APR 1984
52.232-17
Interest
MAY 2014
52.232-18
Availability Of Funds
APR 1984
52.232-23 Alt I
Assignment of Claims (May 2014) - Alternate I
APR 1984
52.232-25
Prompt Payment
JAN 2017
52.232-33
Payment by Electronic Funds Transfer--System for Award Management
OCT 2018
52.232-39
Unenforceability of Unauthorized Obligations
JUN 2013
52.232-40
Providing Accelerated Payments to Small Business Subcontractors
MAR 2023
52.233-1 Alt I
Disputes (May 2014) - Alternate I
DEC 1991
52.233-3
Protest After Award
AUG 1996
52.233-4
Applicable Law for Breach of Contract Claim
OCT 2004
52.242-2
Production Progress Reports
APR 1991
52.242-13
Bankruptcy
JUL 1995
52.244-2
Subcontracts
JUN 2020
52.244-6
Subcontracts for Commercial Products and Commercial Services
FEB 2024
52.245-1
Government Property
SEP 2021
52.245-9
Use And Charges
APR 2012
52.247-63
Preference For U.S. Flag Air Carriers
JUN 2003
52.248-1
Value Engineering
JUN 2020
52.249-2
Termination For Convenience Of The Government (Fixed-Price)
APR 2012
52.249-8
Default (Fixed-Price Supply & Service)
APR 1984
252.203-7000
Requirements Relating to Compensation of Former DoD Officials
SEP 2011
252.203-7001
Prohibition On Persons Convicted of Fraud or Other Defense-Contract-Related Felonies
JAN 2023
252.203-7002
Requirement to Inform Employees of Whistleblower Rights
DEC 2022
252.203-7003
Agency Office of the Inspector General
AUG 2019
252.203-7004
Display of Hotline Posters
JAN 2023
252.204-7000
Disclosure Of Information
OCT 2016
252.204-7003
Control Of Government Personnel Work Product
APR 1992
252.204-7012 (Dev)
Safeguarding Covered Defense Information and Cyber Incident Reporting (DEVIATION 2024-O0013 REVISION 1)
MAY 2024
252.204-7015
Notice of Authorized Disclosure of Information for Litigation Support
JAN 2023
252.204-7018
Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services
JAN 2023
252.204-7020
NIST SP 800-171 DoD Assessment Requirements
NOV 2023
252.205-7000
Provision Of Information To Cooperative Agreement Holders
JUN 2023
252.209-7004
Subcontracting With Firms That Are Owned or Controlled By The Government of a Country that is a State Sponsor of Terrorism
MAY 2019
252.215-7010
Requirements for Certified Cost or Pricing Data and Data Other Than Certified Cost or Pricing Data
JUN 2024
252.217-7003
Changes
DEC 1991
252.217-7004
Job Orders and Compensation
MAY 2006
252.217-7007
Payments
DEC 1991
252.217-7008
Bonds
DEC 1991
252.217-7009
Default
DEC 1991
252.217-7010
Performance
JUL 2009
252.217-7011
Access to Vessel
DEC 1991
252.217-7012
Liability and Insurance
AUG 2003
252.217-7014
Discharge of Liens
DEC 1991
252.217-7015
Safety and Health
DEC 1991
252.217-7016
Plant Protection
DEC 1991
252.217-7028
Over And Above Work
DEC 1991
252.222-7006
Restrictions on the Use of Mandatory Arbitration Agreements
JAN 2023
252.223-7002
Safety Precautions for Ammunition and Explosives
NOV 2023
252.223-7004
Drug Free Work Force
SEP 1988
252.223-7008
Prohibition of Hexavalent Chromium
JAN 2023
252.223-7998 (Dev)
Prohibition on Procurement of Certain Items Containing Perfluorooctane Sulfonate or Perfluorooctanoic Acid (DEVIATION 2022-O0010)
SEP 2022
252.225-7001
Buy American and Balance of Payments Program
FEB 2024
252.225-7002
Qualifying Country Sources As Subcontractors
MAR 2022
252.225-7004
Report of Intended Performance Outside the United States and Canada--Submission after Award
OCT 2020
252.225-7008
Restriction on Acquisition of Specialty Metals
MAR 2013
252.225-7009
Restriction on Acquisition of Certain Articles Containing Specialty Metals
JAN 2023
252.225-7012
Preference For Certain Domestic Commodities
APR 2022
252.225-7013
Duty-Free Entry--Basic
NOV 2023
252.225-7015
Restriction on Acquisition of Hand Or Measuring Tools
JUN 2005
252.225-7016
Restriction on Acquisition of Ball and Roller Bearings
JAN 2023
252.225-7019
Restriction on Acquisition of Anchor and Mooring Chain
JUN 2024
252.225-7048
Export-Controlled Items
JUN 2013
252.225-7052
Restriction on the Acquisition of Certain Magnets, Tantalum, and Tungsten.
MAY 2024
252.225-7056
Prohibition Regarding Business Operations with the Maduro Regime
JAN 2023
252.225-7058
Postaward Disclosure of Employment of Individuals Who Work in the People's Republic of China
JAN 2023
252.225-7060
Prohibition on Certain Procurements from the Xinjiang Uyghur Autonomous Region
JUN 2023
252.225-7063
Restriction on Acquisition of Components of T-AO 205 and T-ARC Class Vessels.
JUN 2024
252.225-7967 (Dev)
Prohibition Regarding Russian Fossil Fuel Business Operations (Deviation 2024-O0006).
MAR 2024
252.225-7972 (Dev)
Prohibition on the Procurement of Foreign-Made Unmanned Aircraft Systems (DEVIATION 2020-O0015)
MAY 2020
252.226-7001
Utilization of Indian Organizations, Indian-Owned Economic Enterprises, and Native Hawaiian Small Business Concerns
JAN 2023
252.227-7013
Rights in Technical Data--Other Than Commercial Products and Commercial Services
MAR 2023
252.227-7015
Technical Data--Commercial Products and Commercial Services
MAR 2023
252.227-7016
Rights in Bid or Proposal Information
JAN 2023
252.227-7017
Identification and Assertion of Use, Release, or Disclosure Restrictions
JAN 2023
252.227-7025