This document outlines government deployment property and personal protective equipment requirements to support unmanned aircraft system operations onboard host cutters for the Department of Homeland Security US Coast Guard. The contractor must coordinate with host cutter property custodians to obtain floating coats, life preserver vests, hearing protection, safety goggles, secure encrypted hard drives, tie down chains, tie down ratchet straps, communication security loaders, headset equipment, desk curtains, portable radios, and crane services as needed for on-load and off-load activities. Items 1 through 12 will be provided initially for UAS installation and then maintained by cutter custodians for contractor use on deployments. The contractor must return all equipment to custodians after each patrol, noting any discrepancies. The solicitation number is 70Z02323R9313000X for Group II and Group III unmanned aircraft systems support on Coast Guard host cutters.
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment: J-11
Host Cutter Deployment Property Nomenclature Quantity
1 Float Coat (Type-1 Personal Floatation Device) 7
2 Flight Deck Crew Cranial Helmets 7
3 Flight Deck Crew Life Preserver Vest (Inflatable) 7
4 Hearing Protection 7
5 Safety Goggles 7
6 Secure Encrypted Hard Drive 2
7 Tie Down Chains 14
8 Tie Down Ratchet Straps 10
9 Communication Security (COMSEC) Loaders 2
10 Keyswitch Integrated Terminal Equipment (KITE) Phone Headset and 100’ cable 1
11 Operation Center curtain for desk 1
12 Portable, XG-75, 378-470 MHz handheld radios 3
13 Crane services to support any Government directed on-load/off-load ASREQ
• The Contractor must coordinate with the host cutter property custodian to obtain Government
Deployment Property (GDP) and Personal Protective Equipment (PPE) necessary to support UAS operations onboard the host cutter. Post patrol, the Contractor must return all GDP and PPE to the host cutter property custodian prior to Contractor detachment departure, noting any material or operational discrepancies.
• Items 1-12 were provided to the host cutter at the completion of UAS installation as a one-time initial disbursement. Cutter property custodians will maintain GDP in accordance with applicable
USCG guidelines.
• Items 1-12 will be provided to the Contractor for use while deployed onboard the host cutter by the property custodian.
• Item 13 Government-provided crane service during installation/de-installation, UAS deployment on-load/off-load, and any other activity requiring crane services as directed by the Government.
Any on-load/off-load at the convenience of the Contractor will not be coordinated nor paid for by the Government.