This is a Draft Performance Work Statement (PWS) for custodial, pest control, and grounds maintenance services at U.S. Marine Corps Air Station (MCAS) Iwakuni, Japan. The contract requires a contractor to provide comprehensive facility support services across 18 annexes, including general information, management and administration, and specific service areas such as custodial, pest control, and grounds maintenance. The work will be performed at MCAS Iwakuni and outlying areas like Atago Hills, Atago Sports Complex, and SOFU Communication Site.
The solicitation is currently in a Sources Sought Notice phase, seeking market research from qualified firms to support future procurement. Interested companies must be authorized to operate in Japan, comply with local laws and regulations, and submit a completed Sources Sought Contractor Information Form by 30 July 2025 at 14:00 Japan Standard Time. The contract is performance-based, relying on the contractor's expertise to determine the most effective service delivery methods. The North American Industry Classification System (NAICS) code for this procurement is 561210 Facility Support Services, and respondents are required to demonstrate previous experience in similar service areas.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Encl 2_Contractor Information Sheet_25QXXXX.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
0100000 – General Information
Table of Contents
Spec Item Title
1 General Information
1.1 Outline of Services
1.2 Acquisition of Additional Work
1.3 Background Information
1.4 Navy PBSA Approach
1.5 Standard Template
1.6 Related Information
1.7 Verification of Workload and Conditions
1.8 Contractor's Knowledge
1.9 Technical Proposal Certification
Spec Item Title Description
1 General Information
1.1 Outline of Services Except where otherwise stated, the Contractor shall furnish all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items necessary to provide the services outlined below and described in this Performance Work
Statement (PWS) at U.S. Marine Corps Air Station (MCAS) Iwakuni, Japan and outlying areas supported by the Installation, including Atago
Hills, Atago Sports Complex, and SOFU Communication Site by means of a performance-based contract that is comprised of both Recurring Work and Non-Recurring Work Items.
The PWS is organized into annexes. Annex 1 is "General Information".
Annex 2 contains the on-site project management and administration requirements. Annexes 3 through 18 contain the technical requirements.
The annex numbers are identified as 1 through 18 in the description column, but the fully expanded annex numbers include seven digits (e.g., Annex 1 expanded number is 0100000 as shown in the header row at the top of this page).
Annex 1 General Information
0100000 General Information
Annex 2 Management and Administration
0200000 Management and Administration
Annex 3 Command and Staff
Annex 4 Public Safety
Annex 5 Air Operations
Annex 6 Port Operations
Annex 7 Ordnance
Annex 8 Range Operations
Annex 9 Health Care Support
Annex 10 Supply
Annex 11 Personnel Support
Annex 12 Morale, Welfare and Recreation Support
Annex 13 Galley
Annex 14 Housing
Annex 15 Facilities Support
1503010 Custodial
1503020 Pest Control
1503050 Grounds Maintenance and Landscaping
Annex 16 Utilities
Annex 17 Transportation
Annex 18 Environmental
1.2 Acquisition of
Additional Work
The Government reserves the right to acquire additional services at additional locations, within the scope of the annexes and areas included in
Spec Item 1.1 Outline of Services, in addition to the services and locations identified in the requirements of this contract. Additional services will be incorporated into the contract in accordance with the CHANGES clause, SECTION I or ordered under the non-recurring work provisions of the contract. Items of work not covered by this contract but within the general intent are considered in the scope of this contract.
1.3 Background Information The intent of this solicitation is to obtain custodial, grounds maintenance, and pest control services to maintain a safe and comfortable environment in and around MCAS Iwakuni facilities. The contract is a performance-based specification relying on the Contractor’s experience and expertise determining the best method of providing these services.
MCAS Iwakuni home page can be found using the following link:
http://www.mcasiwakuni.marines.mil/.
1.4 Navy PBSA Approach The Navy’s approach to performance-based service acquisition (PBSA) includes four component parts, which are:
1) performance outcomes
2) measurable standards
3) consideration of incentives
4) performance assessment plan
1.5 Standard Template Key to implementing the PBSA approach is using a standard template that ensures Navy-wide consistency yet affords appropriate tailoring to meet local needs.
The standard template contains 18 standard annexes. Annex 1 will always contain General Information that is relevant to the entire scope of the contract. Annex 2 contains Management and Administration requirements that are relevant to the entire scope of the contract. Annexes 3 through 18 and their associated sub-annexes contain the General Information, Management and Administration requirements, Performance Objectives, Related Information, and Performance Standards that are relevant to that technical annex. Except where otherwise stated, Annexes 3 through 18 and their associated sub-annex requirements are not relevant to one another. Within each technical annex and sub-annex, the organization of information and requirements are also standardized. Specification Item 1 will always contain General Information. Specification Item 2 will always contain the Management and Administrative requirements. Specification
Item 3 will always contain the Recurring Work requirements.
Specification Item 4 will always contain the Non-Recurring Work requirements. Requirements and standards for higher level specification items apply to all subordinate specification items, e.g., Specification Item
3 standards apply to all recurring work specification items. Specification
Item 3.1 is applicable to all 3.1 subordinate specification items.
Specification Items 3.2 and 3.3 are not considered subordinate to 3.1 nor are they considered subordinate to one another. All costs associated with
Annexes 1 and 2 and Specification Items 1 and 2 shall be priced, and their price shall be allocated pro rata share to the Exhibit Line Items.
1.6 Related Information There are four types of Related Information that can be found in the
Description and Related Information columns of the specification as follows:
Informational Notes as used throughout this PWS provides additional information to offerors’ to be used in developing a thorough understanding of the work to be performed in this contract. Any block of text marked
“Informational Notes” throughout Annexes 1 through 18 and their associated sub-annexes are subject to this disclaimer. Offerors’ may not rely upon the "Informational Notes" as material representations of the
Government. Information provided in "Informational Notes" does not create a contractually binding requirement on either party.
Clarifying Information describes client expectations in a more detailed manner than the Performance Objective and Performance standard alone.
http://www.mcasiwakuni.marines.mil/
Constraining Information describes limitations to the work performed to meet the Performance Objective and Performance Standard.
Requirement Information further describes client requirements associated with each Performance Objective.
1.7 Verification of
Workload and
Conditions
Throughout the PWS, the workload data is generally referred to as being located in Sections C and J. Section C provides data such as descriptions, specifications, and the statement of work. Section J provides data such as system descriptions, maps, floor plans, and tables to represent the type and location of services to be provided.
All facilities, systems, and assets identified in this contract shall be accepted by the Contractor in "AS-IS" condition. The Contractor is fully responsible for all work up to and including the limits of liabilities specified.
As prescribed in FAR 52.237-1, offerors’ or quoters are urged and expected to inspect the site where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance, to the extent that the information is reasonably obtainable. In no event shall failure to inspect the site constitute grounds for a claim after contract award.
1.8 Contractor's Knowledge The Navy expects to receive insightful management from its contractors.
This management shall include the knowledge, skills, authority and willingness to use contractor resources to find better ways of serving Navy clients’ strategic and operational goals and objectives. The Navy's use of performance-based objectives evidences this principle. Although performance work statements will typically contain several levels of performance assessment, the Navy wants its contractors to exercise maximum discretion within bounds of prudent risk management to adjust processes and resources needed to reach specified objectives at the highest performance level.
1.9 Technical Proposal
Certification
The Contractor warrants that its proposal including, but not limited to, proposed approaches, staffing, methodology, or work plans, will meet the performance objectives and standards set forth in this contract during execution thereof. The Contractor is not excused from meeting such performance objectives and standards in the event such proposal proves inadequate as conceived or executed to meet such performance objectives and standards. The Contractor understands that it bears all of the cost and performance risk associated with adopting acceptable additional (and/or alternative) means or methods of meeting the performance objectives and standards.
Spec Item Title
1 General Information
1.1 Outline of Services
1.2 Acquisition of Additional Work
1.3 Background Information
1.4 Navy PBSA Approach
1.5 Standard Template
1.6 Related Information
1.7 Verification of Workload and Conditions
1.8 Contractor's Knowledge
1.9 Technical Proposal Certification
1 General Information
1.1 Outline of Services Except where otherwise stated, the Contractor shall furnish all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items necessary to provide the services outlined below and described in this Performance Work
Statement (PWS) at U.S. Marine Corps Air Station (MCAS) Iwakuni, Japan and outlying areas supported by the Installation, including Atago
Hills, Atago Sports Complex, and SOFU Communication Site by means of a performance-based contract that is comprised of both Recurring Work and Non-Recurring Work Items.
The PWS is organized into annexes. Annex 1 is "General Information".
Annex 2 contains the on-site project management and administration requirements. Annexes 3 through 18 contain the technical requirements.
The annex numbers are identified as 1 through 18 in the description column, but the fully expanded annex numbers include seven digits (e.g., Annex 1 expanded number is 0100000 as shown in the header row at the top of this page).
Annex 1 General Information
0100000 General Information
Annex 2 Management and Administration
0200000 Management and Administration
Annex 3 Command and Staff
Annex 4 Public Safety
Annex 5 Air Operations
Annex 6 Port Operations
Annex 7 Ordnance
Annex 8 Range Operations
Annex 9 Health Care Support
Annex 10 Supply
Annex 11 Personnel Support
Annex 12 Morale, Welfare and Recreation Support
Annex 13 Galley
Annex 14 Housing
Annex 15 Facilities Support
1503010 Custodial
1503020 Pest Control
1503050 Grounds Maintenance and Landscaping
Annex 16 Utilities
Annex 17 Transportation
Annex 18 Environmental
1.2 Acquisition of
Additional Work
The Government reserves the right to acquire additional services at additional locations, within the scope of the annexes and areas included in
Spec Item 1.1 Outline of Services, in addition to the services and locations identified in the requirements of this contract. Additional services will be incorporated into the contract in accordance with the CHANGES clause, SECTION I or ordered under the non-recurring work provisions of the contract. Items of work not covered by this contract but within the general intent are considered in the scope of this contract.
1.3 Background Information The intent of this solicitation is to obtain custodial, grounds maintenance, and pest control services to maintain a safe and comfortable environment in and around MCAS Iwakuni facilities. The contract is a performance-based specification relying on the Contractor’s experience and expertise determining the best method of providing these services.
MCAS Iwakuni home page can be found using the following link:
http://www.mcasiwakuni.marines.mil/.
1.4 Navy PBSA Approach The Navy’s approach to performance-based service acquisition (PBSA) includes four component parts, which are:
1) performance outcomes
2) measurable standards
3) consideration of incentives
4) performance assessment plan
1.5 Standard Template Key to implementing the PBSA approach is using a standard template that ensures Navy-wide consistency yet affords appropriate tailoring to meet local needs.
The standard template contains 18 standard annexes. Annex 1 will always contain General Information that is relevant to the entire scope of the contract. Annex 2 contains Management and Administration requirements that are relevant to the entire scope of the contract. Annexes 3 through 18 and their associated sub-annexes contain the General Information, Management and Administration requirements, Performance Objectives, Related Information, and Performance Standards that are relevant to that technical annex. Except where otherwise stated, Annexes 3 through 18 and their associated sub-annex requirements are not relevant to one another. Within each technical annex and sub-annex, the organization of information and requirements are also standardized. Specification Item 1 will always contain General Information. Specification Item 2 will always contain the Management and Administrative requirements. Specification
Item 3 will always contain the Recurring Work requirements.
Specification Item 4 will always contain the Non-Recurring Work requirements. Requirements and standards for higher level specification items apply to all subordinate specification items, e.g., Specification Item
3 standards apply to all recurring work specification items. Specification
Item 3.1 is applicable to all 3.1 subordinate specification items.
Specification Items 3.2 and 3.3 are not considered subordinate to 3.1 nor are they considered subordinate to one another. All costs associated with
Annexes 1 and 2 and Specification Items 1 and 2 shall be priced, and their price shall be allocated pro rata share to the Exhibit Line Items.
1.6 Related Information There are four types of Related Information that can be found in the
Description and Related Information columns of the specification as follows:
Informational Notes as used throughout this PWS provides additional information to offerors’ to be used in developing a thorough understanding of the work to be performed in this contract. Any block of text marked
“Informational Notes” throughout Annexes 1 through 18 and their associated sub-annexes are subject to this disclaimer. Offerors’ may not rely upon the "Informational Notes" as material representations of the
Government. Information provided in "Informational Notes" does not create a contractually binding requirement on either party.
Clarifying Information describes client expectations in a more detailed manner than the Performance Objective and Performance standard alone.
http://www.mcasiwakuni.marines.mil/
Constraining Information describes limitations to the work performed to meet the Performance Objective and Performance Standard.
Requirement Information further describes client requirements associated with each Performance Objective.
1.7 Verification of
Workload and
Conditions
Throughout the PWS, the workload data is generally referred to as being located in Sections C and J. Section C provides data such as descriptions, specifications, and the statement of work. Section J provides data such as system descriptions, maps, floor plans, and tables to represent the type and location of services to be provided.
All facilities, systems, and assets identified in this contract shall be accepted by the Contractor in "AS-IS" condition. The Contractor is fully responsible for all work up to and including the limits of liabilities specified.
As prescribed in FAR 52.237-1, offerors’ or quoters are urged and expected to inspect the site where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance, to the extent that the information is reasonably obtainable. In no event shall failure to inspect the site constitute grounds for a claim after contract award.
1.8 Contractor's Knowledge The Navy expects to receive insightful management from its contractors.
This management shall include the knowledge, skills, authority and willingness to use contractor resources to find better ways of serving Navy clients’ strategic and operational goals and objectives. The Navy's use of performance-based objectives evidences this principle. Although performance work statements will typically contain several levels of performance assessment, the Navy wants its contractors to exercise maximum discretion within bounds of prudent risk management to adjust processes and resources needed to reach specified objectives at the highest performance level.
1.9 Technical Proposal
Certification
The Contractor warrants that its proposal including, but not limited to, proposed approaches, staffing, methodology, or work plans, will meet the performance objectives and standards set forth in this contract during execution thereof. The Contractor is not excused from meeting such performance objectives and standards in the event such proposal proves inadequate as conceived or executed to meet such performance objectives and standards. The Contractor understands that it bears all of the cost and performance risk associated with adopting acceptable additional (and/or alternative) means or methods of meeting the performance objectives and standards.
0200000 – Management and Administration
Spec Item Title
2 Management and Administration
2.1 Definitions and Acronyms
2.2 General Information
2.2.1 Government Regular Working Hours
2.2.1.1 Observed Federal Holidays
2.2.1.2 Restriction to Contractor Working Hours
2.2.2 Requirements Hierarchy
2.3 General Administrative Requirements
2.3.1 Required Conferences and Meetings
2.3.2 Partnering
2.3.2.1 Informal Partnering
2.3.2.2 Contract Partnering Administration
2.3.2.3 Contract Partnering Session Attendees
2.3.3 Permits and Licenses
2.3.4 Insurance
2.3.45.1 Certificate of Insurance
2.3.45.2 Minimum Insurance Amounts
2.3.5 Protection of Government Property
2.3.6 Directives, Instructions, and References
2.3.7 Invoicing Procedures
2.3.8 Forms
2.3.9 Performance Evaluation
2.4 Government-Furnished Items
2.4.1 Government-Furnished Property (GFP)
2.4.2 Government-Furnished Facilities (GFF)
2.4.3 Government-Furnished Vehicles and Equipment
2.4.4 Government-Furnished Utilities
2.5 Contractor-Furnished Items
2.6 Management
2.6.1 Work Reception
2.6.2 Work Control
2.6.3 Work Schedule
2.6.4 Deliverables
2.6.5 Service Interruptions
2.6.6 Quality Management System (QMS)
2.6.6.1 Quality Management (QM) Plan
2.6.6.2 Quality Inspection and Surveillance
2.6.6.3 Quality Inspection and Surveillance Report
2.6.7 Property Management Plan
2.7 Personnel Requirements
2.7.1 Key Personnel
2.7.1.1 Project Manager (PM)
2.7.1.2 Quality Manager (QM)
2.7.1.3 Site Safety and Health Officer (SSHO)
2.7.1.4 Environmental Manager
2.7.2 Employee Requirements
2.7.2.1 Employee Certification and Training
2.7.2.2 Employee Appearance
2.7.2.3 Employee Conduct
2.7.2.4 Identification as Contractor Employee
Spec Item Title
2.7.2.5 Removal of Employees
2.7.2.6 Proof of Legal Residency
2.7.3 Service Contract Reporting (SCR)
2.8 Security Requirements
2.8.1 Employee Listing
2.8.2 Vehicles
2.8.3 Passes and Badges
2.8.4 Access to Installation
2.8.4.1 DBIDS Program
2.8.4.2 DBIDS Credentials
2.8.5 Access to Buildings
2.8.6 Access Arrangements
2.8.6.1 Escort Arrangement for Secured Areas
2.8.7 Security Clearances
2.8.8 Employee Status
2.8.9 Permission to Use a Camera
2.8.10 Permission to Use a Commercial Radio Transmitter
2.8.11 Permission to Use Heavy Equipment
2.9 Contractor Safety Program
2.9.1 Accident Prevention Plan (APP)
2.9.2 Activity Hazard Analysis (AHA)
2.9.3 Safety and Occupational Health (SOH) Risks and Compliance Plans
2.9.3.1 Alcohol and Drug Abuse Prevention Plan
2.9.3.2 Chemical Hazard Communication Program
2.9.3.3 Confined Space Program
2.9.3.4 Critical Lift Plan
2.9.3.5 Fall Prevention and Protection Plan
2.9.3.6 Pathogen Exposure
2.9.4 Crane Operations
2.9.4.1 Crane Inspections
2.9.4.2 Rigging Gear
2.9.4.3 Crane Operators
2.9.5 Accident and Damage Reporting
2.9.5.1 Accident Reporting and Notification Criteria
2.9.6 Fire Protection
2.9.7 Monthly On-Site Labor Report
2.9.8 OSHA and/or Japanese Labor Standards Inspection Office (LSIO) Citations and Violations
2.9.9 Safety Inspections and Monitoring
2.9.10 Safety Certification
2.9.11 Safety Apparel on Jobsites
2.9.12 Emergency Medical Treatment
2.9.13 Excavations
2.10 Environmental Management and Sustainability
2.10.1 Energy Management Program
2.10.1.1 Water Conservation Plan
2.10.1.2 Energy Efficient Products
2.10.2 Environmental Protection
2.10.2.1 Sampling, Testing and Laboratory Services
2.10.2.2 Solid Waste Management and Recycling
2.10.2.3 Non-Regulated Waste Disposal
Spec Item Title
2.10.2.4 Regulated Waste Disposal
2.10.2.5 Spill Prevention, Containment, and Clean-up
2.10.2.6 Hazardous Material Management
2.10.2.7 Protection of Endangered and Threatened Species (Flora and Fauna)
2.10.2.8 Noise Control
2.10.2.9 Asbestos Containing Material (ACM)
2.10.3 Sustainable Procurement and Practices
2.10.3.1 Environmentally Preferable Products
2.10.3.2 Use of Recovered Materials
2.10.3.3 Use of Biobased Products
2.11 Disaster Preparedness
2.12 Technical Library
2.13 Warranty Management
2.14 Recurring Work Procedures
2.14.1 Recurring Work Preparation of Proposals
2.14.2 Notification to the Government for Work Above the Recurring Work Limitations
2.14.3 Recurring Work Exhibit Line Item Numbers (ELINs)
2.15 Non-Recurring Work
2.15.1 Unit Priced Task (UPT) Work (Non-Negotiated)
2.15.1.1 Acceptance and Performance
2.15.1.2 Invoicing and Receiving Payment
2.15.2 Unit Priced Labor (UPL) Work (Negotiated)
2.15.2.1 Non-recurring Work Preparation of Proposals
2.15.2.1.1 Labor Requirements
2.15.2.1.2 Direct Material and Construction Equipment Requirements
2.15.2.2 Blanket Task Order (BTO)
2.15.2.3 Issuance of Final Task Order
2.15.3 Non-Recurring Work ELINs
0200000 - Management and Administration
2 Management and
Administration
2.1 Definitions and
Acronyms
Definitions and Acronyms are listed in J-0200000-01.
2.2 General
Information
2.2.1 Government
Regular Working
Hours
The Government's regular working hours are from 0800-1630, five days per week, Monday through Friday, except observed Federal holidays. Exceptions to the regular hours of operation are detailed in subsequent sections of this performance work statement (PWS). Work in certain annexes or sub-annexes require Contractor continuous operations, 24 hours a day, every day of the year including holidays. The performance of other work requirements shall be accomplished within the Government’s regular working hours unless the specific work requirement specified herein necessitates otherwise. Any other work outside Government regular working hours must be authorized by the
Government prior to commencement of work.
2.2.1.1 Observed Federal
Holidays
The Government observes the following holidays:
− New Year’s Day − Martin Luther King Jr.’s Birthday
− President’s Day − Memorial Day
− Juneteenth National Independence Day
− Independence Day − Labor Day
− Columbus Day − Veterans’ Day
− Thanksgiving Day − Christmas Day
2.2.1.2 Restriction to
Contractor
Working Hours
The Contractor’s regular working hours for this contract are from 0630-1900, Sunday through Saturday, including holidays. Refer to Spec Item 2.8.4 for work outside the Contractor’s regular working hours.
If the Contractor wishes to work outside of the Government's regular working hours for the Contractor’s convenience, the Contractor shall submit a written
Request to Work Outside Government’s Regular Working Hours per Section F. Excludes work to be performed during specified hours. Any services performed outside the Government’s regular working hours shall be provided at no additional cost to the Government.
2.2.2 Requirements
Hierarchy
Requirements or definitions specified in each spec item of this contract apply to subordinate paragraphs. For example, requirements shown in spec item 3.1 would apply to spec items 3.1.1, 3.1.2, 3.1.2.1 and so on.
Likewise, Performance Standards specified at a lower digit level (i.e. spec item 3.1.1, 3.1.2, 3.1.2.1) apply when performance is assessed at a higher tier
(i.e., spec item 3.1) based on the composite work requirements.
2.3 General
Administrative
Requirements
2.3.1 Required
Conferences and
Meetings
The Contractor shall attend administrative and coordination meetings. The Contractor shall provide sign-in sheets and prepare minutes of all meetings and submit per Section F for review and comments. Comments received within two working days shall be incorporated into the minutes and a copy of the final revision shall be submitted per Section F for concurrence.
Required meetings may be held remotely as directed by the KO.
2.3.2 Partnering The Government requires cohesive partnerships with its Contractors and subcontractors. Key stakeholders, including the supported commands who may receive services, principal individuals from Naval Facilities Engineering
Systems Command (NAVFAC), the performance assessment team, and representative(s) of the installation(s) will be invited to participate in the partnering process. Key members of the prime and sub-contractor teams, including senior management personnel must participate. The partnership will draw on the strength of each organization in an effort to achieve quality contract services done right the first time, within the contract price, as scheduled, and without any safety mishaps. NAVFAC P-204 Facility
Support Contracts Partnering Guide contains the framework necessary for consistent implementation of partnering for Facility Support Contracts
(FSCs).
2.3.2.1 Informal Partnering The KO shall organize the initial Partnering Meeting with key personnel of the project team, including Contractor's personnel and Government personnel.
The initial session will be scheduled concurrent with the Pre-Performance
Conference and held no later than 30 days after award and will be held at a
Government-provided facility as designated by the KO.
The Initial Informal Partnering Session will be conducted and facilitated using electronic media (a video and accompanying forms) provided by KO.
The senior Government stakeholder present will lead the meeting, however, the Contractor’s Project Manager (PM) or senior representative is encouraged to participate as co-lead.
The Partners will determine the frequency of the follow-on sessions.
2.3.2.2 Contract Partnering
Administration
Upon award, the Administrative Contracting Officer (ACO) will contact the
Contractor, supported command(s), Region, and Installation(s) stakeholders, and the performance assessment team to discuss implementation of partnering.
A partnership agreement, The Charter, should be in place as early as possible so issues arising, even before work begins, can be resolved using the issues resolution process.
Replacement of Core Management Team members (stakeholders who attended the initial session and manage the contract work day-to-day) is discouraged since it will disrupt the synergy that has been developed. If replacement of a team member proves to be unavoidable, a follow-on partnering session must be held to officially turn the responsibilities of the position over to the new member.
The Core Management Team consisting of the attendees below must be present during the initial and all follow-on partnering sessions. These are the core mandatory attendees. Other stakeholders may attend if they desire or as recommended by the partners.
2.3.2.3 Contract Partnering
Session Attendees
The Contractor shall bring the necessary personnel to successfully partner on this contract. Asterisk indicates mandatory personnel.
President/Vice President
* Project Manager (PM)
* Quality Manager (QM)
Site Safety and Health Officer (SSHO)
2.3.3 Permits and
Licenses
The Contractor shall obtain all required permits, licenses, and authorizations to perform work under this contract and comply with the Japan
Environmental Governing Standards (JEGS) and all the applicable Federal, host nation (Japanese), prefecture, and local laws and regulations. The
Contractor shall submit copies of Permits and Licenses per Section F.
2.3.4 Insurance The Contractor shall submit a Certificate of Insurance per Section F as evidence of the existence of the following insurance coverage in amounts not less than the amounts specified below in accordance with the Federal
Acquisition Regulation (FAR) Clause 52.228-5, INSURANCE – WORK ON
A GOVERNMENT INSTALLATION. This insurance must be maintained during the performance period.
2.3.4.1 Certificate of
Insurance
The Certificate of Insurance shall provide for at least 30 calendar days written notice to the KO by the insurance company prior to cancellation or material change in policy coverage. Other requirements and information are contained in the aforementioned insurance clause. The Contractor shall submit cancellation or material change in policy coverage per Section F.
2.3.4.2 Minimum
Insurance Amounts
The Contractor shall procure and maintain, during the entire period of performance under this contract, the following minimum insurance coverage:
Comprehensive General Liability: ¥50,000,000 per occurrence
Automobile Liability: ¥20,000,000 per person, ¥50,000,000 per occurrence for bodily injury, ¥2,000,000 per occurrence for property damage
Workmen's Compensation: As required by Japanese worker's compensation and occupational disease statutes
Employer's Liability coverage: ¥10,000,000
Other as required by Japanese law
2.3.5 Protection of
Government
Property
During execution of the work, the Contractor shall protect Government property. The Contractor shall return areas damaged as a result of Contractor negligence under this contract to their original condition at no cost to the
Government.
2.3.6 Directives, Instructions, and
References
Department of Defense (DoD), Secretary of the Navy (SECNAV), Chief of
Naval Operations (OPNAV), and other applicable Directives, Instructions, and References are listed in J-0200000-02 and throughout the various
Performance Work Statements and their respective J Attachments. The Contractor shall comply with the most current version of directives, instructions, and references including versions published during the term of the contract.
Publications from U.S. Government agencies can be obtained from the
Federal Facility Criteria website at https://www.wbdg.org/ffc/federal-facility-criteria. The Contractor shall obtain commercial publications as required for their use and these publications shall remain the property of the Contractor.
2.3.7 Invoicing
Procedures
Refer to Section G for invoicing instructions. Refer to Invoice Form in J-
0200000-03 for sample.
Invoices shall be submitted in a format compatible with the most recent Government installed Microsoft Office Version (currently 365). Invoice data shall be capable of being sorted by CLIN, annex/sub-annex, spec item, spec item title, and Exhibit Line Item Numbers (ELIN)/Sub-ELIN.
2.3.8 Forms Forms referenced in this Annex, e.g. accident reporting, and damage reporting are included among the Forms in J-0200000-03.
2.3.9 Performance
Evaluation
The Contractor’s performance will be evaluated using the Contractor
Performance Assessment Reporting System (CPARS) located on the website https://www.wbdg.org/ffc/federal-facility-criteria https://www.wbdg.org/ffc/federal-facility-criteria https://www.cpars.gov. On-line training for Contractor personnel is available on the website.
Prior to commencement of work, the Contractor is required to provide the
Government with the name, phone number and e-mail address of the
“Contractor’s Representative” that will be responsible for receipt and review of draft performance evaluations prepared by the Government. It is the
Contractor’s responsibility to keep this contact information current and provide changes to the KO per Section F.
2.4 Government-
Furnished Items
Except for items identified below as Government-Furnished, the Contractor shall furnish all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items necessary to provide the services described in this PWS.
Government-Furnished Items will be provided in "AS-IS" condition and their use is at the option of the Contractor. The total or partial breakdown or failure of Government-Furnished Items shall not relieve the Contractor of the responsibility to perform the requirements of this contract.
The Contractor shall provide periodic servicing, maintenance, and repair of the Government-Furnished Items accepted for use at no additional cost to the
Government. Servicing, maintenance, and repair shall be provided in accordance with the manufacturer’s recommendations.
At the completion of the contract, all Government-Furnished Items shall be returned to the Government in the same condition as received, except for reasonable wear and tear. Government-Furnished Items, which becomes worn out due to normal wear and tear, shall be returned to the Government and its replacement shall be the responsibility of the Contractor at no additional cost to the Government. The Contractor shall be responsible for the cost of any repairs or replacement caused by Contractor negligence or abuse.
The Government may inspect Government-Furnished Items at any time and without notice.
2.4.1 Government-
Furnished Property
(GFP)
No Government-Furnished Property will be provided.
2.4.2 Government-
Furnished Facilities
(GFF)
The Government will make available to the Contractor certain facilities for use in connection with this contract. The use of these facilities for any other purposes is prohibited.
The Contractor shall be responsible and accountable for the facilities accepted for use and shall take adequate precautions to prevent fire hazards, odors, and vermin. Janitorial and refuse collection services for the facilities shall be provided by the Contractor. The Contractor shall obtain written acceptance from the KO prior to making any modifications or alterations to the facilities.
A list of the facilities that will be made available to the Contractor is provided in J-0200000-04.
2.4.3 Government-
Furnished Vehicles and Equipment
No Government-Furnished Vehicles or Equipment will be provided.
https://www.cpars.gov/
2.4.4 Government-
Furnished Utilities
The Government will make available water and electricity at existing outlets required for the work to be performed under the contract at no cost to the
Contractor. The Contractor shall provide and maintain, at its expense, the necessary service lines from the existing Government outlets to the work site to include meters acceptable by the Government. The Contractor shall submit a Utility and Storm Water Connection Permit Application per Section F. The application form is provided in J-0200000-03. Provide and maintain backflow prevention devices on connections to domestic water lines and electrical transformer provisions on connections to electric lines. Meet all
Federal, host nation (Japanese), local, and installation codes and regulations for backflow prevention devices and electrical transformer provisions.
Services required by the Contractor, for which there are no available
Government outlets, shall be provided by the Contractor at no cost to the
Government.
2.5 Contractor-
Furnished Items
Except for items identified as Government Furnished, the Contractor shall provide all equipment, materials, parts, supplies, components, and facilities to perform the requirements of this contract. The KO, Contracting Officer’s
Representative (COR), or Performance Assessment Representative (PAR) may inspect Contractor-furnished items for adequacy and compliance with contract requirements. Inadequate or unsafe items shall be removed and replaced by the Contractor at no cost to the Government. Materials containing asbestos, lead, and polychlorinated biphenyls (PCBs) shall not be brought onsite. Energy efficient tools and equipment shall be used when available. The KO may at any time require Samples, Safety Data Sheets
(SDS) or Manufacturer’s Data Cut Sheets of Materials used in this contract.
2.6 Management The Contractor shall manage the total work effort associated with the services required herein to meet the performance objectives and standards. Such management includes but is not limited to planning, scheduling, cost accounting, report preparation, establishing and maintaining records, and quality assurance. The Contractor shall provide a staff with the necessary management expertise to ensure performance objectives and standards are met.
2.6.1 Work Reception The Contractor shall provide the bilingual (English/Japanese) capability to receive, prioritize, correspond, and respond to work orders, Government inquiries and requests, and task orders during Government regular working hours and provide a point of contact (POC) at a local or toll free number who can perform the above function during other than Government regular working hours.
2.6.2 Work Control The Contractor shall implement all necessary work control procedures to ensure timely accomplishment of work requirements, as well as to permit tracking and reporting of work in progress. The Contractor shall plan and schedule work to assure material, labor, and equipment are available to complete work requirements within the specified time limits and in conformance with the quality standards established herein. Verbal scheduling and work status updates shall be provided when requested by the
Government. A status update of any item of work must be provided within two hours of the inquiry during regular working hours, and by 0800 the following work day for inquiries after regular working hours per Section F.
The Contractor shall provide work schedules for both Recurring and Non-
Recurring Work per Section F.
2.6.3 Work Schedule The Contractor's work shall not interfere with normal Government business.
In those cases where some interference is unavoidable, the Contractor shall minimize the impact and effects of the interference. The Contractor shall provide advance access of all of its work schedules to the Government. The
Contractor shall provide written notification of any difficulty in scheduling work due to Government controls, per Section F.
2.6.4 Deliverables Except where otherwise stated, deliverable requirements are specified in
Sections C, F, H, I, J, and within the Directives, Instructions, and References.
The Contractor shall submit accurate and complete documents within the specified timeframes. The Contractor shall revise/modify deliverables, as directed by the KO, at no additional cost to the Government. All Contractor submittals shall be in English or may be submitted in Japanese with English translations.
Except where otherwise specified, all deliverables shall be submitted electronically in a Microsoft Office 365 or Current Version compatible format. Deliverables shall include the company name, contract number, contract title, date, and shall be unprotected and capable of being sorted by
CLIN, work order number, asset number, section, annex/sub-annex, spec item and ELIN/Sub-ELIN or clause. All formulas shall be traceable. Refer to DoDI 5200.48 for marking requirements (as applicable).
Government acceptance of deliverables shall not relieve the Contractor of the responsibility for any error or omission which may exist in the deliverable, as the Contractor is responsible for all requirements of this contract.
2.6.5 Service
Interruptions
If any utilities or other services must be discontinued (even temporarily) due to scheduled contract work, the Contractor shall notify the KO, COR, affected tenants, and customers in accordance with local procedures. If the discontinued service is due to an emergency breakdown, the Contractor shall notify the KO, COR, affected tenants, and customers as soon as practicable.
2.6.6 Quality
Management
System (QMS)
The Contractor shall establish and maintain a complete QMS program in accordance with the provisions specified herein. The Contractor’s QMS program shall provide an effective and efficient means of identifying and correcting problems throughout the entire scope of operations. The Contractor's QMS program shall address:
• Accurate documentation of work processes, procedures, and output measures.
• A systematic procedure for assessing compliance with performance objectives and standards.
• Accurate documentation of quality inspections and surveillance conducted throughout the execution of work.
• Assessment-driven corrective actions and process adjustments as appropriate in a timely manner.
The Contractor QMS Pre-Performance Review Checklist for compliance with this requirement is provided in J-0200000-05.
2.6.6.1 Quality
Management (QM)
Plan
• The Contractor shall develop and submit a QM Plan per Section F. The
QM Plan shall describe the QMS methodology and approaches used under this contract. If any changes are made during the period of performance, the Contractor shall submit the revised QM Plan for acceptance, per Section F.
2.6.6.2 Quality Inspection
and Surveillance
The Contractor shall establish and maintain an inspection and surveillance system in accordance with the FAR Clause <<Note to Spec Writer: consult with your Installation Contracting Office (CON) to determine which clause will be used for the solicitation and choose one of the following: 52.246-4, INSPECTION OF SERVICES – FIXED PRICE or 52.212-4, CONTRACT
TERMS AND CONDITIONS – COMMERCIAL PRODUCTS AND
COMMERCIAL SERVICES, to ensure that the work performed conforms to the contract requirements. The Contractor shall document and maintain a file of all scheduled and performed inspections and surveillances, inspection and surveillance results, and dates and details of corrective and preventive actions. The quality inspection and surveillance file shall be the property of the Government and made available during the Government’s regular working hours. The file shall be submitted to the COR and PAR after completion/termination of the contract per Section F.
2.6.6.3 Quality Inspection
and Surveillance
Report
The Contractor shall submit a copy of the Contractor Quality Inspection and
Surveillance Report per Section F. The Government may adjust the frequency of the submittal based on the Contractor’s quality of performance.
2.6.7 Property
Management Plan
The Contractor shall establish and maintain a plan that meets the contract clause requirements of Specification Item 2.4, Government-Furnished Items, of this Annex. This plan shall identify the Contractor’s policies, procedures, and practices in receiving and performing physical inventories, key control, repairing and maintaining, preserving and protecting, and reporting the disposition of accepted government property in its possession. The Property
Management Plan shall be submitted per Section F.
2.7 Personnel
Requirements
The Contractor shall comply with the personnel requirements stated below:
2.7.1 Key Personnel The Contractor shall submit a List of Key Personnel and Qualifications per
Section F. The Contractor shall provide any additional information requested by the KO or COR necessary to validate their qualifications.
The Contractor shall submit an Organizational Chart per Section F for
Government acceptance, showing lines of authority of the key personnel and on-site supervisor(s) for this contract. The chart shall include names of personnel and their position title in this contract. As a minimum, include the
PM, QM, SSHO, Environmental Manager, interpreter(s), and on-site supervisor(s) and who they will report directly to for this contract. The key personnel shall be revised as applicable for the contract.
The Contractor shall provide complete resumes for proposed substitutes and any additional information requested by the KO. Proposed substitutes shall have comparable qualifications to those of the persons being replaced. The
KO will notify the Contractor within 15 calendar days after receipt of all required information of the consent on substitutions. No change in fixed unit prices may occur as a result of key personnel substitutions.
Key personnel shall be able to speak, read and comprehend English to the extent that they can perform the contract requirements and comply with installation emergency procedures or an interpreter shall be made available at no additional cost to the Government.
2.7.1.1 Project Manager
(PM)
The Contractor shall provide a PM and designated alternate, as applicable, who shall have full authority to act for the Contractor on all contract matters relating to this contract. The PM or alternate shall be on-site during the
Government's regular working hours and shall be available on-site within one hour after the Government's regular working hours.
The PM shall have at least three years of experience in managing a workforce providing services on contracts of similar size, scope and complexity.
2.7.1.2 Quality Manager
(QM)
The Contractor shall provide a QM or designated alternate who shall be on-site at all times when the Contractor is performing work during the
Government's regular working hours and shall be available on-site within two hours after the Government’s regular working hours. The QM or designated alternate shall report directly to a senior corporate official and shall not report directly to the PM. The QM shall not be the same person as the PM.
The QM or designated alternate shall have fulfilled the following pre-requisite training and experiences before being hired as the QM under this contract:
The QM or designated alternate shall have at least three years of experience in preparing and enforcing QMS programs on contracts of similar size, scope and complexity. The QM or designated alternate may be the same person as the SSHO.
2.7.1.3 Site Safety and
Health Officer
(SSHO)
The Contractor shall provide a Level 1 SSHO whose primary duty and responsibility is to prepare and enforce the Contractor’s safety program on this contract. The Level 1 SSHO shall ensure the requirements of EM 385-1-1 and 29 CFR 1926.16 are met for the project. The Level 1 SSHO or an equally qualified Designated Representative/alternate shall be on-site at all times when work is being performed to implement and administer the
Contractor's safety program and government-accepted Accident Prevention
Plan (APP). The Level 1 SSHO shall have fulfilled the pre-requisite qualification, training, continuous learning, and experiences describe in the
EM 385-1-1 before being hired as the Level 1 SSHO under this contract. The
Level 1 SSHO shall not be the same person as the PM, QM, or any other position other than the Level 1 SSHO.
Note: The Japan Construction Occupational Safety and Health Association
(JCOSHA) provides the construction site safety and health management course “KOUJI SHUNIN COURSE,” or “SHOCHOU COURSE,” which is an acceptable equivalent to the 30-hour OSHA safety class. This training can be viewed at the JCOSHA website.
http://www.kensaibou.or.jp or http://www.kensaibou.or.jp/eng/index.html
This training certificate is valid for five years from the date issued. The
SSHO shall maintain a current certificate. The refresher course is also an equivalent course after the initial training course has been completed.
2.7.1.4 Environmental
Manager
The Contractor shall provide an Environmental Manager whose duty and responsibility is to ensure Contractor operations adhere to the goals and policies of the MCAS Iwakuni Environmental Management System (EMS), and other specified Sustainability requirements affecting this contract. The Environmental Manager shall develop, implement and monitor environmental strategies, policies and programs that promote sustainable development and examine the contract activities to establish where improvements can be made and ensure compliance with environmental legislation.
The Environmental Manager shall have a minimum two years’ experience with environmental procedures similar to those of this contract; familiarity with EMSs; and knowledge of environmental regulations that are applicable to operations similar to those of this contract.
The Environmental Manager may be the same person as the PM, QM and/or
SSHO.
http://www.kensaibou.or.jp/ http://www.kensaibou.or.jp/eng/index.html
After contract award, when available and within the base period, the
Environmental Manager shall complete the environmental awareness training, which will be provided by the Government at no cost to the Contractor. After completing the training, the Environmental Manager shall in turn ensure all personnel within their organization working aboard the Installation are familiar and in compliance with the contents and requirements provided from the training in the performance of their daily work.
2.7.2 Employee
Requirements
The Contractor shall provide experienced, qualified, and capable personnel to perform the work in this contract. Personnel shall be fully knowledgeable of all safety, environmental, and energy requirements associated with the work they perform. The Contractor shall provide personnel who can speak, read, and comprehend English to the extent that they can perform the contract requirements and comply with installation emergency procedures, or an interpreter shall be furnished at no additional cost to the Government. An interpreter shall be available on-site within two hours after the Government request.
2.7.2.1 Employee
Certification and Training
The Contractor shall maintain personnel certification, training, and licensing records for employee requirements specified herein and within all technical annexes/sub-annexes. Certification, training, and licensing records shall be kept current and on file for the duration of the contract including all option periods. Records shall be made available for Government review within four hours of request.
The Contractor shall implement an ongoing training program that refreshes the safety skills, qualifications, and awareness of the Contractor workforce on a regular, periodic basis.
2.7.2.2 Employee
Appearance
The Contractor shall ensure that all employees present a professional appearance that is appropriate for their position. The KO reserves the right to determine the acceptability of any clothing worn. All
Contractor/subcontractor employees working under this contract shall be identified by a distinctive nameplate, emblem, or patch…