DRAFT Attachment II Price Schedule.xlsx

XLSX spreadsheet 29 KB Posted

Attached to
Exhibition Design and Fabrication in Support of the United States Coast Guard Museum
Solicitation number
70Z02322R09230001
Issued by

About this file

This document contains a draft price schedule template and statement of work for an exhibition design and fabrication services contract in support of the United States Coast Guard Museum. The solicitation requests proposals for design, engineering, fabrication, and conservation services to develop a 100% final design package for the fabrication of exhibits. Offerors must provide fully burdened labor rates for 62 labor categories covering project management, design, fabrication, installation, and conservation specialties. The price schedule also requires a firm fixed price for conservation services surveying 600 artifacts by December 2022. The final solicitation is expected to be released by August 22nd with a closing date of September 6th. The opportunity is available through the Department of Homeland Security and United States Coast Guard.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Tab1 FFP Burdened Rate

Attachment II Price Schedule
LABOR RATE TABLE FOR CONTRACT PRICING
INSTRUCTIONS: Offeror is to provide the the following:

1)Vendor Labor Category if different from Governmetn Labor Category

2) Fully burdened Labor Rates for each Ordering Period (If using a percentage for escallation include the formula)

3) The Overhead Rate, Material Rate, Loading Rate, or Applied Rate

NOTE: These rates would be used as contract awarded labor rates for the pricing on future task orders and to evluation Total Evaluated Pricing.

Government Labor CategoryVendor Labor CategoryOrdering Period 1Ordering Period 2Ordering Period 3Ordering Period 4Ordering Period 5Average Proposed Labor Rate
Fixed Hourly RateFixed Hourly RateFixed Hourly RateFixed Hourly RateFixed Hourly Rate
1Senior Project Manager IDIQ$0.00$0.00$0.00$0.00$0.00$0.00
2Project Manager$0.00$0.00$0.00$0.00$0.00$0.00
3Senior Designer$0.00$0.00$0.00$0.00$0.00$0.00
4Designer$0.00$0.00$0.00$0.00$0.00$0.00
5Senior Graphics Designer$0.00$0.00$0.00$0.00$0.00$0.00
6Graphics Designer$0.00$0.00$0.00$0.00$0.00$0.00
7Print Graphic Designer$0.00$0.00$0.00$0.00$0.00$0.00
8Detailer$0.00$0.00$0.00$0.00$0.00$0.00
9Editor$0.00$0.00$0.00$0.00$0.00$0.00
10Writer$0.00$0.00$0.00$0.00$0.00$0.00
11Reseracher$0.00$0.00$0.00$0.00$0.00$0.00
12Model Maker$0.00$0.00$0.00$0.00$0.00$0.00
13Illustrator$0.00$0.00$0.00$0.00$0.00$0.00
14Exhibit Evaluator$0.00$0.00$0.00$0.00$0.00$0.00
15Lighting Designer$0.00$0.00$0.00$0.00$0.00$0.00
16Estimator (Design)$0.00$0.00$0.00$0.00$0.00$0.00
17Producer$0.00$0.00$0.00$0.00$0.00$0.00
18Director$0.00$0.00$0.00$0.00$0.00$0.00
19Creative Director$0.00$0.00$0.00$0.00$0.00$0.00
20Visual/Graphic Designer$0.00$0.00$0.00$0.00$0.00$0.00
21Equipment System Integrator$0.00$0.00$0.00$0.00$0.00$0.00
22Lead Software Developer$0.00$0.00$0.00$0.00$0.00$0.00
23Writer$0.00$0.00$0.00$0.00$0.00$0.00
24Programmer$0.00$0.00$0.00$0.00$0.00$0.00
25Storyboard Artist$0.00$0.00$0.00$0.00$0.00$0.00
26Sound or Light Designer$0.00$0.00$0.00$0.00$0.00$0.00
27Information Architect$0.00$0.00$0.00$0.00$0.00$0.00
28Show Designer$0.00$0.00$0.00$0.00$0.00$0.00
29Animator$0.00$0.00$0.00$0.00$0.00$0.00
30Photo Researcher$0.00$0.00$0.00$0.00$0.00$0.00
31Conservator$0.00$0.00$0.00$0.00$0.00$0.00
32Senior Estimator$0.00$0.00$0.00$0.00$0.00$0.00
33Junior Estimator$0.00$0.00$0.00$0.00$0.00$0.00
34Fabricator Senior Project Manager$0.00$0.00$0.00$0.00$0.00$0.00
35Fabricator Junior r Project Manager$0.00$0.00$0.00$0.00$0.00$0.00
36Plant Manager$0.00$0.00$0.00$0.00$0.00$0.00
37Purchasing Manager$0.00$0.00$0.00$0.00$0.00$0.00
38Detail Director$0.00$0.00$0.00$0.00$0.00$0.00
39Senior Detailer$0.00$0.00$0.00$0.00$0.00$0.00
40Junior Detailer$0.00$0.00$0.00$0.00$0.00$0.00
41Foreman Carpenter/Cabinet Maker$0.00$0.00$0.00$0.00$0.00$0.00
42Senior Carpenter/Cabinet Maker$0.00$0.00$0.00$0.00$0.00$0.00
43Apprentice Carpenter/Cabinet Maker$0.00$0.00$0.00$0.00$0.00$0.00
44Graphic Foreman$0.00$0.00$0.00$0.00$0.00$0.00
45Graphic (Senior)$0.00$0.00$0.00$0.00$0.00$0.00
46Graphic (Junior)$0.00$0.00$0.00$0.00$0.00$0.00
47Finisher/Painter (Foreman)$0.00$0.00$0.00$0.00$0.00$0.00
48Finisher/Painter (Senior)$0.00$0.00$0.00$0.00$0.00$0.00
49Finisher/Painter (Junior)$0.00$0.00$0.00$0.00$0.00$0.00
50Metal Fabricator (Foreman)$0.00$0.00$0.00$0.00$0.00$0.00
51Metal Fabricator (Senior)$0.00$0.00$0.00$0.00$0.00$0.00
52Metal Fabricator (Junior)$0.00$0.00$0.00$0.00$0.00$0.00
53Model Maker (Senior)$0.00$0.00$0.00$0.00$0.00$0.00
54Model Maker (Junior)$0.00$0.00$0.00$0.00$0.00$0.00
55Senior Audio-Visual Specialist$0.00$0.00$0.00$0.00$0.00$0.00
56Junior Audio-Visual Specialist$0.00$0.00$0.00$0.00$0.00$0.00
57Senior Installation/Demolition Specialist$0.00$0.00$0.00$0.00$0.00$0.00
58Junior Installation/Demolition Specialist$0.00$0.00$0.00$0.00$0.00$0.00
59Bracket Maker$0.00$0.00$0.00$0.00$0.00$0.00
60Exhibit Maintneance Technician$0.00$0.00$0.00$0.00$0.00$0.00
61A/V Integrator$0.00$0.00$0.00$0.00$0.00$0.00
62Lighting Installer$0.00$0.00$0.00$0.00$0.00$0.00
Total Evaluated Price$0.00
Overhead Rate/Loading Rate0.00%
Material Rate/Applied Factor0.00%
The rates provided shall be fully burdened labor rates.

&"Arial,Bold"&16PRICING TEMPLATE - TIME AND MATERIALS COMPETITIVE MODEL

Page &P of &N

Tab 2 Project Managment

Attachment II Price Schedule
Tab 2 Project Management Team
INSTRUCTIONS: Vendor is to provide the necessary Project Managament to meet the requirement of the SOW. The fields in yellow should be filled in as needed.
Ordering Period 1Ordering Period 2Ordering Period 3Ordering Period 4Ordering Period 5TOTAL
LABOR CATEGORYHoursFixed Hourly RateCostHoursFixed Hourly RateCostHoursFixed Hourly RateCostHoursFixed Hourly RateCostHoursFixed Hourly RateCostTotal Cost
0$0.000$0.000$0.000$0.000$0.00$0.00
0$0.000$0.000$0.000$0.000$0.00$0.00
0$0.000$0.000$0.000$0.000$0.00$0.00

Tab 3 Design Services

Attachment II Price Schedule
Tab 3 Design Services
INSTRUCTIONS: The offeror shall provide a firm fixed-price price proposal for the Design Services for the delivery of a 100% Final Design, Engineering, Detailing and Fabrication Package in accordance with Attachment I Appendix B Exhibition Design, necessary for the fabrication of the exhibit, using the Government Furnished Information.
100% Final Design, Engineering, Detailing and Fabrication Package
Labor Category (Per Tab 1)Key Personnel (Check if designated as Key)Labor Rates (Per Tab 1)Labor Hours (Necessary for service)Remarks

Tab 4 Conservation Services

Attachment II Price Schedule
Tab 4 Conservation Services
INSTRUCTIONS: The offeror shall provide a firm fixed-priced proposal for Conservation Services in accordance with the RFP Attachment I Statement of Work §2.2.2 on Tab 4 of the RFP Attachment II Price Schedule. The survey will consist of 600 artifact and objects located in both Washington DC and New London CT and the Period of Performance shall be 9/29/2022 to 12/15/2022. The travel required for this service shall be a Not-To-Exceed amount determined by the Government per FAR 31.205-46 and does not required a price proposal by the offeror.
Conservation Services
Labor Category (Per Tab 1)Key Personnel (Check if designated as Key)Labor Rates (Per Tab 1)Labor Hours (Necessary for service)Remarks

File details come from the government source that posted it. Updated .