DRAFT Attachment II Price Schedule.xlsx
XLSX spreadsheet 29 KB Posted
- Solicitation number
- 70Z02322R09230001
About this file
This document contains a draft price schedule template and statement of work for an exhibition design and fabrication services contract in support of the United States Coast Guard Museum. The solicitation requests proposals for design, engineering, fabrication, and conservation services to develop a 100% final design package for the fabrication of exhibits. Offerors must provide fully burdened labor rates for 62 labor categories covering project management, design, fabrication, installation, and conservation specialties. The price schedule also requires a firm fixed price for conservation services surveying 600 artifacts by December 2022. The final solicitation is expected to be released by August 22nd with a closing date of September 6th. The opportunity is available through the Department of Homeland Security and United States Coast Guard.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Response to Vendor Questions_8_19_2022.docx | DOCX document | |
| Response to Vendor Questions_8_17_2022.docx | DOCX document | |
| DRAFT Attachment III Contract Clauses.pdf | ||
| RFP Questionnaire.docx | DOCX document | |
| DRAFT Attachment I Statement of Work.pdf | ||
| DRAFT Attachment IV Solicitation Provisions.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Tab1 FFP Burdened Rate
| Attachment II Price Schedule |
| LABOR RATE TABLE FOR CONTRACT PRICING |
| INSTRUCTIONS: Offeror is to provide the the following: |
1)Vendor Labor Category if different from Governmetn Labor Category
2) Fully burdened Labor Rates for each Ordering Period (If using a percentage for escallation include the formula)
3) The Overhead Rate, Material Rate, Loading Rate, or Applied Rate
NOTE: These rates would be used as contract awarded labor rates for the pricing on future task orders and to evluation Total Evaluated Pricing.
| Government Labor Category | Vendor Labor Category | Ordering Period 1 | Ordering Period 2 | Ordering Period 3 | Ordering Period 4 | Ordering Period 5 | Average Proposed Labor Rate | |
| Fixed Hourly Rate | Fixed Hourly Rate | Fixed Hourly Rate | Fixed Hourly Rate | Fixed Hourly Rate | ||||
| 1 | Senior Project Manager IDIQ | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 2 | Project Manager | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 3 | Senior Designer | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 4 | Designer | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 5 | Senior Graphics Designer | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 6 | Graphics Designer | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 7 | Print Graphic Designer | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 8 | Detailer | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 9 | Editor | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 10 | Writer | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 11 | Reseracher | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 12 | Model Maker | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 13 | Illustrator | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 14 | Exhibit Evaluator | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 15 | Lighting Designer | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 16 | Estimator (Design) | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 17 | Producer | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 18 | Director | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 19 | Creative Director | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 20 | Visual/Graphic Designer | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 21 | Equipment System Integrator | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 22 | Lead Software Developer | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 23 | Writer | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 24 | Programmer | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 25 | Storyboard Artist | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 26 | Sound or Light Designer | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 27 | Information Architect | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 28 | Show Designer | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 29 | Animator | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 30 | Photo Researcher | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 31 | Conservator | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 32 | Senior Estimator | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 33 | Junior Estimator | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 34 | Fabricator Senior Project Manager | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 35 | Fabricator Junior r Project Manager | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 36 | Plant Manager | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 37 | Purchasing Manager | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 38 | Detail Director | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 39 | Senior Detailer | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 40 | Junior Detailer | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 41 | Foreman Carpenter/Cabinet Maker | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 42 | Senior Carpenter/Cabinet Maker | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 43 | Apprentice Carpenter/Cabinet Maker | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 44 | Graphic Foreman | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 45 | Graphic (Senior) | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 46 | Graphic (Junior) | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 47 | Finisher/Painter (Foreman) | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 48 | Finisher/Painter (Senior) | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 49 | Finisher/Painter (Junior) | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 50 | Metal Fabricator (Foreman) | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 51 | Metal Fabricator (Senior) | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 52 | Metal Fabricator (Junior) | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 53 | Model Maker (Senior) | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 54 | Model Maker (Junior) | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 55 | Senior Audio-Visual Specialist | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 56 | Junior Audio-Visual Specialist | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 57 | Senior Installation/Demolition Specialist | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 58 | Junior Installation/Demolition Specialist | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 59 | Bracket Maker | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 60 | Exhibit Maintneance Technician | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 61 | A/V Integrator | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 62 | Lighting Installer | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Total Evaluated Price | $0.00 | |||||||
| Overhead Rate/Loading Rate | 0.00% | |||||||
| Material Rate/Applied Factor | 0.00% | |||||||
| The rates provided shall be fully burdened labor rates. |
&"Arial,Bold"&16PRICING TEMPLATE - TIME AND MATERIALS COMPETITIVE MODEL
Page &P of &N
Tab 2 Project Managment
| Attachment II Price Schedule | ||||||||||||||||
| Tab 2 Project Management Team | ||||||||||||||||
| INSTRUCTIONS: Vendor is to provide the necessary Project Managament to meet the requirement of the SOW. The fields in yellow should be filled in as needed. | ||||||||||||||||
| Ordering Period 1 | Ordering Period 2 | Ordering Period 3 | Ordering Period 4 | Ordering Period 5 | TOTAL | |||||||||||
| LABOR CATEGORY | Hours | Fixed Hourly Rate | Cost | Hours | Fixed Hourly Rate | Cost | Hours | Fixed Hourly Rate | Cost | Hours | Fixed Hourly Rate | Cost | Hours | Fixed Hourly Rate | Cost | Total Cost |
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||||||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||||||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 |
Tab 3 Design Services
| Attachment II Price Schedule | ||||
| Tab 3 Design Services | ||||
| INSTRUCTIONS: The offeror shall provide a firm fixed-price price proposal for the Design Services for the delivery of a 100% Final Design, Engineering, Detailing and Fabrication Package in accordance with Attachment I Appendix B Exhibition Design, necessary for the fabrication of the exhibit, using the Government Furnished Information. | ||||
| 100% Final Design, Engineering, Detailing and Fabrication Package | ||||
| Labor Category (Per Tab 1) | Key Personnel (Check if designated as Key) | Labor Rates (Per Tab 1) | Labor Hours (Necessary for service) | Remarks |
Tab 4 Conservation Services
| Attachment II Price Schedule | ||||
| Tab 4 Conservation Services | ||||
| INSTRUCTIONS: The offeror shall provide a firm fixed-priced proposal for Conservation Services in accordance with the RFP Attachment I Statement of Work §2.2.2 on Tab 4 of the RFP Attachment II Price Schedule. The survey will consist of 600 artifact and objects located in both Washington DC and New London CT and the Period of Performance shall be 9/29/2022 to 12/15/2022. The travel required for this service shall be a Not-To-Exceed amount determined by the Government per FAR 31.205-46 and does not required a price proposal by the offeror. | ||||
| Conservation Services | ||||
| Labor Category (Per Tab 1) | Key Personnel (Check if designated as Key) | Labor Rates (Per Tab 1) | Labor Hours (Necessary for service) | Remarks |
File details come from the government source that posted it. Updated .