DRAFT Attachment 1 - PWS - Installation Custodial Services.pdf
PDF 1 MB Posted
- Solicitation number
- W91151-26-R-A004
About this file
This is a Draft Performance Work Statement (PWS) for Installation Custodial Services at Fort Hood, Texas. The contract covers comprehensive custodial services for 586 facilities across the military installation, with an anticipated period of performance of one 11-month base year and six 12-month option years. The contractor will be responsible for providing all personnel, equipment, supplies, and labor necessary to perform custodial tasks across various facility types, including administrative buildings, gymnasiums, libraries, Child Youth and Student Services (CYSS) centers, and Warrior Transition Unit spaces.
Key requirements include daily and periodic cleaning tasks such as trash removal, recycling, floor maintenance, carpet cleaning, restroom sanitation, dusting, window cleaning, and special event cleaning. The contractor must maintain strict quality control standards, with an acceptable quality level of 96% across all service areas. Additional obligations include complying with security protocols, completing required training (e.g., anti-terrorism, iWatch, OPSEC), maintaining safety standards, and submitting detailed monthly reports. The contract will be awarded as a Firm Fixed Price with some "As Required" Contract Line Item Numbers (CLINs), and the total cleanable square footage may fluctuate throughout the contract period.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DRAFT
INSTALLATION CUSTODIAL SERVICES
PERFORMANCE WORK STATEMENT (PWS)
FORT HOOD, TEXAS
Garrison Fort Hood Custodial Services Enterprise-wide Performance Work Statement
(PWS)
(Service 402 - Custodial Services) (U) i
Table of Contents
1.0 1.0 General Description of Services Background Objectives Scope Traffic Flow Restoration of Real Property Damage General Information
1.7.1 Period of Performance (PoP)
1.7.2 Scope
1.7.3 Locations to Receive Custodial Service
1.7.4 Work Log
1.7.5 Recognized Holidays
1.7.6 Hours of Operation
1.7.7 Installation Closures
1.7.8 Emergency Delays and Support
1.7.9 Unforeseen Buildings Closures
1.7.10 Place of Performance
1.7.11 Type of Contract
1.7.12 Security Requirements
Physical Security Access and General Protection/Security Policy and Procedures Pre-screen candidates using E-Verify Program Contractor Vehicle Registration Installation Access
1.7.13 Physical Security
1.7.14 Security Training
Anti-Terrorism (AT) Level I Training iWatch Training Operational Security (OPSEC) Awareness Training Threat Awareness and Reporting Program Training
1.7.15 Local Health Protection Conditions
1.7.16 Key Control
Lost Keys ii
Prohibited use of Government provided keys or key cards
1.7.17 Post Award Conference/Periodic Progress Meetings
1.7.18 Government Roles and Responsibilities
Contracting Officer (KO) Contracting Officer’s Representative (COR)
1.7.19 Specific Contractor Requirements, Roles and Responsibilities U.S. Residency Contractor Hiring Restrictions Contractor Identification Identification Badges Standards of Conduct Contractor Key Personnel
1.7.19.7 Damage Report
1.7.19.8 Phase In /Phase Out Period
Quality Control
1.7.19.10 Quality Control Plan
1.7.19.11 Quality Assurance
Emergency Services
1.7.19.13 Accident Reporting
Environment and OSHA Safety Safety Plan Occupational Safety and Health Safety Measure and Protective Equipment Spill Plan Asbestos Awareness Environmental Compliance
1.7.20 Safety Data Sheets
2.0 2.0 Definitions and Acronyms
Definitions
2.1.1 Ability One Commission
2.1.2 Acceptable Quality Level (AQL)
2.1.3 Carpet Care
2.1.4 Child, Youth and School Services (CYSS)
2.1.5 Cleaning
2.1.6 Contractor
iii
2.1.7 Contractor Acquired Property (CAP)
2.1.8 Contracting Officer (KO)
2.1.9 Contracting Officer’s Representative (COR)
2.1.10 Deficient Service
2.1.11 Deliverable
2.1.12 Disinfect
2.1.13 Dry Buffing
2.1.14 Equipment
2.1.15 Exterior Windows
2.1.16 Government Furnished Property (GFP)
2.1.17 Government Property
2.1.18 Government Project Manager
2.1.19 Hard Surface Floor Care
2.1.20 High-efficiency Particulate Air Vacuum Cleaners (HEPA)
2.1.21 Heating, Ventilation and Air Conditioning (HVAC)
2.1.22 Institute of Inspection, Cleaning and Restoration Certification (IICRC)
2.1.23 Interior Window
2.1.24 International Sanitary Supply Association (ISSA)
2.1.25 Lavatories/Latrines/Bathrooms
2.1.26 Legal and Other Requirements
2.1.27 Loss of Government Property
2.1.28 Material
2.1.29 Non-Personal Services
2.1.30 Performance Requirements Summary (PRS)
2.1.31 Physical/Community Fitness Centers
2.1.32 Physical Security
2.1.33 Property
2.1.34 Property Records
2.1.35 Provide
2.1.36 Public Traffic Areas
2.1.37 Quality Assurance
2.1.38 Quality Assurance Surveillance Plan (QASP)
2.1.39 Quality Control
2.1.40 Real Property
2.1.41 Recyclable Materials
2.1.42 Sanitize
iv
2.1.43 Schedule of Services
2.1.44 Sensitive Property
2.1.45 Service Calls
2.1.46 Soil
2.1.47 Spill Plan
2.1.48 Spray Buffing
2.1.49 Spot Cleaning
2.1.50 Stairwell Cleaning
2.1.51 Stripping
2.1.52 Subcontractor
2.1.53 Sweep
2.1.54 Trash Removal
2.1.55 Wide Area Workflow (WAWF)
2.1.56 Workday
2.1.57 Work Week
ACRONYMS
3.0 3.0 Government Furnished Property, Equipment and Services
General Basic Requirements Facility/Area(s) Privately Owned Vehicles (POVs) Utilities and Services Materials and Supplies
4.0 4.0 Contractor Furnished Materials and Equipment General Classified Controlled Facility Clearance. – N/A Materials and Supplies List of Cleaning Products
4.4.1 Known Hazards
4.4.2 Cleaning Solutions Requirements
Equipment
4.5.1 Carpet, Tile / Grout Cleaning
4.5.2 Unserviceable Contractor Equipment
5.0 5.0 Specific Tasks for General Cleaning General Modification to Attachment 3- Building Inventory List v
Perform Special Event Cleanings (i.e. VIP and/or event cleaning) Specific Tasks for scheduled general cleaning Hard Floors. (Vinyl, Ceramic, Wood, Concrete, etc.)
5.5.1 Spray and Buff
5.5.2 Stripping/Scrub/Finishing
5 . 5 . 3 Floor Finish Remover
5.5.4 Wet Mop
5.5.5 Quarry / Ceramic / Porcelain Tile Cleaning:
5.5.6 Annual Stripping/Finishing and Buffing
Carpeted Floors
5.6.1 Removable Walk off Mats
5.6.2 Carpet Cleaning and Shampooing
5.6.3 Spot Cleaning Carpets
5.6.4 Annual Carpet Cleaning and Shampooing
Stairways/Elevators/Handicap Lifts Solid Waste Collection and Removal
5.8.1 Recycle Collection and Removal
Restrooms/Toilet Areas/Locker Rooms
5.9.1 Clean and Disinfect Restrooms
5.9.2 Contractor Work Log
5.9.3 Waterless Urinal Supplies
5.9.4 Restroom and Locker Room NHSW Removal
5.9.5 Floor Care
5.9.6 Stocking and Restocking of Supplies
Resupplying Dispensers Drinking Fountains Dusting
5.11.1 Dusting, Low Areas (under six (6) feet)
5.11.2 Dusting, High Areas (over six (6) feet)
5.11.3 Dusting, Light
5.11.4 Dusting, Heavy
Interior Glass
5.12.1 Exterior Glass
Child, Youth and Student Service (CYSS) Centers
5.13.1 Child Age Groups
5.13.2 CYS Cleaning Products
vi
5.13.3 CYS Supplies and Solutions Storage
5.13.4 CYS Hours of Operation
CYS Hours of Operation Other Than Normal Other CYSS Facility Hours of Operation Other Than Normal. – N/A
5.13.5 Specific Child Development Center (CDC) Cleaning Tasks. – N/A
5.13.6 Specific Other Child Youth and Student Service (CYSS) Center Cleaning Requirements Gymnasiums and Physical Fitness Centers (PFC)
5.14.1 Disinfectants
5.14.2 Facility Sanitation, Showers, locker rooms, and toilet facilities, General Cleaning of Libraries and Museums University-level Cleaning Warrior Transition Unit (WTU) High Traffic Areas Schedules and Reports
5.19.1 Daily Reports
5.19.2 Schedule of Monthly Services
5.19.3 Alternate Day Work Schedule
5.19.4 Service Delay Notification
5.19.5 Floor Schedule Report
5.19.6 Unscheduled Cleaning Work Reports
5.19.7 Access and Condition Report (Building Closure)
5.19.8 General Report Submittals
Key Personnel Reports Quality Control Report
6.0 6.0 Applicable Publications (Current Editions) Regulations, Publications, Manuals, Local Policies and Procedures
7.0 7.0 Mandatory Records and Report Forms
8.0 8.0 Attachment/Technical Exhibits (TEs)
Attachment 1– Performance Requirements Summary Attachment 2 – Deliverables Schedule TE-C –Custodial Services Tasks and Frequency Performance Standards TE-A – Building Inventory List TE B – Installation Map(s)
(PWS)
(Service 402 - Custodial Services) (U)
1.0 General.
This is a non-personal services contract to provide Custodial Services for the U.S. Army Garrison Fort Hood, TX.
• The Government will not exercise any supervision or control over the contract service providers.
• The Contractor shall perform to the standards specified in this Performance Work Statement (PWS).
• Contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.
• The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to complete the requirements as outlined and defined in this
PWS.
Description of Services
The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform all custodial service tasks and frequencies as described and defined in this Performance Work Statement (PWS), Part 5 Specific Tasks and Part 8 TE-C Custodial Services Performance Standards and Frequencies, except for those items specified as Government furnished property and services (If applicable, see Part 4 Contractor Furnished Items and Services). The Contractor shall perform to the standards in this contract.
Background.
Fort Hood is located near Killeen, Texas in Bell County. Fort Hood consists of approximately 218,823 acres and has 5,838 cleanable buildings. The Post population consists of approximately 46,000 Military, government civilian, and Contractor personnel.
The custodial contract has been an Ability One Source America contract.
Objectives.
The Contractor shall ensure all work accomplished as fulfillment of this PWS meets all applicable Federal, State, and local laws, regulations, directives, and other requirements (LOR) (See Definitions & Acronyms, 2.2 Acronyms --- Legal and Other Requirements) to include the documents in Part 6, Applicable Publications. Part 8, Attachment/Technical Exhibit Listing, TE-A identifies which buildings/areas belong to each building type, the square footage of the building/areas to be cleaned, any special security considerations, and any constraints as to when during the day or week scheduled services can be performed. Part 8, TE-C Custodial Services Performance Standards and Frequencies for maximum standards for each type of building. During performance of the contract, the Government reserves the right to add or delete facilities and increase or decrease the frequency of custodial service required. A modification to the contract will be executed to incorporate these changes.
• The Contractor shall compile historical data, prepare required reports, and submit all information as specified by the Deliverables presented in the contract.
• The Contractor shall ensure all work in support of mission requirements tendered to the Government for acceptance conform to the measurable performance standards of quality, timeliness, and quantity specified in the PWS of this
• The Contractor shall determine the best and most cost-effective ways to fulfill/perform custodial services and their component needs, emphasizing innovation and commercial best practices.
• The Contractor shall ensure all work accomplished maintains and presents a healthy, clean, neat, and professional appearance to all perform custodial services included and covered by this contract in support of mission requirements for users, residents, and visitors.
Scope.
The Contractor shall perform custodial services to the performance standards (task/frequency table) in this PWS in a manner that will maintain the condition and cleanliness of each covered facility and present a professional appearance.
• Services include:
o Scheduled Cleaning Services (for all covered facility types) IAW the PWS performance standard.
o As Ordered / Requested Task included (based on separate CLIN structure and applying a reimbursement MOA, as required):
o Special Event Support Cleaning.
o Limited to minimal Tasks absolutely required to maintain health and appearance of prominent areas (empty trash receptacles, pick-up litter, sweep / mop, vacuum, wipe down high touch hard surfaces, clean restrooms, etc.)
• Services not included:
o Biohazard cleaning service for casualty/trauma, defecation, and bodily fluids decontamination at Medical Treatment Facilities (MTFs) and other facilities performed by installation assets (hazardous material response team, garrison staff, or mission personnel) IAW MEDCOM Reg. 40-35, Management of Regulated Medical Waste, para 16 (2017) o Trauma scene is any area where a trauma occurred outside of a medical, dental, veterinary, or research setting that has been contaminated by human blood or body fluids as a result of such trauma (for example, workplace/home deaths, crime scenes, and vehicular accidents IAW MEDCOM Reg 40-35. (If applicable) Trauma Scene Cleanup shall also be conducted IAW TIP No. 37 011-0122.
o Toilet overflow, mold cleaning, flood cleaning within a covered facility resulting from inclement weather, or waterline break in the building serviced by a separate water cleanup and restoration contract with expertly trained staff.
o Cleaning and disinfecting buildings and areas previously occupied by ’pandemic’ positive personnel. (Note: This type of cleaning and disinfecting will be performed by installation assets IAW Army Public Health Command (APHC) Technical Information Paper (TIP) No. 98-105-0421 and TIP No. 98- 120-0620).
Traffic Flow.
The Contractor shall maintain the free flow of vehicular and pedestrian traffic while conducting custodial service tasks.
Restoration of Real Property Damage.
Any damage to Government Real Property by the Contractor’s operations shall be restored to the original state at no additional cost to the Government (e.g. structural damage, damage to landscape or fencing, et al). The Contractor shall notify the COR/ACOR of any incidents of damage to Government property within (2) hours of each such occurence.
General Information.
1.7.1 Period of Performance (PoP).
The period of performance includes a 30-day phase-in and shall be for one (1) Base Year of 11 months and six (6) 12-month option years.
1.7.2 Scope.
The Contractor shall perform custodial services in accordance with the PWS and the technical exhibits, including the Enterprise-wide Custodial Services Performance Standards. During performance of the contract, the Government reserves the right to add or delete facilities and/or the level of services required. A modification to the contract will be executed to incorporate these changes.
1.7.3 Locations to Receive Custodial Service
The work to be performed under this contract will be performed at 586 facilities scheduled for cleaning Government facilities on Fort Hood and other Direct Reporting Units/Sub-installations/Enclaves. The Contractor shall provide the KO a schedule no later than (10) workdays prior to commencing work. Schedule shall outline tasks to be performed by specific building and identify the timeline for the task to be accomplished.
The KO will provide the Contractor with requirements to make changes to the schedule as they occur. A list of Fort Hood buildings to be cleaned is located in Part 8, Technical Exhibit Listing, TE A.
1.7.4 Work Log.
The Contractor shall keep a detailed log of work accomplished in each building receiving custodial services IAW performance standards.
• The log shall include relevant custodial cleaning task practices and the dates custodial cleaning task is completed.
• The Contractor shall submit this log to the COR not later than the 5th day of each month (Part 8, Attachment/Technical Exhibit Listing, paragraph 8.2, Deliverables Schedule).
1.7.5 Recognized Holidays.
New Year’s Day Labor Day Martin Luther King Jr.’s Birthday Columbus Day President’s Day Veteran’s Day Memorial Day Thanksgiving Day Independence Day Christmas Day Juneteenth
1.7.6 Hours of Operation.
Normal hours of operation are between the hours of 0700 A.M. – 1630 P.M. Monday through Sunday, excluding Federal holidays or when the Government facilities are closed due to local or national emergencies, administrative closings, or similar Government directed facility closings.
• The Contractor shall coordinate with Building Managers or the KO if no Building Manager is available to establish a schedule to conduct business if services are required outside of normal hours of operation.
• This schedule or any schedule changes shall be documented in an MFR and approved by the KO.
• The contractor shall perform service during the normal contractor working hours (0700-1630 hours).
• The Contractor shall maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when Government facilities are not closed for the above reasons.
• Youth Centers- The contractor ensure facilities are in state of cleanliness prior to opening the following day.
1.7.7 Installation Closures.
When an unforeseen installation closure occurs on a regularly scheduled day of work, the Contractor shall reschedule the work to be performed the following day unless the following day is a Saturday, Sunday, a recognized Federal holiday, and when routine work is not scheduled for that day; or reschedule the work for the next business day following the closure.
1.7.8 Emergency Delays and Support.
If the Contractor determines unsafe weather conditions or work environment is cause for an interruption of services, the Contractor shall notify the KO and his/her designated representative, the COR/ACOR, two (2) hours prior to curtailing operations (Part 8, Attachment/Technical Exhibit Listing, paragraph 8.2, Deliverables Schedule).
The Contractor shall obtain KO approval to resume operations. The Contractor shall coordinate with the DPW designated representative(s) and the COR/ACOR, once guidance has been provided by the KO in preparation for and during emergency operations situations such as inclement weather, flood, active shooter, fire or other emergency situations.
1.7.9 Unforeseen Buildings Closures.
When an unforeseen building closure occurs on a regularly scheduled day of work (i.e., severe weather, training holiday, day of mourning, etc.).
• The Contractor shall reschedule the service on any day satisfactory to the customer and minimizes impact on the Contractor’s normal work schedule, but not more than # business days.
• The contractor shall coordinate with the COR in attempt to rectify the non-performance prior to leaving the site. If unable to be rectified by the COR in conjunction with the facility manager in a timely manner, within ## minutes or days, the contractor shall be allowed to proceed to the next scheduled facility without any reperformance or deduction from the schedule.
• Facilities that have been ordered, but for unknown reason will be closed during the month will be reconciled against the order at either the end of the month or the ordering period. Costs shall be deducted from final invoice.
• The Contractor shall immediately notify the COR of any Unscheduled Work Stoppages. The COR will attempt to rectify the Unscheduled Work Stoppage with the facility manager in a timely manner. In those instances where an Unscheduled Work Stoppage occurs and the Contractor cannot continue performance, the service scheduled for that day will not be reperformed or deducted from the Contractor’s invoice.
1.7.10 Place of Performance.
The work to be performed under this requirement will be performed throughout the entire area occupied by Fort Hood and at any pertinent locations in and around Fort Hood. A map of Fort Hood is located in Part 8, Attachment/Technical Exhibit Listing, TE B.
1.7.11 Type of Contract.
The government will award a Firm Fixed Price (FFP) type of contract with some “As Required” CLINs (See Frequency Table located in Part 8, Attachment/Technical Exhibit Listing, TE-C Custodial Services Tasks and Frequency Performance Standards).
1.7.12 Security Requirements.
The Government may require the contractor to provide service to a highly classified facility. In such instances the custodial contractor personnel shall be trained in security requirements and escorted by Government representative during the entire time needed to complete the tasks outlined in this PWS at such facilities.
Physical Security.
Contractor employees will be allowed access to facilities when properly identified on the Contractors employee roster, wearing identification badges, and complying with local security procedures. All contract employees, including subcontractor employees who are not in possession of the appropriate access privileges, will be escorted by Government representative in areas where they may be exposed to classified and/or sensitive materials and/or sensitive or restricted areas.
Access and General Protection/Security Policy and Procedures.
Contractor and all associated subcontractors’ employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (i.e., FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.
Pre-screen candidates using E-Verify Program.
The Contractor shall pre-screen Candidates using the E- verify Program (http://www.uscis.gov/e-verify) website to meet the established employment eligibility requirements. The Contractor shall ensure that the Candidate has two valid forms of Government issued identification prior to enrollment to ensure the correct information is entered into the E-Verify system. An initial list of verified/eligible Candidates shall be provided to the KO no later than 3 business days after the initial contract award.
Contractors who do not require CAC but require access to a DoD Facility or Installation.
Contractor and all associated sub-contractors’ employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190-13), applicable Installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative, as NCIC and TSDB are available), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.
Motor Vehicle Operators. Contractor’s personnel, whose tasks involve operation of any vehicles, shall possess a valid driver’s license, certificates, and permits applicable for the type and class of vehicle being operated.
http://www.uscis.gov/e-verify)
Contractor Vehicle Registration.
The Contractor shall register all Contractor-owned or operated vehicles and trailers operating on the installation within five (5) working days of contract start date. The Contractor shall complete all applications with the Provost Marshal Vehicle Registration section located in Building 69005. Evidence of vehicle ownership and vehicle liability insurance shall be presented upon application of vehicle registration.
Installation Access.
The Contractor shall be responsible for assuring all Contractor personnel authorized to perform work under this contract, obtain Installation access as required by DOD Directive 4630.5, Interoperability and Supportability of Information Technology (IT) and National Security Systems (NSS). Government furnished identification shall be returned to the Government when the employee no longer performs work for the Contractor under this contract, or upon termination of the contract.
All contract personnel requiring physical access to a federal installation or facility shall comply with the access control procedures of that location. Contract personnel requiring unescorted access to meet contract performance requirements on a DoD installation in the US shall be vetted by the installation/facility Provost Marshal/Directorate of Emergency Services/Security Office using the National Crime Information Center- Interstate Identification Index (commonly referred to as “NCIC-III”) and Terrorist Screening Database (commonly referred to as “TSDB”). Contract personnel shall comply with all personal identity verification requirements specified in installation/facility policies and procedures.
Contractor and all associated subcontractors’ employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (i.e., FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.
1.7.13 Physical Security.
At the close of each work period, the contractor shall ensure government facilities, equipment, and materials are secured.
1.7.14 Security Training.
In the event of a National Defense Emergency affecting Fort Hood the Fort Hood POC will immediately notify the contract POC. At that time, the contractor shall take immediate steps to cease all activities on the installation(s) and will cause all personnel to leave the installation(s) property until notice is given by the installation and Fort Hood POC that National Defense Emergency conditions are no longer in effect.
Anti-Terrorism (AT) Level I Training.
IAW Department of Defense Instruction (DoDI) 2000.16, Vol. 1 DoD Antiterrorism Standards and Army Regulation (AR) 525-13 Antiterrorism, all Contractor employees, including subcontractor employees, requiring access to Army installations, facilities, or controlled access areas shall complete Antiterrorism (AT) Level I awareness training within 30 calendar days after contract start date. The Contractor shall submit certificates of completion for each affected contract employee and subcontractor employee to the KO or COR within 30 calendar days after completion of training by all employees and subcontractor personnel on a recurring annual basis. AT Level I awareness training is available at the following site: http://jko.jten.mil (See Part 8, Attachment/Technical Exhibit Listing, paragraph 8.2, Deliverables Schedule).
• If access to a computer is not available, the Government will provide AT Level I training to Contractor employees within 30 business days after contract start and maintain a copy of the attendance roster for one (1) year. Any Contractor hired after contract start will be required to receive AT Level I training within 30 calendar days either online or as provided by the Government. The Contractor must present the training certificate to the KO or designated Government representative/COR within 30 calendar days (See Part 8, Attachment/Technical iWatch Training.
The Contractor shall brief the local iWatch program (training standards provided by the Installation Anti-Terrorism Officer (ATO)) to all its’ employees and associated subcontractors. This training is used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to Fort Hood, Military Police and the COR. The Contractor shall complete the training within 30 calendar days after contract award and within 30 calendar days of new employees commencing performance and send to the KO or designated Government representative/COR via both electronic and paper copy within 30 calendar days of completion (See Part 8, Attachment/Technical Exhibit Listing, paragraph 8.2, Deliverables Schedule).
Operational Security (OPSEC) Awareness Training.
For contracts that require OPSEC Training. All contractor employees, to include subcontractor’s employees, requiring access to Army installation, facilities, controlled, access areas, and/or installation computers shall complete OPSEC Level I training within 30 days after contract start date or effective date of incorporation of this requirement into the contract. The Contractor shall provide either certificates of completion or dates of attendance for each affected contractor employee and subcontractor employee to the COR, or to the Contracting Officer if a COR is not assigned, with 15 calendar days after completion of training by all employees and subcontractor personnel (See Part 8, Attachment/Technical Exhibit Listing, paragraph 8.2, Deliverables Schedule).
http://jko.jten.mil/
Threat Awareness and Reporting Program Training.
For all DA contractors. Training will be completed within 30 days of assignment or employment to an organization and will undergo live environment TARP training will be completed annually IAW AR 381-12 Threat Awareness and Reporting Program. The Contractor shall provide either certificates of completion or dates of attendance at the for each affected contractor employee and subcontractor employee to the COR, or to the Contracting Officer if a COR is not assigned, with 15 calendar days after completion of training by all employees and subcontractor personnel (See Part 8, Attachment/Technical Exhibit Listing, paragraph 8.2, Deliverables Schedule).
1.7.15 Local Health Protection Conditions
Contractor will comply with all national and DoD policies with regard to health protection issues including pandemic outbreaks. Local Health Protection Conditions (HPCON) change based on risk levels in the surrounding area Fort Hood and in cooperation with local, state and national guidance. The Contractor shall comply with installation and higher headquarters policies aimed at mitigating the spread of dangerous communicable diseases. (As of publication date of this document, Fort Hood has an installation mask policy in place in response to the coronavirus outbreak and IAW SecDef guidance.)
1.7.16 Key Control.
The Contractor shall establish and implement methods of making sure all keys/key cards issued to the Contractor by the Government are not lost or misplaced and are not used by unauthorized persons. NOTE: All references to keys include key cards.
• No keys issued to the Contractor by the Government shall be duplicated.
• The Contractor shall develop procedures covering key control that shall be included in the QCP.
• Such procedures shall include turn-in of any issued keys by personnel who no longer require access to locked areas.
• The Government will issue no keys, key cards nor combinations to the
Contractor.
Lost Keys.
• No keys issued to the Contractor by the Government shall be duplicated.
• The Contractor shall immediately report any occurrences of lost keys to the COR in the event keys and master keys are lost or duplicated.
• In the event a key is lost, the Contractor shall, upon direction of the COR, pay for the replacement keys on www.pay.gov and receipt provided to the COR.
• In the event a master key is lost, all locks and keys for that system shall be replaced and paid for by the Contractor on www.pay.gov and receipt provided to the COR.
http://www.pay.gov/ http://www.pay.gov/
Prohibited use of Government provided keys or key cards.
The Contractor shall prohibit the use of Government issued keys/key cards by any persons other than the Contractor’s employees.
• No keys issued to the Contractor by the Government shall be duplicated.
• The Contractor shall prohibit the opening of locked areas by Contractor employees to permit entrance of persons other than Contractor employees engaged in the performance of assigned work in those areas, or personnel authorized entrance by the KO.
1.7.17 Post Award Conference/Periodic Progress Meetings.
The Contractor shall attend the post award conference convened by the Contracting Activity or Contract Administration Office as agreed upon and stated in the contract award document.
• When the KO, COR and DPW management meets with the Contractor to review the Contractor's performance, written minutes of meetings will be recorded by the Government and signed by the Requirements Authority (RA) and the KO.
• The written minutes will be distributed within five (5) business after the meeting.
• If any party does not concur with any portion of the minutes, the non-concurrence shall be provided in writing to the KO/COR within two (2) workdays following receipt of the minutes.
• Notwithstanding the Contractor’s responsibility for total management during the performance of this contract, the administration of the contract requires maximum coordination and cooperation between the Government and the Contractor.
1.7.18 Government Roles and Responsibilities.
Contracting Officer (KO).
The KO is the only person authorized to make any changes in any of the requirements listed on this PWS; notwithstanding any provisions contained elsewhere in this contract, said authority remains solely with the KO.
• In the event the Contractor makes any change at the direction of any person other than the KO, the change will be considered to have been made without authority and solely at the risk and expense of the Contractor.
• All contract administration will be affected by the KO.
• Communications pertaining to contractual administrative matters shall be addressed to the KO.
• No changes in or deviations from the terms and conditions shall be affected without a written modification to the contract, executed by the KO authorizing such changes.
• The KO will approve all Deliverables and plans required in this PWS.
Contracting Officer’s Representative (COR).
The KO will appoint a COR during the performance of this requirement.
• Additional Government personnel may be designated to assist in contract oversight IAW AR 70-13 Management and Oversight of Service Acquisitions.
• Other surveillance personnel may be designated as COR and shall be trained and appointed IAW DoDI 5000.72, Department of Defense (DoD) Standard for Contracting Officer’s Representative (COR) Certification.
• The COR will provide assistance in identification and resolution of problems, conflicts in priority, subtask requirement definitions, and other operations type problems.
• The COR will perform IAW the responsibilities and duties identified in the appointment letter.
1.7.18.3 COR Authority.
A letter of designation will be issued to the COR/ACOR by the KO.
• A copy of the letter will be sent to the Contractor.
• The letter of designation states the responsibilities and limitations of the
COR/ACOR, especially with regard to changes in cost, price estimates, or changes in delivery dates.
• The COR/ACOR is not authorized to change any of the terms and conditions with regard to cost, quantity, or schedule of the resulting order
1.7.18.4 COR or ACOR.
The COR or ACOR shall monitor all technical aspects of the contract and assists in contract administration.
• The COR or ACOR is authorized to perform the following functions:
o assure the Contractor performs the technical requirements of the contract;
o perform inspections necessary in connection with contract performance;
o maintain written and oral communications with the Contractor concerning technical aspects of the contract;
o issue written interpretations of technical requirements;
o monitor, document, and report Contractor's performance and notify both the
KO and Contractor of any deficiencies;
o coordinate availability of Government-Furnished Property and provides direction or assistance for site entry requests of Contractor personnel.
1.7.19 Specific Contractor Requirements, Roles and Responsibilities.
U.S. Residency.
All CONUS Contractor employees shall be legal U.S. residents.
• The Contractor shall immediately remove any employee that is not a legal U.S.
resident.
• The Contractor personnel shall be able to communicate clearly in the English language.
Contractor Hiring Restrictions.
The Contractor shall not hire or subcontract with off-duty or former Government employees whose employment would result in a conflict of interest as defined in DOD 5500.7-R Joint Ethics Regulation 30 August 1993, to include change dated 17 November 2011.
Contractor Identification.
The Contractor shall ensure that personnel be identified as a Contractor to distinguish themselves (e.g., badge, company logo, or uniform) from Government employees.
• The Contractor shall ensure all correspondence and reports produced are marked as Contractor products or that Contractor participation is disclosed.
• Contractor-owned/leased vehicles and trailers shall be clearly identified.
Identification Badges.
Contractor personnel on duty shall wear Contractor provided identification badges displaying at a minimum: company name, employee name, employee photo, contract title, contract number, and contract expiration date. Identification badges shall be always worn on the front upper outer garment and visible. Contractor shall turn in employee identification badges to the PM upon termination of employment or completion of the
Standards of Conduct.
Contractor personnel’s conduct shall not reflect discredit upon the Government.
The Contractor shall ensure all personnel present a professional appearance while working on the Government installation.
• The Contractor’s employees shall observe and comply with all local policies and procedures concerning fire, safety, environmental protection, sanitation, security, and possession of firearms or other lethal or illegal weapons or substance.
• The Contractor shall ensure all Contractor employees, providing services under this contract, conduct themselves and perform services in a professional, safe, and responsible manner.
• The Contractor shall remove, from the job site, any employee for reasons of misconduct or security.
• The Contractor shall ensure employee conduct complies with 41 USC §423, Procurement Integrity.
• The Contractor shall also ensure that no Contractor employees conduct political related activities or events on the installation.
• The removal of such a person shall not relieve the Contractor of the requirement to provide personnel to perform adequate and timely service.
Contractor Key Personnel.
Contractor shall provide a resume of key personnel, who will be designated in writing, to the KO within one week of the contract award (See Part 8, Attachment/Technical Exhibit Listing, paragraph 8.2, Deliverables Schedule).
• The list shall include each employee’s name, job title, telephone numbers, employment date and legible copies of certificates/licenses.
• The Contractor shall revise and resubmit list to the COR and KO within five (5) calendar days of any changes to personnel.
• These key personnel shall be available during normal duty hours.
• These individuals designated as key personnel shall be able to understand, speak, read, and write the English language.
1.7.19.6.1 Project Manager (PM).
The Contractor shall provide a PM who is responsible for the performance of the work.
• A minimum of two (2) years of documented service contract management experience with team management and scheduling of workflow is required.
• The PM shall have full authority to act for the Contractor on all contract matters relating to daily operation of the contract.
• The name and contact information of the PM shall be provided to the KO and shall be Fort Hood present and on-site, and available during normal duty hours.
• The PM shall be available by phone and email and return phone calls and emails Fort Hood during normal duty hours (Monday through Friday 0700-1630).
• In the circumstances when the PM is not available, the Contractor shall designate an alternate who can perform the same duties during the absence.
1.7.19.6.2 Quality Control Manager (QCM).
The Contractor shall designate a full-time QCM on site during normal duty hours.
• As a minimum, the QCM shall have at least two (2) years of documented relative custodial services experience and shall be responsible for the overall management and implementation of the Contractor's Quality Control Plan.
• The QCM and QCI personnel shall not report to the PM or APM but shall be direct reportable to the corporate head of Quality. No supervisor or team leads will be dual hated as Quality Control
1.7.19.6.3 Quality Control Inspectors (QCI).
The Contractor shall designate QCI personnel sufficient to monitor Contract work to assure compliance with Government requirements. Depending on the size of the contract, the QCM may also serve as the QCI.
Damage Report.
The Contractor shall submit a monthly damage report to the KO/COR that annotates the damage, corrective action, and date corrected. (See Part 8, Attachment/Technical
1.7.19.7.1 Damage to Privately Owned Property.
The Contractor shall submit a monthly damage report to the KO/COR that annotates the damage, corrective action, and date corrected.
Phase In /Phase Out Period.
The Contractor shall prepare and submit (within ten (10) business days after contract award), a Phase In/Phase Out Plan to be implemented by the Contractor (See Part 8, Attachment/Technical Exhibit Listing, paragraph 8.2, Deliverables Schedule).
• The Contractor shall provide sufficiently experienced personnel during the phase-in and phase-out period to ensure that the services are maintained at the required level of proficiency.
• During the phase-in, the Contractor shall observe all operations pertinent to the requirements of the PWS.
• The Contractor shall commence all operations required by this PWS by the end of phase in period.
• On the initial day of performance, the Contractor shall provide a work force which is fully qualified and capable of performing all work required under this contract.
• During the ten (10) business day transition period immediately prior to the end of the previous contract, the Contractor shall permit the successor Contractor (and the successor Contractor's employees) to observe and become familiar with any and all operations under the contract.
• The Contractor shall fully cooperate with the successor Contractor during Phase Out and the Government so as not to interfere with future work or duties.
Quality Control
The contractor shall develop and maintain an effective quality control program to ensure services are performed in accordance with this PWS. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The contractor’s quality control program is the means by which he/she assures himself/herself that his/her work complies with the requirement of the contract. No lead person or first line supervisor shall be considered a Quality Control Inspector. The Contractor shall develop, maintain, and submit a Quality Control Plan (QCP) (see paragraph 1.7.12.7.1).
Quality Control Plan
The Contractor shall develop a plan to identify and prevent the recurrence of defective services. The Contractor’s QCP is the means by which they assure themselves that the work conforms to contract requirements. The basic principle of the plan is that the Contractor is responsible for providing a guide they will use to prevent/mitigate quality control concerns. The Contractor's QCP shall include a separate section, which addresses the Contractor's method of managing quality of work. The QCP shall include a description of the inspection system to address services listed in this PWS, and a description of the methods to be used for identifying and preventing defects in the quality of services performed. The plan shall include a description of the Contractor’s inspection system to include specifics as to areas to be inspected on a scheduled and unscheduled basis, frequency of inspections, and the title and organizational placement of the
Contractor’s inspectors. No lead person or first line supervisor shall be considered a Quality Control Inspector. The Contractor shall develop, maintain, and submit a QCP to the KO for acceptance within 5 business days after the contract is awarded. The Contractor shall submit any proposed changes in the QCP to the KO for written approval five (5) working days prior to implementation. (See Part 8, Attachment/Technical Exhibit Listing, paragraph 8.2, Deliverables Schedule).
1.7.19.11 Quality Assurance.
The Government will evaluate the Contractor’s performance under the contract IAW the Government’s Quality Assurance Surveillance Plan (QASP). QASPs are considered to be "living documents," dynamic, adaptable, and subject to modification based on Contractor performance surveillance results. The QASP is not part of the PWS and will not be issued with the solicitation. The QASP focuses on the procedures and processes the Government will implement to assure the Contractor is performing IAW the performance standards within the PWS. The Government plan defines the criteria of how the Contractor’s performance will be evaluated, the frequency of surveillance, and the items to be inspected. Although the Government will develop a QASP, Government surveillance of Contractor performance is not limited to the QASP, or the performance objectives, outlined in the Performance Requirements Summary (PRS). The Government retains the right to evaluate all services required by the contract. The Government will perform inspections and tests in a manner that will not unduly delay the work. If any of the services performed do not conform to contract requirements, the Contractor shall perform the services again at no additional cost to the Government.
Emergency Services.
1.7.19.12.1 Emergency Medical Treatment.
The Contractor or their employees shall immediately notify their supervisor of any incident requiring immediate emergency medical treatment.
• The Government may provide 911 emergency support ambulance service and/or DoD medical facility, if available.
• If injuries incurred while an employee is performing work under this contract, the contractor shall verbally notify the KO/COR no later than (NLT) two (2) hours after an emergency medical event, followed by a documented summary of events (See Part 8, Attachment/Technical Exhibit Listing, paragraph 8.2, Deliverables Schedule).
• The Contractor shall be responsible for reimbursement of any cost of provided emergency medical treatment services provided to Contractor personnel.
• Reimbursement shall be paid to the U.S. Treasury.
Accident Reporting.
• The Contractor or their employees shall immediately notify their supervisor of any ground mishap, accident or any accident requiring emergency medical treatment.
• The Contractor shall comply with Operational Safety and Health Administration (OSHA) for record keeping and reporting of all accidents resulting in death, injury, occupational disease, or adverse environmental impact.
• The Contractor shall provide a verbal report to the KO/COR within two (2) hours of each such occurrence followed up by an email documenting each such occurrence (See Part 8, Attachment/Technical Exhibit Listing, paragraph 8.2, Deliverables Schedule).
• The Contractor shall adhere to reporting of mishaps, The Army Safety Program (Chapter 3 Accident Investigation and Reporting, Chapter 26 Contracting Safety) and OSHA 29 CFR 1904.39 requirements for reporting.
• The Contractor shall be responsible for the emergency medical treatment services for Contractor personnel.
Environment and OSHA.
The Contractor shall comply with all Federal, State, local, and installation environmental laws, rules, plans, and policies. The Contractor shall use and store all materials, chemicals, and equipment used in the performance of services on the installation IAW with industry standards, local, State and Federal laws, and according to manufactures' recommendations. The Contractor shall be financially responsible for all fines and associated costs for hazardous waste management, transportation, and disposal of waste due to the Contractor's non-compliance.
Safety.
The Contractor shall safeguard and maintain all Government and Contractor property, as well as provide for the safety and well-being of personnel employed under this contract.
• The Contractor shall comply with AR 385-10, The Army Safety Program.
• All unsafe acts or conditions fostered by the Contractor or Contractor personnel may be grounds for the KO to halt any and all Contractor performance until such unsafe conditions are corrected.
• The Contractor shall take due caution not to endanger personnel during performance of this contract.
• Upon discovery of a serious hazard, the Contractor shall immediately notify the KO and designated authorized representatives verbally followed up with an email notification (See Part 8, Attachment/Technical Exhibit Listing, paragraph 8.2, Deliverables Schedule).
Safety Plan.
The Contractor shall develop and implement a safety plan for its employees.
• The Contractor shall submit the safety plan to the KO/COR for review and acceptance within 30 business days after contract award (See Part 8, Attachment/Technical Exhibit Listing, paragraph 8.2, Deliverables Schedule).
• Revisions shall be submitted to the KO/COR five (5) business days prior to the effective date of change (See Part 8, Attachment/Technical Exhibit Listing, paragraph 8.2, Deliverables Schedule).
Occupational Safety and Health.
The Contractor shall comply with the Occupational Safety and Health Administration (OSHA) standards. The Contractor shall comply with all applicable Federal, State, and local laws, regulations, and directives.
Safety Measure and Protective Equipment.
The Contractor shall provide all personal protective equipment in accordance with Federal Law and the paragraphs of section 2.5.3. Safety. Workers shall be trained in appropriate safety measures and shall not place materials, machines, or other equipment in traffic lanes or other locations that could create safety hazards. The Contractor shall maintain a safe job site, clean and free of all foreign debris during and upon completion of work. The Contractor shall be responsible for the enforcement of all safety requirements for any work performed under the contract. If the Contractor fails or refuses to comply with safety or environmental requirements, the KO may issue an order stopping all or part of the work in accordance with the Stop work Clause of this contract.
Spill Plan.
The Contractor shall comply with the Fort Hood Spill Prevention Control and Countermeasure Plan (See Part 8, Attachment/Technical Exhibit Listing TE).
• The Contractor shall submit a Spill Plan to the KO or designated Government representative/COR for approval within 30 calendar days of contract award (See Part 8, Attachment/Technical Exhibit Listing, paragraph 8.2, Deliverables Schedule, Deliverable).
• The Contractor shall verbally notify the KO and COR, followed by written notification as required in the Fort Hood Spill Plan, if the Contractor spills or releases any hazardous substances, (i.e., substances listed in 40 CFR 302, Designation, Reportable Quantities, and Notification.)
Asbestos Awareness.
IAW 29 CFR…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .