DRAFT Appendix B Property.docx

DOCX document 20 KB Posted

Attached to
Hill AFB Base Integrated Environmental Support Tasks (BIEST) Federal contract opportunity
Solicitation number
W9123822R0011(1)
Issued by
Department of the Army Corps of Engineers Engineering District Sacramento

About this file

This document provides details for a Base Integrated Environmental Support Tasks contract opportunity at Hill Air Force Base in Utah. The U.S. Army Corps of Engineers intends to issue solicitation W91238-22-R-0011 for a firm fixed price single award contract valued at $42 million. Required services include air quality evaluation, data management, hazardous materials management and containment response, emergency planning support and reporting, water quality evaluation, environmental systems management, and National Environmental Policy Act support and reporting. A virtual site visit will be held on December 6, 2021, and proposals are due on January 6, 2022. The North American Industry Classification System code is 541620 for environmental consulting services. The small business size standard is $16.5 million. The solicitation will be issued via the System for Award Management website.

View the file

Other files for this federal contract opportunity

Other files attached to Hill AFB Base Integrated Environmental Support Tasks (BIEST), newest first.
File Type Posted
Hill BIEST Site Visit 12-6-2021.mp4 MP4 file
DRAFT Appendix C Building Layout.docx DOCX document
DRAFT Appendix A CDRL.docx DOCX document
DRAFT PWS.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Appendix B Provided Property

1.0 Hill Air Force Base Available Equipment/Property

The available property and equipment listed below is in control of the tenants of Hill Air Force Base. The U.S. Corp of Engineers has no oversite or control over the property listed here in. Any issues or claims dealing with the use of the properly listed below are the sole responsibly of the tenants of Hill Air Force Base and shall be separate from the terms and conditions of this contract and the Oversight of the U.S. Army Corp of Engineers.

1.1 Facilities

Hill Air Force Base may provide office/cubical space, including desk space, telephones, computers, and other items necessary to maintain an office environment. The space is large enough to support up to approximately twenty (20) contractor employees.

The following facilities are available in support of the tasks required for this contract.

· Bldg. 383, Hill AFB Main Environmental Office - Eight (8) Permanent Desks and 10 Hoteling desks for Contractor employees

· Bldg. 514, Hazardous Waste Control Facility - Seven (7) Permanent or Hoteling Contractor employees

· Bldg. 893, Treatment, Storage, and Disposal Facility Office - five (5) Permanent or Hoteling Contractor employees Hill Air Force Base reserves the right at any time to change and/or modify Hill Air Force Base facilities function and locations due to government mission needs The following facilities and storage yards are currently available to support the tasks listed in this contract. The Contractor may use these facilities in support of the tasks listed in this contract.

· Bldg. 514, Hazardous Waste Control Facility Main Building (except Rag Laundry Area)

· Bldg. 571, Hazardous Waste Control Facility Storage Shed

· Bldg. 573, Hazardous Waste Control Facility Storage Shed

· Bldg. 579, Hazardous Waste Control Facility Storage Shed

· Bldg. 893, Hazardous Waste Storage Facility Office

· Bldg. 888, Hazardous Waste Storage Facility Main Building

· Bldg. 898, Hazardous Waste Storage Facility Ancillary Building

· Bldg. 801, Qualified Recycling Program Main Facility

· Bldg. 884, Qualified Recycling Program Ancillary Facility

1.2 Utilities

Hill Air Force may provide utilities for the Contractor’s use in performance of tasks outlined in this PWS. The Contractor shall instruct employees in utilities conservation practices. The Contractor shall be responsible for operating under conditions that preclude the waste of utilities, which include turning off the water faucets or valves after using the required amount to accomplish cleaning vehicles and equipment.

1.3 Equipment

Hill Air Force Base may provide equipment for accomplishing the requirements of this PWS in support of the media areas listed below. For the purposes of this PWS Hill Air Force Base maintains this equipment as part of an established maintenance program and repairs are accomplished by submitting a repair request to a centralized hotline. However, if equipment is determined to have incurred damage due to disregard of manufacturer instructions or misuse, the Contractor will be liable for required repairs. In the case of the equipment, it is the responsibility of the Contractor to use the equipment in accordance with manufacturer instructions and keep the equipment in operable condition. Regardless of the type of equipment, the Contractor shall operate the equipment in a careful manner and only for uses appropriate to each specific piece of equipment. If the equipment listed below becomes inoperable during the performance period, it is the responsibility of Hill Air Force Base to repair or replace the equipment in order to maintain an operable condition throughout the performance period. Before the Contractor employees can operate Hill Air Force Base owned equipment listed below, they must receive a short training course provided by the 75 CEG Vehicle Control Officer. Unless otherwise specified in the list below, the contractor shall provide all fuel for equipment.

Hazardous Waste – Hill Air Force Base may supply:

4 - Diesel, 4K Capacity Forklifts - Fuel provided by HAFB 1 - Battery-powered, EE Type, 2K Capacity Forklift 1 - Kubota TL420A Four Wheel Drive Tractor - Fuel provided by HAFB 1 - International 7300 Pump Truck for Waste water - Fuel provided by HAFB 1 - International 4700 Pump Truck for Used Oil - Fuel provided by HAFB 1 - Baron Blakeslee Solvent Distillation Unit Installed in Bldg. 514 1 - Ram Flat Drum Crusher Installed in Bldg. 514 1 - Ingersoll Rand 7526 Industrial Air Compressor Installed in Bldg. 514 1 - Zee Line One Inch Aluminum Diaphragm Pump for Used Oil Installed in Bldg. 514 1 - Fume Hood Installed in Bldg. 514 1 - Ariens Snow blower 2 - Adgressor AXP Floor Scrubbers 1 - 5ft x 5ft OHAUS Platform Scale, 10,000 lb capacity 1 - 5ft x 5ft Salter Brecknell Platform Scale, 10,000 lb capacity 2 - Easy Lift Equipment, Forklift Mounted Parrot Beak Drum Lifters 1 - Rigid 6.5 HP Shop Vacuum 1 - Honda Gas-powered WT30X Trash Pump with Hoses 2 - Aerosol Can Puncturers 4 - Dewalt Battery Powered Impact Wrenches 1 - Dewalt Battery Powered Drill 1 - Milwaukee 6236-6 Deep Cut Band Saw 2 - Honda Lawnmowers 1 - Excell 2800 PSI Pressure Washer 1 - Wilden 2-inch Diaphragm Pump 1 - Stanhope-Seta Flash Series 7 Flashpoint Tester 1 - Mettler PM4600 Lab Scale 1 - Knaack 4ft x 2ft x 3ft Rolling Tool Box with Assorted Hand and Pneumatic Tools 1 - 2ft x 2ft x 3ft Rolling Tool Box with Assorted Hand and Pneumatic Tools 1 – GETAC Tablet Barcode Scanner Compatible with EESOH-MIS HW

Qualified Recycling Program – Hill Air Force Base may authorize the use of the following equipment.

(items with asterisk “*” are only available as needed to support tasks required by the QRP program) *1 - Flatbed Pickup Truck (under GSA lease, make and model may vary during contract) *1 - Standard Pickup Truck (under GSA lease, make and model may vary during contract) 1- Diesel, Bobcat S850 with Standard Bucket, Grappling Bucket, Fork Attachment, and SBX240 Snowblower Attachment 1- Diesel, Hyundai 30D-7E, 4K Capacity Forklift with a Fork Rotator 1- Diesel, Hyster 50 Fortis, 4K Capacity Forklift with Side Shift Forks 1- Electric, Schutte Buffalo, Model WA 8H, Expended Small Arms Cartridge Casing Deformer 1 - Electric, Husky Pro 80-gallon, 4 HP, Two-stage Air Compressor 1- Electric, Dewalt D28715 14-inch Chop Saw 1 - Electric, Milwaukee Sawzall 2 - Electric, 5ft x 5ft Platform Scales, 10,000 lb Capacity 1 - Gas-powered, Generac GP5500 Portable Generator 1 - Gas-powered, Makita EK7651H Cutting Tool 1 - Gas-powered, Echo PB-413H Backpack-mounted Leaf Blower 1 - Gas-powered, Honda HS724 Snow Blower 20 - One-cubic yard capacity Self Dumping Hoppers 15 - Two-cubic yard capacity Self Dumping Hoppers 6 - Three-cubic yard capacity Self Dumping Hoppers 2 - Dolly-mounted Banding Devices 2 - 4ft x 2ft x 3ft Rolling Tool Box with Assorted Hand and Pneumatic Tools 1 - 2ft x 1ft x 18in Tool Box with Assorted Hand Tools Hazardous Materials – Hill Air Force Base will supply:

1 - EESOH-MIS HM (Hazardous Material) Label Printer for use by the Hazardous Materials Cell.

Water Quality – Hill Air Force Base may supply six (6) portable water samplers that are used for sample collection as follows:

1 - Sigma Automatic Water Sampler with flow actuator - Industrial, Used for Industrial Waste water Treatment Plant (IWTP) Effluent 1 - Sigma Automatic Water Sampler with flow actuator - Industrial, Used for Rail Shop Effluent 1 - Sigma Automatic Water Sampler with rain gauge actuator - Stormwater, Used in manhole near Bldg 505 1 - Sigma Automatic Water Sampler with rain gauge actuator - Stormwater, Used in manhole near Bldg 507 1 - Sigma Automatic Water Sampler with rain gauge actuator - Stormwater, Rail Shop 1 - Sigma Automatic Water Sampler with rain gauge actuator - Stormwater, Pond 7

Air Quality – Hill Force Base may supply one 1- AQUIS Plastic Tag Engraver that is used to create Air Quality Utility Information System Number or Base Specific Air ID (AQUIS#) tags for all air quality emission units

1.4 Materials

Hill Air Force Base has an existing inventory of various sizes and types of containers used for hazardous waste management and storage. The hazardous waste containers are available for use by the Contractor at the start of the contract. However, the Contractor will, at the end of the contract period of performance, be responsible for replenishing the container inventory that was available to the Contractor at the beginning of the contract.

A joint inventory between the Contractor and Hill Air Force Base should be conducted at the beginning of the performance period and this inventory shall be used as the basis for the replenishment needed at the end of the period of performance. The replenishment of these materials shall be outside the scope of this contract.

File details come from the government source that posted it. Updated .